RFP26-R012 - Basic Plumbing Services.pdf
PDF 1 MB Posted
- Attached to
- RFP Plumbing Repair Services
- Solicitation number
- RFP26-R012
- Issued by
- Lucas County, Ohio
About this file
RFP26-R012 - Basic Plumbing Services Summary
This Request for Proposals (RFP) document is issued by Lucas Metropolitan Housing (LMH), a metropolitan housing authority in Toledo, Ohio, seeking qualified, licensed, and bonded contractors to provide basic plumbing services for approximately 2,760 public housing units and related affiliate properties. The scope of services encompasses emergency and non-emergency plumbing repair and maintenance work, including unclogging drains, locating and repairing water line leaks, sewer service clearing, sump pump service, storm line service, and related tasks. Contractors must provide 24-hour emergency service with one-hour response time and complete non-emergency work during normal business hours within one day of service request. The RFP was released on November 3, 2026, with a proposal due date of November 23, 2026, at 3:00 p.m. ET. A pre-proposal conference call is scheduled for November 9, 2026, at 11:30 a.m. EST, and a question submittal deadline is set for November 16, 2026, at 12:00 p.m. The contract term is one year from execution with an option for LMH to extend for four additional one-year periods. LMH intends to establish a contractor pool on an as-needed basis, with the actual number of participants dependent on the quality and quantity of proposals received.
Contractors will invoice LMH for time spent on-site only, with all parts, materials, and equipment billed at the contractor's wholesale cost plus a mark-up documented on the Price Proposal Form. LMH has established a goal of 35% of all contract funds being awarded to Minority Business Enterprises (MBEs) or Women Business Enterprises (WBEs), and proposers are encouraged to maximize MBE/WBE participation. Contractors must maintain workers' compensation insurance and general liability insurance with a combined single limit of not less than $1 million per occurrence, as well as automobile liability insurance of not less than $500,000 per occurrence, naming LMH as an additional insured. All work must comply with prevailing wage requirements and OSHA standards, and contractors must provide a one-year warranty on all parts and labor plus a 30-day warranty following unclogging services. Proposals will be evaluated on a best-value basis using four criteria: technical qualifications and experience (25 points), successful completion of similar past projects (20 points), proposed costs (25 points), and approach and methodology to the scope of services (30 points). LMH reserves the right to reject any or all proposals, terminate the RFP process, negotiate fees, award to multiple vendors, and terminate any awarded contract upon 10 days' written notice. No bonding requirements are specified for this solicitation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION RFP26-R012
REQUEST FOR PROPOSALS (RFP)
For
Basic Plumbing Services
Release Date: November 03, 2026
Due Date: November 23, 2026 @ 3:00pm ET
Prepared by Lucas Metropolitan Housing
424 Jackson Street, Toledo, OH 43604
P.O. Box 477, Toledo, OH 43697-0477
REQUEST FOR PROPOSALS - RFP26-R012 – Basic Plumbing Services
LUCAS METROPOLITAN HOUSING (LMH)
Table of Contents
[Table No. 1] Section Description Page
Introduction 2 RFP Information at a Glance 3
1.0 The Agency’s Reservation of Rights 3
2.0 Scope of Services 4
2.1 Overview 4
2.2 Scope of Services 4
2.3 General Information 8
2.4 Bonding & Insurance Requirements 13
3.0 Proposal Format 14
3.1 Preparation of Proposals 14
3.2 Proposal Format 15
3.3 Proposal submission Information 16
4.0 Proposal Evaluation 17
4.1 Preliminary Proposal Review 17
4.2 Final Proposal Review 18
4.3 Appeals & Remedies 19
4.4 Proposal Evaluation Criteria 20
5.0 Contract Award 21
5.1 Contract Award Procedures 21
5.2 Contract Conditions 22
Introduction/Background
The Lucas Metropolitan Housing Authority (LMH) is seeking proposals from qualified entities to provide Basic Plumbing Services for Lucas Metropolitan Housing (LMH). LMH owns and manages approximately 2,760 public housing units and administers 4,391 federal Housing Choice rental assistance vouchers. The Housing Choice Voucher Program has achieved high performer status.
LMH is governed by a Board of Commissioners consisting of five (5) Board members.
LMH is committed to a goal of thirty-five percent of all contract funds being awarded to Minority Business Enterprises (MBE) or Woman Business Enterprises. The firms submitting proposals are encouraged to include MBE/WBE participation to the maximum extent possible.
It is LMH’s intention to take reasonable, affirmative steps to increase access and opportunities for handicapped individuals in all programs, services, and administrative operations, in accordance with Section 504 of the Rehabilitation Act of 1973. If you have visual impairment, hearing or physical impairment that does not permit you to read this notice, the Lucas Metropolitan Housing will provide appropriate assistance.
RFP INFORMATION AT A GLANCE
[Table No. 2]
LUCAS METROPOLITAN HOUSING POINT OF
CONTACT:
Marissa Bentley, Procurement & Contracts Manager Telephone: (419) 259-9452 E-mail: mbentley@lucasmha.org Scott Noonan, Procurement Associate Telephone: (419) 259-9438 E-Mail: snoonan@lucasmha.org
HOW TO OBTAIN THE RFP DOCUMENTS ON THE
EPROCUREMENT MARKETPLACE
1. Access https://ha.internationaleprocurement.com
2. Click on the “Login” button in the upper left side.
3. Follow the listed directions.
4. If you have any problems in accessing or registering on the eProcurement Marketplace, please call customer support at (866) 526-0160.
PRE-PROPOSAL CONFERENCE CALL November 09, 2026 @ 11:30 AM EST Call In #: 312-626-6799 Meeting ID: 869 5915 1589 Passcode: 483820
QUESTION SUBMITTAL DEADLINE
Questions will be received in writing no later than 12:00 pm on November 16, 2026.
Responses will be posted as an addendum and will be posted on the eProcurement Marketplace
PROPOSAL SUBMITTAL DEADLINE.
Upload your proposal to the e-Procurement Housing Authority Marketplace or email to mbentley@lucasmha.org
November 23, 2026, no later than 3:00pm ET:
1.0 LMH’S RESERVATION OF RIGHTS.
The Agency reserves the right to:
a. Reject, Waive, or Terminate the RFP. Reject any or all proposals, waive any informality in the RFP process, or terminate the RFP process at any time, if deemed by the Agency to be in its best interests.
b. Not Award. Not award a contract pursuant to this RFP.
c. Terminate. Terminate a contract awarded pursuant to this RFP, at any time for its convenience upon
10 days’ written notice to the Contractor(s).
d. Determine Time and Location. Determine the days, hours, and locations that the successful proposer (hereinafter, “Contractor”) shall provide the services called for in this RFP.
e. Retain Proposals. Retain all proposals submitted and do not permit withdrawal for a period of 60 days subsequent to the deadline for receiving proposals without the written consent of the Agency Contracting Officer (CO).
f. Negotiate. Negotiate the fees proposed by the proposer entity.
g. Reject Any Proposal. Reject and not consider any proposal or proposer that does not meet the requirements of this RFP, including but not necessarily limited to incomplete proposals and/or proposers offering alternate or non-requested services.
h. No Obligation to Compensate. LMH has no obligation to compensate any proposer for any costs incurred in responding to this RFP.
i. Prohibit. At any time during the RFP or contract process, prohibit any further participation by a proposer or reject any proposal submitted that does not conform to any of the requirements detailed herein. By accessing the eProcurement Marketplace (hereinafter, a.k.a., the “Marketplace”) and by downloading this document, each prospective proposer is thereby agreeing to abide by all terms and conditions listed within this document and within the eProcurement Marketplace, and further agrees that he/she will inform the CO in writing within 5 days of the discovery of any item listed herein or of any item that is issued thereafter by the Agency that he/she feels needs to be addressed. Failure to abide by this timeframe shall relieve the Agency, but not the prospective or actual proposer, of any responsibility pertaining to such an issue.
j. Reject – Obtaining Competitive Solicitation Documents. The eProcurement Marketplace is the only official and appropriate venue to obtain competitive solicitation documents (and any other information pertaining to the competitive solicitation such as addenda). Accordingly, by submitting a response to this competitive solicitation the respondent thereby affirms that he/she obtained all information on the eProcurement Marketplace. Any other group such as a proposal depository that informs potential respondents of the availability of such competitive solicitations are hereby instructed to not distribute these documents to any such potential respondents, but to instruct the potential respondents to visit the eProcurement Marketplace to obtain the documents. The Agency will reject without consideration any response submitted from a firm that has not obtained the documents from the eProcurement Marketplace.
2.0 OVERVIEW OF SERVICES
2.1 Project Overview
The Lucas Metropolitan Housing Authority (LMH) is seeking proposals from qualified, licensed, and bonded entities to provide Basic Plumbing Services for LMH and its affiliates. Offerors will submit proposals to enter into a one (1) year agreement with LMH (the “Agreement”) with an option by LMH to extend for four (4) subsequent one-year agreements.
LMH intends to create a “pool” of Contractor(s) to provide Basic Plumbing Services utilizing various
Contractor(s) which will be on an as-needed basis. The actual number of Pool participants chosen will depend on the number of qualified proposals received. See section 4.8 for further detail.
Lucas Metropolitan Housing Authority (LMH) has a requirement for basic plumbing services for LMH and affiliate properties. LMH requires a contractor to provide a full range of standard basic plumbing services to make emergency and non-emergency repairs/ maintenance work. The services require may occur during normal business hours, nights, weekends, and holidays. Contractor retains all control over personnel and responsibility for direct supervision. Contract personnel may not supervise LMH Staff, affiliate staff, and tenants but may provide direction and instructions as required by duties.
2.1 Scope of Services
The intent of this acquisition is to hire licensed plumbing contractors to furnish all labor, tools, materials, and equipment necessary to complete basic plumbing functions at LMH Communities, Scattered Sites, and LMH affiliate properties. The basic services to be provided include, but are not limited to:
Unclog/Clear toilets including pulling of toilet Unclog /Clear bathtub drains Unclog/Clear bathroom sinks and drains Unclog/Clear kitchen sinks and drains Locating/Repair of Water Line Leaks Sewer Service including clearing main sewer lines and drains including if applicable with a high-pressure water truck Sewer Camera Service Sump Pump Service Storm Line Service Foundation Service Steam Jet Service Frozen Line Service Location Service
2.2 General Requirements
2.2.1.1 Contractor(s) must be willing to service all LMH properties during normal business hours. Contractor shall conduct all non-emergency work during normal working hours unless deemed otherwise by authorized LMH representative. Contractor and LMH designated representative who assigned the work will determine a “reasonable” service date and time. Typically, “reasonable” shall be - meet at the work site within one day of service call request and begin work one day after.
2.2.1.2 The Contractor shall provide 24-hour emergency service, including nights, weekends, and holidays. The Contractor must respond to emergency service work within one (1) hour of notification from an LMH representative. The Contractor shall ensure that skilled personnel required to perform the above-mentioned services are readily available.
2.2.1.3 Contractors shall arrive at the property location ready to commence work. The Contractor shall only invoice LMH for the time spent on the property. LMH shall not pay for time spent in route or traveling to acquire parts/supplies, etc.
2.2.1.4 Contractor(s) shall provide estimates for repairs when requested. If LMH deems such quote to be unreasonable LMH reserves the right to request quotes from other Contractor(s) for such service. Estimates shall be provided within forty-eight (48) hours or as required by designated LMH representative.
2.2.1.5 Contractors are required to contact the designated LMH authorized representative via phone or email within 12-24 hours of performing the service for final inspection (if required) by the designated LMH representative. Failure to notify the LMH representative as required may result in delay of payment or termination of services. Contractor shall provide a statement of work and signed receiver indicating the work performed and acknowledging its completion. A list of LMH employee’s names and numbers who are responsible for accepting all work performed by the Contractor will be provided at the time of award.
2.2.1.6 Contractor(s) shall acquire all permits to complete requested work as applicable. This requirement should be accounted for as the cost of doing business and included as a separate line item on the invoice submitted to LMH.
2.2.1.7 Contractor(s) shall guarantee all work completed shall meet any necessary City, County, or LMH inspections.
Should a plumbing installation or repair made by the Contractor not pass inspection, Contractor shall make all repairs necessary to ensure the installation or repair passes inspection at no additional cost to LMH.
2.2.1.8 Contractor(s) shall provide a (1) year warranty on all parts and labor provided for repair and replacement work. Contractor shall provide a 30-day warranty for each service address after an unclogging/clearing service is performed. If a blockage is discovered prior to the 30-day warranty expiration, and it is determined to be caused by a new obstruction LMH will waive the warranty and pay the applicable service fee.
2.2.1.9 This will be considered a Maintenance Contract. Therefore Contractor(s) are required to pay onsite technicians, including sub-contractors at least the minimum wages as determined by the United States Department of Labor and the United States Department of Housing and Urban Development Prevailing Wage. Please refer to solicitation section 2.5.13 Maintenance Wage Rates for further information and refer to Attachment G-8 for a list of approved wage rates.
2.2.2 Parts, Material, Equipment, and Supplies
2.2.2.1 Contractor is responsible for all parts, material, equipment, and supplies required to complete the job. All purchased parts, material, and if applicable, specialty rented equipment shall be invoiced at Contractor’s wholesale cost plus the mark-up for profit and cost for handling annotated on Contractor’s Price Form (Attachment H). LMH reserves the right to audit Contractor’s invoices at its sole discretion. Contractor shall make available to LMH any requested invoice showing the price Contractor paid for the part, material, or rented equipment, within 3 business days of request or LMH shall not be obligated to pay for the part. All replacement parts installed shall be new and not “refurbished” or “recycled” material.
2.2.3 Work Site
2.2.3.1 The Contractor shall clean up the area where the work was performed, and the Contractor shall remove any debris generated by the work/repairs from LMH premises. At no time, will Contractor discard debris into any LMH refuse receptacle.
2.2.3.2 Contractor(s) shall clearly mark all work areas that might reasonably be expected to endanger the health and safety of residents, guests, or any other persons. Contractor(s) will provide such signs, markers and barricades as required to identify all work areas and minimize inherent dangers.
2.2.3.3 Contractor(s) shall be responsible for notifying LMH immediately of any damages deemed to be a health or safety hazard whether the damage is caused by the contractor or other means.
2.2.3.4 The Contractor(s) and its employees shall at all times represent themselves in a courteous and professional manner. All posted driving and speed regulations shall be observed.
2.2.3.5 Contractor(s) personnel shall be neat and conduct all work in a professional and efficient manner. If any employee of Contractor is deemed unacceptable by LMH, Contractor shall immediately replace personnel with an acceptable substitute to LMH.
2.2.3.6 LMH is enforcing a mask mandate. All Contractors are required to wear masks while in LMH facilities and where social distancing cannot be maintained outdoors. LMH will abide and follow to the best of its ability all Federal, State, and Local health mandates.
2.3 Monthly Report
During the course of the contract the vendor(s) must provide a monthly log of services rendered. This report is to be emailed to: jtodd-warfield@lucasmha.org, no later than the 2nd Monday of the following month.
2.4.1 Scope ClarificaƟon
A) Services are advisory and strategic in nature and do not include direct development, legal services, or financial execuƟon unless otherwise agreed.
2.4.2 Vendor QualificaƟons
Please provide references and demonstrate your experience and capacity with basic plumbing services.
2.4.3 Proposal Requirements
Proposals must include:
See SecƟons 3.1 and 3.2 below.
2.4.4 Term
A) Services shall last for 12-months from the date the contract is signed by both parƟes and is not subject to renewal.
The selected contractor shall maintain appropriate insurance coverage including, at a minimum, general liability and workers’ compensaƟon coverage as required by law. Proof of insurance shall be provided to LMH prior to commencement of work. The contractor shall maintain such insurance for the duraƟon of the project.
2.4.5 EvaluaƟon Method
LMH will review all proposals received in response to this solicitaƟon. Proposals will be evaluated based on factors including, but not limited to:
• Vendor qualificaƟons and experience working in basic plumbing services with Vendor’s capacity to deliver on the scope of services.
• Total project cost, including any opƟonal or alternate pricing
• Project schedule and ability to complete the work within the anƟcipated Ɵmeframe
LMH reserves the right to request addiƟonal informaƟon, clarificaƟon, or revisions from vendors during the evaluaƟon process.
2.4.6 Basis of Award
LMH intends to award a contract to the vendor whose proposal is determined to be most advantageous to the agency, considering price and the evaluaƟon factors idenƟfied above.
LMH reserves the right to:
• Reject any or all proposals
• Waive minor irregulariƟes in proposals
• Award the base project only or include opƟonal work as deemed in the best interest of LMH
2.5 General Information:
2.5.1 Lucas Metropolitan Housing (LMH) is a metropolitan housing authority organized and existing under the Ohio Revised Code Section 3735.27, et seq., and is governed by the U.S.
Housing Act of 1937, as amended, and subject to regulation under Title 24 of the Code of Federal Regulation.
2.5.2 LMH is governed by a five (5) person Board of Commissioners, appointed pursuant to the above cited statue. The President and Chief Executive Officer controls the daily operations.
2.5.3 The mission of LMH is “Housing is vital to our past, present and future! We create quality housing opportunities and build communities through collaborative partnerships. While stimulating economic growth, we empower individuals and develop the neighborhoods of tomorrow for the people of today”.
2.5.4 MBE/WBE LMH is committed to a goal of thirty-five percent of all contract funds being awarded to Minority Business Enterprises (MBE). The firms submitting proposals are encouraged to include MBE participation to the maximum extent possible.
2.5.5 The Competitive Negotiation Process or Award without Discussion(s) will be used to select the contract award, beginning with the highest ranked firm. LMH reserves the right to negotiate a contract with the individual(s), firm(s), or organization(s) that provides the greatest benefit to LMH, not necessarily the lowest price. The Competitive Negotiation Process considers many factors; lowest price may not indicate the successful vendor.
2.5.6 Vendor Disclosures - Vendor must provide disclosure of any pending or threatened court actions and/or claims against the Vendor. This information may not cause rejection of the proposal; but withholding the information may be caused to reject the proposal.
2.5.7 Conflict of Interest - No vendor will promise or give any LMH employee anything of value that could influence that employee in their decision on awarding contracts. No vendor will try to influence an employee of LMH to violate any procurement policies of the agency, the Ohio Revised code, or Federal Procurement Regulations.
2.5.8 Subcontractors - The successful Offeror(s) shall not contract with any proposed subcontractor who has not been accepted by LMH. The successful Offeror(s) shall notify LMH in writing the name of each proposed subcontractor. The acceptance or any objection shall be expressed in writing by LMH within ten (10) working days after receiving the receipt of said request. LMH may, without claim for extra cost by the successful Offeror(s), may disapprove any subcontractor for cause on the basis of its own determination or, because the proposed subcontractor is listed as ineligible to receive awards of contracts for the United States on a current list or lists furnished by HUD.
2.5.9 Hiring and Subcontracting Strategies / Practices - With the submission of this proposal, the Offeror shall be required to provide a Subcontracting Plan, if applicable, which will be in line with LMH’s desired commitment to 35% of all contracts to be awarded to Minority Business Enterprises (MBE).
2.5.10 Section 3 Resident Participation - HUD Act of 1968, Section 3, and all revisions, are hereby incorporated into this solicitation by reference. With the interest of complying with these regulations to the greatest extent feasible, the Offeror shall be required to demonstrate compliance with the LMH Section 3 Policy and Procedures hereby incorporated in this solicitation by reference. All inquiries related to this program shall be directed to LMH’s Section 3 Compliance Coordinator.
2.5.11 Green Procurement - LMH is committed to purchasing products and services that meet the local, state, and national environmental goals. Purchasing preference (whenever feasible) will be given to products that:
a. Decrease greenhouse gas emissions or are made with renewable energy;
b. Decrease the use of toxins detrimental to human health and to the environment;
c. Contain the highest possible percentage of post-consumer recycled content (a finished material that would normally be thrown away as solid waste at the end of its life cycle, and does not include manufacturing or converting wastes);
d. Limit air, land, and/or water pollution;
e. Reduce the amount of waste they produce;
f. Are reusable or contain reusable parts (rechargeable batteries, refillable pens, etc.);
or
g. Are multifunctional (i.e., scanner/copier/printers, multipurpose cleaners) and serve to decrease the total number of products purchased.
2.5.11 Contractor Licensing and standards - The contractor will have the required experience, licenses, insurances, bonding, financial stability, equipment, and personnel needed to complete the work that they are bidding on. All work performed pursuant to this RFP must conform and comply with all applicable local, state, and federal codes, statutes, laws, and regulations. All candidates and staff shall possess all required state and local licenses. In addition, the successful respondent shall comply with all laws, ordinances, and regulations applicable to the services contemplated herein, especially those applicable to conflict of interest. Candidates are presumed to be familiar with all Federal, State and Local Laws, Ordinances, Codes, Rules and Regulations that may in any way affect the services. In any subsequent contract, the successful candidate must agree to follow all local, State, and Federal / HUD regulations. Any resulting contract with the successful bidder will contain the mandatory HUD Form 5370-C1 General Contract Conditions - Non-Construction.
a. Contractor must have documented experience. Documented experience in providing services to private entities, governmental agencies, or agencies of similar size. Contractor must have a broad and practical knowledge of HUD rules, regulations, requirements, law, and related procedures; and knowledge of various HUD housing programs with a particular emphasis on Public Housing and Housing Choice Voucher (Section 8) Housing Programs.
b. Safety Standards: OSHA Hazard Communication Standard: The Occupational Safety
& Health Administration (OSHA) Hazard Communication Standard (29CFR1910.1200) states that contractors/suppliers must be informed of the hazardous chemicals their employees may be exposed to while performing their work and any appropriate protective measures. To comply with this requirement, Lucas Metropolitan Housing Authority has developed a list of all the hazardous chemicals known to be present in our facility. A Safety Data Sheet (SDS) is also on file for each of the chemicals and / or hazardous substances. This information is available to you and to your employees upon request.
c. Hazardous Chemical & Materials. In order to protect the safety and health of our own employees, contractors/supplies must provide (upon request) an SDS on any hazardous chemical (s) or material (s) which they bring into the facility. Failure to provide this information in a timely manner will result in the removal of the contractor/supplier from the premises.
d. Each employer is also responsible for notifying any subcontractor they employ regarding the requirements of OSHA Hazard Communication Standard and other provisions described in this notice.
e. Contractor must follow the Occupational Safety and Health Administration (OSHA) guidelines, all state and local codes and regulations, and services shall be performed in accordance with any applicable governmental regulations, and any directions issued regarding performance of work during the COVID-19 crisis.
f. Regarding fall protection, the Contractor shall review and comply with OSHA fall protection standard: 1926.501 and/or 1926.501(b)(10). Failure to adhere to proper fall protection protocols could result in termination of the contract.
2.5.12 Assignment - The successful respondents shall not enter into any subcontracts, retain consultants, or assign, transfer, convey, sublet, or otherwise dispose of the ensuing contract, or any or all of its rights, title or interest, herein, or its power to execute such contract to any person, company, or corporation without the prior written consent of the LMH.
2.5.13 Equal Employment Opportunity and Supplier Diversity - Both the Contractor and LMH have, pursuant to HUD regulation, certain responsibilities pertaining to the hiring and retention of personnel and subcontractors. Bidders are advised that the goal of MBE/WBE participation on this project is a minimum of 35% of the overall contract cost. Affirmative steps are to include assuring that small and minority businesses and women-owned business enterprises are solicited whenever they are potential sources.
2.5.14 Vendor Examination of the RFP - Contractors are expected to be familiar with the entire RFP. The vendor is expected to respond to the RFP in a manner that makes it clear they understand and have responded to all sections of the RFP. If a vendor discovers any mistakes or omissions in the RFP they must notify LMH’s Contact Person in writing. Clarifications and corrections will be sent to all vendors who have registered with the agency for the RFP.
2.5.15 Changes to RFP - LMH may make changes to this RFP by addendum and shall be posted on the e-procurement marketplace website.
2.5.16 Availability of Funds - This RFP and all agency contracts are contingent on the availability of funds. If, during the RFP process, funds are not available for the proposed services, the RFP process will be cancelled. The vendor will be notified at the earliest possible time. LMH is not required to compensate the vendor for any expenses incurred as a result of the RFP process.
2.5.17 Non-Appropriation Clause - The proposed services will be subject to termination in the subsequent fiscal years if the sufficient funds are not appropriated and budgeted or are not otherwise available to continue making payments for the equipment of other services performing similar functions and services.
2.5.18 Termination - LMH reserves the right to terminate an agreement without prior notification for reasons it deems in the best interest of LMH. If terminated, LMH will notify the contractor of the termination in writing by certified mail, return receipt requested, and shall pay contractor for services rendered prior to contractor’s receipt of the Notice of the Agreement Termination.
2.5.19 Holidays - LMH recognizes the following holidays as vacation days for its employees:
New Year’s Day Columbus Day Dr. Martin Luther King, Jr.’s Birthday Veteran’s Day President’s Day Thanksgiving Day Memorial Day Day after Thanksgiving Juneteenth Christmas Eve Independence Day Christmas Day Labor Day New Year’s Eve
2.5.20 Terms & Conditions - The RFP and the commitments made in the selected proposal will be contractual obligations if a contract ensues. Failure to accept these obligations may result in cancellation of the award.
2.5.21 Type of Contract - The evaluation of proposals submitted in response to this RFP may result in the issuance of a contract. The contract will incorporate the requirements of the RFP, the vendor’s proposal, and all other agreements that may be reached. The vendor is normally responsible for the execution of the project/program and contract requirements. If the vendor proposes a different type of approach, describe the contractual protection offered to ensure successful implementation of the project. If vendor proposes a multi-vendor or sub- contract approach, clearly describe the responsibilities of each party and the assurances of the performance you offer. The successful vendor’s proposal, this RFP, and other applicable addenda will become part of the final contract and will merge into the contract.
2.5.22 Indefinite Delivery/Indefinite Quantity (IDIQ or ID/IQ) – LMH intends to enter into an IDIQ contract providing for an indefinite quantity of services during a fixed period. Should an IDIQ be issued, this type of contract does NOT require LMH to order a specific maximum quantity of services.
2.5.23 Unauthorized Sub-Contracting Prohibited - The successful proposer shall not assign any right, nor delegate any duty for the work proposed pursuant to this RFP (including, but not limited to, selling, or transferring the contract) without the prior written consent of the CO. All subcontractors must be disclosed prior to the start of the work. Any purported assignment of interest or delegation of duty, without the prior written consent of the CO shall be void and may result in the cancellation of the contract with the Authority, or may result in the full or partial forfeiture of funds paid to the successful proposer as a result of the proposed contract; either as determined by the CO. If the contractor does subcontract work, the subcontractor is required to be a legitimate company with a federal tax ID number, and it required to provide LMH with certificates of insurance with the same limits of liability that are required of the contractor.
2.5.24 Public Records Law - All bids/proposals submitted to LMH are subject to the Ohio Public Records Law (O.R.C. 149.43 and the Sunshine Act [5 USC 522(b]) and may be subject to disclosure to the public. Information in proposals that would be deemed a trade secret or otherwise not subject to disclosure under public records laws shall be clearly indicated as such by the contractor, including citations from the Ohio Public Records Law or the Sunshine Act for the exemptions. Also, the contractor shall submit one hard copy and upon request, one electronic copy of its proposal and other submissions, which has been redacted of all trade secrets and other information not subject to disclosure pursuant to a public records request.
Failure to do so may subject the entire contents to disclosure under public records laws.
2.5.25 Confidentiality - Any vendor that has access to confidential information will be required to keep that information confidential.
2.5.26 No smoking on LMH property - Smoking is prohibited on LMH properties. Smoking is only allowed in posted designated areas or a minimum of 20 feet away from building windows and doors.
2.5.27 Assignment of Personnel - LMH shall retain the right to demand and receive a change in personnel assigned to the work if LMH believes that such change is in the best interest of LMH and the completion of the contracted work.
2.5.28 Additional Contract Provisions - The following contract provisions are in effect pursuant to 2 CFR 200.326 for non-federal entity contracts:
Contract Work Hours and Safety Standards (40 U.S.C. 3701-3708) Copeland “Anti-Kickback” Act (40 U.S.C. 3145) Clean Air Act (42 U.S.C. 7401-7671q.)
Federal Water Pollution Control Act (33 U.S.C. 1251-1387) as amended Mandatory policies on energy efficiency contained in the state energy conservation plan Byrd Anti-Lobbying Amendment (31 U.S.C. 1352) Executive Order 11061 to prevent discrimination by agencies that utilize federal funds Title VI of the Civil Rights Act of 1964, Public Law 88-352 Public Law 90-284, Title VIII of the Civil Rights Act of 1968 The Age Discrimination Act of 1975 Anti-Drug Abuse Act of 1988
2.6 Bonding and Insurance Requirements - Proof of Insurance for Contractors and Vendors
2.6.1 BOND REQUIREMENTS:
There are no bonding requirements with this proposal.
2.6.2 INSURANCE REQUIREMENTS:
Workers’ Compensation:
1. LMH requires that contractors and vendors supply LMH with a current Workers’
Compensation Certificate.
2. LMH requires that the Workers’ Compensation Certificate be valid for the term of the contract.
3. Contractors and vendors will immediately provide verification of coverage for the contract term.
2.6.3 General and Commercial Liability:
1. Contractor agrees to name LMH as an additional insured on its general liability policy, which shall be primary to LMH’s general liability policy, and any other insurance policy as determined by LMH that is relevant to the contract scope of work. These policies shall also be primary to and non-contributory to LMH’s General Liability policy.
2. Contractors and subcontractors shall name LMH as an additional insured on their General Liability policy, and any other insurance policy as determined by LMH that is relevant to the contract scope of work.
3. Contractor and subcontractor shall indemnify LMH, to the fullest extent provided by law, for all claims arising out of the contractor’s and subcontractor’s performance of this contract.
4. Contractor and subcontractor shall provide proof of General Liability insurance coverage with combined single limit for bodily injury and property damage not less than $1million per occurrence.
5. LMH reserves the right to request a copy of the contractor’s and subcontractor’s full insurance policies and applicable endorsements.
6. Contractors and subcontractors must maintain the insurance policies that were submitted during the entire length of the contract.
2.6.4 Insurance Automobile Liability:
1. Contractors and subcontractors shall provide proof of Automobile insurance of owned and non-owned vehicles used on the sites or in connection therewith for combined single limit for bodily injury and property damage not less than $500,000 per occurrence.
2.6.5 Indemnity:
1. Contractors and vendors agree to indemnify LMH, to the fullest extent provided by law, for all claims arising out of their performance of the contracts.
2.6.6 Processing:
1. LMH’s Manager of Procurement shall be responsible for obtaining proof of the listed above documents and ensuring that LMH contracts have the appropriate indemnifications.
2.6.7 Workers Compensation:
1. LMH requires that contractors and vendors supply LMH with a current Workers Compensation Certificate.
2. LMH requires that the Workers Compensation Certificate be valid for the term of the contract.
3. Contractors and vendors will immediately provide verification of coverage for the contract term.
3.0 Proposal Format.
3.1 Preparation of Proposal
3.1.1 Proposals must provide a clear picture of the offeror’s qualifications to provide the services required in the RFP. The offeror should respond to the RFP instructions and requirements. The proposal must include all costs that relate to the responses submitted.
3.1.2 All proposals become the property of LMH to use. All proposals will be considered public information and will be open for inspection.
3.1.3 Proposal Cost. The cost of creating proposals is the responsibility of the vendor and shall not be chargeable to LMH. The vendor must guarantee the pricing listed in the proposal will remain in effect for a minimum of 360 days after the proposal submission date.
3.1.4 False or Misleading Statements Proposals containing false or misleading statements may be rejected.
3.1.5 Vendor Representative’s Signature: An officer of the Respondent, who is legally authorized to enter into a contractual relationship on behalf of the Respondent, must sign the submission package. The signature must indicate the title or position the individual holds in the vendor’s organization.
3.1.6 The completed RFP proposal must be received by the time and date listed on the cover of this RFP. All vendors must carefully review their final proposals. Once submitted, proposals cannot be changed; however, LMH may request information or respond to inquiries for clarification purposes only. All vendors submitting a proposal must agree to honor the terms and conditions contained herein for the life of the contract.
3.2 Proposal Format:
3.2.1 Tabbed Proposal Submittal: LMH intends to retain the successful proposer pursuant to a “Best Value” basis, not a “Low Proposal” basis ("Best Value," in that LMH will, as detailed within the following Section, consider factors other than just cost in making the award decision). Therefore, so that LMH can properly evaluate the offers received, all proposals submitted in response to this RFP must be formatted in accordance with the sequence noted following. Each category must be separated by separate tabs and labeled with the corresponding tab reference also noted below.
Proposals must be indexed corresponding to the following format and lettering:
TABLE OF CONTENTS
TAB (A) – LETTER OF TRANSMITTAL
A letter of transmittal (preferably on letterhead) bearing the signature of an authorized representative of the firm and the name(s) of the individual(s) authorized to negotiate services and costs with LMH. Authorized individual contact information, including phone number and email address, shall be included within this letter.
TAB (B) – ORGANIZATION
Information about the company: size, structure, history and any relevant certifications as a Minority-owned or Disadvantaged Business Enterprise
TAB (C) – STATEMENT OF QUALIFICATIONS AND EXPERIENCE
1) The Offeror should describe the qualifications of staff to be assigned that will provide services for LMH. Descriptions should include:
Project team make-up (only include resumes of staff to be assigned to the project.)
Assigned Project Manager (the main liaison/contact person for LMH) Overall supervision to be exercised (including how subcontractors will be handled) Professional Licenses or credentials held by team members.
If any subcontractors are used, then all aforementioned information should be provided about each potential subcontractor.
2) Experience - List assignments within the past two (2) years that best demonstrate the proposer’s competence to perform work similar to the required Scope of Services, including:
Description of project and key participants Dates started and completed.
A brief narrative of the project
TAB (D) – SCOPE OF SERVICES
State specifically your intended practices addressing the “Scope of Services.” Please cite previous examples of providing such services and your organization’s commitment to meeting or exceeding the expectations and duties set forth.
TAB (E) – COST PROPOSAL
All submissions MUST include a fee schedule for the services described in the scope of services (in addition to any other requested itemized costs). Complete the attached “Price Proposal Form” and submit under this section, Tab E, within your proposal.
TAB (F) – REFERENCES
Provide contact information for the project(s) listed in the “Statement of Experience and Qualifications.” Information should include a phone number and an email address. Include at least three (3) organizations and contact information (including email addresses) where you have provided similar services within the last 24 months.
TAB (G) – ATTACHMENTS
(Attachments) All other required information is set forth by each of the following attachments.
Return the ones marked “return” and place in Tab G.
(Other) Any remaining Attachments/Appendices are for your information only and NOT to be returned.
Attachment (A) - Form of Proposal (Return) Attachment (B) - Profile of Firm (Return) Attachment (C) - HUD 5369-A, Representations, Certifications, and Other Statements of Bidders (Return) Attachments (D) - Section 3 Forms (Return) Attachment (E) - HUD 5369-B, Instructions to Offerors, Non-Construction (Information Only) Attachment (F) - Supplementary Instructions for Bidders and Contractors (SIBC) (Information Only) Attachment (G) – Sample LMH Contract (Information Only) Attachment (G1) – Form HUD-5370-C1, General Conditions for Non-Construction Contracts Section I (Without Maintenance Work) (Information Only) Attachment (G2) – Form HUD-5370-C2, General Conditions for Non-Construction Contracts Section II (With Maintenance Work) (Information Only) Attachment (G8) – HUD Maintenance Wage Determination (Information Only) Attachment (H) – Price Proposal Form (Return Under Tab “E”)
Attachment (I) - Form HUD-5369-C, Certifications and Representations of Offerors, Non- Construction Contract (Return) Attachment (J) – Subcontractor Listing (Return)
3.3 Proposal Submission Information
3.3.1 LMH reserves the right to accept or reject any or all proposals, to take exception to the RFP specifications, or to waive any formality. Firms may be excluded from further consideration for failure to comply with the specifications of this RFP. The recommendation of LMH staff, LMH President / CEO and LMH’s Board of Housing Commissioners shall be final.
3.3.2 Proposals may be withdrawn by written request dispatched by the Respondent in time for delivery in the normal course of business prior to the proposal due date and time. Negligence on the part of the Respondent in preparing the required documents confers no right of withdrawal or modification of proposal data after such documents are opened.
3.3.3 The completed submission package must be received by the time and date listed on the cover of this RFP or by the time and date listed in any subsequent addendum. Proposals received after the deadline will not be considered. Submissions delivered by any other method will not be accepted.
3.3.4 All vendors must carefully review their final proposals. Once the file has been opened, proposals cannot be changed; with the exception that LMH may request information or respond to inquiries for clarification purposes only.
3.3.5 All vendors submitting a proposal must agree to honor the terms and conditions contained herein for the life of the contract.
3.3.6 Proposers are not allowed to change any requirements or forms contained herein, either by making or entering onto these documents or the documents submitted any revisions or additions; if such markings are made, the proposal may be deemed invalid. If after accepting a proposal, the Authority decides that any such entry has not changed the intent of the proposal, the Authority may accept the proposal as if the marks, notations, or requirements were not entered on such.
3.3.7 All questions and requests for information must be addressed in writing to the Procurement Manager (PM). The PM will respond to all such inquiries in writing by addendum posted to https://ha.internationaleprocurement.com. Offerors are responsible for ensuring they receive all addenda. During the RFP solicitation process, the PM will NOT conduct any ex parte (a substantive conversation “substantive” meaning, when decisions pertaining to the RFP are made—between the Authority and a prospective proposer when other prospective proposers are not present) conversations that may give one prospective proposer an advantage over other prospective proposers. This does not mean that prospective proposers may not contact the PM it simply means that other than making replies to direct the prospective proposer where his/her answer has already been issued within the solicitation documents, the PM may not respond to the prospective proposer’s inquiries but will direct him/her to submit such inquiry in writing so that the PM may more fairly respond to all prospective proposers in writing by addendum.
4.0 Proposal Evaluation
4.0.1 The Competitive Negotiation Process will be used to select the agreement award, beginning with the highest ranked firm. LMH reserves the right to negotiate an agreement with individual (s), firm(s), or organization (s) that provides the greatest benefit to LMH, not necessarily the lowest price. Firms in the competitive range may be required to be interviewed by the evaluation panel.
4.0.2 LMH will select the respondents that are the most advantageous to LMH based upon the evaluation criteria stated herein. LMH reserves the right to negotiate price and other factors with any acceptable respondents.
4.0.3 LMH reserves the right to award without discussion (s) and may make an award to multiple vendors. The Request for Proposals selective process will involve the ranking of proposers by the appointed LMH evaluation committee. Once the proposals have been evaluated, LMH will negotiate with the Respondent (s) who fall within the competitive range. Fees for these services will be a negotiation factor as well as any other relevant factor identified by the evaluation committee.
4.1 Preliminary Proposal Review
4.1.1 The review process will be conducted in two parts. The preliminary review will consist of a review to be sure the proposal meets the minimum requirements (and mandatory conditions) specified in the RFP. If they do not, they will be rejected.
4.1.2 Proposals in response to the RFP must meet the following requirements:
a. The proposal must be submitted through the e-procurement marketplace as indicated on page 2 in the RFP or sent by email, as instructed on page 2 of this RFP, no later than the time and date listed on the cover of this RFP.
b. Proposals not submitted through the HA E-Procurement Marketplace, or email, by the specified date will be rejected.
c. Proposal must be signed by an authorized vendor representative.
d. Proposals that pass this initial review will be considered a valid proposal and will move on to the final review. Those that do not will be filed as rejected.
4.2 Final Review
4.2.1 All valid proposals will be reviewed, evaluated, and rated by the Review Committee. The Review Committee will be composed of LMH staff.
a. The Review Committee will evaluate each proposal against the criteria in the RFP. During the review, the Committee may request additional information from the vendor. Such information requests and vendor’s responses must always be in writing.
b. All qualified proposals shall be reviewed by the Review Committee using the included evaluation criteria sheet. The number of evaluation points for each section varies according to the value assigned for that aspect of the program.
c. The Review Committee members may request information from sources other than the written proposal to evaluate vendor’s programs. Other sources of information may include oral presentations by vendors, written responses to clarifying questions posed by the Review Committee, and vendor’s history/experience in providing similar services.
d. Review Committee member Rating Sheets will be used to focus discussion. The final composite Evaluation Rating Sheet that includes the prioritized vendor’s rankings will be maintained on file by LMH. The result of the review process is a prioritized list from best to least.
e. Written notification will be made to all vendors who submitted a proposal. In awarding the contract, LMH’s evaluation will include, but will not be limited to:
1. Criteria for the Stage 1 review.
2. Strength and stability of the contractor to provide the requested services;
3. Ability to meet the project/program timelines;
4. Overall responsiveness and completeness of the proposal as well as the likelihood that, in LMH’s opinion and at LMH’s discretion, the proposal best meets or exceeds LMH’s specifications;
5. Scope of service being proposed;
6. Customer references;
7. Cost of proposed service;
8. Any other factors considered relevant by LMH and demonstrated by the proposal or investigation by LMH;
9. Experience with similar projects/programs of comparable size and scope
f. Responsive offerors will be notified of their non-selection after the preferred vendor is notified. If the successful vendor fails to execute the contract, LMH may award the contract to another vendor whose proposal met the requirements of the RFP and any addenda. The period within which such an award of the contract may be made shall be subject to the written agreement between LMH and the vendor.
g. LMH reserves the right to make an award based solely on the respondent or to negotiate further with one or more contractors. The contractor selected for the award will be chosen on the basis of the greatest benefit to LMH, not necessarily on the basis of the lowest price.
4.3 Appeals & Remedies
4.3.1 Contractor Right to Debriefing and Protests
a. It is the LMH's policy to resolve all procurement and contractual issues informally at the Authority level, without litigation. Disputes shall not be referred to HUD until all administrative remedies have been exhausted at the Authority level. HUD will only review protests in cases involving violations of Federal law or regulations or failure of the Authority to review a complaint or protest.
b. Any actual or prospective contractor may protest the solicitation or award of a contract only for serious violations of the principles of LMH’s Statement of Procurement.
c. All protests shall be in writing. If the protest is regarding the solicitation, the notice of protest must be received prior to the solicitation deadline.
d. If the protest is regarding the award, the notice of protest must be received within ten (10) business days after the issuance of the award notice.
e. A written protest shall contain, at a minimum, the name, address and phone number of the protester; identification of the procurement, including solicitation or contract number; a statement of the reasons for the protest; supporting documents, evidence, or documents to substantiate any arguments; and the form of relief requested.
f. LMH shall issue a decision as expeditiously as possible after receiving all relevant information requested.
g. Upon the conclusion of the solicitation period and issuance of the Award Notice, all Offerors shall have the right to a debriefing. The request for a debriefing must be made within 10 days of the date of Award Notice. The debriefing meeting may be held either by phone or in-person at LMH’s office. If the debriefing is in-person, travel expenses shall be the sole responsibility of the Offeror and not LMH.
4.4 PROPOSAL EVALUATION CRITERIA
4.4.1 Evaluation Factors. The following factors will be utilized by the appointed LMH evaluation committee to evaluate each proposal received; award of points for each listed factor will be based upon the documentation that the proposer submits within his/her proposal.
Evaluation Criteria to be used in reviewing proposals and their respective weights are as follows:
[Table No. 3]
No.
Max Point
Value
Factor Description
1 25 points No. 1: Demonstration of ability to provide necessary technical knowledge, skill(s), and qualifications of assigned personnel. Demonstrated Quality of Performance and Past Record of Professional Experience in undertaking work similar to those described in the Scope of Services; Taken into…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .