Abbreviated Justification and Approval Document
FOR OTHER THAN FULL AND OPEN COMPETITION
of Requirements Not Exceeding $550,000 ( IAW FAR 6.304) Contract number: W912CN-08-D-0004 Task Order Number 2008
Control Number 11-23
1. Contracting Activity: Regional Contracting Office, HI, Bldg 692 McCornack Rd
Schofield Barracks, HI 96857
2. Description of Action:
Requirement: New Repeat Pricing: Firm-Fixed Price Time & Materials Cost Funds: OMA Other Funds:
FY11
Name of Proposed Contractor: SUMO Builders Street Address: 2685 N Nimitz Hwy City, State, Zip: Honolulu, HI 96819-2263 Phone: 808.833-3564
3. Description of Services: The estimated value of the proposed action is $ 58,131,16. Describe the services or supplies, including make & model number, to be acquired below.
4. Authority Cited: (Identify the statutory authority, FAR title and FAR citation permitting other than full and open competition. It may be one of the following, but other exceptions may be used.)
10 U.S.C. 2304(g)(3); FAR 13.106-1 (b)(1): The circumstances of the contract action deem only one source reasonably available.
Description of Related Service already completed by SUMO:
Sumo renovated the back area to facilitate voice/data line requirements that included, converting a room occupied by a walk-in chiller into a Communications Room. Sumo installed equipment racks, power circuits, receptacles, cable trays, outside and inside plant conduit, ground conductor cable and 14 voice/data data drops.
Description of Service that we are requesting:
Bldg 586 SCH. Install (2) 48 position patch panels on the voice rack and (1) 48 position patch panel on the data rack in the new telecom room. Provide cable management panels below each patch panel on the racks.
Relocate all voice and data drops in the front area (11 outlet locations with 2 voice and 2 data jacks each) to the new telecom room. Run new Cat 6 drops to the telecom room using new infrastructure (conduit and/or cable tray) and the existing infrastructure. All voice cabling and connectors shall be blue and all data cabling and connectors shall be green
5. Reason for Authority Cited: (State why this is the only source that can provide the required supplies or services.)
(a) Services can only be provided from the original source as this is a follow-on requirement for the continued provision of highly specialized services.
(b) Award to any other source would result in substantial duplication of cost to the Government that is not expected to be recovered through competition.
(c) Services/Supplies are needed immediately to satisfy mission requirements.
(d) Additional Information: Time will be saved by having the contractor already on site and already having the technical knowledge of the additional work that is required.
(i) What harm will come to the Government if desired supplies/services are not provided on time?
(ii) What harm will come to the Government if desired contractor doesn't receive the award?
6. Actions to Increase Competition: (State what actions will be taken to increase competition before subsequent acquisition of the supplies or services is required.)
7. Market Research: (Describe the extent of the market research conducted to identify all qualified sources and the results thereof. "Market Research" is defined as those attempts you made to ascertain whether other qualified sources exist. Research of the market place may consist of written, telephonic, or world wide web inquiries.)
The back half will not have communication ability. Space will be unusable for normal operations involving computer and telephone communications.
Sumo Builder already has worked initial renovation piece, has a good idea of what is required and is currently on site so this should be more economical and efficient as opposed recompeting and possibly awarding to another contractor. Conflicts could arise if another contractor enters the project. Warranty issues will be more discernable and confusing.
N/A
No further market research was conducted. Original task order was competed among three JOC contractors of which SUMO Builders was the lowest, technically acceptable contractor.
8. Procurement History:
Previous Contract or Purchase Order Number: W912CN-8-D-0004, T/O: 2008 or N/A Previously competed? N/A No Yes Previous authority for less than Full & Open Competition:
9. Technical / Requirements Certification: I certify that the support data under my cognizance which is included in this abbreviated-J&A is accurate and complete to the best of my knowledge and belief.
Submitted By: CLIFTON TAKENAKA Position Title (Division Chief or higher): DPW DIV CHIEF, ENGINEERING Email address: CLIFTON.TAKENAKA@US.ARMY.MIL Date: 3 May 2011
10. Fair and Reasonable Determination I hereby determine that the anticipated cost to the Government for this contract action will be fair and reasonable.
Basis for price reasonable determination will be based on the DPW JOC Unit Price Book prepared specifically for the DPW JOC contract. As part of this basis, certified cost or price data will not be required.
11. Contracting Officer’s Approval Based on the foregoing, I approve the Sole Source procurement described above on an other than full and open competition basis pursuant to the authority of FAR 6.302-1 Only one responsible source and no other supplies or services will satisfy agency requirements, subject to availability of funds, and provided that the services and property herein described have otherwise been authorized for acquisition.
MATTHEW W. HAYNES
CPT, JA
Deputy Command Judge Advocate Date:23 May 11
Geralyn Ambrosio Contracting Officer Date: 24 May 11