Summary of RFP2026-015_IOB - Front End Documents
This request for proposals document is issued by San Patricio County for the Ingleside on the Bay Drainage Improvements Project located in the City of Ingleside on the Bay, Texas. The project scope encompasses ditch cleaning and reshaping, storm sewer cleaning, storm pipe installation and replacement, storm inlet installation, and partial-depth roadway reconstruction. The solicitation is seeking sealed bids from qualified contractors to execute these drainage improvement and roadway work throughout the municipal area. Specific details regarding response deadlines, site visit schedules, pre-bid meetings, award timelines, and contract terms should be referenced within the complete bidding documents and technical specifications included in the front-end materials.
Detailed pricing terms, funding sources, contract duration, and any specific set-asides or other conditions applicable to this procurement should be verified in the complete RFP documentation. Prospective bidders are advised to review all addenda, exhibits, and supplementary materials to ensure comprehensive understanding of project requirements, specifications, and bid submission procedures prior to proposal submission.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Documents and Specifications for Construction of:
Ingleside on the Bay Drainage Improvements
SAN PATRICIO COUNTY, TEXAS
GLO CDBG-MIT No. 24-065-146-F005
RFP 2026-015
PROPOSALS MUST BE SUBMITTED NO LATER THAN:
December 16, 2026
2:00 p.m. (local time)
Date Issued: November 19, 2026
Prepared By:
Halff Associates, Inc. (TBPELS Firm #312) 711 North Carancahua Street / Suite 1190 / Corpus Christi, TX / (361) 400-4600
• Advertisement & Invitation to Bid
• Instruction to Bidders
• Bid Tab
• Equal Opportunity Guidelines for Construction Contractors
• Sample Construction Contract o [Insert: HUD 4010 PDF into Construction Contract]
• General Conditions
• Contractor’s Local Opportunity Plan o Proposed Contractor’s Breakdown
• Grant Recipient’s Executed Section 3 Policy & Resolution
• Statement of Bidder’s Qualifications
• Section 3 Preference in Contracting
• Contractor’s Certification Regarding Civil Rights
• Contractor’s Certification Concerning Labor Standards and Prevailing Wage Requirements
• Wage Rates
• Certificate of Liability Insurance
• Non-Collusion Affidavit of Prime Bidder
• Bonds
• Attorney Review Certification
• Certification Regarding Lobbying
• Additional Contract Provisions & Federal Requirements
• No Boycott Israel - Notarized Form
• Policy of Non-Discrimination on the basis of Disability Form
• 1295 Form
• Conflict of Interest Form
• SAM.gov Registration Instructions & Checklist
• List of Specifications
• Geotechnical Report
All contractors and subcontractors, must not be suspended or debarred with the System for Award Management (www.SAM.gov) prior to any formal action authorizing the award of a contract to the contractor (examples of formal action include but are not limited to, authorizing resolution, authorizing ordinance, Council/Commissioners Court approval of award, contract execution, etc.).
Bid and Contract Documents for
Construction Contracts
Advertisement & Invitation to Bid (1 of 2)
ADVERTISEMENT AND INVITATION TO BID
The County of San Patricio will receive bids for Ingleside on the Bay Drainage Improvements until 2:00 PM on December
16, 2026. Please submit your proposal electronically through the County's eBidding platform at www.sanpatriciocountytx.gov (click on Departments, then Purchasing-Bid Opportunities) OR submit one (1) original physical proposal and one (1) thumb drive to San Patricio County, "RFP2026-015 Ingleside on the Bay Drainage
Improvements" 1301 E. Sinton Street Suite C Sinton, Texas 78387. All submitted bids should be clearly labeled with the corresponding RFP number assigned by the County. The bids will be publicly opened and read aloud at 2:00 PM on
December 16, 2026 at 1301 E. Sinton Street Suite C Sinton, Texas 78387.
Bids are invited for several items and quantities of work as follows:
This drainage and flood improvements project includes ditch regrading, partial depth roadway reconstruction, and storm sewer clearing, repair, and installation throughout the City of Ingleside on the Bay.
1. Ditch Cleaning and Reshaping (13,593 LF)
2. Storm Sewer Cleaning (Pipe) (12”-18” Dia.) (4,272 LF)
3. Storm Pipe Installation and Replacement (4,295 LF)
4. Storm Inlet Installation (28 EA)
5. Partial Depth Roadway Reconstruction (36,148 SY)
Physical copies of the Bid/Contract Documents, including Drawings and Technical Specifications are on file at 520 Harvill
St; (Nina Trevino St), Sinton, TX 78387.
Copies of the Bid/Contract Documents may be obtained by downloaded electronically through the County's eBidding platform at www.sanpatriciocountytx.gov (click on Departments, then Purchasing-Bid Opportunities).
A bid bond in the amount of 5 percent of the bid issued by an acceptable surety shall be submitted with each bid [for those contracts that exceed $100,000]. A certified check or bank draft payable to the County of San Patricio or negotiable U.S.
Government Bonds (as par value) may be submitted in lieu of the Bid Bond.
