RFP_Attachment J-2_GFI.pdf
PDF 1 MB Posted
- Solicitation number
- N6339422R0024
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6339422R0024 Amendment 5 Mod.pdf | ||
| N6339422R0024 Amendment 5 Conformed.pdf | ||
| N6339422R0024 Amendment 4.pdf | ||
| N6339422R0024 Amendment 4 Conformed.pdf | ||
| N6339422R0024 Amendment 3.pdf | ||
| C4_22R0024_RFP_Attachment J-S-2_Past Performance Updated on July 26 2022.doc | DOC document | |
| N6339422R0024 Amendment 2 July 26 2022.pdf | ||
| N6339422R00240001 RFP 7-13-2022.pdf | ||
| RFP_Attachment J-3_GFP.xlsx | XLSX spreadsheet | |
| N6339422R0024 RFP 7-5-2022.pdf | ||
| RFP_Exhibit A_CDRL.pdf | ||
| RFP_Attachment J-S-2_Past Performance.doc | DOC document | |
| RFP_Attachment J-S-1_Pricing.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVSEA 4340/2 (Rev. Mar 2018) Page 1 of 2
GOVERNMENT FURNISHED INFORMATION
ATTACHMENT # PR#
PROGRAM TITLE: CONTRACT NUMBER: DATE:
CODE:
(1) NUMBER (5) GFI DUE DATE(4) DOCUMENT DATE(3) DOCUMENT NUMBER(2) DOCUMENT TITLE
NAVSEA 4340/2 (Rev. Mar 2018) Page 2 of 2
NAVSEA Form 4340/2 - Government Furnished Information Instructions
ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.
PR #: Enter Purchase Request (PR) number.
PROGRAM TITLE: Enter the title of the program.
CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.
DATE: Enter the calendar date that this form was prepared.
CODE: Enter the Program Office / Requiring Activity's office code.
NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.
DOCUMENT TITLE, Column (2): Enter Document Title for each item.
DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.
DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).
GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:
DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test
PAGE __ OF __: Assign page numbers sequentially.
NAVSEA 4340/2 (Rev. Mar 2018) Page of NAVSEA 4340/2 (Rev. Mar 2018) Page of
GOVERNMENT FURNISHED INFORMATION
(1) NUMBER
(5) GFI DUE DATE
(4) DOCUMENT DATE
(3) DOCUMENT NUMBER
(2) DOCUMENT TITLE
NAVSEA Form 4340/2 - Government Furnished Information Instructions
ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.
PR #: Enter Purchase Request (PR) number.
PROGRAM TITLE: Enter the title of the program.
CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.
DATE: Enter the calendar date that this form was prepared.
CODE: Enter the Program Office / Requiring Activity's office code.
NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.
DOCUMENT TITLE, Column (2): Enter Document Title for each item.
DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.
DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).
GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:
DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test
PAGE __ OF __: Assign page numbers sequentially.
11.0.1.20130826.2.901444.899636
| CurrentPage: |
| PageCount: |
| TextField1: J-2 |
| TextField2: N6339422R0015 |
| TextField7: MK 41 Vertical Launching System |
| TextField8: TBD |
| DateField1: 27 May, 2022 |
| TextField3: A107 |
| DateField3: 30 DAC |
| DateField3: 30 DAC |
| DateField3: 30 DAC |
| DateField3: 30 DAC |
| DateField3: 30 DAC |
| DateField3: 30 DAC |
| DateField2: |
| TextField6: 8660400-9 |
| TextField6: TL130-AD-PLN-030-VLS |
| TextField6: MK 41 VLS Standing Instruction 94-1F, Attachment 6 |
| TextField6: TL130-AD-PLN-010-VLS |
| TextField6: WS 20130 |
| TextField6: 8660450-9 |
| TextField5: Module Electronics Box (MEB) Drawings |
| TextField5: Firmware Configuration Management |
| TextField5: Marking for technical data |
| TextField5: Configuration Management Program Plan for the MK 41 VLS, Volume 1, Equipment (Hardware) Configuration Management |
| TextField5: Production Environmental Test Requirements for VLS |
| TextField5: Hazard Electronics Box (HEB) Drawings |
| TextField4: 1 |
| TextField4: 6 |
| TextField4: 5 |
| TextField4: 4 |
| TextField4: 3 |
| TextField4: 2 |