This Request for Proposals (RFP) is issued by the City of Suwanee, Georgia, for Design-Build Services to create a Suwanee Arts Center. The project involves the renovation of an existing 2,000-square-foot 1940s-era house into a Creative Arts, Media & Gathering Hub and the demolition and replacement of an existing shed with a new 30' × 50' metal building to serve as the Pottery Barn. The house renovation will accommodate a lobby and display area, creative arts classroom (approximately 453 square feet), fused glass studio/community multipurpose room, digital media room (approximately 133 square feet), sound recording room (approximately 55 square feet), office nook (approximately 30 square feet), and storage rooms. The Pottery Barn will include a pottery studio with space for 8-10 thrown pottery wheels, a pottery classroom, a fire-rated kiln room for 3-4 electric kilns, and two interior restrooms. Site work includes demolition of existing structures, new asphalt paving, ADA-compliant parking and ramps, a 40' × 25' raised wood community deck with a 20' × 20' metal louvered pergola, a covered walkway between structures, a pottery patio, and landscaping. A pre-proposal site visit is scheduled for June 29, 2026, at 3:00 PM at 431 Main Street, Suwanee, GA 30024. The questions deadline is July 16, 2026, at 5:00 PM, and proposals are due July 27, 2026, at 2:00 PM. Potential interviews are tentatively scheduled for August 13, 2026. The City expects the design-build process to proceed through four phases: Phase 1 (Initial Selection), Phase 2 (Preconstruction Services), Phase 3 (Construction Agreement), and Phase 4 (Construction).

The City has established a construction budget of $1,450,000 for the design-build contract, which is inclusive of all design fees, construction costs, contractor overhead, and profit. The City will maintain a separate owner's contingency of $150,000 and will separately fund permit costs. Proposers must submit a preliminary cost assessment demonstrating budget feasibility, with a high-level allocation across major components including design fees, demolition and abatement, house renovation, new Pottery Barn metal building, community deck and pergola, site work and civil, MEP systems, performance and payment bonds, and contractor overhead and profit. If automatic fire sprinkler systems or manual fire alarm systems are deemed required by the Authority Having Jurisdiction during design, such costs will be treated as scope adjustments outside the base budget. Asbestos abatement is required and included in the design-builder's scope; known asbestos-containing materials (ACM) have been identified in kitchen floor vinyl and exterior siding at 25% Chrysotile, with the design-builder responsible for confirming the full abatement scope. Lead paint testing showed results below the EPA threshold, so no lead abatement is required. The selected firm must furnish Performance and Payment Bonds each in the amount of 100% of the total contract price from a Georgia-licensed surety company. The design-build firm must carry general liability insurance (minimum $1,000,000 per occurrence/$2,000,000 aggregate), professional liability/errors and omissions insurance, workers' compensation coverage, and automobile liability insurance, and must comply with Georgia's E-Verify requirements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF SUWANEE, GEORGIA

REQUEST FOR PROPOSALS

Suwanee Arts Center Design-Build Services

RFP Issue Date: June 12, 2026

Pre-Proposal Site Visit: June 29 at 3:00 pm - Attendance Encouraged

Questions Deadline: July 16, 2026 at 5:00 PM

Proposal Due Date: July 27, 2026 at 2:00 PM

Project Location: 431 Main Street, Suwanee, GA 30024 (adjacent to Town Center on Main)

Estimated Project Budget: $1,450,000 (exclusive of Owner contingency)

Owner: City of Suwanee, Georgia

Proposals (in PDF format) must be submitted to:

Jim Simpson, Project Manager

330 Town Center Avenue, Suwanee, GA 30024 jim.simpson@oneatlas.com

This document and all attachments are available at: www.suwanee.com and on the Georgia Procurement Registry (GPR).

mailto:jim.simpson@oneatlas.com

1. INTRODUCTION

The City of Suwanee (“City”) is soliciting proposals to select a Design-Builder based on qualifications, project approach, and other factors, and to proceed using a design-build process.

The project involves two distinct scopes of work delivered under a single design-build contract:

• Renovation of an existing 2,000 square foot, 1940’s era house and grounds, into the Creative Arts, Media & Gathering Hub, and

• Demolition of an existing detached shed and construction of a new 30’ × 50’ metal building (the Pottery Barn) in its place.

The City engaged Lord Aeck Sargent (LAS) to prepare a conceptual expansion study, which is attached as Exhibit A to this RFP. The LAS study establishes the programmatic vision, spatial framework, and design intent that the selected design-build firm will develop into construction documents. The design-build team is expected to bring its own licensed architect and to carry the project from schematic design through construction completion.

2. PROJECT OVERVIEW

2.1 General Description

The site is located at 431 Main Street, Suwanee, GA. It contains an approximately 2,000 square foot house that was constructed in the 1940’s and a detached approximately 1,000 square foot barn. The house is to be renovated and the barn is to be demolished and replaced with an approximately 1,500 square foot metal building. New construction also includes an outdoor community deck and a new driveway.

The conceptual expansion study describes the project goals and should be used as a reference document with one noted significant adjustment: the concept study initially anticipated renovating the detached pottery barn, however, after further study demolition and replacement is now the preferred option.

The anticipated construction includes:

Renovation of an approximately 2,000 square foot existing residential structure into multiple open rooms for an arts facility

Demolition of an existing barn/garage structure

Construction of a new detached metal building (approximately 1,500 square feet), inspired or modeled after the detached metal building at Co-Hatch co-working in Duluth Georgia.

Related site improvements and connectivity between structures

Environmental and structural reports have been prepared and are incorporated as attachments.

A structural assessment of the existing house has been completed and is attached as Exhibit F. The report identifies required structural improvements associated with the conversion of the existing residential structure to a commercial arts facility, including crawlspace framing reinforcement, pier reconstruction, floor framing strengthening, roof framing coordination, and potential lateral system modifications required by Code. Proposers shall review the report and incorporate all required structural modifications. Final structural design, code compliance, and verification of existing conditions shall remain the responsibility of the Design-Builder.

2.2 Project Goals

• Deliver a high-quality, functional arts facility within the established budget

• Honor the programmatic vision established in the LAS expansion study

• Create an architecturally distinctive facility that reflects Suwanee’s commitment to arts and community

• Achieve full ADA accessibility throughout the facility and site

• Complete construction as expeditiously as possible

3. ANTICIPATED PROCUREMENT PROCESS

The City intends to utilize a qualifications-based, criteria-driven design-build delivery method. Under this approach, a single design-build entity holds responsibility for both design and construction services. The process is structured in phases to allow collaborative development of the design and cost prior to execution of a construction contract, as described below.

3.1 Phase 1 — Initial Selection: Proposal submission, evaluation against stated criteria, potential interviews (tentatively scheduled for Thursday August 13, 2026), and selection of the design-build firm.

No design work begins during this phase. If agreement cannot be reached, the City reserves the right to negotiate with the next-ranked firm.

3.2 Phase 2 — Preconstruction Services: Execution of a preconstruction services agreement. The design-build team develops design through construction documents in collaboration with City staff. This phase concludes with a negotiated lump sum or GMP proposal.

3.3 Phase 3 — Construction Agreement: If the City and design-builder reach agreement on the GMP or lump sum, a construction contract is executed.

3.4 Phase 4 — Construction: Full construction through substantial completion, punch list, and closeout.

4. SCOPE OF WORK

4.1 House Renovation

The existing house shall be renovated to accommodate the following program elements:

• Lobby and display area

• Creative arts classroom (approx. 453 SF) — large, light-filled space suitable for painting, drawing, workshops, and camps

• Fused glass studio / community multipurpose room — flexible space for fused glass classes, community events, and allied arts functions

• Digital media room (approx. 133 SF) — space for green screen, video recording, claymation, photography, and digital/analog media

• Sound recording room / booth (approx. 55 SF) — acoustically treated; allied to the digital media room

• Office nook (approx. 30 SF)

• Storage rooms

Interior renovation work shall include, at minimum:

• Selective interior demolition per the LAS demolition plan (Exhibit A): removal of all existing flooring, kitchen, bathrooms, fixtures, and identified partition walls

• Existing structural rehabilitation

• New partition walls and interior configuration per schematic program

• Two (2) restrooms

• New vinyl plank or similar commercial-grade flooring throughout

• New paint throughout

• New energy-efficient LED lighting throughout

• New plumbing — fixtures proximate to existing rough-in locations; minimum 1 sink in flex classroom, 2 sinks in creative arts room, restroom facilities

• New HVAC system

• Upgraded or new electrical system(s) as needed

• Acoustic wall treatment in sound recording room

• New double-door / glass panel entry with steel frame and wood slat screen facade treatment

(eastern facade facing Town Center on Main)

• All work to meet current building code and ADA requirements

• Smoke detection system throughout, meeting fire code requirements for the intended assembly occupancy. Note: Based on the building size and anticipated occupant load, automatic fire sprinkler systems and manual fire alarm systems are not anticipated to be required; however, the design-builder is responsible for confirming all fire and life safety code compliance. If a fire sprinkler system is deemed required by the Authority Having Jurisdiction (AHJ) during the design phase, it shall be treated as a scope adjustment/change to the $1,450,000 budget.

Exterior renovation work shall include, at minimum:

• New roof (asphalt or metal TBD)

• Replacement of siding

• General carpentry and exterior improvements as needed

4.2 Pottery Barn — New Metal Building

The existing shed shall be demolished in its entirety and a new 30’ × 50’ (1,500 SF) metal building constructed in its general location. The new building shall serve as the Pottery Barn and shall accommodate the following program:

• Pottery studio — large open space for 8–10 thrown pottery wheels, with adequate sinks, storage, and supply storage

• Pottery classroom — pottery room with flat work surfaces, sinks, and storage; flexible for other classes

• Kiln room — 1-hour fire-rated enclosure for 3–4 electric kilns

• Two (2) interior restrooms

• If budget permits, city would like to increase the size of the building up to 2,000 square feet

The building shall be a pre-engineered metal building of contemporary, stylish design based on the metal building at the Co-Hatch facility in Duluth. The City’s design intent for this building is a simple, clean, modern industrial aesthetic with significant glazing. Key design features shall include:

• Three (3) full-width glass garage doors on the primary facade to enable indoor/outdoor connectivity

• Contemporary metal panel exterior with architectural detailing that complements the renovated house

• High interior clearance appropriate for an active arts studio environment

• MEP systems including: new electrical service and panel with sufficient capacity for 3–4 electric kilns at 240v; the design-builder's electrician shall confirm required service type (single-phase vs.

three-phase) as part of the design process

• Kiln ventilation and air management: The kiln room shall include a professional-grade mechanical ventilation system specifically designed for electric kiln operation

• New water/sewer connections

• Floor shall consist of a durable, non-porous, non-slip-resistant finish capable of withstanding frequent water exposure and clay "slip”

• Floor drains shall be provided in the pottery studio and kiln room, sized and located to accommodate water and clay slip from wheel-throwing operations

• LED lighting throughout

• Full ADA compliance

• Smoke detection system throughout, meeting fire code requirements for the intended assembly occupancy. Note: Based on the building size and anticipated occupant load, automatic fire sprinkler systems and manual fire alarm systems are not anticipated to be required; however, the design-builder is responsible for confirming all fire and life safety code compliance. If a fire sprinkler system is deemed required by the Authority Having Jurisdiction (AHJ) during the design phase, it shall be treated as a scope adjustment/change to the $1,450,000 budget.

Reference images of a comparable building aesthetic (Co-hatch co-working facility, Duluth, GA) are provided as an attachment.

4.3 Site Work & Civil

The design-build scope shall include all site work necessary to complete the project, including:

• Demolition of existing shed, concrete walks, existing deck and steps as identified in the LAS study

• New asphalt paving and regrading for drop-off area (right-in / right-out configuration from Main Street)

• ADA-compliant concrete parking space with ramp

• New concrete ADA ramps connecting house, community deck, and Pottery Barn (the site currently has approximately 4’ of grade change across the project area)

• New raised wood pressure-treated outdoor community deck (approx. 40’ × 25’) with 20’ × 20’ metal louvered pergola with power and festoon lighting

• Covered walkway connecting the house and the Pottery Barn, designed to provide weather protection along the primary pedestrian circulation path between the two structures. Design and dimensions to be determined during preconstruction in coordination with City staff.

• Pottery patio — hardscape area adjacent to the Pottery Barn

• New sewer connection for the Pottery Barn

• Grading, drainage, and erosion control

• Basic landscaping and planting areas at entry and along Main Street frontage

• New sloped entry walkway and entry porch at house

• Coordination with existing utilities; utility locates and protection

• Asbestos abatement is required prior to any demolition or renovation activity. The design-build scope includes all abatement work including coordination with a GA EPD licensed abatement contractor, submission of required written notifications to the Georgia Environmental Protection Division (GA EPD), and appropriate disposal of all ACM. Known ACM locations identified in the environmental reports (Exhibits B and C) include the kitchen floor vinyl and exterior siding, both confirmed at 25% Chrysotile. The design-builder is responsible for confirming full abatement scope and the contract price shall include all abatement work regardless of any additional ACM discovered during construction.

• Lead paint testing was conducted at 431 Main Street. All samples returned below the EPA threshold requiring certified abatement (0.5% by weight). No lead abatement is required. The lead lab report is provided for reference.

5. BUDGET

The City has established a construction budget of $1,450,000 for this project. This figure represents the total hard cost budget available for the design-build contract, inclusive of all design fees, construction costs, contractor overhead and profit. The City will maintain a separate owner’s contingency of $150,000 that is not part of the design-build contract. The city will also separately fund the cost of permits as needed.

Proposers should review the LAS expansion study and assess the feasibility of delivering the described program within this budget prior to submitting. The City expects proposers to advise on any scope adjustments necessary to achieve budget compliance as part of the pre-contract negotiation process.

The City expects the selected firm to maintain cost transparency throughout the design process and to provide updated cost projections at each design milestone, as mutually agreed upon during preconstruction.

6. PROPOSAL REQUIREMENTS

Proposals shall be submitted as a single PDF document no more than 20 total pages. Responses should be concise and directly responsive to the criteria listed. The City does not require elaborate graphic presentations at this stage.

6.1 Cover Letter

A one-page cover letter on firm letterhead signed by an authorized representative confirming the firm’s interest, legal name, address, primary contact, and acknowledgment of all RFP addenda (if any).

6.2 Team Qualifications & Experience

Provide the following:

• Brief description of firm structure and design-build experience

• Proposed team: general contractor, architect of record, key subcontractors (MEP, civil) if known

• Bios for proposed project manager, superintendent, and lead architect

• Minimum three (3) completed project examples with: project name and location, owner reference and contact, project type and size, contract value, delivery method, and completion date. Preference given to adaptive reuse / renovation, metal building construction, arts or community facilities, and public-sector clients

6.3 References

Minimum three (3) owner references from completed projects of similar scope and complexity. Include name, title, organization, phone, and email. May be the same projects listed in 6.2.

6.4 Project Approach

Provide a narrative (maximum three pages) describing:

• Approach to design-build delivery and budget/schedule alignment

• Preliminary thoughts on scope, concerns, opportunities, or value engineering ideas

6.5 Project Schedule

Provide a realistic preliminary project schedule from contract execution through substantial completion.

The schedule should identify major milestones including design phases, permitting, procurement of the metal building package, demolition, and construction.

6.6 Cost Projection

Proposers shall provide a brief preliminary cost assessment demonstrating their review of the project scope and their assessment of budget feasibility. This is not a bid and will not be used as a binding cost commitment. It will be used to evaluate whether the proposer has a realistic understanding of the project scope and the City's $1,450,000 budget.

The preliminary cost assessment shall include:

• A statement confirming whether the proposer believes the described scope is achievable within the City's $1,450,000 design-build budget, based on their review of the RFP and attached exhibits

• A high-level allocation of the budget across the following major components, with any noted assumptions or qualifications:

Scope Component Preliminary Allocation Notes / Assumptions Design fees (architecture, engineering) $

Demolition & abatement $

House renovation (including structural) $

New Pottery Barn metal building $

Community deck, pergola & covered walkway $

Site work, civil & grading $

MEP — all buildings $

Performance & payment bonds $

Contractor overhead & profit $

Other (as appropriate) $

TOTAL

• Any scope items the proposer would recommend modifying, deferring, or value-engineering to achieve budget compliance

• Any items the proposer cannot assess without additional information, and what information would be needed

The final negotiated contract price will be established during Phase 2-Preconstruction Services and Phase 3-Construction Services and through a collaborative open-book design and estimating process.

The preliminary cost assessment submitted with this proposal does not constitute a price commitment by either party.

7. SELECTION PROCESS

7.1 Process Overview

The City will use a qualifications-based selection process followed by fee negotiation with the top-ranked firm. Proposals will be evaluated, up to three firms shortlisted for interviews, and the top-ranked firm selected for fee negotiation. If agreement cannot be reached, the City will negotiate with the next-ranked firm.

7.2 Evaluation Criteria

Evaluation Criterion Points

Relevant experience and qualifications of firm and key personnel 30

Demonstrated experience with adaptive reuse, and public construction projects

Project approach and understanding of scope 20

Proposed schedule and ability to deliver expeditiously 15

Preliminary cost assessment that demonstrates understanding of project budget constraints.

TOTAL 100

8. SUBMISSION INSTRUCTIONS

Proposals must be received no later than July 27, 2026 at 2:00 PM Eastern Time. Late proposals will not be accepted. Submit as a single PDF to jim.simpson@oneatlas.com

A pre-proposal site visit is scheduled for June 29, 2026 at 3:00 PM at 431 Main Street. Attendance is strongly encouraged. The City will provide interior access to the existing house. Firms unable to attend may arrange an alternative visit with the contact above.

All questions must be submitted in writing to the contact above by July 16, 2026 at 5:00 PM. Responses will be issued by addendum to all firms on record. Firms are responsible for monitoring addenda posted on the City’s website prior to submission of their proposal.

9. TERMS AND CONDITIONS

• The City of Suwanee reserves the right to reject any or all proposals, to waive informalities, and to accept the proposal deemed most advantageous to the City.

• This RFP does not constitute a commitment to award a contract. The City is not liable for any costs incurred by proposers in preparing or submitting proposals.

• All proposals become public records upon submission and may be subject to disclosure under the Georgia Open Records Act.

• The selected design-build firm will be required to carry general liability insurance (minimum $1,000,000 per occurrence / $2,000,000 aggregate), professional liability / errors & omissions insurance, workers’ compensation coverage, and automobile liability insurance at levels acceptable to the City.

mailto:jim.simpson@oneatlas.com

• The selected firm shall obtain all required permits and approvals, including City of Suwanee building permits and any Gwinnett County or state approvals required for the work.

• This RFP and any resulting contract are subject to the laws of the State of Georgia. The project will be posted on the Georgia Procurement Registry in accordance with state law.

• The City does not discriminate on the basis of race, color, religion, sex, national origin, age, disability, or any other protected class in the award of contracts.

• Proposers may not contact elected City officials regarding this RFP during the procurement process. All communications shall be directed to the designated point of contact.

• The City reserves the right to issue addenda to this RFP. It is the proposer’s responsibility to verify that no addenda have been issued prior to submission.

• The selected design-build firm shall comply with all applicable federal, state, and local requirements governing asbestos abatement and demolition, including Georgia EPD notification requirements under the Georgia Air Quality Act. The firm shall employ a GA EPD licensed asbestos abatement contractor for all ACM removal. The City has provided known environmental reports as exhibits to this RFP; however, the design-builder is solely responsible for verifying the full extent of any hazardous materials present and the contract price shall be inclusive of all required abatement work.

• The selected design-build firm shall comply with Georgia's E-Verify requirements pursuant to O.C.G.A. § 13-10-91. The firm shall execute an E-Verify affidavit prior to contract execution and shall require the same of all subcontractors.

• Performance and Payment Bonds: The selected Design-Build firm shall furnish a Performance Bond and a Payment Bond, each in the amount of 100% of the total contract price, from a surety company licensed to do business in the State of Georgia. The cost of these bonds shall be included in the Proposer’s preliminary cost projection.

10. EXHIBITS

The following exhibits are attached to and made part of this RFP:

• Exhibit A — Suwanee Community Arts Center Expansion Study (Lord Aeck Sargent, dated November 7, 2025). Note: The shed renovation scope shown in Exhibit A is superseded by the new metal building described in Section 2.2 of this RFP. All other elements of the study represent the conceptual basis for the design-build scope.

• Exhibit B — ES-America Environmental Lab Letter, dated March 24, 2026 (Environmental Services of America)

• Exhibit C — EMSL Asbestos Lab Report, EMSL Order No. 072602497, dated March 18, 2026

• Exhibit D — EMSL Lead Paint Lab Report, EMSL Order No. 412650724, dated March 20, 2026

• Exhibit E — Photographs of Co-Hatch building in Duluth, Ga.

• Exhibit F – Structural Assessment Report prepared by Sterling M. Cochran, S.E.

###END###

Exhibit A - Suwanee Community Arts Center

Expansion Study (Lord Aeck Sargent, dated November 7th, 2025)

(Note: The shed renovation scope shown in Exhibit A is superseded by the new metal building described in Section 2.2 of this RFP. All other elements of the study represent the conceptual basis for the design-build scope.)

SUWANEE COMMUNITY ARTS CENTER: EXPANSION STUDY

Suwanee Community Arts Center

11.07.25For Study Purposes Only

Shed railroad

M

AIN STREET

Heartis Suwanee

Senior Living

Gwinnett County Fire Station

PlayTown Suwanee

Town Center on Main

Town Center On Main

Proposed Suwanee Arts Center

Expansion Site Suwanee

Town Center

Suwanee Arts Center Current Location

Downtown Suwanee Context

Suwanee Dam Rd NW

Main St

Rail ro ad

Rail ro ad

Buf or d H wy N

E

Community Arts Center As Western Gateway to Civic & Community

District

Views to Park

Existing Shed

Existing House

SITE

11.07.25For Study Purposes Only

PROGRAM

CREATIVE ARTS, MEDIA, & GATHERING - Existing House

THE POTTERY BARN - Existing Shed

Lobby & Display Area

Creative Arts Classroom - Large light �lled space �exible enough for creative arts classes and camps.

Fused Glass Studio / Community Multi-purpose room - Large room �exible enough for Fused Glass Classes, community events, camps, and other allied arts functions.

Digital Media Room - Flexible room with space for a green screen, video recording, claymation, photography and other digital/analog media functions.

Sound Recording Room - Allied to the Digital Media Room, acoustically treated room for sound recording, podcasts, and other audio functions.

Pottery Studio - Large room with enough space for 8-10 thrown pottery wheels, sinks, storage, and supply storage.

Pottery Classroom - Hand-built pottery room with �at work surfaces, storage, sinks.

Flexible enough for other potential classes.

Kiln Room - Fire rated room with 3 to 4 electric kilns.

Community Deck - Large 40’ x 25’ Deck with 20’ x 20’ deck usable for community events, additional classes, and camps.

Pottery Patio - Hardscape outside Pottery Barn to allow indoor/outdoor use of space.

ADA Ramps - In conjunction with the Community Deck, ADA ramps create a �uid connection between the house, the community deck, and the Pottery Barn.

Front Drop Off & Landscape - Eastern facade of the house facing Town Center on Main will receive a wood slat and canopy treatment to create a welcoming entry to the arts center. Combined with a raised drop-off and native landscapes, the entry will create a western gateway to this civic and cultural hub of Downtown Suwanee.

All rooms to use existing roll up door garage openings for indoor/outdoor potential

COMMUNITY DECK & EXTERIOR

CREATIVE

ARTS,

MEDIA, AND

GATHERING

HUB

(Existing House)New

Entry

THE

POTTERY

BARN

(Existing

Shed)

Pottery Patio

Unpaved Compacted Path (Future)

Potential Sidewalk Connection (Future)

COMMUNITY

DECK

(New Deck with Shade for ADA accessibility/ outdoor classes/ community gatherings)

+0 -2’ ADA Ramp

Sidewalk w/ grading to enable ADA accessibility

A D

A R am p

ADA Ramp

-4’

ADA

PKG

railroad

M

AIN STREET

Service / Loading

DROP

OFF

Suwanee Community Arts Center Expansion Study

11.07.25For Study Purposes Only

FRAMEWORK

11.07.25For Study Purposes Only

VISION

CREATIVE ARTS

DROPOFF

COMMUNITY DECK THE POTTERY BARN

CREATIVE ARTS, MEDIA, & GATHERING - Existing House

1 - Lobby & Display Area

2 - Creative Arts Classroom

3 - Fused Glass Studio / Community Multi-purpose room

4 - Digital Media Room

5 - Sound Recording Room

6 - Community Deck

7 - Pottery Patio

8 - ADA Ramps

9 - Front Drop Off & Landscape

COMMUNITY DECK & EXTERIOR

Suwanee Community Arts Center Expansion Study

11.07.25For Study Purposes Only

VISION

THE POTTERY BARN - Existing Shed 10 - Pottery Studio

11 - Pottery Classroom

12 - Kiln Room

Note: Plans are conceptual and for planning / pricing purposes only.

09.08.25

Concept Site Plan

NORTH

Suwanee Arts & Community Center: Expansion Study

Raised Wood PT Outdoor Deck w/ festoon lighting

Existing Sewer

Potential Sidewalk Connection

New Sewer Connection

20’ x 20’ Metal Louvered Pergola w/ Power + Lighting

Ext. PP

Wood ADA Ramps

Landscape Area

Regraded area w/ Ped. Concrete

New Wood Deck & Steps

1023.5’ 1021.5’ 1019.5’

Kiln Room

Glass/ FlexEntry

Arts/ Flex

Digital

Sound

Potter Classroom

Pottery Studio

1023.6’1024’

1023.85’

1023’ 1022’ 1021.5’

Drop-off

New Entry

New Entry Porch

New Sloped Walkway

Planting Area

Potential Right-in / Right-out

Drop-off

Conc. ADA Parking

Space With Ramp

New Asphalt pour & regrading

Suwanee Community Arts Center Expansion Study

PLANS: SITE PLAN

Concept Floor Plan: House

NORTH

Suwanee Arts & Community Center: Expansion Study

- New Vinyl Flooring

- New Paint throughout

- New Lighting throughout

- New Plumbing (fixtures placed proximate to existing locations)

- New HVAC

- Acoustic wall treatment in Sound Recording room -1 Standar Sink in Flex Classroom -2 Standard sinks at Creative Arts Room

Steel Frame / Wood Slat Screen

New Entry / Double Door / Glass Panel

Suwanee Community Arts Center Expansion Study

PLANS: CREATIVE ARTS, MEDIA, & GATHERING

Concept Floor Plan: Shed (Phase 2)

NORTH

Suwanee Arts & Community Center: Expansion Study

Shed Modifications

- New 1-hour fire rate walls around Kiln Room.

- New electrical panel / wiring to allow 3-4 220v electric Kilns (2-phase). Enable capacity for future classroom use in other spaces

-Downdraft exhaust for Kilns

-New lighting and wiring in room

-New Garage Door

-New drywall, insulation & paint in classrooms

-New water line to shed

-New lighting/wiring in classrooms

-Mini-split system with mounted unit in each classroom

-New flooring in Glass Studio

-New sidewalk and stair on east side

-New Stair from Glass studio to Pottery Studio

-Wheel Chair Lift

-New Paint on shed exterior

Suwanee Community Arts Center Expansion Study

11.07.25For Study Purposes Only

PLANS: THE POTTERY BARN

Marco.Ancheita Snapshot

Marco.Ancheita Snapshot

Marco.Ancheita Polygon

Marco.Ancheita Line

08.27.25

House

Shed Existing House & Shed - Front Left

Existing House - Front

M

AIN STREET

Existing House - Right Side 3

Existing Shed 4

Space Between House & Shed 5

View To Town Center On Main Park6

Suwanee Community Arts Center Expansion Study

APPENDIX: EXISTING HOUSE

Existing House & Shed - Views 08.27.25

House - Existing Floor Plan Shed - Existing Floor Plan

Existing House - Bedroom 1 Existing House -

Bedroom 4 Existing House -

Bathroom 5 Existing Shed - Upper Room6 Existing Shed - Lower Room7

Existing House - Living Room 2

Existing House - Sun Porch 3

Suwanee Arts & Community Center: Expansion Study Suwanee Community Arts Center

Expansion Study

APPENDIX: EXISTING HOUSE

-All flooring to be removed -HVAC system to be removed (provide as alternate) -Kitchen & Bathrooms to be removed -Fixtures to be removed

Steps to be removed

Deck & Steps to be removed

Concrete Walk & Porch to be removed

Existing Conditions: House

NORTH

Suwanee Arts & Community Center: Expansion Study

Wall Demo / Modification

Suwanee Community Arts Center Expansion Study

APPENDIX: EXISTING HOUSE, DEMOLITION

-Highlighted walls to be modified for 1 hour fire rating

09.08.25

Existing Conditions: Shed

NORTH

Suwanee Arts & Community Center: Expansion Study

Wall Demo / Modification

Phase 2 Demo

Suwanee Community Arts Center Expansion Study

APPENDIX: EXISTING HOUSE, DEMOLITION

Exhibit B - ES-America Environmental Lab Letter, dated March 24th, 2026 (Environmental Services of America)

From: Sarah Starnes <sarah@es-america.com>

Sent: Tuesday, March 24, 2026 11:22 AM

Subject: ESA lab reports

Attachments: 431 Main StreetSuwanee, Georgia - asbestos lab report .pdf; Jacob

Benton - Asbestos Inspector Refresh 2025 - 2026 .PDF; 431 Main

StreetSuwanee, Georgia 30024 -lead lab report .pdf

External Email! Do not open links, attachments or answer questions if you do not know the sender or are not sure the content is safe.

Good Afternoon, Thank you for allowing ES-America to handle your asbestos and lead testing needs. Attached are your lab report(s).

Your asbestos lab report indicates that the listed materials are ACM (asbestos-containing material). This indicates that abatement (removal) is required in these areas before disturbing these materials during renovations or demolition at this property.

Detected areas:

- kitchen floor vinyl (laundry floor vinyl homogeneous)

- exterior siding

We are creating a quote for the removal of the ACM materials.

Regulatory Overview :

Friable ACM, Category I and Category II non-friable ACM which is in poor condition and has become friable or which will be subjected to drilling, sanding, cutting, grinding, or abrading and which could be crushed or pulverized during anticipated demolition activities are considered regulated ACM (RACM).

RACM must be removed prior to demolition or renovations activities, which will disturb the materials.

The owner or operator must provide the Georgia Environmental Protection Division (GA EPD) with written notification at least 10 working days prior to commencement of demolition activity which will include the disturbance of at least 10 linear feet or 10 square feet of RACM. Removal of RACM must be conducted by a GA EPD licensed asbestos abatement contractor. All ACM must be disposed of at a permitted landfill. The Georgia Department of Natural Resources (DNR) provides the GA EPD authority for regulating asbestos containing waste.

In reference to the lead lab report.

Your lead paint chip report shows that all samples yielded results less than 0.5%, therefore professional lead removal by an abatement company is not necessary.

According to the Environmental Protection Agency (EPA), paint containing ≥1 milligram per square centimeter (mg/cm2) of lead using an XRF or >0.5% by weight (paint chip analysis) is considered lead-based paint (LBP).

What does this mean? :

Lead paint chip sampling results are reported in units of percentage (%) and equally in PPM. The federal standard for lead in paint states it must come back less than 0.5% in order to not require abatement

(removal) by a certified company.

https://epd.georgia.gov/lead-based-paint-hazard-management-rules-summary

The full inspection report for this property will be ready in approximately one - two weeks. You are not required to wait for this report to move forward with asbestos removal or demolition (if the plan is to completely demolish the structures). You are required to remove the asbestos prior to demolition.

Please let me know if you have any questions.

Thank you, Sarah Hernandez Service manager M. (706) 661-0487 W. www.es-america.com

To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet.

Please consider the environment before printing this e-mail

NOTICE:

This email communication contains confidential information belonging to the sender and is intended solely for the designated addressee(s) named herein. The unauthorized use, disclosure or transmission of this email (or any information contained herein) is strictly prohibited. If you have received this email in error, you are requested to notify the sender immediately by return email and to destroy the original email communication, including all attachments, in their entirety.

Exhibit C – EMSL Asbestos Lab Report, EMSL Order No.

072602497 (dated March 18th, 2026)

EMSL Analytical, Inc.

2205 Corporate Plaza Parkway SE, Suite 200 Smyrna, GA 30080

Tel/Fax: (770) 956-9150 / (770) 956-9181 http://www.EMSL.com / atlantalab@emsl.com

072602497EMSL Order:

Customer ID: ESAG42

Customer PO:

Project ID:

Attention: Phone:Elias Hernandez (706) 206-3733

Fax:Environmental Services Of America

Received Date:PO Box 250 03/17/2026 2:05 PM

Analysis Date:Watkinsville, GA 30677 03/18/2026

Collected Date:

Project: 431 Main St. - JB

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

001-Joint Compound

072602497-0001

<1% ChrysotileNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Living Wall NW

HA: A

001-Drywall

072602497-0001A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Living Wall NW

HA: A

002-Joint Compound

072602497-0002

<1% ChrysotileNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Living Wall SE

HA: A

002-Drywall

072602497-0002A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Living Wall SE

HA: A

003-Joint Compound

072602497-0003

<1% ChrysotileNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Dining Wall

HA: B

003-Drywall

072602497-0003A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Dining Wall

HA: B

004-Joint Compound

072602497-0004

<1% ChrysotileNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Kitchen/Laundry Wall

HA: B

004-Drywall

072602497-0004A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Kitchen/Laundry Wall

HA: B

005-Joint Compound

072602497-0005

<1% ChrysotileNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Pink Bed Wall NW

HA: C

005-Drywall

072602497-0005A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Pink Bed Wall NW

HA: C

006-Joint Compound

072602497-0006

<1% ChrysotileNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Pink Bed Wall SE

HA: C

006-Drywall

072602497-0006A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Pink Bed Wall SE

HA: C

Initial report from: 03/18/2026 14:08:48

Page 1 of 7ASB_PLM_0008_0002 - 2.31 Printed: 3/18/2026 2:08 PM

Tel/Fax: (770) 956-9150 / (770) 956-9181 http://www.EMSL.com / atlantalab@emsl.com

072602497EMSL Order:

Customer ID: ESAG42

Customer PO:

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

072602497-0007

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Hall Wall NW

HA: D

072602497-0008

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Hall Wall SE

HA: D

009-Joint Compound

072602497-0009

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Bath Wall NW

HA: E

009-Drywall

072602497-0009A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Bath Wall NW

HA: E

010-Joint Compound

072602497-0010

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Bath Wall SE

HA: E

010-Drywall

072602497-0010A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Bath Wall SE

HA: E

011-Joint Compound

072602497-0011

<1% ChrysotileNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Green Bed Wall NW

HA: F

011-Drywall

072602497-0011A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Green Bed Wall NW

HA: F

012-Joint Compound

072602497-0012

<1% ChrysotileNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Green Bed Wall SE

HA: F

012-Drywall

072602497-0012A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Green Bed Wall SE

HA: F

013-Joint Compound

072602497-0013

<1% ChrysotileNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Master Bed Wall NW

HA: G

013-Drywall

072602497-0013A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Master Bed Wall NW

HA: G

014-Joint Compound

072602497-0014

<1% ChrysotileNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Master Bed Wall SE

HA: G

014-Drywall

072602497-0014A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Master Bed Wall SE

HA: G

015-Ceramic Tile

072602497-0015

None DetectedNon-fibrous (Other)100%Tan/White

Non-Fibrous

Homogeneous

Master Bath Wall NW

Page 2 of 7ASB_PLM_0008_0002 - 2.31 Printed: 3/18/2026 2:08 PM

Tel/Fax: (770) 956-9150 / (770) 956-9181 http://www.EMSL.com / atlantalab@emsl.com

072602497EMSL Order:

Customer ID: ESAG42

Customer PO:

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

HA: H

015-Grout

072602497-0015A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Master Bath Wall NW

HA: H

015-Joint Compound

072602497-0015B

<1% ChrysotileNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Master Bath Wall NW

HA: H

015-Drywall

072602497-0015C

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Master Bath Wall NW

HA: H

016-Ceramic Tile

072602497-0016

None DetectedNon-fibrous (Other)100%Tan/White

Non-Fibrous

Homogeneous

Master Bath Wall SE

HA: H

016-Grout

072602497-0016A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Master Bath Wall SE

HA: H

016-Joint Compound

072602497-0016B

<1% ChrysotileNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Master Bath Wall SE

HA: H

016-Drywall

072602497-0016C

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Master Bath Wall SE

HA: H

017-Vinyl Sheet

Flooring 1

072602497-0017

25% ChrysotileNon-fibrous (Other)75%Green

Fibrous

Homogeneous

Kitchen Floor

HA: I

017-Mastic 1

072602497-0017A

None DetectedNon-fibrous (Other)100%Yellow

Non-Fibrous

Homogeneous

Kitchen Floor

HA: I

017-Vinyl Sheet

Flooring 2

072602497-0017B

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Kitchen Floor

HA: I

017-Mastic 2

072602497-0017C

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Kitchen Floor

HA: I

017-Vinyl Sheet

Flooring 3

072602497-0017D

None DetectedNon-fibrous (Other)100%Brown

Non-Fibrous

Homogeneous

Kitchen Floor

HA: I

017-Mastic 3

072602497-0017E

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Kitchen Floor

HA: I

Page 3 of 7ASB_PLM_0008_0002 - 2.31 Printed: 3/18/2026 2:08 PM

Tel/Fax: (770) 956-9150 / (770) 956-9181 http://www.EMSL.com / atlantalab@emsl.com

072602497EMSL Order:

Customer ID: ESAG42

Customer PO:

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

018-Vinyl Sheet

Flooring 1

072602497-0018

Positive Stop (Not Analyzed)Laundry Floor

HA: I

018-Mastic 1

072602497-0018A

None DetectedNon-fibrous (Other)100%Yellow

Non-Fibrous

Homogeneous

Laundry Floor

HA: I

018-Vinyl Sheet

Flooring 2

072602497-0018B

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Laundry Floor

HA: I

018-Vinyl Sheet

Flooring 3

072602497-0018C

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Laundry Floor

HA: I

018-Mastic 2

072602497-0018D

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Laundry Floor

HA: I

018-Vinyl Sheet

Flooring 4

072602497-0018E

None DetectedNon-fibrous (Other)100%Gold

Non-Fibrous

Homogeneous

Laundry Floor

HA: I

018-Mastic 3

072602497-0018F

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Laundry Floor

HA: I

019-Ceramic Tile

072602497-0019

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Hall Bath Floor NW

HA: J

019-Grout

072602497-0019A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Hall Bath Floor NW

HA: J

020-Ceramic Tile

072602497-0020

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Hall Bath Floor SE

HA: J

020-Grout

072602497-0020A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Hall Bath Floor SE

HA: J

021-Ceramic Tile

072602497-0021

None DetectedNon-fibrous (Other)100%Various

Non-Fibrous

Homogeneous

Master Bath Floor

NW

HA: K

021-Grout

072602497-0021A

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Master Bath Floor

NW

HA: K

021-Mortar

072602497-0021B

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Master Bath Floor

NW

Page 4 of 7ASB_PLM_0008_0002 - 2.31 Printed: 3/18/2026 2:08 PM

Tel/Fax: (770) 956-9150 / (770) 956-9181 http://www.EMSL.com / atlantalab@emsl.com

072602497EMSL Order:

Customer ID: ESAG42

Customer PO:

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

HA: K

022-Ceramic Tile

072602497-0022

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Master Bath Floor SE

HA: K

022-Grout

072602497-0022A

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Master Bath Floor SE

HA: K

022-Mortar

072602497-0022B

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Master Bath Floor SE

HA: K

023-Joint Compound

072602497-0023

<1% ChrysotileNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Kitchen Ceiling

HA: L

023-Drywall

072602497-0023A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Kitchen Ceiling

HA: L

072602497-0024

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Dining Ceiling

HA: L

025-Joint Compound

072602497-0025

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Living Ceiling

HA: L

025-Drywall

072602497-0025A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Living Ceiling

HA: L

026-Joint Compound

072602497-0026

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Hall Bath Ceiling

HA: M

026-Drywall

072602497-0026A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Hall Bath Ceiling

HA: M

027-Texture

072602497-0027

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Pink Bed Ceiling

HA: M

027-Drywall

072602497-0027A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Pink Bed Ceiling

HA: M

028-Texture

072602497-0028

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Green Bed Ceiling

HA: M

028-Drywall

072602497-0028A

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Green Bed Ceiling

HA: M

Page 5 of 7ASB_PLM_0008_0002 - 2.31 Printed: 3/18/2026 2:08 PM

Tel/Fax: (770) 956-9150 / (770) 956-9181 http://www.EMSL.com / atlantalab@emsl.com

072602497EMSL Order:

Customer ID: ESAG42

Customer PO:

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

072602497-0029

25% ChrysotileNon-fibrous (Other)75%Gray

Fibrous

Homogeneous

Siding NW

HA: N

072602497-0030

Positive Stop (Not Analyzed)Siding SE

HA: N

072602497-0031

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Window Glazing NW

HA: O

072602497-0032

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Window Glazing SE

HA: O

033-Shingle 1

072602497-0033

None DetectedNon-fibrous (Other)90%Glass10%Black

Fibrous

Homogeneous

Roof NW

HA: P

033-Shingle 2

072602497-0033A

None DetectedNon-fibrous (Other)90%Glass10%Black

Fibrous

Homogeneous

Roof NW

HA: P

033-Felt

072602497-0033B

None DetectedNon-fibrous (Other)40%Cellulose60%Black

Fibrous

Homogeneous

Roof NW

HA: P

034-Shingle 1

072602497-0034

None DetectedNon-fibrous (Other)90%Glass10%Black

Fibrous

Homogeneous

Roof SE

HA: P

034-Shingle 2

072602497-0034A

None DetectedNon-fibrous (Other)90%Glass10%Black

Fibrous

Homogeneous

Roof SE

HA: P

034-Felt

072602497-0034B

None DetectedNon-fibrous (Other)40%Cellulose60%Black

Fibrous

Homogeneous

Roof SE

HA: P

072602497-0035

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Chimney Mastic A

HA: Q

072602497-0036

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Chimney Mastic B

HA: Q

037-Shingle 1

072602497-0037

None DetectedNon-fibrous (Other)90%Glass10%Black

Fibrous

Homogeneous

Garage Roof NW

HA: R

037-Shingle 2

072602497-0037A

None DetectedNon-fibrous (Other)90%Glass10%Black

Fibrous

Homogeneous

Garage Roof NW

HA: R

037-Felt

072602497-0037B

None DetectedNon-fibrous (Other)40%Cellulose60%Black

Fibrous

Homogeneous

Garage Roof NW

Page 6 of 7ASB_PLM_0008_0002 - 2.31 Printed: 3/18/2026 2:08 PM

Tel/Fax: (770) 956-9150 / (770) 956-9181 http://www.EMSL.com / atlantalab@emsl.com

072602497EMSL Order:

Customer ID: ESAG42

Customer PO:

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

HA: R

038-Shingle 1

072602497-0038

None DetectedNon-fibrous (Other)90%Glass10%Black

Fibrous

Homogeneous

Garage Roof SE

HA: R

038-Shingle 2

072602497-0038A

None DetectedNon-fibrous (Other)90%Glass10%Black

Fibrous

Homogeneous

Garage Roof SE

HA: R

038-Felt

072602497-0038B

None DetectedNon-fibrous (Other)40%Cellulose60%Black

Fibrous

Homogeneous

Garage Roof SE

HA: R

Analyst(s)

Erricka Smith (84) Violedah Richardson, Laboratory Manager or Other Approved Signatory

EMSL maintains liability limited to cost of analysis . Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . The report reflects the samples as received.

Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non- friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis . Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc Smyrna, GA NVLAP Lab Code 101048-1

Page 7 of 7ASB_PLM_0008_0002 - 2.31 Printed: 3/18/2026 2:08 PM

Exhibit D – EMSL Lead Paint Lab Report, EMSL Order No. 412650724

(dated March 20th, 2026)

Project Name:

Customer PO:

EMSL Sales Rep:

Reported:

EMSL Analytical, Inc.

10801 Southern Loop Blvd, Pineville, NC, 28134

Telephone: (704) 525-2205 Fax:(704) 525-2382 emsl.com

Attention:

Received: 03/19/2026 10:05

03/20/2026 07:42

Emily Stressman

EMSL Order ID: 412650724

LIMS Reference ID: LE50724

EMSL Customer ID: ESAG42

431 Main St. - JBElias Hernandez

Environmental Services Of America [ESAG42]

PO Box 250

Watkinsville, GA 30677

(706) 206-3733 reports@es-america.com

Analytical Results

Analyte Results RL Q DF Analysis Date

& AnalystWeight

Prep Date

& Tech

Analytical

MethodPrep Method

Client Sample ID: L001/Trim Paint White Date Sampled: 03/17/26

Matrix: Chips LIMS Reference ID: LE50724-01

1Lead 03/19/26 MSX 03/19/26 MTS<0.018 % wt 0.018 % wt SW 846-7000B0.0882 g SW-846 3050B

Client Sample ID: L002/Living Paint Grey Date Sampled: 03/17/26

Matrix: Chips LIMS Reference ID: LE50724-02

1Lead 03/19/26 MSX 03/19/26 MTS<0.0064 % wt 0.0064 % wt SW 846-7000B0.2512 g SW-846 3050B

Client Sample ID: L003/Living Paint Blue Date Sampled: 03/17/26

Matrix: Chips LIMS Reference ID: LE50724-03

1Lead 03/19/26 MSX 03/19/26 MTS<0.020 % wt 0.020 % wt SW 846-7000B0.0816 g SW-846 3050B

Client Sample ID: L004/Bedroom paint Pink Date Sampled: 03/17/26

Matrix: Chips LIMS Reference ID: LE50724-04

1Lead 03/19/26 MSX 03/19/26 MTS<0.0064 % wt 0.0064 % wt SW 846-7000B0.2528 g SW-846 3050B

Client Sample ID: L005/Bedroom Paint Green Date Sampled: 03/17/26

Matrix: Chips LIMS Reference ID: LE50724-05

1Lead 03/19/26 MSX 03/19/26 MTS<0.0094 % wt 0.0094 % wt SW 846-7000B0.1708 g SW-846 3050B

Client Sample ID: L006/Hall Bath Paint Green Date Sampled: 03/17/26

Matrix: Chips LIMS Reference ID: LE50724-06

1Lead 03/19/26 MSX 03/19/26 MTS0.015 % wt 0.0064 % wt SW 846-7000B0.2534 g SW-846 3050B

Client Sample ID: L007/Master Bed Paint Grey Date Sampled: 03/17/26

Matrix: Chips LIMS Reference ID: LE50724-07

1Lead 03/19/26 MSX 03/19/26 MTS<0.0064 % wt 0.0064 % wt SW 846-7000B0.2532 g SW-846 3050B

Client Sample ID: L008/Ext Trim Paint White Date Sampled: 03/17/26

Matrix: Chips LIMS Reference ID: LE50724-08

1Lead 03/19/26 MSX 03/19/26 MTS0.061 % wt 0.0064 % wt SW 846-7000B0.2542 g SW-846 3050B

Client Sample ID: L009/Ext Wall Paint Burgundy Date Sampled: 03/17/26

Matrix: Chips LIMS Reference ID: LE50724-09

1Lead 03/19/26 MSX 03/19/26 MTS0.10 % wt 0.0064 % wt SW 846-7000B0.2516 g SW-846 3050B

[TOC_1]Sample Results[TOC]

P…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .