About this file
The document is a Cost Schedule Excel file for a Signage Fabrication and Installation contract with Oakland University Facility Management in Michigan. The contract covers two sign standard categories - CURRENT and LEGACY - with pricing for sign fabrication and installation across multiple sign types (identified by ID numbers such as 1.1, 2.0, 3.3f, etc.). The initial contract term is three years, with two optional renewal years from April 1, 2028 to March 30, 2030, during which no rate increases are proposed (0.00% increase for both optional years).
The cost schedule provides a comprehensive pricing framework for different sign types, with separate columns for per-sign costs, installation costs, and lead times. The contract is a prevailing wage job, with wage details to be posted by the state. The solicitation is structured as a preferred supplier relationship, indicating the university seeks a primary vendor for ongoing signage fabrication and installation services. The document suggests a structured procurement process with specific sign standards (Attachment A and Attachment B) that potential suppliers must adhere to when submitting their pricing proposals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atachment A - Sign Standards.pdf | ||
| Attachment B - Legacy Sign Standards.pdf | ||
| RFP for Preferred Supplier Signage.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Schedule - CURRENT
| RFP Signage Fabrication and Installation Cost Schedule C |
| Buyer: Maria Ebner-Smith |
| Supplier Name: |
| This pricing is for the first three years of the agreement | |||
| CURRENT SIGN STANDARD | |||
| Complete this section providing pricing per Attachment A | |||
| Sign ID # | $ Per Sign | Installation Cost | Lead Time |
| 1.1 | |||
| 1.2 | |||
| 2.0 | |||
| 2.2L | |||
| 2.2W | |||
| 3.3f | |||
| 3.9 | |||
| 4.3m | |||
| 6.0a | |||
| 6.0b | |||
| 3.8 | |||
| 3.7 | |||
| 7.0 | |||
| 11.0 | |||
| 8.0 | |||
| 10.2 | |||
| SS | |||
| BID | |||
| CID | |||
| MD-2 | |||
| MD-4 | |||
| D | |||
| PID | |||
| SD-1 | |||
| H | |||
| RATE INCREASE FOR TWO OPTIONAL YEARS | Increase Y/N | Maximum % | |
| 1st Optional Year - April 1, 2028 to March 30, 2029 | 0.00% | ||
| 2nd Optional Year - April 1, 2029 to March 30, 2030 | 0.00% | ||
| Authorized By: |
Date:
Cost Schedule - LEGACY
| RFP Signage Fabrication and Installation Cost Schedule C |
| Buyer: Maria Ebner-Smith |
| Supplier Name: |
| This pricing is for the first three years of the agreement | |||
| LEGACY SIGN STANDARD | |||
| Complete this section providing pricing per Attachment B | |||
| Sign ID # | $ Per Sign | Installation Cost | Lead Time |
| 1.2.1 | |||
| 1.1 | |||
| 4.3 | |||
| 2.1B | |||
| 2.1A | |||
| A4.B | |||
| B1-2 | |||
| ED.1 | |||
| D.10 | |||
| 3.7 |
| RATE INCREASE FOR TWO OPTIONAL YEARS | Increase Y/N | Maximum % |
| 1st Optional Year - April 1, 2028 to March 30, 2029 | 0.00% | |
| 2nd Optional Year - April 1, 2029 to March 30, 2030 | 0.00% | |
| Authorized By: |
Date:
File details come from the government source that posted it. Updated .