RFP26_PR8879_Attachment_B_Price_Schedule.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
Cooling Tower Fill, Drift Eliminators, Louvers, and Refurbishment of Other Components at the Downtown West Central Energy Plant
Solicitation number
PR8879
Issued by
Florida

About this file

This is a Price Schedule attachment (Attachment B) for Request for Proposal (RFP) 26 PR8879 issued by Orlando Utilities Commission (OUC) District Cooling for cooling tower refurbishment services at the Downtown West Central Energy Plant in Florida. The RFP seeks qualified contractors to replace cooling tower film fill material, drift eliminators, louvers, and refurbish other components within Marley crossflow cooling towers. The price schedule is structured as a lump sum bid with two primary options: Option 1 for OEM (Original Equipment Manufacturer) parts and materials, and Option 2 for aftermarket parts and materials. Each option requires bidders to provide pricing for material, labor, and shipping (FOB Destination Prepaid & Allowed), along with lead time in weeks, work duration in weeks, and warranty information for fill media, louvers, and other components. Additional line items address optional costs including refurbishment or replacement of exterior panels, replacement of additional nozzles, and four alternatives for fill replacement material of 15 mil or more thickness (two OEM and two aftermarket options).

Bidders must submit responses that include comprehensive qualifications documentation covering company background, Florida state licensing, insurance requirements with minimum limits of $2,000,000 general liability and $2,000,000 pollution liability, management and staff qualifications with organizational charts and resumes, financial information including Dunn & Bradstreet number and annual revenue for the past four years, project approach and methodology, three verifiable references from similar projects completed within the past five years, health and safety documentation including OSHA rates and workers' compensation experience modification ratings, quality assurance programs, legal history, hiring practices, and training programs. The price schedule also includes sections for bidders to document commercial and technical clarifications and exceptions to the RFP requirements. Payment terms options are requested, including discount structures for early payment (1% for 20 days, 2% for 15 days, and 3% for 10 days, all with net 30 terms).

View the file

Other files

File Type Posted
RFP26_PR8879_ISSUED_11-26-2025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tab 1 - OEM Pricing RFP26 PR8879 FOR COOLING TOWER FILM FILL MATERIAL, DRIFT ELIMINATORS, LOUVERS, AND REFURBISH OTHER COMPONENTS WITHIN THE MARLEY CROSSFLOW COOLING TOWERS AT THE DOWNTOWN WEST CENTRAL ENERGY PLANT

ATTACHMENT B: PRICE SCHEDULE
ITEMDESCRIPTIONUNITQUANTITYUNIT COSTCOST
OPTION NO. 1

COOLING TOWERS NO. 1 & NO. 2 - OEM PARTS AND MATERIALS

A.1MaterialLS1$0.00$0.00
A.2LaborLS1$0.00$0.00
A.3Shipping
(FOB Destination Prepaid & Allowed)LS1$0.00$0.00
TOTAL BID PRICE$0.00
PAYMENT & PERFORMANCE BONDS$0.00
TOTAL LUMP SUM BID PRICE INCLUDING BONDS$0.00
LEAD TIME
MATERIALSWEEKS
DURATION OF THE WORKWEEKS
WARRANTY
FILL MEDIA WARRANTY - MATERIALYEARS
FILL MEDIA WARRANTY - LABORYEARS
LOUVER WARRANTY - MATERIALYEARS
LOUVER WARRANTY - LABORYEARS
OTHER WARRANTY - MATERIALYEARS
OTHER WARRANTY - LABORYEARS
OTHER COSTS
DESCRIPTIONQTYUNITPRICE
1Refurbishment of Exterior Panels (if applicable)$ - 0
2Replacement of Exterior Panels (if applicable)$ - 0
3Replacement of Additional Nozzles$ - 0
4Fill Replacement Material of 15 mil or more Alternative #1 OEM$ - 0
5Fill Replacement Material of 15 mil or more Alternative #2 Aftermarket$ - 0
6Fill Replacement Material of 15 mil or more Alternative #3 OEM$ - 0
7Fill Replacement Material of 15 mil or more Alternative #4 Aftermarket$ - 0
8$ - 0
9$ - 0

Tab 2 - Aftermarket Pricing

RFP26 PR8879 FOR COOLING TOWER FILM FILL MATERIAL, DRIFT ELIMINATORS, LOUVERS, AND REFURBISH OTHER COMPONENTS WITHIN THE MARLEY CROSSFLOW COOLING TOWERS AT THE DOWNTOWN WEST CENTRAL ENERGY PLANT
ATTACHMENT B: PRICE SCHEDULE
ITEMDESCRIPTIONUNITQUANTITYUNIT COSTCOST
OPTION NO. 2

COOLING TOWERS NO. 1 & NO. 2 - AFTERMARKET PARTS AND MATERIALS

A.1MaterialLS1$0.00$0.00
A.2LaborLS1$0.00$0.00
A.3Shipping
(FOB Destination Prepaid & Allowed)LS1$0.00$0.00
TOTAL BID PRICE$0.00
PAYMENT & PERFORMANCE BONDS$0.00
TOTAL LUMP SUM BID PRICE INCLUDING BONDS$0.00
LEAD TIME
MATERIALSWEEKS
DURATION OF THE WORKWEEKS
WARRANTY
FILL MEDIA WARRANTY - MATERIALYEARS
FILL MEDIA WARRANTY - LABORYEARS
LOUVER WARRANTY - MATERIALYEARS
LOUVER WARRANTY - LABORYEARS
OTHER WARRANTY - MATERIALYEARS
OTHER WARRANTY - LABORYEARS
OTHER COSTS
DESCRIPTIONQTYUNITPRICE
1Refurbishment of Exterior Panels (if applicable)$ - 0
2Replacement of Exterior Panels (if applicable)$ - 0
3Replacement of Additional Nozzles$ - 0
4Fill Replacement Material of 15 mil or more Alternative #1 OEM$ - 0
5Fill Replacement Material of 15 mil or more Alternative #2 Aftermarket$ - 0
6Fill Replacement Material of 15 mil or more Alternative #3 OEM$ - 0
7Fill Replacement Material of 15 mil or more Alternative #4 Aftermarket$ - 0
8$ - 0
9$ - 0