Attention is called to the fact that not less than, the federally determined prevailing (Davis-Bacon and Related Acts) wage rate, as issued by the Department of Labor and contained in the contract documents, must be paid on this project. In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of
Advertisement & Invitation to Bid (2 of 2) race, color, religion, sex, sexual identity, gender identity, or national origin.
The County of San Patricio reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by County of San Patricio for a period not to exceed 90 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder’s qualifications prior to the contract award.
All contractors/subcontractors must not be debarred, suspended or otherwise excluded from or ineligible for participation in the System for Award Management (SAM.gov). An Active Registration through SAM.gov is required to be considered eligible to work on this project.
BID SCHEDULE:
NOTICE OF ADVERTISEMENT: November 12, 2026 BID ADVERTISEMENT: November 19, 2026 2nd BID ADVERTISEMENT: November 26, 2026 NON-MANDATORY PRE-BID MEETING: December 2, 2026; 3:00 PM LAST DAY FOR QUESTIONS: December 4, 2026 FINAL ADDENDUM ISSUE: December 11, 2026 BIDS DUE AND OPENING: December 16, 2026; 2:00 PM
Instructions to Bidders (1 of 4)
INSTRUCTION TO BIDDERS FOR
CONSTRUCTION
1. Use of Separate Bid Forms
These contract documents include a complete set of bid and contract forms which are for the convenience of the bidders and are not to be detached from the contract document, completed or executed. Separate bid forms are provided for your use.
2. Interpretations or Addenda
No oral interpretations will be made to any bidder. Each request for clarification shall be made in writing to the Grant Recipient or engineer no less than seven (7) days prior to the bid opening. Each interpretation made will be in the form of an Addendum to the contract documents and will be distributed to all parties holding contract documents no less than seven (7) days prior to the bid opening. It is, however, the bidder's responsibility to make inquiry as to any addenda issued. All such addenda shall become part of the contract documents and all bidders shall be bound by such addenda, whether or not received by the bidders.
If an addendum to the bid package is necessary, it must be distributed to each potential bidder. The distribution of an addendum shall be verified either by statements of receipt or registered/certified mail receipts, which shall be included in the public works construction file. The addendum shall allow adequate time for consideration in bid preparation (usually at least one week). If adequate time is not available, the bid opening date must be extended and the Grant Recipient must republish the invitation for bids containing the place, time, and date for the new bid opening. Note that any change to the original bid opening date will require republication of the invitation for bids at least once in a locally published newspaper. The republished notice will include the place, time and date for the new bid opening and must be published at least seven days prior to the new bid opening date.
3. Inspection of Site
Each bidder should visit the site of the proposed work and should become acquainted with the existing conditions and facilities, the difficulties and restrictions pertaining to the performance of the contract. The bidder should thoroughly examine and become familiar with the drawings, technical specifications and all other contract documents. The contractor by the execution of the contract shall in no way be relieved of any obligation under it due to failure to receive or examine any form or legal document or to visit the site or the conditions existing at the site. The County will be justified in rejecting any claim based on lack of inspection of the site prior to the bid.
4. Alternate bid items
No alternate bids or bid items will be considered unless they are specifically requested by the technical specifications.
5. Bids
a. All bids must be submitted on the forms provided and are subject to all requirements of the Contract Documents, including the Drawings.
b. Bid documents may be submitted electronically OR in person. Electronic bid submittal location can be found through the County’s eBidding platform at www.sanpatriciocountytx.gov (click on Departments, then Purchasing-Bid Opportunities). In person bid submittals shall be submitted in the form of one (1) hard copies and one (1) electronic copy on a USB thumb drive delivered to 1301 E. Sinton Street Suite C Sinton, Texas 78387. All submitted bids should be clearly labeled with the corresponding RFP number assigned by the County.
c. All bids must be regular in every respect and no interlineation, excisions or special conditions may
Instructions to Bidders (2 of 4) be made or included by the bidder.
d. Bid documents, including but not limited to the bid, the bid bond(s), the contractor’s certifications, local opportunity plan, and the statement of the bidder’s qualifications, shall be sealed in an envelope and clearly labeled with the words "Bid Documents”, the project number, name of bidder and the date and time of bid opening.
e. The County may consider as irregular any bid on which there is an alteration of or departure from the bid form and, at its option, may reject any irregular bid.
f. If a contract is awarded, it will be awarded to a responsible bidder on the basis of the lowest/best bid and the selected alternate bid items, if any. The contract will require the completion of the work in accordance with the contract documents.
6. Bid Modifications Prior to Bid Opening
a. Any bidder may modify its bid by submitting a modification or supplemental bid at any time prior to the scheduled closing time for receipt of bids, provided such modification or supplemental bid is received by the locality prior to the closing time. The modification or supplemental bid should not reveal the original bid price but should provide only the addition, subtractions or other modifications to the original bid so that the final prices or terms will not be known by the locality until the sealed bid is open.
7. Bid Bond
a. A bid bond in the amount of 5% of the bid issued by an acceptable surety shall be submitted with each bid [for contracts greater than $100, 000,]. A certified check or bank draft payable to the locality or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond.
b. The bid bond or its comparable will be returned to the bidder as soon as practical after the opening of the bids.
8. Statement of Bidders Qualifications
Each bidder shall submit on the form furnished for that purpose a statement of the bidder's qualifications. The Grant Recipient shall have the right to take such steps as it deems necessary to determine the ability of the bidder to perform its obligations under the contract, and the bidder shall furnish the Grant Recipient all such information and data for this purpose as it may request. The right is reserved to reject any bid where an investigation of the available data does not satisfy the Grant Recipient that the bidder is qualified to carry out properly the terms of the contract.
9. Unit Price
The unit price for each of the several items in the bid shall include its pro rata share of overhead so that the sum of the products obtained by multiplying the quantity shown for each item by the unit price bid represents the total bid. Any bid not conforming to this requirement may be rejected as informal. Special attention is drawn to this condition, as the unit prices will be used to determine the amount of any change orders resulting from an increase or decrease in quantities.
10. Proposed Calendar Day Schedule
All bids must include the bidder’s proposed calendar day schedule to complete the contract work. Attention should be paid to General Conditions 52(a)(1) “Construction Sequence” for work planned at multiple locations and the status of construction easements. The bidder’s proposed schedule will be considered during the evaluation of bids with preference to shorter proposed schedules. Any bid not conforming to this requirement may be rejected as informal.
Instructions to Bidders (3 of 4)
11. Corrections
Erasures or other corrections in the bid must be noted over the signature of the bidder.
12. Time for Receiving Bids
Bids received prior to the advertised hour of opening shall be kept securely sealed. The officer appointed to open the bids shall decide when the specified time has arrived and no bid received thereafter will be considered; except that when a bid arrives by mail after the time fixed for opening, but before the reading of all other bids is completed, and it is shown to the satisfaction of the Grant Recipient that the late arrival of the bid was solely due to delay in the mail for which the bidder was not responsible, such bid will be received and considered.
13. Opening of Bids
The County shall, at the time and place fixed for the opening of bids, open each bid and publicly read it aloud, irrespective of any irregularities therein. Bidders and other interested individuals may be present.
14. Withdrawal of Bids
Bidder may withdraw the bid before the time fixed for the opening of bids, by communicating its purpose in writing to the Grant Recipient. Upon receipt of such notice, the unopened bid will be returned to the bidder. The bid guaranty of any bidder withdrawing his bid will be returned promptly.
15. Award of Contract/Rejection of Bids
a. The contract will be awarded to the responsive, responsible Bidder submitting the lowest/best bid.
The bidder selected will be notified at the earliest possible date. The locality reserves the right to reject any or all bids and to waive any informality in bids received where such rejection or waiver is in its interest.
b. The Grant Recipient reserves the right to consider as unqualified to do the work any bidder who does not habitually perform with his own forces the major portions of the work involved in construction of the improvements embraced in this contract.
16. Execution of Agreement/Performance and Payment Bonds
a. Performance Bonds - Requires all prime contractors which enter into a formal contract in excess of $100,000 with the State, a county, or a municipality; a department, board, or agency of the state, a county, or a municipality; and a school district or a subdivision thereof, to obtain a Performance Bond in the amount of the contract before commencing with work
b. Payment Bonds- Requires all prime contractors which enter into a formal contract with the State, a county, or a municipality; a department, board, or agency of the state, a county, or a municipality;
and a school district or a subdivision thereof, to furnish to the governmental entity a payment bond in the amount of the contract. The payment bond must be filed within 30 days from the date of the Notice of Award:
c. The failure of the successful bidder to execute the agreement and supply the required bonds within thirty (30) days from the date of the notice of award-or within such extended period as the locality may grant, shall constitute a default and the locality may, at its option, either award the contract to the next lowest responsible bidder, or re-advertise for bids. In either case, the locality may charge against the bidder the difference between the amount of the bid, and the amount for which a contract is subsequently executed irrespective of whether this difference exceeds the amount of
Instructions to Bidders (4 of 4) the bid bond. If a more favorable bid is received through re-advertisement, the defaulting bidder shall have no claim against the locality for a refund.
17. Wages and Salaries
Attention is particularly called to the requirement of paying not less than the prevailing Davis Bacon Related Acts (DBRA) wage rates specified in the Contract Documents. These rates are minimums to be paid during the life of the contract. It is therefore the responsibility of the Bidder to inform themselves as to local labor conditions.
18. Equal Employment Opportunity
Attention is called to the requirements for ensuring that employees and applicants for employment are not discriminated against because of race, color, religion, sex, sexual identity, gender identity, or national origin, and other civil rights requirements.
19. Certification Regarding Lobbying –
Contractors who apply or bid for an award of $100,000 or more shall provide the required certification that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer of employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by 31 USC § 1352.
SAN PATRICIO COUNTY CDBG-MIT (MOD)
INGLESIDE ON THE BAY DRAINAGE IMPROVEMENTS
ITEM NO. DESCRIPTION UNIT QTY Unit Bid $ Cost
100-7001 PREPARING ROW AC 5.34
500-7001 MOBILIZATION (7.0% MAX) L.S. 1
502-6001 BARRICADES, SIGNS AND TRAFFIC HANDLING L.S. 1
104-7011 REMOVE CONC (DRIVEWAYS) SY 6860
104-7025 REMOVE CONC (RETAINING WALLS) SY 2
105-7005 RMV (5"-9") TRT/UNTRT BASE & ASPH PAV SY 6144
105-7031 RMV (11") TRT/UNTRT BASE & ASPH PAV SY 220
354-7052 PLANE ASPH CONC PAV (3") SY 36148
496-7002 REMOVE STR (INLET) EA 7
496-7007 REMOVE STR (PIPE) LF 1351
644-7065 RELOCATE SM RD SN SUP&AM TY 10BWG EA 7
644-7073 REMOVE SM RD SN SUP&AM EA 2
760-7001 DITCH CLEANING AND RESHAPING (FOOT) LF 13593
764-7001 DRAIN INLET CLEANING EA 19
764-7007 STORM SEWER CLEANING (PIPE)(12"-18"DIA) LF 4272
CoCC 0256 10 3' CONCRETE VALLEY GUTTER LF 2,461
CoCC 0256 10 5' CONCRETE VALLEY GUTTER LF 579
CoCC 0256 10 VALLEY GUTTER (FOR ROAD) SY 794
275-7001 CEMENT TRT (EXST MATL)(6") SY 17,681
247-7001 FL BS (CMP IN PLC)(TY A GR 1-2) @ 210 LB/SY TON 2,839
275-7006 CEMENT TRT (EXIST MATL & NEW BASE)(6") SY 26,785
310-7004 PRIME COAT (AE-P) @ 0.15 GAL/SY GAL 5,237
341-7048 D-GR HMA TY-D PG70-22 @ 220 LB/SY TON 3,839
6200-XXXX NONWOVEN GEOTEXTILE TYP II SY 4,349
247-7044 FL BS (CMP IN PLC)(TY A GR 1-2) (6") SY 4,349
6240-XXXX 3" HDPE GEOCELL SY 4,349
247-7004 FL BS (CMP IN PLC)(TY A GR 5) @ 300 LB/SY TON 654
530-7006 DRIVEWAYS (CONC) SY 1,222
644-7067 IN SM RD SN SUP&AM EA 2
110-7002 EXCAVATION (CHANNEL) - Includes haul away & over excavation for 6" topsoil CY 4,268
400-7003 STRUCT EXCAV (PIPE) CY 2,418
400-7010 CEM STABIL BKFL CY 160
400-7011 CEMENT STAB BACKFILL (INLET OR MH) CY 18
432-7003 RIPRAP (CONC)(6 IN) CY 8
465-7126 INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT) EA 26
465-XXXX 3'X15' AREA ZONE DRAIN EA 1
465-XXXX SINGLE OPENING AREA ZONE DRAIN EA 1
464-7017 RC PIPE (CL IV)(12 IN) LF 152
464-7018 RC PIPE (CL IV)(15 IN) LF 1,193
464-7019 RC PIPE (CL IV)(18 IN) LF 1,005
464-7020 RC PIPE (CL IV)(24 IN) LF 192
464-7058 RC PIPE (ELLIP)(CL III)(DES 1) LF 400
464-7059 RC PIPE (ELLIP)(CL III)(DES 2) LF 40
466-7001 HEADWALL (CH - FW - 0) (DIA= 12 IN) EA 4
467-7287 SET (TY II) (12 IN) (CMP) (6: 1) (C) EA 1
467-7297 SET (TY II) (15 IN) (RCP) (3: 1) (C) EA 2
474-7001 SLOT DRAIN (GAL STL) (12 IN) LF 98
402-7001 TRENCH EXCAVATION PROTECTION LF 2,544
CoCC 022 021 TRENCH DEWATERING FOR STORM LINE LF 809
RETAINING WALL LF 193
STORM INLET REPLACEMENT (includes removal, install, trench dewatering, fittings, trench, backfill, and reconnection)
EA 17
STORMLINE AND CULVERT REPLACEMENT (30% OF 764-7004) (includes removal, install, trench dewatering, fittings, trench, backfill, and reconnection)
LF 1,313
SAWS 833 FIBER OPTIC BOX ADJUSTMENT EA 1
479-7001 ADJUSTING MANHOLES EA 30
CoCC 0264 02 6-INCH DIA. C900 PVC WATERLINE DR18 LF 360
CoCC 0264 02 6-INCH BEND (45 DEG) EA 4
CoCC 0264 02 6-INCH GATE VALVE AND BOX EA 2
CoCC 0264 02 6-INCH TIE-IN CONNECTION EA 2
CoCC 0264 02 TRENCH SAFETY FOR WATERLINE LF 715
CoCC 0264 01 2 - 4 INCH WATERLINE ADJUSTMENT (includes removal, install, trench dewatering, fittings, trench, backfill, and reconnection)
LF 420
CoCC 0264 02 6 - 8 INCH WATERLINE ADJUSTMENT (includes removal, install, trench dewatering, fittings, trench, backfill, and reconnection)
LF 140
Ingleside on the Bay Drainage Improvements
SITE PREPARATION AND TRAFFIC CONTROL
REMOVAL
ROADWAY
DRAINAGE
UTILITY
PAVEMENT MARKINGS AND SIGNS
SAN PATRICIO COUNTY CDBG-MIT (MOD)
INGLESIDE ON THE BAY DRAINAGE IMPROVEMENTS
ITEM NO. DESCRIPTION UNIT QTY Unit Bid $ Cost
Ingleside on the Bay Drainage Improvements
SITE PREPARATION AND TRAFFIC CONTROL
CoCC 0276 02
6 - 8 INCH WASTEWATER LINE ADJUSTMENT (includes removal, install, fittings, trench, backfill, and reconnection)
LF 20
CoCC 0266 02 4 - 6 INCH WASTEWATER FORCEMAIN ADJUSTMENT (includes removal, install, trench dewatering, fittings, trench, backfill, and reconnection)
LF 180
GAS LINE ADJUSTMENT (adjustments to be performed by pipeline owner, CenterPoint Energy; Contractor to coordinate adjustment with and pay owner directly)
LF 20
100-7013 TREE PROTECTION (INSTALL) EA 62
100-7015 TREE PROTECTION (REMOVE) EA 62
160-7004 FURN & PLACE TOPSOIL (6") SY 23,681
164-7004 BROADCAST SEED (PERM_URBAN_CLAY) SY 23,681
168-7001 VEGETATIVE WATERING TGL 49
506-7020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 250
506-7024 CONSTRUCTION EXITS (REMOVE) SY 250
506-7039 TEMP SEDMT CONT FENCE (INSTALL) LF 29,483
506-7040 TEMP SEDMT CONT FENCE (INLET PROTECTION) LF 658
506-7041 TEMP SEDMT CONT FENCE (REMOVE) LF 29,483
Calendar DaysContractor proposed Calendar Day Schedule:
SUBTOTAL FOR CONSTRUCTION
STORMWATER POLLUTION PREVENTION
Equal Opportunity Guidelines for Construction Contractors (1 of 2)
Equal Opportunity Guidelines for Construction Contractors Note: To be included in bid packet and distributed at the preconstruction conference (optional)
1. What are the responsibilities of the offeror or bidder to ensure equal employment opportunity?
For contracts over $ 10,000, the offeror or bidder must comply with the "Equal Opportunity Clause" and the "Standard Federal Equal Opportunity Construction Contract Specifications."
2. Are construction contractors required to ensure a legal working environment for all employees?
Yes, it is the construction contractor's responsibility to provide an environment free of harassment, intimidation, and coercion to all employees and to notify all foremen and supervisors to carry out this obligation, with specific attention to minority or female individuals.
3. To alleviate developing separate facilities for men and women on all sites, can a construction contractor place all women employees on one site?
No, two or more women should be assigned to each site when possible.
4. Are construction contractors required to make special outreach efforts to Section 3 or minority and female recruitment sources?
Yes, construction contractors must establish a current list of Section 3, minority and female recruitment sources. Notification of employment opportunities, including the availability of on-the-job training and apprenticeship programs, should be given to these sources. The efforts of the construction contractors should be kept in file.
5. Should records be maintained on the number of Section 3 residents, minority and females applying for positions with construction contractors?
Yes, records must be maintained to include a current list of names, addresses and telephone numbers of all Section 3, minority and female applicants. The documentation should also include the results of the applications submitted.
6. What happens if a woman or minority is sent to the union by the Contractor and is not referred back to the Contractor for employment?
If the unions impede the construction contractor's responsibility to provide equal employment opportunity, a written notice should be submitted to GLO.
7. What efforts are made by construction contractors to create entry-level positions for Section 3 residents, women and minorities?
Construction contractors are required to develop on-the-job training programs, or participate in training programs, especially those funded by the Department of Labor, to create positions for Section 3 residents, women and minorities and to meet employment needs.
8. Are any efforts made by the Contractor to publicize their Equal Employment Opportunity (EEO) policy?
Yes, the construction contractor is responsible for notifying unions and sources of training programs of their equal employment opportunity policy. Unions should be requested to cooperate in the effort of equal opportunity. The policy should be included in any appropriate manuals, or collective bargaining agreements. The construction contractor is encouraged to publicize the equal employment opportunity policy in the company newspaper and annual report. The Contractor is also responsible to include the EEO policy in all media advertisement.
9. Are any in-service training programs provided for staff to update the EEO policy?
At least annually a review of the EEO policy and the affirmative action obligations are required of all personnel employees of a decision-making status. A record of the meeting including date, time, location, persons present, subject matter discussed, and disposition of the subject matter should be maintained.
10. What recruitment efforts are made for Section 3 residents, minorities and women?
The construction contractor must notify both orally and in writing, Section 3, minority and female recruitment sources one month prior to the date of acceptance for apprenticeship or other training programs.
Equal Opportunity Guidelines for Construction Contractors (2 of 2)
11. Are any measures taken to encourage promotions for minorities and women?
Yes, an annual evaluation should be conducted for all minority and female personnel to encourage these employees to seek higher positions.
12. What efforts are taken to insure that personnel policies are in accordance with the EEO policy?
Personnel policies in regard to job practices, work assignments, etc. should be continually monitored to insure that the EEO policy is carried out.
13. Can women be excluded from utilizing any facilities available to men?
No, all facilities and company activities are non-segregated except for bathrooms or changing facilities to ensure privacy.
14. What efforts should be utilized to include minority and female contractors and suppliers?
Take affirmative steps to ensure that small, minority, and women owned businesses are included on all lists for contractors/service providers. Solicit these businesses when issuing RFPs and RFQs and soliciting construction bids. Divide project activities into small tasks to allow participation. Keep records of all offers to minority and female construction contractors.
15. If a construction contractor participates in a business related association that does not comply with equal opportunity affirmative action standards, does that show his/her failure to comply?
No, the construction contractor is responsible for its own compliance.
16. Can a construction contractor hire a subcontractor who has been debarred from government contracts pursuant to EEO?
No. The construction contractor must suspend, terminate or cancel its contract with any Subcontractor who is in violation of the EEO policy.
17. What effort has been taken by the construction contractor to monitor all employment to insure the company EEO policy is being carried out?
The construction contractor must designate a responsible individual to keep accurate records of all employees that includes specific information required by the government.
Sample Construction Contract (1 of 2)
SAMPLE CONSTRUCTION CONTRACT
THIS AGREEMENT made this the day of , , by and between
(a corporation organized and existing under the laws of the State of )
(a partnership consisting of ) (an individual trading as ) [Note 1] hereinafter called the “Contractor”, and hereinafter called the “County.”
WITNESSETH, that the Contractor and the County for the considerations stated herein mutually agree as follows:
ARTICLE 1. Statement of Work. The Contractor shall furnish all supervision, technical personnel, labor, materials, machinery, tools, equipment and services, including utility and transportation services, and perform and complete all work required for the construction of the Improvements embraced in Flood and Drainage Improvements for Culvert Replacements (Three Locations) GLO Community Development Block Grant (CDBG) project, all in strict accordance with the contract documents including all addenda thereto, numbered 24-065-146-F005, dated __________ and ________, all as prepared by Halff Associates, Inc., acting and in these contract documents preparation, referred to as the “Engineer”.
ARTICLE 2. The Contract Price. The County will pay the Contractor for the performance of the Contract in current funds, for the total quantities of work performed at the unit prices stipulated in the Bid for the several respective items of work completed subject to additions and deductions as provided in hereof.
Alternate Pricing Techniques: In the event the statutory provisions require the contract price to be a fixed sum, in the absence of an approved form, the following should be substituted for Article 2 above.
“ARTICLE 2. The Contract Price. The County will pay the Contractor for the performance of the Contract, in current funds, subject to additions and deductions as provided in Section 109 hereof, the sum of Dollars ($ ).”
ARTICLE 3. The Contract. The executed contract documents shall consist of the following components:
a. This Agreement (pgs. 1-3)
b. Addenda
c. Invitation for Bids
d. Instructions to Bidders
e. Signed Copy of Bid
f. General Conditions, Part I
g. Special Conditions
h. Technical Specifications
i. Drawings
j. GLO Required Documentation
k. Geotechnical Report
Sample Construction Contract (2 of 2)
ARTICLE 4. Performance. Work, in accordance with the Contract dated , , shall commence on or before , , and Contractor shall complete the WORK within consecutive calendar days thereafter. The date of completion of all WORK is therefore
This Agreement, together with other documents enumerated in this ARTICLE 3, which said other documents are as fully a part of the Contract as if hereto attached or herein repeated, forms the Contract between the parties hereto. In the event that any provision in any component part of this Contract conflicts with any provision of any other component part, the provision of the component part first enumerated in this ARTICLE 3 shall govern, except as otherwise specifically stated.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed in triplicate (Note 3) original copies on the day and year first above written. (Note 3)
(The Contractor)
By [Note 4]
Title
(County)
By
Title
Special Notes:
Note 3. The number of copies to be executed by the parties should be stated in the agreement in the space provided. Such additional signed copies shall be prepared as may be required by the surety companies and others.
Note 4. Supply a description of the Contractor (e.g., proprietorship, partnership, and corporation).
Corporate Certifications
I, , certify that I am the of the corporation named as Contractor herein; that , who signed this Agreement on behalf of the Contractor, was then of said corporation; that said Agreement was duly signed for and in behalf of said corporation by authority of its governing body, and is within the scope of its corporate powers.
Corporate
Seal (Corporate Secretary)
Previous editions obsolete Form HUD-4010, (10/2023) ref. Handbook 1344.1
HUD-4010 U.S. Department of Housing and Urban Development Federal Labor Standards Provisions Office of Davis-Bacon and Labor Standards
A. APPLICABILITY
The Project or Program to which the construction work covered by this Contract pertains is being assisted by the United States of America, and the following Federal Labor Standards Provisions are included in this Contract pursuant to the provisions applicable to such Federal assistance.
1. Minimum wages and fringe benefits
i. All laborers and mechanics employed or working upon the site of the work (or otherwise working in construction or development of the project under a development statute), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of basic hourly wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. As provided in 29 CFR 5.5(d) and (e), the appropriate wage determinations are effective by operation of law even if they have not been attached to the contract. Contributions made or costs reasonably anticipated for bona fide fringe benefits under the Davis-Bacon Act (40 U.S.C. 3141(2)(B)) on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph (a)(1)(v) of these contract clauses; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics must be paid the appropriate wage rate and fringe benefits on the wage determination for the classification(s) of work actually performed, without regard to skill, except as provided in 29 CFR 5.5(a)(4). Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, That the employer’s payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classifications and wage rates conformed under 29 CFR 5.5(a)(1)(iii)) and the Davis-Bacon poster (WH-1321) must be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers.
ii. Frequently recurring classifications A. In addition to wage and fringe benefit rates that have been determined to be prevailing under the procedures set forth in 29 CFR part 1, a wage determination may contain, pursuant to § 1.3(f), wage and fringe benefit rates for classifications of laborers and mechanics for which conformance requests are regularly submitted pursuant to 29 CFR 5.5(a)(1)(iii), provided that:
1. The work performed by the classification is not performed by a classification in the wage determination for which a prevailing wage rate has been determined;
2. The classification is used in the area by the construction industry; and
3. The wage rate for the classification bears a reasonable relationship to the prevailing wage rates contained in the wage determination.
B. The Administrator will establish wage rates for such classifications in accordance with 29 CFR
5.5(a)(1)(iii)(A)(3). Work performed in such a classification must be paid at no less than the wage and fringe benefit rate listed on the wage determination for such classification.
iii. Conformance A. The contracting officer must require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract be classified in conformance with the wage determination. Conformance of an additional classification and wage rate and fringe benefits is appropriate only when the following criteria have been met:
1. The work to be performed by the classification requested is not performed by a classification in the wage determination; and
2. The classification is used in the area by the construction industry; and
3. The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination.
B. The conformance process may not be used to split, subdivide, or otherwise avoid application of classifications listed in the wage determination.
C. If the contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the contracting officer agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken will be sent by the contracting officer by email to DBAconformance@dol.gov. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30–day period that additional time is necessary.
D. In the event the contractor, the laborers or mechanics to be employed in the classification or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the contracting officer will, by email to DBAconformance@dol.gov, refer the questions, including the views of all interested parties and the recommendation of the contracting officer, to the Administrator for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30–day period that additional time is necessary.
E. The contracting officer must promptly notify the contractor of the action taken by the Wage and Hour Division under 29 CFR 5.5 (a)(1)(iii)(C) and (D). The contractor must furnish a written copy of such determination to each affected worker or it must be posted as a part of the wage determination. The wage rate (including fringe benefits where appropriate) determined pursuant to 29 CFR 5.5 (a)(1)(iii)(C) or (D) must be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification.
iv. Fringe benefits not expressed as an hourly rate Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor may either pay the benefit as stated in the wage determination or may pay another bona fide fringe benefit or an hourly cash equivalent thereof.
v. Unfunded plans If the contractor does not make payments to a trustee or other third person, the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, in accordance with the criteria set forth in 29 CFR 5.28, that the applicable standards of the Davis-Bacon Act have been met.
The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program.
vi. Interest In the event of a failure to pay all or part of the wages required by the contract, the contractor will be required to pay interest on any underpayment of wages.
mailto:DBAconformance@dol.gov mailto:DBAconformance@dol.gov
2. Withholding
i. Withholding requirements
The U. S. Department of Housing and Urban Development may, upon its own action, or must, upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor so much of the accrued payments or advances as may be considered necessary to satisfy the liabilities of the prime contractor or any subcontractor for the full amount of wages and monetary relief, including interest, required by the clauses set forth in 29 CFR 5.5(a) for violations of this contract, or to satisfy any such liabilities required by any other Federal contract, or federally assisted contract subject to Davis-Bacon labor standards, that is held by the same prime contractor (as defined in 29 CFR 5.2). The necessary funds may be withheld from the contractor under this contract, any other Federal contract with the same prime contractor, or any other federally assisted contract that is subject to Davis-Bacon labor standards requirements and is held by the same prime contractor, regardless of whether the other contract was awarded or assisted by the same agency, and such funds may be used to satisfy the contractor liability for which the funds were withheld. In the event of a contractor’s failure to pay any laborer or mechanic, including any apprentice or helper working on the site of the work (or otherwise working in construction or development of the project under a development statute) all or part of the wages required by the contract, or upon the contractor’s failure to submit the required records as discussed in 29 CFR 5.5(a)(3)(iv), HUD may on its own initiative and after written notice to the contractor, sponsor, applicant, owner, or other entity, as the case may be, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased.
ii. Priority to withheld funds The Department has priority to funds withheld or to be withheld in accordance with 29 CFR 5.5(a)(2)(i) or (b)(3)(i), or both, over claims to those funds by:
A. A contractor’s surety(ies), including without limitation performance bond sureties and payment bond sureties;
B. A contracting agency for its reprocurement costs;
C. A trustee(s) (either a court-appointed trustee or a U.S. trustee, or both) in bankruptcy of a contractor, or a contractor’s bankruptcy estate;
D. A contractor’s assignee(s);
E. A contractor’s successor(s); or F. A claim asserted under the Prompt Payment Act, 31 U.S.C. 3901-3907.
3. Records and certified payrolls
i. Basic record requirements
A. Length of record retention. All regular payrolls and other basic records must be maintained by the contractor and any subcontractor during the course of the work and preserved for all laborers and mechanics working at the site of the work (or otherwise working in construction or development of the project under a development statute) for a period of at least 3 years after all the work on the prime contract is completed.
B. Information required Such records must contain the name; Social Security number; last known address, telephone number, and email address of each such worker; each worker’s correct classification(s) of work actually performed; hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in 40 U.S.C. 3141(2)(B) of the Davis-Bacon Act); daily and weekly number of hours actually worked in total and on each covered contract; deductions made; and actual wages paid.
C. Additional records relating to fringe benefits. Whenever the Secretary of Labor has found under 29 CFR 5.5(a)(1)(v) that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in 40 U.S.C. 3141(2)(B) of the Davis-Bacon Act, the contractor must maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits.
D. Additional records relating to apprenticeship Contractors with apprentices working under approved programs must maintain written evidence of the registration of apprenticeship programs, the registration of the apprentices, and the ratios and wage rates prescribed in the applicable programs.
ii. Certified payroll requirements A. Frequency and method of submission The contractor or subcontractor must submit weekly, for each week in which any DBA- or Related Acts-covered work is performed, certified payrolls to HUD if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the certified payrolls to the applicant, sponsor, owner, or other entity, as the case may be, that maintains such records, for transmission to HUD. The prime contractor is responsible for the submission of all certified payrolls by all subcontractors. A contracting agency or prime contractor may permit or require contractors to submit certified payrolls through an electronic system, as long as the electronic system requires a legally valid electronic signature; the system allows the contractor, the contracting agency, and the Department of Labor to access the certified payrolls upon request for at least 3 years after the work on the prime contract has been completed; and the contracting agency or prime contractor permits other methods of submission in situations where the contractor is unable or limited in its ability to use or access the electronic system
B. Information required The certified payrolls submitted must set out accurately and completely all of the information required to be maintained under 29 CFR 5.5(a)(3)(i)(B), except that full Social Security numbers and last known addresses, telephone numbers, and email addresses must not be included on weekly transmittals. Instead, the certified payrolls need only include an individually identifying number for each worker (e.g., the last four digits of the worker’s Social Security number). The required weekly certified payroll information may be submitted using Optional Form WH-347 or in any other format desired. Optional Form WH-347 is available for this purpose from the Wage and Hour Division Web site at https://www.dol.gov/ sites/dolgov/files/WHD/legacy/files/wh347.pdf or its successor website. It is not a violation of this section for a prime contractor to require a subcontractor to provide full Social Security numbers and last known addresses, telephone numbers, and email addresses to the prime contractor for its own records, without weekly submission by the subcontractor to the sponsoring government agency (or the applicant, sponsor, owner, or other entity, as the case may be, that maintains such records).
C. Statement of Compliance Each certified payroll submitted must be accompanied by a “Statement of Compliance,” signed by the contractor or subcontractor, or the contractor’s or subcontractor’s agent who pays or supervises the payment of the persons working on the contract, and must certify the following:
1. That the certified payroll for the payroll period contains the information required to be provided under 29 CFR 5.5(a)(3)(ii), the appropriate information and basic records are being maintained under 29 CFR 5.5 (a)(3)(i), and such information and records are correct and complete;
2. That each laborer or mechanic (including each helper and apprentice) working on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly https://www.dol.gov/sites/dolgov/files/WHD/legacy/files/wh347.pdf https://or/ https://or/ from the full wages earned, other than permissible deductions as set forth in 29 CFR part 3;
and
3. That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification(s) of work actually performed, as specified in the applicable wage determination incorporated into the contract.
D. Use of Optional Form WH-347 The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 will satisfy the requirement for submission of the “Statement of Compliance” required by 29 CFR 5.5(a)(3)(ii)(C).
E. Signature The signature by the contractor, subcontractor, or the contractor’s or subcontractor’s agent must be an original handwritten signature or a legally valid electronic signature.
F. Falsification The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal prosecution under 18 U.S.C. 1001 and 31 U.S.C. 3729.
G. Length of certified payroll retention The contractor or subcontractor must preserve all certified payrolls during the course of the work and for a period of 3 years after all the work on the prime contract is completed.
iii. Contracts, subcontracts, and related documents The contractor or subcontractor must maintain this contract or subcontract and related documents including, without limitation, bids, proposals, amendments, modifications, and extensions. The contractor or subcontractor must preserve these contracts, subcontracts, and related documents during the course of the work and for a period of 3 years after all the work on the prime contract is completed.
iv Required disclosures and access A. Required record disclosures and access to workers The contractor or subcontractor must make the records required under 29 CFR 5.5(a)(3)(i)–(iii), and any other documents that HUD or the Department of Labor deems necessary to determine compliance with the labor standards provisions of any of the applicable statutes referenced by 29 CFR 5.1, available for inspection, copying, or transcription by authorized representatives of HUD or the Department of Labor, and must permit such representatives to interview workers during working hours on the job.
B. Sanctions for non-compliance with records and worker access requirements If the contractor or subcontractor fails to submit the required records or to make them available, or refuses to permit worker interviews during working hours on the job,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .