RFP_MRWG Receiving Water Monitoring Program.pdf
PDF 902 KB Posted
- Solicitation number
- PWG126-LANDD-6108
- Issued by
- San Bernardino County, California
About this file
This Request for Proposal (RFP) is issued by the San Bernardino County Flood Control District on behalf of the Mojave River Watershed Group (MRWG), a working group composed of San Bernardino County, the Town of Apple Valley, and the Cities of Hesperia and Victorville. The District seeks a qualified consultant to implement the MRWG's Receiving Water Monitoring Program as required by the Phase II Municipal Separate Storm Sewer System (MS4) Permit. The consultant will provide coordinated regional, sub-regional, and multi-jurisdictional monitoring services at two specified monitoring locations: the Urban/Rural Interface (Upstream Location, MR-URI) and the Urban Downstream Location (MR-UD), both located on U.S. Army Corps of Engineers property. Services include field monitoring, photo documentation, quality control of laboratory data, data consolidation, and retrieval of U.S. Geological Survey stream gage data, guided by the existing Receiving Water Monitoring Program Plan and Quality Assurance Project Plan. The proposal submission deadline is 3:00 PM on Monday, February 2, 2026, with a tentative contract award in February/March 2026. The contract term is for a maximum of five years, commencing July 1, 2026, and ending June 30, 2031. Questions must be submitted by 3:00 PM on Monday, January 19, 2026.
Proposers must submit pricing on Attachment E in a separately sealed envelope using the County's electronic procurement system (ePro) or via hard copy with original signatures. All costs for labor, materials, equipment rental, transportation, lodging, and per diem must be included in the fee proposal for fiscal years 2026-2027 through 2030-2031. The District will conduct a best value evaluation based on qualifications and experience (40%), technical review (40%), and references (20%). A local preference of five percent (5%) applies to vendors meeting defined local vendor criteria. The evaluation panel will review proposals independently and rank them before fee proposals are opened. Consultant must register with the Department of Industrial Relations as required by Senate Bill 854 and obtain proper licensing and permits for site access. The selected proposer must provide comprehensive insurance coverage, including general liability ($1,000,000 per occurrence), automobile liability ($1,000,000 or $2,000,000 if transporting passengers), workers' compensation, and professional liability ($1,000,000 per claim/$2,000,000 aggregate). The consultant is responsible for all costs associated with proposal preparation and must comply with prevailing wage requirements under California Labor Code sections 1720 et seq. and 1770 et seq., as applicable to public works and maintenance projects.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev. 9/2025 - Pro. Services D20410
Request for Proposal No.
PWG126-LANDD-6108
Mojave River Watershed Group Receiving Water Monitoring Program
San Bernardino County Flood Control District Attn: Environmental Management Division –
NPDES
825 E. Third Street
San Bernardino, CA, 92415-0835 Deadline Date: February 2, 2026
San Bernardino County Flood Control District
Request for Proposal Mojave River Watershed Group
Receiving Water Monitoring Program
No. PWG126-LANDD-6108
I. INTRODUCTION
A. Purpose The San Bernardino County Flood Control District (District), representing the Mojave River Watershed Group (hereafter referred to as the “MRWG”) is seeking Proposals from interested and qualified Proposers to provide services to implement the MRWG’s Receiving Water Monitoring Program Plan as required by the Phase II Municipal Separate Storm Sewer System (MS4) Permit (Water Quality Order No. 2013-0001-DWQ, NPDES No. CAS000004), Part E.13.d.1.
The MRWG is not a legal entity but rather is a working group composed of employees of San Bernardino County (County), the Town of Apple Valley and the Cities of Hesperia and Victorville. The County, the Town of Apple Valley and the Cities of Hesperia and Victorville are collectively referred to in this Request for Proposals (RFP) as the “Member Agencies.” The District, on behalf of the Member Agencies, through this RFP, will retain a consultant to conduct coordinated regional, sub-regional and multi-jurisdictional activities, as applicable.
B. RFP Contact
All correspondence, including Proposals and questions (no bid questions), must be submitted to the person identified below (RFP Contact):
San Bernardino County Flood Control District Environmental Management Division - NPDES Attn: Jonathan Dillon, P.E., Supervising Engineer 825 E. Third Street San Bernardino, CA 92415-0835
(909) 387-8109 Phone
(909) 387-0305 Fax Jonathan.Dillon@dpw.sbcounty.gov Email
Proposals will not be accepted by email or facsimile (not bid questions). Proposals must be submitted electronically through the County Electronic Procurement Network (ePro), and/or via (Paper) hard copy with original signature submitted to the address indicated above. The completed and signed proposal must be received by the Deadline for Proposals specified in Section II – Proposal Timeline. All Proposers must register with the ePro system prior to the date and time to submit the proposal or they will be disqualified.
C. Reserved
D. Contract Term Services to be provided under this Request for Proposals (RFP) are outlined under Section V, Scope of Work. The Contract period will be for a maximum of five (5) years beginning on July 1, 2026 and ending on June 30, 2031.
E. Location of Services Location(s) where Services are to be provided, completed and managed are within MS4 Phase 2 boundary. Proposer will provide services at two (2) monitoring locations. See Exhibit 1 for site location, site access, frequency, and other details.
The Proposer must include in Proposal, Attachment E – Fee Proposal Sheet(s), all transportation, lodging, and per diem costs sufficient to pay its personnel and travel to the aforementioned locations.
mailto:Jonathan.Dillon@dpw.sbcounty.gov
Request for Proposal Mojave River Watershed Group
Receiving Water Monitoring Program
F. Assistance to Proposers with a Disability Proposers with a disability may request accommodation regarding the means of communicating this RFP or participating in the procurement process. For more information, contact the RFP Contact no later than ten (10) days prior to the Deadline for Proposals.
II. PROPOSAL TIMELINE
Release of RFP December 2025
Deadline for Submission of Questions 3:00 PM, Monday, January 19, 2026
Deadline for Proposals 3:00 PM, Monday, February 2, 2026
Date for Tentative Contract Award February /March 2026
Questions regarding the contents of this RFP must be submitted in writing in ePro on or before the Deadline for Submission of Questions. All questions will be answered and both the question and answer will be posted as an Addendum to the RFP in ePro.
III. DEFINITIONS
Capitalized terms used in this RFP shall have the meanings given to them in the RFP and as defined below:
Board: The San Bernardino County Flood Control District Board of Supervisors.
Contract: The Contract between the District and the Proposer resulting from the award issued pursuant to this RFP to the successful Proposer.
Consultant: Any individual, company, firm, corporation, partnership or other organization to whom a contract award is made by the District.
County: San Bernardino County.
District: San Bernardino County Flood Control District.
Facilitator: A County Purchasing Department buyer or designated individual tasked with managing the processes of the evaluation panel.
MRWG: Mojave River Watershed Group, collectively composed of: San Bernardino County, the Town of Apple Valley and the Cities of Hesperia and Victorville. This group is also known and referred to as the “Member Agencies.”
NPDES: National Pollutant Discharge Elimination System.
MS4: Municipal Separate Strom Sewer Systems.
LRWQCB: Lahontan Regional Water Quality Control Board.
Permit: The NPDES Phase 2 MS4 General Permit, Water Quality Order No. 2013-0001-DWQ, NPDES No.
CAS000004.
Proposal: The offer to provide specific goods or services at specified prices and/or other conditions specified in the RFP.
Purchasing Agent: The Director of the County Purchasing Department.
Request for Proposal Mojave River Watershed Group
Receiving Water Monitoring Program
QAPP: Quality Assurance Project Plan.
RWMP: Receiving Water Monitoring Program.
Request For Proposal (RFP): The request for an offer from Proposers interested in providing the identified services sought to be procured by the District. The RFP specifies the evaluation factors to be used and contains or incorporates by reference contractual terms and conditions applicable to the procurement.
Services: The requested professional services described in this RFP.
Subconsultant: An individual, company, firm, corporation, partnership or other organization, not in the employment of or owned by Consultant who is performing services on behalf of Consultant under the Contract or under a separate contract with or on behalf of Consultant.
IV. PROPOSAL CONDITIONS
A. Authorized Signatures
All proposals must be signed by an individual authorized to bind the Proposer to the provisions of the
RFP.
B. Term of Offer
Proposals shall remain open, valid and subject to acceptance anytime within nine (9) months after the Proposal submission.
C. Required Review Proposers should carefully review this RFP for defects and questionable or objectionable material.
Comments from Proposers concerning defects and objectionable material in this RFP must be made in writing and received by the RFP contact prior to the deadline for submission of questions identified in Section II or at least ten (10) calendar days before the Deadline for Proposals (whichever occurs last).
This will allow issuance of any necessary amendments or addendums to the RFP. It will also help prevent the opening of a defective RFP and exposure of Proposals upon which an award could not be made.
Protests based on any omission or error, or on the content of this RFP, may be disallowed if not submitted in writing to the attention of the RFP Contact prior to the deadline for submission of questions identified in Section II or at least ten (10) calendar days before the Deadline for Proposals (whichever occurs last).
D. Incurred Costs
The District is not obligated to pay any costs incurred by Proposer in the preparation of a Proposal in response to this RFP. Proposers agree that all costs incurred in developing a Proposal are the Proposer’s responsibility.
E. Amendments/Addendums to RFP The District reserves the right to issue amendments or addendums to this RFP if the District considers that changes are necessary or additional information is needed.
Changes to a Proposal or withdrawal of a Proposal will only be allowed if a request is received prior to the Deadline for Proposals. No amendments or withdrawals will be accepted after the Deadline for Proposals.
F. Best Value Evaluation As established in this RFP, the District realizes that criteria other than price are important and will award contract(s) based on the Proposal that best meets the needs of the District.
Request for Proposal Mojave River Watershed Group
Receiving Water Monitoring Program
G. Right of Rejection
Offers must comply with all of the terms of the RFP, and all applicable local, state, and federal laws, codes, and regulations. The District may reject as non-responsive any Proposal that does not comply with all of the material and substantial terms, conditions, and performance requirements of the RFP.
Further, the District may reject a Proposal from any entity that is a parent, affiliate, or subsidiary, or that is under common ownership, control, or management with any other entity submitting a Proposal in response to this RFP.
A Proposer may not qualify the Proposal nor restrict the rights of the District. If Proposer does so, the Proposal may be determined to be a non-responsive counter-offer and the Proposal may be rejected.
No Proposal shall be rejected, however, if it contains a minor irregularity, defect or variation. If the irregularity, defect or variation is considered by the District to be immaterial or inconsequential, the District may choose to accept the Proposal.
Minor irregularities may be waived by the Purchasing Agent when they are any of the following:
1. Do not affect responsiveness;
2. Are merely a matter of form or format;
3. Do not change the relative standing or otherwise prejudice other offers;
4. Do not change the meaning or scope of the RFP;
5. Are trivial, negligible, or immaterial in nature;
6. Do not reflect a material change in the work; or
7. Do not constitute a substantial reservation against a requirement or provision.
In such cases the Proposer will be notified of the deficiency in the Proposal and given an opportunity to correct the irregularity, defect or variation or the District may elect to waive the deficiency and accept the Proposal. The decision to provide a waiver shall in no way modify or compromise the overall purpose of the submittal, nor excuse the Proposer from compliance with all requirements if awarded a Contract.
This RFP does not commit the District to award a contract. The District reserves the right to reject any or all Proposals if it is in the best interest of the District to do so. The District also reserves the right to terminate this RFP process at any time.
H. Local Preference
The San Bernardino County has adopted a Local Preference Policy. A local preference of five percent (5%) shall be applied in the cost evaluation of proposals or bids for goods, services, equipment, or a minor public work project, unless an exemption applies. In a price-based bid, five percent (5%) will be deducted from the local vendor’s proposed cost for the purpose of comparison when the local vendor’s proposed cost is not the lowest. If the local vendor’s bid is equal to or lower than the price of an otherwise successful non-local vendor after the 5% preference is applied, the local vendor will be given the opportunity to match the lowest quoted price. In a best value evaluation, five percent (5%) of the awardable points for cost will be added to the local vendor’s score. If the local vendor’s overall score is equal to or lower than that of an otherwise successful nonlocal vendor, the local vendor will be recommended for award.
“Due to the evaluation of qualitative elements along with cost in a best value evaluation, application of local preference for cost proposals may not result in award to a local vendor with the lowest cost after applying local preference.”
Local Vendor - A local vendor is any vendor, contractor or consultant (hereafter “vendor”) that meets all of the following requirements:
1. Vendor’s main office (headquarters) or a major regional office is located within the County;
Request for Proposal Mojave River Watershed Group
Receiving Water Monitoring Program
2. Vendor employs a minimum of 25% of the vendor’s full-time management employees and 25% of its full-time regular employees working from the San Bernardino County location(s);
3. Vendor employs one full-time or two part-time employees with primary residence in the County;
Vendor’s “point of sale” for purposes of reporting sales tax to the State Board of Equalization is within the boundaries of the County. The payment of any local share of sales tax must go to the County or a city within the County. If the local business has more than one sales office in the State of California, the office located in the County shall be the point of sale for sales tax calculation;
4. Vendor is not delinquent in any taxes or other payments to the County;
5. Vendor possesses a valid and verifiable business license (if required);
6. Vendor has been open and established for at least six months prior to the issuance of the
7. solicitation;
8. Vendor can demonstrate on-going business activity in the field of endeavor on which they are proposing from that office during the preceding six months;
9. Vendor has not within five years prior to the solicitation admitted guilt or been found guilty by any court or state or federal regulatory enforcement agency of violation of any criminal law or any law or regulation regarding fraud;
10. Vendor is not federally debarred; and
11. Vendor is not suspended or debarred from participation in doing business with the County, in the scope of work that is the subject of the solicitation.
12. Local Vendor Self-certification – Documentation provided
Local Vendor self-certification form is required for any bid or proposal when a local preference is claimed affirming that it meets each of the above stated criteria, and signed by a vendor representative with the authority to obligate the company under penalty of perjury. (See Attachment O)
I. Clarification of Offers In order to determine if a Proposal is reasonably susceptible for award, communications by the Facilitator for the evaluation panel are permitted with a Proposer to clarify uncertainties or eliminate confusion concerning the contents of a Proposal. Clarifications may not result in a material or substantive change to the Proposal. The evaluation by the panel may be adjusted as a result of a clarification under this section.
J. Public Records Act All Proposals and other material submitted become the property of the District and are subject to release according to the California Public Records Act (Government Code §7290.000). All Proposal information, including cost information, will be held in confidence during the evaluation and negotiation process.
Thereafter, Proposals are subject to becoming a non-exempt public record.
If a Proposer believes that any portion of its Proposal is exempt from public disclosure, it must indicate the specific portions believed to be confidential and not subject to disclosure on Attachment I - Public Records Act Exemptions. The Proposer also must include a brief description that sets out the reasons for exemption from disclosure. Each stated exemption must include a citation to supporting legal authority, including statutory authority or case law, to support exemption from the Public Records Act. Requested exemptions that do not meet the requirements of this section will not be considered.
The District will use reasonable means to ensure that such information is safeguarded, but will not be held liable for inadvertent disclosure of the information. Proposals marked “Confidential” in their entirety will not be honored, and the District might not deny public disclosure of any portion of Proposals so marked.
By submitting a Proposal with portions identified in Attachment I as “Confidential,” Proposer represents that it has a good faith belief that such portions are exempt from disclosure under the Public Records Act.
Proposer may be requested to obtain legal protection from disclosure should a Public Records Act request
Request for Proposal Mojave River Watershed Group
Receiving Water Monitoring Program be received. In the event the District does not disclose the information marked “Confidential,” Proposer agrees to reimburse the District for, and to indemnify, defend (with counsel approved by District) and hold harmless the District, its officers, employees, agents, and volunteers from and against any and all claims, damages, losses, liabilities, suits, judgments, fines, penalties, costs and expenses, including without limitation, attorneys’ fees, expenses and court costs of any nature arising from or relating to the District’s non-disclosure of any such designated portions of a Proposal.
K. Employment of Former County Officials Information must be provided in Attachment G regarding former County Administrative Officials (as defined below) who are employed by or represent Proposer. The information provided must include a list of former County Administrative Officials who terminated County employment within the last five years and who are now officers, principals, partners, associates or members of Proposer and should also include the employment and/or representative capacity and the dates these individuals began employment with or representation of Proposer. For purposes of this section, “County Administrative Official” is defined as a member of the Board of Supervisors or such member’s staff, Chief Executive Officer or member of such officer’s staff, County department or group head, assistant department or group head, or any employee in the Exempt Group, Management Unit or Safety Management Unit.
Failure to provide this information may result in the Proposal being deemed non-responsive.
L. Iran Contracting Act of 2010 In accordance with Public Contract Code section 2204(a), the Proposer certifies that at the time the Proposal is submitted, the Proposer signing the Proposal is not identified on a list created pursuant to subdivision (b) of Public Contract Code section 2203 (https://www.dgs.ca.gov/PD/Resources/Page- Content/Procurement-Division-Resources-List-Folder/List-of-Ineligible-Businesses) as a person (as defined in Public Contract Code section 2202(e)) engaging in investment activities in Iran described in subdivision (a) of Public Contract Code section 2202.5, or as a person described in subdivision (b) of Public Contract Code section 2202.5, as applicable.
Proposers are cautioned that making a false certification may subject the Proposer to civil penalties, termination of an existing contract, and ineligibility to bid on a contract for a period of three (3) years in accordance with Public Contract Code section 2205. Proposer agrees that signing the Proposal shall constitute signature of this Certification.
M. Disclosure of Criminal and Civil Proceedings
The District reserves the right to request the information described herein from the Proposer selected for Contract award. Failure to provide the information may result in a disqualification from the selection process and no award of Contract to the Proposer. The District also reserves the right to obtain the requested information by way of a background check performed by an investigative firm. The selected Proposer may also be requested to provide information to clarify initial responses. Negative information provided or discovered may result in disqualification from the selection process and no award of Contract.
The selected Proposer may be asked to disclose whether the firm, or any of its partners, principals, members, associates or key employees (as that term is defined herein), within the last ten years, has been indicted on or had charges brought against it or them (if still pending) or convicted of any crime or offense arising directly or indirectly from the conduct of the firm’s business, or whether the firm, or any of it partners, principals, members, associates or key employees, has within the last ten years, been indicted on or had charges brought against it or them (if still pending) or convicted of any crime or offense involving financial misconduct or fraud. If the response is affirmative, the Proposer will be asked to describe any such indictments or charges (and the status thereof), convictions and the surrounding circumstances in detail.
https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-Division-Resources-List-Folder/List-of-Ineligible-Businesses https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-Division-Resources-List-Folder/List-of-Ineligible-Businesses
Request for Proposal Mojave River Watershed Group
Receiving Water Monitoring Program
In addition, the selected Proposer may also be asked to disclose whether the firm, or any of its partners, principals, members, associates or key employees, within the last ten years, has been the subject of legal proceedings as defined herein arising directly from the provision of services by the firm or those individuals. “Legal proceedings” means any civil actions filed in a court of competent jurisdiction, or any matters filed by an administrative or regulatory body with jurisdiction over the firm or the individuals. If the response is affirmative, the Proposer will be asked to describe any such legal proceedings (and the status and disposition thereof) and the surrounding circumstances in detail.
For purposes of this provision “key employees” includes any individuals providing direct service to the District. “Key employees” do not include clerical personnel providing service at the firm’s offices or locations.
N. Debarment and Suspension; California Secretary of State Business Entity Registration
Proposer certifies in Attachment D that neither it nor its principals or subcontractors are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal department or agency. (See Attachment D and the following United States General Services Administration’s System for Award Management website https://www.sam.gov). Proposer also certifies in Attachment D that if it or any of the subcontractors listed in the Proposal are business entities that must be registered with the California Secretary of State, they are registered and in good standing with the Secretary of State.
O. Unsatisfactory Performance
Proposer affirms that it has no record of unsatisfactory performance with the District in the twenty-four
(24) month period immediately preceding the date of issuance of this RFP.
P. Final Authority The final authority to award a contract(s) as a result of this RFP rests solely with the District Board of Supervisors, or as delegated by the Board of Supervisors.
Q. Department of Industrial Relations Registration Proposer must be registered with the Department of Industrial Relations as required by Senate Bill 854 (Chapter 28, Statutes of 2014) and Senate Bill 96 (Chapter 28, Statutes of 2017) to work on public works contracts as defined under the Labor Code.
R. Additional License Requirement The awarded Proposer will need to obtain the proper licensing/permit to access the selected sampling sites mentioned in the RWMP (Exhibit 1).
V. SCOPE OF WORK
A. BACKGROUND INFORMATION
The San Bernardino County Flood Control District, on behalf of the San Bernardino County, is engaged in a program to reduce the amount of pollutants entering the storm drain systems within its jurisdiction as mandated by the NPDES Phase 2 MS4 General Permit, Water Quality Order No. 2013-0001-DWQ, NPDES No. CAS000004, hereafter referred to as the “Permit”, and included herein as Exhibit 3. Exhibit 3 contains only the main body of the Permit. All Permit Attachments and the Fact Sheet can be found on the State Water Resources Control Board website:
(http://www.swrcb.ca.gov/water_issues/programs/stormwater/phase_ii_municipal.shtml ) https://www.sam.gov/ http://www.swrcb.ca.gov/water_issues/programs/stormwater/phase_ii_municipal.shtml
Request for Proposal Mojave River Watershed Group
Receiving Water Monitoring Program
Each jurisdiction covered under the Permit is responsible for implementing programs to achieve compliance within its boundaries. However, a number of programs could be implemented more cost effectively through cooperation amongst adjoining jurisdictions. To that end, the Member Agencies have formed the MRWG to conduct regional, sub-regional and multi-jurisdictional activities where applicable.
The current NPDES Phase 2 MS4 General Permit, requires the permittees to develop a water quality monitoring plan to comprehensively evaluate the water quality conditions within the Mojave River Watershed. More specifically, in accordance to provision E.13.d.1 (Receiving Water Monitoring) of the 2013 Phase II Small MS4 General Permit, selection of one upstream urban/rural interface monitoring site and one downstream urban area monitoring site was required as part of the development of a Receiving Water Monitoring Program (RWMP). During the April 23, 2014, MRWG meeting, the group requested information and guidance from Lahontan Regional Water Quality Control Board (LRWQCB) staff, Mary Dellavalle, regarding the selection of the upstream and downstream receiving water monitoring locations.
On May 28, 2014, Ms. Dellavalle responded through a letter providing recommendations on the selection of regional monitoring locations within the MRWG jurisdictional boundaries. Following the LRWQCB’s recommendations, the MRWG developed the RWMP by November 13, 2014, and secured the appropriate access permits for the recommended sampling sites from the U.S. Army Corps of Engineers, before initiating RWMP activities in late Spring/Summer of 2015. The MRWG submitted the RWMP, QAPP (attached as Exhibits 1 and 2, respectively), and the Baseline Receiving Water Monitoring Report as part of the Fiscal Year 2014-2015 Annual Report to fulfill the requirements of the 2013 Phase II MS4 Permit.
The MRWG is conducting this solicitation to retain a consultant to continue and, where applicable, improve upon the Receiving Water Monitoring Program to comply with the administratively continued Permit and any new Permit that may be issued.
B. PROJECT DESCRIPTION
The selected Proposer will provide monitoring services to continue the implementation of the MRWG’s Receiving Water Monitoring Program (RWMP) Plan as required by the Phase 2 Municipal Separate Storm Sewer System (MS4) Permit, Part E.13.d.1.
Monitoring will be carried out at two selected monitoring locations, the Urban/Rural Interface (Upstream Location), MR-URI, and the Urban Downstream Location, MR-UD. For details on location, analytical methods, and frequency for monitoring of each location, the MRWG as described above, developed a Receiving Water Monitoring Program Plan, and a Quality Assurance Project Plan (QAPP) back in 2014, which was approved by the LRWQCB. This document will serve as the guide to continue the MRWG’s monitoring program and continue to satisfy the requirements of the current Phase 2 MS4 Permit. Both the RWMP and the QAPP, will be included as Exhibit 1, and Exhibit 2, respectively.
Project reporting tasks will include collecting field photo logs, performing quality control on laboratory data obtained, data input and consolidation of laboratory data, and retrieving U.S. Geological Survey stream gage data. In providing the deliverables for all services provided, the selected proposer shall act in accordance with established County policies and procedures in the Agreement. At no time shall the selected Proposer perform work without written approval from the County. Also, the selected Proposer may not use subcontractors without prior written approval from the County.
C. ADDITIONAL REQUIREMENTS
Warranties, licensing, maintenance, change orders and modifications, extension or renewal, correction of performance deficiencies.
Two (2) monitoring locations (MR-URI & MR-UD), are located on U.S Army Corps of Engineers (USACE) property. The selected proposer, on behalf of the District, is expected to coordinate with the
Request for Proposal Mojave River Watershed Group
Receiving Water Monitoring Program
USACE and obtain proper licensing for access, allowing continuous/uninterrupted receiving water monitoring at both sites.
VI. PROPOSAL SUBMISSION
A. General
1. All interested and qualified Proposers are invited to submit a Proposal for consideration. Submission of a Proposal indicates that the Proposer has read and understands the entire RFP, including all appendixes, attachments, exhibits, schedules, and addenda (as applicable) and that all concerns regarding the RFP have been resolved.
2. Proposals must be received by the designated date and time. All proposers must register with the ePro system prior to the date and time to receive the proposal or they will be disqualified. Late or incomplete proposals will not be accepted. System-related issues in ePro shall be directed to the Purchasing Department at (909) 387-2060. For procurement questions involving ePro, please contact the RFP Contact identified in Section I, Paragraph A - Purpose.
3. The Proposer acknowledges that its electronic signature is legally binding. Submittals in ePro will be opened from the system’s encrypted lock box after the deadline and evaluated as stated in this RFP.
4. Paper responses may be submitted in lieu of electronic submission, by mail or in person to the RFP Contact and will be time/date stamped when received. Proposals can be withdrawn at any time prior to the scheduled Deadline for Proposals.
Hand carried Proposals may be delivered to the RFP Contact between the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday, excluding holidays observed by the County. Proposers are responsible for informing any commercial delivery service, if used, of all delivery requirements, and for ensuring that the address information appears on the outer wrapper or envelope used by such service.
5. For proposals submitted through ePro, the Proposer shall not include Attachment E, “Fee Proposal Sheet(s)”, as part of the proposal submittal, but instead shall upload Attachment E as a separate attachment, clearly labeled. The proposal and Attachment E must be received (separately) on or before the Deadline for Proposals in the manner described in Section 1, Paragraph B. Failure to comply with this requirement shall disqualify the Proposer.
6. For proposals submitted via hard copy, the Proposer shall not include Attachment E, “Fee Proposal Sheet(s),” as part of Proposer’s initial proposal, but instead shall mail or submit in person Attachment E, in a separate sealed envelope, clearly labeled with the RFP Number and Title and the name of the Proposer clearly marked on the outside, to the address stated in Section 1, Paragraph B. The proposal and Attachment E must be received (in separate envelopes) on or before the Deadline for Proposals in the manner described in Section 1, Paragraph B. Failure to comply with this requirement shall disqualify the Proposer.
7. Proposals must be submitted in the format described herein. Proposals are to be prepared in such a way as to provide a straightforward, concise description of capabilities to satisfy the requirements of this RFP.
8. Proposals must be completed in all respects as required in this section. A Proposal may not be considered if it is conditional or incomplete.
Request for Proposal Mojave River Watershed Group
Receiving Water Monitoring Program
B. Proposal Format Responses to this RFP must be in the form of a Proposal package, which must be submitted in the following format:
1. Presentation
Format the Proposal to fit on an 8-½ v 11 sheet of paper with margins of at least ¾ inches. Text should be single spaced and font size should be no smaller than 11 points. Each page, including attachments, must be clearly and consecutively numbered.
2. Cover Page Use Attachment A as the cover page.
This form must be fully completed and signed by an authorized officer of the Proposer.
3. Table of Contents All pages of the Proposal, including the enclosures, must be clearly and consecutively numbered and correspond to the Table of Contents.
4. Statement of Certification
Include the following on Attachment B:
a. A statement that the offer made in the Proposal is firm and binding for nine (9) months from the
Deadline for Proposals.
b. A statement that all aspects of the Proposal, including cost, have been determined independently, without consultation with any other Proposer (competitor) for the purpose of restricting competition.
c. A statement that all declarations in the Proposal and attachments are true and that this shall constitute a warranty, the falsity of which will entitle the District to pursue any remedy by law.
d. A statement that the Proposer agrees that all aspects of the RFP and the Proposal submitted shall be binding if the Proposal is selected and a Contract awarded.
e. A statement that the Proposer agrees to provide the District with any other information the District determines is necessary for an accurate determination of the Proposer’s ability to perform the Services as proposed.
f. A statement that the Proposer, if selected will comply with all applicable rules, laws and regulations.
g. A statement that the Proposer has reviewed the RFP and General Contract Terms in their entirety and have no exceptions to any requirements, terms or conditions, except as noted in Attachment H.
5. Statement of Experience and Qualifications
Include the following in this section of the Proposal:
a. Business name of the Proposer and type of legal entity such as corporation, partnership, etc. If
Proposer is a business entity that must be registered with the California Secretary of State, Proposer shall provide the District the entity number assigned to it by the Secretary of State.
b. Number of years the Proposer has been in business under the present business name, as well as related prior business names.
c. Statement that the Proposer does not have any commitments or potential commitments that may impact the Proposer’s ability to perform the Contract, if awarded.
6. Licenses, Permits, and/or Certifications
Provide copies of all licenses, permits and/or certifications in Attachment C as required under Section X. TERMS AND CONDITIONS Paragraph A, 21.
Request for Proposal Mojave River Watershed Group
Receiving Water Monitoring Program
The Services requested under this RFP include “public works” and “maintenance” services as defined in the California Labor Code. Under Labor Code section 1725.5 Consultant must be registered with the Department of Industrial Relations (DIR) at the time Consultant submits a Proposal. Include Consultant’s DIR registration number on Attachment C and the DIR registration number of all subcontractors who may be performing “public works” and “maintenance” Services if a Contract is awarded to Proposer.
The awarded Proposer will need to obtain the proper licensing/permit to access the selected sampling sites mentioned in the RWMP (Exhibit 1).
7. Reserved
8. Project Team Organization Chart
Provide an organization chart illustrating the project team, and clearly show the organization of the team and the hierarchy of the members. It must include:
a. Organizational framework for the proposed project team.
b. Company name and staff name for each role identified in the chart.
c. Resumes of key personnel, including qualifications, education and project experience
9. Proposal Description The Proposal should include the following:
a. A brief synopsis of the Proposer’s understanding of the District’s needs and how the Proposer plans to meet them.
b. A detailed statement of the proposed Services.
c. An explanation of any assumptions or constraints.
10. Work Plan and Schedule
Include the following:
a. Summary of management/work plan for this Project.
b. Project schedule
11. Certification Regarding Debarment or Suspension Complete Attachment D.
12. Cost Complete proposed pricing on Attachment E and enclose it in a separately sealed and labeled envelope or file, submitted along with the Proposal.
13. References Provide three (3) references from other entities, preferably public agencies, of same or similar size as the District, with whom you have established a contract on a project of this nature. Provide Contact Name, Address, Phone Number, email, and dates Services were provided on Attachment F.
14. Former County Officials Complete Attachment G
15. Exceptions to RFP Complete Attachment H.
16. Public Records Act Exemptions Complete Attachment I – Public Records Act Exemptions if applicable.
Request for Proposal Mojave River Watershed Group
Receiving Water Monitoring Program
17. Indemnification and Insurance Requirements Affidavit Submit evidence of ability to insure as stated in Section X, Paragraph B – Indemnification and Insurance Requirements. Proposer must complete and submit Attachment J – Indemnification and Insurance Requirements Affidavit, and ensure the form is complete, including the signature from Proposer’s insurance broker/agent.
18. Conflict of Interest Complete Attachment L – Conflict of Interest and Political Reform Act Obligations.
VII. EVALUATION
Proposals will be subject to an Initial Review to confirm responsiveness, by determining whether each Proposal includes the stipulated content, required certifications or licensing, etc., and is presented in the required format, in order for the Proposal to advance for evaluation. Any reasonable person reviewing for responsiveness must be able to ascertain that the Proposal meets these requirements.
The evaluation process includes the following categories, and may include additional specific criteria.
Likewise, the listed considerations are possible considerations, and may not be the only factors involved in the evaluation.
A. QUALIFICATIONS AND EXPERIENCE
Weight: 40% Considerations:
• Proposer background and reputation
• Qualifications of the project team
• Experience with local approval agencies
• Experience with similar services and entities
B. RESERVED
C. TECHNICAL REVIEW
Weight: 40% Considerations:
• Statement of understanding of the County’s needs
• Work plan
• Scheduling
• Technical specifications and functionality
• Quality control
• Adequacy of support staff and subcontractors
D. REFERENCES
Weight: 20% Considerations:
• Satisfactory performance of similar work
• Quality of interactions
• Likelihood of continued use
The District may, at its sole discretion, create a shortlist of Proposals for further evaluation; require an oral interview, presentation, or demonstration; and utilize outside experts to assist in the evaluation process.
The District will establish an evaluation panel with responsibility for reviewing all Proposals and conducting the qualifications evaluation. A Facilitator will manage the integrity of the qualifications evaluation process
Request for Proposal Mojave River Watershed Group
Receiving Water Monitoring Program and will not be a voting member of the evaluation panel. An initial meeting will be scheduled and held with the evaluation panel members, wherein the Facilitator will distribute all relevant documents to the evaluators including the RFP, evaluation criteria, and evaluation instructions.
After the initial meeting, evaluators will independently review and score the Proposals. The evaluation panel will then convene again to discuss the individual scores to resolve questions and to discuss the basis for individual scores, but not for the evaluators to agree upon scoring. At the end of this discussion, each evaluator will be given an option to revise his/her scores.
Evaluators will make independent determinations for scores, including review and understanding of any additional information obtained by the group discussion. In the event a score is revised, the evaluator will document the new score and provide comments to support the revision.
If clarifying information is needed at any point, the Facilitator will contact Proposer(s) to obtain the necessary information. The Facilitator will then provide the information to the evaluation panel electronically or verbally, as appropriate.
If the qualifications evaluation process includes components such as oral interviews, product demonstration, and/or site visits, the Facilitator will coordinate those with evaluators. Individual scoring and any subsequent evaluation panel meetings with respect to such components must be conducted.
Once all scorings are finalized and documented, the Facilitator will create a final qualifications evaluation scoring worksheet and rank the proposals first, second, third, etc.
Following the qualifications evaluation and ranking of the proposals, the Facilitator will open all fee proposals.
The ranking of the proposals will not be altered once the fee proposals have been opened. However, the fee proposals will be used during negotiations with the selected Proposer(s).
VIII. NEGOTIATIONS AND NOTICE OF INTENT TO AWARD
The District may require the potential Proposer(s) selected to participate in negotiations. This may include cost, technical, or other clarifications needed to make a decision.
A. Contract Negotiation
After selection, negotiations may be conducted with the Proposer(s) of the highest-ranked Proposal(s).
Negotiations, if held, shall be within the scope of work in the request for Proposals.
If the contract negotiations take place in San Bernardino County, California, the Proposer will be responsible for its travel and per diem expenses of its personnel.
B. Failure to Negotiate
If the selected Proposer:
1. Fails to provide the information required to begin negotiations in a timely manner; or
2. Fails to negotiate in good faith; or
3. Indicates it cannot perform the Contract within the budgeted funds available for the services; or
4. If the Proposer and the District, after a good faith effort, simply cannot come to terms;
Then the District may terminate negotiations with the Proposer initially selected and commence negotiations with the next highest ranked Proposer.
Request for Proposal Mojave River Watershed Group
Receiving Water Monitoring Program
C. Notice of Intent to Award (NOIA) – Proposer Notification of Selection After the completion of Contract negotiations a written or electronic Notice of Intent to Award (NOIA) and denial letters (or a copy of the NOIA) will be issued to all Proposers. The issuance date of the NOIA is the date the NOIA was delivered by email or into the care of the United States Postal Service for delivery to the Proposer.
D. Reserved
E. Award A Contract will be awarded based on a competitive selection of Proposals received. The contents of the Proposal of the successful Proposer will become contractual obligations and failure to accept these obligations in a Contract may result in cancellation of the award.
IX. APPEAL AND AWARD
In the event a dispute arises concerning the Proposal process prior to the award of the Contract, the Proposer raising the dispute shall submit a request for resolution in writing to the Purchasing Agent. Proposer may appeal the recommended award or denial of award (Protest), provided the Protest:
1. Is submitted in writing.
2. Is submitted within ten (10) calendar days of the issuance date of the NOIA.
A Protest can only be brought on the following grounds:
1. Failure of the District to follow the selection procedures and adhere to requirements specified in the RFP or any addenda or amendments.
2. Violation of conflict of interest as provided by California Government Code Section 87100 et seq.
3. Violation of State or Federal law.
Protests will not be accepted for any other reasons than those stated above. All Protests must be sent to:
Pete Mendoza, Director
Purchasing Department 777 E. Rialto Avenue San Bernardino, CA 92415-0760
Upon receipt of the formal Protest, the Purchasing Agent, or his/her designee, will attempt to resolve the Protest. A Protest shall be disallowed when, in the judgment of the Purchasing Agent it has been submitted:
(1) as a delay tactic; (2) for the purpose of posturing the Proposer advantageously for future procurement;
(3) in a form that deviates from the one prescribed; (4) without adequate factual basis or merit; or (5) in an untimely manner.
The Purchasing Agent shall make a decision concerning the appeal, and notify the Proposer submitting the Protest, within a reasonable timeframe prior to the tentatively scheduled date for awarding the Contract. The decision of the Purchasing Agent shall be deemed final.
Alternatively, at the Purchasing Agent’s discretion, an Appeal Panel consisting of five (5) members appointed by the Purchasing Agent shall hear the Protest. The Proposer will be provided reasonable notice of the time, Request for Proposal Mojave River Watershed Group
Receiving Water Monitoring Program date and location of the hearing. In the event that a protesting Proposer does not appear at the Protest hearing as scheduled, the Protest will be disallowed.
The hearing is informal, in that it is not subject to the strict rules of evidence or procedure, and live witnesses, if any, will not be sworn. All relevant evidence is admissible, including hearsay. It will be up to the Appeal Panel members to consider the credibility of the evidence and the weight to give it.
The Panel will determine by at least three (3) affirmative votes: 1) whether the Protest was submitted timely;
2) whether the Protest is based on at least one of the three designated grounds identified above; and 3) whether the grounds on which the Protest are based have been substantiated.
If any of the grounds are determined to be valid, the Panel will also decide if the valid portion of the Protest has so tainted the RFP process that it is unfair to the Proposer or whether the valid grounds for the Protest are in the nature of harmless error and that the RFP process was fair to the Proposer. The Panel will not re-evaluate the Proposals.
The Purchasing Agent shall notify the Proposer making the Protest of the decision, within a reasonable timeframe prior to the tentatively scheduled date for awarding the Contract. The decision of the Appeal Panel shall be deemed final. If the Contract must be approved by the Board, after receiving a decision from the Purchasing Agent or Appeal Panel, the Proposer may then present its Protest to the Clerk of the Board of Supervisors for the Board’s review and decision. The Proposer must file its written Protest with the Clerk of the Board or provide a verbal Protest (typically limited to three minutes) prior to the Board making a decision on the Contract. Any decision of the Board shall be deemed final.
A Proposer protesting the results of any of the processes described herein must follow the procedures set forth. By submitting a “Letter of Intent to Protest”, the Proposer has agreed that the protest procedures herein shall precede any action in a judicial or quasi-judicial tribunal regarding this Proposal. Protests that do not follow these procedures shall not be considered. The protest procedures constitute the sole administrative remedy available to the Proposer under this RFP. Upon exhaustion of this remedy no additional recourse is available.
X. TERMS AND CONDITIONS
The selected Proposer will be required to enter into a formal Contract with the District. This RFP sets forth some of the general provisions which will be included in the final Contract. In submitting a response to this RFP, Proposer will be deemed to have agreed to each clause unless the Proposal identifies an objection and District agrees to a change of language in writing. All objections to any Terms and Conditions must be listed on Attachment H – Exceptions to RFP, or any exception thereto shall be waived.
A. General
1. Contract Amendments Consultant agrees any alterations, variations, modifications, or waivers of the provisions of the Contract, shall be valid only when reduced to writing, executed and attached to the original Contract and approved by the person(s) authorized to do so on behalf of Consultant and District.
2. Contract Exclusivity
This is not an exclusive Contract. The District reserves the right to enter into a Contract with other Contractors for the same or similar Services. The District does not guarantee or represent that the Consultant will be permitted to perform any minimum amount of work, or receive compensation other than on a per order basis, under the terms of this Contract.
3. Attorney’s Fees and Costs
Request for Proposal Mojave River Watershed Group
Receiving Water Monitoring Program
If any legal action is instituted to enforce any party’s rights hereunder, each party shall bear its own costs and attorney’s fees, regardless of who is the prevailing party. This paragraph shall not apply to those costs and attorney’s fees directly arising from a third-party legal action against a party hereto and payable under the Indemnification and Insurance Requirements.
4. Background Checks for Consultant Personnel Consultant shall ensure that its personnel (a) are authorized to work in the jurisdiction in which they are assigned to perform Services; (b) do not use legal or illegal substances in any manner which will impact their ability to provide services to the District; and (c) are not otherwise disqualified from performing the Services under applicable law. If requested by the District and not in violation of applicable law, Consultant shall conduct a background check, at Consultant’s sole expense, on all its personnel providing Services. If requested by the District, Contractor shall provide the results of the background check of each individual to the District. Such background check shall be in the form generally used by Consultant in its initial hiring of employees or contracting for contractors or, as applicable, during the employment-screening process but must, at a minimum, have been performed within the preceding 12-month period.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .