This document is a User Requirement Specification (URS) for the installation of a new Hammer Mill and Hammer Mill Plenum system for the Dakota Bioproducts Innovation Institute, a research facility in Brookings, South Dakota. The project includes the procurement, delivery, and start-up support for the equipment, but no installation is required. The URS defines the overall requirements, capacities, construction, health and safety, operation, materials, and reliability for the Hammer Mill feed hopper and plenum system.
The URS provides selection criteria for vendors, including mandatory technical requirements, pricing review, technical response, lead time, product warranty, and experience and demonstrated results. Bids must be returned to the specified contacts and comply with various provisions, such as Buy America, federal funding disclosure, restrictions on business with prohibited entities, and restrictions on boycotting Israel. The contract does not include any renewal options.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hammer Mill Plenum and Feed Hopper
USER REQUIREMENT SPECIFICATIONS
Dakota Bioproducts Innovation Institute
1414 Research Park Way
Brookings, SD, 57006
Revision No.: 0
APPROVED
1 TABLE OF CONTENTS
1 TABLE OF CONTENTS
Page 2 of 9 User Requirement Specification
Effective Date: 12-07-23
2 SCOPE
3 BACKGROUND
4 PROCESS DESCRIPTION
5 BASIS OF DESIGN
5.1 CAPACITIES
5.2 CONSTRUCTION
5.3 HEALTH, SAFETY AND ENVIRONMENT (HSE)
5.4 OPERATION, PERSONNEL AND AUTOMATION
5.5 MATERIALS OF CONSTRUCTION
5.6 RELIABILITY & MAINTENANCE
6 ABBREVIATIONS, ACRONYMS & DEFINITIONS
7 USER REQUIREMENT SPECIFICATIONS
8 SELECTION CRITERIA
9 RETURN BIDS TO
10 OTHER PROVISIONS
2 SCOPE
The project will include the installation of a new Hammer Mill and Hammer Mill Plenum system. This document defines the requirements and deliverables for this system. It describes overall requirements that must be met to produce the specific equipment requested. Equipment procurement, delivery, and start-up support are included. No installation is required.
This URS is the input document for the:
• Equipment procurement purposes.
• Equipment sizing
• Functional and technical specifications.
Page 3 of 9 User Requirement Specification
3 BACKGROUND
The Dakota Bioproducts Innovation Institute is a research facility for the development of high-quality bioproducts. A hammer mill has been identified as one of the size reduction technologies that will be available for customer use.
4 PROCESS DESCRIPTION
The Hammer Mill will be used to grind a variety of products. It will be mounted on a steel structure that will position the hammer mill over a plenum and collection screw.
An air assist filter and fan will provide a negative air draw to the Hammer Mill system.
Dust collected from the air assist filter will join with the ground Hammer Mill product via a collection screw conveyor that will convey the sized material to a collection vessel or supersack. A feed hopper will be positioned over the hammer mill feeder to allow the unloading of super sacks of material to be ground. A collection screw conveyor will be mounted to a hammer mill plenum that will allow ground material and fine particles to settle for collection in the screw conveyor.
5 BASIS OF DESIGN
5.1 Capacities
The Feed Hopper will be sized to contain the contents of a super sack. This will be roughly 64 cubic feet. The Hammer Mill plenum will be sized to allow settling of ground material from the hammer mill into the collection screw conveyor.
Cross sectional area of the plenum will be designed to provide for 100 fpm or less air velocity from the hammer mill discharge to the air assist baghouse inlet so that material can drop effectively into the discharge screw conveyor.
5.2 Construction
The feed hopper and the hammer mill plenum shall be constructed of 7 Ga carbon steel. The feed hopper will be open top and have a bottom discharge flange to mate directly with the hammer mill rotary feeder.
Page 4 of 9 User Requirement Specification
Flanges will be provided on the top of the plenum properly sized for the selected hammer mill and selected air assist baghouse. Requirements for the support structure and other component parts will be defined by the hammer mill plenum supplier in a pre-purchase detailed proposal and drawings.
5.3 Health, Safety and Environment (HSE)
The hammer mill feed hopper and plenum will satisfy appropriate conformity assessment procedures. The plenum shall be provided with an explosion vent on the end closest to the baghouse flange sized properly using a Kst of 147 bar-m/s and a Pmax of 7.77 barg. The hammer mill plenum will be designed for a Pred of 2.50 psi.
5.4 Operation, personnel and automation
The hammer mill feed hopper and plenum will be set up to be operated by a single operator. No automation or electrical controls are needed for the feeder or plenum.
5.5 Materials of Construction
Materials of construction for the feeder hopper and plenum will be 7 Ga.
carbon steel. Welds on seams and flanges will be continuous for dust tight operation. Flanges for the feeder hopper discharge, hammer mill inlet, baghouse inlet, explosion vents and discharge screw conveyor will be carbon steel angle iron.
5.6 Reliability & maintenance
The hammer mill plenum will be designed to operate routinely during 8-12hour per day milling operations.
6 ABBREVIATIONS, ACRONYMS & DEFINITIONS
Acronyms Description BEA Business Essential Attribute BMS Building Management System
ASME-BPE
American Society of Mechanical Engineers BioProcessing Equipment
BSL-1 Bio-Safety Level 1 C&Q Commissioning & Qualification CIP Clean In Place QCA Quality Critical Attribute
Page 5 of 9 User Requirement Specification cGMP current Good Manufacturing Practices HVAC Heating Ventilation & Air Conditioning OA Optional Attribute PLC Programable Logic Controller SCADA Supervisory Control and Data Acquisition SOP Standard Operating Procedures URS User Requirements Specification
7 USER REQUIREMENT SPECIFICATIONS
URS TABLE – Hammer Mill Plenum
Designation Description Type
URS-F1
The hammer mill feed hopper will be constructed of 7 Ga. carbon steel welded. Welds to be continuous for dust tight performance. Size will be approximately 64 cubic feet (4’ X 4’ X4’) with open top and a discharge flange to mate directly to the hammer mill rotary feeder inlet.
Page 6 of 9 User Requirement Specification
URS-F2
The hammer mill plenum will be constructed of 7 Ga. carbon steel welded. Welds to be continuous for dust tight performance. Plenum to be designed for Pred of 2.50 psi. Dimensions of plenum will be provided.
BEA
URS-F3
Hammer mill plenum to have two square flanges on the top of the plenum for a selected hammer mill and air assist baghouse. Flange dimensions will be provided. The hammer mill will be supported by a separate steel structure. The baghouse will be directly bolted to the plenum and be supported by the plenum.
BEA
URS-F4
Transition from the hammer mill to the plenum will be required. Transition to be 7 Ga carbon steel. Dimensions will be given as equipment is selected.
BEA
URS-F5
Hammer mill plenum will require bolt-on 3” X 3” angle iron legs (six total) with X-bracing to set the plenum at a height of 24” clearance below the discharge flange.
BEA
URS-F6 Hammer mill plenum to have 1-foot vertical sidewalls preferably. BEA
URS-F7
Hammer mill plenum to taper down to and have a bottom flange suitable to bolt directly to a 6” screw conveyor. Screw conveyor flange dimensions will be provided as equipment is selected.
BEA
URS-F8
Hammer mill plenum will require an explosion vent on the air assist baghouse end that will discharge through a 7 Ga. duct going out an exterior wall a maximum distance of 28”. Vent to be sized using Kst of 147 bar-m/s and Pmax of 7.77 barg. Duct will be flange mated to the explosion vent flange.
BEA
URS-F9
Hammer mill plenum to have a 2’ X 2’ bolted door on one side of the tapered part of the plenum centered on the length to allow for cleaning out the internal parts of the plenum. The door to have two handles for easy removal and installation. Door to be secured using 3/8” studs and nuts with flat washers spaced every 6 inches.
BEA
URS-F10
Hammer mill plenum to be primed and painted white prior to shipping on exterior only. Interior of plenum to be painted with two-part epoxy paint or comparable to provide a smooth sealed surface for fine ground material to slide easily.
BEA
END OF SPECIFICATION
8 SELECTION CRITERIA
Vendors will be evaluated based on the following criteria:
Page 7 of 9 User Requirement Specification
Evaluation Criteria
Description Ranking Weight Mandatory Technical Requirements A review of your proposal to determine adherence with the REQ specifications and technical requirements.
1-10 30%
Proposal Pricing Review of your proposal in relation to the services offered in the proposal. Proposals will be evaluated against competing proposals for cost effectiveness. Proposals will be evaluated to be reasonable and appropriate.
1-10 20%
Technical Response The technical response in your proposal portrays knowledge, experience, and professionalism. Relevant product features and/or specifications are available with your equipment other than those mandatory specifications allotted above.
1-10 10%
Lead Time A review of your product’s lead time to meet business objectives.
1-10 15%
Product Warranty The available warranty, in scope, duration, and value, proposed with your product.
1-10 5%
Experience and Demonstrated Results Our evaluation will include a review of your history, your experience as it relates to the requirements within this RFP, evidence of past performance, quality and relevance of past work, references, and related items.
1-10 20%
9 RETURN BIDS TO
Craig Arnold craig@dbii.org
Bobby Markham Bobby.Markham@sdstate.edu
Page 8 of 9 User Requirement Specification
10 OTHER PROVISIONS
Must meet 200 CFR buy America Provision Title 49 Subtitle B Chapter VI Part 661
Federal Participation Disclosure – “This project will be partially funded with Federal funds from the United States Department of Commerce, Economic Development Administration and therefore is subject to the Federal laws and regulations associated with that program.”
Must meet Federal Contract provision 200 CFR Title 2 subtitle A Chapter II Part 200
Certification Relating to Prohibited Entity For contractors, vendors, suppliers, or subcontractors who enter into a contract with the State of South Dakota by submitting a response to this solicitation or agreeing to contract with the State, the bidder or offeror certifies and agrees that the following information is correct:
The bidder or offeror, in preparing its response or offer or in considering proposals submitted from qualified, potential vendors, suppliers, and subcontractors, or in the solicitation, selection, or commercial treatment of any vendor, supplier, or subcontractor, is not an entity, regardless of its principal place of business, that is ultimately owned or controlled, directly or indirectly, by a foreign national, a foreign parent entity, or foreign government from China, Iran, North Korea, Russia, Cuba, or Venezuela, as defined by South Dakota Executive Order 2023-02. It is understood and agreed that, if this certification is false, such false certification will constitute grounds for the State to reject the bid or response submitted by the bidder or offeror on this project and terminate any contract awarded based on the bid or response. The successful bidder or offeror further agrees to provide immediate written notice to the contracting executive branch agency if during the term of the contract it no longer complies with this certification and agrees such noncompliance may be grounds for contract termination.
RESTRICTION OF BOYCOTT OF ISRAEL
For contractors, vendors, suppliers, or subcontractors with five (5) or more employees who enter into a contract with the State of South Dakota that involves the expenditure of one hundred thousand dollars ($100,000) or more, by submitting a response to this solicitation or agreeing to contract with the State, the bidder or offeror certifies and agrees that the following information is correct:
The bidder or offeror, in preparing its response or offer or in considering proposals submitted from qualified, potential vendors, suppliers, and subcontractors, or in the solicitation, selection, or commercial treatment of any vendor, supplier, or subcontractor, has not refused to transact business activities, has not terminated business activities, and has not taken other similar actions intended to limit its commercial relations, related to the subject matter of the bid or offer, with a person or entity on the basis of Israeli national origin, or residence
Page 9 of 9 User Requirement Specification or incorporation in Israel or its territories, with the specific intent to accomplish a boycott or divestment of Israel in a discriminatory manner. It is understood and agreed that, if this certification is false, such false certification will constitute grounds for the State to reject the bid or response submitted by the bidder or offeror on this project and terminate any contract awarded based on the bid or response. The successful bidder or offeror further agrees to provide immediate written notice to the contracting executive branch agency if during the term of the contract it no longer complies with this certification and agrees such noncompliance may be grounds for contract termination.
CERTIFICATION OF NO STATE LEGISLATOR INTEREST
Offeror (i) understands neither a state legislator nor a business in which a state legislator has an ownership interest may be directly or indirectly interested in any contract with the State that was authorized by any law passed during the term for which that legislator was elected, or within one year thereafter, and (ii) has read South Dakota Constitution Article 3, Section 12 and has had the opportunity to seek independent legal advice on the applicability of that provision to any Agreement entered into as a result of this RFP. By signing an Agreement pursuant to this RFP, Offeror hereby certifies that the Agreement is not made in violation of the South Dakota Constitution Article 3, Section 12
| 1 TABLE OF CONTENTS |
| 2 SCOPE |
| 3 BACKGROUND |
| 4 PROCESS DESCRIPTION |
| 5 BASIS OF DESIGN |
| 5.1 Capacities |
| 5.2 Construction |
| 5.3 Health, Safety and Environment (HSE) |
| 5.4 Operation, personnel and automation |
| 5.5 Materials of Construction |
| 5.6 Reliability & maintenance |
| 6 ABBREVIATIONS, ACRONYMS & DEFINITIONS |
| 7 USER REQUIREMENT SPECIFICATIONS |
| 8 SELECTION CRITERIA |
| 9 RETURN BIDS TO |
| 10 OTHER PROVISIONS |