Tab 3 - Qualifications

RFP26 PR8879 FOR COOLING TOWER FILM FILL MATERIAL, DRIFT ELIMINATORS, LOUVERS, AND REFURBISH OTHER COMPONENTS WITHIN THE MARLEY CROSSFLOW COOLING TOWERS AT THE DOWNTOWN WEST CENTRAL ENERGY PLANT
1Company Background DataResponse
1.1Name of Firm
1.2Name of Parent Company
1.3Complete Business Address
1.4State of Incorporation
1.5Number of Employees
1.6A Brief History of Your Firm
1.7Is your Firm Union or Non-Union?
1.8Location of Nearest Service Office
1.9Does your firm use subcontractors?
1.10If yes, what percentage of the work listed under this solicitation is anticipated to be subcontracted?
1.11What are the names of the subcontractors that will be utilized? If none, mark as "N/A".
1.12Which services are the subcontractor (or subcontractors) expected to perform? If none, mark as "N/A".
1.13How many Years Has Your Firm Been in Business?
1.14How many Years of Industry Experience does Your Firm have in Providing (or Performing) Services of the Same Type as Those Listed in this Solicitation?
1.19Primary Contact for this RFPResponse
1.19.1Name
1.19.2Email Address
1.19.3Office Phone Number
1.19.4Mobile Phone Number
1.19.5Telefax Number
2LicenseResponse
2.1The awarded firm (or firms) must be licensed by the State of Florida to perform the services that are requested under this RFP prior to the execution of a written Contract. Is your firm currently licensed by the State of Florida? (Yes or No) If your firm is currently licensed by the state of Florida, please provide a copy of the Annual Report from the Florida Division of Corporations website: (https://dos.myflorida.com/sunbiz/search/)
3InsuranceResponse
3.1Potential Bidders shall be properly insured in accordance with the minimum specified OUC insurance requirements. Provide a sample copy of your firms insurance certificates. (Yes or No)
3.2Firms Insurance Policy provides for General Liability Limits of at least $2,000,000 per occurrence. (Yes or No)
3.3Firms Insurance Policy provides for Auto Coverage of at least $1,000,000. (Yes or No)
3.4Firms Insurance Policy provides for Workers Comp/Employers Liability Coverage meeting Statutory Limits. (Yes or No)
3.5Firms Insurance Policy provides for Pollution Liability Coverage of at least $2,000,000. (Yes or No)
3.6Firms Insurance Policy provides for Additional Insured Requirements. (Yes or No)
3.7Firms Insurance Policy provides for Waiver of Subrogation Requirements. (Yes or No)
4Management/Staff Qualifications and ExperienceResponse
4.1A detailed organization chart depicting their management, operations, maintenance, and administrative support structure for any staff assigned to the contract. The chart should be a broad overview or breakdown of the firm’s corporate management infrastructure and hierarchy. Please be sure to also include an organizational chart of the projected team that would be assigned to this Contract.
4.2Resumes for Key Management Personnel assigned to the Contract (including Site Manager(s) & Field Supervisor(s))
5FinancialResponse
5.1Dunn and Bradstreet (D&B) Number
5.2Firms annual dollar volume for the last four years specific to the division of the firm to provide the services requested:2024:
2023:
2022:
2021:
6Project ApproachResponse
6.1Provide a narrative describing your firm’s capabilities in regards to the scope of work/services being requested in this RFP. Include the overall approach and specific methodology to provide the specified services.
7Provide three (3) verifiable references for three (3) projects of similar type, size, and scope to that of this RFP. References should be from within the past five (5) years. Please do not use OUC or OUC personnel as a reference.
7.1Reference # 1Response
7.1.1Name of Company/Firm
7.1.2Location
7.1.3Dates of Contract Term
7.1.4Total Dollar Value of Contract
7.1.5Contact: Name, phone number, and e-mail address. Contact must be a representative employed directly by the referenced firm that is familiar with the details of the contract. The point of contact must be able to comment or directly respond as to the contractor’s performance under the contract.
7.1.6Was any of the work subcontracted?
7.1.7If yes, what percentage?
8Reference # 2Response
8.1.1Name of Company/Firm
8.1.2Location
8.1.3Dates of Contract Term
8.1.4Total Dollar Value of Contract
8.1.5Contact: Name, phone number, and e-mail address. Contact must be a representative employed directly by the referenced firm that is familiar with the details of the contract. The point of contact must be able to comment or directly respond as to the contractor’s performance under the contract.
8.1.6Was any of the work subcontracted?
8.1.7If yes, what percentage?
9Reference # 3Response
9.1.1Name of Company/Firm
9.1.2Location
9.1.3Dates of Contract Term
9.1.4Total Dollar Value of Contract
9.1.5Contact: Name, phone number, and e-mail address. Contact must be a representative employed directly by the referenced firm that is familiar with the details of the contract. The point of contact must be able to comment or directly respond as to the contractor’s performance under the contract.
9.1.6Was any of the work subcontracted?
9.1.7If yes, what percentage?
10Health & Safety (All documentation requested must pertain to scope of work/services and equipment similar to those described in the RFP)
10.1Provided a copy of your firm’s Health & Safety Manual. (Yes or No) NOTE: Failure to provide this could result in OUC assuming your firm does not have written Health and Safety programs.
10.2Firms Workman's Comp Exp Mod rating for the last three (3) years.2024:
2023:
2022:
10.3OSHA Incidence Rate for the last three (3) years (Data should apply to the division of the firm providing the service) (OSHA Recordable Rate)2024:
2023:
2022:
10.4OSHA Frequency Rate for the last three (3) years (Data should apply to the division of the firm providing the service) (OSHA DART Rate)2024:
2023:
2022:
10.5OSHA Severity Rate for the last three (3) years (Data should apply to the division of the firm providing the service)2024:
2023:
2022:
10.6Has your company had any fatalities in the last three (3) years. (Yes or No)
10.7If yes to item 10.6 above, please describe and provide the details surrounding the incident(s).
10.8Does your company have a Drug Free Work Place Policy? (Yes or No)
10.9Has your company ever been issued a warning or violation by a regulatory agency for noncompliance with Federal or State regulations? (Yes or No)
10.10.If yes to item 10.9 above, please describe and provide date of violation or warning.
11QualityResponse
11.1Does your company have a Quality Assurance program? If yes, provide an outline or attach a copy of the program. NOTE: Failure to provide this may result in OUC assuming your firm does not have a written Quality Assurance Program.
12LegalResponse
12.1Is your firm currently involved in any unsettled litigation? (Yes or No)
12.2If yes to item 12.1 above, please provide any pertinent details of the matter that is currently being adjudicated.
12.3Has your company ever been in a lawsuit where the company or one of its employees was accused of a wrong doing? (Yes or No)
12.4If yes to item 12.3 above, please provide the pertinent details of the lawsuit, including but not limited to: the name of the plaintiff, dates of the lawsuit, and claim.
12.5Has your company ever had a contract terminated? (Yes or No)
12.6If yes to item 12.5 above, please provide an explanation which includes the client company's name, date(s), and cause of termination.
13Hiring Practices (Please indicate below if your firm conducts the following pre-employment screening and testing)Response
13.1Pre-Employment Criminal Background Checks? (Yes or No)
13.2Drug Screening Tests? (Yes or No)
13.3Workers Compensation History Review? (Yes or No)
13.4Driver License Verification (Yes or No)
13.5Pre-Employment Physical Exam (Yes or No)
14Training ProgramsResponse
14.1Does your company have a Training Program for your employees? If yes, provide an outline or attach a copy of the program.
15Pricing DiscountResponse
15.1Does your firm offer an option for 1% 20 Days, Net 30?
15.2Does your firm offer an option for 2% 15 Days, Net 30?
15.3Does your firm offer an option for 3% 10 Days, Net 30?

Tab 4 - Clarifications

RFP26 PR8879 FOR COOLING TOWER FILM FILL MATERIAL, DRIFT ELIMINATORS, LOUVERS, AND REFURBISH OTHER COMPONENTS WITHIN THE MARLEY CROSSFLOW COOLING TOWERS AT THE DOWNTOWN WEST CENTRAL ENERGY PLANT
Clarifications
All of Bidder’s Clarifications herein itemized and included with the Proposal do not constitute explicit variation or deviation from performance of the Work by the Bidder in strict accordance with the requirements of the solicitation documents.
Commercial Clarifications
ItemReference ArticleStated Commercial Clarifications
CC1
CC2
CC3
CC4
CC5
CC6
CC7
CC8
CC9
CC10
Technical Clarifications
ItemReference ArticleStated Technical Clarifications
TC1
TC2
TC3
TC4
TC5
TC6
TC7
TC8
TC9
TC10

Tab 5 - Exceptions

RFP26 PR8879 FOR COOLING TOWER FILM FILL MATERIAL, DRIFT ELIMINATORS, LOUVERS, AND REFURBISH OTHER COMPONENTS WITHIN THE MARLEY CROSSFLOW COOLING TOWERS AT THE DOWNTOWN WEST CENTRAL ENERGY PLANT
Exceptions
All of Bidder’s Exceptions herein itemized and included with the Proposal do not constitute explicit variation or deviation from performance of the Work by the Bidder in strict accordance with the requirements of the solicitation documents.
Commercial Exceptions
ItemReference ArticleStated Commercial Exceptions
CE1
CE2
CE3
CE4
CE5
CE6
CE7
CE8
CE9
CE10
Technical Exceptions
ItemReference ArticleStated Technical Exceptions
TE1
TE2
TE3
TE4
TE5
TE6
TE7
TE8
TE9
TE10

File details come from the government source that posted it. Updated .