This Request for Proposals is issued by Bryan County, Georgia Board of Commissioners for the furnishing and installation of a complete sewer grinder system at the Bryan County Detention Center. The selected contractor must provide all labor, supervision, equipment, materials, permits, transportation, tools, testing, and services necessary to deliver a complete operational system, including installation of a JWC Environmental Muffin Monster open-channel grinder (Model No. 30005-0012-DI) with associated equipment, civil site work, electrical work with motor controller installation, inspections, startup, commissioning, operator and maintenance staff training, and restoration of disturbed areas. Sealed proposals are due Wednesday, December 2, 2026 at 2:00 PM EST to the Finance Director at 66 Captain Matthew Freeman Drive, Suite 201, Richmond Hill, GA 31324. The deadline for vendor questions is Monday, November 16, 2026 at 5:00 PM EST. The tentative award date is Tuesday, January 12, 2027. The project is anticipated to commence immediately following award, with completion as soon as possible. Bidders must submit one original and three printed copies plus one electronic copy on USB drive.

Vendors must hold a current Georgia Utility Contractor License and demonstrate experience, personnel, equipment, and financial capacity to complete the project. Evaluation criteria total 100 points: Details of Proposal (20 points), Price (40 points), Contractor's Understanding of Scope (20 points), Contractor's History with Bryan County (10 points), and List of Similar Installations (10 points). A performance bond is required. Contractors must maintain comprehensive insurance including Commercial General Liability ($1,000,000 per occurrence / $2,000,000 aggregate), Automobile Liability ($1,000,000 combined single limit), Workers' Compensation per Georgia statutory requirements, Contractors' Pollution Liability ($1,000,000 per claim / $2,000,000 aggregate), and Professional Liability ($1,000,000 per claim and aggregate), with Bryan County named as Additional Insured where applicable. Bryan County is tax-exempt. The equipment specifications in Appendix A are mandatory with no substitutions permitted. Proposals are valid for 90 days from the submission deadline. The manufacturer must provide field inspection services for one day minimum and staff training on equipment operation and maintenance.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRYAN COUNTY, GA

REQUEST FOR PROPOSALS

FOR

SEWER GRINDER SYSTEM

SEALED SUBMISSIONS ARE DUE AT THE TIME AND DATE

SHOWN BELOW

WEDNESDAY, DECEMBER 2, 2026 AT 2:00 PM, EST

BRYAN COUNTY BOARD OF COMMISSIONERS

Attn: Finance Director

66 Captain Matthew Freeman Drive Suite 201

Richmond Hill, GA 31324

THE RESPONSIBILITY FOR SUBMITTING A RESPONSE TO THIS RFP ON OR BEFORE

THE STATED DATE AND TIME WILL BE SOLELY AND STRICTLY THE

RESPONSIBILITY OF THE OFFEROR.

PROJECT OVERVIEW

The Bryan County Board of Commissioners is soliciting qualified licensed utility contractors to furnish and install a complete sewer grinder system incorporated into the existing sewer discharge line for the Bryan County Detention Center. The County intends to award the contract to the responsible contractor whose proposal is determined to provide the best overall value to the County, based on the evaluation criteria set forth in this RFP. Factors considered may include, but are not limited to, proposed cost, understanding of the project scope and requirements, relevant qualifications and experience, and the proposed schedule for completing the work.

SCOPE OF SERVICES

The selected contractor shall provide all labor, supervision, equipment, materials, permits, transportation, tools, incidentals, coordination, testing, and other services necessary to deliver a complete, operational system, except as expressly identified otherwise in the final contract.

• Provide and install a manhole sized to accommodate anticipated peak flows and the grinder system.

• Furnish and install the JWC Environmental Muffin Monster open-channel grinder and associated equipment in strict accordance with Appendix A.

• Perform required civil/site work associated with the installation.

• Perform required electrical work, including installation and connection of the specified motor controller and associated components.

• Coordinate inspections, startup, commissioning, and operational verification.

• Provide manufacturer or manufacturer’s representative services for installation inspection, initial energization, rotation verification, and initial operation, as required by Appendix A.

• Provide operator and maintenance staff training and operation and maintenance manuals.

• Restore disturbed areas and remove construction debris and packaging generated by the work.

The proposer shall identify all assumptions, exclusions, interfaces, and work believed to be the County’s responsibility. Any item reasonably necessary for a complete and functioning installation shall be clearly identified in the proposal.

MANDATORY EQUIPMENT REQUIREMENTS

Appendix A, Open-Channel Grinders, is incorporated into this RFP. The specified equipment is JWC Environmental Muffin Monster, Model No. 30005-0012-DI, with the specified JWC Environmental motor controller, Model No. PC2200. The technical requirements, materials, ratings, accessories, controls, submittals, warranty, service, installation, inspection, and training provisions in Appendix A apply.

Substitutions are not permitted. Proposals must expressly acknowledge compliance with the complete Appendix A specification. A proposal taking exception to a mandatory specification may be deemed nonresponsive, subject to applicable County procurement requirements.

PROJECT SCHEDULE AND COMPLETION

The proposer shall provide a realistic schedule showing procurement and delivery of equipment, site preparation, installation, electrical work, inspection, startup, commissioning, training, and final completion. The contractor shall coordinate work with the County and Bryan County Detention Cener to minimize disruption to facility operations.

SUBMITTALS, COMMISSIONING, TRAINING, AND WARRANTY

The contractor shall provide the product data and drawings identified in Appendix A in PDF format for review before installation. Operation and maintenance manuals shall be provided in printed and electronic PDF formats. The equipment shall include the 12-month limited warranty described in Appendix A. Manufacturer or manufacturer’s representative field inspection and training shall be provided as specified in Appendix A. The contractor shall document commissioning and demonstrate that the installed system operates as intended.

GENERAL CONDITIONS

• The County reserves the right to reject any or all proposals, waive minor irregularities where permitted, request clarifications, and make an award in the County’s best interest, subject to applicable law and procurement policy.

• No contract is formed until a written agreement, or purchase order is properly approved and executed by the County.

• The contractor shall obtain and maintain permits and licenses required for its work and shall comply with applicable codes, safety requirements, and laws.

• The contractor shall protect existing facilities, utilities, equipment, and operations and shall promptly repair damage caused by its work.

• The contractor shall coordinate outages, tie-ins, and work affecting Detention Center operations with the County before proceeding.

• Payment terms, retainage, insurance limits, indemnification, liquidated damages, and other contract-specific terms shall be set forth in the final contract.

PROPOSAL SECURITY / BONDING

• A performance bond will be required for this project.

INFORMATION TO VENDORS

RFP Timeline The anticipated schedule for the RFP is as follows:

Date of Issuance Thursday, October 29, 2026

Deadline for Questions Monday, November 16, 2026, by 5 PM EST

Sealed Submittal deadline Wednesday, December 2, 2026, by 2:00

PM EST

Tentative Award Date Tuesday, January 12, 2027, at the regular Bryan County Board of Commissioners’ meeting

Minimum Qualifications Bidders must submit their proposals in a sealed envelope: should be plainly and clearly marked "SEWER GRINDER SYSTEM BRYAN COUNTY DETENTION CENTER”. Bidders must submit verifiable evidence of the following minimum criteria. Failure to include these credentials within the proposal package will result in immediate disqualification:

• Hold a current Georgia Utility Contractor License and any other licenses required for the proposed work.

• Have the experience, personnel, equipment, and financial and operational capacity to complete the project safely and on schedule.

• Can perform the civil, electrical, equipment installation, startup, and commissioning work described in this RFP, either directly or through identified qualified subcontractors.

• Maintain a written project-specific safety plan and comply with applicable federal, state, and local requirements.

• Can provide contact references for comparable sewer grinder or wastewater system installations.

Proposal Requirements To facilitate consistent evaluation, proposals shall be organized in the following order:

• Cover letter identifying the proposer’s legal name, address, primary contact, telephone number, and email address.

• Detailed scope of supply and work, including equipment, labor, subcontractors, civil work, electrical work, commissioning, and training.

• Written acknowledgement of compliance with Appendix A without exceptions or substitutions.

• Project approach and demonstration of understanding of the existing sewer discharge line and installation requirements.

• Project schedule identifying anticipated start date, major milestones, duration, commissioning, and substantial completion.

• Itemized total price, with a clear breakdown of equipment, civil/site work, electrical work, installation, startup/commissioning, and any other costs. Identify applicable taxes, allowances, and optional items separately.

• List of similar installations, including project name, owner, location, scope, completion date, and contract value where available.

• At least three client references for similar projects, including contact name, organization, telephone number, and email address where available.

• Copy of current Georgia Utility Contractor License and any other applicable licenses.

• Project-specific safety plan.

• Bid bond or proposal security

• List of proposed subcontractors and the work each will perform.

• Disclosure of proposed exceptions, assumptions, or exclusions. No exceptions to

Appendix A are permitted; other exceptions may affect responsiveness.

Evaluation Criteria The County intends to evaluate responsive proposals and select the responsible proposer providing the best value to Bryan County. The evaluation criteria and point values below reproduce the scoring system provided in the County’s source material.

Evaluation Criterion Maximum Points Details of the Proposal 20 Price 40 Contractor’s Understanding of Scope 20 Contractor’s History with Bryan County 10 List of Similar Installations 10

TOTAL 100

The proposer receiving the highest total score will be recommended for selection, subject to responsiveness, responsibility, any required approvals, and the County’s applicable procurement procedures. The County reserves the right to verify references and information submitted.

BID SUBMISSION – SEALED PROPOSAL

Please submit One (1) Original clearly labeled “ORGINAL” and Three (3) printed copies and One (1) electronic copy on a USB Drive submittal to the Finance Director, Charlene Bunch, no later than WEDENSDAY, December 2, 2026, BY 2:00 PM EST. Proposals must be in sealed envelope plainly marked “SEWER GRINDER SYSTEM FOR BRYAN COUNTY DETENTION CENTER” and addressed to the Finance Director, Charlene Bunch at 66 Captain Matthew Freeman Drive, Suite 201, Richmond Hill, GA, 31324.

CONTACT PERSON

Vendors may contact Charlene Bunch, Finance Director, by email at cbunch@bryancountyga.gov to clarify any part of the RFP requirements. All questions that arise prior to the DEADLINE FOR QUESTIONS due date shall be directed to the contact person in writing via email. All questions must be submitted by 5:00 PM EST on MONDAY, November 16, 2026. Any unauthorized contact shall not be used as a basis for responding to this RFP and may result in the disqualification of the vendor's submittal.

Vendors may not contact any elected official or other county employee to discuss the bid process or bid opportunities except through the Finance Director named herein.

ADDITIONAL INFORMATION/ADDENDA

Bryan County will issue responses to inquiries and any other corrections or amendments it deems necessary in writing via email.

LATE SUBMITTAL AND LATE MODIFICATIONS

Submittals received after the due date and time will not be considered. Modifications received after the due date will not be considered. Bryan County Government assumes no responsibility for the premature opening of a proposal not properly addressed and identified and/or delivered to the proper designation.

REJECTION OF PROPOSALS/CANCELLATION

Bryan County Government reserves the right to reject any and all submittals and reserves the right mailto:cbunch@bryancountyga.gov to waive any irregularities or informalities in any submittal or in the submittal procedure, when to do so would be to the advantage of Bryan County. The Bryan County Board of Commissioners reserves the right to cancel this solicitation and/or reject any and all proposals in whole or in part if Bryan County determines that cancellation and/or rejections are advantageous to the County. Proposals are legal and binding upon the Respondent when submitted. It will also be the responsibility of each Bidder to obtain any addenda issued for the project. The written documents supersede any verbal or written prior communications between the parties.

MIMINUM RFP ACCEPTANCE PERIOD

Submittals shall be valid and may not be withdrawn for a period of 90 days from the date specified for receipt of submittals.

NON-COLLUSION AFFIDAVIT

By submitting a response to this RFP, the vendor represents and warrants that such proposal is genuine and not a sham or collusive or made in the interest or or solicited any other vendor to put in a sham proposal or any other person, firm or corporation to refrain from submitting and that the vendor has not in any manner sought by collusion to secure to that vendor any advantage over any other vendor.

By submitting a proposal, the vendor represents and warrants that no official or employee of Bryan County Government has, in any manner, an interest, directly or indirectly, in the proposal or in the contract, which may be made under it, or in any expected profits to arise therefrom.

COST INCURRED BY VENDORS

All expenses involved with the preparation and submission of the RFP to the Bryan County Board of Commissioners, or any work performed in connection therewith is the responsibility of the vendor(s).

OPEN RECORDS

All materials submitted in connection with this RFP will be public documents and subject to the Open Records Act and all other laws of the State of Georgia, the United States of America and the open records policies of Bryan County Board of Commissioners. All such materials shall remain the property of Bryan County and will not be returned to the respondent.

PROJECT BEGINNING AND COMPLETION

The project is tentatively anticipated to commence immediately following the anticipated award date of January 12, 2027, and the subsequent execution of a contract with the selected bidder.

The completion date should be as soon as possible, with preference given to vendors who can demonstrate the ability to complete the project quickly and efficiently. Vendors should include a detailed timeline in their proposals to ensure timely completion.

TAXES

Bryan County Government is tax-exempt. No sales tax will be charged on any products or services. Bryan County cannot exempt any other person/vendor from applicable sales taxes that may be required of them in relation to this project. Upon request, the selected vendor will be provided with Bryan County’s Sales and Use Tax Certificate of Exemption number.

Bryan County will select the firm deemed in the judgment of the County to be the most qualified, best suited, and who best meets the requirements of the County among those submitting Proposals. If the proposer fails to negotiate and sign Bryan County’s standard contract within 45 days of award, then Bryan County will negotiate with the second-highest proposer. This RFP shall in no manner be construed as a commitment on the part of the County to execute a contract, to pay any cost incurred in the preparation of proposals to this request, or to procure or contract for any services. The County reserves the right to reject any proposal which, in its opinion, does not have adequate qualifications. Furthermore, the County reserves the right to reject any or all proposals and to advertise for new proposals for any reason(s) or for no reason(s). The County reserves the right to waive minor irregularities and/or formalities.

All Proposals and other materials or documents submitted by Proposer in response to this RFP will become the property of Bryan County. The County is subject to open records requirements of the State of Georgia Statute 50-18-70, and as such, all materials submitted by the Proposer to the County are subject to disclosure. Proposer specifically waives any claims against the County related to the disclosure of any materials if made under a public records request.

No interpretation or clarification of the RFP will be made to any Proposer verbally. If any prospective Proposer wishes to question or has doubt as to the meaning of any part of the RFP, a written request for a clarification or interpretation must be submitted by email to cbunch@bryancountyga.gov. All such interpretations and any supplemental information will be sent to each Proposer at the respective email address furnished for such purposes prior to the date fixed for the deadline for Proposals. Failure of any Proposer to receive any such addendum or interpretation shall not relieve said Proposer from any obligation contained therein.

Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the County to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.

All materials and documents submitted in the response shall become the property of the County and will not be returned.

INSURANCE REQUIREMENTS

In order to contract with Bryan County Board of Commissioners, suppliers/contractors providing professional, technical and/or construction services are required to provide acceptable proof of insurance coverage. Acceptable proofs of insurance: (i) a Certificate of Insurance with Additional Insured Endorsement (a Certificate of Insurance by itself is not acceptable) or (ii) Declaration Pages of the insurance policies listed below which show Bryan County Board of Commissioners as additional insured. The insurance company must be authorized to provide insurance in the State of Georgia.

mailto:cbunch@bryancountyga.gov.

Required Insurance Policies and Endorsements:

• Commercial General Liability Insurance with limits of not less than $1,000,000 per occurrence and $2,000,000 aggregate, covering bodily injury, personal injury, property damage, contractual liability, and products/completed operations, as applicable to the services provided.

Bryan County Board of Commissioners shall be named as an Additional Insured on the Commercial General Liability policy.

• Automobile Liability Insurance with limits of not less than $1,000,000 combined single limit per occurrence for bodily injury and property damage. Coverage shall apply to all vehicles used in the performance of the contract, including owned, non-owned, leased, and hired vehicles.

Bryan County Board of Commissioners shall be named as an Additional Insured where permitted by the policy.

• Workers' Compensation Insurance shall be maintained in accordance with the statutory requirements of the State of Georgia. Employers' Liability Insurance shall be maintained with limits of not less than:

o $1,000,000 each accident;

o $1,000,000 each employee for disease; and o $1,000,000 policy limit for disease.

The Workers' Compensation policy shall include a waiver of subrogation in favor of Bryan County Board of Commissioners, to the extent permitted by law.

• Contractors' Pollution Liability Insurance- for contractors performing sewer grinder pump installation, repair, maintenance, or other work involving wastewater infrastructure, Contractors' Pollution Liability Insurance with limits of not less than $1,000,000 per claim or occurrence and $2,000,000 aggregate.

Coverage shall include bodily injury, property damage, and environmental damage arising from pollution conditions, including accidental sewage releases, wastewater spills, and contamination resulting from the contractor's operations.

• Professional Liability, Errors and Omissions Insurance appropriate to the services provided under this RFP shall be maintained with limits of not less than $1,000,000 per claim and $1,000,000 aggregate.

Coverage shall include claims arising from professional errors, omissions, negligent acts, or failures in the performance of engineering, system design, technical consulting, and other professional services provided under the contract.

Additional Insurance Requirements All required insurance policies shall:

• Be issued by insurance companies authorized to conduct business in the State of Georgia and reasonably acceptable to the County.

• Be maintained continuously throughout the term of the contract.

• Be primary and non-contributory with respect to insurance maintained by Bryan

County Board of Commissioners, where applicable.

• Include Bryan County Board of Commissioners as an Additional Insured where specified above.

• Include a waiver of subrogation in favor of Bryan County Board of

Commissioners where specified above.

• Apply to all subcontractors performing services under the contract or require subcontractors to maintain equivalent coverage as determined by the County.

Notice of Cancellation or Material Change All required insurance policies shall provide that Bryan County Board of Commissioners will receive written notice of cancellation, non-renewal, material modification, restriction, or reduction in coverage, in accordance with the terms and notice provisions available under the applicable insurance policy and Georgia law.

The Contractor shall promptly notify the County of any cancellation, non-renewal, lapse, or material reduction in required coverage.

Certificates of Insurance and Endorsements Prior to execution of the contract and commencement of services, the successful proposer shall provide Certificates of Insurance (ACORD or equivalent) evidencing all required coverage.

Upon request, the Contractor shall provide copies of applicable insurance endorsements demonstrating:

• Additional Insured status;

• Waiver of subrogation;

• Primary and non-contributory coverage, where required; and

• Required policy limits.

• Failure to maintain the required insurance coverage shall constitute a material breach of the contract and may result in suspension of services, withholding of payments, termination of the contract, or other remedies available to the County.

Subcontractors If subcontractors are utilized, the Contractor shall be responsible for ensuring that all subcontractors maintain insurance coverage appropriate to the services they perform. The County may require certificates of insurance and applicable endorsements for any subcontractor prior to the commencement of subcontracted work.

The Contractor's insurance requirements shall not limit the Contractor's liability or responsibility for the acts or omissions of its employees, agents, subcontractors, or representatives.

RESERVED RIGHTS

a) Issuance of this RFP does not constitute a commitment on the part of Bryan County to award a contract pursuant to this RFP. Bryan County reserves the rights to:

b) Amend, modify, or withdraw this RFP.

c) Revise any requirements under this RFP.

d) Require supplemental statements of information from any responding party.

e) Extend the deadline for submission of responses hereto.

f) Negotiate or hold discussions with any bidder to correct insufficient responses that do not completely conform to the instructions contained herein.

g) Waive any nonconformity with this RFP.

h) Cancel, in whole or in part, this RFP if the County deems it is in its best interest to do so.

i) Request additional information or clarification of information provided in the response without changing the terms of the RFP.

j) Waive any portion of the selection process to accelerate the selection and negotiation with the top-ranked contractor.

k) Not award a contract as a part of, or result of, this RFP process.

OWNER QUESTIONS

Any vendor that submits a proposal may be requested to provide additional information to Bryan County. Such information is only for the purpose of clarification and in no way changes the vendor’s proposal as originally submitted. Bryan County reserves the right to ask any or all vendors to clarify any portion of their proposals after submission.

COSTS OF PROPOSALS

Bryan County is not responsible or liable for any of the costs incurred by any vendor in preparing and/or submitting a proposal pursuant to this RFP.

EQUAL OPPORTUNITY

Bryan County prohibits discrimination based on race, color, gender, religion, national origin, or disability.

ACCESS TO PUBLIC RECORDS ACT NOTICE

Each vendor should give specific attention to the identification of those portions of its proposal that it considers confidential, proprietary commercial information or trade secrets, and provide justification as to why such materials, upon request, should not be disclosed.

GENERAL CONDITIONS

Upon submission of a bid, the bidder hereby certifies on behalf of his company or organization that:

1. This proposal is genuine and not made in the interest of, or on behalf of, an undisclosed person, firm, or corporation.

2. This proposal is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation.

3. The Contractor has not directly or indirectly induced or solicited any other bidder to submit a false or sham bid.

4. The Contractor has not solicited or induced any person, firm, or corporation to refrain from bidding.

5. The Contractor has not sought by collusion to obtain for itself any advantages over any other bidder or over Bryan County.

TITLE 13 – E-VERIFY COMPLIANCE

In accordance with Georgia Law (O.C.G.A. § 13-10-91), private employers that contract with county governments must be registered for and use the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired during the term of the contract for the services specified in the contract, as well as existing employees assigned to work on this contract. The contractor must also include a requirement in subcontracts that the subcontractor must utilize the E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.

All contractors must sign and submit the Contractor E-Verify Affidavit as part of their submittal of bid.

APPENDIX A- OPEN-CHANNEL GRINDER TECHNICAL

SPECIFICATION

OPEN-CHANNEL GRINDERS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes GENERAL, PRODUCT (Manufacturers, Open-channel Grinder, Installation Frame, Guide rail and Motor Controller), EXECUTION.

1.2 REFERENCE STANDARDS

A. Equipment, as applicable, meets the requirements of the following industry standards.

B. ASTM International (ASTM):

1. ASTM A36 - Carbon Steel Plate.

2. ASTM A536 - Ductile Iron Castings.

3. ASTM A48 - Gray Iron Castings.

4. ASTM A564 - Grade 630 condition H1150 (17-4) stainless steel

C. American Iron and Steel Institute (AISI):

1. AISI Type 1020 Steel

2. AISI Type 1045 Steel.

3. AISI Type 4130 - Heat Treated Alloy Steel.

4. AISI Type 4140 Heat Treated Alloy Steel.

5. AISI Type 18-8 Stainless Steel

6. AISI Type 303 Stainless Steel.

7. AISI Type 304 and 304L Stainless Steel.

8. AISI Type 316 and 316L Stainless Steel.

D. Society of Automotive Engineers (SAE):

1. SAE Type 660 Bearing Bronze.

E. Society of Protective Coatings (SSPC)

1. SSPC-SP 1 Solvent Cleaning.

2. SSPC-SP 6 Commercial Blast Cleaning.

F. National Electrical Manufacturer’s Association (NEMA) Standards.

G. National Electrical Code (NEC).

H. Underwriters Laboratory (UL and cUL).

I. International Electrotechnical Commission (IEC).

1.3 QUALITY ASSURANCE

A. Qualifications:

1. Manufacturer is documented as being engaged in the sale of similar products for over fifty years.

2. Manufacturer is single supplier for equipment listed in this section.

3. Manufacturer’s Service Center is located domestically for repairs and upgrades.

4. Manufacturer stocks all non-custom spare Parts.

B. Regulatory Requirements:

1. Manufacturer is U.L. listed for the construction of controller.

C. Certifications:

1. Manufacturer’s management system is ISO9001 certified.

1.4 SUBMITTALS

A. Submittal documentation provided for approval in “.pdf” format.

1. Product Data

a. Product description text.

b. Performance curves or capacity tables.

c. Catalog data (Motor).

2. Drawings

a. Product configuration and general arrangement of installation.

b. Main assembly and sub-assemblies.

c. Controller front panel layout and schematic.

1.5 OPERATION & MAINTENANCE MANUALS

A. Operation & Maintenance Manuals supplied as printed hard copy and in electronic “.pdf” format.

1. Sections

a. Introduction

b. Safety and Intended Use

c. Receiving & Storage

d. Installation

e. Operation

f. Maintenance

g. Troubleshooting

2. Drawings

a. General arrangement of installation.

b. Main Assembly and Sub-Assemblies

c. Electrical schematics.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Packaging, Shipping, Handling, and Unloading

1. Packaged in containers or on skids suitable for normal shipping, handling, and storage.

2. Protected from rain, snow, impact, and abrasion while in the possession of the carrier.

B. Acceptance at Site

1. Receiver reviews the contents of the shipment at time of delivery and promptly notifies the carrier and supplier of any discrepancies.

C. Storage and Protection

1. Equipment to remain in the packaging provided by the supplier until it is installed.

2. Equipment to be stored in a dry environment between 40 and 100 degrees F.

D. Waste Management and Disposal

1. Contractor responsible for discarding all packaging materials in an environmentally friendly manner and in accordance with local regulations.

1.7 WARRANTY

A. 12-month Limited Warranty

1. Manufacturer submits a standard twelve-month limited warranty document clearly identifying the scope, terms, and exclusions from the coverage.

1.8 SERVICE

A. Supplier supports product with multiple program options.

1. Renew Program: Provides new factory-built replacements of selected products without requirement to return existing products.

2. Repairs and Upgrades: Provides factory inspection and replacement or upgrade of required parts.

3. Preventative Maintenance Program: Provides inspection, recommendation, and service of equipment by manufacturer’s technicians.

4. Spare Parts: Providing shipment of factory authorized parts.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. JWC Environmental Inc, 2850 S. Red Hill Ave. Suite 125, Santa Ana, CA 92705; Tel: 800-331- 2277; www.jwce.com

B. Substitutions: Not permitted.

2.2 OPEN-CHANNEL GRINDER

A. Basis of Design: Muffin Monster model# 30005-0012-DI

1. Manufactured and supplied by JWC Environmental Inc

2. Maximum Design Flow Capacity: 620 GPM (0.89 MGD)

3. Cutter Stack Height: 12-inches

B. Cutter Stack Assembly- Single zone-helical stack:

1. Cutters create upward converging helix with a uniform type, thickness, and material throughout assembly.

2. Cutter Assembly- 7-tooth cam style cutters with spacers

a. Cutters:

http://www.jwce.com/

1) .438-inch thick, 4.710-inch diameter

2) Thickness tolerance of +.000/ -.001

3) Hexagonal inner profile

b. Spacers:

1) .446-inch thick with smooth outside diameter

2) Thickness tolerance of +.001/ -.000

3) Hexagonal inner profile

3. Material: Alloy Steel

a. Cutters: Through hardened to 45-52 HRC

b. Spacers: Through hardened to 34-52 HRC

C. Mechanical Seal and Bearing Cartridges

1. Seals and bearing incorporated into a cartridge style design requiring no external seal flush or lubricants to operate wet or dry.

2. Rated for maximum operating depth: 208 feet (90 psi).

3. Dynamic and Static seal faces to be Tungsten carbide with 6% nickel binder.

4. Cartridge bushing and housing are AISI 304 stainless steel.

5. O-rings to be Buna-N (Nitrile).

D. Shafts

1. 2-inch hexagonal heat treated

2. AISI 4140 alloy steel

3. Minimum tensile strength of 170,000 psi.

4. Supported on either end by mechanical seal and bearing cartridges.

E. End Housings, Side Rails, Top Cover, Bottom Cover, and Gaskets

1. End Housings

a. Cast integral bushing deflector directs solids away from Mechanical Seal and Bearing Cartridge bushings.

b. Directional flow arrows on side of housings indicate correct installation orientation for solids discharge.

c. Cast ASTM A536-84 65-45-12 ductile iron.

2. Side Rails

a. Evenly spaced horizontal flow channels. Horizontal flow channels create additional open areas through grinder increasing flow capacity. Geometry of the horizontal flow channels directs solids toward cutters by creating a pressure differential towards the cutters.

b. Design creates a pressure gradient to force solids to cutters and minimizes water head loss.

c. Horizontal flow channels are positioned on the upstream side of the grinder, terminating even with the center of the cutter proving free discharge.

d. Side rails with flow channel running the entire length of the side rail are not allowed.

e. Cast ASTM A536-84 65-45-12 ductile iron.

3. Top Cover:

a. Manufacturing identification plate mounting.

b. Cast ASTM A536-84 65-45-12 ductile iron.

4. Bottom Cover:

a. ASTM A36 Steel.

5. Gaskets:

a. Cork and neoprene rubber.

F. Transfer Gears

1. Heat treated and hardened AISI 4140 alloy steel.

2. Number of teeth on gears creates ratio of cutter tip speed on low-speed shaft to cutter tip speed of highspeed shaft greater than 0.90 and less than 1.00 to promote cleanout of processed material in cutting stack.

G. Couplings

1. Low Speed Coupling

a. Two-piece 3-jaw interlocking design.

b. Hardened AISI 4140 alloy steel

2. High Speed Coupling

a. Type L 3-jaw with elastomer

b. Buna-N spider.

H. Lifting Eyes

1. Drop forged Steel.

2. Rated for 1300 lb.

I. Speed Reducer

1. Grease lubricated cycloidal design Cyclo Series 6000 with 29:1 reduction ratio.

2. Manufacturer: Sumitomo Machinery Corporation of America.

J. Motor

1. 5 HP XPNV Immersible Explosion Proof Motor

a. Motor Service Factor: 1.15.

b. Grinder’s Performance:

1) Full Load Torque with Reducer: 435 lb-ft

2) Full Load Force at Cutter Tip: 2,217 lbf

c. UL rated NEMA 6P, Class I, Div. 1 Groups C&D, Class II Div. 2, Groups F&G, Class III Div. 1.

d. Manufacturer rating of 40 consecutive days of submergence at a maximum depth of 40 feet.

e. Capable of operating in air 100 percent of time with no external cooling required.

f. No fan cooling during operation.

g. Utilize ceramic shaft seal requiring no oil lubrication.

K. Identification:

1. Corrosion resistant nameplate affixed to top cover of Grinder.

2. Nameplate Information: Manufacturer’s name and address, Model No., Serial No., Capacity, Max. psi, Weight, Manuf. Date.

L. Finishes:

1. Tnemec 1095 Polyurethane paint in the color Hunter Green.

2. Paint Coatings for Previously Coated Components (Motors, Speed Reducers, etc.):

Prepared to SSPC-SP1 (Solvent Cleaning).

3. Paint Coatings for Ferrous Materials: Prepared to SSPC-SP6 (Commercial blast Cleaning) and coated with a minimum 3 to 5 mils TDFT (total dry film thickness).

2.3 INSTALLATION FRAME

A. Designed to position and secure grinder in channel or wet well.

B. Frame design uses pocket or guide plate to allow grinder to be lifted or lowered in and out of frame with no removal of fasteners.

C. Mounting holes allow for attachment to channel walls with mounting anchors.

D. Mounting anchors supplied by contractor.

E. Fabricated of AISI 304L stainless steel.

2.4 MOTOR CONTROLLER

A. DESIGN: NEMA enclosure with programmable logic controller (PLC), operation and fail indicators, and selector switches.

B. Basis of Design- Model# PC2200:

1. Manufactured and supplied by JWC Environmental Inc.

2. Motor Controller Power Supply:

a. 460 V/ 3 PH/ 60 Hz

b. NEMA 4X Fiberglass enclosure:

1) AISI 304 Fiberglass Reinforced Plastic with hinged lockable door and mounting flanges.

2) 22 mm, three-position, rated equal or better than the enclosure and indicate On-Off/Reset-Remote.

3) 22 mm, LED (pilot lamp), rated equal or better than the enclosure and indicate POWER ON, grinder RUN, grinder JAMMED and MOTOR FAULT.

3. Programmable Logic Controller

a. Basis of Design: Siemens S7-1200

1) 100kB working memory.

2) (8) 24 Vdc inputs, (6) relay outputs.

3) (2) 0-10 Vdc analog inputs.

4) PROFINET interface.

4. Motor Starters, Overload Relays and Control Power Transformer:

a. IEC, full voltage, and reversing.

b. Maximum short circuit protective fault current 5 kA.

c. Adjustable and sized to full load amperes (FLA) of the motor.

d. Produce 120-volt AC power from the supply power. Sized and fused in accordance with code to accommodate the control power requirements.

5. Current Transducers

a. Discrete output type with an adjustable set point from 1-135A with 200ms or faster response time.

6. ON-OFF/RESET-REMOTE Switch Status Contact

a. Provides indication of controller switch in REMOTE position

b. Normally open contact rated for 10A.

C. Operation:

1. Grinder Control: In accordance with ON-OFF/RESET-REMOTE Selector Switch.

a. OFF/RESET Position (OFF): De-energizes Grinder.

b. OFF/RESET Position (RESET): Clears all fault conditions.

c. ON Position: Energizes Grinder

d. REMOTE Position: Grinder operates as controlled by a remote start/stop dry contact.

2. Grinder JAMMED Condition: In accordance with setting of current transducer.

a. Controller will stop and reverse the Grinder motor three (3) times and activate the Grinder FAIL indicator and relay.

b. Grinder will stop operation.

c. The JAMMED indicator lamp will be illuminated, and the fail contact will be closed.

3. Grinder MOTOR OVERLOAD Condition: In accordance with setting of Motor Overload

Relay.

a. The MOTOR FAULT indicator lamp will be illuminated, and the fail contact will be closed.

4. Grinder MOTOR OVERTEMP Condition: In accordance with setting of Motor

Thermostat. (Only with applicable motors).

a. The MOTOR FAULT indicator lamp will be illuminated, and the fail contact will be closed.

5. Power Failure:

a. While System is Operating: System return to normal operation when power is restored.

b. While System is in a Fail Condition: System returns to a fail state when power is restored. The fail state is not cleared until reset.

6. Reset of Grinder: Accomplished from the controller only.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Coordinate installation of the equipment in accordance with the manufacturer’s installation instructions, approved submittals, and manuals, and in accordance with OSHA, local, state, and federal codes, and regulations.

3.2 FIELD QUALITY CONTROL

A. INSPECTION

1. The manufacturer is required to provide the services of a factory or manufacturer’s representative for a minimum of one day to inspect the equipment for proper installation, apply power for the first time and check for proper motor rotation, oversee the initial introduction of material into the system and confirm the equipment operates as intended.

B. TRAINING

1. Field training for operations, maintenance, and supervisory staff members is to be provided by manufacturer or manufacturer’s representative. Field instructions will cover key components of the equipment, operating and maintenance requirements and troubleshooting techniques.

BRYAN COUNTY, GA REQUEST FOR PROPOSALS
FOR
ADDITIONAL INFORMATION/ADDENDA
LATE SUBMITTAL AND LATE MODIFICATIONS
REJECTION OF PROPOSALS/CANCELLATION
MIMINUM RFP ACCEPTANCE PERIOD
NON-COLLUSION AFFIDAVIT
COST INCURRED BY VENDORS
OPEN RECORDS
PROJECT BEGINNING AND COMPLETION
TAXES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes GENERAL, PRODUCT (Manufacturers, Open-channel Grinder, Installation Frame, Guide rail and Motor Controller), EXECUTION.
1.2 REFERENCE STANDARDS
A. Equipment, as applicable, meets the requirements of the following industry standards.
B. ASTM International (ASTM):
1. ASTM A36 - Carbon Steel Plate.
2. ASTM A536 - Ductile Iron Castings.
3. ASTM A48 - Gray Iron Castings.
4. ASTM A564 - Grade 630 condition H1150 (17-4) stainless steel
C. American Iron and Steel Institute (AISI):
1. AISI Type 1020 Steel
2. AISI Type 1045 Steel.
3. AISI Type 4130 - Heat Treated Alloy Steel.
4. AISI Type 4140 Heat Treated Alloy Steel.
5. AISI Type 18-8 Stainless Steel
6. AISI Type 303 Stainless Steel.
7. AISI Type 304 and 304L Stainless Steel.
8. AISI Type 316 and 316L Stainless Steel.
D. Society of Automotive Engineers (SAE):
1. SAE Type 660 Bearing Bronze.
E. Society of Protective Coatings (SSPC)
1. SSPC-SP 1 Solvent Cleaning.
2. SSPC-SP 6 Commercial Blast Cleaning.
F. National Electrical Manufacturer’s Association (NEMA) Standards.
G. National Electrical Code (NEC).
H. Underwriters Laboratory (UL and cUL).
I. International Electrotechnical Commission (IEC).
1.3 QUALITY ASSURANCE
A. Qualifications:
1. Manufacturer is documented as being engaged in the sale of similar products for over fifty years.
2. Manufacturer is single supplier for equipment listed in this section.
3. Manufacturer’s Service Center is located domestically for repairs and upgrades.
4. Manufacturer stocks all non-custom spare Parts.
B. Regulatory Requirements:
1. Manufacturer is U.L. listed for the construction of controller.
C. Certifications:
1. Manufacturer’s management system is ISO9001 certified.
1.4 SUBMITTALS
A. Submittal documentation provided for approval in “.pdf” format.
1. Product Data
a. Product description text.
b. Performance curves or capacity tables.
c. Catalog data (Motor).
2. Drawings
a. Product configuration and general arrangement of installation.
b. Main assembly and sub-assemblies.
c. Controller front panel layout and schematic.
1.5 OPERATION & MAINTENANCE MANUALS
A. Operation & Maintenance Manuals supplied as printed hard copy and in electronic “.pdf” format.
1. Sections
a. Introduction
b. Safety and Intended Use
c. Receiving & Storage
d. Installation
e. Operation
f. Maintenance
g. Troubleshooting
2. Drawings
a. General arrangement of installation.
b. Main Assembly and Sub-Assemblies
c. Electrical schematics.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Packaging, Shipping, Handling, and Unloading
1. Packaged in containers or on skids suitable for normal shipping, handling, and storage.
2. Protected from rain, snow, impact, and abrasion while in the possession of the carrier.
B. Acceptance at Site
1. Receiver reviews the contents of the shipment at time of delivery and promptly notifies the carrier and supplier of any discrepancies.
C. Storage and Protection
1. Equipment to remain in the packaging provided by the supplier until it is installed.
2. Equipment to be stored in a dry environment between 40 and 100 degrees F.
D. Waste Management and Disposal
1. Contractor responsible for discarding all packaging materials in an environmentally friendly manner and in accordance with local regulations.
1.7 WARRANTY
A. 12-month Limited Warranty
1. Manufacturer submits a standard twelve-month limited warranty document clearly identifying the scope, terms, and exclusions from the coverage.
1.8 SERVICE
A. Supplier supports product with multiple program options.
1. Renew Program: Provides new factory-built replacements of selected products without requirement to return existing products.
2. Repairs and Upgrades: Provides factory inspection and replacement or upgrade of required parts.
3. Preventative Maintenance Program: Provides inspection, recommendation, and service of equipment by manufacturer’s technicians.
4. Spare Parts: Providing shipment of factory authorized parts.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. JWC Environmental Inc, 2850 S. Red Hill Ave. Suite 125, Santa Ana, CA 92705; Tel: 800-331-2277; www.jwce.com
B. Substitutions: Not permitted.
2.2 OPEN-CHANNEL GRINDER
A. Basis of Design: Muffin Monster model# 30005-0012-DI
1. Manufactured and supplied by JWC Environmental Inc
2. Maximum Design Flow Capacity: 620 GPM (0.89 MGD)
3. Cutter Stack Height: 12-inches
B. Cutter Stack Assembly- Single zone-helical stack:
1. Cutters create upward converging helix with a uniform type, thickness, and material throughout assembly.
2. Cutter Assembly- 7-tooth cam style cutters with spacers
a. Cutters:
1) .438-inch thick, 4.710-inch diameter
2) Thickness tolerance of +.000/ -.001
3) Hexagonal inner profile
b. Spacers:
1) .446-inch thick with smooth outside diameter
2) Thickness tolerance of +.001/ -.000
3) Hexagonal inner profile
3. Material: Alloy Steel
a. Cutters: Through hardened to 45-52 HRC
b. Spacers: Through hardened to 34-52 HRC
C. Mechanical Seal and Bearing Cartridges
1. Seals and bearing incorporated into a cartridge style design requiring no external seal flush or lubricants to operate wet or dry.
2. Rated for maximum operating depth: 208 feet (90 psi).
3. Dynamic and Static seal faces to be Tungsten carbide with 6% nickel binder.
4. Cartridge bushing and housing are AISI 304 stainless steel.
5. O-rings to be Buna-N (Nitrile).
D. Shafts
1. 2-inch hexagonal heat treated
2. AISI 4140 alloy steel
3. Minimum tensile strength of 170,000 psi.
4. Supported on either end by mechanical seal and bearing cartridges.
E. End Housings, Side Rails, Top Cover, Bottom Cover, and Gaskets
1. End Housings
a. Cast integral bushing deflector directs solids away from Mechanical Seal and Bearing Cartridge bushings.
b. Directional flow arrows on side of housings indicate correct installation orientation for solids discharge.
c. Cast ASTM A536-84 65-45-12 ductile iron.
2. Side Rails
a. Evenly spaced horizontal flow channels. Horizontal flow channels create additional open areas through grinder increasing flow capacity. Geometry of the horizontal flow channels directs solids toward cutters by creating a pressure differential towa...
b. Design creates a pressure gradient to force solids to cutters and minimizes water head loss.
c. Horizontal flow channels are positioned on the upstream side of the grinder, terminating even with the center of the cutter proving free discharge.
d. Side rails with flow channel running the entire length of the side rail are not allowed.
e. Cast ASTM A536-84 65-45-12 ductile iron.
3. Top Cover:
a. Manufacturing identification plate mounting.
b. Cast ASTM A536-84 65-45-12 ductile iron.
4. Bottom Cover:
a. ASTM A36 Steel.
5. Gaskets:
a. Cork and neoprene rubber.
F. Transfer Gears
1. Heat treated and hardened AISI 4140 alloy steel.
2. Number of teeth on gears creates ratio of cutter tip speed on low-speed shaft to cutter tip speed of highspeed shaft greater than 0.90 and less than 1.00 to promote cleanout of processed material in cutting stack.
G. Couplings
1. Low Speed Coupling
a. Two-piece 3-jaw interlocking design.
b. Hardened AISI 4140 alloy steel
2. High Speed Coupling
a. Type L 3-jaw with elastomer
b. Buna-N spider.
H. Lifting Eyes
1. Drop forged Steel.
2. Rated for 1300 lb.
I. Speed Reducer
1. Grease lubricated cycloidal design Cyclo Series 6000 with 29:1 reduction ratio.
2. Manufacturer: Sumitomo Machinery Corporation of America.
J. Motor
1. 5 HP XPNV Immersible Explosion Proof Motor
a. Motor Service Factor: 1.15.
b. Grinder’s Performance:
1) Full Load Torque with Reducer: 435 lb-ft
2) Full Load Force at Cutter Tip: 2,217 lbf
c. UL rated NEMA 6P, Class I, Div. 1 Groups C&D, Class II Div. 2, Groups F&G, Class III Div. 1.
d. Manufacturer rating of 40 consecutive days of submergence at a maximum depth of 40 feet.
e. Capable of operating in air 100 percent of time with no external cooling required.
f. No fan cooling during operation.
g. Utilize ceramic shaft seal requiring no oil lubrication.
K. Identification:
1. Corrosion resistant nameplate affixed to top cover of Grinder.
2. Nameplate Information: Manufacturer’s name and address, Model No., Serial No., Capacity, Max. psi, Weight, Manuf. Date.
L. Finishes:
1. Tnemec 1095 Polyurethane paint in the color Hunter Green.
2. Paint Coatings for Previously Coated Components (Motors, Speed Reducers, etc.): Prepared to SSPC-SP1 (Solvent Cleaning).
3. Paint Coatings for Ferrous Materials: Prepared to SSPC-SP6 (Commercial blast Cleaning) and coated with a minimum 3 to 5 mils TDFT (total dry film thickness).
2.3 INSTALLATION FRAME
A. Designed to position and secure grinder in channel or wet well.
B. Frame design uses pocket or guide plate to allow grinder to be lifted or lowered in and out of frame with no removal of fasteners.
C. Mounting holes allow for attachment to channel walls with mounting anchors.
D. Mounting anchors supplied by contractor.
E. Fabricated of AISI 304L stainless steel.
2.4 MOTOR CONTROLLER
A. DESIGN: NEMA enclosure with programmable logic controller (PLC), operation and fail indicators, and selector switches.
B. Basis of Design- Model# PC2200:
1. Manufactured and supplied by JWC Environmental Inc.
2. Motor Controller Power Supply:
a. 460 V/ 3 PH/ 60 Hz
b. NEMA 4X Fiberglass enclosure:
1) AISI 304 Fiberglass Reinforced Plastic with hinged lockable door and mounting flanges.
2) 22 mm, three-position, rated equal or better than the enclosure and indicate On-Off/Reset-Remote.
3) 22 mm, LED (pilot lamp), rated equal or better than the enclosure and indicate POWER ON, grinder RUN, grinder JAMMED and MOTOR FAULT.
3. Programmable Logic Controller
a. Basis of Design: Siemens S7-1200
1) 100kB working memory.
2) (8) 24 Vdc inputs, (6) relay outputs.
3) (2) 0-10 Vdc analog inputs.
4) PROFINET interface.
4. Motor Starters, Overload Relays and Control Power Transformer:
a. IEC, full voltage, and reversing.
b. Maximum short circuit protective fault current 5 kA.
c. Adjustable and sized to full load amperes (FLA) of the motor.
d. Produce 120-volt AC power from the supply power. Sized and fused in accordance with code to accommodate the control power requirements.
5. Current Transducers
a. Discrete output type with an adjustable set point from 1-135A with 200ms or faster response time.
6. ON-OFF/RESET-REMOTE Switch Status Contact
a. Provides indication of controller switch in REMOTE position
b. Normally open contact rated for 10A.
C. Operation:
1. Grinder Control: In accordance with ON-OFF/RESET-REMOTE Selector Switch.
a. OFF/RESET Position (OFF): De-energizes Grinder.
b. OFF/RESET Position (RESET): Clears all fault conditions.
c. ON Position: Energizes Grinder
d. REMOTE Position: Grinder operates as controlled by a remote start/stop dry contact.
2. Grinder JAMMED Condition: In accordance with setting of current transducer.
a. Controller will stop and reverse the Grinder motor three (3) times and activate the Grinder FAIL indicator and relay.
b. Grinder will stop operation.
c. The JAMMED indicator lamp will be illuminated, and the fail contact will be closed.
3. Grinder MOTOR OVERLOAD Condition: In accordance with setting of Motor Overload Relay.
a. The MOTOR FAULT indicator lamp will be illuminated, and the fail contact will be closed.
b. Grinder will stop operation.
4. Grinder MOTOR OVERTEMP Condition: In accordance with setting of Motor Thermostat. (Only with applicable motors).
a. The MOTOR FAULT indicator lamp will be illuminated, and the fail contact will be closed.
b. Grinder will stop operation.
5. Power Failure:
a. While System is Operating: System return to normal operation when power is restored.
b. While System is in a Fail Condition: System returns to a fail state when power is restored. The fail state is not cleared until reset.

6. Reset of Grinder: Accomplished from the controller only.

PART 3 - EXECUTION
3.1 INSTALLATION
A. Coordinate installation of the equipment in accordance with the manufacturer’s installation instructions, approved submittals, and manuals, and in accordance with OSHA, local, state, and federal codes, and regulations.
3.2 FIELD QUALITY CONTROL
A. INSPECTION