This document is an addendum to a Request for Proposal (RFP) issued by the Minnesota Department of Administration's Real Estate and Construction Services (RECS) division for geotechnical engineering and drilling services for a new construction project at the Anoka Metro Regional Treatment Center (AMRTC) in Anoka, Minnesota. The addendum provides answers to questions submitted by potential respondents, including the location of wetlands, the scope of post-construction services, property identification numbers, snow removal responsibilities, administrative requirements during construction, prevailing wage requirements, and the need for wetland delineation and geothermal testing. It also includes a revised Exhibit B fee proposal form with details on the requested services, which include geotechnical borings and reporting, a Phase I environmental assessment, and wetland delineation during the design development phase, as well as construction phase services such as responding to requests for information and periodic site visits.
The revised Exhibit B fee proposal form outlines the expected compensation, including professional fees for the basic services, additional services, and reimbursable expenses, which are capped at $300. The contract is a prevailing wage project, and no markup is allowed on subconsultant fees. The state may elect to add post-construction services at a later date if needed, and a Phase 2 environmental assessment is anticipated as an additional service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_Public_Geotech_16364_Addendum_01.pdf | ||
| RFP_Public_Geotech_16364_Addendum_02.pdf | ||
| Exhibit_A1_Survey_Map_wBorings.pdf | ||
| RFP_Public_Geotech_16364_Addendum_03.pdf | ||
| RFP_Public_Geotech_16364_Exhibit_C.docx | DOCX document | |
| RFP_Public_Geotech_16364.pdf | ||
| RFP_Public_Geotech_16364_Exhibit_B_rev1.docx | DOCX document | |
| RECS_RFP_Geotechnical_Services_for_Miller_Building.pdf | ||
| RFP_Public_Geotech_16364_Exhibit_B.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REAL ESTATE AND CONSTRUCTION SERVICES
309 Administration Building
50 Sherburne Ave St. Paul, Minnesota 55155
Voice: (651) 201.2550
TTY: (800) 627.3529
FAX: (651) 215.6245
http://mn.gov/admin/
Addendum #4
Date: November 14, 2024
Request for Proposal: RECS RFP Geotechnical Engineering & Drilling for the Miller Building at AMRTC RECS Project Number: 55AK0054 Event ID: 2000016364
Subject: RFP Questions & Answers, Revised Exhibit B
Questions & Answers:
Question #1: Where is the anticipated wetland delineation located on the property?
Answer #1: Existing wetland resides east of the parking lot and another wetland to the north of the access drive. The area to the north of the access drive is currently greenspace with mature trees located in and around the existing wetland: See areas circled in snip below. Wetland delineation will likely need to wait until Spring.
http://mn.gov/admin/ http://mn.gov/admin/
Question #2: What are the “Post Construction Phase” scope of services?
Answer #2: Post Construction Phase will not be required by this contract for this response to this RFP. If soils are found to be problematic beyond construction, the State may elect to add these services at a later date.
Question #3: What are the Property ID numbers for the properties to be included in the Phase I, does the entire parcel need to be covered by the Phase I or can it be just a limited area?
Answer #3: Property ID is 31-32-24-31-0002. The area will be within the blue/red delineated on the plan with the boring locations.
Question #4: Will snow removal, if necessary, be handled by the facility or should it be included in our fees?
Answer #4: By facility if needed.
Question #5: What are the “Administration Requirements” during the Construction Phase?
Answer #5: Being available to answer any questions that come up during construction. Conditions discovered during excavation not anticipated from the boring information, bad soil, water, other soil conditions, etc.
providing information on applicable RFI’s and changes.
Question #6: Is this a prevailing wage project?
Answer #6: Yes.
Question #7: Is wetland identification/delineation really needed from us as typically that’s in the Civil Engineer’s work scope and it appears Elan Lab is already the project civil? Otherwise we’ll be looking to subcontract this with another civil engineering firm.
Answer #7: Yes, it is required to be included in this scope. Elan is not able to provide this service. If needed, this can be subcontracted to the respondent to this RFP.
Question #8: Geothermal borings and testing is more commonly done by well drilling companies and so I’m wondering if this should be separated out from this RFP? Otherwise, I’ll be subcontracting this work about as well. It also sounds like the Darcy Ground Source System is something proprietary by Darcy Solutions that would have to be tested by them or with them included.
Answer #8: It is desired to have this included in this scope of work.
Question #9: Are there AISC Requirements for type of materials that can or cannot be used for creating the conductivity test well other than the state well and boring construction and sealing regulations?
Answer #9: No further requirements known at this time. The Darcy wells are basically the same as a normal drinking water well.
Question #10: I assume the Phase 1 Study refers to Environmental Site Assessment and the Phase 2 Study under Anticipated Additional Services is Environmental Services? Or is that referring to a Phase 2 Geotechnical Study?
Answer #10: Correct, Phase 1 Study refers to Environmental Site Assessment and Phase 2 Environmental Services.
Question #11: If a Phase 2 Environmental Study is anticipated, is there knowledge of contamination on the site or what is the reason for anticipating this being needed?
Answer #11: There is a suspected buried fuel tank.
Question #12: Phase 2 Study is listed under Anticipated Additional Services but is not included in Exhibit B – Fee Proposal?
Answer #12: This will be a potential later addition to the scope after the Phase I report is issued so the scope of the Phase 2 is known.
Question #13: Are there any fenced in areas that need to be accessed and who will be responsible for opening or taking those down and putting back up for drilling access?
Answer #13: No. Locations will be adjust to avoid fenced areas.
Question #14: Are there any dates or times that fieldwork is restricted?
Answer #14: It is requested that borings in close proximity to the building not start until after 10:00.
Revised Exhibit B:
A revised Exhibit B has been attached.
End of Addendum #4
Exhibit B - Fee Proposal
Exhibit B – Fee Proposal
Name of Project: Miller Building Project Facility: Anoka Metro Regional Treatment Center Project Location: 3301 7th Avenue, Anoka, MN RECS Project No.: 55AK0054 Primary Consultant Firm: (Name and Address) Contact Person:
Phone:
Email:
(Submit an Exhibit B sheet for all subconsultants. Include the all-inclusive fee on Primary Consultant Firm’s Fee Proposal)
Proposed Compensation:
Fee summary Amount % of Total
Professional Fees – Basic Services* - - Design Development Phase – Geotechnical Borings & report $ Design Development Phase I Environmental Assessment Wetland Delineation – 2 areas required to be included $ Construction Documents Phase $
Total Basic Services $ Additional Services (For specific work required by the project. Not for Supplement Agreement work)
Construction Phase Responding to RFI’s and Periodic On-Site Observation (4) Site Visits
Total Additional Services $ - Total Reimbursable Expenses (from Schedule of Reimbursable Expenses) $ -
Total Compensation (Fees + Reimbursable expenses)
Total Fee -As a Percentage of Construction: _N/A_% (Total Basic Services Fee divided by Budgeted/Estimated Cost of Construction.)
* Markup is not allowed on Subconsultant fee
Exhibit B - Fee Proposal
Exhibit B (Continued)
Schedule of Reimbursable Expenses (estimated):
Only the following reimbursable expenses are allowed. Any other expenses must be included in the Consultant’s Fee for Basic Services
Expense Description Amount Printing: Consultant shall be reimbursed for printing of Documents and Construction Documents.
Plans: Blue Line or Black Line prints at $ 0.10 per sq ft $ 30” x 42” sheet = $0.88 $ 24” x 36” sheet = $0.60 $ Predesign, Reports and Construction Specifications:
Instant Print $0.05 per sheet (each face). Specifications shall be duplicated utilizing both sides of sheet.
Electronic Files of record drawings and specifications: Files are to be in dwg, doc, xls and pdf formats –
- 2 copies to State’s Project Manager (one for internal file; one for archiving)
- 1 copy to user facility/agency
- 3 copies to Facilities Management Division – for projects located on the
Capitol Complex in St. Paul
Mail: Consultant shall be reimbursed at cost for U.S. Mail or Express postage fees to convey Predesign, Schematic Design, Design Development, Construction and Bidding Documents to the State review consultants and to State and local officials
Telephone: Consultant shall be reimbursed at cost for long-distance telephone calls pertaining to the Project.
Total Reimbursable Expenses( Included in fee): $Not to Exceed $300
END OF EXHIBIT B
SHicks Cross-Out
| Questions & Answers: |
| Revised Exhibit B: |
| ADP6695.tmp |
| Exhibit B – Fee Proposal |
| Proposed Compensation: |
| % of Total |
| Amount |
| Fee summary |
| Exhibit B (Continued) |
| Schedule of Reimbursable Expenses (estimated): |
| Amount |