RFP26-R011: Fire Systems Testing, Inspection, and Maintenance Services
This Request for Proposals (RFP) is issued by Lucas Metropolitan Housing (LMH), a metropolitan housing authority in Toledo, Ohio, governing approximately 2,760 public housing units and administering 4,391 Housing Choice rental assistance vouchers. LMH seeks qualified, licensed, and bonded entities to provide comprehensive fire systems testing, inspection, and maintenance services across multiple properties and affiliate locations. Services include testing and maintenance of fire alarm systems, smoke detectors, pull stations, sprinkler systems, standpipe systems, fire pumps, backflow prevention valves, fire doors and dampers, and commercial range hood suppression systems, all performed in accordance with National Fire Protection Association (NFPA) standards and Ohio Fire Code requirements. The RFP was released November 3, 2026, with a proposal due date of November 23, 2026, at 3:00 p.m. ET. A pre-proposal conference call is scheduled for November 10, 2026, at 10:00 a.m. EST, and written questions must be submitted by November 16, 2026, at 12:00 p.m. The contract will be awarded for an initial one-year term, with LMH holding the option to extend for four subsequent one-year agreements.
LMH has established a goal of awarding 35 percent of all contract funds to Minority Business Enterprises (MBE) or Women Business Enterprises (WBE), and proposers are encouraged to maximize MBE/WBE participation. Contractors must maintain current Workers' Compensation certificates and provide proof of General Liability insurance with a combined single limit of not less than $1 million per occurrence, as well as Automobile Liability insurance of not less than $500,000 per occurrence. No specific bonding requirements are mandated. This is a maintenance contract; therefore, contractors must comply with prevailing wage requirements as determined by the United States Department of Labor and the United States Department of Housing and Urban Development. The evaluation will be conducted on a "Best Value" basis rather than lowest price, with proposals scored on technical qualifications (25 points), past performance and project completion (20 points), proposed costs (25 points), and approach and methodology (30 points), for a total of 100 points. LMH reserves the right to negotiate fees with the highest-ranked proposer and may conduct oral interviews with firms within the competitive range. Contract services must comply with all applicable federal, state, and local codes and regulations, and all work shall be documented with records forwarded to relevant authorities as required by law.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION RFP26-R011
REQUEST FOR PROPOSALS (RFP)
For
Fire Systems Testing, Inspection, and Maintenance Services
Release Date: November 03, 2026
Due Date: November 23, 2026 @ 3:00pm ET
Prepared by Lucas Metropolitan Housing
424 Jackson Street, Toledo, OH 43604
P.O. Box 477, Toledo, OH 43697-0477
REQUEST FOR PROPOSALS - RFP26-R011 – Fire Systems Testing, Inspection, and Maintenance Services
LUCAS METROPOLITAN HOUSING (LMH)
Table of Contents
[Table No. 1] Section Description Page
Introduction 2 RFP Information at a Glance 3
1.0 The Agency’s Reservation of Rights 3
2.0 Scope of Services 4
2.1 Overview 4
2.2 Scope of Services 4
2.3 General Information 8
2.4 Bonding & Insurance Requirements 13
3.0 Proposal Format 14
3.1 Preparation of Proposals 14
3.2 Proposal Format 15
3.3 Proposal submission Information 16
4.0 Proposal Evaluation 17
4.1 Preliminary Proposal Review 17
4.2 Final Proposal Review 18
4.3 Appeals & Remedies 19
4.4 Proposal Evaluation Criteria 20
5.0 Contract Award 21
5.1 Contract Award Procedures 21
5.2 Contract Conditions 22
Introduction/Background
The Lucas Metropolitan Housing Authority (LMH) is seeking proposals from qualified entities to provide Fire Systems Testing, Inspection, and Maintenance Services for Lucas Metropolitan Housing (LMH). LMH owns and manages approximately 2,760 public housing units and administers 4,391 federal Housing Choice rental assistance vouchers. The Housing Choice Voucher Program has achieved high performer status.
LMH is governed by a Board of Commissioners consisting of five (5) Board members.
LMH is committed to a goal of thirty-five percent of all contract funds being awarded to Minority Business Enterprises (MBE) or Woman Business Enterprises. The firms submitting proposals are encouraged to include MBE/WBE participation to the maximum extent possible.
It is LMH’s intention to take reasonable, affirmative steps to increase access and opportunities for handicapped individuals in all programs, services, and administrative operations, in accordance with Section 504 of the Rehabilitation Act of 1973. If you have visual impairment, hearing or physical impairment that does not permit you to read this notice, the Lucas Metropolitan Housing will provide appropriate assistance.
RFP INFORMATION AT A GLANCE
[Table No. 2]
LUCAS METROPOLITAN HOUSING POINT OF
CONTACT:
Marissa Bentley, Procurement & Contracts Manager Telephone: (419) 259-9452 E-mail: mbentley@lucasmha.org Scott Noonan, Procurement Associate Telephone: (419) 259-9438 E-Mail: snoonan@lucasmha.org
HOW TO OBTAIN THE RFP DOCUMENTS ON THE
EPROCUREMENT MARKETPLACE
1. Access https://ha.internationaleprocurement.com
2. Click on the “Login” button in the upper left side.
3. Follow the listed directions.
4. If you have any problems in accessing or registering on the eProcurement Marketplace, please call customer support at (866) 526-0160.
PRE-PROPOSAL CONFERENCE CALL November 10, 2026 @ 10:00 AM EST Call In #: 309-205-3325 Meeting ID: 891 9228 1178 Passcode: 576992
QUESTION SUBMITTAL DEADLINE
Questions will be received in writing no later than 12:00 pm on November 16, 2026.
Responses will be posted as an addendum and will be posted on the eProcurement Marketplace
PROPOSAL SUBMITTAL DEADLINE.
Upload your proposal to the e-Procurement Housing Authority Marketplace or email to mbentley@lucasmha.org
November 23, 2026, no later than 3:00pm ET:
1.0 LMH’S RESERVATION OF RIGHTS.
The Agency reserves the right to:
a. Reject, Waive, or Terminate the RFP. Reject any or all proposals, waive any informality in the RFP process, or terminate the RFP process at any time, if deemed by the Agency to be in its best interests.
b. Not Award. Not award a contract pursuant to this RFP.
c. Terminate. Terminate a contract awarded pursuant to this RFP, at any time for its convenience upon
10 days’ written notice to the Contractor(s).
d. Determine Time and Location. Determine the days, hours, and locations that the successful proposer (hereinafter, “Contractor”) shall provide the services called for in this RFP.
e. Retain Proposals. Retain all proposals submitted and do not permit withdrawal for a period of 60 days subsequent to the deadline for receiving proposals without the written consent of the Agency Contracting Officer (CO).
f. Negotiate. Negotiate the fees proposed by the proposer entity.
g. Reject Any Proposal. Reject and not consider any proposal or proposer that does not meet the requirements of this RFP, including but not necessarily limited to incomplete proposals and/or proposers offering alternate or non-requested services.
h. No Obligation to Compensate. LMH has no obligation to compensate any proposer for any costs incurred in responding to this RFP.
i. Prohibit. At any time during the RFP or contract process, prohibit any further participation by a proposer or reject any proposal submitted that does not conform to any of the requirements detailed herein. By accessing the eProcurement Marketplace (hereinafter, a.k.a., the “Marketplace”) and by downloading this document, each prospective proposer is thereby agreeing to abide by all terms and conditions listed within this document and within the eProcurement Marketplace, and further agrees that he/she will inform the CO in writing within 5 days of the discovery of any item listed herein or of any item that is issued thereafter by the Agency that he/she feels needs to be addressed. Failure to abide by this timeframe shall relieve the Agency, but not the prospective or actual proposer, of any responsibility pertaining to such an issue.
j. Reject – Obtaining Competitive Solicitation Documents. The eProcurement Marketplace is the only official and appropriate venue to obtain competitive solicitation documents (and any other information pertaining to the competitive solicitation such as addenda). Accordingly, by submitting a response to this competitive solicitation the respondent thereby affirms that he/she obtained all information on the eProcurement Marketplace. Any other group such as a proposal depository that informs potential respondents of the availability of such competitive solicitations are hereby instructed to not distribute these documents to any such potential respondents, but to instruct the potential respondents to visit the eProcurement Marketplace to obtain the documents. The Agency will reject without consideration any response submitted from a firm that has not obtained the documents from the eProcurement Marketplace.
2.0 OVERVIEW OF SERVICES
2.1 Project Overview
The Lucas Metropolitan Housing Authority (LMH) is seeking proposals from qualified, licensed, and bonded entities to provide Fire Systems Testing, Inspections, and Maintenance services for LMH.
Offerors will submit proposals to enter into a one (1) year agreement with LMH (the “Agreement”) with an option by LMH to extend for four (4) subsequent one-year agreements.
Lucas Metropolitan Housing Authority (LMH) has a requirement for Fire Systems Testing, Inspections, and Maintenance Services for LMH and affiliate properties. LMH requires a contractor to provide a full range of services to successfully complete testing, inspections, maintenance, etc., that may be required of LMH’s fire systems. The services required may occur during normal business hours. Contractor retains all control over personnel and responsibility for direct supervision. Contract personnel may not supervise LMH Staff, affiliate staff, and tenants but may provide direction and instructions as required by duties.
2.1 Scope of Services
Introduction
Early warning plays a key role in the ability to safely evacuate persons during a fire emergency. As a result, immense expectations are placed upon a fire alarm system’s ability to operate and function properly. So much so, in fact, that state law [see rules as set forth in Chapter 1301:7-7- of the Ohio Administrative Code known as the "Ohio Fire Code" (OFC)] prohibits the occupancy of any portion of a building until the required fire alarm and detection system has been tested and approved. Furthermore, OFC requires that such systems be maintained in an operative condition at all times and be repaired or replaced when defective. Lastly, in order to meet federal, state, and local requirements; fire alarm systems are required to be inspected, tested, and maintained in accordance with National Fire Protection Association (NFPA) and Ohio Fire Code.
IMPORTANT: It must be noted that this document and its content is intended to serve as a reference only and is not intended to be all-inclusive of current regulations and laws. It covers some, but may not cover all, of the inspection, testing and maintenance requirements applicable to fire alarm systems. It is important, therefore, that the proposer is familiar with all requirements to be fulfilled according to the regulations of NFPA, OFC and local regulations.
Inspection, Testing, and Maintenance Services
1. Fire alarm systems shall be tested, and service tagged at the main alarm panel, at the frequency required by local, state, or federal statute. Testing shall include but not be limited to all smoke detectors, manual pull stations, sprinkler systems, annunciators, visual indicators and strobes, control units, voice/alarm communication systems, commercial range hood fire suppression systems, and other special hazard protection systems.
2. Testing of the fire alarm systems shall be performed in accordance with NFPA standards and 29 CFR
1910.164.
3. Testing frequency shall be in accordance with NFPA standard number 72 and local, state, and federal statutes 29 CFR 1910.164 and 1910.163.
4. Testing and maintenance of sprinkler systems shall be performed in accordance with NFPA standards and federal statutes 29 CFR 1910.159(c)(2).
5. Inspection, testing, and service tagging of wet and dry standpipe systems, hose connections, pressure reducing valves, and hose connection pressure reducing devices shall be performed in accordance with NFPA standards and 29 CFR 1910.161 and 1910.163.
6. Testing and maintenance of fire pumps and hydrants shall be performed in accordance with NFPA standards, including 13E.
7. Testing and certification of backflow prevent valves, in accordance with the governing agency that has jurisdiction.
8. Testing and maintenance of fire doors and dampers shall be performed in accordance with manufacturer’s guidelines and NFPA standard.
9. A record of each inspection, test, or service shall be maintained as specified in NFPA standards and local, state, or federal statutes. Copies of each inspection shall be forwarded to the local, state, and federal authorities as required by law, code, or ordinance. The inspection type and date should also be tagged on or near the equipment.
10. All work shall be performed on a scheduled and systematic basis. In all cases, all equipment shall be maintained to the manufacturer’s specifications, kept in proper working order and in compliance with all applicable codes, at all times. Only authorized maintenance vendors may work on the fire systems, this includes any manufacturer requirements.
Location of Fire Systems
Location/AMP List of Fire Suppression Systems currently in place
List of Fire Detection/Alarm Systems currently in place
AMP 111 Systems in Place Systems in Place Dorrell Manor 14 inch open with standpipe Wet system Simplex - Model 4010ES
Fire Pump Make-Allis Chalmers – located in mechanical room
19 Pull Station Single Action
8 Photo Smoke Detectors 1 Audio/Visual Signal Device 1 Annunciator 1 Elevator Alternative Recall 1 Elevator Primary Recall 18 Horn 1 Telephone Dialer in Mechanical
Room by Fire Pump AMP 112 Systems in Place Systems in Place Flory Gardens Firelite ES-1000X on Floor 1 by Boiler
Room 2 23 Heat Detectors 109 Photo Smoke Detectors 27 Pull Station Single Action 4 Single Station Smoke Detectors 46 Audio/Visual Signal Devices 1 Remote Annunciator - in Front
Hallway 6 Visual Only Signals 9 Door Holders 5 Power Supply Glendale Terrace Apartments
Commercial Range Hood
Edwards EST 4 - in Maintenance Area
19 Door Closer with Detector 3 Heat Detector 4 Photo Duct Smoke Detector 232 Photo Smoke Detector 38 Pull Station Single Action 32 Audio/Visual Signal Device 1 Printer - in Maintenance Shop 2 Visual Signal Only 4 Power Supply - in Boiler Room 2-5 Elmdale Court Notifier NFW-50X - in Storage Room in
Maintenance Area 4 Duct Smoke Detector 5 Pull Station Single Action 6 Single Station Smoke Detector 5 Audio/Visual Signal Devices 2 Horns 6 Visual Signal Only 2 Keypads 211 S. Byrne Rd. Firelite Ms4412b 3 Photo Duct Smoke Detector 15 Photo Smoke Detector 8 Audio/Visual Signal Device 2 Visual Signal Only 1 Telephone Dialer in Telephone Room in Conference Room AMP 121 Systems in Place Systems in Place Weiler Home Maintenance / Laundry
Edwards LCC 4 -Maintenance Building
4 Heating Detectors 18 Ionization Smoke Detectors 2 Photo Duct Smoke Detectors 27 Photo Duct Smoke Detectors 7 Pull Station Single Action 9 Audio/Visual Signal Devices 1 Annunciator - Main Entrance 4 Visual Signal Only 1 Dialer- Kitchen Closet Weiler Homes Office 12 ½ Inch Limited (wet)
- in Daycare Pyrotronics Cp-400-Office – in Community Room, Bottom of Stairs, In basement
11 Inch Limited (wet) -in Modular Unit 767 Bedroom Closet
2 Photo Duct Smoke Detectors
11 Inch Limited (wet) -in Modular Unit 769
1 Photo Duct Smoke Detector5 Pull Station Single Action
4 Audio Visual Signal Devices
1 Dialer - in Basement Office AMP 122 Systems in Place Systems in Place Ravine Park Dmp Xr500fc – in Ravine Main Office 1 Photo Duct Smoke Detector 2 Pull Station Single Action 10 Single Station Smoke Detectors 1 Bell 3 Horns 2 Keypads 1 Power Supply AMP 131 Systems in Place Systems in Place Vistula Manor 22 ½ Inch Open Wet
System (Limited Area Only) – in Mechanical Room and Boiler Room
Firelite Notifier ES-1000X Manual Fire Alarm Boxes (4 Circuit Style)
158 Photo Smoke Detector (4 Circuit Style)
2 Photo Duct Detector 3 Heat Detector 3 Waterflow Switches 138 Strobes 390 Speakers
19 Signaling Line Circuits Connected to System
435 Nebraska Central Office Dmp Xr500 Fc Basement Phone Room
8 Storage Tanks 9 Photo Smoke Detector 2 Ionization Smoke
Detectors 6 Pull Station Single Action
2 Photo Detector 3 Bells 6 Horns 4 Keypads 1 Bell 1 Power Supply – in Basement by Fire
Panel 2 Manual Pull Stations 201 Belmont Ave One 4” Inch Auto
Model GTO Dry System
– in Second Floor Upstairs Office
Simplex 4006-9101 – in Electrical Room in Main Entrance Foyer
One 6” Inch Auto Model 373 Wet System
– in Maintenance Shop
8 Pull Station Single Action
One 6” Inch Auto Model 373 Wet System
– in Parking
4 Horns
Garage/Warehouse One 6” Inch Auto
Model 373 Wet System
– in Basement
1 Backflow Prevention Valve
1 Rangeguard Commercial Range Hood Fire Suppression System (Wet System) – in Attic
12 Fusible Links 131 Indiana Ave XR200F Fire System AMP 133 Systems in Place Systems in Place Teneyck Towers 16” Shot Gun Riser Wet
System Edwards Est-4 – in First Floor Elevator Maintenance Room
1 Fire Pump 3 Heat Detector 89 Photo Smoke Detector 27 Single Action Pull Station 73 Speaker/Visual 1 Annunciator Located in Front Lobby 4 Power Supply 1 Telephone Dialer – in First Floor
Elevator Ashley Arms Allis Chalmers Fire
Pump Edwards Est-4 Panel
16” Inch Open Standpipe Wet System
14 Single Action Pull Station
19 Audio/Visual Signal Devices 1 Telephone Dialer – In Maintenance
Shop 32 Photo Detectors 1 Waterflow Switch 1 Heat Detector 4 Supervisory Switches 1 Backflow Prevention Valve 424 Jackson Straight Wet / Shotgun
Notifier NFW2-100 – Maintenance 05/2009 7 Smoke Detector 41 Speaker / Strobe 4 Duct Detector 6 Pull Station 1 Heat Detector 3 Supervisory 1 Backflow Prevention Valve
Segur Landry
201 Belmont Ave Toledo, OH 43697 (AL) Alarm Systems
(BF) Backflow (KISUP) Kitchen Suppression (SP) Sprinkler Quantity Location
Simplex 4006-9101
Electric Room in Main Entrance Foyer
Horn
By pull station
Pull Station
– Single Action
Throughout Building
Backflow Prevention Valve
Basement
Rangeguard Commercial Range Hood Fire Suppression System (Wet System)
Attic
4” Inch Auto Model GTO Dry System
Second Floor Upstairs Office
6” Inch Auto Model 373 Wet System
Maintenance Shop
One 6” Inch Auto Model 373 Wet
Parking Garage/Warehouse
One 6” Inch Auto Model 373 Wet
Basement
Fusible Link
Part of (SPs)
2.2 General Requirements
2.2.1.1 Contractor(s) must be willing to service all LMH properties during normal business hours. Contractor shall conduct all non-emergency work during normal working hours unless deemed otherwise by authorized LMH representative. Contractor and LMH designated representative who assigned the work will determine a “reasonable” service date and time.
2.2.1.2 Contractor(s) shall provide estimates for repairs when requested. If LMH deems such quote to be unreasonable LMH reserves the right to request quotes from other Contractor(s) for such service. Estimates shall be provided within forty-eight (48) hours or as required by designated LMH representative.
2.2.1.3 Contractors are required to contact the designated LMH authorized representative via phone or email when they will be onsite. A list of the current Maintenance Supervisors and Property Managers will be proved to the awarded contractor.
2.2.1.4 Contractor(s) shall guarantee all work completed shall meet any necessary City, County, or LMH inspections.
Should any Fire Systems installation or repair made by the Contractor not pass inspection, Contractor shall make all repairs necessary to ensure the installation or repair passes inspection at no additional cost to LMH.
2.2.1.5 This will be considered a Maintenance Contract. Therefore Contractor(s) are required to pay onsite technicians, including sub-contractors at least the minimum wages as determined by the United States Department of Labor and the United States Department of Housing and Urban Development Prevailing Wage. Please refer to solicitation section 2.5.13 Maintenance Wage Rates for further information and refer to Attachment G-8 for a list of approved wage rates.
2.2.1.6 The Contractor(s) shall perform a fire alarm and suppression system inventory count at the beginning of each contracted year and submit to LMH Maintenance Supervisors and the LMH procurement department. The report shall contain a current list of all fire alarm/detection and suppression systems currently installed at LMH sites, their locations, manufacturer name and model #, quantity, etc. If a fire system is added, removed, modified, etc. The Contractor is to revise the inventory report and submit the modified report to LMH as soon as the change is made.
An example of what should be contained in the report is shown below:
2.2.1 Scope ClarificaƟon
A) Services are advisory and strategic in nature and do not include direct development, legal services, or financial execuƟon unless otherwise agreed.
2.2.2 Vendor QualificaƟons
Please provide references and demonstrate your experience and capacity with fire systems tesƟng, inspecƟon, and maintenance services.
2.2.3 Proposal Requirements
Proposals must include:
See SecƟons 3.1 and 3.2 below.
2.2.4 Term
A) Services shall last for 12-months from the date the contract is signed by both parƟes and is not subject to renewal.
The selected contractor shall maintain appropriate insurance coverage including, at a minimum, general liability and workers’ compensaƟon coverage as required by law. Proof of insurance shall be provided to LMH prior to commencement of work. The contractor shall maintain such insurance for the duraƟon of the project.
2.2.5 EvaluaƟon Method
LMH will review all proposals received in response to this solicitaƟon. Proposals will be evaluated based on factors including, but not limited to:
• Vendor qualificaƟons and experience working in fire systems tesƟng, inspecƟon, and maintenance services with Vendor’s capacity to deliver on the scope of services.
• Total project cost, including any opƟonal or alternate pricing
• Project schedule and ability to complete the work within the anƟcipated Ɵmeframe
LMH reserves the right to request addiƟonal informaƟon, clarificaƟon, or revisions from vendors during the evaluaƟon process.
2.2.6 Basis of Award
LMH intends to award a contract to the vendor whose proposal is determined to be most advantageous to the agency, considering price and the evaluaƟon factors idenƟfied above.
LMH reserves the right to:
• Reject any or all proposals
• Waive minor irregulariƟes in proposals
• Award the base project only or include opƟonal work as deemed in the best interest of LMH
2.3 General Information:
2.3.1 Lucas Metropolitan Housing (LMH) is a metropolitan housing authority organized and existing under the Ohio Revised Code Section 3735.27, et seq., and is governed by the U.S.
Housing Act of 1937, as amended, and subject to regulation under Title 24 of the Code of Federal Regulation.
2.3.2 LMH is governed by a five (5) person Board of Commissioners, appointed pursuant to the above cited statue. The President and Chief Executive Officer controls the daily operations.
2.3.3 The mission of LMH is “Housing is vital to our past, present and future! We create quality housing opportunities and build communities through collaborative partnerships. While stimulating economic growth, we empower individuals and develop the neighborhoods of tomorrow for the people of today”.
2.3.4 MBE/WBE LMH is committed to a goal of thirty-five percent of all contract funds being awarded to Minority Business Enterprises (MBE). The firms submitting proposals are encouraged to include MBE participation to the maximum extent possible.
2.3.5 The Competitive Negotiation Process or Award without Discussion(s) will be used to select the contract award, beginning with the highest ranked firm. LMH reserves the right to negotiate a contract with the individual(s), firm(s), or organization(s) that provides the greatest benefit to LMH, not necessarily the lowest price. The Competitive Negotiation Process considers many factors; lowest price may not indicate the successful vendor.
2.3.6 Vendor Disclosures - Vendor must provide disclosure of any pending or threatened court actions and/or claims against the Vendor. This information may not cause rejection of the proposal; but withholding the information may be caused to reject the proposal.
2.3.7 Conflict of Interest - No vendor will promise or give any LMH employee anything of value that could influence that employee in their decision on awarding contracts. No vendor will try to influence an employee of LMH to violate any procurement policies of the agency, the Ohio Revised code, or Federal Procurement Regulations.
2.3.8 Subcontractors - The successful Offeror(s) shall not contract with any proposed subcontractor who has not been accepted by LMH. The successful Offeror(s) shall notify LMH in writing the name of each proposed subcontractor. The acceptance or any objection shall be expressed in writing by LMH within ten (10) working days after receiving the receipt of said request. LMH may, without claim for extra cost by the successful Offeror(s), may disapprove any subcontractor for cause on the basis of its own determination or, because the proposed subcontractor is listed as ineligible to receive awards of contracts for the United States on a current list or lists furnished by HUD.
2.3.9 Hiring and Subcontracting Strategies / Practices - With the submission of this proposal, the Offeror shall be required to provide a Subcontracting Plan, if applicable, which will be in line with LMH’s desired commitment to 35% of all contracts to be awarded to Minority Business Enterprises (MBE).
2.3.10 Section 3 Resident Participation - HUD Act of 1968, Section 3, and all revisions, are hereby incorporated into this solicitation by reference. With the interest of complying with these regulations to the greatest extent feasible, the Offeror shall be required to demonstrate compliance with the LMH Section 3 Policy and Procedures hereby incorporated in this solicitation by reference. All inquiries related to this program shall be directed to LMH’s Section 3 Compliance Coordinator.
2.8.11 Green Procurement - LMH is committed to purchasing products and services that meet the local, state, and national environmental goals. Purchasing preference (whenever feasible) will be given to products that:
a. Decrease greenhouse gas emissions or are made with renewable energy;
b. Decrease the use of toxins detrimental to human health and to the environment;
c. Contain the highest possible percentage of post-consumer recycled content (a finished material that would normally be thrown away as solid waste at the end of its life cycle, and does not include manufacturing or converting wastes);
d. Limit air, land, and/or water pollution;
e. Reduce the amount of waste they produce;
f. Are reusable or contain reusable parts (rechargeable batteries, refillable pens, etc.);
or
g. Are multifunctional (i.e., scanner/copier/printers, multipurpose cleaners) and serve to decrease the total number of products purchased.
2.3.11 Contractor Licensing and standards - The contractor will have the required experience, licenses, insurances, bonding, financial stability, equipment, and personnel needed to complete the work that they are bidding on. All work performed pursuant to this RFP must conform and comply with all applicable local, state, and federal codes, statutes, laws, and regulations. All candidates and staff shall possess all required state and local licenses. In addition, the successful respondent shall comply with all laws, ordinances, and regulations applicable to the services contemplated herein, especially those applicable to conflict of interest. Candidates are presumed to be familiar with all Federal, State and Local Laws, Ordinances, Codes, Rules and Regulations that may in any way affect the services. In any subsequent contract, the successful candidate must agree to follow all local, State, and Federal / HUD regulations. Any resulting contract with the successful bidder will contain the mandatory HUD Form 5370-C1 General Contract Conditions - Non-Construction.
a. Contractor must have documented experience. Documented experience in providing services to private entities, governmental agencies, or agencies of similar size. Contractor must have a broad and practical knowledge of HUD rules, regulations, requirements, law, and related procedures; and knowledge of various HUD housing programs with a particular emphasis on Public Housing and Housing Choice Voucher (Section 8) Housing Programs.
b. Safety Standards: OSHA Hazard Communication Standard: The Occupational Safety
& Health Administration (OSHA) Hazard Communication Standard (29CFR1910.1200) states that contractors/suppliers must be informed of the hazardous chemicals their employees may be exposed to while performing their work and any appropriate protective measures. To comply with this requirement, Lucas Metropolitan Housing Authority has developed a list of all the hazardous chemicals known to be present in our facility. A Safety Data Sheet (SDS) is also on file for each of the chemicals and / or hazardous substances. This information is available to you and to your employees upon request.
c. Hazardous Chemical & Materials. In order to protect the safety and health of our own employees, contractors/supplies must provide (upon request) an SDS on any hazardous chemical (s) or material (s) which they bring into the facility. Failure to provide this information in a timely manner will result in the removal of the contractor/supplier from the premises.
d. Each employer is also responsible for notifying any subcontractor they employ regarding the requirements of OSHA Hazard Communication Standard and other provisions described in this notice.
e. Contractor must follow the Occupational Safety and Health Administration (OSHA) guidelines, all state and local codes and regulations, and services shall be performed in accordance with any applicable governmental regulations, and any directions issued regarding performance of work during the COVID-19 crisis.
f. Regarding fall protection, the Contractor shall review and comply with OSHA fall protection standard: 1926.501 and/or 1926.501(b)(10). Failure to adhere to proper fall protection protocols could result in termination of the contract.
2.3.12 Assignment - The successful respondents shall not enter into any subcontracts, retain consultants, or assign, transfer, convey, sublet, or otherwise dispose of the ensuing contract, or any or all of its rights, title or interest, herein, or its power to execute such contract to any person, company, or corporation without the prior written consent of the LMH.
2.3.13 Equal Employment Opportunity and Supplier Diversity - Both the Contractor and LMH have, pursuant to HUD regulation, certain responsibilities pertaining to the hiring and retention of personnel and subcontractors. Bidders are advised that the goal of MBE/WBE participation on this project is a minimum of 35% of the overall contract cost. Affirmative steps are to include assuring that small and minority businesses and women-owned business enterprises are solicited whenever they are potential sources.
2.3.14 Vendor Examination of the RFP - Contractors are expected to be familiar with the entire RFP. The vendor is expected to respond to the RFP in a manner that makes it clear they understand and have responded to all sections of the RFP. If a vendor discovers any mistakes or omissions in the RFP they must notify LMH’s Contact Person in writing. Clarifications and corrections will be sent to all vendors who have registered with the agency for the RFP.
2.3.15 Changes to RFP - LMH may make changes to this RFP by addendum and shall be posted on the e-procurement marketplace website.
2.3.16 Availability of Funds - This RFP and all agency contracts are contingent on the availability of funds. If, during the RFP process, funds are not available for the proposed services, the RFP process will be cancelled. The vendor will be notified at the earliest possible time. LMH is not required to compensate the vendor for any expenses incurred as a result of the RFP process.
2.3.17 Non-Appropriation Clause - The proposed services will be subject to termination in the subsequent fiscal years if the sufficient funds are not appropriated and budgeted or are not otherwise available to continue making payments for the equipment of other services performing similar functions and services.
2.3.18 Termination - LMH reserves the right to terminate an agreement without prior notification for reasons it deems in the best interest of LMH. If terminated, LMH will notify the contractor of the termination in writing by certified mail, return receipt requested, and shall pay contractor for services rendered prior to contractor’s receipt of the Notice of the Agreement Termination.
2.3.19 Holidays - LMH recognizes the following holidays as vacation days for its employees:
New Year’s Day Columbus Day Dr. Martin Luther King, Jr.’s Birthday Veteran’s Day President’s Day Thanksgiving Day Memorial Day Day after Thanksgiving Juneteenth Christmas Eve Independence Day Christmas Day Labor Day New Year’s Eve
2.3.20 Terms & Conditions - The RFP and the commitments made in the selected proposal will be contractual obligations if a contract ensues. Failure to accept these obligations may result in cancellation of the award.
2.3.21 Type of Contract - The evaluation of proposals submitted in response to this RFP may result in the issuance of a contract. The contract will incorporate the requirements of the RFP, the vendor’s proposal, and all other agreements that may be reached. The vendor is normally responsible for the execution of the project/program and contract requirements. If the vendor proposes a different type of approach, describe the contractual protection offered to ensure successful implementation of the project. If vendor proposes a multi-vendor or sub- contract approach, clearly describe the responsibilities of each party and the assurances of the performance you offer. The successful vendor’s proposal, this RFP, and other applicable addenda will become part of the final contract and will merge into the contract.
2.3.22 Indefinite Delivery/Indefinite Quantity (IDIQ or ID/IQ) – LMH intends to enter into an IDIQ contract providing for an indefinite quantity of services during a fixed period. Should an IDIQ be issued, this type of contract does NOT require LMH to order a specific maximum quantity of services.
2.3.23 Unauthorized Sub-Contracting Prohibited - The successful proposer shall not assign any right, nor delegate any duty for the work proposed pursuant to this RFP (including, but not limited to, selling, or transferring the contract) without the prior written consent of the CO. All subcontractors must be disclosed prior to the start of the work. Any purported assignment of interest or delegation of duty, without the prior written consent of the CO shall be void and may result in the cancellation of the contract with the Authority, or may result in the full or partial forfeiture of funds paid to the successful proposer as a result of the proposed contract; either as determined by the CO. If the contractor does subcontract work, the subcontractor is required to be a legitimate company with a federal tax ID number, and it required to provide LMH with certificates of insurance with the same limits of liability that are required of the contractor.
2.3.24 Public Records Law - All bids/proposals submitted to LMH are subject to the Ohio Public Records Law (O.R.C. 149.43 and the Sunshine Act [5 USC 522(b]) and may be subject to disclosure to the public. Information in proposals that would be deemed a trade secret or otherwise not subject to disclosure under public records laws shall be clearly indicated as such by the contractor, including citations from the Ohio Public Records Law or the Sunshine Act for the exemptions. Also, the contractor shall submit one hard copy and upon request, one electronic copy of its proposal and other submissions, which has been redacted of all trade secrets and other information not subject to disclosure pursuant to a public records request.
Failure to do so may subject the entire contents to disclosure under public records laws.
2.3.25 Confidentiality - Any vendor that has access to confidential information will be required to keep that information confidential.
2.3.26 No smoking on LMH property - Smoking is prohibited on LMH properties. Smoking is only allowed in posted designated areas or a minimum of 20 feet away from building windows and doors.
2.3.27 Assignment of Personnel - LMH shall retain the right to demand and receive a change in personnel assigned to the work if LMH believes that such change is in the best interest of LMH and the completion of the contracted work.
2.3.28 Additional Contract Provisions - The following contract provisions are in effect pursuant to 2 CFR 200.326 for non-federal entity contracts:
Contract Work Hours and Safety Standards (40 U.S.C. 3701-3708) Copeland “Anti-Kickback” Act (40 U.S.C. 3145) Clean Air Act (42 U.S.C. 7401-7671q.)
Federal Water Pollution Control Act (33 U.S.C. 1251-1387) as amended Mandatory policies on energy efficiency contained in the state energy conservation plan Byrd Anti-Lobbying Amendment (31 U.S.C. 1352) Executive Order 11061 to prevent discrimination by agencies that utilize federal funds Title VI of the Civil Rights Act of 1964, Public Law 88-352 Public Law 90-284, Title VIII of the Civil Rights Act of 1968 The Age Discrimination Act of 1975 Anti-Drug Abuse Act of 1988
2.4 Bonding and Insurance Requirements - Proof of Insurance for Contractors and Vendors
2.4.1 BOND REQUIREMENTS:
There are no bonding requirements with this proposal.
2.4.2 INSURANCE REQUIREMENTS:
Workers’ Compensation:
1. LMH requires that contractors and vendors supply LMH with a current Workers’
Compensation Certificate.
2. LMH requires that the Workers’ Compensation Certificate be valid for the term of the contract.
3. Contractors and vendors will immediately provide verification of coverage for the contract term.
2.4.3 General and Commercial Liability:
1. Contractor agrees to name LMH as an additional insured on its general liability policy, which shall be primary to LMH’s general liability policy, and any other insurance policy as determined by LMH that is relevant to the contract scope of work. These policies shall also be primary to and non-contributory to LMH’s General Liability policy.
2. Contractors and subcontractors shall name LMH as an additional insured on their General Liability policy, and any other insurance policy as determined by LMH that is relevant to the contract scope of work.
3. Contractor and subcontractor shall indemnify LMH, to the fullest extent provided by law, for all claims arising out of the contractor’s and subcontractor’s performance of this contract.
4. Contractor and subcontractor shall provide proof of General Liability insurance coverage with combined single limit for bodily injury and property damage not less than $1million per occurrence.
5. LMH reserves the right to request a copy of the contractor’s and subcontractor’s full insurance policies and applicable endorsements.
6. Contractors and subcontractors must maintain the insurance policies that were submitted during the entire length of the contract.
2.4.4 Insurance Automobile Liability:
1. Contractors and subcontractors shall provide proof of Automobile insurance of owned and non-owned vehicles used on the sites or in connection therewith for combined single limit for bodily injury and property damage not less than $500,000 per occurrence.
2.4.5 Indemnity:
1. Contractors and vendors agree to indemnify LMH, to the fullest extent provided by law, for all claims arising out of their performance of the contracts.
2.4.6 Processing:
1. LMH’s Manager of Procurement shall be responsible for obtaining proof of the listed above documents and ensuring that LMH contracts have the appropriate indemnifications.
2.4.7 Workers Compensation:
1. LMH requires that contractors and vendors supply LMH with a current Workers Compensation Certificate.
2. LMH requires that the Workers Compensation Certificate be valid for the term of the contract.
3. Contractors and vendors will immediately provide verification of coverage for the contract term.
3.0 Proposal Format.
3.1 Preparation of Proposal
3.1.1 Proposals must provide a clear picture of the offeror’s qualifications to provide the services required in the RFP. The offeror should respond to the RFP instructions and requirements. The proposal must include all costs that relate to the responses submitted.
3.1.2 All proposals become the property of LMH to use. All proposals will be considered public information and will be open for inspection.
3.1.3 Proposal Cost. The cost of creating proposals is the responsibility of the vendor and shall not be chargeable to LMH. The vendor must guarantee the pricing listed in the proposal will remain in effect for a minimum of 360 days after the proposal submission date.
3.1.4 False or Misleading Statements Proposals containing false or misleading statements may be rejected.
3.1.5 Vendor Representative’s Signature: An officer of the Respondent, who is legally authorized to enter into a contractual relationship on behalf of the Respondent, must sign the submission package. The signature must indicate the title or position the individual holds in the vendor’s organization.
3.1.6 The completed RFP proposal must be received by the time and date listed on the cover of this RFP. All vendors must carefully review their final proposals. Once submitted, proposals cannot be changed; however, LMH may request information or respond to inquiries for clarification purposes only. All vendors submitting a proposal must agree to honor the terms and conditions contained herein for the life of the contract.
3.2 Proposal Format:
3.2.1 Tabbed Proposal Submittal: LMH intends to retain the successful proposer pursuant to a “Best Value” basis, not a “Low Proposal” basis ("Best Value," in that LMH will, as detailed within the following Section, consider factors other than just cost in making the award decision). Therefore, so that LMH can properly evaluate the offers received, all proposals submitted in response to this RFP must be formatted in accordance with the sequence noted following. Each category must be separated by separate tabs and labeled with the corresponding tab reference also noted below.
Proposals must be indexed corresponding to the following format and lettering:
TABLE OF CONTENTS
TAB (A) – LETTER OF TRANSMITTAL
A letter of transmittal (preferably on letterhead) bearing the signature of an authorized representative of the firm and the name(s) of the individual(s) authorized to negotiate services and costs with LMH. Authorized individual contact information, including phone number and email address, shall be included within this letter.
TAB (B) – ORGANIZATION
Information about the company: size, structure, history and any relevant certifications as a Minority-owned or Disadvantaged Business Enterprise
TAB (C) – STATEMENT OF QUALIFICATIONS AND EXPERIENCE
1) The Offeror should describe the qualifications of staff to be assigned that will provide services for LMH. Descriptions should include:
Project team make-up (only include resumes of staff to be assigned to the project.)
Assigned Project Manager (the main liaison/contact person for LMH) Overall supervision to be exercised (including how subcontractors will be handled) Professional Licenses or credentials held by team members.
If any subcontractors are used, then all aforementioned information should be provided about each potential subcontractor.
2) Experience - List assignments within the past two (2) years that best demonstrate the proposer’s competence to perform work similar to the required Scope of Services, including:
Description of project and key participants
Dates started and completed.
A brief narrative of the project
TAB (D) – SCOPE OF SERVICES
State specifically your intended practices addressing the “Scope of Services.” Please cite previous examples of providing such services and your organization’s commitment to meeting or exceeding the expectations and duties set forth.
TAB (E) – COST PROPOSAL
All submissions MUST include a fee schedule for the services described in the scope of services (in addition to any other requested itemized costs). Complete the attached “Price Proposal Form” and submit under this section, Tab E, within your proposal.
TAB (F) – REFERENCES
Provide contact information for the project(s) listed in the “Statement of Experience and Qualifications.” Information should include a phone number and an email address. Include at least three (3) organizations and contact information (including email addresses) where you have provided similar services within the last 24 months.
TAB (G) – ATTACHMENTS
(Attachments) All other required information is set forth by each of the following attachments.
Return the ones marked “return” and place in Tab G.
(Other) Any remaining Attachments/Appendices are for your information only and NOT to be returned.
Attachment (A) - Form of Proposal (Return) Attachment (B) - Profile of Firm (Return) Attachment (C) - HUD 5369-A, Representations, Certifications, and Other Statements of Bidders (Return) Attachments (D) - Section 3 Forms (Return) Attachment (E) - HUD 5369-B, Instructions to Offerors, Non-Construction (Information Only) Attachment (F) - Supplementary Instructions for Bidders and Contractors (SIBC) (Information Only) Attachment (G) – Sample LMH Contract (Information Only) Attachment (G1) – Form HUD-5370-C1, General Conditions for Non-Construction Contracts Section I (Without Maintenance Work) (Information Only) Attachment (G2) – Form HUD-5370-C2, General Conditions for Non-Construction Contracts Section II (With Maintenance Work) (Information Only) Attachment (G8) – HUD Maintenance Wage Determination (Information Only) Attachment (H) – Price Proposal Form (Return Under Tab “E”)
Attachment (I) - Form HUD-5369-C, Certifications and Representations of Offerors, Non- Construction Contract (Return) Attachment (J) – Subcontractor Listing (Return)
3.3 Proposal Submission Information
3.3.1 LMH reserves the right to accept or reject any or all proposals, to take exception to the RFP specifications, or to waive any formality. Firms may be excluded from further consideration for failure to comply with the specifications of this RFP. The recommendation of LMH staff, LMH President / CEO and LMH’s Board of Housing Commissioners shall be final.
3.3.2 Proposals may be withdrawn by written request dispatched by the Respondent in time for delivery in the normal course of business prior to the proposal due date and time. Negligence on the part of the Respondent in preparing the required documents confers no right of withdrawal or modification of proposal data after such documents are opened.
3.3.3 The completed submission package must be received by the time and date listed on the cover of this RFP or by the time and date listed in any subsequent addendum. Proposals received after the deadline will not be considered. Submissions delivered by any other method will not be accepted.
3.3.4 All vendors must carefully review their final proposals. Once the file has been opened, proposals cannot be changed; with the exception that LMH may request information or respond to inquiries for clarification purposes only.
3.3.5 All vendors submitting a proposal must agree to honor the terms and conditions contained herein for the life of the contract.
3.3.6 Proposers are not allowed to change any requirements or forms contained herein, either by making or entering onto these documents or the documents submitted any revisions or additions; if such markings are made, the proposal may be deemed invalid. If after accepting a proposal, the Authority decides that any such entry has not changed the intent of the proposal, the Authority may accept the proposal as if the marks, notations, or requirements were not entered on such.
3.3.7 All questions and requests for information must be addressed in writing to the Procurement Manager (PM). The PM will respond to all such inquiries in writing by addendum posted to https://ha.internationaleprocurement.com. Offerors are responsible for ensuring they receive all addenda. During the RFP solicitation process, the PM will NOT conduct any ex parte (a substantive conversation “substantive” meaning, when decisions pertaining to the RFP are made—between the Authority and a prospective proposer when other prospective proposers are not present) conversations that may give one prospective proposer an advantage over other prospective proposers. This does not mean that prospective proposers may not contact the PM it simply means that other than making replies to direct the prospective proposer where his/her answer has already been issued within the solicitation documents, the PM may not respond to the prospective proposer’s inquiries but will direct him/her to submit such inquiry in writing so that the PM may more fairly respond to all prospective proposers in writing by addendum.
4.0 Proposal Evaluation
4.0.1 The Competitive Negotiation Process will be used to select the agreement award, beginning with the highest ranked firm. LMH reserves the right to negotiate an agreement with individual (s), firm(s), or organization (s) that provides the greatest benefit to LMH, not necessarily the lowest price. Firms in the competitive range may be required to be interviewed by the evaluation panel.
4.0.2 LMH will select the respondents that are the most advantageous to LMH based upon the evaluation criteria stated herein. LMH reserves the right to negotiate price and other factors with any acceptable respondents.
4.0.3 LMH reserves the right to award without discussion (s) and may make an award to multiple vendors. The Request for Proposals selective process will involve the ranking of proposers by the appointed LMH evaluation committee. Once the proposals have been evaluated, LMH will negotiate with the Respondent (s) who fall within the competitive range. Fees for these services will be a negotiation factor as well as any other relevant factor identified by the evaluation committee.
4.1 Preliminary Proposal Review
4.1.1 The review process will be conducted in two parts. The preliminary review will consist of a review to be sure the proposal meets the minimum requirements (and mandatory conditions) specified in the RFP. If they do not, they will be rejected.
4.1.2 Proposals in response to the RFP must meet the following requirements:
a. The proposal must be submitted through the e-procurement marketplace as indicated on page 2 in the RFP or sent by email, as instructed on page 2 of this RFP, no later than the time and date listed on the cover of this RFP.
b. Proposals not submitted through the HA E-Procurement Marketplace, or email, by the specified date will be rejected.
c. Proposal must be signed by an authorized vendor representative.
d. Proposals that pass this initial review will be considered a valid proposal and will move on to the final review. Those that do not will be filed as rejected.
4.2 Final Review
4.2.1 All valid proposals will be reviewed, evaluated, and rated by the Review Committee. The Review Committee will be composed of LMH staff.
a. The Review Committee will evaluate each proposal against the criteria in the RFP. During the review, the Committee may request additional information from the vendor. Such information requests and vendor’s responses must always be in writing.
b. All qualified proposals shall be reviewed by the Review Committee using the included evaluation criteria sheet. The number of evaluation points for each section varies according to the value assigned for that aspect of the program.
c. The Review Committee members may request information from sources other than the written proposal to evaluate vendor’s programs. Other sources of information may include oral presentations by vendors, written responses to clarifying questions posed by the Review Committee, and vendor’s history/experience in providing similar services.
d.