This document is a Request for Proposals (RFP) for a maintenance dredging contract at Green River LD One on the Ohio River. The Department of the Army Corps of Engineers Louisville District is soliciting price proposals from MATOC contractors for this task order under Contracts W9123722D0002, W9123722D0003, and W9123722D0004 for Dredging Support.
The work consists of maintenance dredging in the approach to Green River LD One, with an estimated quantity of 10,000 cubic yards. The contractor must be able to dredge to 30 feet in moderately swift current and is required to start work within 5 days of the Notice to Proceed, with all work to be completed by early October 2024. Proposals are due by 12:00 PM Eastern on September 5, 2024 and will be evaluated based on lowest overall price. The government will provide a dredge disposal location but the contractor must furnish any material barges needed. Proposal pricing should include all costs such as mobilization, demobilization, effective and non-effective hourly rates, and performance bonds.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BD_Green RV 1_18Jul2024.pdf | ||
| Mile782-784_ThreeMile__Chart46_disposal area.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
LOUISVILLE DISTRICT, CORPS OF ENGINEERS
P.O. BOX 59
LOUISVILLE,KENTUCKY 40201-0059
REPLY TO
ATTENTION OF
CELRL-CT 23 August 2024
Ohio River Salvage, Inc.
Amherst Madison, Inc.
C.J. Mahan Construction Co., LLC.
Dear MATOC Contractors:
Reference is made to your Indefinite Delivery Indefinite Quantity Contracts, Numbers W9123722D0002, W9123722D0003, and W9123722D0004, for Dredging Support for the Great Lakes and Ohio River Division.
We request you submit a price proposal for maintenance dredging in the approach at Green River LD One.
The basis for award of this task order is lowest evaluated price (Base + All Options). Please complete the price breakout schedule and include a labor category table demonstrating the use of the binding rates included in your MATOC contract. The submitted price breakdown should include sufficient detail to allow the Government to verify that your proposed price incorporates the binding rates from your base contract. Any level of effort shown in the submitted information will not be used for evaluation purposes and will be used only to ensure that the proposal is in compliance with the binding rates from the base contract.
Offerors shall allow for Government acceptance of proposals for 60 calendar days from the date proposals are due.
Any proposal that does not allow acceptance for 60 days will not be considered and will be rejected.
The cost range is Between $250,000.00 and $500,000 per FAR 36.204 Disclosure of the magnitude of construction projects.
PLEASE NOTE: THIS IS FOR CONSTRUCTION SERVICES ONLY: the effective DBA Wage Rate for this requirement is KY20240071 dated 07/19/2024.
The basis for award of this task order is lowest evaluated price. Please complete the price breakout schedule and include a labor category table demonstrating the use of the binding rates included in your MATOC contract. The submitted price breakdown should include sufficient detail to allow the Government to verify that your proposed price incorporates the binding rates from your base contract. Any level of effort shown in the submitted information will not be used for evaluation purposes and will be used only to ensure that the proposal is in compliance with the binding rates from the base contract.
Offerors shall allow for Government acceptance of proposals for 60 calendar days from the date proposals are due.
Any proposal that does not allow acceptance for 60 days will not be considered and will be rejected.
Proposals are due no later than 12:00 PM Eastern Time on Thursday, 5 September 2024. Submit your proposal using PIEE to Joel Huberman.
Payment and Performance Bonds will be required for this project. The Notice to Proceed will be issued after receipt and approval of the bonds.
If you have contractual questions, please contact Joel Huberman at the email address provided above. If an Offeror believes that the requirements in the RFP contain an error, omission, or are otherwise unsound; the offeror shall immediately notify the Contract Specialist in writing with supporting rationale. The Offeror is reminded that the Government reserves the right to award this RFP based on the initial proposals, as received, without discussion.
Matthew P. Judd Contracting Officer
(Signature) (Date)
(Printed Name)
(Firm Name)
Sincerely, ELECTRONIC PROPOSAL SUBMISSION
Offerors shall submit one (1) electronic copy of their offer via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module before the time and date specified in Block 13 of this SF 1442. No paper copies, CDROMS, facsimile, or DoD SAFE submissions will be accepted.
A User ID and Password are required to access PIEE. Offerors are required to self-register as a Vendor or Contractor with the user's CAGE code(s) and must have an active registration in the System for Award Management (SAM) prior to the PIEE registration process.
1. Instructions for registering in PIEE:
a. Navigate to htps://piee.eb.mil/
b. Select Register [top right]
c. Select Vendor
d. Create a User ID and Password and follow the prompts [next]
e. Create Security Questions [next]
f. Complete your User Profile Information [next]
g. Complete your Supervisor or Approving Official Information [next]
h. Complete Roles
i. Step 1. Select SOL-Solicitation
ii. Step 2. Select Proposal Manager
iii. Step 3. Click Add Roles
iv. Step 4. Fill in your Location Code (CAGE Code) [next]
i. Provide a justification for your registration [next]
j. Follow the remaining prompts to submit your registration
2. Instructions for Electronic Proposal Submission in PIEE Solicitation Module:
a. Log into PIEE and select the Solicitation Icon.
b. Enter search criteria to find the solicitation. (Search Criteria can be the complete solicitation number, Solicitation Open Date, Response Due Date, Product or Service Code, NAICS, Set Aside code, Place of Performance Zip Code, Contracting Office DODAAC, or Status)
c. The search results display. Select the Solicitation Number link to open the solicitation.
d. The solicitation displays. The information is view only.
e. Scroll down to see the Contract Information and Attachments. The Attachments can be viewed by selecting the File link. Scroll back up to the top of the screen and click the Offer tab.
f. Click the Offer tab to Add and review current offers on the Solicitation. Click the Add button to add an offer to the Solicitation.
g. Select the applicable CAGE Code for which submitting the offer for. The list is prefiltered based on the CAGEs in the Proposal Manager’s profile.
h. Upload the attachments that comprise the offer by selecting the Choose Files link.
i. After entering all necessary information enter a Signature Date and Click the Signature button.
j. The Sign Document pop-up will be displayed requiring the user to enter a Digital Pin and One Time Password (OTP). Click the Sign and Submit button to continue.
k. After successfully adding the Offer a success message of the submission will be displayed and the offer displayed collapsed. Users may expand and view all their offers on a Solicitation.
File Size Limitations: Offerors are advised to follow the above instructions for uploading files. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.
File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:
• W912QR-42335019_FIRMNAME_VOLUME_I
• W912QR-42335019_FIRMNAME_VOLUME_II
Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description.
Please see examples above. (***NOTE: The PIEE Solicitation Module will replace special characters and spaces in the attachment filename with underscores “_”***)
File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 11 or larger. Pages shall be letter sized (larger page sizes (such as 11x17 fold-outs, etc.) will be counted as two pages. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in each section for each factor.
Upload Completion & Deadline: Offerors are highly encouraged to become familiar with the PIEE Solicitation module well in advance of the proposal due date. Interested offerors shall submit proposals no later than the date specified on the solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within PIEE Solicitation module. Do not assume that electronic submission will occur instantaneously. Large files will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.
Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked).
Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to Offerors – Competitive Acquisition (Jan 2017),” subparagraph (e), which is found in 00 21 00 Instructions of the Solicitation.
The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.
For training and help using the PIEE Solicitation module, reference the links below.
• New User Information and Help: https://piee.eb.mil/xhtml/unauth/help/helpvendors.xhtml
• Vendor Customer Support:
https://piee.eb.mil/xhtml/unauth/web/homepage/vendorCustomerSupport.xhtml
PLEASE NOTE THAT THE FOLLOWING PAGE NUMBERING MAY NOT BE ACCURATE
https://piee.eb.mil/xhtml/unauth/help/helpvendors.xhtml https://piee.eb.mil/xhtml/unauth/web/homepage/vendorCustomerSupport.xhtml
PRICE BREAKOUT SCHEDULE
2024 LRL Ohio Open Channel Dredge via W91237-22-D-0002/3/4
LINE
ITEM
DESCRIPTION UNIT QTY UNIT PRICE TOTAL
0001 Effective Hours (Deck Flat Fleet)
HR 110 $ $
0002 Non-Effective Hours (Deck Flat Fleet)
HR 14 $ $
0003 Milage MILE 90 $ $ 0004 Mobilization
(To Green RV 9)
LUMP SUM 1 $ $
0005 Demobilization (From ORM 784)
LUMP SUM 1 $ $
0006 Reimbursement of Performance Bonds
LUMP SUM 1 $ $
BASE TOTAL: $
0007 Option 1:
Effective Hours
HR 0 $ $
0008 Option 1:
Non-Effective Hours
HR 0 $ $
OPTION 1
TOTAL:
0009 Option 2:
Effective Hours
HR 0 $ $
00010 Option 2:
Non-Effective Hours
HR 0 $ $
OPTION 2
TOTAL:
BID TOTAL: $
STATEMENT OF WORK
MAINTENANCE DREDGING
Ohio River
W91237-22-D-0002/3/4
19 AUG 2024
1. Work consists of maintenance dredging in the approach at Green River LD One, as indicated on contract drawings or as directed by the Government. The contractor is required to begin physical work for this Task Order no later than 5 days following the issuance of a Notice to Proceed. All work under this task order needs to be start around 23 September 2024 and be completed by early October 2024. The contractor shall work on a 10-hour, 7 day per week schedule to maximize efficiency. The Government reserves the right to change the sequence of dredging or add/remove cuts and shall compensate the contractor based on the awarded hourly unit rates. While specific sites, sequences, and quantities of hours may be adjusted, the overall awarded contract price shall stand as not to be exceeded.
2. Dredge site specific information:
a. Green River One –GRM 9.0: Dredge area is the Green River LD 1 Lower Approach (approx..10,000 cy). There will be two cuts at this location and finish grade elevation for each cut is marked on the attached dredge map. The approved disposal area for this location will be on the Ohio River at mile 783 on the left descending bank near the mouth of Green River (See attached map for location).
Required production rate at this location is 225 tons/hour.
3. Equipment or this work shall be capable of dredging to a depth of 30 ft, in moderately swift current. Dredging equipment must include all operators and operating supplies. Also, no spudding will be allowed in the lock chamber. The contractor shall propose a fixed effective rate for the required equipment fleet. The Contractor shall be paid by the rates on the awarded bid schedule, based on the fleet configuration required. Pay Rates (Effective and Non-Effective) are fixed, but quantities thereof are approximate and may be adjusted according to the needs of the Government in the field. The final paid amount shall not exceed the awarded total project cost.
a. Equipment that will be utilized for this Task Order will be Bid Item 2052 ”Dredge Package #3” which include the following line items 2018 (qty 1), 2021 (qty 1), 2024 (qty 1), 2027 (qty 1), 2030 (qty 1), 2032 (qty 2), and 2043 (qty 1). USACE will be credited for the following Line Items in “Dredge Package 3”, 2024 (qty1) 2027 (qty 1), 2030 (qty 1). These three-line items will be replaced with the following Line Items 2023 (qty1), 2026 (qty 1), and 2029 (qty 1). We also are requiring Line Item 2059 (Satellite Positioning Equipment).
b. This Task Order is requiring a Minimum of a 5 cy smooth bucket for dredging.
c. Availability of empty barges shall not impede the performance of dredge operations (see contract, Section 00800, “Payment”). The contractor shall furnish any material barges needed for all dredging locations, unless otherwise specified herein as “Government Furnished Equipment”.
d. DQM reporting is not required for dredging plant locations in this Task Order.
e. Equipment mobilized for this task order shall include portable toilet facilities and an office trailer with reliable generator, as specified in the contract, to be stationed on or with the plant dedicated to dredging activities.
f. All equipment shall be suitable for both day and night work in accordance with EM 385-1-1.
g. At locations where the Contractor’s floating plant may not be moored at the work site during non-working hours, the Government shall reimburse the contractor at the 60 percent non-effective rate for both daily set up and moving to an offline mooring location. This shall not exceed 15 minutes at the beginning and end of each workday. The contractor shall make all efforts to keep the floating plant online at the work site overnight, wherever possible.
4. Estimated volumes of dredged material are variable. Post dredge sonar surveys will be performed by the government to verify that depth requirements are met. The material characteristics are expected to be primarily sand and debris. However, other materials such as gravel, cobble, or debris may be encountered. Contractor shall coordinate with the Government to plan the sequence of work in a way that will allow river traffic to pass the site as soon as possible. Contractor will make provisions for periodic work stoppage to allow river traffic to pass as necessary. Traffic passage and industry notification shall be coordinated with the on-site government inspector.
5. The proposal to be submitted by the contractor for this Task Order should include all costs to complete the above described work. The submitted proposal shall include, but is not limited to, mobilization/demobilization, effective and non-effective rates, transit rate, and performance bonds. The proposal shall be of significant detail to evaluate the itemized labor force, equipment, and hours anticipated to perform the subject work. An itemized bid sheet is attached, and shall be considered the governing document for pricing proposal.
6. SSHO requirements are to be addressed in the APP submittal specific to this Task Order, and shall adhere to the Safety section in the contract specifications. Refer contract safety specifications and EM 385-1-1 (Rev.
November 2014).
Project Coordination and Management:
The Contact for Task Order will be Mr. James Scherzinger at (502) 515-3078. Upon award of the task order, all technical questions should be addressed to Mr. Scherzinger. james.a.scherzinger@usace.army.mil.
SECURITY REQUIREMENTS
SECURITY REQUIREMENTS
All Contractors and subcontractor employee(s) working on this contract who require access in and/or around any Louisville District facilities (i.e. flood control dams, locks and dams, etc.) shall receive authorization to be on our facilities based upon a favorable background investigation in accordance with “Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD 12).
The Louisville District Security Management Office shall submit contractor(s) information in order to complete the background investigation and make a recommendation to the Contracting Office of an employee’s suitability for work on Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on the contract based upon the results provided by the Louisville District Security Management Office of the background investigation. The Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the Louisville District Security Management Office has completed a review of such items and determined they can be released. Contractor’s failure to adhere can result in penalties, fines, or sanctions up to and including contract termination and/or forfeiture of future contract consideration.
Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the Louisville District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted unescorted access in or around all District facilities. The documents listed below are required:
SF 85, Questionnaire for Non-Sensitive Positions (see http://www.opm.gov/forms/ to print form). FD 258, Contractor Fingerprint Card (one card for digital prints, two for ink prints) (NOTE: a trained/qualified individual must take prints, ORI block on the FD 258 must be USOPM000Z) (Contractor Fingerprint Cards (FD-258) may be obtained by Contracting Division by contacting the Louisville District Security Management office).
Contractor shall report any changes in personnel or at anytime conditions change at least 5 working days prior to individual(s) need to have access to the site. The Contractor shall provide the same information as listed above for all new employees.
Following submission of paperwork, the Security Management Office will conduct an initial criminal check based upon the information provided. If there are no issues, Security Management Office will make recommendations to the PCO or their Designated Representative. The Security Management Office cannot give approval due to unfavorable report(s). The Security Management Office shall coordinate with Office of Counsel and will jointly make recommendations to the PCO and/or the Designated Representative. The PCO will make the determination whether to allow the Contractor personnel to work on the site based on Security and Office of Counsel recommendations, and the PCO will advise Contractor of the decision.
mailto:james.a.scherzinger@usace.army.mil http://www.opm.gov/forms/
FOREIGN NATIONALS
The Contractor shall provide the package listed above, as well as additional materials noted below for all Foreign Nationals. The Contractor is to expect additional time in the approval process for all Foreign Nationals due to the level of review and elevation of the review to Headquarters Staff to accomplish. All Foreign Nationals must comply with the following paragraph:
In accordance with Engineering Regulation 380-1-18, “Technology Transfer, Disclosure of Information and Contacts with Foreign Representatives” dated 1 August 1996, Section 4, all foreign nationals who work on Corps of Engineers’ contracts shall be approved by the Headquarters US Army Corps of Engineers (HQ USACE) Foreign Disclosure Officer before beginning work on this contract; this regulation includes subcontractor employees. The Contractor shall submit to the Security Management Office, the names of all foreign nationals proposed for performance under this contract, along with documentation to verify legal admittance into the United States. Such documentation shall include at least one of the following a U.S. passport, Certificate of U.S. Citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), Alien Registration Card with photograph (INS Form I-151 or I-551), Employment Authorization Card (INS Form I-688A), etc.
In order to assure forms are properly completed, and to minimize time delays, Contractor is encouraged to work closely with the Security Management Office. The Government will return for correction incomplete forms, illegible forms, etc. which will delay the contractor / subcontractor from beginning work. Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, regulation or policy changes, etc.
The Government shall add any changes to security requirements by modification to the contract.
The Contractor shall contact the Security Management Office by phone, letter, or email at the following numbers/addresses:
CELRL-SC
P.O Box 59, Louisville, Kentucky 40201-0059
Stone, Roy phone (502) 315-6915; email Roy.A.Stone@usace.army.mil Lukat, Philip A, phone (502) 315-6922; email Philip.A.Lukat@usace.army.mil
AT/OPSEC REQUIREMENTS
AT Level I Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: https://atlevel1.dtic.mil/at/; or it can be provided by the RA ATO in presentation form which will be documented via memorandum."
Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes."
Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something). This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. Proposed language: "The contractor and all associated sub-contractors shall receive a brief/training mailto:Roy.A.Stone@usace.army.mil
(provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training."
For Contracts that Require OPSEC Training. All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites:
https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum."
Pre-screen candidates using E-Verify Program. Proposed language: "The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
WAGE DETERMINATIONS
"General Decision Number: KY20240071 07/19/2024
Superseded General Decision Number: KY20230071
State: Kentucky
Construction Type: Heavy
County: Henderson County in Kentucky.
HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658. Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2024 1 03/15/2024 2 07/05/2024 3 07/19/2024
* CARP0090-001 04/01/2024
http://www.dol.gov/whd/govcontracts
Rates Fringes
CARPENTER (Form Work Only).......$ 32.90 23.55
ELEC1701-001 07/01/2023
Rates Fringes
ELECTRICIAN......................$ 35.60 8.35+30.8%
ENGI0181-050 07/01/2024
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 40.05 19.10
GROUP 2.....................$ 37.19 19.10
GROUP 4.....................$ 36.87 19.10
OPERATING ENGINEER CLASSIFICATIONS
GROUP 1 - Crane; Drill; Loader; Mechanic; Pumpcrete
GROUP 2 - Bobcat/Skid Steer/Skid Loader; Concrete Pump
GROUP 4 - Pump
Operators on cranes with booms 150 feet and over (including jib) shall receive $1.00 above Group 1 rate; 250 feet and over including jib shall receive $1.50 above Class 1 rate.
Combination Rate: All crane operators operating cranes, where the length of the boom in combination with the length of the piling leads equal or exceeds 150 feet, shall receive $1.00 above the Group 1 rate.
Employees assigned to work below ground level are to be paid 10% above basic wage rate. This does not apply to open cut work.
IRON0070-001 06/01/2024
Rates Fringes
IRONWORKER (ORNAMENTAL AND
REINFORCING).....................$ 34.59 25.00
LABO0265-015 05/01/2023
Rates Fringes
LABORER
Flagger.....................$ 34.62 13.65
LABO0561-013 07/01/2023
Rates Fringes
LABORER
Backfiller, Common or General, Concrete Worker, Form Stripping & Grade Checker.....................$ 24.81 17.60 Concrete Finishing..........$ 25.71 17.60 Jack Hammer, Pipelayer& Tamper (Hand Held/Walk Behind).....................$ 25.06 17.60
LABO1392-003 07/01/2023
Rates Fringes
LABORER
Concrete Saw (Hand Held/Walk Behind)...........$ 25.97 15.81
* UAVG-KY-0005 01/01/2023
Rates Fringes
OPERATOR: Forklift..............$ 37.19 19.55
* UAVG-KY-0006 01/01/2023
Rates Fringes
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 37.19 19.55
* SUKY2011-027 06/25/2014
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 25.46 17.49
OPERATOR: Bulldozer.............$ 23.63 10.98
OPERATOR: Oiler.................$ 24.34 13.00
OPERATOR: Roller................$ 20.21 13.00
OPERATOR: Trencher..............$ 26.34 12.58
TRUCK DRIVER: Dump Truck........$ 16.69 ** 6.20 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey.
Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be https://www.dol.gov/agencies/whd/government-contracts
Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana.
2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination.
08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
State Adopted Rate Identifiers
Classifications listed under the ""SA"" identifier indicate that the prevailing wage rate set by a state (or local) government was adopted under 29 C.F.R §1.3(g)-(h).
Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
01/03/2024 reflects the date on which the classifications and rates under the ?SA?
identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board).
Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"