RFP938700-01 DOC MPCF IPI Building Stormwater Management Addendum 1.pdf

PDF 86 KB Posted

Attached to
DOC MPCF IPI Building Stormwater Management
Solicitation number
RFP938700-01
Issued by
Henry County, Iowa

About this file

This document is an Addendum to a Request for Proposal (RFP) issued by the State of Iowa Department of Administrative Services (DAS) for Stormwater Management services at the existing IPI building located at the DOC MPCF facility in Mount Pleasant, Iowa. The addendum provides clarification on several questions, including the ability to remove and reinstall fencing during construction, responsibility for utility locates, and any concerns with the size of the stormwater pipe under the fence. The proposal due date remains unchanged.

The original RFP seeks professional design services to help mitigate water intrusion along the north elevation of the existing IPI building. No additional details on pricing, set asides, incumbents, funding requirements, or other salient information are provided in the addendum.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #1

Project Name:

DOC MPCF IPI Building Stormwater Management

DAS#9387.00

RFP938700-01

Addendum #1

Dated: April 1st, 2024

This Addendum forms a part of the Request For Proposal documents. This Addendum supersedes and supplements all portions of the original Request For Proposal for which it conflicts.

ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE REQUEST FOR PROPOSAL. FAILURE TO

DO SO MAY SUBJECT TO DISQUALIFICATION.

1. Proposal Schedule — Proposal due date does not change.

2. Questions:

a. Q. Can the fence be removed during construction and then re-installed A. Yes, we can work with the facility but will need to provide any needed details for scope work

b. Q. Who will be responsible for utility locates? A.The facility will provide needed locates as required. Any needed site survey work should be included in the proposal response.

c. Q.? Any concern with storm water pipe size if exiting under the fence A. No

Attachments: NONE

END OF ADDENDUM