This Request for Proposals (RFP) document is issued by the Portland City Auditor's Office for financial audit services for the City of Portland and its reporting entities, beginning Fiscal Year 2026-27. The Auditor's Office seeks proposals from certified public accountants holding Municipal Auditor licenses from the Oregon Board of Accountancy to perform comprehensive financial audits of the City of Portland, Prosper Portland (the City's economic development agency), and the Fire and Police Disability and Retirement Funds. Required services include annual financial statement audits, information technology reviews, federal Single Audits in accordance with the Uniform Guidance, eight hours of continuing professional education training annually, technical assistance, and optional non-audit services limited to 36 hours annually. The RFP document serves as the Project Information Packet with detailed scope of work, evaluation criteria, and contract terms. An optional pre-proposal meeting was held on November 10, 2026. Written proposals were due December 15, 2026, before 3:00 p.m. Pacific Standard Time, with a planned short list posting and Phase 2 instructions by January 15, 2027, interviews scheduled for the week of January 25, 2027, and Notice of Intent to Award anticipated February 1, 2027. The resulting contract will begin April 1, 2027, for an initial three-year term with two optional one-year renewals, covering five years total.
The five-year contract budget is anticipated not to exceed $700,000 annually or $3.5 million over five years, with reasonable annual inflation increases anticipated. Historical cost data provided includes City audit costs of approximately $383,000 annually, Prosper Portland audits of $136,000 annually, Single Audit costs of $19,100 per major program, and FPDR audits of $33,000 annually. The City estimates total annual hours of 1,500 to 1,600 hours for City audits, 620 hours for Prosper Portland, 260 to 320 hours for Single Audits, and 100 hours for FPDR. The contract will be awarded to a single firm, with proposers evaluated on responsiveness, responsibility, mandatory criteria including Oregon Board of Accountancy Municipal Auditor licensing and peer review compliance, and Phase 1 evaluation criteria weighted as follows: Proposer Capabilities (15 percent), Project Team (15 percent), Project Approach (25 percent), Pricing (25 percent), and Corporate Responsibility including Equal Opportunity and Access in Subcontracting (7 percent), Equal Opportunity Employer and Community Involvement (10 percent), and Sustainable Business Practices (3 percent). Insurance requirements include Commercial General Liability of $2 million per occurrence, Professional Liability/Errors and Omissions of $1 million per occurrence with $3 million aggregate, and Cyber Liability of $1 million per occurrence. No set-asides are identified in this procurement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposals for Financial Audits beginning Fiscal Year 2026-27 Project Information Packet RFP Number: Doc2463361188
Personal Services
Issued Date: November 3, 2026
Contents RFP at a glance
Section 1: Opportunity overview
Section 2: How your proposal will be evaluated
Section 3: Scope of work
Section 4: Exhibits
Section 5: Sample contract
Section 6: RFP Terms and Conditions
RFP Information Packet | RFP #Doc2463361188
RFP at a glance
Proposals due December 15, 2026, before 3:00:00 p.m. Pacific Standard Time
Summary The Portland City Auditor is seeking proposals from certified public accountants to perform financial audits for the City of Portland and its reporting entities, beginning with Fiscal Year 2026-27. Proposers must be Municipal Auditors licensed by the Oregon Board of Accountancy. Audits will follow Government Auditing Standards and Oregon Minimum Standards. Single Audits will follow the federal Uniform Guidance.
Optional pre-proposal meeting November 10, 2026, 10:00 – 11:00 a.m. Pacific Standard Time
Join the Microsoft Teams Meeting:
https://teams.microsoft.com/meet/2244188934250518?p=qF2Nd7f9qgnCovfdSg or
Dial in by phone:
971-323-0035, phone conference ID: 134 346 19#
Refer to Section 1.5: Optional pre-proposal meeting for details.
Submit your proposal Proposals must be submitted through the City of Portland Online Procurement Center.
Refer to the Project Response Packet: Section 7: Submission instructions for details.
Have questions or need help? Single point of contact Send questions, requests for clarification, or requests for assistance by telephone or email before December 8, 2026 at 4:00:00 p.m. Pacific Standard Time. Any questions https://teams.microsoft.com/meet/2244188934250518?p=qF2Nd7f9qgnCovfdSg https://service.ariba.com/Discovery.aw/ad/profile?key=AN11181807487 received after this date and time may not be answered. Questions submitted through the City’s Online Procurement Center will not be answered. Only the Single Point of Contact can answer questions about this RFP.
Rosie McGown Business Operations Manager Auditor’s Office Business Operations 503-823-4007 rosie.mcgown@portlandoregon.gov mailto:rosie.mcgown@portlandoregon.gov
Section 1: Opportunity overview
1.1 Background
1.1.1 Auditor’s Office overview
The Auditor’s Office ensures open and accountable government by conducting impartial audits, investigations, and hearings and providing access to public information and services to City government and the public. It employs nearly 50 full-time equivalent staff who work in seven divisions at three downtown Portland locations. The City Auditor is directly elected by Portland voters and is independent from City Council, the Mayor, and the City’s leadership team.
1.1.2 Audit Services overview
The Audit Services Division is the auditing arm of the office of the elected Portland City Auditor. The Division oversees the financial audit contract and conducts performance audits of City operations.
1.1.3 Needs statement
To ensure open and accountable government, the Portland City Auditor is seeking external financial audits beginning with Fiscal Year 2026-27. The City of Portland, Oregon is a full-service municipal government serving 635,000 people. The City of Portland reported $12.6 billion in assets as of June 30, 2025 and $2.6 billion in expenses during fiscal year 2024-25.
In addition to the financial audit of the City of Portland, we are also seeking annual audits of:
• Prosper Portland: The City’s economic development agency reports to a Board of Commissioners, issues its own Annual Comprehensive Financial Report, and is a discretely presented component unit on the government-wide statements of the City of Portland.
• Fire and Police Disability and Retirement Funds: A disability and retirement plan for Portland firefighters and police officers that reports to a Board of Trustees, issues its own financial statements for two funds, and is a blended component unit of the City’s Annual Comprehensive Financial Report under fiduciary funds.
• Single Audit of federal compliance: As recipient of federal funds, the City is required to obtain an annual Single Audit in compliance with the Uniform Guidance.
Successful Propsoer must meet all applicable laws, regulations, and standards, including:
• Licensing requirements by the Oregon Board of Accountancy
• Compliance with Government Auditing Standards (“Yellow Book”), including having passed external peer review
• Completion of work required by Minimum Standards for Audits of Oregon
Municipal Corporations (“Oregon Minimum Standards”)
• Completion of work required by the Uniform Guidance
• No independence impairments with the City and its reporting entities, as required by Government Auditing Standards and City Code
The City of Portland’s fiscal year ends June 30. The City of Portland’s financial audit should begin in late spring. We aspire to complete the City of Portland’s financial audit by the end of October, but due to resource constraints the City may also aim to complete it by the end of November.
Proposers may offer that some part of the scope of work will be performed by subcontractors. The Auditor’s Office supports a deliberate and strategic subcontracting approach aimed at building additional capacity within the audit industry. The successful proposer will be fully responsible for subcontractors meeting applicable laws, regulations, standards, and contract requirements.
In Portland’s form of government, the City Council performs legislative and quasi-judicial functions, the Mayor oversees City services with an appointed City Administrator, and the elected Auditor oversees financial and performance audits of City government. The Portland City Auditor is directly accountable to voters and strongly emphasizes auditor independence from those entities subject to audit.
Prior years’ financial statements can be found online:
• portland.gov/accounting/finance-reports
• prosperportland.us/our-budget/
• portland.gov/fpdr/budget-reports
See the Scope of Work below for a complete list of the Auditor’s Office’s required services and deliverables.
http://www.portland.gov/accounting/finance-reports https://prosperportland.us/our-budget/ http://www.portland.gov/fpdr/budget-reports
1.2 Outcome goals
1) Successful Proposer will complete the financial audit opinions and other deliverables within deadlines of the resulting contract.
2) Successful Proposer will maintain independence from the audited entity, and
Successful Proposer will comply with applicable laws, regulations, and standards.
3) Successful Proposer will communicate clearly and proactively with Auditees and the Contract Manager about audit progress, any issues with obtaining access to records or information needed for the audit, and preliminary findings.
4) Successful Proposer will respond flexibly if Auditees are experiencing minor delays and adapt the audit timeline.
5) Successful Proposer will present audit results to management and governing boards.
1.3 Contract details
The resulting contract term will be 3 years with two optional one-year renewals. Work under the resulting contract is expected to begin April 1, 2027.
The five-year budget for the resulting contract is anticipated not to exceed $700,000 per year or $3.5 million over five years. The five-year budget anticipates reasonable annual inflation increases.
Full details of insurance requirements are contained in section 6.2 of the sample contract, which can be found in section 5 of this information packet and include:
• Commercial General Liability: $2 million per occurrence;
• Automobile Liability: $2 million or each accident;
• Workers’ Compensation: $1 million each accident, $1 million disease each employee, and $1 million disease policy limit;
• Professional Liability/Errors and Omissions: $1 million per occurrence and aggregate of $3 million for all claims per occurrence; and
• Technology Errors and Omissions; Cyber Liability: $1 million per occurrence.
The resulting contract will be awarded to a single firm.
1.4 Estimated RFP timeline
The timeline below is an estimate for the RFP and contracting process.
Event Date
Optional pre-proposal meeting November 10, 2026
Deadline for RFP questions December 8, 2026
Written proposals due before 3:00:00 p.m. PST (for Phase 1) December 15, 2026
Short list posted and Phase 2 instructions shared (if applicable) January 15, 2027
Interviews (if applicable) Week of January 25, 2027 (subject to change)
Notice of Intent to Award posted February 1, 2027
Contract execution By March 31, 2027
The Auditor’s Office will adjust the schedule as necessary.
1.5 Optional pre-proposal meeting
There will be an optional pre-proposal meeting for this Project on Tuesday, November 10, 2026, from 10:00 – 11:00 a.m. Pacific Standard Time.
Join the Microsoft Teams meeting:
https://teams.microsoft.com/meet/2244188934250518?p=qF2Nd7f9qgnCovfdSg or
Dial in by phone:
971-323-0035, phone conference ID: 134 346 19#
This meeting is not mandatory. You can submit a proposal without attending this meeting.
The Auditor’s Office makes reasonable accommodation for people with disabilities. To request an accommodation, please notify the Official RFP Contact at least two (2) Business Days prior to the event, by the City’s TTY at 503-823-6868, or by the Oregon Relay Service at 1-800-735-2900.
https://teams.microsoft.com/meet/2244188934250518?p=qF2Nd7f9qgnCovfdSg
1.6 Addenda
The Auditor’s Office will share more information about this RFP if something is missing or unclear. The Auditor’s Office will share this information as an addendum (or addenda, if more than one). The Auditor’s Office will post addenda on the City of Portland Online Procurement Center.
Addenda issued seventy-two (72) hours or more before the due date are binding. The seventy-two (72) hour window excludes Saturdays, Sundays, and City-observed holidays.
You are responsible for complying with the addenda, even if you do not see it.
Section 2: How your proposal will be evaluated
2.1 Proposal review and selection
2.1.1 Evaluation overview
The Auditor’s Office will appoint an Evaluation Committee (Committee) to evaluate the proposals received. To score proposals, the Committee will evaluate each proposal using the criteria below. The Committee may seek outside expertise. The Committee will require at least ten (10) Business Days to evaluate and score the proposals.
The Auditor’s Office can decide how or when to proceed through the evaluation process. The Auditor’s Office can also set timelines it deems reasonable and decide whether additional clarifications are needed, when to begin or end negotiations, whether to open negotiations with a lower scoring proposer.
The Auditor’s Office can also decide to cancel the solicitation or reject all proposals.
2.1.2 Evaluation process
Each proposal is evaluated using these criteria:
2.1.2.1 Responsiveness, responsibility, and mandatory criteria
The Auditor’s Office will determine if you are a Responsible Proposer who has submitted a Responsive Proposal (ORS 279B.005).
https://service.ariba.com/Discovery.aw/ad/profile?key=AN11181807487 https://service.ariba.com/Discovery.aw/ad/profile?key=AN11181807487 https://www.portland.gov/policies/human-resources-administrative-rules/leaves/hrar-602-holidays https://www.portland.gov/policies/human-resources-administrative-rules/leaves/hrar-602-holidays
Refer to Procurement Rules for the Auditor’s Office for details.
Mandatory criteria:
• Proposer holds a Municipal Auditor license with the Oregon Board of Accountancy
• Proposer meets the peer review requirements in Government Auditing Standards and has passed their most recent peer review
• Neither Proposer nor any subcontractors are listed on the government exclusions in the System for Award Management by the federal government
2.1.2.2 Evaluation phase 1 – written scoring
Proposals that meet the responsiveness, responsibility, and mandatory requirements will be evaluated in Evaluation Phase 1. The Committee will conduct a detailed review of the written proposals and will score based on the points allocation listed below.
Phase 1 Evaluation Criteria
Evaluation criteria Percent of total points
Percent of points for sub-criteria
Proposer Capabilities 15 —
Project Team 15 —
Project Approach 25 —
Pricing 25 —
Corporate Responsibility 20 —
Equal Opportunity and Access in Subcontracting — 7
Equal Opportunity Employer and Community Involvement — 10
Sustainable Business Practices — 3
Total 100% https://www.portland.gov/policies/adopted-rules-auditors-office/procurement-rules-auditors-office/ara-201-procurement-rules
2.1.2.3 Short listing
At the end of any evaluation phase, the Evaluation Committee may focus on only a limited number of proposals by developing a “short list” based on the scores. The number of proposals on the short list depends on the number of proposals the Committee believes have a reasonable chance of leading to a contract award. If you are eliminated from further consideration, you will be notified by a Notice of Short List posted on the City of Portland Online Procurement Center.
2.1.2.4 Subsequent evaluation phases
The Auditor’s Office will proceed with subsequent evaluation phases as needed. These phases may include oral interviews, demonstrations, presentations, site visits, clarification of the proposals, or other activities.
If you are invited to participate in subsequent evaluation phases, the Auditor’s Office will share additional information and instructions in a reasonable amount of time before any further evaluation is held.
2.1.2.5 Evaluation Phase 2 – Interviews, demonstrations, or presentations
If the Auditor’s Office determines a Phase 2 process is required, further detail on specific criteria, weighting, and point breakdown will be part of the information and instructions provided by the City at the end of Phase 1.
Phase 2 Evaluation Criteria
Evaluation criteria % Allocation
Content of Phase 2 Evaluation to be determined 100
2.1.2.6 Additional optional evaluation phases and methods
In addition to the evaluation phases above, the Auditor’s Office can use other methods like best and final offers, serial negotiations, and competitive simultaneous negotiations.
Proposers eliminated at any stage of the evaluation process will be notified.
2.1.2.7 Total overall score
At the end of each evaluation phase, the points from that phase will be added to your cumulative score to determine your Total Overall Score. The proposer with the highest Total Overall Score may be identified as the finalist.
The selection of the finalist may also be based on negotiated costs and agreeing to the Auditor’s Office’s terms and conditions within the Auditor’s Office’s Sample Contract.
Negotiations will follow with the finalist. If successful, negotiations may result in a final award and Contract for the work. If the Contract with the finalist cannot be reached within a time that is reasonable to the Auditor’s Office, the Auditor’s Office may elevate the proposer with the next highest Total Overall Score to be the finalist.
2.2 Award review and protest
2.2.1 Review
The Auditor’s Office will post a Notice of Intent to Negotiate and Award on the City of Portland’s Online Procurement Center. The Notice will identify the proposer(s) to which the Auditor’s Office intends to award a contract.
Following the Notice of Intent to Negotiate and Award, the public may view proposal documents, in accordance with the Oregon Public Records Act.
If you were not awarded the Contract, you can ask for clarification or debriefing, request time to review the selection procedures, or discuss the scoring methods used by the Evaluation Committee.
2.2.2 Protests
Proposers can challenge the Auditor’s Office’s decision to exclude the proposer from the next step in the evaluation process, and to award a contract. If you wish to protest your elimination, you must submit a protest within seven (7) Calendar Days of the Auditor’s Office’s notice of non-responsiveness, posting of the Notice of Short List, or Notice of Intent to Award.
Proposers can read Procurement Rules for the Auditor's Office regarding protest procedures, all of which may be found online. Proposers may also learn more about protests by reviewing ORS 279B.405 and ORS 279B.410.
Protesters may not use judicial appeal rights unless all protest and appeal rights are exhausted.
https://service.ariba.com/Discovery.aw/ad/profile?key=AN11181807487 https://www.portland.gov/policies/adopted-rules-auditors-office/procurement-rules-auditors-office/ara-201-procurement-rules
Section 3: Scope of work
3.1 Service requirements
3.1.1 Service 1: Financial statement audits
Successful Proposer shall provide the following services each year:
• Audit of the Annual Comprehensive Financial Report of the City of Portland (City)
• Audit of the Annual Comprehensive Financial Report of Prosper Portland
• Audit of the annual financial statements of the Fire and Police Disability and
Retirement Funds (FPDR)
The objective of these financial audits is to express an opinion or disclaimer of an opinion on the fairness of presentation of the basic financial statements for each fiscal year in conformity with the appropriate basis of accounting.
These financial audits shall be in accordance with:
• Government Auditing Standards issued by the Comptroller General of the United States, as required by City Charter Sections 2-507 and 2-508
• Minimum Standards for Audits of Oregon Municipal Corporations (“Oregon Minimum Standards”)
• Generally accepted auditing standards promulgated by the American Institute of Certified Public Accountants, as required by Oregon Minimum Standards
• City Code 3.05.070, which requires the audit be conducted by persons who have no financial interests in the affairs of the governmental unit or its officers
In the fourth and fifth year options, the City and Prosper Portland may decide to include or exclude the Prosper Portland audit.
3.1.2 Service 2: IT reviews
As part of the annual financial audits, the Successful Proposer shall perform information technology reviews of the City and of Prosper Portland to obtain an understanding of the key accounting systems and network infrastructure which produced the Auditees’ financial statements. The Successful Proposer shall make written reports of observations, including possible findings, business process improvements, and any related recommendations. The City and Prosper Portland may invoke their privilege under state law to exempt such reports from public disclosure.
3.1.3 Service 3: Federal Compliance Audit, also known as Single Audit
Successful Proposer shall conduct the annual Single Audit of the City of Portland which includes federal awards received by or passed through Prosper Portland.
In addition to the financial statement audits set out above, the Single Audit has the following objectives:
• Determine whether the City’s Schedule of Expenditures of Federal Awards (SEFA) is stated fairly in all material respects in relation to the City’s Annual Comprehensive Financial Report as a whole (2 CFR 200.514 (b))
• Determine which federal programs are major programs (2 CFR 200.518)
• Obtain a sufficient understanding of internal control over federal programs and then plan, test, and report on the internal control over major programs’ compliance requirements (2 CFR 200.514 (c))
• Determine and express an opinion or disclaim an opinion about whether the City has complied with the requirements (laws, regulations, and the provisions of contracts or grant agreements) relating to major federal programs (2 CFR
200.514 (d))
• Follow up on prior audit findings, to assess the reasonableness of the summary schedule of prior audit findings prepared by the Auditee, and report, as a current year audit finding, when the status of any prior audit finding is materially misrepresented. (2 CFR 200.514 (e))
These federal compliance audits shall be in accordance with:
• Single Audit Act Amendments of 1996 and any subsequent amendments
• Uniform Guidance in Title 2 CFR Part 200 Subpart F
• Government Auditing Standards, as required by 2 CFR 200.514 (a)
3.1.4 Deliverable schedule for services 1, 2, and 3
For the audit of Fiscal Year 2026-27, Successful Proposer will perform the work according to the following schedule. Subsequent years’ audits will follow a similar schedule determined by the City.
Deliverable City Single Audit
Prosper Portland
FPDR
Pre-Audit Conference By June 30, By June 30, By June 30, By June 30, Start of interim fieldwork
July 2027 (2 to 3 weeks suggested) N/A
June 2027 (1 week suggested) N/A
Provided-by-Client lists To be determined
To be determined
To be determined
To be determined
Preliminary determination of Single Audit major programs N/A
Early August 2027 N/A N/A
Report on IT review Mid-August 2027 N/A
Mid-August 2027 N/A
Start of (final) fieldwork
Mid- August to mid- September (4 weeks suggested) And late September (2 additional weeks with small team suggested)
Late September (4 weeks suggested)
Late August (2 weeks suggested)
September (1 week suggested)
Auditee intends to provide draft financial statements to contractor
Mid- September
Late September
Late September
Late September
Final determination of Single Audit major programs N/A
Late September 2027 N/A N/A
Deliverable City Single Audit
Prosper Portland
FPDR
Multiple rounds of review comments
In the four weeks preceding the audit opinion, details to be specified in the contract
Audit Opinion October 29, 2027, noon
4 weeks after City ACFR opinion
October 26, October 22, Communications to those charged with governance Same as audit opinion
Management Recommendation letters
Same as audit opinion, or negotiable within a few weeks after the audit opinion
Presentations to governing boards/committees
As scheduled by the Contract Manager, usually within one to eight weeks after audit opinion
The City aspires to complete its Annual Comprehensive Financial Report and receive the audit opinion by the end of October. However, due to the complexity of the City’s financial reporting and due to resource and technical constraints, Proposers should also be prepared for the City financial reporting timeline to be delayed by four to five weeks.
Proposers may propose slightly different timelines for fieldwork and IT reviews.
However, the Proposer should assume that only limited Auditee staff and resources will be available during the production of the City’s ACFR statements for four weeks following the delivery of the draft financial statement to Contractor. The Successful Proposer needs to avoid fieldwork at Prosper Portland in the two weeks before Prosper Portland delivers its draft ACFR while accounting staff prepare it.
Successful Proposer shall make good-faith efforts to schedule staff in such a way to work around temporary delays of certain audit schedules, to minimize risks of delay for reports and other deliverables. Successful Proposer shall be responsible for informing Contract Manager of any potential situations that could delay delivery dates.
The City’s Contract Manager and Successful Proposer can mutually agree to extend due dates. The intent is to accommodate scope changes, delays in federal guidance, or force majeure. The City will not approve delays for Successful Proposer underestimating time or Successful Proposer personnel capacity/scheduling issues. If due dates are extended because of late delivery of financial statements or audit schedules by Auditees, the extension shall be no more than the number of business days of the late delivery.
3.1.5 Detailed requirements for deliverables
3.1.5.1 Independence memorandum
Annually at kick-off of the audit, Successful Proposer shall submit a signed memorandum certifying their auditor independence in accordance with Government Auditing Standards and City Code, on a form acceptable to the City’s Contract Manager. City may also require Successful Proposer’s certification of compliance with Byrd Anti-Lobbying Amendment provisions (2 CFR 200 Appendix II (I)).
3.1.5.2 Confidentiality agreement
When requested by City, Successful Proposer personnel assigned to the resulting contract shall sign confidentiality agreements on a form acceptable to the City.
3.1.5.3 Peer review report
Successful Proposer shall submit a copy of the most recent report of the external peer review in accordance with Government Auditing Standards, including the peer reviewer’s comment letter and firm’s response. (Government Auditing Standard 5.155, 2 CFR 200.509 (a))
3.1.5.4 Progress meetings
Successful Proposer shall participate in audit progress meetings with each Auditee.
Audit progress meetings will be held weekly during interim fieldwork, and at least weekly from the start of final fieldwork to the audit opinion issuance.
Successful Proposer shall prepare and distribute a meeting agenda in advance of the meeting. The meeting agenda shall include: summaries of activities, deliverables completed, due dates of upcoming deliverables, and delayed items.
3.1.5.5 Report on IT reviews
Successful Proposer shall confirm with City’s Contract Manager the list of recipients for these reports before distribution. As applicable, report pages shall be marked “confidential.”
3.1.5.6 Audit opinions
Audit opinions or disclaimers of opinion shall include: Government Auditing Standards report and Oregon Minimum Standards report. Successful Proposer shall also provide:
Summary of Revenues and Expenditures form to be filed with Oregon Secretary of State, Schedule of Findings and Recommendations. Auditees will assemble and print the ACFRs including the auditor’s opinion and reports.
When applicable, to meet the Oregon Minimum Standards, the Successful Proposer shall express an “in relation to” opinion (or disclaimer of opinion) on combining and individual fund statements and schedules and on budgetary schedules. The deadline for these “in relation to” opinions shall be the same as the due dates for the related financial audit opinions.
Successful Proposer will review and approve the “Oregon Audits Division Summary of Revenues and Expenditures” forms for the City’s ACFR and Prosper Portland’s ACFR at the end the annual financial audit. The Successful Proposer will send this form electronically to the respective Auditee project managers, and the Auditee’s financial staff will file the required audited financial statements with the State of Oregon.
3.1.5.7 Single Audit
Single audit reports shall be compiled into one package in the format required (2 CFR 200.512) for upload to the Federal Audit Clearinghouse including:
• Audited SEFA
• Auditor’s opinion (or disclaimer of an opinion) about whether the City’s SEFA is presented fairly in all material respects in relation to the City’s ACFR taken as a whole
• Report on compliance with requirements (including laws, regulations, contracts and awards) that could have a direct and material effect on each major program, and on the City’s internal control over compliance
• A schedule of findings and questioned costs, as applicable, with the Auditee’s management responses to the findings and recommendations
• City and/or Prosper Portland management responses to any findings in the schedule of findings and questioned costs, as required by the Uniform Guidance, to be included in the Single Audit report package filed with the federal government
• Duplicate copy of the Government Auditing Standards report published in the City’s ACFR on the internal controls over financial reporting and their tests of compliance with applicable laws and regulation
Successful Proposer shall certify the Uniform Guidance electronic data collection form (2 CFR 200.514 (f)) for the Federal Audit Clearinghouse 30 days after the Single Audit report or by March 31, whichever occurs first. Successful Proposer shall forward the Federal Audit Clearinghouse’s confirmation of the auditor’s certification to City Contract Manager and Auditee project manager.
3.1.5.8 Communication to those charged with governance
Successful Proposer shall submit reports as required by Statement on Auditing Standards No. 114 and any successor statements, to communicate to “those charged with governance” for each of the City and Prosper Portland. These communications shall be in writing and drafts should be discussed during the audit progress meetings.
3.1.5.9 Meetings with those charged with governance
Attendance of Successful Proposer’s relevant key personnel shall be required for meetings with City Auditor, City Council, Prosper Portland Board of Commissioners, FPDR Board of Trustees, other governing bodies or committees, or others charged with governance.
3.1.5.10 Management recommendation letters
Successful Proposer shall submit two Management Recommendation Letters to the City Auditor and the Auditee’s management: One for the City, Single Audit, and FPDR; and one for Prosper Portland. The Management Recommendation Letter shall address neither significant deficiencies nor material weaknesses; instead, they shall communicate less serious internal control deficiencies, recommendations for improvement that may lead to increased effectiveness and efficiency, or other matters to be brought to the attention of management. The letters shall include any findings, observations, opinions, comments, or recommendations relating to internal control, accounting systems, data processing, compliance with laws, rules and regulations or any other matters that come to the attention of the independent auditor during the course of the audit. The letters shall present recommendations to promote “best practices” in these matters. The letters shall also include information about new accounting standards, auditing standards and regulations applicable to future years.
Contractor shall report any significant deficiencies or material weaknesses separately, as required by Government Auditing Standards and applicable standards.
Management recommendations shall not be construed as special or additional studies.
They should result from procedures associated with the study of internal control systems and procedures and the audit of the financial statements.
Successful Proposer shall work with City Auditor’s Contract Manager and Auditee project managers to prepare working drafts and discuss potential findings and recommendations with Auditee management.
The Management Recommendation Letter for the City should be addressed to the City Administrator or their designee, and should be copied to the City Auditor.
The Management Recommendation Letter for Prosper Portland should be addressed to its Board of Commissioners and Audit Committee and Executive Director, and copied to the City Auditor.
Auditee management will respond in writing to recommendations made by Contractor in these letters through the City Administrator to the City Auditor and Contractor, within a time specified by the City Auditor.
3.1.5.11 Report distribution
The City’s Contract Manager will be the primary point of contact for the Successful Proposer’s report distribution (except for the audit opinions for the ACFRs, which will go directly to the Auditees’ accounting departments for inclusion in the ACFRs to be published). The Contract Manager will receive copies of all other reports and written deliverables specified in the resulting contract, and will advise on the addressees when questions arise, and will assist with report distribution.
3.1.5.12 Debrief meeting
The Successful Proposer shall schedule debrief meetings in which it will provide feedback to the Auditees’ accounting staff on the prior year’s audit schedules and suggest changes to improve the audit process.
3.1.5.13 Deliverable acceptance criteria
1. Written deliverables are complete and delivered to the correct recipients, and – as applicable – they cover the correct time period and include signatures
2. Peer review report: Contractor must have passed peer review
3. Audit Opinions and associated reports are complete and include a statement of compliance with professional standards and applicable laws
4. Communications to those charged with governance and Management
Recommendation letters are complete and include a reference to professional standards
3.1.6 Service 4: Training
Successful Proposer shall provide eight (8) continuing professional education (CPE) hours of training to Auditees’ staff each year. The CPE credits must be of a type that is accepted and approved by the Oregon Board of Accountancy.
The Successful Proposer shall issue CPE certificates to attendees, track the number of CPE credits provided during each year, and the number of people provided with this CPE, and shall provide this data to the Contract Manager within two weeks of each training date. Training may be requested by one of the Auditee project managers or by the City’s Contract Manager.
This service shall not be billed separately, but included in the Proposer’s price for the financial audits.
3.1.7 Service 5: Technical Assistance
As part of the routine activities directly related to performance of the audits under the resulting contract, the Successful Proposer shall provide advice or assistance to the Auditees throughout each contract year, at the request of the Auditees. Such advice and assistance shall include but not be limited to the following:
1. Assistance to the City and Prosper Portland in maintaining their Government Finance Officers Association (GFOA) Certificates of Achievement for Excellence in Financial Reporting. This assistance will include the Successful Proposer’s consideration during their ACFR reviews of the comments received by the City and Prosper Portland from the GFOA for the prior year’s Certificate of Achievement.
2. Responding to Auditees’ questions on accounting, reporting, or internal control as part of the audit.
3. Providing advice to the City and reporting entities on accounting matters as an ancillary part of the overall audit.
4. Providing to the City and reporting entities information that is readily available to the Successful Proposer, such as best practices, when the Auditee requests this or when the Successful Proposer feels such information will be in the best interests of the Auditee. This readily available information will include any benchmarking studies used by the Successful Proposer during the audits’ analytical review procedures, or in reporting audit results to illustrate any audit findings or best practices recommendations.
When providing these technical assistance services, the Successful Proposer shall take care not to impair their independence, as described in Government Auditing Standards.
This service shall not be billed separately but can be included in the Proposer’s price for the financial audits.
3.1.8 Service 6: Option for Non-Audit Services
Provide limited non-audit services upon request to the City, Prosper Portland, or Fire and Police Disability and Retirement, up to 36 hours in any contract year.
The Successful Proposer shall provide limited technical advice or assistance throughout each resulting contract year, at the request of the Auditees’ project managers and with approval of the City Auditor’s Contract Manager. Any requested advice or assistance will be of a type which Government Auditing Standards considers to be non-audit services. Such advice and assistance shall include but not be limited to the following:
1. Consultation and assistance as necessary and requested by the Auditees about their adoption of appropriate accounting standards.
2. Provide Auditees with counsel and advice on reformatting financial statements to reflect any future GASB pronouncements and other applicable regulations.
3. Provide Auditees with assistance in research on accounting and financial reporting treatments when requested.
3.2 Hours and cost estimate
To aid Proposers in preparing their proposals, the Auditor’s Office is disclosing an estimate of actual contractor hours for one recent year of financial audits. Nevertheless, Proposers should propose their true project hours based on their own capabilities, team, and project approach.
• City: 1,500 to 1,600 hours
• Prosper Portland: 620 hours
• Single Audit (4 major programs): 260 to 320 hours
• FPDR: 100 hours
To aid proposers in preparing their proposals, the Auditor’s Office is disclosing the contractual maximum price for one recent year of financial audits. Nevertheless, Proposers should propose maximum prices based on their own capabilities, team, and project approach. The City is operating in a constrained fiscal environment, values cost-effective financial audits and moderate cost increases, and will evaluate the cost of Proposals.
• City: $383,000
• Prosper Portland: $136,000
• Single Audit (per one major program): $19,100
• FPDR: $33,000
3.3 Role of the Auditor’s Office and Auditees
The Auditor’s Office is responsible for overseeing the financial audit contract. The Auditor’s Office will provide a Contract Manager to facilitate communication and resolve issues between the Contractor and Auditees. The Contract Manager will also facilitate the Successful Proposer’s presentation of audit results to governing boards. The Contract Manager will facilitate any contract amendments, contract task/change orders, and changes to due dates of deliverables.
Auditees are responsible for preparing the financial statements, audit schedules, and providing supporting documentation to the Successful Proposer.
Section 4: Exhibits The following exhibits are available on the City of Portland Online Procurement Center.
Exhibit Number
Name Description
RFP Exhibit 1 Procedural requirements for financial audits and Single Audits
5 pages. This exhibit describes additional requirements Contractor shall meet while conducting financial audits.
RFP Exhibit 2 Fund types provided by the City of Portland and its reporting entities;
accounting systems; and transaction cycles
4 pages. This exhibit lists the number of types of funds, describes accounting systems, and lists transaction cycles to aid proposers in planning their project approach.
Section 5: Sample contract A copy of the sample contract is available on the City of Portland Online Procurement Center.
Section 6: RFP Terms and Conditions View the RFP Terms and Conditions, available on The Auditor’s Office website.
https://www.portland.gov/auditor/documents/auditors-office-rfp-terms-and-conditions/download
| Project Information Packet |
| RFP at a glance |
| Proposals due |
| Summary |
| Optional pre-proposal meeting |
| Submit your proposal |
| Have questions or need help? Single point of contact |
| Section 1: Opportunity overview |
| 1.1 Background |
| 1.1.1 Auditor’s Office overview |
| 1.1.2 Audit Services overview |
| 1.1.3 Needs statement |
| 1.2 Outcome goals |
| 1.3 Contract details |
| 1.4 Estimated RFP timeline |
| 1.5 Optional pre-proposal meeting |
| 1.6 Addenda |
| Section 2: How your proposal will be evaluated |
| 2.1 Proposal review and selection |
| 2.1.1 Evaluation overview |
| 2.1.2 Evaluation process |
| 2.1.2.1 Responsiveness, responsibility, and mandatory criteria |
| 2.1.2.2 Evaluation phase 1 – written scoring |
| 2.1.2.3 Short listing |
| 2.1.2.4 Subsequent evaluation phases |
| 2.1.2.5 Evaluation Phase 2 – Interviews, demonstrations, or presentations |
| 2.1.2.6 Additional optional evaluation phases and methods |
| 2.1.2.7 Total overall score |
| 2.2 Award review and protest |
| 2.2.1 Review |
| 2.2.2 Protests |
| Section 3: Scope of work |
| 3.1 Service requirements |
| 3.1.1 Service 1: Financial statement audits |
| 3.1.2 Service 2: IT reviews |
| 3.1.3 Service 3: Federal Compliance Audit, also known as Single Audit |
| 3.1.4 Deliverable schedule for services 1, 2, and 3 |
| 3.1.5 Detailed requirements for deliverables |
| 3.1.5.1 Independence memorandum |
| 3.1.5.2 Confidentiality agreement |
| 3.1.5.3 Peer review report |
| 3.1.5.4 Progress meetings |
| 3.1.5.5 Report on IT reviews |
| 3.1.5.6 Audit opinions |
| 3.1.5.7 Single Audit |
| 3.1.5.8 Communication to those charged with governance |
| 3.1.5.9 Meetings with those charged with governance |
| 3.1.5.10 Management recommendation letters |
| 3.1.5.11 Report distribution |
| 3.1.5.12 Debrief meeting |
| 3.1.5.13 Deliverable acceptance criteria |
| 3.1.6 Service 4: Training |
| 3.1.7 Service 5: Technical Assistance |
| 3.1.8 Service 6: Option for Non-Audit Services |
| 3.2 Hours and cost estimate |
| 3.3 Role of the Auditor’s Office and Auditees |
| Section 4: Exhibits |
| Section 5: Sample contract |
| Section 6: RFP Terms and Conditions |
File details come from the government source that posted it. Updated .