RFP No_ 1003_2025 Lift Station Rehabilitation.pdf
PDF 1 MB Posted
- Solicitation number
- PE-66061-NONST-2025-000000030
- Issued by
- Fulton County, Colquitt City, Georgia
About this file
This is a Request for Proposal (RFP No. 1003-2025) issued by the City of College Park, Georgia for the rehabilitation of the Forest Parkway Lift Station located at the City of College Park Power Department Storage Facility at 1060 Forest Parkway. The scope includes furnishing equipment, labor, material and personnel to perform removal and replacement of existing pumps, valves, piping, fittings, emergency discharge connection, site restoration and other appurtenant items, as well as furnishing and installing sewage force main pipe and fittings. Proposals are due by March 7th, 2025 at 3:00 PM EDT. A non-mandatory pre-bid meeting will be held on February 11th, 2025 at 10:00 AM EDT. The last day for questions is February 21st, 2025 at 12:00 PM EDT. The initial contract term is one year with two optional one-year renewals.
The evaluation criteria includes project approach and method (30 points), experience and qualifications (30 points), and fee schedule proposal (40 points). Bidders must submit a bid bond for 10% of the total bid amount, and the successful bidder must provide performance and payment bonds for 100% of the contract value. The project requires compliance with Davis-Bacon Act wage requirements and encourages participation from Disadvantaged Business Enterprises (DBEs). Proposals must include one signed original marked "ORIGINAL", five bound photocopies marked "COPY", and one flash drive containing a PDF of the submittal. The fee proposal must be submitted in a separate sealed envelope.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP No_ 1103_2025 Addendum No_ 1 Lift Statio.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL (RFP) – 1003-2025
CITY OF COLLEGE PARK REHABILITATION PROGRAM
FOR
FOREST PARKWAY LIFT STATION
Proposals Due by 3:00 P.M. Friday, March 7th, 2025
3667 Main Street College Park, Georgia 30337
Dear Vendor:
I thank you for your interest in doing business with the City of College Park. We look forward to a very successful procurement process. Please take notice of the response submittal requirements and the l certification checklist outlined in this solicitation. Please be sure to read and follow the instructions very carefully, as any misinterpretation or failure to comply with instructions may result in dismissal of your submittal. Any changes(s) to this solicitation will be conveyed through the written addenda process. In addition, notification of addenda are posted on the City's website, which is located at Bid Posting(s) - City of College Park (collegeparkga.com) and the Georgia
Procurement Registry website https://ssl.doas.state.ga.us/PRSapp/PR index.jsp.
Please read carefully and follow all instructions provided in the addendum, as well as the instructions provided in the original solicitation. It is solely the vendor's responsibility to routinely check the City's website at Bid Posting(s) - City of College Park (collegeparkga.com) and
The Georgia Procurement Registry website https://ssl.doas.state.ga.us/PRSapp/PR_index.jsp for any changing information prior to their reply.
One of the objectives of the Purchasing Department is to provide quality and efficient service. If you have any questions, please visit our website or contact the agent of concern. The staff of the
City of College Park strives to provide excellent service "while purchasing best for less with the highest level of transparency, efficiency and integrity".
Again, thank you in advance for your continued interest in doing business with the City of College Park.
https://www.collegeparkga.com/departments/purchasing_department/bid_posting_s_ https://ssl.doas.state.ga.us/PRSapp/PR_index.jsp
City of College Park Purchasing Department City of College Park 3667 Main Street
College Park, Georgia 30337
REQUEST FOR PROPOSAL (RFP) NO.1003-2025
LIFT STATION REHBILITATION
Table of Contents
PURPOSE
PROPOSAL DUE DATE
CONTACT PERSON AND INQUIRIES
RFP SCHEDULE OF EVENTS
CLARIFICATION & ADDENDA
DISADVANTAGED BUSINESS ENTERPRISE.18
SUBMISSION REQUIREMENTS……………….40
OVERVIEW PROPOSAL REQUIREMENTS….
PROPOSAL EVALUATION
BID FORM …………………………………….
EXHIBIT I (DETAILED SCOPE OF SERVICES)
EXHIBIT II (REFERENCE VERIFICATION FORM
EXHIBIT III – REQUIRED CERTIFICATIONS/ATTACHMENTS FORM 1
NON-COLLUSION BIDDING CERTIFICATE
FORM 2 NON-COLLUSION SUB-CONTRACTOR
FORM 3 CERTIFICATION REGARDING DEBARMENT
FORM 4 INELIGIBILITY CERTIFICATE
FORM 5 CERTIFICATION OF DRUG-FREE WORKPLACE
FORM 6 CONFLICT OF INTEREST
FORM 7 AFFIDAVIT VERIFYING STATUS
FORM 8 CERTIFICATION REGARDING LOBBYING
FORM 9 PROPOSAL SUBMITTAL LETTER
FORM 10 GEORGIA SECURITY AND IMMIGRATION CONTRACTOR AFFIDAVIT
FORM 11 GEORGIA SECURITY SUB-CONTRACTOR AFFIDAVIT
FORM 12 CERTIFICATE OF ACCEPTANCE
FORM 13 SUNCONTRACTOR FORM
3667 Main Street
College Park, Georgia 30337
REQUEST FOR PROPOSALS (RFP) NO. 1003-2025
REHABILITATION PROGRAM FOR FOREST PARKWAY LIFTSTATION
The City of College Park, (hereafter referred to as “the City), is seeking written proposals from qualified contractors to furnish equipment, labor, material and personnel to perform the following tasks of removal and replacement of existing pumps for the rehabilitation of the Forest Parkway Lift Station located at the
City of College Park Power Department Storage Facility, 1060 Forest Parkway, Georgia 30349.
Through the issuance of this Request for Proposal (“RFP” and/or “Proposals”), the City is soliciting
Proposals from qualified Proposers for the Forest Parkway Lift Station Program, a federal government
EPA program. The work will include but not limited to the removal and replacement of existing
Pumping, panels, including equipment, labor, material and personnel to perform the task:
Mobilization Grinder Pump Motors
Bypass Pumping Grinder Pump Switch Panel
Pump Watch Knife Gate Door Service & Rods
8" Pumps 2SOKW Generator
6" Pumps Epoxy Seal Grinder Pump Channel
Control Panel for Lift State 8’’ Check Valve/8" Gate Valve
6" Check Valve/6 Gate Valve
Proposals provided in response to this RFP that comply with Clean Water State Revolving Fund
(CWSRF) and Drinking Water State Revolving Fund (DWSRF) and the submittal requirements set forth in Section 3.2, including all forms and certifications, will be evaluated in accordance with the criteria and procedures described in Section 3.2. Based on the results of the evaluation, the City will award the
Lift Station -Forest Parkway Rehabilitation to the most advantageous Proposer based on the cost and the evaluation factors set forth in the RFP.
All qualification submittals will be evaluated in accordance with the applicable City of College Park rules, regulations, and laws. Evaluation of firms submitting statements of qualification for this project will be based on qualifications, experience, and performance on past projects, along with references.
The contract shall be written for all work required, expressed, or implied, that is necessary to perform the work described in the bid documents, special instructions, specifications, and all other contract documents. No money shall be paid for any extra work or modifications to the specifications unless such work or modification is expressly approved in writing by the owner’s designated representative prior to execution.
Contractor’s bid shall include all necessary labor, materials, tools, equipment, and all other items necessary to complete the contract requirements in accordance with bid documents, special instructions, specifications, and all other provisions included in this bid document. It is the bidder’s responsibility to visit the jobsite and become familiar with the local conditions.
3667 Main Street
College Park, Georgia 30337
Solicitation Method: This solicitation is being conducted in accordance with all applicable provisions of the City of College Park Purchasing Policy. By submitting a Proposal in reference to this solicitation, a
Proponent acknowledges that it is familiar with all laws applicable to this solicitation, including, but not limited to, the City’s Purchasing Manual Guidelines.
Minimum Qualifications: In addition to meeting all other requirements of this RFP, all responding
Proposers shall furnish verifiable evidence that their firm and personnel, at a minimum, meet the following qualifications.
• Proposer must already possess or be able to obtain a business license from the City prior to execution of the License and be licensed to do business within the State of Georgia.
• A minimum of (2) years of company, experience, individual experience and qualifications, references, or completed projects. Proof of these qualifications should be submitted with your proposal submission.
• Proposal prices shall remain in effect for a period of 1 year from the date the contract is awarded.
• Bidders should use their extensive knowledge and experience within the technology industry to recommend a creative solution that will meet or exceed City requirements.
• The responses will be assessed according to how well they meet the City’s needs and assure the City’s success in relation to the submission requirements.
• The detail and clarity of the written submission will be considered indicative of the bidder’s expertise and competence.
• All information provided in response to this RFP must contain sufficient detail to support the services being proposed. Incomplete submissions will not be considered.
Certificate of Authority to Transact Business in Georgia: Each Proponent must submit documentation that demonstrates it is duly authorized to conduct business in the State of Georgia with its proposal.
This requirement also applies to Joint Venture (JV) Team Members, Sub- Consultants and Sub-
Contractors.
3667 Main Street
College Park, Georgia 30337
1.2 COMMUNITY BACKGROUND
City of College Park City Council (City) is the governing authority of the City of College Park.
The affairs of the City are conducted by a mayor and four (4) member City Council. This elected body is responsible for the active coordination of community resources, to meet community needs.
The City Manager, who is appointed by the Mayor and City Council, oversees the day-to-day operations of the city, and ensures the efficient delivery of City Services. All activities and functions of the city are administered by the City Manager under the jurisdiction of the Mayor and City Council as set forth in State and Local Laws.
3667 Main Street
College Park, Georgia 30337
SECTION 2.0
OBTAINING THE RFP
All potential Bidders can obtain a copy of the Bid and Specifications located on the City’s website at Bid Posting(s) - City of College Park (collegeparkga.com) and Georgia Procurement Registry website https://ssl.doas.state.ga.us/PRSapp/PR_index.jsp. The bid is administered by the City of
College Park.
2.1 PRE-PROPOSAL CONFERENCE
All Pre-Proposal Conference, or any other information session (if indicated in the schedule of events) will be held via TEAMS. Information regarding the meeting will be listed in the “Schedule of Events” of this RFP. Unless indicated otherwise, attendance is not mandatory, although suppliers are strongly encouraged to attend. However, in the event the conference has been identified as mandatory, then a representative of the supplier must attend the conference in its entirety to be eligible for a contract award.
2.2 PROPOSAL DUE DATE
All proposals are due in the Purchasing office of City of College Park located in the City of College
Park, City Hall, 3667 Main Street College Park, GA 30337 on or before Friday, March 7th, 2025, at 3:00 PM, EDT via TEAMS, legal prevailing time. All submitted proposals shall be time and date stamped according to the clock at the front desk of the City of College Park Purchasing
Department. Any proposals received after this appointed schedule will be considered late and will be returned unopened to the Proposer. The proposal due date can be changed only by addendum.
FEE PROPOSAL MUST BE INCLUDED IN SEPARATE SEALED ENVELOPE.
Each envelope or package on the outside shall be clearly marked as follows:
REQUEST FOR PROPOSALS (RFP) NO. 1003-2025
LIFT STATION REHABILITATION FOREST PARKWAY
City of College Park, Jack P. Longino City Hall, Attn: Purchasing
3667 Main Street College Park, GA 30337
RFP DUE DATE: Friday, March 7th, 2025 (3:00 PM) EDT
Proposals will be received no later than Friday, March 7th, 2025 at 3:00 pm (EST) at the, 3667 Main
Street, College Park Georgia, 30337.
https://ssl.doas.state.ga.us/PRSapp/PR_index.jsp
3667 Main Street
College Park, Georgia 30337
2.3 SUBMITTAL INSTRUCTIONS
It shall be the sole responsibility of the Proposer to have his/her proposal/bid submittal delivered to the
City of College Park Purchasing Department for receipt on or before the above stipulated due date and time. If a proposal is sent by U.S. Mail, FedEx, the proposer shall be responsible for its timely delivery to the Purchasing Department.
2.3.1 BID OPENING
The City of College Park Purchasing Department bid openings is online. For your convenience, bids will be opened and live streamed Friday, March 7th, 2025 at 3:00 p.m. via Teams. Joining the
Teams meeting will allow you to view the vendors responding to each bid and when applicable, the bid amount submitted from each vendor. This will replace in-person bid openings.
To view the bid opening, please join the TEAMS meeting below: City of College Park is inviting you to a scheduled TEAMS meeting.
REQUEST FOR PROPOSAL LIFT STATION REHABILITATION FOREST PARKWAY
Date and Time: Friday, March 7th, 2025 at 03:00 PM Eastern Time (US and Canada)
Join the meeting now
Meeting options
Meeting ID: 284 748 473 51
Passcode: FH2mL9Uh
2.4 CONTACT PERSON AND INQUIRIES
Any questions or suggestions regarding this RFP shall be submitted in writing to the City of College Park at PurchasngDepartment@CollegeParkga.com, 3667 Main Street College Park, Ga 30337. Any response made by the City shall be provided in writing to all Proposers by addendum. No verbal responses shall be authoritative.
https://teams.microsoft.com/l/meetup-join/19%3ameeting_MDI4MzEyNmQtZTQ2OS00Mjg1LWJmOTgtZGZkZjEyNzZkZjEx%40thread.v2/0?context=%7b%22Tid%22%3a%226c75f594-8155-4405-8165-6f347374e39e%22%2c%22Oid%22%3a%222603c762-4cea-46cc-81f9-916eb39366fa%22%7d https://teams.microsoft.com/meetingOptions/?organizerId=2603c762-4cea-46cc-81f9-916eb39366fa&tenantId=6c75f594-8155-4405-8165-6f347374e39e&threadId=19_meeting_MDI4MzEyNmQtZTQ2OS00Mjg1LWJmOTgtZGZkZjEyNzZkZjEx@thread.v2&messageId=0&language=en-US mailto:PurchasngDepartment@CollegeParkga.com
3667 Main Street
College Park, Georgia 30337
2.5 REQUEST FOR PROPOSAL “SCHEDULE OF EVENTS”
Below is the current Schedule of Events, local time (EDT), that will take place in the procurement process. The
City reserves the right to make changes to the schedule as the City determines is in its best interest. Unless otherwise notified in writing by the City, the dates indicated below for submission of items or for other actions on the part of a Provider shall constitute absolute deadlines for those activities and failure to fully comply by the time stated shall cause a provider to be disqualified.
EVENT
DATE
Request For Proposals Issued to Public Wednesday, January 29th, 2025
Non-Mandatory Pre-Bid Meeting
City of College Park Power Department
Forest Parkway Lift Station
Power Department Storage Facility, 1060 Forest Parkway, Georgia 30349
Tuesday, February 11th, 2025, 10 AM, EDT
Last Day for Questions to be Submitted Friday, February 21st, 2025, 12 Noon, EDT
RFP Submittal Due Date
Join the meeting now
Meeting options
Meeting ID: 284 748 473 51
Passcode: FH2mL9Uh
Friday, March 7th, 2025, 3 PM, EDT
Presentations TBA
Project Manager – Dr. Emmanuel Adediran https://teams.microsoft.com/l/meetup-join/19%3ameeting_MDI4MzEyNmQtZTQ2OS00Mjg1LWJmOTgtZGZkZjEyNzZkZjEx%40thread.v2/0?context=%7b%22Tid%22%3a%226c75f594-8155-4405-8165-6f347374e39e%22%2c%22Oid%22%3a%222603c762-4cea-46cc-81f9-916eb39366fa%22%7d https://teams.microsoft.com/meetingOptions/?organizerId=2603c762-4cea-46cc-81f9-916eb39366fa&tenantId=6c75f594-8155-4405-8165-6f347374e39e&threadId=19_meeting_MDI4MzEyNmQtZTQ2OS00Mjg1LWJmOTgtZGZkZjEyNzZkZjEx@thread.v2&messageId=0&language=en-US
3667 Main Street
College Park, Georgia 30337
2.6 NO CONTACT DURING THE PROCUREMENT PROCESS
Persons seeking an award of a City contract may not initiate or continue any verbal or written communications regarding a solicitation with any City Official, City Employee or other City representative other than the purchasing agent named in the solicitation between the date of the issuance of the solicitation and the date of the final contract award. The city manager or designee will review violations. If determined that such communication has compromised the competitive process, the offer submitted by the individual, firm or business may be disqualified from consideration for award.
2.7 CLARIFICATION & ADDENDA
Proposers may submit requests for clarifications or interpretations regarding this RFP and the
Contract. Proposers must prepare such requests in writing for the City’s consideration as set forth in this section of this RFP. While the City has not placed an initial limitation on the number of requests which can be submitted, Proposers are cautioned that if Proposers do not request meaningful clarifications or interpretations in an organized manner (e.g., limited frequency of requests), the City will set restrictions on the frequency and number of requests permitted. The city will not respond to requests, oral or written, received after Friday, February 21st, 2025, 12
Noon, EDT., local prevailing time. The City reserves the right to post an addendum at any time prior to the bid opening date and it is the responsibility of the proposer to view the City’s website for any all-addendum post for specified solicitation. Proposers are advised that this section places no obligation on the part of the City to respond to any or all requests for clarification nor interpretation, and that the City’s failure to respond to any such request will not relieve the
Proposer of any obligations or conditions required by this RFP.
Requests for clarification or interpretation regarding this RFP shall only be Submitted in writing via letter or email to the designated Purchasing Representative:
Purchasing Email: PurchasingDepartment@CollegeParkga.gov
Telephone inquiries will not be accepted.
All responses to written requests for clarification, interpretation, or additional information will be distributed as addenda to this RFP and posted on the City website Bid Posting(s) - City of College
Park (collegeparkga.com) and Dashboard | GEORGIA PROCUREMENT REGISTRY
(state.ga.us) mailto:PurchasingDepartment@CollegeParkga.gov https://www.collegeparkga.com/departments/purchasing_department/bid_posting_s_ https://www.collegeparkga.com/departments/purchasing_department/bid_posting_s_ https://ssl.doas.state.ga.us/GPRBuyerPortal/home
3667 Main Street
College Park, Georgia 30337
No oral interpretation, instruction, or information concerning this RFP given by any employee or agent of the City shall be binding on the City. Proposers who submit a Proposal in reliance on any such oral information risk having their response to this RFP deemed non-responsive by the City.
Only written responses issued by addendum to this RFP should be considered by the Proposers.
During the period provided for the preparation of Proposals, the City may issue addenda to this
RFP. These addenda will be numbered consecutively and will be posted on the City website, Bid
Posting(s) - City of College Park (collegeparkga.com) and Dashboard | GEORGIA
PROCUREMENT REGISTRY (state.ga.us). These addenda will be issued by, or on behalf of, the
City and will constitute a part of this RFP.
Each Proposer is required to acknowledge receipt of each addendum by submitting an executed acknowledgment form. This acknowledgment shall include all addenda distributed prior to the
Proposal Submission Date. All responses to this RFP shall be prepared with full consideration of the addenda issued prior to the Proposal Submission Date.
2.8 PREPARTION OF PROPOSALS
a. Negligence on the part of the proposer in preparing the proposal confers no right for withdrawal or modification in any way after the deadline for the proposal opening.
b. Unit price must be shown on the Proposal Cost Submittal Form in this document. All proposals should be tabulated, totaled, and checked for accuracy. The unit price will prevail in case of errors.
c. All products, equipment, articles, or material must be new and unused or in current production.
No reconditioned or used item(s) will be accepted except as specifically requested herein. Units that are classified as prototype or discontinued models are not acceptable.
d. Samples of items, when required, must be submitted within the time specified and unless otherwise specified by the city, at no expense to the city. Unless otherwise specified, samples will be returned at the proposer's request and expense if items are not destroyed by testing.
e. Full identification of each item proposal upon, including brand name, model, catalog number, etc., must be furnished to identify exactly what the proposer is offering. Whenever an article or material is defined by describing a proprietary product or by using the name of a manufacturer, the term "or equal" if not inserted shall be implied.
f. The specified article or material shall be understood as indicating the type, function, minimum standard of design, efficiency, and quality desired and shall not be construed as to exclude other manufactured products of comparable quality, design, and efficiency. In the event that any equivalent version is proposed, prospective proposers are herewith advised that precise, adequate, and documented evidence of equivalency in performance, stability, and operational efficiency should be submitted with the proposal for further consideration.
http://www.cityofstockbridge.com/bids.aspx?id=4375&catid=26 http://www.cityofstockbridge.com/bids.aspx?id=4375&catid=26
3667 Main Street
College Park, Georgia 30337
g. Final determination of equivalency will be determined by the City of College Park.
h. Proposers are required to examine the scope carefully and to make sure they have full understanding of the outlined scope.
i. The City of College Park will not be responsible for proposer’s errors or misjudgment, nor for any information or lack of information, on location conditions, and/or general laws and regulations.
j. Failure of a proposer to be aware of any applicable federal, state, or local regulations shall not excuse compliance, regardless of whether specifically cited in the Contract Documents and
Specifications or any related document.
2.9 REJECTION AND WITHDRAWAL OF PROPOSALS
a. Withdrawal of Proposal due to errors, the supplier has up to forty-eight (48) hours to notify the
Purchasing Department of an obvious clerical error made in calculation of proposal in order to withdraw a proposal after proposal opening. Withdrawal of proposal for this reason must be done in writing within the forty-eight-hour period.
b. The city will make a recommendation of the proposal to the City Council within 60 days from the date of the opening.
c. The City may reject all or part of the proposal within 60 days of proposal opening.
2.10 PROPOSAL AND CONTRACT DOCUMENTS
a. A proposal executed by an attorney or agent on behalf of the Bidder shall be accompanied by an authenticated copy of the Power of Attorney or other evidence of authority to act on behalf of the Bidder Corporation:
If the Bidder is a corporation, the bid must be submitted in the name of the corporation, not simply the corporation's trade name. In addition, the bid shall be signed by an officer of the corporation.
Partnership: If the Bidder is a partnership, all partners must sign the bid. If all the partners do not sign the bid, then the names of all those except limited partners must be furnished on the bid and evidence of the authority of the signer(s) to execute the bid on behalf of the partnership.
Limited Liability Company (LLC): If the Bidder is a limited liability company, the authorized agent having authority to bind the limited liability company must sign the bid documents.
Sole Proprietorship or Individual: If the Bidder is a sole proprietor or individual, a signature is required on all bid documents by that individual.
3667 Main Street
College Park, Georgia 30337
b. The contract documents consist of this Agreement, Specifications and Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement. These form the Contract and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representation, or agreements, either written or oral.
c. Contract Time
1. The Work shall be performed within the date established in the Notice to Proceed.
2. The work is to be performed only during weekdays 8:00 AM to 5:00 PM (Monday to Friday).
Work performed during weekends (Saturday or Sunday) and holidays shall be approved by the
City of College Park Project Manager.
3. The “Commencement Term” of this Agreement shall begin on the date of execution of the
Agreement in the year 2025, the starting date upon execution of the contract, and shall end absolutely and without further obligation on the part of the City within in one (1) of the awards.
Unless the terms of this Agreement are fulfilled with no further obligation of the part of either party on or before the final date of the Commencement Term as stated above, or unless an event of termination as defined within this Agreement occurs during the Commencement Term, this
Agreement may be renewed at the written option of the City upon the approval of the Council for two (2), (1) one-year (“Renewal Terms”). However, no Renewal Term of this Agreement shall be authorized nor shall any Renewal Term of this Agreement commence unless and until each
Renewal Term has first been approved in writing by the City Council for the Renewal Term.
Unless mutually agreed upon in writing by the parties, or otherwise indicated herein, all provisions and conditions of any Renewal Term shall be exactly the same as those contained within in this
Agreement.
4. Statutory Compliance Regarding Purchase Contracts. The parties intend that this Agreement shall, and this Agreement shall operate in conformity with and not in contravention of the requirements of O.C.G.A. § 36-60-13, as applicable, and in the event that this Agreement would conflict therewith, then this Agreement shall be interpreted and implemented in a manner consistent with such statute
The Contract may commence within ten (10) calendar days after receipt of written Notice to Proceed
(NTP)
Completion of Work: The Work is complete (subject to surviving obligations) when it is ready for final payment as established by the City’s written recommendation of final payment and issuance of notice of the acceptability of the Work.
d. Liquidated Damages: Time is an essential element of the Contract, and any delay in the prosecution of The Work may inconvenience the public, obstruct traffic, or interfere with business. In addition to the aforementioned inconveniences, any delay in completion of The
Work will always increase the cost of engineering. For this reason, it is important that The
Work be pressed vigorously to completion. Should the Contractor or, in case of default, the
3667 Main Street
College Park, Georgia 30337
Surety fails to complete The Work within the time stipulated in the Contract or within such extra time that may be allowed, charges shall be assessed against any money due or that may become due the Contractor in accordance at the rate of five hundred ($500) per calendar day.
e. Barricades and Warnings: The contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient number of watchmen to direct traffic, and take all necessary precautions for the protection of the work and safety of the public. Barricades and obstructions shall be illuminated at night and lights shall be kept burning from sunset to sunrise.
f. Removal of Trash and Rubbish: The contractor shall be responsible for the removal and legal disposal of all waste, trash, and rubbish resulting from the work under this contract. Work site shall be kept clean and orderly during construction; trash shall be removed from the site or adequately containerized daily.
g. Pre-Construction Conference: Successful bidder will be required to attend a Pre-Construction
Conference with the owner’s representative prior to commencement of work under resulting contract.
h. Unit Price Work
A. Where the Contract Documents provide that all or part of the Work is to be Unit Price
Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price
Work times the estimated quantity of each item as indicated in the Agreement.
B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Payments to
Contractor for Unit Price Work will be based on actual quantities.
C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor’s overhead and profit for each separately identified item
2.11 EXCEPTIONS AND OMISSIONS
Any exceptions to the specifications and/or terms and conditions must be addressed during the question/clarification and addendum phases.
2.12 ALTERATIONS OF SOLICITATION AND ASSOCIATED DOCUMENTS
Alterations of City documents are strictly prohibited and will result in automatic disqualification of the proposer's solicitation response. If there are "exceptions" or comments to any of the solicitation requirements or other language, then the proposer may make notes to those areas, but may not materially alter any document language.
2.13 COST INCURRED BY VENDORS
All expenses involved with the preparation and submission of the RFP to the City of College
Park, or any work performed in connection therewith is the responsibility of the vendor(s).
3667 Main Street
College Park, Georgia 30337
2.14 CODES, PERMITS, FEED, LICENSES AND LAW
a. All permits, fees, arrangements for inspections, licenses, and costs incurred for the same shall be the sole responsibility of the successful Proposer. All materials, labor and construction must comply with all applicable rules and regulations of local, state and/or national codes, laws and ordinances of all authorities having jurisdiction over the project, shall apply to the contract throughout and will be deemed to be included in the contract the same as though herein written out in full.
b. State Law regarding Worker Verification requires that all who enter a contract for the physical performance of services with the City must satisfy O.C.G.A. §13-10-91 and Rule
300-10-1-.02, in all manner, and such are conditions of the contract. By submitting a proposal to the City Proposer agrees that in the event the Proposer employs or contracts with any Subcontractor(s) in connection with the covered contract, the Proposer will secure from the Subcontractor(s) such Subcontractor(s) indication of the employee- number Category applicable to the Subcontractor as well as an attestation(s) from such Subcontractor(s) that they are complying. Such attestation(s) shall be maintained and may be inspected by the City at any time. An affidavit of such compliance included with the proposal must be signed by the Proposer and will become part of the contract.
c. The contractor shall obtain and pay for all permits, licenses, and any other regulatory requirements necessary for the prosecution of these services. The Contractor will pay all governmental charges and inspection fees necessary for the prosecution of these services.
2.15 SAFETY
All vendors and Subcontractor performing services are required and shall comply with all
Occupational Safety and Health Administration (OSHA), State and CITY Safety and
Occupational Health Standards and any other applicable rules and regulations. Also, all Proposers and Subcontractors shall be held responsible for the safety of their employees and any unsafe acts or conditions that may cause injury or damage to any persons or property within and around the worksite area under this contract.
2.16 DESIGN, STANDARDS AND PRACTICES
Design, strength, quality of materials and workmanship must conform to the industry
Acceptable standards of engineering practices and/or professional services.
2.17 STATEMENT OF WARRANTY
A Statement of Warranty should include all applicable manufacturers' warranty and the
Proposer's warranty regarding equipment, materials, and workmanship. This statement shall include the terms, conditions, and the period of warranty coverage. Any exclusion(s) must be clearly stated.
3667 Main Street
College Park, Georgia 30337
2.18 NON-COLLUSION
By submitting a proposal in response to this solicitation, the proposer represents that in the preparation and submission of this proposal, said Proposer did not either directly or indirectly, enter into any combination or arrangement with any person, Proposer, Corporation or enter into any agreement, participate in any collusion, or otherwise take any action in the restraint of free, competitive bidding in violation of the Sherman Act (15 U.S.C. Section I or Section 59.1-9.1 through 59.1-9.17 or Sections 59.1 -68.6 through 59.68.8). Collusion and fraud in proposal preparation shall be reported to the State of Georgia Attorney General and the United States
Justice Department.
2.19 NONDISCRIMINATION
Notwithstanding any other provision of this Agreement, during the performance of this
Agreement, Proposer, for itself, its heirs, personal representatives, successors in interest and assigns, as part of the consideration of this Agreement does hereby covenant and agree, as a covenant running with the land, that:
a. No person on the grounds of race, color, religion, sex, or national origin shall be excluded from participation in, denied the benefits of, or otherwise be subjected to discrimination.
b. In the production of the vehicle(s), and the furnishing of services therein or thereon, no person on the grounds of race, color, religion, sex, or national origin shall be excluded from participation in, or denied the benefits of, such activities, or otherwise be subjected to discrimination.
2.20 DRUG FREE WORKPLACE CERTICATION
By signing the Supply Service Contract form, the Proposer certifies that the provisions of Code
Sections 50-24-1 through 50-24-6 of the Official Code of Georgia Annotated, relating to The
“Drugfree Workplace Act” have been complied with in full. The undersigned further certifies that:
a. A drug-free workplace will be provided for the Proposer's employees during performance of the contract; and
b. Each Proposer who hires a Subcontractor to work in a drug-free workplace shall secure from that Subcontractor the following written certification: "As part of the subcontracting agreement with (Proposer's name), (Subcontractor’s name) certifies to the Proposer that a drug-free workplace will be provided for the subcontractor’s employees during the performance of this Contract pursuant to Paragraph (7) of Sub-section (b) of Code Section
50-24-3".
c. The Proposer further certifies that he will not engage in the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana during the performance of the Contract.
3667 Main Street
College Park, Georgia 30337
d. Proposer may be suspended, terminated, or debarred if it is determined that:
(1) The Proposer has made false certification hereinabove; or
(2) The Proposer has violated such certification by failure to carry out the requirements of the Official Code of Georgia Section 5 0-24-3.
2.21 GEORGIA SECURITY AMD IMMIGRATION ACT
Pursuant to the Georgia Security and Immigration Compliance Act of 2006, the successful
Proposer understands and agrees that compliance with the requirements of O.C.G.A.13-10-91 and Georgia Department of Labor Rule 300-10-02 are conditions of this proposal and contract document. The Proposer further agrees that such compliance shall be attested by the Proposer and any of his Subcontractors by execution of the appropriate Affidavit and Agreement which will be included and become a part of the Agreement between the City of College Park and the successful Proposer.
2.22 SYSTEMATIC ALIEN VERIFICATION FOR ENTITLEMENTS (SAVE) PROGRAM
Since a contract has been deemed a "public benefit," the Proposer or other party to the contract must be run through the federal Systematic Alien Verification for Entitlements (SAVE)
Program. This program requires that local government verify the legal status of non-U.S.
citizens who apply for certain benefits. The Proposer must execute a SA VE affidavit attesting that either he or she is a U.S. citizen or legally qualified to receive the benefit. If the Proposer is not a U.S. citizen, then the local government must run that Proposer through the SAVE system.
Only non-U.S. citizens can be processed through the SAVE program.
2.23 DELIVERY AND F.O.B. DESTINATION
a. All prices shall include shipping and delivery cost to our destination, F.O.B., College Park, Georgia, unless otherwise requested. The proposer shall handle all material purchasing, storage, and delivery to the project site. Unless otherwise specified in this specification, the proposer shall supply all materials required. The City will grant no allowance for boxing, crating or delivery unless specifically provided for in this proposal. The proposer shall retain title for the risk of transportation, including the filing for loss or damages.
b. The City desires delivery of the product(s) or service(s) as specified at the earliest possible time after the date of award. Unreasonable delivery may be cause for disqualifying a proposal. Each firm shall state a definite delivery time and avoid using general terms such as "ASAP" or approximately so many days.
3667 Main Street
College Park, Georgia 30337
2.24 DISADVANTAGED BUSINESS ENTERPRISE
DBEs are for-profit small business concerns where socially and economically disadvantaged individuals own at least a 51% interest and also control management and daily business operations.
Requirements for DBE Participation
To participate in the DBE program, a small business owned and controlled by socially and economically disadvantaged individuals must receive DBE certification from a state
Unified Certification Program (UCP).
2.25 AUTHORITY TO SIGN
a. If a proposal is made by an individual, the name and mailing address must be shown. If made by a firm or partnership, the name and mailing address of each member of the firm or partnership must be shown. If made by a corporation, the Corporate Certificate must be executed.
b. The proposer should ensure that the legal and proper name of his/her proprietorship, firm, partnership, or corporation is printed or typed in the space provided.
2.26 PROPOSAL SECURITY AND PERFORMANCE BONDS
Each bid shall be accompanied by a Bid Bond in an amount of not less than ten percent (10%) of the total bid amount. The Bid Bond may be in the form of a bond issued by a surety acceptable to the City or a cashier’s check made payable to the City of College Park, Georgia. The entire
Bid Bond shall be forfeited to the City of College Park, Georgia as liquidated damages if the bidder fails to execute all sets of the Contract Documents and provide Performance and Payment Bonds within fifteen (15) days after receipt of the documents.
The successful bidder will be required to furnish a contract Performance Bond and a Payment
Bond, each in the sum of one hundred percent (100%) of the total amount bid and provide insurance coverage as required in the Contract Documents.
a. Bid Bond - the General Contractor/Company awarded the contract for the project must provide a Proposal Bond in the amount not less than 10% of the total amount payable by the terms of the Contract. No bid shall be read aloud or considered if a proper bid bond has not been submitted.
b. Payment Bond - the General Contractor Company awarded the contract for the project must provide a Payment Bond in the amount equal to one hundred percent (100%) of the General Contractor Price prior to the execution of the Contract.
3667 Main Street
College Park, Georgia 30337
c. Performance Bond - General Contractor Company awarded the contract for the project must provide a Performance Bond in the amount equal to one hundred percent (100%) of the
General Contractor Price prior to the execution of the Contract.
2.27 RFP SUBMITTALS
See all specifications, for the RFP, Submittal Checklist, and requirements. The checklist will assist you to ensure that all submittals are included in your proposal. Ensuring that submittals are complete is solely the responsibility of the proposer/bidder. Failure to submit all submittals may deem your proposal non-responsive.
2.28 EVALUATION PROCESS
The Evaluation Committee (EC) will be responsible for ranking and recommending the most qualified firm(s) to the City Council for an award. The process for this procurement may proceed in the following manner: The Procurement Division delivers the RFP submittals to agency staff for summarization for the Evaluation Committee members. The appropriate department will review the litigation history and the Finance Department will review the financial portion of the submittals. Staff will also identify any incomplete responses. The Purchasing Director, will review the information and will make a recommendation to the Evaluation Committee as to each firm’s responsiveness to the requirements of the RFP.
The final determination of responsiveness rests solely on the decision of the Evaluation
Committee. All firms that are found to be both responsive and responsible to the requirements of the RFP may have an opportunity to make an oral presentation to the EC and discuss their proposal to illustrate to the Evaluation Committee their approach to the scope of work. If interviews are requested by the City, staff may provide a list of subject matter for the discussion and each firm will be given equal time to present but the question and answer may vary. The final determination of responsiveness rests solely on the decision of the Evaluation Committee.
All proposals will be evaluated using the Evaluation Criteria and the detailed scope of services and requirements throughout this Request For Proposal.
2.29 PRESENTATIONS / DEMONSTRATIONS / INTERVIEWS (WHEN APPLICABLE)
The City reserves the right to negotiate the fee and/or Scope of Services with the highest ranked
Proposer. If negotiations cannot be completed successfully, then the City reserves the right to negotiate with the second highest ranked Proposer. Recommendations for an award will be the
Proposer with whom potential contract negotiations were successful.
The EC may provide a list of subject matter for the discussion. The individuals / firms will have equal time to present but the question-and-answer time may vary. Proposers / Providers may be requested to demonstrate the nature of their offered solution to the SC. After receipt of submittals, all firms will receive a description of, and arrangements for, the desired demonstration. A copy of the demonstration (hard copy, DVD, CD, or a combination of both) should be given to the Purchasing Agent at the meeting to retain it in the Purchasing files.
3667 Main Street
College Park, Georgia 30337
2.30 CITY’S TAX EXEMPTION
The City of College Park is exempt from Federal Excise Tax or Georgia Sales Tax regarding goods and services purchased directly by the City of College Park. Exemption certificates furnished upon request.
2.31 AWARD OF CONTRACT
a. The City of College Park desires to complete the award process in a timely manner. The City of
College Park reserves the right to reject or accept any or all proposals, whole or any parts hereof, by item or group of items, by section or geographic area, or make multiple awards and be the final approval of proposal(s) selection which would be the most advantageous to the City with price and other factors considered. The City of College Park may elect to waive any technicalities. The proposal will be awarded to the lowest responsive, responsible, or highest scored proposer(s), based upon the qualification requirements herein. The proposal specifications and results will be available on the City's web site: Bid Posting(s) - City of
College Park (collegeparkga.com) and the Georgia Procurement Registry Dashboard |
GEORGIA PROCUREMENT REGISTRY (state.ga.us)
b. City of College Park reserves the right to reject any proposal if the evidence submitted by or investigation of the proposer fails to satisfy the City that the proposer is properly qualified to carry out the obligations of the Contract. If the successful proposer defaults on their proposal, an award may be made to the next lowest responsive and responsible proposer or highest scored proposer(s).
c. Multiple Awards: The City reserves, at its sole discretion, the option to award multiple Proponents.
Responsibility - The determination of the proposer's responsibility will be made by the
City based on whether the proposer meets the following minimum standard requirements:
• Relevant knowledge, experience and qualifications of firm and team members.
• Proposed methodology and work plan to be used in the process.
• Understanding of the project and overall completeness of submission.
• Experience on similar projects/References
• The ability, capacity, and skill of the Bidder to perform and/or provide the Work required.
• The City reserves the right to reject any bid if the evidence submitted by, or investigation of, the bidder fails to satisfy the City that he/she is properly qualified to carry out the obligations of any Contract that is made from this award.
• Has adequate financial means to meet obligations incidental to the work; and
• Such other factors as the City deem to be pertinent to either the bid or the contract.
3667 Main Street
College Park, Georgia 30337
d. Responsiveness - The determination of the proposer's responsiveness will be made by the
City based on a consideration of whether the proposer has submitted complete proposal documents meeting proposal requirements without irregularities, excisions, special conditions, or alternatives proposals for any item unless specifically requested in the proposal solicitation.
e. The City is subject to making records available for disclosure after the City of College Park approval of the recommendation. The award shall be made by the City Council of College
Park unless the lowest, qualified bid is less than the City Councils' approval limit. No claim shall be made by the selected Proposer for loss of profit if the contract is not awarded or awarded for less work than is indicated and for less than the amount of the proposal. The total of the awarded contract shall not exceed the available funds allocated for the proposal project.
2.32 NEGOTIATION AND AWARD
It is the City’s intent to conduct the first negotiation meeting no later than thirty (30) days after the final ranking by the Committee. At least one (1) of the representatives for the firm participating in negotiations with the City must be authorized to bind the firm. In the event that the negotiations are not successful within a reasonable timeframe (notification will be provided to the firm) an impasse will be declared and negotiations with the first-ranked firm will cease.
Negotiations will begin with the next ranked firm. This process shall continue until the City successfully negotiates a Contract.
2.33 DISQUALIFICATION OF PROPOSERS
The submission of more than one (1) proposal to the City as the primary Proposer or member of a joint venture for the same work by and individual firm, partnership, or corporation under the same or different names may be grounds for disqualification of a Proposer and the rejection of the proposal.
2.34 RESERVED RIGHTS
The City reserves the right to accept or reject any and/or all proposals, to waive irregularities and technicalities, and to request resubmission. Any sole response that is received may or may not be rejected by the City depending on available competition and the timely needs of the City.
There is no obligation on the part of the City to award the contract to the lowest proposer and the City reserves the right to award the contract to the responsible proposers submitting responsive proposals with resulting agreements most advantageous and in the best interest of the City. The City shall be the sole judge of the proposals and the resulting agreements that are in its best interest and its decision shall be final. Also, the City reserves the right to make such an investigation as it deems necessary to determine the ability of any proposer to perform the work or service requested. Information the City deems necessary to make this determination shall be provided by the proposer. Such information may include, but shall not be limited to, 3667 Main Street
College Park, Georgia 30337 current financial statements by an independent CPA; verification of availability of personnel;
and past performance records.
Proposers failing to include all documents in the submittal package as required by the proposal requirements may cause the proposal to be declared as non-responsive and be rejected. The failure to follow instructions in completing any part of the proposal package may also cause the proposal to be declared non-responsive and be rejected.
2.35 APPLICABLE LAWS
All applicable laws and regulations of the State of Georgia and ordinances and regulations of
City shall apply. This solicitation is being conducted in accordance with all applicable provisions of the City of College Park Code of Ordinances. By submitting a proposal/Bid in reference to this solicitation, a Proposer acknowledges that it is familiar with all laws applicable to this solicitation, including, but not limited to, the City’s Code of Ordinances, which laws are incorporated into this solicitation by reference.
2.36 CONTROLLING LAW, VENUE
Any dispute arising as a result of this proposal and/or an Agreement which was created from the terms, conditions and specifications of this document or their interpretation, litigation shall only be entered into and shall be performed in College Park, Georgia. This Agreement shall be governed by the applicable laws of the City of College Park and the State of Georgia. Any dispute arising out of the agreement, this proposal solicitation, its interpretations, or its performance shall be litigated only in the Fulton County Judicial Courts.
2.37 PROPOSER/CONTRACTOR AS INDEPENDENT PROPOSER/CONTRACTOR
In conducting its business hereunder, Proposer acts as an independent Contractor and not as an employee or agent of the City. The selection, retention, assignment, direction, and payment of Proposer's employees shall be the sole responsibility of Contractor/Proposer Contractor.
2.38 ASSIGNMENT
The Agreement, in whole or any part hereof, created by the award to the successful Proposer shall not be sold, not be assigned or transferred by Proposer by process or operation of law or in any other manner whatsoever, including intra-corporate transfers or reorganizations between or among a subsidiary of Proposer, or with a business entity which is merged or consolidated with Proposer or which purchases a majority or controlling interest in the ownership or assets of
Proposer without the prior written consent of the City of College Park.
2.39 PERFORMANCE OF CONTRACT
a. The City reserves the right to enforce the…
This is the start of the file's text. The full file is on GovTribe.