This is an amendment to a request for proposals issued by the US Agency for International Development Indonesia. It provides responses to questions received regarding RFP number 72049723R00002 for the Health Technical Assistance Project II. The amendment extends the submission deadline and modifies the RFP document with changes highlighted in yellow. The RFP solicits proposals for a cost-plus-fixed-fee completion contract with a total estimated cost between $17-20 million over five years. The scope of work involves providing technical assistance and consultants to support USAID's health program and strategies through objectives of providing short and long-term technical assistance, arranging meetings and logistics support, and strengthening local organizations' capacities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Issue Date: May 12, 2023 Subject: Amendment No. 01 Request For Proposals (RFP) No.72049723R00002 USAID Health Technical Assistance (BANTU II)
Dear Prospective Offerors, The purpose of this Amendment No. 01 is to provide USAID/Indonesia’s responses to the questions received by the due date provided in the subject RFP as detailed in Attachment 1.
Please see changes to the RFP in yellow highlighted under Attachment 2.
Thank you for your interest in USAID Programs.
Sincerely, Mohib Ahmed Supervisory Agreement Officer Director, Office of Acquisition and Assistance USAID/Indonesia
RFP No. 72049723R00002 USAID Health Technical Assistance (BANTU II)
Amendment No. 01
ATTACHMENT 1
QUESTIONS AND ANSWERS
Cover Page
1. Submission dates: Would USAID consider moving the submission date(s) back to allow for more time for production?
2. Taking into consideration that the RFP was issued during the Lebaran period, when the majority of local partners, civil society organizations and others who will be relevant to Bantu II were not available, we respectfully request an extension of the due date by 1 (one) week.
USAID Response: We are extending the submission deadline.
Section C – Statement of Work
C.1. Background
3. The RFP Background in Section C references the Mission’s four development objectives and indicates the following: “While we expect the majority of support to be provided to USAID/Indonesia’s fourth development objective, priority health outcomes improved, the contract will support the other three Development Objectives if so requested.”
Please provide any additional information possible on the interest of other Development Objectives within the Mission to access Bantu II and the procedure that would be envisioned for such a “buy-in” if it were to happen.
USAID Response: From the perspective of the contractor, this would simply mean that consultants would be hired for technical areas in other sectors besides health, and/or local organizations working in sectors besides health would receive organizational capacity building support.
C.3. Scope of Work
4. Under Objective 3, can USAID clarify if the potential local organizations the project will be assessing and supporting through capacity building are existing USAID grantees/sub-grantees or others that have not yet worked with USG (as a prime or sub) but show potential?
USAID Response: We expect this to be existing grantees and sub grantees.
5. For Objective 3. Support local organizations to address gaps in their organizational capacity, please provide a list and/or additional detail on other efforts being supported by the Mission to help further strengthen local organizational capacity and more broadly support Administrator Power’s efforts around localization.
USAID Response: The Mission’s MADANI Civil Society Support Initiative is focused on capacity building of local organizations. Several other Mission projects such as CHISU, MCGL and MPHD strengthen the capacity of their local sub-awardees.
C.4. Expected Results, Objective 3:
6. The RFP states: “All organizations provided with organizational capacity support demonstrate improved organizational capacity, including generating outcomes consistent with gender equality and female empowerment.”
Deliverable No. 11 in the List of Reports/Deliverables under Section F.6 Reports and Deliverables (Page 31) and F.6.11 (Page 36) states: “Support Local Organizations and improve organizational capacity: At least 80% of local organizations provided support demonstrating improvement based on a standardized tool.” Could USAID please confirm which result and target is accurate?
USAID Response: The target is at least 80% of local organizations provide support demonstrating improvement based on a standardized tool.
Section F – Deliveries or Performance
F.4. Key Personnel
7. On page 27-28, sections a and d note three TBD key personnel, with section b highlighting that “Key personnel specified above are considered essential to the work being performed under this contract."
a. Can USAID confirm that these positions are intentionally labelled TBD?
USAID Response: Yes, they are intentionally labeled TBD at this RFP stage. Key personnel will be identified post award, based on approved key personnel position(s) proposed by the successful offeror. See RFP section L.10.C.4 - Key Personnel and Management Approach https://www.madani-indonesia.org/
b. As Section L.10.(4) notes that an offeror may propose up to three (3) key personnel positions, can USAID confirm that the offeror can set associated roles and responsibilities and necessary qualifications in line with their own definition of the roles?
USAID Response: We are not sure we understand the question. As stated in Section L10.C.4 Key Personnel and Management Approach, “The offeror must describe roles and responsibilities for each of the proposed key personnel positions including their minimum qualifications and work experience at proposal submission time.” We do not ask for candidates or names at this time.
F.6 Reports and Deliverables:
8. In the List of Reports/Deliverables, Deliverables No. 8, 9, and 10 state they “will be reported semi-annually.” Can USAID please confirm whether these deliverables will be reported as part of the quarterly performance reports and annual reports or if a separate reporting process will be required?
USAID Response: These deliverables do not need to be reported separately. They need to be part of the second quarterly report and the annual report.
Section J – List of Attachments
Attachment 1 Past Performance Matrix and Attachment 2 Past Performance Reference Questionnaire:
9. Attachment 1 and Attachment 2 were not included as separate attachments, but only within the RFP PDF. Can USAID please provide separate attachment files in the appropriate file types?
USAID Response: We can provide separate attachments. Please find them in the attachments section of the solicitation in sam.gov.
Section L – Instructions, Conditions, and Notices to Offerors
L.4.2. Delivery Instructions:
10. Could USAID please confirm that email submissions should be addressed to Mr. Mohib Ahmed, Supervisory Contracting Officer?
USAID Response: Proposals must be addressed to Mr. Mohib Ahmed, Supervisory Contracting Officer, at the following email address: proposals-indonesia@usaid.gov
L.9 Instructions for the preparation of past performance
(1) Past Performance Information:
11. The RFP states: “The offeror…must provide performance information for itself, the contractor teaming arrangements, if any, and each major subcontractor…” and goes on to state: “Utilizing the Past Performance Matrix in Attachment J.1, list up to three (3) for the Prime and three (3) for each proposed major subcontractor…”
Can USAID please provide guidance on reporting past performance information for contractor teaming arrangements, other than major subcontractors?
USAID Response: Reporting team past performance for other than major subcontractors (over 20% of proposed costs) is not required. For joint venture information, please see L.11.5 Joint Venture Information
12. Subsection (c) pertaining to quality award and certifications concludes with “this information is not included in the page limitation”. Could USAID please confirm that there are no page limitations for information requested under L.10 (1) (a) and L.10 (1) (b)?
USAID Response: There is no page limitation for any information requested for past performance, including under L.9 (1) (a) and L.9 (1) (b).
(2) Past Performance Questionnaire:
13. The RFP states: “In addition to using the CPARS as one method of obtaining information about and evaluating past performance, USAID will use the “Past Performance Reference Questionnaire” (Attachment J.2) to obtain information, particularly for those awards for which a CPAR is not available.” The RFP goes on to state: “For those activities in which a CPARS report is not available, Offerors must: 1. complete the Part A.
Reference Information; and 2. forward the Past Performance Reference Questionnaire for Prime Offeror and any proposed major partners/subcontractors to the identified contact person of the referenced organization (the referee). The referee must submit mailto:proposals-indonesia@usaid.gov the completed questionnaire directly to USAID/Indonesia by the past performance due date specified on the Cover Page, as directed on the Past Performance Reference Form.”
a) Could USAID please confirm that Past Performance Reference Questionnaires are only required for those awards where CPAR reports are not available?
USAID Response: USAID confirms that Past Performance Reference Questionnaires are only required for those awards where CPARS reports are not available.
b) If CPAR reports are available for all awards and included as part of Past
Performance Information, can USAID please confirm that offerors do not need to send Past Performance Reference Questionnaires to referees and therefore do not need to include them in RFP submissions?
USAID Response: USAID confirms that If CPARS reports are available for all awards and included as part of Past Performance Information, offerors do not need to send Past Performance Reference Questionnaires to references, and therefore do not need to include them in the RFP submission.
L.10, A. General Instructions:
14. Per this section, one component of the Technical Proposal is a “Key Personnel, Management and Staffing Plan.” The RFP refers to this section as “Key Personnel and Management Approach in Section L.11, C.,4. Key Personnel and Management Approach (Page 111) and Section M.2.2, Evaluation Criteria (Page 127-128). Could USAID please confirm that the section should be titled “Key Personnel and Management Approach”?
USAID Response: Component “3. Key Personnel Management and Staffing Plan” is revised to reflect “3. Key Personnel and Management Approach.”
L.10, C., 1. Cover Page:
15. The requirements for the Cover Page listed in this section differ from the requirements for the Cover Page listed in Section L.2 (c) (2) Submission, Modification, Revision, and Withdrawal of Proposals (Page 101). Could USAID please confirm the complete list of required information that must be shown on the cover page?
USAID Response: FAR 52.215-1 ALT I should not have been in full text and is Incorporated By Reference (IBR).
L.10, C., 4. Key Personnel and Management Approach:
16. The RFP states: “Offeror must not submit candidates at this stage.” Under Salaries and Wages in Section L.12.2 Proposed Costs/Prices (Page 116) the RFP also states: “No key or non-key personnel are to be named at the proposal. All positions must be represented by a Position Title…” Could USAID please clarify whether these instructions specifically concern Key Personnel and the core team and whether it is permissible to include an illustrative matrix of long-term and short-term consultants and local organizations qualified to provide support envisioned under Bantu II?
USAID Response: These instructions refer to all personnel, no names should be included within the proposal. The second part of this question is unclear. If the offeror is wanting to put together a matrix that shows where possible consultants come from within their consortium, that would be acceptable. However, this is not an instruction, only an attempt to answer the question as we understand it.
17. Section L of the RFP clearly outlines the requirements, sections and related details including Annexes, where it also specifies that offerors are not required to name the three Key Personnel positions requested as follows: Offeror must propose Key Personnel positions that have the appropriate skill sets to assure successful achievement of the contract objectives. Offeror must not submit candidates at this stage. All individual(s) approvals (i.e. bio data, TCN approval, etc.) will be completed post award. The offeror must describe roles and responsibilities for each of the proposed key personnel positions including their minimum qualifications and work experience at proposal submission time. Offeror may propose up to three (3) Key Personnel positions.
Please clarify whether offerors may propose additional Key Personnel and/or include non-Key Personnel descriptions in the Management and Staffing section given the requirements? In addition, may offerors include an additional Annex showcasing CVs for Personnel it has lined up for important full-time positions as part of the Core Team, specifying that final approvals of Key Personnel will take place per the terms of the RFP?
USAID Response: Offerors may propose other non-key personnel positions as part of the staffing plan and organizational chart. The offerors must not submit candidates and CVs at this stage.
L.11. Instructions for the Preparation of the Cost Proposal
18. Under point 2. Proposed Costs/Prices, three components are listed: (i) Assumptions, (ii) Excel Workbook, and (iii) Budget Narrative. It appears that component (i) Assumptions should be a standalone section in the Cost Proposal. Section L.12.2, c. Budget Narrative, however, states: “Offeror should explain its assumptions in determining why the proposed unit/quantity aligns with its overall technical approach in order to address why these costs are considered realistic.” Would USAID consider offerors to include all assumptions in the budget narrative in lieu of having a separate assumptions section and a separate budget narrative?
USAID Response: The assumptions listed in L11.2.a. to be used by all offerors must be included within the budget and explained in the narrative. Other assumptions used to determine unit/quantity alignment with the technical approach must also be explained in the narrative.
19. Under point 4., Offeror’s Policies and Procedures are listed as an item that must be included in the Cost Proposal. However, Section L.12.4 Organizations Policies and Procedures (Page 121) states: “USAID reserves the right to request a copy of the apparently successful offeror most current personnel policies, especially regarding salary and wage scales, fringe benefits, merit increases, promotions, leave, differentials, travel, and per diem regulations, etc. The Contracting Officer may determine that a pre-award survey is necessary (see FAR 9.106).” Could USAID confirm that no policies and procedures (except for information concerning Workday and Work-week, and Paid Absences per Section L.12.2, a. Assumptions [Page 113] and corporate policies regarding annual salary increases per Section L.12.2 Proposed Costs/Prices under Salaries and Wages [Page 116]) should be submitted with the Cost Proposal at this time?
USAID Response: Thank you for noting this discrepancy in the RFP. Only the apparently successful offeror will be requested to submit organizational policies, if necessary.
20. For budgeting purposes, could USAID provide estimates for the LOE days they expect to request over the life of the project for: 1) long term consultants; and 2) short-term consultants? If the estimates are not available at this point, would USAID be willing to provide plug figures for long-term and short-term LOE with the goal of fair comparison of cost proposals from bidders?
USAID Response: Please see answer to Question 22 for new guidance on cost proposal benchmarks.
L.11.2 Proposed Costs/Prices:
21. The RFP states in subsection (b): “Offerors provide one Excel workbook for their proposed Cost/Price submission. Offerors must incorporate and link sub-contractor budgets within their own.”
Our subcontractors consider their cost/price data proprietary and prefer to submit that directly to the Government (e.g., NICRA, financial data). Will the Government allow for subcontractors to submit sanitized versions of their proposals to the Prime so they can be incorporated into the one Excel workbook and allow the subcontractors to submit their matching unsanitized/sealed package cost/price submission directly to the Government?
USAID Response: The prime may choose to package or “sanitize” the information as it determines best. However, please note, this may increase the chances of cost questions or require additional clarifications/negotiations. Further, it is unclear how the prime would be compliant with Consent to Subcontract (i.e., submit the required information, negotiation memo, etc.) in the absence of receiving and independently reviewing the information first, in accordance with Section L.11.7. it is the prime’s responsibility to make the initial determination prior to the government accepting or consenting to the sub-contract. The government will not accept direct submissions of sub-contract pricing.
22. Considering the resource and activity support nature of the contract where the skills, level effort, and support activities will change over time will USAID provide some guidance (common assumptions for all bidders) that will assist in developing the Detailed Budget by year. The solicitation does not include sufficient information on requirements to build-up to an award value consistent with the estimated cost range.
Based on the operating expectations for the contract that includes a high level of engagement by the COR in personnel resource application (approval of all personnel, their cost rates, and level of effort) and other support (approval of travel, meeting cost, capacity building engagements) there will be a high level of financial control once specific requirements are defined. Considering those controls and the lack of information to build-up direct and indirect costs over the five-year contract term, would USAID consider simply stipulating a contract cost ceiling? Section B only requires identification of total contract estimated direct cost, indirect cost and fee in addition to the approved indirect rates. The Detailed Budget will ultimately be inaccurate soon after award and does not reasonably inform Section B. Since the basis of award is currently “Best Value/Tradeoff”, would USAID consider providing one or more sample task requirements that will be priced by all bidders providing a foundation for like-for-like price comparison? Alternatively, can USAID provide plug figures to be used by all bidders for personnel positions and level of effort, consultant support, allowances, travel expenses, equipment and supplies, contractual/subcontract costs, and other direct costs.
Ultimately, the concern is that the solicitation does not include sufficient information to accurately set direct and indirect costs estimates for the five-year period and there is substantial opportunity for vastly different pricing interpretations that will thwart any like-for-like comparison of proposals.
USAID Response: To make valuable cost comparisons, we ask that all offerors budget $12,000,000 between the Consultants and Contractual/Subcontract Cost categories.
The offerors can determine how to split these costs across these two categories;
however, the summation of these two cost categories may not exceed the value stated above.
L.12. Instruction for the Preparation of the Branding Implementation and Marking Plan:
23. The RFP states in subsection (a): “…In response to this RFP, the apparently successful Offeror must include a Branding Implementation and Marking Plan…” and states in subsection (b): “The Branding and Marking Plan will only be required to be submitted by the apparently successful Offeror. Offerors must note that the plan is a separate item and will not be scored.”
Section M.5 Branding Implementation and Marking Plan (Page 131) states: “While the Branding Implementation Plan and Marking Plan will not be evaluated as a part of the best value consideration, award to the otherwise successful Offeror will not be made unless and until an acceptable plan is approved by the Government. Failure to submit an acceptable plan may cause the Government to award it to the next successful Offeror.”
Could USAID confirm that a Branding Implementation and Marking Plan is not required to be submitted with proposal at this time? If it is required to be submitted as part of the proposal at this time, could USAID please confirm that it should be included as an annex in the Cost Proposal (instead of the Technical Proposal)?
USAID Response: The Branding Implementation and Marking Plan is not required to be submitted with the proposal.
Other:
24. Was there a mid-term or end-term evaluation completed on the original Bantu or related programs in the USAID/Indonesia Health portfolio? None is readily available on the DEC or other sources, so a list and links/files would be appreciated if such exists.
USAID Response: No, there wasn’t any mid-term or end-term evaluation completed on the original Bantu or related programs in the USAID/Indonesia Health portfolio.
25. Considering degradation of environment intercepts with public health issues, especially for Emerging Infectious Disease (IR 4.1: Infectious Disease Burden Reduced) therefore there will be potential sources of funding comes from Environment Office (Climate Change), the World Bank and The UK AID which have allocated funding for this issue.
Will USAID allows BANTU 2 receive cost sharing from other donors for certain activities?
USAID Response: We do not have any information on cost sharing from other donors at this time. We will inform the apparently successful offeror if such an opportunity arises.
U.S. AGENCY FOR INTERNATIONAL DEVELOPMENT
U.S. Embassy Jakarta Jl. Medan Merdeka Selatan 3-5 Jakarta 10110, Indonesia USAID.gov
ATTACHMENT 2
Issuance Date: April 20, 2023 Closing Date/Time for Questions: May 4, 2023, 04:00 PM, Jakarta time Closing Date/Time for Past Performance: May 26, 2023, 04:00 PM, Jakarta time Closing Date/Time for Receipt of Proposals: June 2, 2023, 07:00 PM, Jakarta time Email Submission to: proposals-indonesia@usaid.gov NAICS Code: 541611 - Administrative Management and
General Management Consulting Authorized Geographic Code: 937
Subject: Request for Proposal (RFP) Number 72049723R00002 - USAID Health Technical
Assistance (BANTU II)
To Small Business Offerors:
The United States Government, as represented by the United States Agency for International Development (USAID) Mission to Indonesia, is seeking proposals from qualified U.S Small Business Offerors interested in providing technical services for USAID Health Technical Assistance Project (BANTU II) as described in the attached Request For Proposals (RFP). USAID anticipates awarding one Cost-Plus-Fixed-Fee (CPFF) Completion type contract, with a total estimated cost in the range of $17 to $20 million, covering a total estimated period of five (5) years.
In accordance with FAR Part 19.5, this acquisition is being set aside for U.S. Small Businesses only.
Teaming arrangements that include local partners are encouraged in order to adequately provide the expertise required for the program implementation.
The Project will involve providing technical assistance to USAID and its partners, including procurement sensitive activities, which may have an impact on the selected offeror’s eligibility for selected future procurements.
If your organization decides to submit a proposal in response to this solicitation, it must be submitted in accordance with the instructions provided Section L of this RFP. Offerors must also carefully review Section M - Evaluation Factors. Sections B through I of the solicitation and Attachment J will become a substantive part of the anticipated contract with blanks to be completed by the Contracting Officer upon award. Section K - Representations, Certifications and Acknowledgements must be filled out in full.
Please note that Past Performance Matrix and Past Performance Reference Questionnaires must be submitted early and separately from Technical and Cost Proposal, no later than the
Bantu II
Amendment No. 01 closing dates stated above. If the past performance information and proposals are received after the closing date and time, or if it is incomplete, it will not be accepted nor considered unless authorized by the Contracting Officer pursuant to FAR 15.208.
Amendments to this solicitation will be made available at http://www.sam.gov. It is the offeror’s responsibility to check this website periodically for official updates and amendments to the solicitation. This solicitation in no way obligates USAID to award a contract, nor does it commit USAID to pay any costs incurred in the preparation and submission of a proposal in response hereto. Furthermore, the Government reserves the right to reject any and all offers, if such action is considered to be in the best interest of the Government.
All questions, comments, and/or requests for clarifications must be sent in writing to proposals-indonesia@usaid.gov no later than the date and time indicated above.
Thank you for your interest and we look forward to your participation.
Sincerely, Mohib Ahmed Supervisory Contracting Officer Director, Office of Acquisition and Assistance USAID/Indonesia
Note: Text highlighted in yellow indicates deleted, new or revised text in accordance with Amendment No. 01 of RFP 72049723R000002 https://sam.gov/content/home
(x)
72049723R00002 x x
N/A
Not Applicable
720497
Jakarta 10110 JI. Medan Merdeka Selatan 3-5 American Embassy USAID/Indonesia
REQ-497-23-000006See Bloc 16C
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning ___________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended,
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
01/20/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
One(01) x
The purpose of this Amendment No.01 is to provide USAID/Indonesia’s responses to the questions received by the due date provided in the subject RFP as detailed in Attachment 1. Please see changes to the RFP in yellow highlighted under Attachment 2.
x
N/A
N/A
Mohib Ahmed, Supervisory Contracting Officer
5/12/2023
X FAA of 1961, as amended, and EO 11223
Amendment No. 01
TABLE OF CONTENTS
ACRONYM LIST
PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS
B.1 PURPOSE
B.2 CONTRACT TYPE AND CONTRACT SERVICES
B.3 ESTIMATED COST, FIXED FEE AND OBLIGATED AMOUNT
B.4 BUDGET
B.5 FAR 52.216-8 FIXED FEE (JUN 2011)
B.6 INDIRECT RATES
B.7 REIMBURSABLE COSTS
SECTION C – STATEMENT OF WORK
SECTION D – PACKAGING AND MARKING
D.1 AIDAR 752.7009 MARKING (JAN 1993)
D.2 BRANDING STRATEGY
D.3 BRANDING AND MARKING PLAN COMPLIANCE
SECTION E – INSPECTION AND ACCEPTANCE
E.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE
E.2 INSPECTION AND ACCEPTANCE
E.3 PERFORMANCE STANDARDS
SECTION F – DELIVERIES OR PERFORMANCE
F.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE
F.2 PERIOD OF PERFORMANCE (CPFF)
F.3 PLACE OF PERFORMANCE
F.4 KEY PERSONNEL
F.5 AUTHORIZED WORKDAY/WEEK
F.6 REPORTS AND DELIVERABLES
SECTION G – CONTRACT ADMINISTRATION DATA
G.1 ADMINISTRATIVE CONTRACTING OFFICE
G.2 CONTRACTING OFFICER
G.3 CONTRACTING OFFICER’S REPRESENTATIVE (COR)
G.5 TECHNICAL DIRECTIONS/RELATIONSHIP WITH USAID
G.6 AIDAR 752.7003 DOCUMENTATION FOR PAYMENT (NOV 1998)
G.7 PAYING OFFICE
G.8 ACCOUNTING AND APPROPRIATION DATA
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 NOTICE LISTING CONTRACT CLAUSE INCORPORATED BY REFERENCE
H.2 AUTHORIZED GEOGRAPHIC CODE
H.3 LOGISTIC SUPPORT
Amendment No. 01
H.4 LANGUAGE REQUIREMENTS
H.5 AIDAR 752.7007 PERSONNEL COMPENSATION (JULY 2007)
H.6 ADDITIONAL REQUIREMENTS FOR PERSONNEL COMPENSATION - AIDAR 722.170 EMPLOYMENT
OF THIRD COUNTRY NATIONALS (TCN’s) AND COOPERATING COUNTRY NATIONALS (CCN’s)
H.7 AIDAR 752.228-3 WORKER’S COMPENSATION INSURANCE (DEFENSE BASE ACT) (DEC
1991)[DEVIATION M-OAA-DEV-AIDAR-22-10c (JUNE 2022)]
H.8 AIDAR 752.7004 EMERGENCY LOCATOR INFORMATION (JUL 1997)
H.9 AIDAR 752.231-71 SALARY SUPPLEMENTS FOR HOST GOVERNMENT EMPLOYEES (OCT 1998) ... 46
H.10 AIDAR 752-229-71 REPORTING OF FOREIGN TAXES (JULY 2007)
H.11 752.204-72 CONTRACTOR ACCESS TO USAID FACILITIES AND USAID’S INFORMATION SYSTEMS
(AUGUST 2013) [DEVIATION (APR 2022]
H.12 AIDAR 752.231-72 CONFERENCE PLANNING AND REQUIRED APPROVAL (AUG 2013) [DEVIATION
M/OAA-DEV-AIDAR-22-05c (APR 2022)]
H.13 EXECUTIVE ORDER ON TERRORISM FINANCING (FEB 2002)
H.14 AIDAR 752.7032 - INTERNATIONAL TRAVEL APPROVAL AND NOTIFICATION REQUIREMENTS (APR
2014)
H.15 BUSINESS CLASS TRAVEL
H.16 FOREIGN GOVERNMENT DELEGATION TO INTERNATIONAL CONFERENCES (JAN 2002)
H.17 INFORMATION TECHNOLOGY APPROVAL (APRIL 2018) (DEVIATION NO. MOAA-DEV-FAR-22-03c)
(APRIL 2020)
H.18 AIDAR 752.245-71 TITLE TO AND CARE OF PROPERTY (APR 1984)
H.19 VALUE ADDED TAX AND CUSTOMS DUTIES
H.20 SUBCONTRACTOR CONSENT
H.21 CONFLICTS OF INTEREST
H.22 DISCLOSURE OF INFORMATION
H.23 FAR PART 4.21 PROHIBITION ON CONTRACTING FOR CERTAIN COVERED TELECOMMUNICATIONS
AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (SECTION 889) (DECEMBER 2021)
PART II – CONTRACT CLAUSES
SECTION I – CONTRACT CLAUSES
I.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE
I.2 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
I.3 AR 52.219-14 LIMITATIONS ON SUBCONTRACTING (SEPT 2021) [Deviation M/OAA-DEV-FAR-21-
02C (September 2021)] I.4 FAR 52.222-50 COMBATING TRAFFICKING IN PERSONS (FEB 2009) Alt. I (AUG 2007)
I.5 FAR 52.244-2 SUBCONTRACTS (JUN 2007)
I.6 AIDAR 752.209-71 ORGANIZATIONAL CONFLICTS OF INTEREST DISCOVERED AFTER AWARD (JUN
1993)
I.7 AIDAR 752-222-71 NONDISCRIMINATION (JUNE 2012)
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
K.1 NOTICE LISTING SOLICITATION PROVISIONS INCORPORATED BY REFERENCE
Amendment No. 01
K.2 FAR 52.204-3 TAXPAYER IDENTIFICATION (OCT 1998)
K.3 FAR 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2022)
K.4 FAR 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
K.5 FAR 52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES REPRESENTATION
(OCT 2020)
K.6 FAR 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (AUG 2020)
K.7 FAR 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
K.8 FAR 52.222-56 CERTIFICATION REGARDING TRAFFICKING IN PERSONS COMPLIANCE PLAN (OCT
2020)
K.9 FAR 52.230-1 COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (JUN 2020)
K.10 FAR 52.230-7 PROPOSAL DISCLOSURE – COST ACCOUNTING PRACTICE CHANGES (APR 2005)
K.11 COMPLIANCE WITH VETERANS’ EMPLOYMENT REPORTING REQUIREMENTS
K.12 INSURANCE - IMMUNITY FROM TORT LIABILITY
K.13 AUTHORIZED NEGOTIATORS
K.14 AGREEMENT ON, OR EXCEPTIONS TO, TERMS AND CONDITIONS
K.15 CONTRACTOR PURCHASING SYSTEM REVIEW
K.16 SIGNATURE
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L.1 NOTICE LISTING SOLICITATION PROVISIONS INCORPORATED BY REFERENCE
L2.FAR 52.215-1 INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION (JAN 2004) ALT I (OCT
1997)
L.2 FAR 52.233-2 SERVICE OF PROTEST (SEP 2006)
L.3 QUESTIONS AND CLARIFICATIONS
L.4 PROPOSAL PREPARATION AND DELIVERY INSTRUCTIONS
L.5 RESPONSIVENESS TO RFP
L.6 PROPOSAL VALIDITY
L.7 OFFEROR’S RESPONSIBILITIES
L.8 GOVERNMENT OBLIGATION
L.9 INSTRUCTIONS FOR THE PREPARATION OF PAST PERFORMANCE
L.10 INSTRUCTIONS FOR THE PREPARATION OF THE TECHNICAL PROPOSAL
L.11 INSTRUCTIONS FOR THE PREPARATION OF THE COST PROPOSAL
L.12 INSTRUCTION FOR THE PREPARATION OF THE BRANDING IMPLEMENTATION AND MARKING
PLAN
L.13 WAIVERS UNDER FAR PART 4.2101 PROHIBITION ON COVERED TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES AND EQUIPMENT DEC 2021)
SECTION M – EVALUATION FACTORS FOR AWARD
M.1 OVERVIEW
M.2 TECHNICAL EVALUATION CRITERIA
M.3 BUSINESS/COST PROPOSAL EVALUATION
M.4 DETERMINATION OF THE COMPETITIVE RANGE AND CONTRACT AWARD
M.5 BRANDING IMPLEMENTATION AND MARKING PLAN
Amendment No. 01
ACRONYM LIST
AIDAR: USAID Acquisition Regulation
AMELP: Activity Monitoring, Evaluation, and Learning Plan
BAST: Berita Acara Serah Terima
CBLD: Capacity Building Indicator
CCN: Cooperating Country National
CDCS: Country Development Cooperation Strategy
CFR: Code Federal Regulation
CLA: Collaborating, Learning, and Adapting
CO: Contracting Officer
COP: Chief of Party
COR: Contracting Officer’s Representative
CPFF: Cost Plus Fixed Fee
CSO: Civil Society Organizations
DBA: Defense Base Act
DRG: Office of Democratic, Resilience and Governance
EGE: Office of Economic Growth and Education
ENV: Office of Environment
FAR: Federal Acquisition Regulation
GIDAP: Gender and Inclusive Development Action Plan
GOI: Government of Indonesia (GOI)
HEA: Office of Health
HSS: Health Systems Strengthening
Amendment No. 01
HSPD: Homeland Security Presidential Directive
ID: Infectious Diseases
KPI: Key Performance Indicators
LTTA: Long-Term Technical Assistance
MCH: Maternal and Child Health
MOH: Ministry of Health
NGO: Non-Government Organizations
PIV: Personal Identity Verification
SMART: Specific, Measurable, Achievable, Relevant, Timely
STTA: Short Term Technical Assistance
TB: Tuberculosis
TCN: Third Country National
UEI: Unique Entity Identification
Amendment No. 01
PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS
B.1 PURPOSE
The purpose of this contract is to provide technical assistance and services as described in detail in Section C, Statement of Work for the implementation of USAID Indonesia’s “Health Technical Assistance (Bantu II) Project”.
B.2 CONTRACT TYPE AND CONTRACT SERVICES
This is a cost-plus-fixed fee (CPFF) completion-type, cost reimbursement contract. For the consideration set forth in the contract, the Contractor must provide the deliverables or outputs described in Section C and Section F.
B.3 ESTIMATED COST, FIXED FEE AND OBLIGATED AMOUNT
B.3.1 The total estimated cost for the performance of the work required hereunder, exclusive of fixed fee, if any, is $[TBD]. The fixed fee, if any, is $[TBD]. The estimated cost-plus fixed fee, if any, is $[TBD]. USAID will not pay the Contractor any sum in excess of the total estimated cost.
B.3.2 Within the estimated cost plus fixed fee (if any) specified in paragraph (a) above, the amount currently obligated and available for reimbursement of allowable costs incurred by the Contractor (and payment of fee, if any) for performance hereunder is $[TBD].
B.3.3 Funds obligated hereunder are anticipated to be sufficient through $[TBD]. Funding for this contract will be on an incremental basis, subject to the availability of funds.
B.3.4 The Contractor must not exceed the aforesaid obligated amount, nor will the U.S.
Government be responsible for costs incurred should the Contractor do so.
B.4 BUDGET
The Contractor is not allowed to exceed any contract line item nor is authorized to shift funding between contract line items without prior written approval of the Contracting Officer. The fee is fixed according to the terms of this contract.
AWARD BUDGET
[TBD -- Below structure is for illustrative purposes only]
Amendment No. 01
Contract Line Items Total Amount CLIN 001. Direct Cost $ [TBD] CLIN 002. Indirect Cost $ [TBD] CLIN 003. Fixed Fee (if any) $ [TBD] Total Estimated Cost-Plus Fixed Fee (if any) $ [TBD]
B.5 FAR 52.216-8 FIXED FEE (JUN 2011)
The Government will pay the Contractor for performing this contract the fixed fee specified in Section B.3. In accordance with FAR 52.216-8, Fixed Fee (2011) USAID will withhold 15% of the total fee or $100,000, whichever is less until the required conditions under the referenced clause have been met.
The payment of fee will be in accordance with the following fee schedule which is tied to the list of reports and deliverable in Section F.6 as provided below:
Ref. Deliverables % of Fixed Fee
Yr.1 Yr.2 Yr.3 Yr.4 Yr.5 Total
F.6.2 Annual Work Plan 2% 2% 2% 2% 2% 10%
F.6.3 Activity Monitoring, Evaluation, and Learning (AMEL) Plan
4% 4%
F.6.7 Annual Report 3% 3% 3% 3% 3% 15%
F.6.8 Provide STTAs and LTTAs:
At least 98% of all short and long-term consultants receive a satisfactory or higher score from client organizations
2% 4% 4% 4% 2% 16%
F.6.9 Provide STTAs and LTTAs:
At least 98% of Technical Assistance provided meets deliverables and performance expectations in the TA’s scope of work.
2% 4% 4% 4% 2% 16%
Amendment No. 01
F.6.10 Arrange Meetings and Logistic Support: At least 98% of all meetings planned receive a satisfactory score or higher based on client feedback.
2% 2% 2% 2% 2% 10%
F.6.11 Support Local Organizations and improve organizational capacity: At least 80% of local organizations provided support demonstrating improvement based on a standardized tool (eg:
Organization's Performance Indicators)
3% 5% 5% 5% 3% 21%
F.6.17 Final Report 8% 8%
Total Fixed Fee 16% 21% 21% 21% 21% 100%
B.6 INDIRECT RATES
Pending establishment of revised provisional or final indirect cost rates, allowable indirect costs shall be reimbursed on the basis of the following negotiated provisional or predetermined rates and the appropriate bases:
(TBD at time of award)
B.7 REIMBURSABLE COSTS
Allowable costs shall be limited to reasonable, allocable, and necessary costs determined in accordance with FAR 52.216-7, “Allowable Cost and Payment,” FAR 52.216-8, “Payment of Fixed Fee,” FAR 52.232-20, “Limitation of Cost,” and FAR 52-232-22, “Limitation of Funds,” if applicable, and AIDAR 752.7003, “Documentation for Payment.”
[END OF SECTION B]
Amendment No. 01
SECTION C – STATEMENT OF WORK
C.1 BACKGROUND
The USAID/Indonesia Country Development Cooperation Strategy (CDCS) drives the mission’s strategy for the period Fiscal Year (FY) 2021 through FY2025 and is built around the overarching goal of creating a stronger Indonesia advancing national and global development. There are four Development Objectives that build up to this goal: effective, democratic governance strengthened (DRG); inclusive economic growth increased (EGE); environmental sustainability improved (ENV); and priority health outcomes improved (HEA).
While we expect the majority of support to be provided to USAID/Indonesia’s fourth development objective, priority health outcomes improved, the contract will support the other three Development Objectives if so requested.
USAID/Indonesia’s Objective four (HEA) is comprised of three intermediate results:
IR 4.1: Infectious Disease Burden Reduced IR 4.2: Maternal and Newborn Health Outcomes Improved IR 4.3: Public Health Financing and Governance Improved
USAID/Indonesia works closely with the Government of Indonesia (GOI) and other local counterparts to help them achieve national goals and priorities towards a healthier Indonesia.
USAID provides targeted support and expertise that complements the contributions of other donors and the significant investments of GOI. Improving the skills of the clinical and public health workforces as well as the quality of care in the facilities where they work is essential to improving the health status of Indonesians. Improving access to care and strengthening the capacity of health systems is also imperative.
USAID/Indonesia partners with the GOI at national and sub-national levels, academic and private sector, and other donors to strengthen the GOI’s national strategies for improved health outcomes, health system strengthening, and disease control. The Office of Health’s portfolio comprises two teams: 1) maternal and child health (MCH) and Health Systems Strengthening (HSS), and 2) infectious diseases (ID). Under MCH and HSS, USAID is primarily focused on improving maternal and neonatal survival by improving quality of services, reducing delays within the emergency obstetrical care referral system and otherwise improving access to care, improving the governance environment, and supporting health system improvements. Within ID, USAID supports programs to control tuberculosis (TB), HIV/AIDS, avian and pandemic influenza/emerging pandemic threats, as well as selected neglected tropical diseases.
C.2 PROGRAM PURPOSE
The purpose of the Health Technical Assistance Project II (Bantu II) is to identify, recruit, hire, Amendment No. 01 administer and support qualified individuals or organizations to provide short or long-term technical assistance as needed and requested by USAID Indonesia’s Office of Health and other offices, in particular, to support USAID’s Health program and CDCS strategies and priorities. The Bantu II project will provide specialized, high-level technical assistance to USAID, USAID-funded programs, the GOI (e.g., the Ministry of Health (MOH), National AIDS Commission, Indonesian Commission for Hospital Accreditation, etc.) parastatal organizations (e.g., Eijkman Institute), sub-national government (e.g., district health office), non-government organizations (NGOs), civil society organizations (CSOs), academic institutions, and other research institutes as required. The contract will support current and future areas of strategic interest, including USAID’s Locally Led Development Strategy, USAID ‘s Climate Strategy, and other directives.
Bantu II will identify a pool of diverse Indonesian, expatriate, and regional health, governance, information technology (IT), management professionals and local organizations who are able provide specialized expertise that may be lacking in the health systems, but which are critical to the success of Indonesian public health programs and achievement of the Mission’s development objectives related to health. Most of the technical assistance requests will contribute to achievement of specific health results as defined by USAID’s CDCS, but requests may also support the other three Development Objectives.
In addition, the Contract will support USAID to strengthen the capacity and sustainability of it’s local partners so that these organizations will be better able to fulfill their mandates
C.3 SCOPE OF WORK
The Contractor must identify, contract and make available for short- and long-term periods individuals, organizations, or subcontractors to perform the specific tasks identified and requested by the USAID/Indonesia Office of Health or other USAID Offices. For the purposes of the Bantu II contract, short-term assignments will be those that last up to six months; long-term assignments will be six months to three years. The Contractor must identify appropriate consultants with the required expertise, availability, language proficiencies, and experience for each task.
Consultants provided under this contract will work from the Contractor`s offices, be deployed inside the institution supported, work within USAID/Indonesia’s office if/when required, and/or be deployed to any of the areas outside of Jakarta where USAID is engaged. In some cases, consultants may need to travel to ASEAN member states.
The Contractor must be responsible for maintaining clear lines of communication with USAID to ensure timeliness and responsiveness to project tasks, regular feedback on performance of individual consultants and organizations on specific assignments, and satisfactory completion of deliverables and assignments.
USAID will plan, to the extent possible, all anticipated consultant and technical assistance needs and annually submit to the Contractor a plan for consultancies, upon which the Contractor must build their annual work plan. While separate Statements of Work will be drafted for each
Amendment No. 01 position, the Contracting Officer’s Representative (COR) Technical Direction may include the requirement for the consultants to provide services to support specific work activities.
The Contractor must, as instructed by USAID, coordinate and collaborate with other identified partners and USAID programs. Furthermore, the Contractor must utilize local individuals and local organizations as appropriate in order to contribute to capacity development. If local individuals and organizations are used, the Contractor must manage the logistics, travel, per diem, and other such appropriate allowances as will be necessary to relocate these consultants domestically to their assignment location.
The Contractor must provide oversight mechanisms to avoid an actual or the appearance of conflict of interest. In addition, the Contractor must vet the backgrounds and affiliations of all proposed candidates, securing Non-Disclosure and Conflict Agreement forms affirming that they do not have a conflict of interest, when appropriate. The Contractor is responsible for obtaining and maintaining the security clearance of their proposed advisors and consultants before an institutional contractor begins work and will be responsible to ensure their contractor’s ethical behavior and professional compliance when granted access to USAID systems or facilities.
The Contractor’s responsibilities are comprised of three objectives:
Objective 1. Provide short-term and long-term technical assistance.
Short Term Technical Assistance (STTA)
The contractor must identify, recruit, and place short-term and intermittent technical advisors and/or subcontractors for a range of assignments in order to contribute to the health-related results expected under the CDCS and of the Ministry of Health’s goals related to maternal, neonatal, and child health, infectious diseases, and health systems strengthening.
Illustrative examples of possible tasks include:
● Identification of a gender and inclusive development expert and training experts who can develop and conduct a locally appropriate training module for NGOs working in communities to improve access and compliance of female TB patients and also patients from marginalized groups to treatment and also advise the gender-transformative programming on Maternal Child Health (MCH).
● Identification and placement of a team (including an epidemiologist, a biostatistician, and a proposal writer) to provide technical support to the Ministry of Health assessment of HIV/AIDS related data.
● Identify and hire a local expert to provide on-going intermittent technical expertise in data analysis for the National AIDS Commission.
● Recruit and hire a local organization to provide technical and management mentoring and training to local NGOs who have been awarded USAID grants or contracts.
Amendment No. 01
● Identify and hire local and international experts to work with the Ministry of Health and USAID to conduct an assessment on factors contributing stunting and early childhood nutrition.
● Recruit technical experts to work directly with senior GOI staff as requested to prepare gender-responsive policy papers or other communication materials in preparation for their regional or international meetings on topics related to USAID’s assistance.
To meet the requested need for technical assistance, the Contractor may need to do the following:
i. hire an individual expert;
ii. hire or subcontract with a team of experts; and/or
iii. hire or subcontract with an organization.
For assignments requiring international experts or the domestic relocation of Indonesian consultants, the Contractor must obtain visas, lodging, and other allowances and provide on-going logistic and administrative assistance. Some tasks may be requested by USAID on very short notice, requiring rapid response from the Contractor to ensure the effectiveness of the contract.
Long-Term Technical Assistance (LTTA)
The contractor must identify, recruit, and hire appropriate candidates and/or subcontractors as long-term technical advisors in Indonesia.
Illustrative examples of possible tasks include:
● Recruit, hire and place a laboratory specialist in TB, at the National TB Program for two years.
● Hire a technical team to support the Ministry of Health to support COVID-19 data center in the implementation of their new online data systems.