This is Addendum #1 to an RFP issued by the Coquille Indian Tribe for civil and sitework construction of a new CELS Building. The addendum provides several key clarifications following a mandatory pre-proposal meeting, including restrictions due to an adjacent eagle nesting area that will affect construction schedules between March and August when eagles are nesting. Work hours are restricted to 7am-6pm due to proximity to residential areas. The project involves foundation preparation, backfilling, workspace preparation, and fiber conduit boring which has been added to the scope. Revised construction drawings C4.1 and C4.2 are included showing foundation excavation plans and typical sections.

The addendum removes the Professional Liability insurance requirement and clarifies that background checks are not required unless scope changes to involve interaction with children. The site contains clean fill material with no rock or groundwater issues encountered during geological surveys, allowing for light to moderate excavation equipment. The Tribe will provide disposal sites for excess soil (.25 miles away) and woody debris (1 mile away). While the Tribe plans to haul logs, contractors should provide an add-alternate cost for consideration. Permitting will be handled through the Tribe's Planning Office, though contractors must comply with permit closure requirements. The mandatory pre-proposal meeting sign-in sheet shows attendance by 10 firms including general contractors and subcontractors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CELS New Building Civil & Sitework Construction RFP

Addendum #1

January 17, 2025

This Addendum is hereby issued to inform you of the following revisions and or clarifications to the above-referenced RFP and/or the Contract Documents for the Project, to the extent they have been modified herein. Any conflict or inconsistency between this Addendum and the Solicitation

Document or any previous addenda will be resolved in favor of this Addendum. Proposals shall conform to this Addendum. Unless specifically changed by this Addendum, all other requirements, terms and conditions of the Solicitation Document and or Contract Documents, and any previous addenda, remain unchanged and can be modified only in writing by CIT. The following changes are hereby made:

• Mandatory Pre-Proposal Meeting Resulting Clarifications o The site is adjacent to an eagle nesting area. The area has noise and heavy equipment schedule limitations beginning when eggs are laid (typically in March) and when the eaglets fledge (typically in August). These limits will determine the schedule. Please plan for these in your proposal.

o Page 5, item “J. Professional Liability” is removed from the RFP in its entirety.

Professional Liability is not required for this RFP.

o The site is adjacent to residential areas. Work hours are not to occur outside of 7 am – 6 pm without prior written approval from the project manager.

o The property is in trust. Permitting is completed through the Tribe. Permit drawings and associated application have been submitted to the Planning OAice for approval.

Obtaining and paying for the permits for this project are not the responsibility of the contractor but there will be an expectation that the contractor will comply with all needed information to close the permits at project completion.

o Mandatory Pre-Proposal Sign-in Sheet attached.

• Additional Questions Received o Page 15 requires Background Checks for all employees on the project. Is this required for this Project?

A background check is required for employees, contractors, temporary hires, and all other types of personnel, when their written or unwritten duties involve: (1) Personal interaction with children at least once per week; (2) The authority to direct, supervise, mentor, care for, detain, or control children, in any manner, or (3) Serving within the chain of command over a person described in (1) or (2), above. Since the current scope of this project does not require these items, RFP responses can consider this not required. If the scope for any reason is altered to include the items outlined above, the contract would be altered to include them through a change order process.

o On Page G3.0 of the plans General Note 8 says "The contractor shall independently review ground, topography, and conditions throughout the site, and assume the risk of completing the work set out on these plans, regardless of rock, water table or other conditions which may be encountered in the course of the work". As it is not reasonable for all the bidders to perform subsurface investigations prior to bid time to determine subsurface conditions, could you please provide prior to the bid date a copy of the geotechnical investigation that was mentioned during the pre-bid the

Tribe has already had performed for the site?

This is a pretty standard note specifying that your proposed cost will cover the work needing to be done without change orders for subsurface conditions. With that said the certified engineering geologist that conducted the investigation notes that he did not encounter any rock or ground water within the work area during investigations. The Tribe has been placing clean fill on the project site, and excavation can be completed with light to moderate eAort using mini excavators or back hoes. The Geotech report will be provided to the winning bidder, the report is in final review and has not been released yet.

o On Page G3.0 of the plans General Note 15 refers to the saving of topsoil to be utilized in landscape areas. Is this relevant to this Project? If so, are we responsible for placing it? Are we responsible for any other irrigation and/or landscaping?

It is unlikely that there will be any usable topsoil that can be utilized in this project. The imported fill currently onsite will not be usable for landscaping.

Irrigation and landscaping are not part of this project.

o On Page G3.0 of the plans Earthwork Note 11 refers to the Tribe providing a disposal site for excess excavation materials and during the pre-bid meeting this was confirmed as well as a site for woody debris. Can you provide a site map of where these areas are relative to the site? Are we responsible for burning the woody debris? It was said the Tribe would haul oA logs, please confirm.

A site map will be provided to the winning bidder. Clean soil disposal is .25 road miles away and the woody debris disposal site is approximately 1 road mile away. Contractor is not responsible for burning. Currently the Tribe plans to haul oA the logs. Please provide an add alternate cost for the Tribe to consider.

o Page C4.1 of the plans indicates the gravel working surface around the new structure that has been requested by the Builder. One can presume that this surface will be installed prior to foundation backfill as it is shown 3' away from the new structure which corresponds with the 3' over excavation required outside of the foundation. Is this really what the builder wants or should it be against the foundation once the building is backfilled? Only really relevant regarding the March scheduled completion time for our first phase of work because the builder would have to have the foundation complete for backfill prior to that time frame. Please clarify.

The working surface does not need to be gravel, native soil is anticipated to be used for this. The working surface is not needed for foundation prep, it will be utilized by the framers and subsequent building activities. Once the over excavation of the foundation area is complete and the rock is placed and compacted, the foundation contractor will build the foundations. Within five (5) days after forms are pulled, backfilling against the footings/stem walls and construction of the level workspace of 5’ on the East and West, and 10’ abutting the South of the building will be needed. The bidder is expected to do the foundation prep and then perform the back filling and prep the work area for framing after foundations are complete. Contractor will return after the structure has been completed and excavate to complete final grades along the perimeter of the building by removing the “Level

Workspace”.

Revised Sheet C4.1 & C4.2 attached with clouds containing modifications.

o Please provide direction if we are to provide boring of fiber conduit which the plan currently shows completed by others.

Boring of fiber conduit to be included in the scope of this RFP.

Attachments:

Revised Sheet C4.1 & C4.2 – dated 01/17/2025

Pre-Proposal Meeting Sign-in Sheet

END OF ADDENDUM #1

FOUNDATION EXCAVATION PLAN N

AutoCAD SHX Text

CO

AutoCAD SHX Text

SS

AutoCAD SHX Text O:\Coosbay\2024\624087-CELSBldg-CIT\Dwgs\624087-GRDG.dwg

AutoCAD SHX Text

SAVED: 1/17/2025 11:46 AM ZCARTER, PLOTTED: 1/17/2025 1:05 PM CARTER, ZACKARY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PROJ. NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

SEQ

AutoCAD SHX Text 1"

AutoCAD SHX Text

AutoCAD SHX Text

VERIFY SCALES

AutoCAD SHX Text

BAR IS ONE INCH ON

AutoCAD SHX Text

ORIGINAL DRAWING

AutoCAD SHX Text

IF NOT ONE INCH ON

AutoCAD SHX Text

THIS SHEET, ADJUST

AutoCAD SHX Text

SCALES ACCORDINGLY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

NO.

AutoCAD SHX Text

APVD

AutoCAD SHX Text

DR

AutoCAD SHX Text

CHK

AutoCAD SHX Text

DSGN

AutoCAD SHX Text

BY

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

275 MARKET AVENUE

AutoCAD SHX Text

COOS BAY, OR. 97420

AutoCAD SHX Text 541-266-9890

AutoCAD SHX Text

WWW.SHN-ENGR.COM

AutoCAD SHX Text F

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text

OREGON

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

101201PE

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1. 1-17-25 BID ADDENDUM #1 LYF

AutoCAD SHX Text 12/2024

AutoCAD SHX Text 624087

AutoCAD SHX Text C4.1

AutoCAD SHX Text

COQUILLE INDIAN TRIBE

AutoCAD SHX Text

CELS BUILDING

AutoCAD SHX Text

COOS BAY, OREGON

AutoCAD SHX Text

LYF

AutoCAD SHX Text

CDN/ZC

AutoCAD SHX Text

LYF

AutoCAD SHX Text

EARTHWORK GRADING

AutoCAD SHX Text

OVER EXCAVATE 3' PAST BUILDING ENVELOPE

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text

1. REMOVE MINIMUM OF 1' OF EXISTING GROUND MATERIAL WHERE FILL OCCURS. REMOVE MINIMUM OF 1' OF EXISTING GROUND MATERIAL WHERE FILL OCCURS. 2. EXCAVATE WITHIN BUILDING FOUNDATION AREAS TO PROVIDE SPACE FOR EXCAVATE WITHIN BUILDING FOUNDATION AREAS TO PROVIDE SPACE FOR COMPACTED SUBGRADE PER SECTION A/C4.0. 3. PLACE LIFTS NO THICKER THAN 8" OF LOOSE ROCK, COMPACT TO 95% OF PLACE LIFTS NO THICKER THAN 8" OF LOOSE ROCK, COMPACT TO 95% OF MODIFIED PROCTOR. 4. MIN 1' OF 3/4"-0 ROCK BELOW ALL BUILDING FOUNDATIONS COMPACTED TO MIN 1' OF 3/4"-0 ROCK BELOW ALL BUILDING FOUNDATIONS COMPACTED TO 95% OF MODIFIED PROCTOR.

AutoCAD SHX Text 1"=5'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FF=60.35'

AutoCAD SHX Text NATIVE FILL MAY BE PLACED FOR 4:1 SLOPE AWAY FROM BUILDING. SEE SECTION A/C4.2 FOR DETAILS.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SECTION E

SECTION A

SECTION B

SECTION C SECTION D

AutoCAD SHX Text

(TYPICAL SIDEWALK SECTION)

AutoCAD SHX Text

4" CONCRETE

AutoCAD SHX Text

4" 3/4"-0 AGGREGATE BASE

AutoCAD SHX Text

(FLUSH CURB SIDEWALK SECTION)

AutoCAD SHX Text

4" CONCRETE

AutoCAD SHX Text

4" 3/4"-0 AGGREGATE BASE

AutoCAD SHX Text

(PERFORATED STORM PIPE SECTION)

AutoCAD SHX Text

(PARKING LOT CURB SECTION)

AutoCAD SHX Text

2" AC

AutoCAD SHX Text

6" 3/4"-0 AGGREGATE BASE

AutoCAD SHX Text

EG

AutoCAD SHX Text

FG

AutoCAD SHX Text

5H:1V MAX

AutoCAD SHX Text

4" 3/4"-0 AGGREGATE BASE

AutoCAD SHX Text

NATIVE FILL

AutoCAD SHX Text

1. CUT SLOPE 2:1 MAX, ALL CUT SLOPES TO RECEIVE CUT SLOPE 2:1 MAX, ALL CUT SLOPES TO RECEIVE HYDROSEEDING AND NOT EXCEED EXISTING SLOPES

AutoCAD SHX Text

NOTE:

AutoCAD SHX Text

SEE NOTE 1

AutoCAD SHX Text

NTS

AutoCAD SHX Text C4.0

AutoCAD SHX Text O:\Coosbay\2024\624087-CELSBldg-CIT\Dwgs\624087-GRDG.dwg

AutoCAD SHX Text

SAVED: 1/17/2025 11:46 AM ZCARTER, PLOTTED: 1/17/2025 1:05 PM CARTER, ZACKARY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PROJ. NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

SEQ

AutoCAD SHX Text 1"

AutoCAD SHX Text

AutoCAD SHX Text

VERIFY SCALES

AutoCAD SHX Text

BAR IS ONE INCH ON

AutoCAD SHX Text

ORIGINAL DRAWING

AutoCAD SHX Text

IF NOT ONE INCH ON

AutoCAD SHX Text

THIS SHEET, ADJUST

AutoCAD SHX Text

SCALES ACCORDINGLY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

NO.

AutoCAD SHX Text

APVD

AutoCAD SHX Text

DR

AutoCAD SHX Text

CHK

AutoCAD SHX Text

DSGN

AutoCAD SHX Text

BY

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

275 MARKET AVENUE

AutoCAD SHX Text

COOS BAY, OR. 97420

AutoCAD SHX Text 541-266-9890

AutoCAD SHX Text

WWW.SHN-ENGR.COM

AutoCAD SHX Text F

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text

OREGON

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

101201PE

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1. 1-17-25 BID ADDENDUM #1 LYF

AutoCAD SHX Text 12/2024

AutoCAD SHX Text 624087

AutoCAD SHX Text C4.2

AutoCAD SHX Text

COQUILLE INDIAN TRIBE

AutoCAD SHX Text

CELS BUILDING

AutoCAD SHX Text

COOS BAY, OREGON

AutoCAD SHX Text

LYF

AutoCAD SHX Text

CDN/ZC

AutoCAD SHX Text

LYF

AutoCAD SHX Text

TYPICAL SECTIONS

AutoCAD SHX Text

OVER EXCAVATE MIN 3' PAST FOUNDATION FOOTINGS

AutoCAD SHX Text

TOP OF AGGREGATE 57.72'

AutoCAD SHX Text

FLUSH CURB

AutoCAD SHX Text

STANDARD CURB

AutoCAD SHX Text

FLOW LINE TO SLOPE MIN 1% TOWARD CATCH BASIN

AutoCAD SHX Text

6" COMPACTED NATIVE MATERIALS

AutoCAD SHX Text

6" OF 3/4"-0 COMPACTED TO 95% RELATIVE COMPACTION

AutoCAD SHX Text

2" THICK 1/2" DENSE LEVEL 2 ACP. COMPACT TO MIN. 90% OF MAX DENSITY.

AutoCAD SHX Text

CURB TO BE FLUSH WITH PARKING LOT

AutoCAD SHX Text -1.5%%%

AutoCAD SHX Text -1.5%%%

AutoCAD SHX Text

ALL SIDEWALKS TO SLOPE AWAY FROM BUILDING

AutoCAD SHX Text

(FOUNDATION EARTHWORK SECTION)

AutoCAD SHX Text

(PARKING LOT SECTION)

AutoCAD SHX Text 4H:1V

AutoCAD SHX Text H2:1V

AutoCAD SHX Text

TOP OF STEM WALL TO BE EXPOSED MIN 6", SEE HI-LINE FOUNDATION PLANS FOR DETAILS

AutoCAD SHX Text

EG

AutoCAD SHX Text

MATCH EG

AutoCAD SHX Text

NTS

AutoCAD SHX Text C4.0

AutoCAD SHX Text

NTS

AutoCAD SHX Text C4.0

AutoCAD SHX Text

NTS

AutoCAD SHX Text C4.0

AutoCAD SHX Text

NTS

AutoCAD SHX Text C4.0

AutoCAD SHX Text

AutoCAD SHX Text C7.1

AutoCAD SHX Text

AutoCAD SHX Text C7.1

AutoCAD SHX Text

BENCH SLOPE FOR FILL PLACEMENT

AutoCAD SHX Text

EXCAVATE 1' MIN. OF EXISTING GROUND PRIOR TO PLACEMENT OF ROCK

AutoCAD SHX Text

COMPACT NATIVE SOIL TO 95% RC BELOW 3/4"-0 CRUSHED ROCK

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

RFP - CELS New Building Civil Sitework Construction - Addendum #1
624087-CELS-SITE-CIVILREV1
C4.1 EARTHWORK GRADING
C4.2 TYPICAL SECTIONS

Pre-Proposal Meeting Sign-in Sheet