RFP_N01DA-21-8957.pdf

PDF 7 MB Posted

Attached to
In Vitro Metabolism and Non-Clinical ADME Studies
Solicitation number
N01DA-21-8957
Issued by

View the file

Other files

File Type Posted
Attachment2_SOW_updated 03221.docx DOCX document
Amendment 01_Solicitation N01DA-21-8957.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB #0990-0115

Request for Proposal (RFP) No. N01DA-21-8957 In Vitro Metabolism and Non-Clinical ADME Studies

Issued by:

Office of Acquisitions, NIDA National Institute on Drug Abuse, NIH Bethesda, MD 20892

Point of Contact: Polina Klimenkova, Contract Specialist E-Mail: polina.klimenkova@nih.gov Phone: 301.443.6677

DATE ISSUED: Friday, February 12, 2021

PROPOSAL DUE DATE: Monday, March 29, 2021, 4:00 P.M. Eastern Time

The National Institute on Drug Abuse invites you to send a proposal responding to the requirements of this RFP No. N01DA-21-8957 for “In Vitro Metabolism and Non-Clinical ADME Studies".

This Request for Proposal is prepared in accordance with the Uniform Contract Format prescribed for Government Wide application by the Federal Acquisition Regulation (FAR). The Uniform Contract Format is both a Request for Proposal and a contract award document. The resulting contract will consist of Parts I, II, III of the Uniform Contract Format.

NIDA expects to award a single, indefinite delivery, indefinite quantity (task order) type contract with a period of performance of five years. NIDA expects to award completion, severable or non-severable, fixed price task orders. NIDA funding will be made available through issuance of task orders and will be dependent on program needs and funding availability. The contract will contain a guaranteed minimum of $100,000 and an estimated maximum quantity of $3,500,000. The initial performance period will start on or around September 2021. You should respond with technical and cost/price proposals based on the assumptions provided in Section C and L. Please include separate cost/ prices for each of the fourteen items listed in Section B, Specific Requirements, of the Statement of Work (SOW).

Particularly direct your attention to Part IV of the RFP, which contains instructions, provisions, and evaluation factors for the submission and review of proposals. The balance of Parts I, II, and III contain provisions, clauses, and special requirements which will be made a part of any resultant award. Review these parts as to the effects on performance capability and technical and cost considerations in the development of your proposal. However, you do not fill in blanks or otherwise complete portions of Parts I, II, and III which otherwise appear to require the insertion of data.

The Government will complete those Parts prior to contract award. NIDA tailors Parts I, II, and III with the selected offeror to the final negotiation (if negotiations are conducted) and modified, as necessary, for the type of contractor organization, cost and/or fee arrangement, and other elements as negotiated prior to award.

An official authorized to bind your organization must sign the proposal. NIDA must receive one

(1) original electronic copy of your technical proposal and one (1) original electronic copy of your business proposal.

Proposals must be submitted via the electronic Contract Proposal Submission (eCPS) website (https://ecps.nih.gov) no later than March 29, 2020 at 04:00 P.M. Eastern Time. Proposals submitted by facsimile, e-mail, or hard copy will not be accepted.

Offerors are solely responsible for submitting proposals in a timely manner. Please note that creating an account to submit may take up to three (3) business days. Please plan accordingly. Additional instructions on how to submit a proposal via eCPS can be found at https://ecps.nih.gov/home/howto and in Attachment 01.

Furnish in writing (by e-mail is acceptable) any areas of uncertainty, which, in your opinion, require clarification or correction to the Contracting Officer and the Contract Specialist. You must submit your questions in sufficient time for receipt on or before February 26, 2021. Mark the e-mail "Offeror's Questions, RFP No. N01DA-21-8957."

This RFP does not commit the Government to pay the costs for the preparation and submission of a proposal. The Contracting Officer is the only individual who legally can commit the Government to the expenditure of public funds in connection with this acquisition.

Following your proposal submission and our review, the Contracting Officer may seek more information. In accordance with FAR 15.306(a)(3) and FAR 52.215-1, we advise you that the Government intends to evaluate proposals and award a contract without discussions (except clarifications). Therefore, your initial proposal should contain the best terms from cost or price and technical standpoints. However, we reserve the right to conduct discussions if the Contracting Officer later decides them to be necessary.

You must have an authorized organizational official sign your Business Proposal. It must contain a detailed breakdown of costs by task, for each cost category/element, an explanation of the basis for all costs, and provide documentation to support these costs. We direct special attention to the Breakdown of Proposed Estimated Costs (plus fixed fee) w/Excel Spreadsheet contained in the Business Proposal Cost Information, Attachment 9. See Section L.2.c.

Business Proposal Instructions for additional detail.

The Offeror must submit its Travel Policy, Total Compensation Plan and Annual Report with the initial Business Proposal.

If you want to receive an e-mail notice of any amendments to this RFP, you should register on the beta.sam.gov website. Also, NIDA will post all amendments, or provide an appropriate link, on the NIDA Contracts Home Page.

Requests for any information concerning this RFP should be directed to Polina Klimenkova, NIDA Contract Specialist who may be reached at polina.klimenkova@nih.gov; collect calls will not be accepted. Discussions with any other individual outside the NIDA Office of Acquisitions should not occur.

Office of Acquisitions, NIDA/NIH

- 1 -

SOLICITATION

SECTION A - SOLICITATION/CONTRACT FORM

1. Requisition or other Purchase Authority: 102-321 as amended

2. Request for Proposal (RFP) Number:

N01DA-21-8957

3. Issue Date:

02/12/2021

4. Set Aside:

[X] No

[ ] Yes See Part IV Section L

5. Title : In Vitro Metabolism and Non-Clinical ADME Studies

6. ISSUED BY:

National Institute on Drug Abuse, NIH Office of Acquisitions 301 N Stonestreet Ave Bethesda, Maryland 20892

7. SUBMIT OFFERS TO:

See Part III, Section J, "Packaging and Delivery of the Proposals for Use with the NIH electronic Contract Proposal Submission ( eCPS) Website," ATTACHMENT 1 of this Solicitation.

8. Proposals for furnishing the supplies and/or services in THE SCHEDULE will be received at the place specified in, and in the number of copies specified in Attachment 1, "Packaging and Delivery of the Proposal," until 4:00 pm local time on 03/29/2021. Offers will be valid for 120 days unless a different period is specified by the offeror on the Attachment entitled, "Proposal Summary and Data Record, NIH 2043.

9. This solicitation requires delivery of proposals as stated in ATTACHMENT 1, " Packaging and Delivery of the Proposals for Use with the NIH electronic Contract Proposal Submission ( eCPS) Website." If proposals are required to be delivered to two different locations, the OFFICIAL POINT OF RECEIPT for determining TIMELY DELIVERY is the eCPS Website.

IF YOUR PROPOSAL IS NOT RECEIVED BY THE CONTRACTING OFFICER OR HIS DESIGNEE AT THE PLACE AND TIME SPECIFIED FOR THE OFFICE OF ACQUISITIONS, THEN IT WILL BE CONSIDERED LATE AND HANDLED IN ACCORDANCE WITH subparagraph (c)(3) of FAR Clause 52.215-1, Instructions to Offerors--Competitive Acquisition," LOCATED IN SECTION L.1. OF THIS SOLICITATION.

10. Offeror must be registered in the System for Award Management (SAM) prior to award of a contract. Offerors must access the CCR through The System for Award Management (SAM) at http://www.sam.gov

11. FOR INFORMATION CALL: Polina Klimenkova, Contract Specialist

PHONE: 301-443-6677

e-MAIL: polina.klimenkova@nih.gov

COLLECT CALLS WILL NOT BE ACCEPTED.

Kenneth E. Goodling Contracting Officer Office of Acquisitions, NIDA http://www.sam.gov

RFP Number : N01DA-21-8957

- 2 -

RFP TABLE OF CONTENTS

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

SECTION D - PACKAGING, MARKING AND SHIPPING

SECTION E - INSPECTION AND ACCEPTANCE

SECTION F - DELIVERIES OR PERFORMANCE

SECTION G - CONTRACT ADMINISTRATION DATA

SECTION H - SPECIAL CONTRACT REQUIREMENTS

PART II - CONTRACT CLAUSES

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

SECTION J - LIST OF ATTACHMENTS

SOLICITATION ATTACHMENTS

TECHNICAL PROPOSAL ATTACHMENTS

BUSINESS PROPOSAL ATTACHMENTS

INFORMATIONAL ATTACHMENTS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

1. GENERAL INFORMATION

a. INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION

b. NAICS CODE AND SIZE STANDARD

c. TYPE OF CONTRACT AND NUMBER OF AWARDS

d. ESTIMATE OF EFFORT

e. COMMITMENT OF PUBLIC FUNDS

f. COMMUNICATIONS PRIOR TO CONTRACT AWARD

g. RELEASE OF INFORMATION

h. PREPARATION COSTS

i. SERVICE OF PROTEST

2. INSTRUCTIONS TO OFFERORS

a. GENERAL INSTRUCTIONS

1. Contract Type and General Clauses

2. Authorized Official and Submission of Proposal

3. Proposal Summary and Data Record (NIH-2043)

4. Separation of Technical and Business Proposals

5. Alternate Proposals

6. Evaluation of Proposals

7. Potential Award Without Discussions

8. Use of the Metric System of Measurement

9. Privacy Act - Treatment of Proposal Information

10. Selection of Offerors

11. Institutional Responsibility Regarding Investigator Conflicts of Interest

- 3 -

12. ROTC Access and Federal Military Recruiting on Campus

13. Past Performance Information

15. Electronic Information Technology Accessibility Notice, HHSAR 352.239-73 (December 2015)

16. Solicitation Provisions Incorporated by Reference

b. TECHNICAL PROPOSAL INSTRUCTIONS

1. Technical Discussions

2. Other Considerations

3. Technical Evaluation

4. Care of Live Vertebrate Animals

5. Research Involving Live Vertebrate Animals

6. Obtaining and Disseminating Biomedical Research Resources

c. BUSINESS PROPOSAL INSTRUCTIONS

1. Basic Cost/Price Information

2. Proposal Cover Sheet

3. Information Other than Cost or Pricing Data

4. Requirements for Cost or Pricing Data or Information Other than Cost and Pricing Data

5. Salary Rate Limitation

6. Small Business Subcontracting Plan

7. Mentor Protege Program, HHSAR 352.219-70

8. HUBZone Small Business Concerns

9. Total Compensation Plan

10. Other Administrative Data

11. Qualifications of the Offeror

12. Subcontractors

13. Proposer's Annual Financial Report

14. Travel Costs/Travel Policy

SECTION M - EVALUATION FACTORS FOR AWARD

1. GENERAL

2. COST/PRICE EVALUATION

3. LIVE VERTEBRATE ANIMALS EVALUATION

4. MANDATORY QUALIFICATION CRITERIA

5. EVALUATION OF DATA SHARING PLAN

6. TECHNICAL EVALUATION FACTORS

7. PAST PERFORMANCE FACTOR

- 4 -

PART I - THE SCHEDULE

THE INFORMATION SET FORTH IN SECTION A - SOLICITATION/CONTRACT FORM, HEREIN CONTAINS IMPORTANT INFORMATION FOR ANY OFFEROR INTERESTED IN RESPONDING TO THIS SOLICITATION.

ANY CONTRACT RESULTING FROM THIS SOLICITATION WILL INCLUDE IN ITS SECTION A - SOLICITATION/ CONTRACT FORM, ACCOUNTING, APPROPRIATION AND GENERAL INFORMATION APPLICABLE TO THE

CONTRACT AWARD.

THE CONTRACT SCHEDULE SET FORTH IN SECTIONS B THROUGH H, HEREIN, CONTAINS CONTRACTUAL INFORMATION PERTINENT TO THIS SOLICITATION. IT IS NOT AN EXACT REPRESENTATION OF THE CONTRACT DOCUMENT THAT WILL BE AWARDED AS A RESULT OF THIS SOLICITATION. THE CONTRACT COST OR PRICE AND OTHER CONTRACTUAL PROVISIONS PERTINENT TO THE OFFEROR (i.e., those relating to the organizational structure [e.g., Non-Profit, Commercial] and specific cost authorizations unique to the Offeror's proposal and requiring Contracting Officer Prior Approval) WILL BE DISCUSSED IN THE NEGOTIATION PROCESS, AS NECESSARY, AND WILL BE INCLUDED IN THE RESULTANT CONTRACT. THE ENCLOSED CONTRACT SCHEDULE IS INTENDED TO PROVIDE THE OFFEROR WITH THE NECESSARY INFORMATION

TO UNDERSTAND THE TERMS AND CONDITIONS OF THE RESULTANT CONTRACT.

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

ARTICLE B.1. BRIEF DESCRIPTION OF SUPPLIES OR SERVICES

The Division of Therapeutics and Medical Consequences (DTMC) of the National Institute on Drug Abuse (NIDA) supports research and development of new medications for the treatment of drug addiction. Medication development involves in vitro evaluations, nonclinical pharmacology and toxicology studies, pharmaceutical development, and clinical evaluation of new medications for treating addiction.

The objective of this contract is to carry out in vitro metabolism and permeability and in vivo ADME studies to support the medications development program of the National Institute on Drug Abuse (NIDA). NIDA and NIDA sponsored investigators will use the data obtained for submissions to the Food and Drug Administration (FDA) in support of Investigational New Drugs (INDs) and New Drug Applications (NDAs).

ARTICLE B.2. PRICES/COSTS

a. This is an Indefinite Quantity contract as contemplated by FAR 16.504. The Contractor shall be reimbursed by the Government in an amount not less than a total of $100,000 (minimum) nor more than a total of $3,500,000 (maximum) for successful performance of this contract. The minimum amount is inclusive of all task orders issued under this contract. Total compensation will be based on the combined negotiated task orders (fixed price).

b. The costs and/or prices set forth in this ARTICLE will cover the contract period September 2021 through September 2026.

c. The Government will issue fixed price Task Orders (severable and nonseverable) based on the work described in SECTION C of this contract.

d. Ordering procedures are listed in the TASK ORDER PROCEDURE Article in SECTION G of this contract.

ARTICLE B.3. PROVISIONS APPLICABLE TO DIRECT COSTS

This article will prohibit or restrict the use of contract funds, unless otherwise approved by the Contracting Officer. The following is a list of items that may be included in the resultant contract as applicable. 1) Conferences & Meetings, 2) Food for Meals, Light Refreshments & Beverages, 3) Promotional Items, 4) Acquisition, by purchase or lease, of any interest in real property; 5) Special rearrangement or alteration of facilities; 6) Purchase or lease of any item of general purpose office furniture or office equipment regardless of dollar value; 7) Travel Costs including Foreign Travel; 8)

- 5 -

Consultant Costs; 9) Subcontract Costs; 10) Patient Care Costs; 11) Accountable Government Property; 12) Printing costs; and 13) Research Funding.

ARTICLE B.4. ADVANCE UNDERSTANDINGS

Specific elements of cost, which normally require prior written approval of the Contracting Officer before incurrence of the cost (e.g., foreign travel, consultant fees, subcontracts) will be included in this Article if the Contracting Officer has granted his/her approval prior to contract award.

- 6 -

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

ARTICLE C.1. STATEMENT OF WORK

a. Independently and not as an agent of the Government, the Contractor shall be required to furnish all the necessary services, qualified personnel, material, equipment, and facilities, not otherwise provided by the Government, as needed to perform the Statement of Work, dated November 23, 2020, attached hereto and made a part of this Solicitation (See SECTION J - List of Attachments).

ARTICLE C.2. REPORTING REQUIREMENTS

All reports required herein shall be submitted in electronic format in accordance with Article F.2. Deliveries.

All electronic reports submitted shall be compliant with Section 508 of the Rehabilitation Act of 1973. Additional information about testing documents for Section 508 compliance, including guidance and specific checklists, by application, can be found at: http://www.hhs.gov/web/508/index.html under "Making Files Accessible."

a. Technical Progress Reports

1. In addition to the required reports set forth elsewhere in this Schedule, the preparation and submission of regularly recurring Technical Progress Reports will be required in any contract resulting from this solicitation. These reports will require descriptive information about the activities undertaken during the reporting period and will require information about planned activities for future reporting periods. The frequency and specific content of these reports will be determined prior to contract award. The Contractor shall include the applicable PubMed Central or NIH Manuscript Submission reference number when citing publications that arise from its NIH funded research.

For proposal preparation purposes only, it is estimated these electronic reports will be required as follows and as directed in ARTICLE F.2.:

a. Individual Study/Task Reports (e.g., interspecies comparison in vitro metabolism studies, enzyme inhibition studies, enzyme induction studies, permeability studies, etc.): Within 15 working days after completion of a study or a task, the Contractor shall submit one (1) electronic copy of a comprehensive draft report detailing the work completed, results, and conclusions to the NIDA COR.

Within 5-10 working days after receiving comments from the COR, the Contractor shall submit one (1) electronic copy of a final study/task report to the NIDA COR. The study reports must be in a format suitable for submission to the FDA.

b. Monthly Progress Reports: Within the first 5 working days after each calendar month, the Contractor shall provide the COR one (1) electronic copy of a report on activities during the preceding month. In the monthly report, the Contractor shall briefly (in one or two paragraphs) describe work accomplished (data generated), work planned, changes in staff, and actual or projected problems and proposed solutions. In addition, the Contractor shall include a list of final study/task reports sent to the NIDA COR during the month under report.

c. Annual Reports: Not later then 15 working days after the end of each year of contract work, the Contractor shall provide an executive summary and a comprehensive report on activities during the year. The executive summary shall provide a list of all studies performed during the year and status of studies. This comprehensive report shall contain detailed summary of all tasks/studies performed during the year including description of procedures/methods, results, and tentative conclusions.

One (1) electronic copy each of an executive summary and a report are to the NIDA COR. One (1) electronic copy of an executive summary is to be sent to the Contracting Officer. The annual report for the last year of the contract shall be incorporated into the Final Report.

http://www.hhs.gov/web/508/index.html

- 7 -

d. Final Report: On or before the expiration date of the contract, the Contractor shall provide an executive summary and a comprehensive summary of work conducted for each task. The report shall also include copies of publications and manuscripts which the Contractor may intend to submit for publication. This report shall incorporate the final Annual Report. One (1) electronic copy each of an executive summary and a report are to the NIDA COR. One (1) electronic copy of an executive summary is to be sent to the Contracting Officer. The annual report for the last year of the contract shall be incorporated into the Final Report.

2. Summary of Salient Results

The Contractor will be required to prepare and submit, with the final report, a summary (not to exceed 200 words) of salient results achieved during the performance of the contract. This report will be required on or before the expiration date of the contract.

b. Other Reports/Deliverables

1. Reporting of Financial Conflict of Interest (FCOI)

All reports and documentation required by 45 CFR Part 94, Responsible Prospective Contractors including, but not limited to, the New FCOI Report, Annual FCOI Report, Revised FCOI Report, and the Mitigation Report, shall be submitted to the Contracting Officer in Electronic format. Thereafter, reports shall be due in accordance with the regulatory compliance requirements in 45 CFR Part 94.

45 CFR Part 94 is available at: http://www.ecfr.gov/cgi-bin/text-idx?

c=ecfr&SID=0af84ca649a74846f102aaf664da1623&rgn=div5&view=text&node=45:1.0.1.1.51&idno=45.

See Part 94.5, Management and reporting of financial conflicts of interest for complete information on reporting requirements.

(Reference subparagraph g. of the INSTITUTIONAL RESPONSIBILITY REGARDING INVESTIGATOR FINANCIAL CONFLICTS OF INTEREST Article H.15. in SECTION H of this contract.)

2. INFORMATION AND/OR PHYSICAL SECURITY

The Contractor shall submit the following reports as required by the INFORMATION AND PHYSICAL ACCESS SECURITY Article in SECTION H of this contract.

A. SA&A Package Deliverables - The Contractor (and/or any subcontractor) shall provide an SA&A package within 30 days of contract award to the CO and/or COR. The following SA&A deliverables are required to complete the SA&A package.

● System Security Plan (SSP) - due within 30 days after contract award. The SSP shall comply with the NIST SP 800-18, Guide for Developing Security Plans for Federal Information Systems, the Federal Information Processing Standard (FIPS) 200, Recommended Security Controls for Federal Information Systems, and NIST SP 800-53, Security and Privacy Controls for Federal Information Systems and Organizations applicable baseline requirements, and other applicable NIST guidance as well as HHS and NIH policies and other guidance. The SSP shall be consistent with and detail the approach to IT security contained in the Contractor's bid or proposal that resulted in the award of this contract.

The SSP shall provide an overview of the system environment and security requirements to protect the information system as well as describe all applicable security controls in place or planned for meeting those requirements. It should provide a structured process for planning adequate, cost-effective security protection for a system. The Contractor shall update the SSP at least annually thereafter.

● E-Authentication Questionnaire - The contractor (and/or any subcontractor) shall collaborate with government personnel to ensure that an E-Authentication Threshold Analysis (E-auth TA) is completed to determine if http://www.ecfr.gov/cgi-bin/text-idx?c=ecfr&SID=0af84ca649a74846f102aaf664da1623&rgn=div5&view=text&node=45:1.0.1.1.51&idno=45 http://www.ecfr.gov/cgi-bin/text-idx?c=ecfr&SID=0af84ca649a74846f102aaf664da1623&rgn=div5&view=text&node=45:1.0.1.1.51&idno=45

- 8 -a full E-Authentication Risk Assessment (E-auth RA) is necessary. System documentation developed for a system using E-auth TA/E-auth RA methods shall follow OMB 04-04 and NIST SP 800-63, Rev. 2, Electronic Authentication Guidelines.

Based on the level of assurance determined by the E-Auth, the Contractor (and/or subcontractor) must ensure appropriate authentication to the system, including remote authentication, is in-place in accordance with the assurance level determined by the E-Auth (when required) in accordance with HHS policies.

● Privacy Threshold Analysis (PTA)/ Privacy Impact Assessment (PIA)- The Contractor shall assist the NIH Office of the Senior Official for Privacy (SOP) or designee with conducting a PTA for the information system and/or information handled under this contract to determine whether or not a full PIA needs to be completed.

The NIH PIA guide is located at https://oma.od.nih.gov/forms/Privacy%20Documents/Documents/NIH%20PIA %20Guide.pdf.

a. If the results of the PTA show that a full PIA is needed, the Contractor shall assist the OpDiv SOP or designee with completing a PIA for the system or information within 60 calendar days after completion of the PTA and in accordance with HHS policy and OMB M-03-22, Guidance for Implementing the Privacy Provisions of the E-Government Act of 2002.

b. The Contractor shall assist the NIH Office of the SOP or designee in reviewing the PIA at least every three years throughout the system development lifecycle (SDLC)/information lifecycle, or when determined by the agency that a review is required based on a major change to the system, or when new types of PII are collected that introduces new or increased privacy risks, whichever comes first.

● FIPS 199 Assessment The Contractor shall submit a FIPS 199 Assessment within thirty (30) days after contract award. The FIPS 199 Assessment shall be consistent with the cited NIST standard.

B. POSITION SENSITIVITY DESIGNATIONS. All Contractor (and/or any subcontractor) employees must obtain a background investigation commensurate with their position sensitivity designation that complies with Parts 1400 and 731 of Title 5, Code of Federal Regulations (CFR). The following position sensitivity designation levels apply to this solicitation/contract:

[ ] Level 6: Public Trust - High Risk. Contractor/subcontractor employees assigned to Level 6 positions shall undergo a Suitability Determination and Background Investigation (MBI).

[ ] Level 5: Public Trust - Moderate Risk. Contractor/subcontractor employees assigned to Level 5 positions with no previous investigation and approval shall undergo a Suitability Determination and a Minimum Background Investigation (MBI), or a Limited Background Investigation (LBI).

[X] Level 1: Non-Sensitive. Contractor/subcontractor employees assigned to Level 1 positions shall undergo a Suitability Determination and National Check and Inquiry Investigation (NACI).

1. HOMELAND SECURITY PRESIDENTIAL DIRECTIVE (HSPD)-12

Roster-

a. The Contractor (and/or any subcontractor) shall submit a roster by name, position, e-mail address, phone number and responsibility, of all staff working under this acquisition where the Contractor will develop, have the ability to access, or host and/or maintain a government information system(s). The roster shall be submitted to the COR and/or CO within fourteen (14) calendar days after the effective date of this contract. Any revisions to the roster as a result of staffing changes shall be submitted within seven (7) calendar days of the change.

The COR will notify the Contractor of the appropriate level of investigation required for each staff member. An electronic template, "Roster of Employees Requiring Suitability Investigations," is available for contractor use at:

https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/SuitabilityRoster_10-15-12.xlsx.

b. If the Contractor is filling a new position, the Contractor shall provide a position description and the Government will determine the appropriate suitability level. Upon receipt of the Government's notification of applicable Suitability Investigations required, the Contractor shall complete and submit the required forms within 30 days of the notification.

https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/SuitabilityRoster_10-15-12.xlsx

- 9 -

c. Upon receipt of the Government's notification of applicable Suitability Investigations required, the Contractor shall complete and submit the required forms within 30 days of the notification.

d. The Contractor shall notify the Contracting Officer in advance when any new personnel, who are subject to a background check/investigation, will work under the contract and if they have previously been the subject of national agency checks or background investigations.

e. All contractor and subcontractor employees shall comply with the conditions established for their designated position sensitivity level prior to performing any work under this contract. Contractors may begin work after the fingerprint check has been completed.

f. Investigations are expensive and may delay performance, regardless of the outcome of the investigation. Delays associated with rejections and consequent re-investigations may not be excusable in accordance with the FAR clause, Excusable Delays - see FAR 52.249-14. Accordingly, the Contractor shall ensure that any additional employees whose names it submits for work under this contract have a reasonable chance for approval.

g. Typically, the Government investigates personnel at no cost to the Contractor. However, multiple investigations for the same position may, at the Contracting Officer's discretion, justify reduction(s) in the contract price of no more that the cost of the additional investigation(s).

h. The Contractor shall include language similar to this "HHS Controlled Facilities and Information Systems Security" language in all subcontracts that require subcontractor personnel to have the same frequency and duration of (1) physical access to an HHS-controlled facility; (2) logical access to an HHS-controlled information system; (3) access to sensitive HHS data/information, whether in an HHS-controlled information system or in hard copy; or (4) any combination of circumstances (1) through (3).

i. The Contractor shall direct inquiries, including requests for forms and assistance, to the Contracting Officer or designee.

j. Within 7 calendar days after the Government's final acceptance of the work under this contract, or upon termination of the contract, the Contractor shall return all identification badges to the Contracting Officer or designee.

C. Contractor Non-Disclosure Agreement (NDA)- Each Contractor (and/or any subcontractor) employee having access to non-public government information under this contract shall complete the NIH non-disclosure agreement https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/Nondisclosure.pdf#search=non %2Ddisclosure, as applicable. A copy of each signed and witnessed NDA shall be submitted to the Contracting Officer (CO) and/or CO Representative (COR) prior to performing any work under this acquisition.

ARTICLE C.3. INVENTION REPORTING REQUIREMENT

All reports and documentation required by FAR Clause 52.227-11, Patent Rights-Ownership by the Contractor including, but not limited to, the invention disclosure report, the confirmatory license, and the Government support certification, shall be directed to the Division of Extramural Inventions and Technology Resources (DEITR), OPERA, OER, NIH, 6705 Rockledge Drive, Suite 310, MSC 7980, Bethesda, Maryland 20892-7980 (Telephone: 301-435-1986). In addition, one copy of an annual utilization report, and a copy of the final invention statement, shall be submitted to the Contracting Officer and the Contract Specialist. The final invention statement (see FAR 27.303(b)(2)(ii)) shall be submitted to the Contracting Officer and the Contract Specialist on the expiration date of the contract.

The annual utilization report shall be submitted in accordance with the DELIVERIES Article in SECTION F of this contract. The final invention statement (see FAR 27.303(b)(2)(ii)) shall be submitted on the expiration date of the contract. All reports shall be sent to the Contracting Officer and the Contract Specialist electronically.

If no invention is disclosed or no activity has occurred on a previously disclosed invention during the applicable reporting period, a negative report shall be submitted to the Contracting Officer and the Contract Specialist.

To assist contractors in complying with invention reporting requirements of the clause, the NIH has developed "Interagency Edison," an electronic invention reporting system. Use of Interagency Edison is required as it streamlines the reporting process and greatly reduces paperwork. Access to the system is through a secure interactive Web site https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/Nondisclosure.pdf#search=non%2Ddisclosure https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/Nondisclosure.pdf#search=non%2Ddisclosure

- 10 -to ensure that all information submitted is protected. Interagency Edison and information relating to the capabilities of the system can be obtained from the Web ( http://www.iedison.gov), or by contacting the Extramural Inventions and Technology Resources Branch, OPERA, NIH.

http://www.iedison.gov

- 11 -

SECTION D - PACKAGING, MARKING AND SHIPPING

All deliverables required under this contract shall be packaged, marked and shipped in accordance with Government specifications. At a minimum, all deliverables shall be marked with the contract number and Contractor name. The Contractor shall guarantee that all required materials shall be delivered in immediate usable and acceptable condition.

- 12 -

SECTION E - INSPECTION AND ACCEPTANCE

a. The Contracting Officer or the duly authorized representative will perform inspection and acceptance of materials and services to be provided.

b. For the purpose of this SECTION, COR and alternate COR (See Article G.1) are the authorized representative of the Contracting Officer.

c. Inspection and acceptance will be performed at:

National Institute on Drug Abuse National Institutes of Health Bethesda, MD

Acceptance may be presumed unless otherwise indicated in writing by the Contracting Officer or the duly authorized representative within 30 days of receipt.

d. This contract incorporates the following clause by reference, with the same force and effect as if it were given in full text. Upon request, the Contracting Officer will make its full text available.

FAR Clause 52.246-9, Inspection of Research and Development (Short Form) (April 1984).

FAR Clause 52.246-16, Responsibility for Supplies (April 1984).

- 13 -

SECTION F - DELIVERIES OR PERFORMANCE

ARTICLE F.1. PERIOD OF PERFORMANCE

a. The period of performance of this contract shall be from September 2021 through September 2026.

ARTICLE F.2. DELIVERIES

Satisfactory performance of the final contract shall be deemed to occur upon performance of the work described in the Statement of Work Article in SECTION C of this contract and upon delivery and acceptance by the Contracting Officer, or the duly authorized representative, of the following items in accordance with the stated delivery schedule:

a. The items specified below as described in the REPORTING REQUIREMENTS Article in SECTION C of this contract will be required to be delivered electronically in accordance with and by the date(s) specified below:

b. The above items shall be addressed and delivered to:

Item Description Quantity Delivery Date Place of Delivery

(1) Draft Individual Study/Task Report 1 Within 15 business days of study completion

COR

(2) Final Individual Study/Task Report 1 Within 5-10 business days after receiving comments from Project Officer

COR

(3) Monthly Progress Reports 1 Within 5 days of end of each calendar month

COR

(4) Annual Progress Reports 2 Within 15 days of end of contract year

1 to COR, 1 to CO

(5) Final Contract Report 2 On or before end of contract

1 to COR, 1 to CO

(6) All data, etc. in accordance with "End of Contract" special requirements

-- On or before contract expiration

To be designated by

COR

(7) Reporting of Financial Conflict of Interest

(FCOI)

1 See Article C.2(b)(1) CO

(8) Annual Invention Statement 2 Within 15 days of end of contract year

1 to COR, 1 to CO

(9) FIPS 199 Assessment 2 30 calendar days after contract award

1 to COR, 1 to CO

(10) Contractor-Employee Non-Disclosure Agreement(s)

1 14 days after contract award; 15 calendar days after staffing revisions

COR

(11) IT Security Plan (IT-SP) 2 30 calendar days after contract award and updated annually from contract award date

1 to COR, 1 to CO

(12) IT Risk Assessment (IT-RA) 2 30 calendar days after contract award and updated annually from contract award date

1 to COR, 1 to CO

(13) IT Security Certification and Accreditation

(IT-SC&A)

2 90 calendar days after contract award and

1 to COR, 1 to CO

- 14 -

Item Description Quantity Delivery Date Place of Delivery updated annually from contract award date

(14) Roster of Employees Requiring Suitability Investigations

2 14 days after contract award; 15 calendar days after staffing revisions

1 to COR, 1 to CO

(15) Reporting of New and Departing Employees 2 Within 5 days of any staffing changes

1 to COR, 1 to CO

(16) Annual Utilization Reports 2 Within 15 days of end of contract year

1 to COR, 1 to CO

* The electronic files shall be in the form of a Microsoft Word document or a PDF format.

ARTICLE F.3. CLAUSES INCORPORATED BY REFERENCE, FAR 52.252-2 (FEBRUARY

1998)

This contract incorporates the following clause(s) by reference, with the same force and effect as if it were given in full text. Upon request, the Contracting Officer will make its full text available. Also, the full text of a clause may be accessed electronically at this address: https://www.acquisition.gov/?q=browsefar.

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSE:

52.242-15, Stop Work Order (August 1989)

Alternate I (April 1984) is not applicable to this contract.

https://www.acquisition.gov/?q=browsefar

- 15 -

SECTION G - CONTRACT ADMINISTRATION DATA

ARTICLE G.1. CONTRACTING OFFICER'S REPRESENTATIVE (COR)

The following Contracting Officer's Representative (COR) will represent the Government for the purpose of this contract:

[To be specified prior to award]

The COR is responsible for: (1) monitoring the Contractor's technical progress, including the surveillance and assessment of performance and recommending to the Contracting Officer changes in requirements; (2) interpreting the statement of work and any other technical performance requirements; (3) performing technical evaluation as required; (4) performing technical inspections and acceptances required by this contract; and (5) assisting in the resolution of technical problems encountered during performance.

The Contracting Officer is the only person with authority to act as agent of the Government under this contract. Only the Contracting Officer has authority to: (1) direct or negotiate any changes in the statement of work; (2) modify or extend the period of performance; (3) change the delivery schedule; (4) authorize reimbursement to the Contractor for any costs incurred during the performance of this contract; (5) otherwise change any terms and conditions of this contract; or (6) sign written licensing agreements. Any signed agreement shall be incorporated by reference in Section K of the contract

The Government may unilaterally change its COR designation.

ARTICLE G.2. KEY PERSONNEL, HHSAR 352.237-75 (December 2015)

The key personnel specified in this contract are considered to be essential to work performance. At least 30 days prior to the contractor voluntarily diverting any of the specified individuals to other programs or contracts the Contractor shall notify the Contracting Officer and shall submit a justification for the diversion or replacement and a request to replace the individual. The request must identify the proposed replacement and provide an explanation of how the replacement's skills, experience, and credentials meet or exceed the requirements of the contract (including, when applicable, Human Subjects Testing requirements). If the employee of the contractor is terminated for cause or separates from the contractor voluntarily with less than thirty days notice, the Contractor shall provide the maximum notice practicable under the circumstances. The Contractor shall not divert, replace, or announce any such change to key personnel without the written consent of the Contracting Officer. The contract will be modified to add or delete key personnel as necessary to reflect the agreement of the parties.

(End of Clause)

The following individual(s) is/are considered to be essential to the work being performed hereunder:

Name Title

TBD

ARTICLE G.3. TASK ORDER PROCEDURE

The Government will evaluate the Task Order proposals against the requirements of the TORFP. Specifically, the technical evaluation factors, cost/price, past performance and any other factor specifically identified in the TORFP will be used for evaluation of each proposal.

Upon completion of evaluations, the Contracting Officer will issue a task order to the Contractor.

This contract provides for the issuance of Task Orders on a negotiated basis as follows:

a. General.

- 16 -

Only the Contracting Officer may issue Task Orders to the Contractor, providing specific authorization or direction to perform work within the scope of the contract and as specified in the Statement of Work. Unless specifically authorized by the Contracting Officer, the Contractor shall not commence work until a fully executed Task Order has been awarded. The Contractor may incur costs under this contract in performance of task orders and task order modifications issued in accordance with this ARTICLE.

No other costs are authorized unless otherwise specified in the contract or expressly authorized by the Contracting Officer.

b. Requesting Task Order Proposals.

The Contracting Officer or a designated individual may solicit responses to requirements from Contractors within a technical area covered by a task order requirement in writing. A Task Order Request for Proposals (TORFP) will be prepared and issued for each task order requirement.

Generally, the Task Order Request for Proposal (TORFP) will include but is not limited to the following:

1. Statement of Work;

2. Reporting Requirements and Deliverables;

3. Proposal Due Date and Location to Deliver Proposals;

4. Period of Performance of Task Order;

5. Anticipated type of Task Order;

6. Technical Proposal Instructions;

7. Business proposal Instructions

8. Evaluation Factors for Award

All contract clauses contained this contract shall be incorporated in the TORFP and the resultant task order.

If conflicts exist between the contract clauses and the information outlined in the task order, the contract language takes precedence over the information in the task order.

c. Ordering Process.

1. The Contractor will receive e-mail notification advising of the availability of each proposed task order requirement. All proposed task orders will incorporate all terms of this contract unless otherwise specified in the task order.

2. The Contractor will be provided an adequate time to prepare and submit responses based on the Contracting Officer's consideration of the estimated dollar value and complexity of the proposed task order. Responses will not be considered a proposal as defined in FAR Part 15. However, the Contractor shall provide information sufficient for consideration in accordance with FAR Part

16. Each TORFP will indicate the criteria for the evaluation of proposals. The responses shall demonstrate capability for each criterion to be evaluated. Generally, the Contractor will be asked to demonstrate the following as appropriate:

- Understanding of the requirements;

- Experience and capability on similar tasks;

- Technical approach, methods and procedures for satisfying the requirements with a discussion of potential problems to be encountered and proposed solutions and/or risk mitigation strategies;

- Procedures for assuring quality of work, products, and deliverables;

- 17 -

- Plan for managing the task order, including meeting requirements and schedules, and performance measures (if applicable);

- Staffing plan with skill levels and level of effort for each individual proposed. Generally, resumes will be required for proposed personnel (if not previously submitted);

- Reference to evaluate past performance; and

- Cost/price to perform the task order.

d. Evaluation and Award of Task Order Proposals.

The Government will evaluate the Task Order proposals against the requirements of the TORFP.

Specifically, the technical evaluation factors, cost/price, and any other factor specifically identified in the TORFP will be used for evaluation of each proposal. The Contractor shall submit a Task Order Proposal in response to the TORFP.

Upon receipt of a Task Order Proposal, the Government shall evaluate the proposal under the factors identified in the TORFP. The Government may conduct discussions prior to awarding a Task Order or award a Task Order without discussions. Generally, technical factors will be significantly more important than cost or price. The Government reserves the right to cancel a TORFP anytime prior to Task Order Award.

ARTICLE G.4. INVOICE SUBMISSION

a. Invoice Instructions for NIH Fixed-Price Type Contracts, NIH(RC)-2, are attached and made part of this contract.

The Contractor shall follow the attached instructions and submission procedures specified below to meet the requirements of a "proper invoice" pursuant to FAR Subpart 32.9, Prompt Payment.

1. The Contractor shall submit invoice to the National Institutes of Health (NIH)/Office of Financial Management (OFM) via email at invoicing@nih.gov with a copy to the approving official, as directed below. The Contractor must follow step-by-step instructions as stated in the NIH/OFM Electronic Invoicing Instructions for NIH Contractors/Vendors, which is included as an attachment in Section J of this contract. The invoice shall be transmitted as an attachment via email to the address listed above in one of the following formats: Word, or Adobe Portable Document Format (PDF). The Contractor must submit only one invoice per email. Do not submit supporting documentation (e.g., receipts, time sheets, vendor invoices, etc.) with your invoice unless specified elsewhere in the contract or requested by the Contracting Officer.

The Contractor shall submit a copy of the electronic invoice to the following Approving Official (Contracting Officer) and Contracting Officer’s Representative:

Approving Official: Contracting Officer

Name-___TBD________________Email Address-TBD

Contracting Officer’s Representative

Name- ___TBD________________Email Address-TBD https://ofm.od.nih.gov/Pages/Home.aspx https://ofm.od.nih.gov/Pages/Home.aspx mailto:invoicing@nih.gov https://oamp.od.nih.gov/DGS/DGS-workform-information/attachment-files https://oamp.od.nih.gov/DGS/DGS-workform-information/attachment-files

- 18 -

For inquiries regarding the status of invoices, contact OFM Customer Service via email at ofm_customer_service@incontactemail.com or via phone at 301-496-6088. To send your inquiries via other available communication methods refer to the OFM Customer Service website at https:// ofm.od.nih.gov/Pages/Customer-Service.aspx.

Note: The OFM Customer Service is open Eastern Standard Time Monday – Friday from 8:30 a.m. to 5:00 p.m. and is closed between 12:00 p.m. to 1:00 p.m.

2. In addition to the requirements specified in FAR 32.905 for a proper invoice, the Contractor shall include the following information on the face page of all payment requests:

a. Name of the Office of Acquisitions. The Office of Acquisitions for this contract is NIDA .

b. Federal Taxpayer Identification Number (TIN). If the Contractor does not have a valid TIN, it shall identify the Vendor Identification Number (VIN) on the payment request. The VIN is the number that appears after the Contractor's name on the face page of the contract. [Note: A VIN is assigned to new contracts awarded on or after June 4, 2007, and any existing contract modified to include the VIN number.] If the Contractor has neither a TIN, DUNS, or VIN, contact the Contracting Officer.

c. DUNS or DUNS+4 Number. The DUNS number must identify the Contractor's name and address exactly as stated in the contract and as registered in the Central Contractor Registration (CCR) database. If the Contractor does not have a valid DUNS number, it shall identify the Vendor Identification Number (VIN) on the payment request. The VIN is the number that appears after the Contractor's name on the face page of the contract. [Note: A VIN is assigned to new contracts awarded on or after June 4, 2007, and any existing contract modified to include the VIN number.] If the Contractor has neither a TIN, DUNS, or VIN, contact the Contracting Officer.

d. Invoice Matching Option. This contract requires a two-way match.

e. Unique Invoice Number. Each payment request must be identified by a unique invoice number, which can only be used one time regardless of the number of contracts or orders held by an organization.

f. The Contract Title is:

In Vitro Metabolism and Non-Clinical ADME Studies

g. Contract Line Items as follows:

Line Item # Line Item Description

b. The Contractor shall include the following certification on every invoice for reimbursable costs incurred with Fiscal Year funds subject to HHSAR Clause 352.231-70, Salary Rate Limitation in SECTION I of this contract.

For billing purposes, certified invoices are required for the billing period during which the applicable Fiscal Year funds were initially charged through the final billing period utilizing the applicable Fiscal Year funds:

"I hereby certify that the salaries charged in this invoice are in compliance with HHSAR Clause 352.231-70, Salary Rate Limitation in SECTION I of the above referenced contract."

mailto:OFM%20Customer%20Service mailto:ofm_customer_service@incontactemail.com https://ofm.od.nih.gov/Pages/Customer-Service.aspx https://ofm.od.nih.gov/Pages/Customer-Service.aspx

- 19 -

ARTICLE G.5. PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS

SUBCONTRACTORS, FAR 52.232-40 (December 2013)

a. Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor.

b. The acceleration of payments under this clause does not provide any new rights under the prompt Payment Act.

c. Include the substance of this clause, include this paragraph c, in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.

(End of Clause)

ARTICLE G.6. POST AWARD EVALUATION OF CONTRACTOR PERFORMANCE

a. Contractor Performance Evaluations

Interim and Final evaluations of Contractor performance will be prepared on this contract in accordance with FAR Subpart 42.15. The Final performance evaluation will be prepared at the time of completion of work. In addition to the Final evaluation, Interim evaluation(s) may be prepared beginning in the first quarter of the Government's fiscal year following one year of contract performance.

Inter…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .