This Request for Proposals (RFP) is issued by the City of Suwanee, Georgia, for Design-Build Services to create a Suwanee Arts Center. The project involves the renovation of an existing 2,000-square-foot 1940s-era house into a Creative Arts, Media & Gathering Hub and the demolition and replacement of an existing shed with a new 30' × 50' metal building to serve as the Pottery Barn. The house renovation will accommodate a lobby and display area, creative arts classroom (approximately 453 square feet), fused glass studio/community multipurpose room, digital media room (approximately 133 square feet), sound recording room (approximately 55 square feet), office nook (approximately 30 square feet), and storage rooms. The Pottery Barn will include a pottery studio with space for 8-10 thrown pottery wheels, a pottery classroom, a fire-rated kiln room for 3-4 electric kilns, and two interior restrooms. Site work includes demolition of existing structures, new asphalt paving, ADA-compliant parking and ramps, a 40' × 25' raised wood community deck with a 20' × 20' metal louvered pergola, a covered walkway between structures, a pottery patio, and landscaping. A pre-proposal site visit is scheduled for June 29, 2026, at 3:00 PM at 431 Main Street, Suwanee, GA 30024. The questions deadline is July 16, 2026, at 5:00 PM, and proposals are due July 27, 2026, at 2:00 PM. Potential interviews are tentatively scheduled for August 13, 2026. The City expects the design-build process to proceed through four phases: Phase 1 (Initial Selection), Phase 2 (Preconstruction Services), Phase 3 (Construction Agreement), and Phase 4 (Construction).
The City has established a construction budget of $1,450,000 for the design-build contract, which is inclusive of all design fees, construction costs, contractor overhead, and profit. The City will maintain a separate owner's contingency of $150,000 and will separately fund permit costs. Proposers must submit a preliminary cost assessment demonstrating budget feasibility, with a high-level allocation across major components including design fees, demolition and abatement, house renovation, new Pottery Barn metal building, community deck and pergola, site work and civil, MEP systems, performance and payment bonds, and contractor overhead and profit. If automatic fire sprinkler systems or manual fire alarm systems are deemed required by the Authority Having Jurisdiction during design, such costs will be treated as scope adjustments outside the base budget. Asbestos abatement is required and included in the design-builder's scope; known asbestos-containing materials (ACM) have been identified in kitchen floor vinyl and exterior siding at 25% Chrysotile, with the design-builder responsible for confirming the full abatement scope. Lead paint testing showed results below the EPA threshold, so no lead abatement is required. The selected firm must furnish Performance and Payment Bonds each in the amount of 100% of the total contract price from a Georgia-licensed surety company. The design-build firm must carry general liability insurance (minimum $1,000,000 per occurrence/$2,000,000 aggregate), professional liability/errors and omissions insurance, workers' compensation coverage, and automobile liability insurance, and must comply with Georgia's E-Verify requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF SUWANEE, GEORGIA
REQUEST FOR PROPOSALS
Suwanee Arts Center Design-Build Services
RFP Issue Date: June 12, 2026
Pre-Proposal Site Visit: June 29 at 3:00 pm - Attendance Encouraged
Questions Deadline: July 16, 2026 at 5:00 PM
Proposal Due Date: July 27, 2026 at 2:00 PM
Project Location: 431 Main Street, Suwanee, GA 30024 (adjacent to Town Center on Main)
Estimated Project Budget: $1,450,000 (exclusive of Owner contingency)
Owner: City of Suwanee, Georgia
Proposals (in PDF format) must be submitted to:
Jim Simpson, Project Manager
330 Town Center Avenue, Suwanee, GA 30024 jim.simpson@oneatlas.com
This document and all attachments are available at: www.suwanee.com and on the Georgia Procurement Registry (GPR).
mailto:jim.simpson@oneatlas.com
1. INTRODUCTION
The City of Suwanee (“City”) is soliciting proposals to select a Design-Builder based on qualifications, project approach, and other factors, and to proceed using a design-build process.
The project involves two distinct scopes of work delivered under a single design-build contract:
• Renovation of an existing 2,000 square foot, 1940’s era house and grounds, into the Creative Arts, Media & Gathering Hub, and
• Demolition of an existing detached shed and construction of a new 30’ × 50’ metal building (the Pottery Barn) in its place.
The City engaged Lord Aeck Sargent (LAS) to prepare a conceptual expansion study, which is attached as Exhibit A to this RFP. The LAS study establishes the programmatic vision, spatial framework, and design intent that the selected design-build firm will develop into construction documents. The design-build team is expected to bring its own licensed architect and to carry the project from schematic design through construction completion.
2. PROJECT OVERVIEW
2.1 General Description
The site is located at 431 Main Street, Suwanee, GA. It contains an approximately 2,000 square foot house that was constructed in the 1940’s and a detached approximately 1,000 square foot barn. The house is to be renovated and the barn is to be demolished and replaced with an approximately 1,500 square foot metal building. New construction also includes an outdoor community deck and a new driveway.
The conceptual expansion study describes the project goals and should be used as a reference document with one noted significant adjustment: the concept study initially anticipated renovating the detached pottery barn, however, after further study demolition and replacement is now the preferred option.
The anticipated construction includes:
Renovation of an approximately 2,000 square foot existing residential structure into multiple open rooms for an arts facility
Demolition of an existing barn/garage structure
Construction of a new detached metal building (approximately 1,500 square feet), inspired or modeled after the detached metal building at Co-Hatch co-working in Duluth Georgia.
Related site improvements and connectivity between structures
Environmental and structural reports have been prepared and are incorporated as attachments.
A structural assessment of the existing house has been completed and is attached as Exhibit F. The report identifies required structural improvements associated with the conversion of the existing residential structure to a commercial arts facility, including crawlspace framing reinforcement, pier reconstruction, floor framing strengthening, roof framing coordination, and potential lateral system modifications required by Code. Proposers shall review the report and incorporate all required structural modifications. Final structural design, code compliance, and verification of existing conditions shall remain the responsibility of the Design-Builder.
2.2 Project Goals
• Deliver a high-quality, functional arts facility within the established budget
• Honor the programmatic vision established in the LAS expansion study
• Create an architecturally distinctive facility that reflects Suwanee’s commitment to arts and community
• Achieve full ADA accessibility throughout the facility and site
• Complete construction as expeditiously as possible
3. ANTICIPATED PROCUREMENT PROCESS
The City intends to utilize a qualifications-based, criteria-driven design-build delivery method. Under this approach, a single design-build entity holds responsibility for both design and construction services. The process is structured in phases to allow collaborative development of the design and cost prior to execution of a construction contract, as described below.
3.1 Phase 1 — Initial Selection: Proposal submission, evaluation against stated criteria, potential interviews (tentatively scheduled for Thursday August 13, 2026), and selection of the design-build firm.
No design work begins during this phase. If agreement cannot be reached, the City reserves the right to negotiate with the next-ranked firm.
3.2 Phase 2 — Preconstruction Services: Execution of a preconstruction services agreement. The design-build team develops design through construction documents in collaboration with City staff. This phase concludes with a negotiated lump sum or GMP proposal.
3.3 Phase 3 — Construction Agreement: If the City and design-builder reach agreement on the GMP or lump sum, a construction contract is executed.
3.4 Phase 4 — Construction: Full construction through substantial completion, punch list, and closeout.
4. SCOPE OF WORK
4.1 House Renovation
The existing house shall be renovated to accommodate the following program elements:
• Lobby and display area
• Creative arts classroom (approx. 453 SF) — large, light-filled space suitable for painting, drawing, workshops, and camps
• Fused glass studio / community multipurpose room — flexible space for fused glass classes, community events, and allied arts functions
• Digital media room (approx. 133 SF) — space for green screen, video recording, claymation, photography, and digital/analog media
• Sound recording room / booth (approx. 55 SF) — acoustically treated; allied to the digital media room
• Office nook (approx. 30 SF)
• Storage rooms
Interior renovation work shall include, at minimum:
• Selective interior demolition per the LAS demolition plan (Exhibit A): removal of all existing flooring, kitchen, bathrooms, fixtures, and identified partition walls
• Existing structural rehabilitation
• New partition walls and interior configuration per schematic program
• Two (2) restrooms
• New vinyl plank or similar commercial-grade flooring throughout
• New paint throughout
• New energy-efficient LED lighting throughout
• New plumbing — fixtures proximate to existing rough-in locations; minimum 1 sink in flex classroom, 2 sinks in creative arts room, restroom facilities
• New HVAC system
• Upgraded or new electrical system(s) as needed
• Acoustic wall treatment in sound recording room
• New double-door / glass panel entry with steel frame and wood slat screen facade treatment
(eastern facade facing Town Center on Main)
• All work to meet current building code and ADA requirements
• Smoke detection system throughout, meeting fire code requirements for the intended assembly occupancy. Note: Based on the building size and anticipated occupant load, automatic fire sprinkler systems and manual fire alarm systems are not anticipated to be required; however, the design-builder is responsible for confirming all fire and life safety code compliance. If a fire sprinkler system is deemed required by the Authority Having Jurisdiction (AHJ) during the design phase, it shall be treated as a scope adjustment/change to the $1,450,000 budget.
Exterior renovation work shall include, at minimum:
• New roof (asphalt or metal TBD)
• Replacement of siding
• General carpentry and exterior improvements as needed
4.2 Pottery Barn — New Metal Building
The existing shed shall be demolished in its entirety and a new 30’ × 50’ (1,500 SF) metal building constructed in its general location. The new building shall serve as the Pottery Barn and shall accommodate the following program:
• Pottery studio — large open space for 8–10 thrown pottery wheels, with adequate sinks, storage, and supply storage
• Pottery classroom — pottery room with flat work surfaces, sinks, and storage; flexible for other classes
• Kiln room — 1-hour fire-rated enclosure for 3–4 electric kilns
• Two (2) interior restrooms
• If budget permits, city would like to increase the size of the building up to 2,000 square feet
The building shall be a pre-engineered metal building of contemporary, stylish design based on the metal building at the Co-Hatch facility in Duluth. The City’s design intent for this building is a simple, clean, modern industrial aesthetic with significant glazing. Key design features shall include:
• Three (3) full-width glass garage doors on the primary facade to enable indoor/outdoor connectivity
• Contemporary metal panel exterior with architectural detailing that complements the renovated house
• High interior clearance appropriate for an active arts studio environment
• MEP systems including: new electrical service and panel with sufficient capacity for 3–4 electric kilns at 240v; the design-builder's electrician shall confirm required service type (single-phase vs.
three-phase) as part of the design process
• Kiln ventilation and air management: The kiln room shall include a professional-grade mechanical ventilation system specifically designed for electric kiln operation
• New water/sewer connections
• Floor shall consist of a durable, non-porous, non-slip-resistant finish capable of withstanding frequent water exposure and clay "slip”
• Floor drains shall be provided in the pottery studio and kiln room, sized and located to accommodate water and clay slip from wheel-throwing operations
• LED lighting throughout
• Full ADA compliance
• Smoke detection system throughout, meeting fire code requirements for the intended assembly occupancy. Note: Based on the building size and anticipated occupant load, automatic fire sprinkler systems and manual fire alarm systems are not anticipated to be required; however, the design-builder is responsible for confirming all fire and life safety code compliance. If a fire sprinkler system is deemed required by the Authority Having Jurisdiction (AHJ) during the design phase, it shall be treated as a scope adjustment/change to the $1,450,000 budget.
Reference images of a comparable building aesthetic (Co-hatch co-working facility, Duluth, GA) are provided as an attachment.
4.3 Site Work & Civil
The design-build scope shall include all site work necessary to complete the project, including:
• Demolition of existing shed, concrete walks, existing deck and steps as identified in the LAS study
• New asphalt paving and regrading for drop-off area (right-in / right-out configuration from Main Street)
• ADA-compliant concrete parking space with ramp
• New concrete ADA ramps connecting house, community deck, and Pottery Barn (the site currently has approximately 4’ of grade change across the project area)
• New raised wood pressure-treated outdoor community deck (approx. 40’ × 25’) with 20’ × 20’ metal louvered pergola with power and festoon lighting
• Covered walkway connecting the house and the Pottery Barn, designed to provide weather protection along the primary pedestrian circulation path between the two structures. Design and dimensions to be determined during preconstruction in coordination with City staff.
• Pottery patio — hardscape area adjacent to the Pottery Barn
• New sewer connection for the Pottery Barn
• Grading, drainage, and erosion control
• Basic landscaping and planting areas at entry and along Main Street frontage
• New sloped entry walkway and entry porch at house
• Coordination with existing utilities; utility locates and protection
• Asbestos abatement is required prior to any demolition or renovation activity. The design-build scope includes all abatement work including coordination with a GA EPD licensed abatement contractor, submission of required written notifications to the Georgia Environmental Protection Division (GA EPD), and appropriate disposal of all ACM. Known ACM locations identified in the environmental reports (Exhibits B and C) include the kitchen floor vinyl and exterior siding, both confirmed at 25% Chrysotile. The design-builder is responsible for confirming full abatement scope and the contract price shall include all abatement work regardless of any additional ACM discovered during construction.
• Lead paint testing was conducted at 431 Main Street. All samples returned below the EPA threshold requiring certified abatement (0.5% by weight). No lead abatement is required. The lead lab report is provided for reference.
5. BUDGET
The City has established a construction budget of $1,450,000 for this project. This figure represents the total hard cost budget available for the design-build contract, inclusive of all design fees, construction costs, contractor overhead and profit. The City will maintain a separate owner’s contingency of $150,000 that is not part of the design-build contract. The city will also separately fund the cost of permits as needed.
Proposers should review the LAS expansion study and assess the feasibility of delivering the described program within this budget prior to submitting. The City expects proposers to advise on any scope adjustments necessary to achieve budget compliance as part of the pre-contract negotiation process.
The City expects the selected firm to maintain cost transparency throughout the design process and to provide updated cost projections at each design milestone, as mutually agreed upon during preconstruction.
6. PROPOSAL REQUIREMENTS
Proposals shall be submitted as a single PDF document no more than 20 total pages. Responses should be concise and directly responsive to the criteria listed. The City does not require elaborate graphic presentations at this stage.
6.1 Cover Letter
A one-page cover letter on firm letterhead signed by an authorized representative confirming the firm’s interest, legal name, address, primary contact, and acknowledgment of all RFP addenda (if any).
6.2 Team Qualifications & Experience
Provide the following:
• Brief description of firm structure and design-build experience
• Proposed team: general contractor, architect of record, key subcontractors (MEP, civil) if known
• Bios for proposed project manager, superintendent, and lead architect
• Minimum three (3) completed project examples with: project name and location, owner reference and contact, project type and size, contract value, delivery method, and completion date. Preference given to adaptive reuse / renovation, metal building construction, arts or community facilities, and public-sector clients
6.3 References
Minimum three (3) owner references from completed projects of similar scope and complexity. Include name, title, organization, phone, and email. May be the same projects listed in 6.2.
6.4 Project Approach
Provide a narrative (maximum three pages) describing:
• Approach to design-build delivery and budget/schedule alignment
• Preliminary thoughts on scope, concerns, opportunities, or value engineering ideas
6.5 Project Schedule
Provide a realistic preliminary project schedule from contract execution through substantial completion.
The schedule should identify major milestones including design phases, permitting, procurement of the metal building package, demolition, and construction.
6.6 Cost Projection
Proposers shall provide a brief preliminary cost assessment demonstrating their review of the project scope and their assessment of budget feasibility. This is not a bid and will not be used as a binding cost commitment. It will be used to evaluate whether the proposer has a realistic understanding of the project scope and the City's $1,450,000 budget.
The preliminary cost assessment shall include:
• A statement confirming whether the proposer believes the described scope is achievable within the City's $1,450,000 design-build budget, based on their review of the RFP and attached exhibits
• A high-level allocation of the budget across the following major components, with any noted assumptions or qualifications:
Scope Component Preliminary Allocation Notes / Assumptions Design fees (architecture, engineering) $
Demolition & abatement $
House renovation (including structural) $
New Pottery Barn metal building $
Community deck, pergola & covered walkway $
Site work, civil & grading $
MEP — all buildings $
Performance & payment bonds $
Contractor overhead & profit $
Other (as appropriate) $
TOTAL
• Any scope items the proposer would recommend modifying, deferring, or value-engineering to achieve budget compliance
• Any items the proposer cannot assess without additional information, and what information would be needed
The final negotiated contract price will be established during Phase 2-Preconstruction Services and Phase 3-Construction Services and through a collaborative open-book design and estimating process.
The preliminary cost assessment submitted with this proposal does not constitute a price commitment by either party.
7. SELECTION PROCESS
7.1 Process Overview
The City will use a qualifications-based selection process followed by fee negotiation with the top-ranked firm. Proposals will be evaluated, up to three firms shortlisted for interviews, and the top-ranked firm selected for fee negotiation. If agreement cannot be reached, the City will negotiate with the next-ranked firm.
7.2 Evaluation Criteria
Evaluation Criterion Points
Relevant experience and qualifications of firm and key personnel 30
Demonstrated experience with adaptive reuse, and public construction projects
Project approach and understanding of scope 20
Proposed schedule and ability to deliver expeditiously 15
Preliminary cost assessment that demonstrates understanding of project budget constraints.
TOTAL 100
8. SUBMISSION INSTRUCTIONS
Proposals must be received no later than July 27, 2026 at 2:00 PM Eastern Time. Late proposals will not be accepted. Submit as a single PDF to jim.simpson@oneatlas.com
A pre-proposal site visit is scheduled for June 29, 2026 at 3:00 PM at 431 Main Street. Attendance is strongly encouraged. The City will provide interior access to the existing house. Firms unable to attend may arrange an alternative visit with the contact above.
All questions must be submitted in writing to the contact above by July 16, 2026 at 5:00 PM. Responses will be issued by addendum to all firms on record. Firms are responsible for monitoring addenda posted on the City’s website prior to submission of their proposal.
9. TERMS AND CONDITIONS
• The City of Suwanee reserves the right to reject any or all proposals, to waive informalities, and to accept the proposal deemed most advantageous to the City.
• This RFP does not constitute a commitment to award a contract. The City is not liable for any costs incurred by proposers in preparing or submitting proposals.
• All proposals become public records upon submission and may be subject to disclosure under the Georgia Open Records Act.
• The selected design-build firm will be required to carry general liability insurance (minimum $1,000,000 per occurrence / $2,000,000 aggregate), professional liability / errors & omissions insurance, workers’ compensation coverage, and automobile liability insurance at levels acceptable to the City.
mailto:jim.simpson@oneatlas.com
• The selected firm shall obtain all required permits and approvals, including City of Suwanee building permits and any Gwinnett County or state approvals required for the work.
• This RFP and any resulting contract are subject to the laws of the State of Georgia. The project will be posted on the Georgia Procurement Registry in accordance with state law.
• The City does not discriminate on the basis of race, color, religion, sex, national origin, age, disability, or any other protected class in the award of contracts.
• Proposers may not contact elected City officials regarding this RFP during the procurement process. All communications shall be directed to the designated point of contact.
• The City reserves the right to issue addenda to this RFP. It is the proposer’s responsibility to verify that no addenda have been issued prior to submission.
• The selected design-build firm shall comply with all applicable federal, state, and local requirements governing asbestos abatement and demolition, including Georgia EPD notification requirements under the Georgia Air Quality Act. The firm shall employ a GA EPD licensed asbestos abatement contractor for all ACM removal. The City has provided known environmental reports as exhibits to this RFP; however, the design-builder is solely responsible for verifying the full extent of any hazardous materials present and the contract price shall be inclusive of all required abatement work.
• The selected design-build firm shall comply with Georgia's E-Verify requirements pursuant to O.C.G.A. § 13-10-91. The firm shall execute an E-Verify affidavit prior to contract execution and shall require the same of all subcontractors.
• Performance and Payment Bonds: The selected Design-Build firm shall furnish a Performance Bond and a Payment Bond, each in the amount of 100% of the total contract price, from a surety company licensed to do business in the State of Georgia. The cost of these bonds shall be included in the Proposer’s preliminary cost projection.
10. EXHIBITS
The following exhibits are attached to and made part of this RFP:
• Exhibit A — Suwanee Community Arts Center Expansion Study (Lord Aeck Sargent, dated November 7, 2025). Note: The shed renovation scope shown in Exhibit A is superseded by the new metal building described in Section 2.2 of this RFP. All other elements of the study represent the conceptual basis for the design-build scope.
• Exhibit B — ES-America Environmental Lab Letter, dated March 24, 2026 (Environmental Services of America)
• Exhibit C — EMSL Asbestos Lab Report, EMSL Order No. 072602497, dated March 18, 2026
• Exhibit D — EMSL Lead Paint Lab Report, EMSL Order No. 412650724, dated March 20, 2026
• Exhibit E — Photographs of Co-Hatch building in Duluth, Ga.
• Exhibit F – Structural Assessment Report prepared by Sterling M. Cochran, S.E.
###END###
Exhibit A - Suwanee Community Arts Center
Expansion Study (Lord Aeck Sargent, dated November 7th, 2025)
(Note: The shed renovation scope shown in Exhibit A is superseded by the new metal building described in Section 2.2 of this RFP. All other elements of the study represent the conceptual basis for the design-build scope.)
SUWANEE COMMUNITY ARTS CENTER: EXPANSION STUDY
Suwanee Community Arts Center
11.07.25For Study Purposes Only
Shed railroad
M
AIN STREET
Heartis Suwanee
Senior Living
Gwinnett County Fire Station
PlayTown Suwanee
Town Center on Main
Town Center On Main
Proposed Suwanee Arts Center
Expansion Site Suwanee
Town Center
Suwanee Arts Center Current Location
Downtown Suwanee Context
Suwanee Dam Rd NW
Main St
Rail ro ad
Rail ro ad
Buf or d H wy N
E
Community Arts Center As Western Gateway to Civic & Community
District
Views to Park
Existing Shed
Existing House
SITE
11.07.25For Study Purposes Only
PROGRAM
CREATIVE ARTS, MEDIA, & GATHERING - Existing House
THE POTTERY BARN - Existing Shed
Lobby & Display Area
Creative Arts Classroom - Large light �lled space �exible enough for creative arts classes and camps.
Fused Glass Studio / Community Multi-purpose room - Large room �exible enough for Fused Glass Classes, community events, camps, and other allied arts functions.
Digital Media Room - Flexible room with space for a green screen, video recording, claymation, photography and other digital/analog media functions.
Sound Recording Room - Allied to the Digital Media Room, acoustically treated room for sound recording, podcasts, and other audio functions.
Pottery Studio - Large room with enough space for 8-10 thrown pottery wheels, sinks, storage, and supply storage.
Pottery Classroom - Hand-built pottery room with �at work surfaces, storage, sinks.
Flexible enough for other potential classes.
Kiln Room - Fire rated room with 3 to 4 electric kilns.
Community Deck - Large 40’ x 25’ Deck with 20’ x 20’ deck usable for community events, additional classes, and camps.
Pottery Patio - Hardscape outside Pottery Barn to allow indoor/outdoor use of space.
ADA Ramps - In conjunction with the Community Deck, ADA ramps create a �uid connection between the house, the community deck, and the Pottery Barn.
Front Drop Off & Landscape - Eastern facade of the house facing Town Center on Main will receive a wood slat and canopy treatment to create a welcoming entry to the arts center. Combined with a raised drop-off and native landscapes, the entry will create a western gateway to this civic and cultural hub of Downtown Suwanee.
All rooms to use existing roll up door garage openings for indoor/outdoor potential
COMMUNITY DECK & EXTERIOR
CREATIVE
ARTS,
MEDIA, AND
GATHERING
HUB
(Existing House)New
Entry
THE
POTTERY
BARN
(Existing
Shed)
Pottery Patio
Unpaved Compacted Path (Future)
Potential Sidewalk Connection (Future)
COMMUNITY
DECK
(New Deck with Shade for ADA accessibility/ outdoor classes/ community gatherings)
+0 -2’ ADA Ramp
Sidewalk w/ grading to enable ADA accessibility
A D
A R am p
ADA Ramp
-4’
ADA
PKG
railroad
M
AIN STREET
Service / Loading
DROP
OFF
Suwanee Community Arts Center Expansion Study
11.07.25For Study Purposes Only
FRAMEWORK
11.07.25For Study Purposes Only
VISION
CREATIVE ARTS
DROPOFF
COMMUNITY DECK THE POTTERY BARN
CREATIVE ARTS, MEDIA, & GATHERING - Existing House
1 - Lobby & Display Area
2 - Creative Arts Classroom
3 - Fused Glass Studio / Community Multi-purpose room
4 - Digital Media Room
5 - Sound Recording Room
6 - Community Deck
7 - Pottery Patio
8 - ADA Ramps
9 - Front Drop Off & Landscape
COMMUNITY DECK & EXTERIOR
Suwanee Community Arts Center Expansion Study
11.07.25For Study Purposes Only
VISION
THE POTTERY BARN - Existing Shed 10 - Pottery Studio
11 - Pottery Classroom
12 - Kiln Room
Note: Plans are conceptual and for planning / pricing purposes only.
09.08.25
Concept Site Plan
NORTH
Suwanee Arts & Community Center: Expansion Study
Raised Wood PT Outdoor Deck w/ festoon lighting
Existing Sewer
Potential Sidewalk Connection
New Sewer Connection
20’ x 20’ Metal Louvered Pergola w/ Power + Lighting
Ext. PP
Wood ADA Ramps
Landscape Area
Regraded area w/ Ped. Concrete
New Wood Deck & Steps
1023.5’ 1021.5’ 1019.5’
Kiln Room
Glass/ FlexEntry
Arts/ Flex
Digital
Sound
Potter Classroom
Pottery Studio
1023.6’1024’
1023.85’
1023’ 1022’ 1021.5’
Drop-off
New Entry
New Entry Porch
New Sloped Walkway
Planting Area
Potential Right-in / Right-out
Drop-off
Conc. ADA Parking
Space With Ramp
New Asphalt pour & regrading
Suwanee Community Arts Center Expansion Study
PLANS: SITE PLAN
Concept Floor Plan: House
NORTH
Suwanee Arts & Community Center: Expansion Study
- New Vinyl Flooring
- New Paint throughout
- New Lighting throughout
- New Plumbing (fixtures placed proximate to existing locations)
- New HVAC
- Acoustic wall treatment in Sound Recording room -1 Standar Sink in Flex Classroom -2 Standard sinks at Creative Arts Room
Steel Frame / Wood Slat Screen
New Entry / Double Door / Glass Panel
Suwanee Community Arts Center Expansion Study
PLANS: CREATIVE ARTS, MEDIA, & GATHERING
Concept Floor Plan: Shed (Phase 2)
NORTH
Suwanee Arts & Community Center: Expansion Study
Shed Modifications
- New 1-hour fire rate walls around Kiln Room.
- New electrical panel / wiring to allow 3-4 220v electric Kilns (2-phase). Enable capacity for future classroom use in other spaces
-Downdraft exhaust for Kilns
-New lighting and wiring in room
-New Garage Door
-New drywall, insulation & paint in classrooms
-New water line to shed
-New lighting/wiring in classrooms
-Mini-split system with mounted unit in each classroom
-New flooring in Glass Studio
-New sidewalk and stair on east side
-New Stair from Glass studio to Pottery Studio
-Wheel Chair Lift
-New Paint on shed exterior
Suwanee Community Arts Center Expansion Study
11.07.25For Study Purposes Only
PLANS: THE POTTERY BARN
Marco.Ancheita Snapshot
Marco.Ancheita Snapshot
Marco.Ancheita Polygon
Marco.Ancheita Line
08.27.25
House
Shed Existing House & Shed - Front Left
Existing House - Front
M
AIN STREET
Existing House - Right Side 3
Existing Shed 4
Space Between House & Shed 5
View To Town Center On Main Park6
Suwanee Community Arts Center Expansion Study
APPENDIX: EXISTING HOUSE
Existing House & Shed - Views 08.27.25
House - Existing Floor Plan Shed - Existing Floor Plan
Existing House - Bedroom 1 Existing House -
Bedroom 4 Existing House -
Bathroom 5 Existing Shed - Upper Room6 Existing Shed - Lower Room7
Existing House - Living Room 2
Existing House - Sun Porch 3
Suwanee Arts & Community Center: Expansion Study Suwanee Community Arts Center
Expansion Study
APPENDIX: EXISTING HOUSE
-All flooring to be removed -HVAC system to be removed (provide as alternate) -Kitchen & Bathrooms to be removed -Fixtures to be removed
Steps to be removed
Deck & Steps to be removed
Concrete Walk & Porch to be removed
Existing Conditions: House
NORTH
Suwanee Arts & Community Center: Expansion Study
Wall Demo / Modification
Suwanee Community Arts Center Expansion Study
APPENDIX: EXISTING HOUSE, DEMOLITION
-Highlighted walls to be modified for 1 hour fire rating
09.08.25
Existing Conditions: Shed
NORTH
Suwanee Arts & Community Center: Expansion Study
Wall Demo / Modification
Phase 2 Demo
Suwanee Community Arts Center Expansion Study
APPENDIX: EXISTING HOUSE, DEMOLITION
Exhibit B - ES-America Environmental Lab Letter, dated March 24th, 2026 (Environmental Services of America)
From: Sarah Starnes <sarah@es-america.com>
Sent: Tuesday, March 24, 2026 11:22 AM
Subject: ESA lab reports
Attachments: 431 Main StreetSuwanee, Georgia - asbestos lab report .pdf; Jacob
Benton - Asbestos Inspector Refresh 2025 - 2026 .PDF; 431 Main
StreetSuwanee, Georgia 30024 -lead lab report .pdf
External Email! Do not open links, attachments or answer questions if you do not know the sender or are not sure the content is safe.
Good Afternoon, Thank you for allowing ES-America to handle your asbestos and lead testing needs. Attached are your lab report(s).
Your asbestos lab report indicates that the listed materials are ACM (asbestos-containing material). This indicates that abatement (removal) is required in these areas before disturbing these materials during renovations or demolition at this property.
Detected areas:
- kitchen floor vinyl (laundry floor vinyl homogeneous)
- exterior siding
We are creating a quote for the removal of the ACM materials.
Regulatory Overview :
Friable ACM, Category I and Category II non-friable ACM which is in poor condition and has become friable or which will be subjected to drilling, sanding, cutting, grinding, or abrading and which could be crushed or pulverized during anticipated demolition activities are considered regulated ACM (RACM).
RACM must be removed prior to demolition or renovations activities, which will disturb the materials.
The owner or operator must provide the Georgia Environmental Protection Division (GA EPD) with written notification at least 10 working days prior to commencement of demolition activity which will include the disturbance of at least 10 linear feet or 10 square feet of RACM. Removal of RACM must be conducted by a GA EPD licensed asbestos abatement contractor. All ACM must be disposed of at a permitted landfill. The Georgia Department of Natural Resources (DNR) provides the GA EPD authority for regulating asbestos containing waste.
In reference to the lead lab report.
Your lead paint chip report shows that all samples yielded results less than 0.5%, therefore professional lead removal by an abatement company is not necessary.
According to the Environmental Protection Agency (EPA), paint containing ≥1 milligram per square centimeter (mg/cm2) of lead using an XRF or >0.5% by weight (paint chip analysis) is considered lead-based paint (LBP).
What does this mean? :
Lead paint chip sampling results are reported in units of percentage (%) and equally in PPM. The federal standard for lead in paint states it must come back less than 0.5% in order to not require abatement
(removal) by a certified company.
https://epd.georgia.gov/lead-based-paint-hazard-management-rules-summary
The full inspection report for this property will be ready in approximately one - two weeks. You are not required to wait for this report to move forward with asbestos removal or demolition (if the plan is to completely demolish the structures). You are required to remove the asbestos prior to demolition.
Please let me know if you have any questions.
Thank you, Sarah Hernandez Service manager M. (706) 661-0487 W. www.es-america.com
To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet.
Please consider the environment before printing this e-mail
NOTICE:
This email communication contains confidential information belonging to the sender and is intended solely for the designated addressee(s) named herein. The unauthorized use, disclosure or transmission of this email (or any information contained herein) is strictly prohibited. If you have received this email in error, you are requested to notify the sender immediately by return email and to destroy the original email communication, including all attachments, in their entirety.
Exhibit C – EMSL Asbestos Lab Report, EMSL Order No.
072602497 (dated March 18th, 2026)
EMSL Analytical, Inc.
2205 Corporate Plaza Parkway SE, Suite 200 Smyrna, GA 30080
Tel/Fax: (770) 956-9150 / (770) 956-9181 http://www.EMSL.com / atlantalab@emsl.com
072602497EMSL Order:
Customer ID: ESAG42
Customer PO:
Project ID:
Attention: Phone:Elias Hernandez (706) 206-3733
Fax:Environmental Services Of America
Received Date:PO Box 250 03/17/2026 2:05 PM
Analysis Date:Watkinsville, GA 30677 03/18/2026
Collected Date:
Project: 431 Main St. - JB
Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E
Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
001-Joint Compound
072602497-0001
<1% ChrysotileNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Living Wall NW
HA: A
001-Drywall
072602497-0001A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Living Wall NW
HA: A
002-Joint Compound
072602497-0002
<1% ChrysotileNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Living Wall SE
HA: A
002-Drywall
072602497-0002A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Living Wall SE
HA: A
003-Joint Compound
072602497-0003
<1% ChrysotileNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Dining Wall
HA: B
003-Drywall
072602497-0003A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Dining Wall
HA: B
004-Joint Compound
072602497-0004
<1% ChrysotileNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Kitchen/Laundry Wall
HA: B
004-Drywall
072602497-0004A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Kitchen/Laundry Wall
HA: B
005-Joint Compound
072602497-0005
<1% ChrysotileNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Pink Bed Wall NW
HA: C
005-Drywall
072602497-0005A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Pink Bed Wall NW
HA: C
006-Joint Compound
072602497-0006
<1% ChrysotileNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Pink Bed Wall SE
HA: C
006-Drywall
072602497-0006A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Pink Bed Wall SE
HA: C
Initial report from: 03/18/2026 14:08:48
Page 1 of 7ASB_PLM_0008_0002 - 2.31 Printed: 3/18/2026 2:08 PM
Tel/Fax: (770) 956-9150 / (770) 956-9181 http://www.EMSL.com / atlantalab@emsl.com
072602497EMSL Order:
Customer ID: ESAG42
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E
Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
072602497-0007
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Hall Wall NW
HA: D
072602497-0008
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Hall Wall SE
HA: D
009-Joint Compound
072602497-0009
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Bath Wall NW
HA: E
009-Drywall
072602497-0009A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Bath Wall NW
HA: E
010-Joint Compound
072602497-0010
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Bath Wall SE
HA: E
010-Drywall
072602497-0010A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Bath Wall SE
HA: E
011-Joint Compound
072602497-0011
<1% ChrysotileNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Green Bed Wall NW
HA: F
011-Drywall
072602497-0011A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Green Bed Wall NW
HA: F
012-Joint Compound
072602497-0012
<1% ChrysotileNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Green Bed Wall SE
HA: F
012-Drywall
072602497-0012A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Green Bed Wall SE
HA: F
013-Joint Compound
072602497-0013
<1% ChrysotileNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Master Bed Wall NW
HA: G
013-Drywall
072602497-0013A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Master Bed Wall NW
HA: G
014-Joint Compound
072602497-0014
<1% ChrysotileNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Master Bed Wall SE
HA: G
014-Drywall
072602497-0014A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Master Bed Wall SE
HA: G
015-Ceramic Tile
072602497-0015
None DetectedNon-fibrous (Other)100%Tan/White
Non-Fibrous
Homogeneous
Master Bath Wall NW
Page 2 of 7ASB_PLM_0008_0002 - 2.31 Printed: 3/18/2026 2:08 PM
Tel/Fax: (770) 956-9150 / (770) 956-9181 http://www.EMSL.com / atlantalab@emsl.com
072602497EMSL Order:
Customer ID: ESAG42
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E
Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
HA: H
015-Grout
072602497-0015A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Master Bath Wall NW
HA: H
015-Joint Compound
072602497-0015B
<1% ChrysotileNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Master Bath Wall NW
HA: H
015-Drywall
072602497-0015C
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Master Bath Wall NW
HA: H
016-Ceramic Tile
072602497-0016
None DetectedNon-fibrous (Other)100%Tan/White
Non-Fibrous
Homogeneous
Master Bath Wall SE
HA: H
016-Grout
072602497-0016A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Master Bath Wall SE
HA: H
016-Joint Compound
072602497-0016B
<1% ChrysotileNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Master Bath Wall SE
HA: H
016-Drywall
072602497-0016C
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Master Bath Wall SE
HA: H
017-Vinyl Sheet
Flooring 1
072602497-0017
25% ChrysotileNon-fibrous (Other)75%Green
Fibrous
Homogeneous
Kitchen Floor
HA: I
017-Mastic 1
072602497-0017A
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Kitchen Floor
HA: I
017-Vinyl Sheet
Flooring 2
072602497-0017B
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Kitchen Floor
HA: I
017-Mastic 2
072602497-0017C
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Kitchen Floor
HA: I
017-Vinyl Sheet
Flooring 3
072602497-0017D
None DetectedNon-fibrous (Other)100%Brown
Non-Fibrous
Homogeneous
Kitchen Floor
HA: I
017-Mastic 3
072602497-0017E
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Kitchen Floor
HA: I
Page 3 of 7ASB_PLM_0008_0002 - 2.31 Printed: 3/18/2026 2:08 PM
Tel/Fax: (770) 956-9150 / (770) 956-9181 http://www.EMSL.com / atlantalab@emsl.com
072602497EMSL Order:
Customer ID: ESAG42
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E
Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
018-Vinyl Sheet
Flooring 1
072602497-0018
Positive Stop (Not Analyzed)Laundry Floor
HA: I
018-Mastic 1
072602497-0018A
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Laundry Floor
HA: I
018-Vinyl Sheet
Flooring 2
072602497-0018B
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Laundry Floor
HA: I
018-Vinyl Sheet
Flooring 3
072602497-0018C
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Laundry Floor
HA: I
018-Mastic 2
072602497-0018D
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Laundry Floor
HA: I
018-Vinyl Sheet
Flooring 4
072602497-0018E
None DetectedNon-fibrous (Other)100%Gold
Non-Fibrous
Homogeneous
Laundry Floor
HA: I
018-Mastic 3
072602497-0018F
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Laundry Floor
HA: I
019-Ceramic Tile
072602497-0019
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Hall Bath Floor NW
HA: J
019-Grout
072602497-0019A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Hall Bath Floor NW
HA: J
020-Ceramic Tile
072602497-0020
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Hall Bath Floor SE
HA: J
020-Grout
072602497-0020A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Hall Bath Floor SE
HA: J
021-Ceramic Tile
072602497-0021
None DetectedNon-fibrous (Other)100%Various
Non-Fibrous
Homogeneous
Master Bath Floor
NW
HA: K
021-Grout
072602497-0021A
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Master Bath Floor
NW
HA: K
021-Mortar
072602497-0021B
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Master Bath Floor
NW
Page 4 of 7ASB_PLM_0008_0002 - 2.31 Printed: 3/18/2026 2:08 PM
Tel/Fax: (770) 956-9150 / (770) 956-9181 http://www.EMSL.com / atlantalab@emsl.com
072602497EMSL Order:
Customer ID: ESAG42
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E
Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
HA: K
022-Ceramic Tile
072602497-0022
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Master Bath Floor SE
HA: K
022-Grout
072602497-0022A
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Master Bath Floor SE
HA: K
022-Mortar
072602497-0022B
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Master Bath Floor SE
HA: K
023-Joint Compound
072602497-0023
<1% ChrysotileNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Kitchen Ceiling
HA: L
023-Drywall
072602497-0023A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Kitchen Ceiling
HA: L
072602497-0024
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Dining Ceiling
HA: L
025-Joint Compound
072602497-0025
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Living Ceiling
HA: L
025-Drywall
072602497-0025A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Living Ceiling
HA: L
026-Joint Compound
072602497-0026
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Hall Bath Ceiling
HA: M
026-Drywall
072602497-0026A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Hall Bath Ceiling
HA: M
027-Texture
072602497-0027
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Pink Bed Ceiling
HA: M
027-Drywall
072602497-0027A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Pink Bed Ceiling
HA: M
028-Texture
072602497-0028
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Green Bed Ceiling
HA: M
028-Drywall
072602497-0028A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Green Bed Ceiling
HA: M
Page 5 of 7ASB_PLM_0008_0002 - 2.31 Printed: 3/18/2026 2:08 PM
Tel/Fax: (770) 956-9150 / (770) 956-9181 http://www.EMSL.com / atlantalab@emsl.com
072602497EMSL Order:
Customer ID: ESAG42
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E
Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
072602497-0029
25% ChrysotileNon-fibrous (Other)75%Gray
Fibrous
Homogeneous
Siding NW
HA: N
072602497-0030
Positive Stop (Not Analyzed)Siding SE
HA: N
072602497-0031
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Window Glazing NW
HA: O
072602497-0032
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Window Glazing SE
HA: O
033-Shingle 1
072602497-0033
None DetectedNon-fibrous (Other)90%Glass10%Black
Fibrous
Homogeneous
Roof NW
HA: P
033-Shingle 2
072602497-0033A
None DetectedNon-fibrous (Other)90%Glass10%Black
Fibrous
Homogeneous
Roof NW
HA: P
033-Felt
072602497-0033B
None DetectedNon-fibrous (Other)40%Cellulose60%Black
Fibrous
Homogeneous
Roof NW
HA: P
034-Shingle 1
072602497-0034
None DetectedNon-fibrous (Other)90%Glass10%Black
Fibrous
Homogeneous
Roof SE
HA: P
034-Shingle 2
072602497-0034A
None DetectedNon-fibrous (Other)90%Glass10%Black
Fibrous
Homogeneous
Roof SE
HA: P
034-Felt
072602497-0034B
None DetectedNon-fibrous (Other)40%Cellulose60%Black
Fibrous
Homogeneous
Roof SE
HA: P
072602497-0035
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Chimney Mastic A
HA: Q
072602497-0036
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Chimney Mastic B
HA: Q
037-Shingle 1
072602497-0037
None DetectedNon-fibrous (Other)90%Glass10%Black
Fibrous
Homogeneous
Garage Roof NW
HA: R
037-Shingle 2
072602497-0037A
None DetectedNon-fibrous (Other)90%Glass10%Black
Fibrous
Homogeneous
Garage Roof NW
HA: R
037-Felt
072602497-0037B
None DetectedNon-fibrous (Other)40%Cellulose60%Black
Fibrous
Homogeneous
Garage Roof NW
Page 6 of 7ASB_PLM_0008_0002 - 2.31 Printed: 3/18/2026 2:08 PM
Tel/Fax: (770) 956-9150 / (770) 956-9181 http://www.EMSL.com / atlantalab@emsl.com
072602497EMSL Order:
Customer ID: ESAG42
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E
Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
HA: R
038-Shingle 1
072602497-0038
None DetectedNon-fibrous (Other)90%Glass10%Black
Fibrous
Homogeneous
Garage Roof SE
HA: R
038-Shingle 2
072602497-0038A
None DetectedNon-fibrous (Other)90%Glass10%Black
Fibrous
Homogeneous
Garage Roof SE
HA: R
038-Felt
072602497-0038B
None DetectedNon-fibrous (Other)40%Cellulose60%Black
Fibrous
Homogeneous
Garage Roof SE
HA: R
Analyst(s)
Erricka Smith (84) Violedah Richardson, Laboratory Manager or Other Approved Signatory
EMSL maintains liability limited to cost of analysis . Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . The report reflects the samples as received.
Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non- friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis . Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.
Samples analyzed by EMSL Analytical, Inc Smyrna, GA NVLAP Lab Code 101048-1
Page 7 of 7ASB_PLM_0008_0002 - 2.31 Printed: 3/18/2026 2:08 PM
Exhibit D – EMSL Lead Paint Lab Report, EMSL Order No. 412650724
(dated March 20th, 2026)
Project Name:
Customer PO:
EMSL Sales Rep:
Reported:
EMSL Analytical, Inc.
10801 Southern Loop Blvd, Pineville, NC, 28134
Telephone: (704) 525-2205 Fax:(704) 525-2382 emsl.com
Attention:
Received: 03/19/2026 10:05
03/20/2026 07:42
Emily Stressman
EMSL Order ID: 412650724
LIMS Reference ID: LE50724
EMSL Customer ID: ESAG42
431 Main St. - JBElias Hernandez
Environmental Services Of America [ESAG42]
PO Box 250
Watkinsville, GA 30677
(706) 206-3733 reports@es-america.com
Analytical Results
Analyte Results RL Q DF Analysis Date
& AnalystWeight
Prep Date
& Tech
Analytical
MethodPrep Method
Client Sample ID: L001/Trim Paint White Date Sampled: 03/17/26
Matrix: Chips LIMS Reference ID: LE50724-01
1Lead 03/19/26 MSX 03/19/26 MTS<0.018 % wt 0.018 % wt SW 846-7000B0.0882 g SW-846 3050B
Client Sample ID: L002/Living Paint Grey Date Sampled: 03/17/26
Matrix: Chips LIMS Reference ID: LE50724-02
1Lead 03/19/26 MSX 03/19/26 MTS<0.0064 % wt 0.0064 % wt SW 846-7000B0.2512 g SW-846 3050B
Client Sample ID: L003/Living Paint Blue Date Sampled: 03/17/26
Matrix: Chips LIMS Reference ID: LE50724-03
1Lead 03/19/26 MSX 03/19/26 MTS<0.020 % wt 0.020 % wt SW 846-7000B0.0816 g SW-846 3050B
Client Sample ID: L004/Bedroom paint Pink Date Sampled: 03/17/26
Matrix: Chips LIMS Reference ID: LE50724-04
1Lead 03/19/26 MSX 03/19/26 MTS<0.0064 % wt 0.0064 % wt SW 846-7000B0.2528 g SW-846 3050B
Client Sample ID: L005/Bedroom Paint Green Date Sampled: 03/17/26
Matrix: Chips LIMS Reference ID: LE50724-05
1Lead 03/19/26 MSX 03/19/26 MTS<0.0094 % wt 0.0094 % wt SW 846-7000B0.1708 g SW-846 3050B
Client Sample ID: L006/Hall Bath Paint Green Date Sampled: 03/17/26
Matrix: Chips LIMS Reference ID: LE50724-06
1Lead 03/19/26 MSX 03/19/26 MTS0.015 % wt 0.0064 % wt SW 846-7000B0.2534 g SW-846 3050B
Client Sample ID: L007/Master Bed Paint Grey Date Sampled: 03/17/26
Matrix: Chips LIMS Reference ID: LE50724-07
1Lead 03/19/26 MSX 03/19/26 MTS<0.0064 % wt 0.0064 % wt SW 846-7000B0.2532 g SW-846 3050B
Client Sample ID: L008/Ext Trim Paint White Date Sampled: 03/17/26
Matrix: Chips LIMS Reference ID: LE50724-08
1Lead 03/19/26 MSX 03/19/26 MTS0.061 % wt 0.0064 % wt SW 846-7000B0.2542 g SW-846 3050B
Client Sample ID: L009/Ext Wall Paint Burgundy Date Sampled: 03/17/26
Matrix: Chips LIMS Reference ID: LE50724-09
1Lead 03/19/26 MSX 03/19/26 MTS0.10 % wt 0.0064 % wt SW 846-7000B0.2516 g SW-846 3050B
[TOC_1]Sample Results[TOC]
P…