RFP Preferred Supplier Signage Fabrication and Installation Cost Schedule C.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Campus Signage Fabrication and Installation Agreement - Preferred Supplioer
Solicitation number
00239
Issued by
Oakland County, Michigan

About this file

The document is a Cost Schedule Excel file for a Signage Fabrication and Installation contract with Oakland University Facility Management in Michigan. The contract covers two sign standard categories - CURRENT and LEGACY - with pricing for sign fabrication and installation across multiple sign types (identified by ID numbers such as 1.1, 2.0, 3.3f, etc.). The initial contract term is three years, with two optional renewal years from April 1, 2028 to March 30, 2030, during which no rate increases are proposed (0.00% increase for both optional years).

The cost schedule provides a comprehensive pricing framework for different sign types, with separate columns for per-sign costs, installation costs, and lead times. The contract is a prevailing wage job, with wage details to be posted by the state. The solicitation is structured as a preferred supplier relationship, indicating the university seeks a primary vendor for ongoing signage fabrication and installation services. The document suggests a structured procurement process with specific sign standards (Attachment A and Attachment B) that potential suppliers must adhere to when submitting their pricing proposals.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Schedule - CURRENT

RFP Signage Fabrication and Installation Cost Schedule C
Buyer: Maria Ebner-Smith
Supplier Name:
This pricing is for the first three years of the agreement
CURRENT SIGN STANDARD
Complete this section providing pricing per Attachment A
Sign ID #$ Per SignInstallation CostLead Time
1.1
1.2
2.0
2.2L
2.2W
3.3f
3.9
4.3m
6.0a
6.0b
3.8
3.7
7.0
11.0
8.0
10.2
SS
BID
CID
MD-2
MD-4
D
PID
SD-1
H
RATE INCREASE FOR TWO OPTIONAL YEARSIncrease Y/NMaximum %
1st Optional Year - April 1, 2028 to March 30, 20290.00%
2nd Optional Year - April 1, 2029 to March 30, 20300.00%
Authorized By:

Date:

Cost Schedule - LEGACY

RFP Signage Fabrication and Installation Cost Schedule C
Buyer: Maria Ebner-Smith
Supplier Name:
This pricing is for the first three years of the agreement
LEGACY SIGN STANDARD
Complete this section providing pricing per Attachment B
Sign ID #$ Per SignInstallation CostLead Time
1.2.1
1.1
4.3
2.1B
2.1A
A4.B
B1-2
ED.1
D.10
3.7
RATE INCREASE FOR TWO OPTIONAL YEARSIncrease Y/NMaximum %
1st Optional Year - April 1, 2028 to March 30, 20290.00%
2nd Optional Year - April 1, 2029 to March 30, 20300.00%
Authorized By:

Date: