This is a competitiveness matrix document from the State of Oregon Infrastructure Finance Authority detailing industrial development requirements across twelve different industrial sectors (A through L). The matrix provides detailed specifications and requirements for various types of industrial developments, including heavy industrial/manufacturing, high-tech/cleantech manufacturing, food processing, advanced manufacturing, general manufacturing, industrial business parks, business services, warehousing/distribution, UAV manufacturing, and data centers.

The matrix outlines specific requirements for physical site characteristics, transportation access, and utility infrastructure needs. Key specifications include site size requirements ranging from 5-100+ acres, slope requirements typically between 0-7%, transportation requirements including trip generation rates and proximity to interstates, and detailed utility specifications for water, sewer, natural gas, electricity, and telecommunications. The document includes special considerations for each sector, such as distance requirements from sensitive land uses, expansion capabilities, and environmental concerns. The matrix is primarily used as a technical reference tool for industrial development planning and site selection in Oregon, with requirements categorized as "Required," "Competitive," or "Preferred" based on their importance to each sector.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF OREGON ‐ Infrastructure Finance Authority Industrial Development Competitiveness Matrix

PROFILE A B C D E F G I H J K L

CRITERIA

Heavy Industrial

/ Manufacturing

High‐Tech /

Clean‐Tech

Manufacturing

Food Processing

Advanced

Manufacturing

& Assembly

General

Manufacturing

Industrial

Business Park and R&D

Campus

Business /

Admin Services

Regional

Warehouse /

Distribution

Local

Warehouse /

Distribution

UVA

Manufacturing /

Research

Data Center Rural

Industrial

PHYSICAL SITE

2 TOTAL SITE SIZE**

Competitive

Acreage* 10 ‐ 100+ 5 ‐ 100+ 5 ‐ 25+ 5 ‐ 25+ 5 ‐ 15+ 20 ‐ 100+ 5 ‐ 15+ 20 ‐ 100+ 10 ‐ 25+ 10 ‐ 25+ 10 ‐ 25+ 5 ‐ 25+

3 COMPETITIVE SLOPE: Maximum Slope 0 to 5% 0 to 5% 0 to 5% 0 to 7% 0 to 5% 0 to 7% 0 to 12% 0 to 5% 0 to 5% 0 to 7% 0 to 7% 0 to 5%

TRANSPORTATION

5 TRIP GENERATION:

Average Daily Trips per Acre

40 to 60

(ADT / acre)

40 to 60

(ADT / acre)

50 to 60

(ADT / acre)

40 to 60

(ADT / acre)

40 to 50

(ADT / acre)

60 to 150

(ADT / acre)

170 to 180

(ADT / acre)

40 to 80

(ADT / acre)

40 to 80

(ADT / acre)

40 to 80

(ADT / acre)

20 to 30

(ADT / acre)

40 to 50

(ADT / acre)

MILES TO INTERSTATE

OR OTHER PRINCIPAL

ARTERIAL:

Miles w/ in 10 w/ in 10 w/ in 30 w/ in 15 w/ in 20 N/A N/A w/ in 5

(only interstate or equivalent) w/ in 5

(only interstate or equivalent)

N/A w/ in 30 N/A

7 RAILROAD ACCESS: Dependency Preferred Preferred Preferred Not Required Preferred Preferred Not Required Preferred Preferred Not Required Avoid N/A

PROXIMITY TO MARINE

PORT:

Dependency Preferred Preferred Preferred Not Required Preferred Preferred Not Required Preferred Preferred Not Required Not Required N/A

9 Dependency Preferred Competitive Preferred Competitive Preferred Required Preferred Preferred Preferred Preferred Competitive N/A

Distance (Miles) w/ in 60 w/ in 60 w/ in 60 w/ in 30 w/ in 60 w/ in 30 w/ in 60 w/ in 60 w/ in 60 w/ in 30 w/ in 60 N/A

10 Dependency Preferred Competitive Preferred Competitive Preferred Competitive Preferred Preferred Preferred Competitive Preferred N/A

Distance (Miles) w/ in 300 w/ in 300 w/ in 300 w/ in 100 w/ in 300 w/ in 100 w/ in 300 w/ in 300 w/ in 300 w/ in 100 w/ in 300 N/A

UTILITIES

11 WATER:

Min. Line Size

(Inches/Dmtr) 8" ‐ 12" 12" ‐ 16" 12" ‐ 16" 8" ‐ 12" 6" ‐ 10" 8" ‐ 12" 4" ‐ 6" 4" ‐ 8" 4" ‐ 6" 4" ‐ 8" 16" 4" ‐ 8"

Min. Fire Line Size

(Inches/Dmtr) 10" ‐ 12" 12" ‐ 18" 10" ‐ 12" 10" ‐ 12" 8" ‐ 10" 8" ‐ 12" 6" ‐ 10" 10" ‐ 12" 6" ‐ 8" 6" ‐ 10" 10"‐12"

6"

(or alternate source)

High Pressure

Water Dependency Preferred Required Required Preferred Not Required Preferred Not Required Not Required Not Required Not Required Required Not Required

Flow

Gallons per Day per

Acre)

(GPD / Acre)

(GPD / Acre)

(GPD / Acre)

(GPD / Acre)

(GPD / Acre)

(GPD / Acre)

(GPD / Acre)

(GPD / Acre)

(GPD / Acre)

(GPD / Acre)

50‐200

(Gallons per

MWh) †

(GPD / Acre)

12 SEWER:

Min. Service Line

Size (Inches/Dmtr) 6" ‐ 8" 12" ‐ 18" 10" ‐ 12" 10" ‐ 12" 6" ‐ 8" 10" ‐ 12" 6" ‐ 8" 4" 4" 6" 8"‐10"

4" ‐ 6"

(or on‐site source)

Flow

(Gallons per Day per Acre)

(GPD / Acre)

(GPD / Acre)

(GPD / Acre)

(GPD / Acre)

(GPD / Acre)

(GPD / Acre)

(GPD / Acre)

(GPD / Acre)

(GPD / Acre)

(GPD / Acre)

(GPD / Acre) ‡

(GPD / Acre)

13 NATURAL GAS:

Preferred Min.

Service Line Size

(Inches/Dmtr)

4" ‐ 6" 6" 4" 6" 4" 6" 2" 2" 2" 2" 4" N/A

On Site Competitive Competitive Preferred Competitive Competitive Competitive Preferred Preferred Preferred Preferred Preferred Preferred

14 ELECTRICITY:

Minimum Service

Demand

2 MW 4‐6 MW 2‐6 MW 1 MW 0.5 MW 0.5 MW 0.5 MW 1 MW 1 MW 0.5 MW 5‐25 MW 1 MW

Close Proximity to

Substation Competitive Competitive Not Required Competitive Preferred Competitive Preferred Not Required Not Required Not Required

Required, could be on site Not Required

Redundancy

Dependency Required Preferred Not Required Required Not Required Competitive Required Not Required Not Required Not Required Required Not Required

15 TELECOMMUNICATIONS:

Major

Communications

Dependency

Preferred Required Preferred Required Required Required Required Preferred Preferred Required Required Preferred

Route Diversity

Dependency Not Required Required Not Required Required Not Required Preferred Required Not Required Not Required Not Required Required Not Required

Fiber Optic

Dependency Preferred Required Preferred Required Preferred Required Required Preferred Preferred Required Required Not Required

SPECIAL

CONSIDERATIONS:

Adequate distance from sensitive land uses

(residential, parks, large retail centers) necessary.

High throughput of materials.

Large yard spaces and/or buffering required.

Often transportation related requiring marine/rail links.

Acreage allotment includes expansion space

(often an exercisable option).

Very high utility demands in one or more areas common.

Sensitive to vibration from nearby uses.

May require high volume/supply of water and sanitary sewer treatment.

Often needs substantial storage/yard space for input storage.

Onsite water pre‐ treatment needed in many instances.

Surrounding environment of great concern

(vibration, noise, air quality, etc.).

Increased setbacks may be required.

Onsite utility service areas.

Avoid sites close to wastewater treatment plants, landfills, sewage lagoons, and similar land uses.

Lower demands for water and sewer treatment than Production

High‐Tech

Manufacturing.

Adequate distance from sensitive land uses

(residential, parks) necessary.

Moderate demand for water and sewer.

Higher demand for electricity, gas, and telecom.

High diversity of facilities within business parks.

R&D facilities benefit from close proximity to higher education facilities.

Moderate demand on all infrastructure systems.

Relatively higher parking ratios may be necessary.

Will be very sensitive to labor force and the location of other similar centers in the region.

High reliance on telecom infrastructure.

Transportation routing and proximity to/from major highways is crucial.

Expansion options required.

Truck staging requirements mandatory.

Minimal route obstructions between the site and interstate highway such as rail crossings, drawbridges, school zones, or similar obstacles.

Transportation infrastructure such as roads and bridges to/from major highways is most competitive factor.

Must be located witihn or near FAA‐ regulated UAV testing sites.

Moderate utility demands.

Low reliance on transportation infrastructure.

Larger sites may be needed. The

25 acre site requirement represents the more typical site.

Power delivery, water supply, and security are critical.

Surrounding environment

(vibration, air quality, etc.) is crucial.

May require high volume/supply of water and sanitary sewer treatment.

Located in more remote locations in the state.

Usually without direct access

(within 50 miles) of Interstate or

City of more than

50,000 people.

Terms:

More Critical

Use is permitted outright, located in UGB or equivalent and outside flood plain; and site (NCDA) does not contain contaminants, wetlands, protected species, or cultural resources or has mitigation plan(s) that can be implemented in 180 days or less.

'Required' factors are seen as mandatory in a vast majority of cases and have become industry standards

'Competitive' significantly increases marketability and is highly recommended by Business Oregon . May also be linked to financing in order to enhance the potential reuse of the asset in case of default.

Production Manufacturing Warehousing & Distribuiton Specialized

GENERAL REQUIREMENTS

Mackenzie; Business Oregon

PROXIMITY TO

INTERNATIONAL

AIRPORT:

PROXIMITY TO

REGIONAL COMMERCIAL

AIRPORT:

Value‐Added Manufacturing and Assembly Light / Flex Industrial

† Data Center Water Requirements: Water requirement is reported as gallons per MWh to more closely align with the Data Center industry standard reporting of Water Usage Effectiveness (WUE).

Less Critical

* Competitive Acreage: Acreage that would meet the site selection requirements of the majority of industries in this sector.

‡ Data Center Sewer Requirements: Sewer requirement is reported as 200% of the domestic usage at the Data Center facility. Water and sewer requirements for Data Centers are highly variable based on new technologies and should be reviewed on a case‐by‐case basis for specific development requirements.

**Total Site: Building footprint, including buffers, setbacks, parking, mitigation, and expansion space

'Preferred' increases the feasibility of the subject property and its future reuse. Other factors may, however, prove more critical.