This document is a User Requirement Specification (URS) for a bulk dryer system issued by the Dakota Bioproducts Innovation Institute (Dakota BioWorx) and South Dakota State University. The URS outlines the requirements for a bulk dryer system to be used in the development of high-quality bioproducts. The system must have a minimum capacity of 30 liters of wet material per batch and be able to process a minimum of 90 liters of wet material in an 8-hour period. The system must be easily cleanable, use food-grade materials, and include data logging capabilities for temperature and food-grade validation. Bids will be evaluated based on compliance with the URS, pricing, lead time, and the vendor's relevant experience and track record.
The contract opportunity is funded in part by the U.S. Department of Commerce Economic Development Administration and is subject to federal regulations, including the Buy America provision and restrictions related to prohibited entities and boycotts. Vendors must certify compliance with these requirements. Bids should be submitted to the designated contacts at Dakota BioWorx and South Dakota State University.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
#33 Bulk Dryer
USER REQUIREMENT SPECIFICATIONS
Dakota Bioproducts Innovation Institute
Operating as “Dakota BioWorx”
2405 Research Park Way
Brookings, SD, 57006
South Dakota State University
Box 2201, SAD 200
1015 Campanile Ave
Brookings, SD 57007
U.S. DEPARTMENT OF COMMERCE
Economic Development Administration (EDA)
Award Number: 05-79-06192
Revision No.: 0
APPROVED
User Requirement Specification
Bulk Dryer Revision No.: 0
Effective Date: 04-29-24
1 TABLE OF CONTENTS
1 TABLE OF CONTENTS
2 SCOPE
3 BACKGROUND
4 PROCESS DESCRIPTION
5 BASIS OF DESIGN
5.1 CAPACITIES
5.2 HEALTH, SAFETY AND ENVIRONMENT
5.3 OPERATION, PERSONNEL AND AUTOMATION
5.4 MATERIALS OF CONSTRUCTION
5.5 RELIABILITY & MAINTENANCE
6 ABBREVIATIONS, ACRONYMS & DEFINITIONS
7 USER REQUIREMENT SPECIFICATIONS
8 SELECTION CRITERIA
9 RETURN BIDS TO
10 OTHER PROVISIONS
9 OTHER PROVISIONS
Revision No.: 0
2 SCOPE
The project will include a bulk dryer. This document defines the requirements for this system. It describes overall requirements that must be met to produce the specific equipment requested. This scope covers procurement, delivery, and start-up support of the specified equipment; no installation is required.
This URS is the input document for:
• Equipment procurement purposes
• Equipment sizing
• Functional and technical specifications
Bids will be evaluated based on compliance with the URS, pricing, lead time, and the company’s experience and track record as they pertain to the relevant equipment. See Evaluation Criteria below.
3 BACKGROUND
The Dakota Bioproducts Innovation Institute (Dakota BioWorx) is a research facility for the development of high-quality bioproducts. Many bioproducts include bulk solids that require drying. Examples include animal feed that has undergone bioconversion or any large-particle suspended solids that don’t require spray drying into powder. The majority of these bioproducts will utilize our decanter centrifuge prior to drying in the bulk dryer.
4 PROCESS DESCRIPTION
Bioproducts needing the bulk dryer can be processed in a variety of drying configurations. Drying systems that will work and can compete within this RFP include tray dryers, fluidized beds, drum dryers, and freeze dryers. All theses systems are capable of providing drying capacity and can compete on cost and capacity. The process is roughly the same between all these systems where an environment encouraging either evaporation or sublimation is applied to desiccate solids that already have a large amount of moisture removed via centrifugation.
Revision No.: 0
5 BASIS OF DESIGN
5.1 Capacities
The system shall be able to process at minimum 30L of wet biomass product.
Ideally, the system can provide semi-continuous drying, larger batch drying, or smaller but quick batch drying.
5.2 Health, Safety and Environment
The system shall include protections against the main hazards of drying including dust management and overheating/fire as applicable.
5.3 Operation, personnel and automation
The system shall require limited operation while drying, with the bulk of operation on loading and unloading the product. The system shall be able to run continuously with automation to detect and end drying at specific moisture levels.
5.4 Materials of Construction
The material of construction should be compatible with food grade processes and include validation of materials and construction.
5.5 Reliability & maintenance
Continuous operation during working hours and appropriate maintenance and cleaning is expected for the bulk drying system.
6 ABBREVIATIONS,
ACRONYMS & DEFINITIONS
Acronyms Description
REQ Required Attribute
OPT Optional Attribute
UL Underwriters Laboratories
URS User Requirements Specification
Revision No.: 0
7 USER REQUIREMENT
SPECIFICATIONS
URS TABLE – Bulk Dryer Designation Description Type URS-F1 Capacity of 30L of wet material minimum for each batch run. REQ
URS-F2
Ability to dry and process a minimum of 90L of wet material in an 8-hour working period.
REQ
URS-F3 Parts in contact with product be easily cleaned or removable. REQ
URS-F4 3AA polish or food grade applicable for drying surfaces. REQ
URS-F5 Power supplied will be either 120V or 208V REQ
URS-F6 Data logging to ensure temperature and food grade validation REQ
URS-F7 REQ
END OF SPECIFICATION
8 SELECTION CRITERIA
Vendors will be evaluated based on the following criteria:
Evaluation Criteria Description Ranking Weight
Mandatory Technical Requirements A review of your proposal to determine adherence with the REQ specifications and technical requirements.
1-10 30%
Proposal Pricing Review of your proposal in relation to the services offered in the proposal. Proposals will be evaluated against competing proposals for cost effectiveness. Proposals will be evaluated to be reasonable and appropriate.
1-10 20%
Technical Response The technical response in your proposal portrays knowledge, experience, and professionalism. Relevant product features and/or specifications are available with your equipment other than those mandatory specifications allotted above.
1-10 10%
Lead Time A review of your product’s lead time to meet business objectives.
1-10 15%
Product Warranty The available warranty, in scope, duration, and value, proposed with your product.
1-10 5%
Revision No.: 0
Evaluation Criteria Description Ranking Weight
Experience and Demonstrated Results Our evaluation will include a review of your history, your experience as it relates to the requirements within this RFP, evidence of past performance, quality and relevance of past work, references, and related items.
1-10 20%
9 RETURN BIDS TO
Craig Arnold Craig@dakotabioworx.org
Greg Opdahl Greg@dakotabioworx.org
Bobby Markham Bobby.Markham@sdstate.edu
10 OTHER PROVISIONS
Must meet 200 CFR buy America Provision• Title 49 Subtitle B Chapter VI Part 661
Federal Participation Disclosure – “This project will be partially funded with Federal funds from the United States Department of Commerce, Economic Development Administration and therefore is subject to the
Federal laws and regulations associated with that program.”
Must meet Federal Contract provision 200 CFR Title 2 subtitle A Chapter II Part 200
1.1 CERTIFICATION RELATING TO PROHIBITED ENTITY
For contractors, vendors, suppliers, or subcontractors who enter into a contract with the State of South Dakota by submitting a response to this solicitation or agreeing to contract with the State, the bidder or offeror certifies and agrees that the following information is correct:
mailto:Craig@dakotabioworx.org mailto:Greg@dakotabioworx.org mailto:Bobby.Markham@sdstate.edu https://www.ecfr.gov/current/title-49/subtitle-B/chapter-VI/part-661?toc=1 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/appendix-Appendix%20II%20to%20Part%20200
Revision No.: 0
The bidder or offeror, in preparing its response or offer or in considering proposals submitted from qualified, potential vendors, suppliers, and subcontractors, or in the solicitation, selection, or commercial treatment of any vendor, supplier, or subcontractor, is not an entity, regardless of its principal place of business, that is ultimately owned or controlled, directly or indirectly, by a foreign national, a foreign parent entity, or foreign government from China, Iran, North Korea, Russia, Cuba, or Venezuela, as defined by SDCL 5-18A. It is understood and agreed that, if this certification is false, such false certification will constitute grounds for the State to reject the bid or response submitted by the bidder or offeror on this project and terminate any contract awarded based on the bid or response. The successful bidder or offeror further agrees to provide immediate written notice to the contracting executive branch agency if during the term of the contract it no longer complies with this certification and agrees such noncompliance may be grounds for contract termination.
1.2 RESTRICTION OF BOYCOTT OF ISRAEL
For contractors, vendors, suppliers, or subcontractors with five (5) or more employees who enter into a contract with the State of South Dakota that involves the expenditure of one hundred thousand dollars ($100,000) or more, by submitting a response to this solicitation or agreeing to contract with the State, the bidder or offeror certifies and agrees that the following information is correct:
The bidder or offeror, in preparing its response or offer or in considering proposals submitted from qualified, potential vendors, suppliers, and subcontractors, or in the solicitation, selection, or commercial treatment of any vendor, supplier, or subcontractor, has not refused to transact business activities, has not terminated business activities, and has not taken other similar actions intended to limit its commercial relations, related to the subject matter of the bid or offer, with a person or entity on the basis of Israeli national origin, or residence or incorporation in Israel or its territories, with the specific intent to accomplish a boycott or divestment of Israel in a discriminatory manner. It is understood and agreed that, if this certification is false, such false certification will constitute grounds for the State to reject the bid or response submitted by the bidder or offeror on this project and terminate any contract awarded based on the bid or response. The successful bidder or offeror further agrees to provide immediate written notice to the contracting executive branch agency if during the term of the contract it no longer complies with this certification and agrees such noncompliance may be grounds for contract termination.
1.3 CERTIFICATION OF NO STATE LEGISLATOR INTEREST
Offeror (i) understands neither a state legislator nor a business in which a state legislator has an ownership interest may be directly or indirectly interested in any contract with the State that was authorized by any law passed during the term for which that legislator was elected, or within one year thereafter, and (ii) has read South Dakota Constitution Article 3, Section 12 and has had the opportunity to seek independent legal advice on the applicability of that provision to any Agreement entered into as a result of this RFP. By signing an Agreement
Revision No.: 0 pursuant to this RFP, Offeror hereby certifies that the Agreement is not made in violation of the South Dakota Constitution Article 3, Section 12.
File details come from the government source that posted it. Updated .