This is a Request for Proposals (RFP) issued by the Village of Wilson, NY for a Water Asset Management Plan funded by a $50,000 CDBG Planning grant. The project involves evaluating and documenting the condition of the Village's water system, which includes 7.9 miles of waterlines, 542 service connections, and 164 fire hydrants serving approximately 1,305 people. The scope of work is divided into four main tasks: system inventory and assessment (6 months), level of service determination (2 months), asset prioritization (2 months), and implementation planning (2 months). Proposals are due March 5, 2025 by 3PM, with potential interviews on March 6-7, 2025, and an award date of March 10, 2025. The project must be completed by January 26, 2026.
The total project budget is estimated at $53,000, with $50,000 coming from the CDBG Planning grant. The RFP strongly encourages proposals from Minority and Women-Owned Business Enterprises (MWBE). Evaluation criteria include responsiveness and quality (15%), project understanding (10%), cost (15%), team reputation (10%), qualifications (10%), RFP compliance (15%), resource adequacy (10%), and relevant experience (15%). Proposals must include a detailed budget broken down by task and team member billing rates. The project aims to benefit low-to-moderate income residents and prepare the Village for future federal, state, or local funding opportunities.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposals
Village of Wilson
Water Asset Management Plan
Background and Purpose of Study
The Village of Wilson was awarded a $50,000 CDBG Planning grant to complete an estimated $53,000
Village wide Water Asset Management Plan. The plan will evaluate and document the condition of the
Village ’s water system, identify needed water system improvements, and provide an implementation strategy to address the needs, including grant resources, to reduce Village cost burdens. Expected outcomes and deliverables include:
• The plan would include immediate, short-term, and long-term project planning for the entire
Village including assessments of existing facilities as well as identifying and documenting the need for projects, alternative evaluations, proposed projects, and cost estimates.
• Determination of implementation projects that will meet a national objective under the CDBG program and/or prepare the community for other Federal, State, or Local funding programs.
• Providing benefits to low- and moderate- income families and improving health and safety of the community.
• Alleviate the increased cost burden of higher water rates that all citizens will face if the Village of
Wilson delays investigation of necessary improvements
• Planning for future anticipated regulatory changes
The Niagara County Water District (NCWD) supplies water to the Village of Wilson through transmission mains and 3 master meters. The village distribution system is fed by these transmission mains and operated by the Village Water Department. The village service area consists of approximately 7.9 miles of waterlines, 542 service connections, including 164 fire hydrants and valves and serves approx. 1305 people.
Parts of the system are more than a century old, coming into service between 1917- 1919. Consequently, the village needs to document, inventory, and prepare a Water Asset Management Plan to ensure the long-term sustainability of the water supply system.
Scope of Work
The proposed scope for the study is as follows:
Task 1: Inventory and assessment of the current system (6 months):
a. Inventory the entire system in tanks, filtration plant, distribution lines, transmission lines, hydrants, pump stations, and equipment
b. Input data for each component into an asset management software platform including asset name, useful life, age, condition, remaining useful life, service history
c. Input location and associated data into a geographic information system that is linked to the asset management platform
d. Hold first public meeting
e. Interview key stakeholders
Task 2: Determine the level of service (LOS) for each component (2 months)
a. Define LOS based on regulatory requirements and customer service expectations
b. Assess the performance of the system and its components related to the required LOS
Task 3: Prioritize assets and establish reserve needs (2 months):
a. Prioritize based on:
i. Expected LOS and performance
ii. How critical the component is to system performance, regulations, and customer needs
b. Estimate years until failure (lifecycle)
c. Estimate cost to repair, rehabilitate, or replace
d. Based on 3b & 3c – established required annual reserve for each component
Task 4: Prepare an implementation and funding plan & final report (2 months):
a. Implementation and strategy for improvements will incorporate output of asset management platform and modifications of water system staff.
b. Prepare a multi-year funding strategy including reserves, potential rate adjustments, and grant funding. Funding will include CDBG Infrastructure funding, EFC Infrastructure funding and federal funding through EPA. The grant funding strategy will also include dates to complete associated
c. Provide a separate GIS layer for proposed improvement timeframes
d. Identify which projects would benefit low-to-moderate income people by overlaying the
GIS system improvement date with the HUD low-to-moderate income GIS layer for the
Village, census tracts and block groups.
e. Hold final public meeting to provide opportunities for public input on recommendations and findings
f. Assist Village with annual and semi-annual reporting
MWBE Encouragement
The Village of Wilson strongly encourages proposals from Minority and Women-Owned Business
Enterprises (MWBE). We are committed to fostering diversity and inclusion by providing equal opportunities for all qualified businesses. MWBEs are especially encouraged to apply for this CDBG-funded project.”
Proposal Format
Proposals should include a one-page cover letter, printed on official letterhead and signed by an authorized representative of the firm or institution. The proposal should include the following sections:
Part A: Project Understanding, Approach and Scope of Work- A narrative of the understanding of the project objectives, scope of work and timeline and the firm’s approach to this scope.
Part B: Relevant Experience - A listing and/or project sheets of recent and relevant experience in similar projects that includes the firms function during those projects
Please provide three (3) professional references on recent and relevant projects.
Part C: Project Team - Organizational Chart and one-page resumes of key personnel of the
Consultant and all subconsultants that will be committed to the project. Resumes shall indicate the individual’s defined role on this project and examples of their relevant experience.
Part D: Cost Proposal - Provide a detailed budget broken down by task and estimated expenses
Provide billing rates for all team members.
Submission Process
Proposals must be submitted no later than the date and time specified in the Schedule at the end of this
RFP. No late submissions will be considered. Applicants must submit their proposals (one original and three copies) in paper form in a sealed envelope submitted to the Village offices by mail or hand delivered as well as in electronic form (PDF):
Gregory R Martin, Deputy Mayor
Village of Wilson
PO Box 596
375 Lake St
Wilson, NY 14172.
Please submit requests for clarifications in writing via email to VOW@VillageofWilson.org
Evaluation Process
The Village of Wilson will screen all proposals to ensure they meet all requirements of this RFP. If a proposal is found to be incomplete, the proposal may be eliminated from the competition. Proposals will be evaluated on the applicant’s demonstrated ability to
(a) Responsiveness, thoroughness and overall quality of the proposal 15%.
(b) Presentation of an understanding of project 10%.
(c) Cost of services 15%.
(d) Professional reputation of team 10%.
(e) Relevant qualifications and experience of personnel to be assigned to the project 10%.
(f) Compliance with all RFP requirements 15%.
(g) Demonstration of adequate resources to supply said services 10%.
(h) Demonstration of a history of supplying similar services 15%.
Notification of Awards
Prior to the award of the project, qualified applicants may be asked to participate in an interview, the date of which is to be determined. The award recipient may be asked to submit a revised work plan, timeline, and budget. Projects cannot start until the contract is signed by both parties. The Village will not pay for expenses incurred prior to a contract being in place.
Schedule
RFP Release: February 7, 2025
Deadline for Questions: February 21, 2025
Sealed Proposals due to the Village: March 5, 2025, 3PM
If required, interviews: March 6th and March 7th, 2025
Award Date: March 10, 2025
Project Duration: The project must be completed by January 26, 2026.