This Request for Proposals document is issued by the Board of Water, Light and Sinking Fund Commissioners of the City of Dalton, Georgia (d/b/a Dalton Utilities) for the Eastern Water Distribution System Reliability Project. The project involves constructing water rehabilitation infrastructure across approximately 34 roads in Dalton, Georgia, including the installation of new water mains (both 6-inch and 8-inch Class 350 ductile iron pipe), fire hydrants, water services, valves, and appurtenant facilities, along with pavement repairs, grassing, and restoration work to return post-construction conditions to equal or better than pre-construction conditions. The scope encompasses multiple linear feet of pipeline installation varying by road segment, with specific quantities detailed for each of the 30 separate bid sheets corresponding to individual road projects. Sealed proposals must be received by 2:00 p.m. local time on December 14, 2026, at the Dalton Utilities Administration Building. A mandatory pre-qualification package submission is required by 5:00 p.m. on November 30, 2026, with bidder notifications by 5:00 p.m. on November 31, 2026. A mandatory pre-bid meeting is scheduled for December 3, 2026, at 2:00 p.m., with attendance required for bid consideration. All work must be completed within 455 calendar days of the notice to proceed, with contractors expected to commence work within three weeks of bid award.

Bidders must provide complete pricing for labor, equipment, and materials on a unit price basis for all line items, with prices inclusive of overhead, profit, insurance, and all erosion control measures. A bid bond equal to 10 percent of the total bid amount is required, along with performance and payment bonds each equal to 100 percent of the contract price. Liquidated damages are assessed at $1,000 per calendar day for failure to meet the completion deadline. Bidders must hold a valid Georgia Utility Contractor License and possess all applicable federal, state, and local licenses and permits. Pre-qualification requirements include demonstrated corporate experience of at least four years under the current name, sufficient bonding capacity, access to adequate equipment, a history of on-time and on-budget project completion, no involvement in litigation within the past five years, and available project management personnel with at least two years of relevant experience. Technical experience requirements mandate submission of two water main expansion or installation projects of similar scale completed or started between January 1, 2022, and January 1, 2026, with minimum project values of $2,000,000 or subcontracted portions of at least $6,000,000. All contractors and subcontractors must comply with the E-Verify Program pursuant to Georgia Security and Immigration Compliance Act (SB 529). The contract will be awarded to the lowest responsible and responsive bidder based on a combination of price, schedule, previous experience, references, and other criteria as determined by Dalton Utilities, with the Owner reserving the right to reject any or all bids.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

November 2026

REQUEST FOR PROPOSALS

CONTRACT, PLANS AND SPECIFICATIONS

FOR

CONSTRUCTING WATER REHABILITATION

THE BOARD OF WATER, LIGHT AND SINKING FUND COMMISSIONERS

OF

THE CITY OF DALTON, GEORGIA

EASTERN WATER DISTRIBUTION SYSTEM RELIABILITY

PROJECT

COMMISSIONERS

JOE YARBROUGH – CHAIRMAN

KEVIN BRUNSON

TOMMY BOGGS

ED ANTHONY

JACKIE KILLINGS

JOHN THOMAS

CHIEF EXECUTIVE OFFICER

TABLE OF CONTENTS

EASTERN WATER DISTRIBUTION SYSTEM RELIABIITY PROJECT

FOR

THE WATER, LIGHT AND SINKING FUND COMMISSION

OF

THE CITY OF DALTON, GEORGIA

Advertisement for Bids……………………………………………….…………… 001113

Instructions to Bidders………………………………………………….…………. 002113

Bid…………………………………………………………………….…………… 004113

Non-Collusion Affidavit of Prime Bidder…………………………….…………... 004519

Corporate Certificate………………………………………………….…………… 004543

Statement of License Certificate…………………………………………………...

E-Verify Affidavit…………..……………………………………………………..

004546

004549

Construction Contract…………………………………………………………….. 005213

SRF Supplemental General Conditions……………………………………………

Performance Bond…………………………………………………………………

GEFA

006113.13

Payment Bond…………………………………………………………………….. 006113.16

General Requirements and Conditions……………………………………….…… 007213

Allowances………………………………………………………………………… 012100

Owner Supplied Materials…………………………………………………………

Technical Specifications

012126

Trenching and Backfilling……………………………………………………. 312333

Erosion and Sedimentation Controls………………..………………………...

Boring and Jacking……………………………………………………………

312500

3330523.16

Asphalt and Concrete Pavement...……………………………………………

WC Roads Pavement Cut Detail

Water Main and Accessories…….……………………………………………

Attachments:

1. Water Index

2. Plan Sets

331100

340113

ADVERTISEMENT FOR

BIDS

001113

ADVERTISEMENT FOR BIDS

EASTERN WATER DISTRIBUTION SYSTEM RELIABILITY PROJECT

FOR

THE BOARD OF WATER, LIGHT AND

SINKING FUND COMMISSIONERS

OF THE

CITY OF DALTON, GEORGIA

D/B/A DALTON UTILITIES

Print Date: 11/2/2026

Sealed Proposals for EASTERN WATER DISTRIBUTION SYSTEM RELIABILITY

PROJECT for the BOARD OF WATER, LIGHT AND SINKING FUND COMMISSIONERS

OF THE CITY OF DALTON, GEORGIA D/B/A DALTON UTILITIES (“Owner”) will be received in the Auditorium of the Dalton Utilities Administration Building at 1200 V.D. Parrott

Jr. Parkway until 2:00 P.M. local time December 14, 2026, at which time they will be publicly opened and read.

Work to be Done: The work to be done (hereinafter referred to as “Work”) consists of furnishing all materials and equipment, except those specified in the Bid, and performing all labor necessary for the following project (hereinafter referred to as “Project”):

Construct the Eastern Water Distribution System Reliability Project as shown in the drawings and specifications. The project will include the construction of multiple roads: Tibbs Bridge Rd, Headrick Circle, N. Woodland Dr, Keeter Rd, Riverside Dr, North Dr, Timberlake Dr, Sane Rd, Cavender Rd, Riverbend Rd, Bettis Rd, Gordon Dr, Shirley Dr, Matha Sue Dr, Leon Cr, Conasauga Way, Deal Dr, Greenson Bend, Jackson Kinnamon, Ridley Rd, Callie Jones, Barney

Pierce, Thorton Rd, Adam Rd, Stafford Rd, Keswick Dr, Pannel Dr, Cochran Dr, Hwy 225, Hwy

52 Alt, Crestview Dr, Vann Cr, & Mary Sue.

Rehab will consist of replacing existing pipe infrastructure, valves, fire hydrants, installing new services, connecting existing mains, driveway crossing (rock/concrete), etc…

The Contractor’s work also includes all erosion, sedimentation, and pollution control necessary for the project. The cost of any permits required for erosion control and land disturbing will be borne by the Owner. The Contractor will be responsible for the cost of any other permits or licenses required to complete the work. The Contractor will complete all necessary clean-up and restoration work to include filling, finish grading, grassing, landscaping, pavement repairs, driveway repairs, culvert repairs, drainage ditch restoration and other necessary restoration activities such that post construction conditions are EQUAL TO OR BETTER than those conditions that existed prior to any construction activity occurring.

The Owner is authorized to issue change orders, without the necessity of additional requests for bids, within the scope of the Project when appropriate or necessary in the performance of the contract. No additional work shall be performed unless authorized by the Owner. The bidder declares that it understands that the unit price quantities shown in the proposal are subject to

001113-2

Advertisement for Bids adjustment by either increase or decrease, by the Owner, and that should the quantities of any of the items of the work be increased, the bidder proposes to do the additional work at the unit prices stated herein; and should the quantities be decreased, the bidder also understands that payment will be made on actual quantities at the unit price bid and will make no claim for anticipated profits for any decrease in the quantities, and that quantities will be determined upon completion of the Work at which time adjustment will be made to the contract amount by direct increase or decrease.

Bidder Pre-qualification: Pre-qualification of bidders for this project is required. Bidders must submit a pre-qualification package containing requested information to the office of Dalton

Utilities by 5:00 P.M., local time, Monday, November 30, 2026. All applicants submitting pre-qualification documentation will be notified of their status via phone call to the contact person listed on the package by 5:00 P.M. Tuesday, November 31, 2026. Only bids submitted by properly pre-qualified bidders will be opened.

Mandatory Pre-Bid Meeting: A mandatory pre-bid meeting will be held on Thursday, December 3, 2026, at 2:00 pm in auditorium at Dalton Utilities administrative building, addition information will be sent out to qualified bidders. If pre-qualified bidders do not attend, then Dalton Utilities will not open a bid from this contractor.

Time Allotted: All work as specified herein shall be completed within 455 calendar days of notice to proceed. Contractors submitting bids on project must be prepared to proceed with work within three weeks of bid opening.

Bids: Bids shall contain complete and detailed prices for labor, equipment, and construction materials for all items listed.

Contractor’s License: All bidders must possess any and all licenses and permits as may be required by applicable federal, state and/or local law/ordinances. The Georgia Utility

Contractor License Number shall be written on the face of the bid.

Performance and Bid Bond: A bid bond will be required in the amount of 10% of the total bid amount. A contract performance bond and a payment bond, in an amount equal to one hundred percent (100%) of the contract price, will be required of the successful bidder.

Withdrawal of Bids: Except as provided in O.C.G.A. Section 36-91-43, no submitted bid may be withdrawn for a period of sixty (60) days after the scheduled closing time for the receipt of bids.

Additional Instructions to Bidders, Drawings, Specifications and Contract Documents:

Additional instructions to bidders, drawings, specifications, and other contract documents may be examined at Dalton Utilities, Watershed Engineering Services, 1200 V.D. Parrott Jr. Parkway, Dalton, Georgia. Drawings, Specifications and Contract Documents may be obtained at Dalton

Utilities’ website https://www.dutil.com/engineering/ or in person at Dalton

Utilities, 1200 V.D. Parrott Jr. Parkway, Dalton, Georgia 30721.

001113-3

Advertisement for Bids

Acceptance or Rejection of Bids: The right is reserved to accept or reject any and all bids and to waive technicalities and informalities.

Statutory Requirements: Notwithstanding any provision of this advertisement, all proposals must also comply with the minimum applicable requirements of Chapter 91 of Title 36 of the

Official Code of Georgia Annotated.

E-Verify Requirements: All contractors and subcontractors performing work for Dalton Utilities must participate in the E-Verify Program pursuant to the Georgia Security and Immigration

Compliance Act (SB 529).

THE BOARD OF WATER, LIGHT AND SINKING FUND

COMMISSIONERS OF THE CITY OF DALTON, GEORGIA

By: John Thomas, Chief Executive Officer

INSTRUCTIONS TO

BIDDERS

002113

Print Date: 11/02/2026

INSTRUCTIONS TO BIDDERS

EASTERN WATER DISTRIBUTION SYSTEM REALIABILITY PROJECT

FOR

THE BOARD OF WATER, LIGHT AND SINKING FUND COMMISSIONERS

OF THE

CITY OF DALTON, GEORGIA

D/B/A DALTON UTILITIES

Bids received until 2:00P.M., Local Time, December 14, 2026

INSTRUCTIONS TO BIDDERS

I. Definitions:

Unless otherwise defined in this document, capitalized terms have the meaning defined in the Contract.

II. Evaluation of Bidders:

The Contract will be awarded pursuant to O.C.G.A. Section 36-91-21 to the lowest responsible and responsive bidder whose bid meets the requirements and criteria set forth in the invitation for bids. A responsible bidder is a person or entity that has the capability in all respects to perform fully and reliably the Contract requirements as determined by Dalton Utilities (“Owner”). A responsive bidder is a person or entity that has submitted a bid that conforms in all material respects to the requirements set forth in the invitation for bids as determined by Owner. Factors to be considered may include, but are not necessarily limited to the following:

A. Determination of Contract Awardee:

1. The Owner reserves the right to award the project to the Contractor who presents a bid that is determined to be the best overall value to the Owner. This does not guarantee award of the project to the lowest bidder. Award of this contract will be based on a combination of price, schedule, previous experience on similar projects, references from other sources having employed the contractor, and all other requirements detailed in this document and all contract documents.

002113-2

Instructions to Bidders

The Owner will determine which is the lowest responsible and responsive bidder based on:

a) Completeness: The completeness and regularity of the bid form.

b) Exclusions: Bid form without exclusions, alternatives, or special conditions.

c) Contract Time: The Contractor has a maximum of 455 calendar days to complete the project.

2. Bidder’s ability to begin the Work on this Project within three weeks upon the award of the Contract with sufficient resources to complete the Project by the Completion Date and maintain timely progress as determined by the Owner.

B. Qualifications of Bidders:

1. Each bidder must submit as part of its bid proposal a completed

Statement of Bidder’s Qualifications

2. The bidder must maintain a permanent place of business.

3. The bidder must have adequate technical experience on similar projects of comparable size.

4. The bidder must have sufficient resources (including but not limited to labor, equipment, and financial resources) to complete the Project by the Completion Date and maintain timely progress as determined by the Owner. The bidder should consider existing commitments in determining adequate personnel and equipment availability throughout the Project so as to stay on schedule and finish all Work by the Completion Date.

5. The bidder shall possess all necessary certifications for the bidder as an entity, for individuals it employs, and for all associated equipment to complete the Project by the Completion Date. Any reference made to necessary certifications includes but is not limited to conforming to the standards of all applicable technical society, organization, body, code, and standards. The bidder shall provide all materials needed to meet or exceed these necessary certifications including material fabrication, and the bidder shall provide all necessary testing and installation. In a case where the Owner establishes a more stringent qualification, the more stringent qualification shall prevail. In

002113-3 addition, necessary certifications shall include all applicable requirements of local codes, utilities, and any other authorities having jurisdiction regarding the Project. The bidder must have a damage prevention program in place providing for coordination of excavating with the Utilities Protection Center of Georgia and have the provisions for a readily available location for the excavation permit on site for the particular excavation. This information shall be delivered in writing prior to commencement of Work on the Project.

6. The bidder shall have all necessary licenses and permits to complete the Project by the Completion Date. All licenses and permits must give the bidder authority to perform the Work including similar licensing for reference in the bidder’s State of origin. This includes any permits required by Whitfield County for pavement cuts.

7. If the Contract is awarded to the bidder, the bidder must obtain and maintain insurance coverage of the types and amounts set forth in the Construction Contract.

III. Site Examination and Sub-Surface Conditions:

The bidder is expected to examine the location of the Project and to inform itself fully as to the conformation of the ground; the character of equipment and facilities needed preliminary to, and during the performance of the Work; the general and local conditions; and all other matters that can in any way affect the Work to be done.

A sub-surface investigation has not been made on any portion of the work site by Dalton Utilities. As such, the amount of rock excavation and unsuitable materials is unknown. The bidder shall make its own analysis of the materials to be encountered and include prices for removal and replacement of these materials in its unit prices.

IV. Interpretation of Drawings and Specifications:

If any entity contemplating submitting a bid for the Project has any question as to the true meaning of any part of the Drawings, Specifications, or other Contract Documents, or as to the scope of any part of the Work, it shall submit to the Owner a written request for an interpretation thereof. The entity submitting the request will be responsible for its prompt delivery in ample time for an interpretation to be issued before the bid opening date. Questions must be received by 2:00 pm on Monday, December 7, 2026. No questions will be answered within 72 hours of bid opening. Interpretations of the documents will

002113-4 be made only by addendum, and a copy of the addendum will be posted on the Owner’s website 72 hours prior to bid opening. The Owner will not be responsible for other interpretations of the documents. The bids shall be opened publicly, and evaluated by the Owner without discussion with the bidders.

V. Complete Work Required:

The Specifications, the Drawings, and all Contract Documents are essential parts of the Contract. Application requirements occurring in one are as binding as though occurring in all. All requirements are intended to be complementary, and to describe and provide for the complete Work.

VI. Pre-qualification Submittal:

1. The bidder shall provide Corporate experience including:

a.) The applicant has operated under the current corporate name for the last 4 years.

b.) Provide name, address, and telephone number of applicant’s corporate headquarters, relevant regional office(s) and subsidiaries, if any.

c.) Provide name, title and biographical summary of all corporate officers.

d.) The applicant has sufficient bonding capacity to provide performance and payment bonds, both in the amount of 100 % of the contract amount. Provide a statement of bonding capacity, bonding company, insurance agent contact persons, and telephone numbers.

e.) The applicant has access to adequate equipment to complete the project. Provide a list of major equipment proposed to perform the work and indicate whether owned or leased.

f.) The applicant has never failed to complete a project. Provide a statement that the applicant has never failed to complete a project.

If this is not the case, explain.

g.) The applicant has a history of completing projects consistently on time and within the bid amount. Contractor must provide a statement of any projects that were not completed on time.

Provide a statement that the applicant has not been involved in liquidated damages in the past 5 years or served the Owner with a claim for additional compensation prepared by an attorney or a claims consultant, excluding routing change order requests. If this is not the case, explain.

h.) The applicant has a history of not being involved in litigation against Owners or Engineering Firms. The applicant should

002113-5 provide a statement that they have not been involved in litigation as a plaintiff against the Owner or Engineering Firm in the past 5 years. If this is not the case, please explain.

i.) The applicant has available project management personnel with at least two years’ experience on projects with the technical characteristics listed in paragraph 2 below to complete the project.

Provide experience of proposed on-site project manager and/or field superintendent who would supervise and be in charge of the project. Experience can be from a previous employment but must be pertinent to technical information listed in paragraph 2. If your firm is the successful bidder, at least one of these key personnel must be actively involved in the day-to-day operations of the Eastern Water Distribution System Reliability Project in Whitfield County, Georgia.

j.) List all other projects currently under contract, the current contract amounts, and scheduled completion dates.

k.) Contractor must provide OSHA Incident Rate for the past three (3) years.

2. The bidder shall provide Technical Experience including:

a.) Two water main expansion / installation projects of similar scale and technical difficulty of the Eastern Water Distribution

System Reliability Project. must have been completed or started within the time frame of January 1, 2022 and January 1, 2026.

Each of these projects must be complete or progressing on schedule as of January 1, 2026. Dalton Utilities will consider experience performed as a sub-contractor, provided that these projects were completed ahead of schedule and under budget.

b.) Projects must be at least $2,000,000 or that portion of a sub-contracted project must have been equal to or greater than $6,000,000.

c.) Contractor must have previous experience with the installation of water mains. List previous experience.

3. Provide the information specified below for each of the above projects:

a.) Name of the project as bid; name of Owner; name of engineering firm; name, position or title, address and telephone number of contact person currently employed by each of the above; percent of labor related items performed by the applicant’s own work force.

b.) A complete description of each project including linear footage of pipeline installed and associated diameters.

c.) The bid amount and final cost to the Owner, with an explanation of cost overrun, if any, including change orders.

d.) The contract time as bid, actual time to complete project and

002113-6 completion date, with an explanation of time overrun, if any.

The applicant’s pre-qualification package should be signed by an officer of the company. Failure of the contractor to provide requested information or provide accurate information may result in contractor disqualification. No bid shall be opened unless the bidder has been approved by Dalton Utilities prior to the bid opening date. If the bid is submitted by a joint venture, all parties to the joint venture must individually satisfy the pre-qualification requirements. Final determination of the applicant’s qualification is the approval by Dalton Utilities.

The package must be received by the Owner not later than 5 PM on Monday, November 30, 2026. Applicants will be advised of their pre-qualification status by 5 PM on Tuesday, November 31, 2026. This package shall be sent to the Owner at Dalton Utilities, 1200 V.D. Parrott Jr. Parkway, Dalton, Georgia 30721 Attention: Allen Peters.

BID

004113

BID

Project Description: Eastern Water Distribution System Reliability Project

Proposal of ________________________________________________________

(hereinafter called “Bidder”), To: The Board of Water, Light and Sinking Fund Commissioners of the City of Dalton, Georgia.

Gentlemen:

The Bidder, in compliance with your Advertisement for Bids for the construction of this project, having examined the Drawings and Specifications with related documents and the site of the proposed work and being familiar with all of the conditions surrounding the construction of the proposed project, including the availability of materials and labor, hereby proposes to furnish all labor, materials, equipment, and supplies to construct the project in accordance with the Contract Documents, within the time set forth therein, and at the price(s) stated below. This price(s) is to cover all expenses including overhead and profit incurred in performing the work required under the Contract Documents, of which this proposal is a part.

Bidder hereby agrees to commence work under this contract on or before a date to be specified in written Notice to Proceed of the Owner and to fully complete the project within 455 consecutive calendar days thereafter as stipulated in the specifications. Bidder further agrees to pay, as liquidated damages, the sum of $ 1,000.00 for each consecutive calendar day thereafter as hereinafter provided in the General Conditions.

Bidder acknowledges receipt of the following addenda:

Bidder agrees to perform all necessary work as described in the Specifications and shown on the Plans to complete the Project as specified, including all appurtenant and accessory work for the attached price(s).

The attached price(s) shall include all labor, materials, equipment, supplies, overhead, profit, insurance, etc., to cover the finished work of the several kinds for which are called.

Bidder understands that the Owner reserves the right to reject any or all Bids and to waive any informality in the bidding.

004113-2

Bid

The Bidder agrees that this Bid shall be good and may not be withdrawn for a period of 60 calendar days after the scheduled closing time for receiving Bids.

Upon receipt of written notice of the acceptance of this Bid, Bidder will execute the formal contract attached within twenty (20) calendar days and deliver surety bonds and certificate(s) of insurance as required by the Contract Documents. 10 percent of the total Bid is to become the property of the Owner in the event the contract and bond are not executed within the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby.

Respectfully submitted:

By_________________________________ Signature

Title________________________________

Business Address

ATTEST:

Name_____________________________ (Please Type)

Title______________________________ (SEAL)

Note: Attest for corporation secretary; for a partnership by another partner; for an individual By a Notary.

Road Names Total Labor Cost

1 Tibbs Bridge RD $

2 Headrick Circle $

3 N. Woodland Dr $

4 Keeter Rd $

5 Riverside Dr $

6 North Dr $

7 Timberlake Dr $

8 Sane Rd $

9 Cavender Rd $

10 Riverbend Rd $

11 Bettis Rd $

12 Gordon Dr $

13 Shirley Dr $

14 Martha Sue Dr $

15 Leon Cr $

16 Conasauga Way $

17 Deal Dr $

18 Greeson Bend $

19 Jackson Kinnamon $

20 Ridley Rd $

21 Callie Jones $

22 Barney Pierce $

23 Thorton Rd $

24 Adams Rd $

25 Stafford Rd / Stafford Spur $

26 Keswick Dr $

27 Pannel Dr & Cochran Dr $

28 Hwy 225 S $

29 Hwy 52 Alternate $

30 Crestview Dr, E. Vann Cr, W. Vann Cr, & Mary Sue $

Total Labor For Eastern Water Distribution System Reliability Project = $

EASTERN WATER DISTRIBUTION SYSTEM RELIABILITY PROJECT

BID SHEET

Tibbs Bridge Rd Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 8,300 LF Install New 6" Class 350 Ductile Iron Pipe (includes fittings) $ -

2.) 13,000 LF Install New 8" Class 350 Ductile Iron Pipe (includes fittings) $ -

3.) 1 EA Tie In Existing 8" Water Main (Airport Rd) $ -

4.) 19 EA

Tie Over Side Streets (Cypress,Newberry Farm Rd,Bryson Rd.,Keith Mill

Rd.,Burgess Dr,Law Dr.,Cedar Ridge Rd., ,Cedar Ridge Rd. Se,Keith

Dr,Kitchens Dr.,Maddox Mill Rd,Womack Rd ,Old Grade Rd,Kirby

Dr,Ranger Place,Robinwood Cr,Butterfield Dr,Orange Dr) $ -

5.) 2 EA Connect to Existing @ (Coahulla Creek) $ -

6.) 190 EA Install New Water Services $ -

7.) 15 EA

Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings) $ -

8.) 1 EA Kill Old Water Main $ -

9.) 720 Tons Stone backfill $ -

10.) 18,500 LF Grassing $ -

11.) 9 EA Remove Old Fire Hydrant $ -

12.) 15 EA Additional Valves as Needed $ -

13.) 50 EA Install Misc. Fittings (11.25, 22.5, 45 bends) $ -

14.) 200 LF Asphalt Surface Repair $ -

15.) 30 CY Concrete Drive Repairs $ -

Allowance Items

1.) 100 CY Rock Removal -$

2.) 100 Tons Additional Stone Backfill -$

TOTAL BID FOR PROJECT: -$

NOTE: Allowance items are for additional work order by the owner.

Contractors unit prices are all inclusive and cover all items detailed in the scope. Any erosion control measures required must be provided by the contractor (silt fence, grassing, check dams, etc) these materials will not be provided by Dalton Utilities. No separate payment will be made for the necessary erosion control, this cost shall be included in the unit priced for labor.

Signature: _________________________________________

Company Officer

Title: _________________________________________

Company Seal

Date: _________________________________________

Headrick Circle Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 7,700 LF Install New 6" Class 350 Ductile Iron Pipe (includes fittings) $ -

2.) 2 EA Tie to Existing 8" Water Main (Airport Rd) $ -

3.) 3 EA

Reconnect to Existing Side Street (Circle View, Timothy Dr, S. Woodland Dr) $ -

4.) 60 EA Install New Water Services $ -

5.) 7 EA Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings)

6.) 2 EA Kill Old Water Main $ -

7.) 365 Tons Stone backfill $ -

8.) 7,200 LF Grassing $ -

9.) 7 EA Remove Old Fire Hydrant $ -

10.) 20 EA Install Misc. Fittings (11.25, 22.5, 45 bends) $ -

11.) 2 EA Additional Valves as Needed $ -

12.) 120 LF Asphalt Surface Repair $ -

13.) 70 CY Concrete Drive Repairs $ -

Allowance Items

1.) 75 CY Rock Removal -$

2.) 25 Tons Additional Stone Backfill -$

TOTAL BID FOR PROJECT: -$

NOTE: Allowance items are for additional work order by the owner.

Contractors unit prices are all inclusive and cover all items detailed in the scope. Any erosion control measures required must be provided by the contractor (silt fence, grassing, check dams, etc) these materials will not be provided by Dalton Utilities. No separate payment will be made for the necessary erosion control, this cost shall be included in the unit priced for labor.

Signature: _________________________________________

Company Officer

Title: _________________________________________

N. Woodland Dr Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 800 LF Install New 6" Class 350 Ductile Iron Pipe (includes fittings) $ -

2.) 4 EA Install New Water Services $ -

3.)

2 EA Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings)

4.) 24 Tons Stone backfill $ -

5.) 800 LF Grassing $ -

6.) 2 EA Remove Old Fire Hydrant $ -

7.) 5 EA Install Misc. Fittings (11.25, 22.5, 45 bends) $ -

8.) 60 LF Asphalt Surface Repair $ -

9.) 12 CY Concrete Drive Repairs $ -

Allowance Items

1.) 10 CY Rock Removal -$

2.) 24 Tons Additional Stone Backfill -$

TOTAL BID FOR PROJECT: -$

NOTE: Allowance items are for additional work order by the owner.

Contractors unit prices are all inclusive and cover all items detailed in the scope. Any erosion control measures required must be provided by the contractor (silt fence, grassing, check dams, etc) these materials will not be provided by Dalton Utilities. No separate payment will be made for the necessary erosion control, this cost shall be included in the unit priced for labor.

Signature: _________________________________________

Company Officer

Title: _________________________________________

Keeter Rd Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 1,900 LF Install New 6" Class 350 Ductile Iron Pipe (includes fittings) $ -

4.) 20 EA Install New Water Services $ -

5.) 3 EA Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings)

6.) 1 EA Kill Old Water Main $ -

7.) 50 Tons Stone backfill $ -

8.) 1,900 LF Grassing $ -

9.) 3 EA Remove Old Fire Hydrant $ -

10.) 10 EA Install Misc. Fittings (11.25, 22.5, 45 bends) $ -

11.) 40 LF Asphalt Surface Repair $ -

12.) 18 CY Concrete Drive Repairs $ -

Allowance Items

1.) 25 CY Rock Removal -$

2.) 75 Tons Additional Stone Backfill -$

TOTAL BID FOR PROJECT: -$

NOTE: Allowance items are for additional work order by the owner.

Contractors unit prices are all inclusive and cover all items detailed in the scope. Any erosion control measures required must be provided by the contractor (silt fence, grassing, check dams, etc) these materials will not be provided by Dalton Utilities. No separate payment will be made for the necessary erosion control, this cost shall be included in the unit priced for labor.

Signature: _________________________________________

Company Officer

Title: _________________________________________

Riverside Dr Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 3,750 LF Install New 6" Class 350 Ductile Iron Pipe (includes fittings) $ -

2.) 24 EA Install New Water Services $ -

3.) 4 EA Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings)

4.) 150 Tons Stone backfill $ -

5.) 3,700 LF Grassing $ -

6.) 4 EA Remove Old Fire Hydrant $ -

7.) 20 EA Install Misc. Fittings (11.25, 22.5, 45 bends) $ -

8.) 70 LF Asphalt Surface Repair $ -

9.) 36 CY Concrete Drive Repairs $ -

Allowance Items

1.) 10 CY Rock Removal -$

2.) 40 Tons Additional Stone Backfill -$

TOTAL BID FOR PROJECT: -$

NOTE: Allowance items are for additional work order by the owner.

Contractors unit prices are all inclusive and cover all items detailed in the scope. Any erosion control measures required must be provided by the contractor (silt fence, grassing, check dams, etc) these materials will not be provided by Dalton Utilities. No separate payment will be made for the necessary erosion control, this cost shall be included in the unit priced for labor.

Signature: _________________________________________

Company Officer

Title: _________________________________________

North Dr Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 850 LF Install New 6" Class 350 Ductile Iron Pipe (includes fittings) $ -

2.) 11 EA Install New Water Services $ -

3.) 1 EA Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings)

4.) 35 Tons Stone backfill $ -

5.) 840 LF Grassing $ -

6.) 1 EA Remove Old Fire Hydrant $ -

7.) 2 EA Install Misc. Fittings (11.25, 22.5, 45 bends) $ -

8.) 14 CY Concrete Drive Repairs $ -

Allowance Items

1.) 10 CY Rock Removal -$

2.) 25 Tons Additional Stone Backfill -$

TOTAL BID FOR PROJECT: -$

NOTE: Allowance items are for additional work order by the owner.

Contractors unit prices are all inclusive and cover all items detailed in the scope. Any erosion control measures required must be provided by the contractor (silt fence, grassing, check dams, etc) these materials will not be provided by Dalton Utilities. No separate payment will be made for the necessary erosion control, this cost shall be included in the unit priced for labor.

Signature: _________________________________________

Company Officer

Title: _________________________________________

Timberlake Dr Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 1,800 LF Install New 6" Class 350 Ductile Iron Pipe (includes fittings) $ -

2.) 24 EA Install New Water Services $ -

3.) 2 EA Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings)

4.) 100 Tons Stone backfill $ -

5.) 1,800 LF Grassing $ -

6.) 2 EA Remove Old Fire Hydrant $ -

7.) 10 EA Install Misc. Fittings (11.25, 22.5, 45 bends) $ -

8.) 40 LF Asphalt Surface Repair $ -

9.) 14 CY Concrete Drive Repairs $ -

Allowance Items

1.) 10 CY Rock Removal -$

2.) 25 Tons Additional Stone Backfill -$

TOTAL BID FOR PROJECT: -$

NOTE: Allowance items are for additional work order by the owner.

Contractors unit prices are all inclusive and cover all items detailed in the scope. Any erosion control measures required must be provided by the contractor (silt fence, grassing, check dams, etc) these materials will not be provided by Dalton Utilities. No separate payment will be made for the necessary erosion control, this cost shall be included in the unit priced for labor.

Signature: _________________________________________

Company Officer

Title: _________________________________________

Sane Rd Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 11,100 LF Install New 6" Class 350 Ductile Iron Pipe (includes fittings) $ -

2.) 2 EA Tie to Existing 8" Water Main 8"x6" HOT TAP Ridge Rd $ -

3.) 3 EA Reconnect Side Streets ( N.Pine Lake , S. Pine Lake, Land Dr) $ -

4.) 75 EA Install New Water Services $ -

5.)

9 EA Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings)

6.) 2 EA Kill Old Water Main $ -

7.) 440 Tons Stone backfill $ -

8.) 11,100 LF Grassing $ -

9.) 9 EA Remove Old Fire Hydrant $ -

10.) 20 EA Install Misc. Fittings (11.25, 22.5, 45 bends) $ -

11.) 6 EA Additional Valves $ -

12.) 350 LF Asphalt Surface Repair $ -

13.) 90 CY Concrete Drive Repairs $ -

Allowance Items

1.) 10 CY Rock Removal -$

2.) 50 Tons Additional Stone Backfill -$

TOTAL BID FOR PROJECT: -$

NOTE: Allowance items are for additional work order by the owner.

Contractors unit prices are all inclusive and cover all items detailed in the scope. Any erosion control measures required must be provided by the contractor (silt fence, grassing, check dams, etc) these materials will not be provided by Dalton Utilities. No separate payment will be made for the necessary erosion control, this cost shall be included in the unit priced for labor.

Signature: _________________________________________

Company Officer

Title: _________________________________________

Cavender Rd Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 5,700 LF Install New 8" Class 350 Ductile Iron Pipe (includes fittings) $ -

2.) 1 EA Tie to Existing 8" Water Main 8"x6" Hot Tap (Antioch Rd) $ -

3.) 1 EA Tie to Existing 6" Water Main (Peek Rd) $ -

4.) 3 EA Reconnect Side Streets (New Zion Hill Rd, Harrison Ln, & Willeve St) $ -

5.) 62 EA Install New Water Services $ -

6.)

4 EA Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings)

7.) 3 EA Kill Old Water Main (4" and 6" Water Main) $ -

8.) 120 Tons Stone backfill $ -

9.) 5,700 LF Grassing $ -

10.) 4 EA Remove Existing Firehydrants $ -

11.) 10 EA Install Misc. Fittings (11.25, 22.5, 45 bends) $ -

12.) 200 LF Asphalt Surface Repair $ -

13.) 27 CY Concrete Drive Repairs $ -

Allowance Items

1.) 10 CY Rock Removal -$

2.) 25 Tons Additional Stone Backfill -$

TOTAL BID FOR PROJECT: -$

NOTE: Allowance items are for additional work order by the owner.

Contractors unit prices are all inclusive and cover all items detailed in the scope. Any erosion control measures required must be provided by the contractor (silt fence, grassing, check dams, etc) these materials will not be provided by Dalton Utilities. No separate payment will be made for the necessary erosion control, this cost shall be included in the unit priced for labor.

Signature: _________________________________________

Company Officer

Title: _________________________________________

Riverbend Rd Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 11,000 LF

Install New 6" Class 350 Ductile Iron Pipe (includes fittings) Hickory Flat to

Dead End $ -

2.) 1 EA Tie into Existing Valve @ Hickory Flats Rd $ -

3.) 2 EA Reconnect Side Roads @ Hunter Circle $ -

4.) 65 EA Install New Water Services $ -

5.)

9 EA Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings)

6.) 1 EA Kill Old Water Main 6" HDPE , 6" C900 @ Hickory Flats $ -

7.) 360 Tons Stone backfill $ -

8.) 11,000 LF Grassing $ -

9.) 9 EA Remove Existing Firehydrants $ -

10.) 12 EA Install Misc. Fittings (11.25, 22.5, 45 bends) $ -

11.) 80 LF Asphalt Surface Repair $ -

12.) 20 CY Concrete Drive Repairs $ -

Allowance Items

1.) 25 CY Rock Removal -$

2.) 75 Tons Additional Stone Backfill -$

TOTAL BID FOR PROJECT: -$

NOTE: Allowance items are for additional work order by the owner.

Contractors unit prices are all inclusive and cover all items detailed in the scope. Any erosion control measures required must be provided by the contractor (silt fence, grassing, check dams, etc) these materials will not be provided by Dalton Utilities. No separate payment will be made for the necessary erosion control, this cost shall be included in the unit priced for labor.

Signature: _________________________________________

Company Officer

Title: _________________________________________

Bettis Rd Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 4,860 LF Install New 6" Class 350 Ductile Iron Pipe (includes fittings) $ -

2.) 2 EA Tie to Existing 6" Water Main (Hwy 76,Leon Cr) $ -

3.) 1 EA Reconnect Side Streets (Goldsmith Ln) $ -

4.) 24 EA Install New Water Services $ -

5.) 3

EA Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings)

6.) 2 EA Kill Old Water Main $ -

7.) 150 Tons Stone backfill $ -

8.) 4,650 LF Grassing $ -

9.) 2 EA Remove Old Fire Hydrant $ -

10.) 12 EA Install Misc. Fittings (11.25, 22.5, 45 bends) $ -

11.) 20 LF Asphalt Surface Repair $ -

12.) 45 CY Concrete Drive Repairs $ -

Allowance Items

1.) 25 CY Rock Removal -$

2.) 75 Tons Additional Stone Backfill -$

TOTAL BID FOR PROJECT: -$

NOTE: Allowance items are for additional work order by the owner.

Contractors unit prices are all inclusive and cover all items detailed in the scope. Any erosion control measures required must be provided by the contractor (silt fence, grassing, check dams, etc) these materials will not be provided by Dalton Utilities. No separate payment will be made for the necessary erosion control, this cost shall be included in the unit priced for labor.

Signature: _________________________________________

Company Officer

Title: _________________________________________

Gordon Dr Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 2,850 LF Install New 6" Class 350 Ductile Iron Pipe (includes fittings) $ -

2.) 12 EA Install New Water Services $ -

3.) 2

EA Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings)

4.) 130 Tons Stone backfill $ -

5.) 2,850 LF Grassing $ -

6.) 1 EA Remove Old Fire Hydrant $ -

7.) 10 EA Install Misc. Fittings (11.25, 22.5, 45 bends) $ -

8.) 50 LF Asphalt Surface Repair $ -

9.) 30 CY Concrete Drive Repairs $ -

Allowance Items

1.) 25 CY Rock Removal -$

2.) 75 Tons Additional Stone Backfill -$

TOTAL BID FOR PROJECT: -$

NOTE: Allowance items are for additional work order by the owner.

Contractors unit prices are all inclusive and cover all items detailed in the scope. Any erosion control measures required must be provided by the contractor (silt fence, grassing, check dams, etc) these materials will not be provided by Dalton Utilities. No separate payment will be made for the necessary erosion control, this cost shall be included in the unit priced for labor.

Signature: _________________________________________

Company Officer

Title: _________________________________________

Martha Sue Dr Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 3,200 LF Install New 6" Class 350 Ductile Iron Pipe (includes fittings) $ -

2.) 12 EA Install New Water Services $ -

3.) 2 EA Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings)

4.) 1 EA Kill Old Water Main $ -

5.) 50 Tons Stone backfill $ -

6.) 3,200 LF Grassing $ -

7.) 1 EA Remove Old Fire Hydrant $ -

8.) 10 EA Install Misc. Fittings (11.25, 22.5, 45 bends) $ -

9.) 40 LF Asphalt Surface Repair $ -

10.) 8 CY Concrete Drive Repairs $ -

Allowance Items

1.) 10 CY Rock Removal -$

2.) 40 Tons Additional Stone Backfill -$

TOTAL BID FOR PROJECT: -$

NOTE: Allowance items are for additional work order by the owner.

Contractors unit prices are all inclusive and cover all items detailed in the scope. Any erosion control measures required must be provided by the contractor (silt fence, grassing, check dams, etc) these materials will not be provided by Dalton Utilities. No separate payment will be made for the necessary erosion control, this cost shall be included in the unit priced for labor.

Signature: _________________________________________

Company Officer

Title: _________________________________________

Shirley Dr Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 850 LF Install New 6" Class 350 Ductile Iron Pipe (includes fittings) $ -

2.) 4 EA Install New Water Services $ -

3.)

2 EA Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings)

4.) 20 Tons Stone backfill $ -

5.) 900 LF Grassing $ -

6.) 2 EA Remove Old Fire Hydrant $ -

7.) 2 EA Install Misc. Fittings (11.25, 22.5, 45 bends) $ -

8.) 7 CY Concrete Drive Repairs $ -

Allowance Items

1.) 10 CY Rock Removal -$

2.) 25 Tons Additional Stone Backfill -$

TOTAL BID FOR PROJECT: -$

NOTE: Allowance items are for additional work order by the owner.

Contractors unit prices are all inclusive and cover all items detailed in the scope. Any erosion control measures required must be provided by the contractor (silt fence, grassing, check dams, etc) these materials will not be provided by Dalton Utilities. No separate payment will be made for the necessary erosion control, this cost shall be included in the unit priced for labor.

Signature: _________________________________________

Company Officer

Title: _________________________________________

Leon Circle Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 3,600 LF Install New 6" Class 350 Ductile Iron Pipe (includes fittings) $ -

2.) 15 EA Install New Water Services $ -

3.) 4

EA Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings)

4.) 60 Tons Stone backfill $ -

5.) 3,600 LF Grassing $ -

6.) 1 EA Remove Old Fire Hydrant $ -

7.) 16 EA Install Misc. Fittings (11.25, 22.5, 45 bends) $ -

8.) 30 LF Asphalt Surface Repair $ -

9.) 16 CY Concrete Drive Repairs $ -

Allowance Items

1.) 25 CY Rock Removal -$

2.) 40 Tons Additional Stone Backfill -$

TOTAL BID FOR PROJECT: -$

NOTE: Allowance items are for additional work order by the owner.

Contractors unit prices are all inclusive and cover all items detailed in the scope. Any erosion control measures required must be provided by the contractor (silt fence, grassing, check dams, etc) these materials will not be provided by Dalton Utilities. No separate payment will be made for the necessary erosion control, this cost shall be included in the unit priced for labor.

Signature: _________________________________________

Company Officer

Title: _________________________________________

Conasauga Way Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 940 LF Install New 6" Class 350 Ductile Iron Pipe (includes fittings) $ -

2.) 1 EA Tie to Existing 6" Water Main (Greeson Bend) $ -

3.) 2 EA Install New Water Services $ -

4.) 1

EA Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings)

5.) 20 Tons Stone backfill $ -

6.) 940 LF Grassing $ -

7.) 0 EA Remove Old Fire Hydrant $ -

8.) 4 EA Install Misc. Fittings (11.25, 22.5, 45 bends) $ -

9.) 60 LF Asphalt Surface Repair $ -

10.) 12 CY Concrete Drive Repairs $ -

Allowance Items

1.) 25 CY Rock Removal -$

2.) 20 Tons Additional Stone Backfill -$

TOTAL BID FOR PROJECT: -$

NOTE: Allowance items are for additional work order by the owner.

Contractors unit prices are all inclusive and cover all items detailed in the scope. Any erosion control measures required must be provided by the contractor (silt fence, grassing, check dams, etc) these materials will not be provided by Dalton Utilities. No separate payment will be made for the necessary erosion control, this cost shall be included in the unit priced for labor.

Signature: _________________________________________

Company Officer

Title: _________________________________________

Deal Rd Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 1,400 LF Install New 6" Class 350 Ductile Iron Pipe (includes fittings) $ -

2.) 1 EA Tie to Existing 6" Water Main (RiversEdge Rd ) $ -

3.) 8 EA Install New Water Services $ -

4.) 1

EA Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings)

6.) 18 Tons Stone backfill $ -

7.) 1,400 LF Grassing $ -

8.) 1 EA Remove Old Fire Hydrant $ -

9.) 5 EA Install Misc. Fittings (11.25, 22.5, 45 bends) $ -

10.) 60 LF Asphalt Surface Repair $ -

Allowance Items

1.) 25 CY Rock Removal -$

2.) 10 Tons Additional Stone Backfill -$

TOTAL BID FOR PROJECT: -$

NOTE: Allowance items are for additional work order by the owner.

Contractors unit prices are all inclusive and cover all items detailed in the scope. Any erosion control measures required must be provided by the contractor (silt fence, grassing, check dams, etc) these materials will not be provided by Dalton Utilities. No separate payment will be made for the necessary erosion control, this cost shall be included in the unit priced for labor.

Signature: _________________________________________

Company Officer

Title: _________________________________________

Greeson Bend Rd Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 5,900 LF Install New 6" Class 350 Ductile Iron Pipe (includes fittings) $ -

2.) 200 LF 12" Case Bore Under HWY 52 $ -

3.) 1 EA Tie to Existing at Hwy 52 (12" x 6" Hot Tap) $ -

4.) 2 EA Tie into Existing Main @ (Scott Rd & Jackson Kinnamon Rd south entrance ) $ -

5.) 35 EA Install New Water Services $ -

6.) 5

EA Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings)

7.) 2 EA Kill Old Water Main $ -

8.) 360 Tons Stone backfill $ -

9.) 5,900 LF Grassing $ -

10.) 3 EA Remove Old Fire Hydrant $ -

11.) 18 EA Install Misc. Fittings (11.25, 22.5, 45 bends) $ -

12.) 5 Ea Additional Valves as needed $ -

13.) 90 LF Asphalt Surface Repair $ -

14.) 60 CY Concrete Drive Repairs $ -

Allowance Items

1.) 25 CY Rock Removal -$

2.) 75 Tons Additional Stone Backfill -$

TOTAL BID FOR PROJECT: -$

NOTE: Allowance items are for additional work order by the owner.

Contractors unit prices are all inclusive and cover all items detailed in the scope. Any erosion control measures required must be provided by the contractor (silt fence, grassing, check dams, etc) these materials will not be provided by Dalton Utilities. No separate payment will be made for the necessary erosion control, this cost shall be included in the unit priced for labor.

Signature: _________________________________________

Company Officer

Title: _________________________________________

Jackson Kinamon Rd Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 3,700 LF Install New 6" Class 350 Ductile Iron Pipe (includes fittings) $ -

2.) 18 EA Install New Water Services $ -

3.) 3

EA Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings)

4.) 50 Tons Stone backfill $ -

5.) 3,700 LF Grassing $ -

6.) 2 EA Remove Old Fire Hydrant $ -

7.) 16 EA Install Misc. Fittings (11.25, 22.5, 45 bends) $ -

8.) 20 LF Asphalt Surface Repair $ -

9.) 6 CY Concrete Drive Repairs $ -

Allowance Items

1.) 10 CY Rock Removal -$

2.) 30 Tons Additional Stone Backfill -$

TOTAL BID FOR PROJECT: -$

NOTE: Allowance items are for additional work order by the owner.

Contractors unit prices are all inclusive and cover all items detailed in the scope. Any erosion control measures required must be provided by the contractor (silt fence, grassing, check dams, etc) these materials will not be provided by Dalton Utilities. No separate payment will be made for the necessary erosion control, this cost shall be included in the unit priced for labor.

Signature: _________________________________________

Company Officer

Title: _________________________________________

Ridley Rd Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 3,900 LF Install New 6" Class 350 Ductile Iron Pipe (includes fittings) $ -

2.) 44 EA Install New Water Services $ -

3.) 3

EA Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings)

4.) 1 EA Kill Old Water Main $ -

5.) 126 Tons Stone backfill $ -

6.) 4,000 LF Grassing $ -

7.) 1 EA Remove Old Fire Hydrant $ -

8.) 10 EA Install Misc. Fittings (11.25, 22.5, 45 bends) $ -

9.) 100 LF Asphalt Surface Repair $ -

10.) 60 CY Concrete Drive Repairs $ -

Allowance Items

1.) 10 CY Rock Removal -$

2.) 25 Tons Additional Stone Backfill -$

TOTAL BID FOR PROJECT: -$

NOTE: Allowance items are for additional work order by the owner.

Contractors unit prices are all inclusive and cover all items detailed in the scope. Any erosion control measures required must be provided by the contractor (silt fence, grassing, check dams, etc) these materials will not be provided by Dalton Utilities. No separate payment will be made for the necessary erosion control, this cost shall be included in the unit priced for labor.

Signature: _________________________________________

Company Officer

Title: _________________________________________

Callie Jones Rd Labor & Equipment

Approx. Unit Total

Item No. Quantity Unit Description Price Price

1.) 6,200 LF Install New 6" Class 350 Ductile Iron Pipe (includes fittings) $ -

2.) 70 LF 12" Case Bore (Hwy 52 Alt) $ -

2.) 1 EA Tie Into Existing main @ Greeson Bend 6x6" Hot Tap $ -

3.) 1 Ea Tie to Existing Main @ Hwy 52 A 6x6 Hot Tap $ -

5.) 1 EA Reconnect Side Streets (Huffman Ln.) $ -

6.) 60 EA Install New Water Services $ -

7.) 3

EA Install Fire Hydrant Complete (includes fittings Tee, Valve, FH, Anchor

Couplings)

8.) 2 EA Kill Old Water Main $ -

9.) 300 Tons Stone backfill $ -

10.) 6,200 LF Grassing $ -

11.) 3 EA Remove Old Fire Hydrant $ -

12.) 10 EA Install Misc. Fittings (11.25, 22.5, 45 bends)…