Summary of Matrix of RFP Changes for NLS II RFP 10-99-021, Revision T

This document is a matrix of RFP changes for the NLS II (National Leadership Survey II) 2026 On-Ramp Effort under RFP 10-99-021, Revision T. The matrix catalogs modifications across two amendments. Amendment 1 includes six FAR clauses added to Section C, Clause 36.0 (FAR 52.203-6, 52.222-50, 52.226-8, 52.232-40, 52.233-3, and 52.233-4), an update to NPD 2810.1A changed to 2810.1F in Attachment D1 Section 6.0, removal of TDRSS Compatible Telemetry System from Attachment D1 Section 25.0, a change from NASA/TBP Center to TBD Center in Attachment D1 Exhibit 4, and removal of PDF format and email format specifications from Attachment E2 Section 10.3.

Amendment 2 adds a single FAR clause (FAR 52.222-90) to Section C, Clause 36.0. These changes appear to address federal compliance requirements, documentation standards, center designations, and technical system requirements. The document serves as a reference guide for proposers to identify all modifications made to the original RFP through its current revision.

View the file

Other files

File Type Posted
3. RFP10-99-0021 Rev T_Amendment 2.docx DOCX document
FAR 52.222-90.pdf PDF
LSP-PD-120.05_Rev_D-2025-02-03.pdf PDF
3. RFP10-99-0021 Rev T_Amendment 1.docx DOCX document
2026 On-Ramp Questions and Answers.pdf PDF
2. Matrix of Changes_Amendment 1.pdf PDF
3. RFP10-99-0021 Rev T.pdf PDF
2. Matrix of Changes.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Changes to the NLS II RFP for the 2026 On-Ramp Effort

Matrix of RFP Changes

RFP 10-99-021

Revision T

RFP Section Summary of Change Page #

RFP Section Summary of Change Page # Section C, Clause 36.0 Added FAR 52.203-6

Added FAR 52.222-50 Added FAR 52.226-8 Added FAR 52.232-40 Added FAR 52.233-3 Added FAR 52.233-4

C-92: C-93

Attchment D1, Section 6.0 Updated NPD 2810.1A to 2810.1F D1-28 Attachment D1, Section 25.0 Removed TDRSS Campatible Telemtry System D1-48 Attachment D1, Exhibit 4 Changed NASA/TBP Center to TBD Center D1-49 Attachment E2, Section 10.3 Removed 'PDF Format' and 'Documents should be emailed in

MS Word or PDF Format' E2-9

RFP Section Summary of Change Page # Section C, Clause 36.0 Added FAR 52.222-90 C-95

Amendment 1 Changes

Amendment 2 Changes