DEPARTMENT OF THE AIR FORCE

HEADQUARTERS AIR FORCE TEST CENTER (AFMC)

EDWARDS AIR FORCE BASE CALIFORNIA

1 March 2023

COMBINED SYNOPSIS/SOLICITATION

FROM: AFTC/PZIA

Arnold Engineering Development Complex 100 Kindel Drive, Suite A332 Arnold AFB, TN 37389

SUBJECT: Request for Proposal (RFP) FA910123RB014, PES Transformer #7 RCA

This is a full and open, competitive solicitation. The subject requirement is for a commercial service; as such, this solicitation is prepared in accordance with (IAW) the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This solicitation is not authorization to begin performance, and in no way obligates the Government for any costs incurred by the offeror associated with developing a proposal. The Government reserves the right not to award a contract in response to this RFP. Prior to commencement of any activities associated with performance of this requirement, the Government will issue a written directive or contractual document signed by the Contracting Officer with appropriate consideration established.

The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular, FAC 2023-01 dated 30 December 2022, Department of Defense Federal Acquisition Regulation (DFARS) Change 12/30/2022 effective 30 December 2022, and Air Force Federal Acquisition Regulation (AFFARS) Change 12/20/2022 effective 20 December 2022.

The North American Industry Classification System (NAICS) code for this acquisition is 541330 – Engineering Services, with a size standard of $25.5M. The Product Service Code (PSC) is B513, Special Studies/Analysis- Feasibility (Non-Construction).

The purpose of this solicitation is for the Government to obtain a Root Cause Analysis report that details the root cause for failure of a 161- kV, 192.258 MVA for 5 minutes, Brand-name Tamini transformer, (with 33-position on-load tap changer) Serial Number 66826, in accordance with Attachment 1 – Statement of Work (SOW). There are four tasks associated with the required service: 1. Develop and deliver a Fault Data Report; 2.

Develop and deliver a Preliminary On-site Inspection and Testing Report; 3. Conduct an Internal Inspection;

and 4. Develop and deliver an Inspection, Analysis and Comprehensive Report. The anticipated Period of Performance (PoP) is 06 March 2023 – 06 May 2023.

Provided Below are the anticipated Contract Line Item Numbers (CLINs), Service Descriptions, Quantities, and Unit of Measure (UOM):

CLIN Service Description Quantity UOM 0001 Task 1 – Fault Data Report

IAW Attachment 1 – SOW 1 Each

0002 Task 2 - Preliminary On-site Inspection and Testing Report IAW Attachment 1 – SOW

1 Each

0003 Task 3 – Internal Inspection IAW Attachment 1 – SOW

1 Each

0004 Task 4 - Inspection, Analysis and Comprehensive Report IAW Attachment 1 – SOW

1 Each

0005 CDRLs 1 Each

*FAR Provision 52.212-1, Instructions to Offerors – Commercial Products and Commercial Services (Nov 2021) applies to this acquisition and the following addendum applies:

Paragraph (a) first sentence revised as follows: “The NAICS code and small business size standard for this acquisition appear above.”

Paragraph (c) first sentence revised as follows: “The vendor agrees to hold the prices in its proposal firm for 30 calendar days from the date specified for receipt of proposals, unless another time period is specified in an addendum to the proposal.”

RFP due date: 3 March 2023 RFP due time: 10:00 A.M. Central Time Email to: brooke.vandeman@us.af.mil

Note: .zip files are not an acceptable format for the Air Force Network and will not go through our email system.

All questions regarding this RFP must be emailed to brooke.vandeman@us.af.mil no later than 1:00 P.M.

Central Time on 2 March 2023.

Offerors shall identify any exception to the RFP terms and conditions with supporting rationale. The Government reserves the right to determine any such exceptions are unacceptable. Any exception determined unacceptable by the Government may result in the Offeror’s proposal being determined unacceptable and ineligible for award. If no exceptions are taken, include a statement stating so with the proposal.

Please provide the following information with your proposal:

1. Technical approach that meets the work required IAW Attachment 1 – SOW. The proposed technical approach shall not exceed 25-pages, and shall, at a minimum, include the following:

a. Safety Plan, Confined Space Plan, and Lift Plan IAW Attachment 1 – SOW.

b. Temporary Shelter Plan IAW Attachment 1 – SOW.

c. Resume for proposed independent TME. At a minimum, independent TME shall have the following relevant experience/credentials:

i. Over 20 years working with liquid immersed power transformers rated 10 MVA and larger with voltage ratings of 15 kV thru 161 kV in an engineering and design role for a transformer manufacture.

ii. Shop floor manufacturing, testing, and quality control technical supervisory experience of transformers of liquid immersed transformers in the power and voltage range similar to this requirement.

iii. Field installation and testing technical supervisory experience of transformers of liquid immersed transformers in the power and voltage range similar to this requirement.

iv. Forensic experience of transformers of liquid immersed transformers in the power and voltage range similar to this requirement.

v. Demonstrated active member of industry standards working group committees of IEEE and

IEC.

vi. Professional Engineer status in home state/country.

vii. Design and manufacturing experience with rectifier transformers built to:

1. IEEE Std C57.18.10 “Standard Practices and Requirements for Semiconductor

Power Rectifier Transformers”

2. IEC 61378 “Converter Transformers – Transformers for Industrial Applications”

3. IEEE C57.12 series of transformer standards

4. IEC 60076 transformer standards.

d. Subcontracts/Teaming Arrangements (if applicable). Identify any aspects of the work specified in Attachment 1 – SOW that will be performed by a subcontractor, to include the subcontractor’s name and identification of task to be performed in support of the contemplated contract.

e. Project Schedule that reflects planned, significant events scheduled to occur at specific times in performance of the SOW, throughout a period of performance not exceeding two-months, to include all deliverables. Project schedule shall also reflect each task’s start date and end date.

2. Submission of at least two (but no more than three) projects that demonstrate experience in performing the required work IAW Attachment 1 - SOW. The submitted projects shall meet the following minimum conditions:

a. Each project shall be similar (or greater) in size, scope, and complexity of this acquisition.

b. No project may be used more than once.

c. Each project submitted must be ongoing or have been completed within five‐years from the date of issuance of this solicitation.

Include Contractor Name, Contract Number, Order Number (if applicable), Project Title, Total Period of Performance (or Delivery Period, if applicable, including options), Project Value, Description of the work performed relevant to the requirements of this acquisition, and Contact Information (i.e. name, phone number, and email) of the agency/company point of contact with cognizance over the project.

3. Completed Pricing Worksheet (RFP - Attachment 2). Offerors shall complete green-colored cells.

All companies must be registered in the System for Award Management at https://www.sam.gov/portal/public/SAM/ to be considered for award. The Government will not provide contract financing for this acquisition. Invoice instructions are provided in Attachment 3 – Provisions and Clauses.

Basis of Award:

A competitive simplified acquisition selection process will be conducted IAW FAR Part 13. Contracts awarded under FAR 13 are not subject to FAR 15.3 procedures. Accordingly, award of a contract under this RFP, should an award be made, shall follow the procedures outlined in FAR 13, as supplemented.

A. Contract award will be made IAW the procedures specified in this RFP, to the Offeror whose proposal results in the best value to the Government. A contract may be awarded to the offeror who is deemed responsible IAW FAR 9.1, as supplemented, whose proposal conforms to the RFP’s requirements (to include all stated terms, conditions, representations, certifications, and all other information required by the RFP instructions) and is judged, based on the evaluation factors, to represent the best value to the Government.

B. The Government will conduct the award selection and evaluation process in two phases: Phase 1 and Phase

2. In Phase 1, Factor 1 – Technical Approach, will be evaluated. Proposals that receive an acceptable rating for Factor 1 in Phase 1 will be included in Phase 2 evaluations. In Phase 2, Factor 2 – Technical Experience and Factor 3 – Price, will be evaluated. The Government will perform a comparative analysis in Phase 2 in order to select the Offeror that is best suited to fulfill the requirements of the RFP. The comparative analysis (comparing proposals to each other) will be based on the Offeror’s responses to Factor 2 – Technical Experience and Factor 3 – Price, given their stated relative order of importance. The relative order of importance of Factor 2 and Factor 3 is as follows: Factor 2 – Technical Experience is more important than Factor 3 - Price.

C. Interchanges are fluid interaction(s) between the CO and Offerors that may address any aspect of the proposal and may or may not be documented in real time. The Government intends to make award based on the Offerors’ initial proposal submissions without conducting interchanges. Therefore, each proposal should contain the Offeror’s best terms from a technical and price standpoint. Once the Government determines (through the comparative analysis) the Offeror that is best suited to meet the stated requirements, the Government reserves the right to conduct post-selection interchanges, to include technical and price, with only that Offeror. If post-selection interchanges with the best suited Offeror does not result in an award, the Government may conduct post-selection interchanges with the next best suited Offeror, based on the original analysis. This process will continue until a contract is awarded.

D. Evaluation Factors.

As discussed in Paragraph B above, the Government will conduct the award selection and evaluation process in two phases: Phase 1 and Phase 2.

Phase 1: In this phase, responses to this RFP will be evaluated against the following factor:

Factor 1 - Technical Approach

Under this factor, the Government will assign the factor an adjectival rating of Acceptable or Unacceptable, as defined in Table 1 below.

Table 1 – Factor 1 Ratings

Rating Definition

Acceptable Proposal meets all measures of merit for Factor 1.

Unacceptable Proposal does not meet all measures of merit for Factor 1.

For this factor, the Government will evaluate the proposal using the following measures of merit:

i. Technical approach meets the work required IAW Attachment 1 – SOW. At a minimum, the Technical Approach includes:

a. Safety Plan, Confined Space Plan, and Lift Plan that meets the specifications required in

Attachment 1 – SOW.

b. Resume for the proposed independent TME, and the resume reflects, at a minimum, the following relevant experience/credentials:

i. Over 20 years working with liquid immersed power transformers rated 10 MVA and larger with voltage ratings of 15 kV thru 161 kV in an engineering and design role for a transformer manufacture.

ii. Shop floor manufacturing, testing, and quality control technical supervisory experience of transformers of liquid immersed transformers in the power and voltage range similar to this requirement.

iii. Field installation and testing technical supervisory experience of transformers of liquid immersed transformers in the power and voltage range similar to this requirement.

iv. Forensic experience of transformers of liquid immersed transformers in the power and voltage range similar to this requirement.

v. Demonstrated active member of industry standards working group committees of IEEE and IEC.

vi. Professional Engineer status in home state/country.

vii. Design and manufacturing experience with rectifier transformers built to:

1. IEEE Std C57.18.10 “Standard Practices and Requirements for Semiconductor Power Rectifier Transformers”

2. IEC 61378 “Converter Transformers – Transformers for Industrial Applications”

3. IEEE C57.12 series of transformer standards

4. IEC 60076 transformer standards.

c. Identifies Subcontracts/Teaming Arrangements for any aspects of the work specified in Attachment 1 – SOW that will be performed by a subcontractor. At a minimum, identification includes the subcontractor’s name and task to be performed in support of the contemplated contract.

d. Project Schedule that reflects planned, significant events scheduled to occur at specific times in performance of the SOW, throughout a period of performance not exceeding two-months, to include all deliverables. The Project Schedule reflects each task’s start date and end date.

Note: Proposal must be rated as technically acceptable to move to Phase 2 evaluation.

Phase 2: Proposals rated Acceptable in Phase 1 will be evaluated in Phase 2 against the following factors:

Factor 2 - Technical Experience Factor 3 - Price

The Government will perform a comparative analysis (comparing proposals included in Phase 2 to one another) in order to select the Offeror that is best suited to fulfill the requirements of the RFP. The comparative analysis will be based on the Offeror’s responses to Factor 2 – Technical Experience and Factor 3 – Price, given their stated relative order of importance. The relative order of importance of Factor 2 and Factor 3 is as follows: Factor 2 – Technical Experience is more important than Factor 3 - Price.

Factor 2: Technical Experience

The Government will assign this factor an adjectival rating of Superior, Acceptable, or Unacceptable, as defined in Table 2 below. The overall factor rating will be used for the comparative analysis.

Table 2 – Factor 2 Ratings

Rating Definition

Superior Based on Technical Experience, there is a high expectation that the Offeror will successfully meet the requirements stated in the RFP.

Acceptable Based on Technical Experience, there is reasonable expectation that the Offeror will successfully meet the requirements stated in the RFP.

Unacceptable Based on Technical Experience, the Government does not have a reasonable expectation that the Offeror will be able to successfully meet the requirements stated in the RFP.

Under this factor, the Government will evaluate Technical Experience based on the following measures of merit:

i. The offeror provided at least two (but no more than three) projects that demonstrate experience in performing the required work IAW Attachment 1 – SOW.

a. Each project submitted is similar (or greater) in size, scope, and complexity of this acquisition.

b. No one project is used more than once.

c. Each project submitted is either ongoing or has been completed within five‐years from the date of issuance of the solicitation.

ii. For each project referenced, the offeror provided the Contract Number, Order Number (if applicable), Project Title, Total Period of Performance (or Delivery Period, if applicable, including options), Project Value, Description of the work performed relevant to the requirements of this acquisition, and Contact Information (i.e. name, phone number, and email) of the agency/company point of contact with cognizance over the project.

Factor 3: Price

Price proposals should be provided in Attachment 2 – Pricing Worksheet and should support the offeror’s proposed Factor 1 ‐ Technical Approach. Price proposals will be evaluated (but not rated). The Offeror’s Initial Total Evaluated Price (I‐TEP) will be calculated as the sum of the total price for each CLIN. After any interchanges, if necessary, the Government will evaluate the Final TEP (F‐TEP). If interchanges do not occur, the I‐TEP will become the F‐TEP. The F-TEP be evaluated in terms of completeness, reasonableness, and balanced pricing. Offerors whose F-TEP is determined to be incomplete, unreasonable, or unbalanced will not be considered for award.

Applicable definitions are outlined below:

Completeness - The Offeror’s F-TEP will be reviewed to determine the extent to which all the price elements have been addressed. The Offeror’s price proposal will be evaluated to ensure continuity and traceability of prices to the technical proposal and between the initial proposal and any revisions. The review will determine the adequacy of the contractor’s proposal in addressing and fulfilling the RFP requirements.

Reasonableness - For a price to be reasonable, it must represent a price to the Government that a prudent person would pay in the conduct of competitive business. The Government will determine prices fair and reasonable through the use of one or more of the price analysis techniques at FAR 13.106-3(a).

Unbalanced pricing - Contractors are cautioned against submitting an offer that contains unbalanced pricing.

Unbalanced pricing may increase performance risk and could result in payment of unreasonably high prices.

Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or understated. The Government shall analyze offers to determine whether they are unbalanced with respect to separately priced line items or sub-line items. An offer that is determined to be unbalanced may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

E. Although past performance may not be used as an evaluation factor, the projects submitted by the Offeror to meet Factor 2, Technical Experience, and information obtained from sources available to the

Government will be used as part of the responsibility determination made IAW FAR 9.104-1. The Government reserves the right to obtain information relative to present and past performance on its own.

FAR Provision 52.212-3, Offeror Representations and Certifications-Commercial Products and Commercial Services (Alternate I) Dec 2022, applies to this acquisition. All vendors must be registered in System for Award Management at https://www.sam.gov/portal/public/SAM/ at the time of proposal submittal.

FAR clause at 52.212-4, Contract Terms and Conditions-Commercial Products and Commercial Services (Dec 2022), applies to this acquisition with the following Addendum: Paragraph (c) of this clause is tailored as follows: Changes in the terms and conditions of this contract may be made only by written agreement of the parties with the exception of administrative changes, such as changes in the paying office, appropriations data, etc., which may be changed unilaterally by the Government.

Note: The vendor acknowledges that should the proposal terms and conditions and/or agreement conflict with mandatory provisions of the Federal Acquisition Regulation (FAR) and other Federal law applicable to commercial acquisitions, to the extent of such conflict the FAR and Federal law govern and conflicting vendor terms and conditions and/or agreement are unenforceable and are not considered incorporated into any resultant contract.

FAR clause 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Products and Commercial Services (Dec 2022), is applicable to this acquisition. For the FAR clauses cited in FAR clause 52.212-5 that are applicable to this acquisition see Attachment 3 – Provisions and Clauses.

For additional FAR provisions and clauses not referenced specifically in this document that apply to this acquisition, see Attachment 3 – Provisions and Clauses. Likewise, for DFARS and AFFARS provisions and clauses that are applicable to this acquisition, see Attachment 3 – Provisions and Clauses. The full text of these clauses and (*) provisions may be assessed electronically at the website acquisition.gov. NOTE: ALL

PROVISIONS WILL BE REMOVED AT TIME OF AWARD BUT SHALL REMAIN PART OF THE

CONTRACT FILE.

BROOKE Z. VANDEMAN

AFTC/PZIA (Arnold) Contracting Officer

Attachments:

Attachment 1 – Statement of Work Attachment 2 – Pricing Worksheet Attachment 3 – Provisions and Clauses Attachment 4 – DRAFT Contract Data Requirements Lists (CDRLs)

2023-03-01T15:02:28-0600
VANDEMAN.BROOKE.ZELL.1178474304

File details come from the government source that posted it. Updated .