RFP510922.pdf
PDF 274 KB Posted
- Attached to
- X209 Mazak FUSE System FY27
- Solicitation number
- RFP510922
- Issued by
-
Department of Energy
About this file
This is a Request for Proposal (RFP) issued by Oak Ridge National Laboratory (ORNL), a Department of Energy facility managed by UT-Battelle, LLC, for the procurement of a Mazak FUSE System to support the ORNL Defense Manufacturing Program Office. The RFP Number is RFP510922, with questions due by November 20, 2026 at 3:00 PM EST and offers due by November 27, 2026 at 3:00 PM EST. The anticipated subcontract is on a firm fixed price basis with a 120-day offer validity period. The NAICS code is 333517 (Machine Tool Manufacturing) with a size standard of 500 employees, and this is not a small business set-aside. The anticipated period of performance is to be determined (TBD), with delivery required within 13 to 14 months after receipt of order. Payment terms are Net 30 days for large businesses or Net 15 days for small businesses upon final acceptance, made via electronic funds transfer in U.S. Dollars.
The technical proposal must demonstrate compliance with the Statement of Work (Attachment A) and address specific requirements including system configuration, integration approach for machine stations and pallet changer assemblies, design review submittals, facility and utility prerequisites, runoff testing and acceptance procedures, technical deliverables, and proposed schedule. Offerors must provide quality assurance documentation and must either be on ORNL's Evaluated Supplier List or demonstrate ability to pass a quality audit. All proposals must be submitted in MS Excel, MS Word, or PDF format and include a technical proposal, price proposal, exceptions/non-compliance section, conditions of proposal/assumptions, and supplementary requirements. The award basis is Lowest Price Technically Acceptable (LPTA), and one award is anticipated. Offerors exceeding $15,000 must complete Representations and Certifications forms; those at $900,000 or more (if large business) must submit a Small Business Subcontracting Plan. The procurement officer is Rian Lewis at lewisgr@ornl.gov.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL (RFP)
RFP No.:RFP510922
Request for Proposal BSD-CS-2282 (Rev.2) October 1, 2025
REQUEST FOR PROPOSAL (RFP)
1. INTRODUCTION
Date: 11/13/2026 RFP No.: RFP510922 RFP Description: X209 Mazak FUSE System FY27
Subject: RFP510922 for the ORNL Defense Manufacturing Program Office In Response Refer to: RFP510922 - Mazak FUSE System FY27
ORNL Procurement Officer: Rian Lewis Email: lewisgr@ornl.gov
Oak Ridge National Laboratory (ORNL) is a US Department of Energy (DOE) science and energy laboratory, conducting basic and applied research to deliver transformative solutions to compelling problems in energy and security. ORNL is managed and operated by UT-Battelle, LLC (Company). ORNL’s diverse capabilities span a broad range of scientific and engineering disciplines, enabling the Laboratory to explore fundamental science challenges and to carry out the research needed to accelerate the delivery of solutions to the marketplace.
The Company is pleased to invite your firm, herein referred to as “Offeror,” to submit a proposal in support of the subject effort, as outlined in the attached Statement of Work or Specification and/or Technical Direction attached.
The Company reserves the right to update this RFP by amendment prior to date of award.
The Offeror’s proposal shall be prepared in accordance with the information provided in this RFP. Specific responses to the Company’s requirements are necessary to enable the Company to evaluate Offeror’s understanding of and capability to accomplish the stated objectives. Throughout the proposal, the Offeror shall provide sufficient detail to substantiate the validity of all stated claims, comments, or positions. All proposed concepts must be shown to be technically feasible and achievable within the allotted time limitations, and all performance and schedule requirements must be shown to be realistic. The response shall correspond to the requirements of this RFP, unless otherwise specified in writing by the Company. All Offerors are strongly encouraged to maintain an active registration in SAM.gov to facilitate verification of small business status and eligibility.
2. RFP INFORMATION
Solicitation Number: RFP510922 Questions Due By: 11/20/2026 at 3:00PM EST Offers Due By: 11/27/2026 at 3:00PM EST Offer Validity Period: 120 days NAICS Code: 333517 – Machine Tool Manufacturing – SIZE STANDARD - 500
Employees Subcontract Type Anticipated: Firm Fixed Price Small Business Set-Aside: No Description of Supplies/Services Sought: Mazak FUSE System Anticipated Subcontract Period of Performance: TBD mailto:lewisgr@ornl.gov
BSD-CS-2282 (Rev.2) October 1, 2025
3. LIST OF RFP ATTACHMENTS
Attachment No. Description Document Title (Date/Revision)
Attachment A Statement of Work (SOW)
Statement of Work - Mazak FUSE System
10/08/2026
Attachment B ORNL Terms and Conditions Commerical-Products-and- Services-BSD-CS-2146
09/30/2026
Attachment C Prime Contract T&C Flow Downs
Prime-Flowdown-Clauses-BSD-CS-
09/30/2026
Attachment D Representations and Certifications Reps-and-Certs-Abbreviated 03/09/2026
Attachment E Draft Subcontract Fixed Price Subcontract - Draft
Attachment F Representations Regarding Small Business
Representations Regarding Small Business Subcontracting Plan (BSD-
CS-2125)
10/01/2025
Attachment G SCLS Certification-Exemption-from- SCLS-Certain-Services-BSD-CS-2049
08/20/2025
Attachment H C-SCRM C-SCRM-Questionnaire - BSD-CS- 2290-
01/31/2025
Attachment I Exhibit 2 Exhibit-2-Rep-Limited-Rights-Data-
Restricted-Computer-Software-
BSD-CS-2005
10/13/2025
4. STATEMENT OF WORK/SPECIFICATIONS
Work shall be completed in accordance with Attachment A - Statement of Work “Mazak FUSE System.”
5. PROPOSAL PREPARATION
Preparation of Offers. (a) Offerors are expected to examine the drawings, specifications, descriptions, terms and conditions, and all instructions. Failure to do so will be at the Offeror's risk. (b) Each Offeror shall furnish the information required by the solicitation. The Offeror shall sign the offer. Erasures or other changes must be initialed by the person signing the offer. (c) Unit price for each unit offered shall be shown and such price shall include packing and shipping materials unless otherwise specified. A total price shall be entered for each item offered. Any tariffs shall be expressly stated and priced separately. In case of discrepancy between a unit price and total price, the unit price will be presumed to be correct. (d) Offeror must state a definite time for delivery of supplies or performance of services unless otherwise specified in the solicitation. Time, if stated as a number of days, will include Saturdays, Sundays, and holidays unless offeror expressly states offer is in business days. (e) Offers in strict accordance with the solicitation are desired.
Any exceptions should be referenced to related documents by title, page, and paragraph, and should be set forth in detail. (f) This request does not commit Company to pay for any costs incurred in the preparation and submission of an offer or for any other costs incurred prior to the execution of an Agreement.
Explanation to Prospective Offerors. Any explanation desired by a prospective Offeror regarding the meaning or interpretation of the solicitation, drawings, specification, etc., must be requested with sufficient time allowed for a reply to reach all prospective Offerors before submission of their offers. Any information given to a prospective Offeror will be furnished to all prospective Offerors if such information is necessary in submitting offers or if the lack of such information would be prejudicial to any other prospective Offerors.
https://contracts.ornl.gov/terms-and-conditions/ https://contracts.ornl.gov/special-articles-and-forms/ https://contracts.ornl.gov/special-articles-and-forms/
BSD-CS-2282 (Rev.2) October 1, 2025
Proposal Format. Offeror is requested to submit their proposal in MS Excel, MS Word, or PDF formats. Proposals must be submitted on the forms furnished by the Company. If no form is provided, Offeror may submit their proposal in a format of their choosing.
Contractual / Administrative Authority. No direction to proceed or other instruction to begin work shall be binding upon Company except when specifically issued and confirmed in writing by Company Procurement Officer. Offeror’s acceptance of, or reliance upon any direction to proceed or other instruction by Company’s technical personnel, or other representatives not specifically authorized to issue formal purchase order commitments, shall be at Offeror’s own risk and shall not constitute a binding purchase commitment upon Company.
Acknowledgement of Amendments. Receipt of an amendment to a solicitation must be acknowledged in writing.
Proposal Contact. Any questions regarding any portion of this RFP must be coordinated through the Company’s Procurement Officer, identified as Company’s Contact in the Introduction. No written or verbal correspondence will be permitted with any other member of the Company without coordination through the Company’s Procurement Officer.
Failure to comply with this requirement may result in the Offeror’s disqualification from consideration for award. The Company is open to proposal clarification questions/discussions in regard to this RFP via the email address or telephone number provided in the Introduction.
Omissions. It shall be clearly understood that, not-withstanding the detailed requirements contained herein, it is the Offeror’s responsibility to identify and quote any aspect or area which may have been omitted in this RFP and which will nevertheless be necessary to meet the general requirements of the defined effort.
Proposal Acceptance. The Company reserves the right to (a) consider proposals or modifications to proposals received after the due date should such action be determined to be in the best interest of Company or its customer, and/or (b) make award without written or oral discussion.
Affordability. This effort is in support of the U.S. Government, who has a vital mission and constrained resources, and it is incumbent upon industry to provide our customer with high quality and affordable solutions. The Company considers this challenge to be a major discriminator in our proven performance and demonstrated value to our customers. The Company has developed a number of initiatives to drive value for our customer, and we expect our partners in our supply chain to do the same. It is requested as part of your proposal in response to this RFP that you articulate and demonstrate specifics in your offer that are affordable and meet or exceed all technical and schedule requirements. Your response to these criteria will be an element of the proposal evaluation and award decision process.
Payment. Payment shall be made by electronic funds transfer (EFT). EFT enrollment shall be completed during the Ariba registration process.
Rights to Technical Data in Successful Proposals. Should an Agreement be awarded based on a proposal, it is policy, in consideration of the award, to obtain unlimited rights for the Government in technical data (but not commercial or financial information) contained in a successful proposal upon which award of an Agreement is based. To exclude technical data contained in a proposal from the Government’s rights, the offer must:
(1) Advise the Company that the technical data, or portions thereof that are identified by the Offeror, are covered by the restrictive notice regarding the disclosure and use of proposal information in accordance with the provision of this RFP entitled Treatment of Offer Information and request that such protection be maintained by excluding the data from the Government’s rights; or
BSD-CS-2282 (Rev.2) October 1, 2025
(2) Establish to the Company’s satisfaction that identified portions of the technical data do not relate directly to or will not be utilized in the work to be performed under the Agreement, and request that such portions be excluded from the Government’s rights.
If unlimited rights to technical data in successful proposals, as set forth in the first paragraph of this section are to be acquired, it shall be by use of the clause below titled, “Rights to Proposal Data (Technical).” Any excluded technical data will be identified by inserting appropriate proposal page numbers in the clause, which clause enables the identification of data to be excluded from the Government’s rights, as discussed in the first paragraph of this section. Such exclusion is not dispositive of the protective status of the data, but any excluded technical data, as well as any commercial and financial information contained in the proposal, will be used for evaluation purposes only. If there is a need to have access to any of the excluded technical data during contract performance, their acquisition will be as limited rights data, if they so qualify, in accordance with FAR 27.404- 1(d).
Rights to Proposal Data (Technical)
Except for data contained on pages _______, it is agreed that as a condition of the award of this subcontract and notwithstanding the conditions of any notice appearing thereon, the Government shall have unlimited rights (as defined in the “Rights in Data – General” clause contained in this subcontract in and to the technical data contained in the proposal dated, _______, upon which this subcontract is based.
Treatment of Offer Information. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Company or the Government except for evaluation purposes, shall:
(a) Mark the title page with the following legend:
This proposal includes information that shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal. If, however, an Agreement is awarded to this Offeror as a result of—or in connection with—the submission of this information, the Company and the Government shall have the right to duplicate, use, or disclose the information to the extent provided in the resulting Agreement. This restriction does not limit the Company’s and the Government's right to use information contained in this information if it is obtained from another source without restriction. The information subject to this restriction are contained in pages [insert numbers or other identification of pages]; and
(b) Mark each page of information it wishes to restrict with the following legend:
Use or disclosure of information contained on this page is subject to the restriction on the title page of this proposal.
Company Profile. Provide a company profile to include business classification (e.g. Large, Small, Disadvantaged, etc.).
Signing Authority. Provide the names, positions, email address, and phone numbers of persons authorized to negotiate this proposal, contractually commit the Offeror, or persons to be contacted for clarification or questions.
Proposal Validity. Unless otherwise stated in the Offeror’s proposal, the Offeror’s proposal shall be valid for 120 calendar days.
FOB and Shipping Terms. FOB Destination for domestic shipments. The preferred terms for international shipments are Delivered at Place (DAP). Do not insure shipments.
BSD-CS-2282 (Rev.2) October 1, 2025
Offeror Business Information. Complete business address of the Offeror, the corporate name to be used on any resultant contract, and the remittance address if different from that above. Identify “parent company” or “sponsoring corporation” name, also provide such identity as appropriate.
Withdrawal of Offers. Offers may be withdrawn by written notice received by the Procurement Officer at any time before award.
Proposal Package. A complete proposal package consists of the following elements:
Technical Proposal Price Proposal Exceptions/Non-Compliance Conditions of Proposal / Assumptions Supplementary Requirements
TECHNICAL PROPOSAL REQUIREMENTS:
The technical proposal should be specific, detailed, and complete to demonstrate clearly and fully that the Offeror has a thorough understanding of the Company’s requirements. The technical proposal must enable the technical evaluators to make a thorough analysis and arrive at a sound determination as to whether or not the proposal meets the Company’s requirements. The technical proposal must be sufficient to show how the Offeror proposes to comply with the Company’s requirements and it must include a full explanation of the methods proposed. The Offeror shall include a glossary of acronyms and special terminology.
No certified cost or pricing information shall be included in the technical proposal.
Technical proposals shall include technical discussion on how the offeror intends to provide the requirements listed in Attachment A – Statement of Work. All scope items must be identified and discussed in the technical proposal.
To demonstrate compliance with technical requirements, the Offeror’s proposal shall include, at a minimum:
• A description of the proposed system configuration and confirmation that all required equipment and quantities are included
• A description of the integration approach for machine stations, pallet changer assemblies, PMC connections, PALLETECH system, and heat treatment interface
• A description of the design review submittals the Offeror will provide
• A description of facility, utility, and installation prerequisites
• A description of runoff testing and final acceptance approach
• A list of technical deliverables to be provided
• A proposed schedule showing design review, general assembly, runoff, shipment, installation, and final acceptance within the required delivery window - the schedule requirement of delivery within 13 to 14 months after receipt of order shall be confirmed within the technical proposal.
• Confirmation of warranty and Service Support in accordance with the Statement of Work.
• Seller shall clearly identify any exceptions, assumptions, optional features, consumables not included, software limitations, and dependencies required to meet the requirements.
Quality
BSD-CS-2282 (Rev.2) October 1, 2025
To be eligible for the receipt of any award or contract under this Agreement, the Supplier must be explicitly listed on the Company’s Evaluated Supplier List (ESL) prior to the date of such award. Inclusion on the ESL is conditioned upon the Supplier maintaining a documented quality assurance program that meets or exceeds the Company’s specified quality standards and evaluation criteria.
Offerors proposal shall include a quality manual and/or other documentation showing an adequate quality control/assurance program.
Other Considerations. Identify and discuss specific factors not included elsewhere which support your proposal. Using specifically titled subparagraphs, items may include:
• Any agreements and/or arrangements with subcontractor(s). Provide as much detail as necessary to explain how the statement of work will be accomplished within this working relationship.
• Unique arrangements which none or very few organizations are likely to have, which is advantageous for effective implementation of this project.
• Equipment and unusual operating procedures established to protect personnel from hazards associated with this project.
• Other factors you feel are important and support your proposed research.
• Recommendations for changing reporting requirements or other deliverables if such changes are more compatible with the offeror's proposed schedules.
PRICE PROPOSAL REQUIREMENTS:
All proposals shall be submitted in U.S. Dollars (USD) on a firm fixed price basis.
If a standard proposal pricing worksheet/form is provided within this RFP, the Offeror shall submit their pricing via the worksheet/form. If the worksheet/form is not provided, the Offeror may submit their pricing information in their own format.
This proposal may be subject to a government price audit.
Milestone Payment Plan. The Company may consider a proposed payment plan with the Offeror’s response.
Proposed payments must demonstrate significant progress against the schedule incorporated into the subcontract.
EXCEPTIONS/NON-COMPLIANCE:
Exception(s) to or non-compliance with any portion of this RFP shall be clearly identified in a separate Exceptions/Non-Compliance section referencing the specific document, page, paragraph, and item. Exceptions identified in the Offeror’s Technical Proposal need not be restated in this section. You are required to explain the reason(s) for the non-compliance and identify any alternate solutions to achieve compliance. Any exceptions that are taken to the provisions of this RFP will be considered in evaluating the Offeror’s proposal and may result in your offer being deemed non-responsive. The absence of a proposal section entitled “Exceptions/Non-Compliance” or a statement indicating “no exceptions are taken” implies complete and unequivocal acceptance of all requirements, terms, and conditions.
CONDITIONS OF PROPOSAL/ASSUMPTIONS:
BSD-CS-2282 (Rev.2) October 1, 2025
The Offeror shall identify any conditions and/or assumptions of its proposal in a separate Conditions of Proposal/Assumptions section. The Offeror shall include a list of any Company/Government equipment and/or information needed as a condition of performance. Offeror shall include its assertion of Limited or Restricted Rights in Data and/or Software.
SUPPLEMENTARY REQUIREMENTS:
Representations and Certifications – Abbreviated. If your proposal exceeds $15,000, Offeror must complete and return a copy of the Representations and Certifications – Abbreviated (BSD-CS-2260) form, a copy of which can be found here: https://contracts.ornl.gov/special-articles-and-forms/.
Organizational Conflicts of Interest. If your proposal exceeds $15,000 and the Special Provisions section of this RFP includes the "Organizational Conflicts of Interest" clause, the statement required by paragraph (c) of the provision entitled "Organizational Conflicts of Interest Disclosure - Advisory and Assistance Services," is made a part of this RFP. A copy of these OCI disclosure statement requirements for Advisory and Assistance Services can be found here:
https://contracts.ornl.gov/special-articles-and-forms/.
Small Business Subcontracting Plan. If your offer, including options, is $900,000 (or $2 million for Construction) or more and the Offeror is a large business, the Offeror shall submit a Small Business Subcontracting Plan that fully meets the requirements of FAR 52.219-9 or complete the ORNL Small Business Subcontracting Plan Form (BSD-CS-2129). A copy of this form can be found here: https://contracts.ornl.gov/special-articles-and-forms/. Annual small business reporting will be required via the Electronic Subcontracting Reporting System (http://www.esrs.gov). If the Offeror determines it is not required to submit a plan for subcontracting with small business concerns, they shall submit a Representations Regarding Small Business Subcontracting Plan.
Foreign End Products. The Offeror shall list as foreign end products those end products that are manufactured outside of the United States that do not qualify as domestic end products. List all foreign end products proposed and their country of origin.
6. COMPETITION
This RFP is being issued on a competitive basis. The Company intends to make one award.
Access to ORNL Site. Vendor personnel may come onto the ORNL site only if they have a current ORNL badge or a visitor's pass. Persons who need visitors' passes to deliver offers or participate in site visits must provide their e-mail address to the Procurement Officer on a workday at least 24 hours in advance. The Site Administrator will send a link to a secure portal (via-email) where vendor personnel provide the following information: (i) Full name, (ii) employer, (iii) social security number, (iv) date of birth, (v) gender and (vi) country of citizenship. Visitors' passes must be picked up at the Visitor Center, Building 5200. Government issued photo identification is required.
Questions. Questions concerning this RFP must be submitted in writing, via email, to the Procurement Officer listed in the Introduction of this RFP. Information given to one prospective offeror will be furnished to all prospective offerors if a lack of the information would be prejudicial to them.
7. BASIS OF AWARD
Basis of Award – Lowest Price Technically Acceptable (LPTA). An award resulting from this solicitation will be made to the responsible offeror submitting the lowest-priced offer that meets all specified requirements. Offers will be evaluated for technical acceptability under each of the factors listed below. An offer that is evaluated as https://contracts.ornl.gov/special-articles-and-forms/ https://contracts.ornl.gov/special-articles-and-forms/ https://contracts.ornl.gov/special-articles-and-forms/ http://www.esrs.gov/ https://contracts.ornl.gov/wp-content/uploads/2023/11/Representations-Regarding-Small-Business-Subcontracting-Plan-BSD-CS-2125-11.15.23-1.pdf
BSD-CS-2282 (Rev.2) October 1, 2025 unacceptable under any factor will not be considered for award. In your proposal, please clearly document how your offer meets or exceeds the below listed acceptability factors. Note and explain any deviation from the specifications. Make specific written response to items that cannot be met as specified in the specifications.
Technical Acceptability Factors:
1. Provide the requested services per SOW/ Specification (Attachment A) with no exceptions.
2. Assurance that Offeror is either already on the ORNL Evaluated Suppliers List or has the ability to pass a quality audit.
8. SPECIAL PROVISIONS
As listed is Section 7, Special Provisions of Attachment E - Fixed Price Subcontract – Draft.
9. PAYMENT TERMS
Payment terms are Net 30 (Large Business) or Net 15 (Small Business) days upon final acceptance of the product/service. All payments will be made in U.S. Dollars (USD). Payment shall be made by electronic funds transfer.
10. CLOSING
Should additional information be required on any of these requests please do not hesitate to contact the undersigned Procurement Officer below.
Sincerely, ORNL Procurement Officer: Rian Lewis Email: lewisgr@ornl.gov mailto:lewisgr@ornl.gov
File details come from the government source that posted it. Updated .