9.18.2019

RFI’s

Question:

- Do you require professional installation services?

- Is the turf being installed indoors or outdoors?

- Is the turf being installed on concrete?

- Do you have photos of the existing area you're able to share?

- The solicitation requests a delivery date of 30 September. However, production lead times are usually 6-9 weeks ARO plus transit time to Alaska. Are you flexible with your delivery date?

Answer:

- We do not require installation services

- The turf will be installed indoors

- it will be installed on concrete

- Pictures are attached of the facility (See Page 2 and 3)

- Please provide the earliest delivery lead time