RFP938300-01 - Addendum 1.pdf
PDF 21 MB Posted
- Attached to
- DOC MPCF New Apprenticeship Building
- Solicitation number
- RFP938300-01
- Issued by
- Henry County, Iowa
About this file
This document is an addendum to a Request for Proposals (RFP) issued by the State of Iowa Department of Administrative Services (DAS) for professional design services for a New Apprenticeship Building located at the DOC MPCF facility in Mount Pleasant, Iowa. The RFP seeks proposals for the design of this new 20,000 square foot building, with responses due by January 15, 2023. A mandatory pre-proposal conference was held on January 5, 2023, and the contract is expected to be awarded by February 28, 2023. The contract term is for one year with the option to renew for up to four additional one-year terms.
The addendum provides clarification on the project scope, including the requirement for the design of a training facility, administrative offices, and support spaces. Respondents must be licensed to practice architecture in the State of Iowa. Pricing is to be provided based on hourly rates for each personnel classification, with a total not-to-exceed amount. There are no set-asides or preferences identified, and the incumbent provider is unknown. Funding for this project will be provided by the State of Iowa.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP938300-01 - Addendum 2.pdf | ||
| RFP938300-01 - DOC MPCF New Apprenticeship Building.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #1
Project Name: DOC MPCF New Apprenticeship Building
DAS# 9319.00
RFP938300-01
Addendum #1
Dated: February 6, 2024
This Addendum forms a part of the Request for Proposal documents. This Addendum supersedes and supplements all portions of the original Request for Proposal dated January 22, 2024, with which it conflicts.
ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE REQUEST FOR PROPOSAL. FAILURE TO
DO SO MAY SUBJECT TO DISQUALIFICATION.
1. Questions:
a. Are we to include the geotechnical testing costs in our proposal? Yes, the designer is to include geotechnical services costs in your proposal. Per section1.3.9 of the RFP
b. Please confirm that no stormwater detention is required on site for the proposed improvements.
Design Professional is to follow State of Iowa adopted codes.
c. Please confirm what minimum building setbacks are for the proposed building from the security fence, utility tunnel, adjacent buildings, and the adjacent drives/roads. 1. Security Fence – To be determined with MPCF. 2. Utility Tunnel – Design Professional is to evaluate the distance based on structural concerns. 3. Adjacent Buildings – Design Professional is to follow State of Iowa adopted codes. 4. Drives/Roads – Design Professional is to follow State of Iowa adopted code.
d. Are there any records of the existing utilities available for the proposed project areas. Design
Professional is to verify all existing utilities. See attachments.
e. Confirm that no new drives or parking lot is required for the project. Extend existing roadway to overhead door openings in building.
f. Can you confirm that a new transformer will not be required as part of the project for the medium voltage loop. Can it be confirmed the available spare capacity, panel type, and location for where and how much power can be provided to the new building? Design Professional to verify if a transformer is needed. If needed, additional design services can be negotiated with Design
Professional to add transformers to their scope
g. Will a utility map be provided with available utilities adjacent to the sites? See attachments.
h. Will a potential equipment list be provided for understanding of intent? This portion of the scope will be discussed during design development.
i. Will a dust collection system be required for the project? No.
j. Will a welding exhaust system be required? How many potential booths? No.
k. Is it anticipated with the automotive work if a sand / oil separator will be required for the project?
No.
l. Will there be exterior light requirements? An exterior light shall be provided over the entry doors.
m. What is the size of the existing tunnel? Approximately 6’Tall x 8’Wide. Design Professional to verify.
n. Is there an option to tie into existing steam piping for heating requirements in the new building?
Yes. This is not basis of design. Please provide a cost opinion at 50% DD to evaluate the cost to tie into existing steam as an alternate. Design Professional services can be negotiated into scope.
2. Attachments:
a. RFP Pre-Proposal meeting sign in sheet.
b. Existing Drawings
END OF ADDENDUM