9.18.2019
RFI’s
Question:
- Do you require professional installation services?
- Is the turf being installed indoors or outdoors?
- Is the turf being installed on concrete?
- Do you have photos of the existing area you're able to share?
- The solicitation requests a delivery date of 30 September. However, production lead times are usually 6-9 weeks ARO plus transit time to Alaska. Are you flexible with your delivery date?
Answer:
- We do not require installation services
- The turf will be installed indoors
- it will be installed on concrete
- Pictures are attached of the facility (See Page 2 and 3)
- Please provide the earliest delivery lead time