RFP 8960 11.19.26.pdf

PDF 3 MB Posted

Attached to
Commissioning Services for Renovations to the Int'l Dual Language School
Solicitation number
RFP 8960- Wtby
Issued by
New Haven County, Connecticut

About this file

This Request for Proposal (RFP) No. 8960 is issued by the City of Waterbury and the Waterbury Development Corporation seeking a qualified commissioning agent to provide commissioning services for the renovation and expansion of the Roberto Clemente International Dual Language School located at 116 Beecher Avenue, Waterbury, Connecticut. The scope of work encompasses comprehensive commissioning services across design, construction, occupancy, and operations phases for a 47,451-square-foot building project that will combine elementary and middle school grade levels on a single campus. The project includes adaptive reuse of an existing convent building integrated with the current elementary school facility, modernizing systems to meet current educational, safety, and accessibility standards. Commissioning activities will address heating, ventilation, air conditioning, refrigeration systems, lighting and daylighting controls, domestic water systems, sprinkler systems, renewable energy systems, emergency power systems, and building envelope systems in accordance with Connecticut High-Performance Building Standards. Responses are due January 7, 2027, by 11:00 a.m., with submission to Kevin McCaffery, Director of Purchasing, Room 103, 235 Grand Street, Waterbury, Connecticut 06702. A mandatory information session is scheduled for December 3, 2026, at 2:00 p.m. at the school site, with mandatory interviews for shortlisted firms scheduled for the week of January 13, 2027. The contract term runs from 2027 through July 2030, with an estimated 24 months of construction.

The commissioning agent must be an independent third-party certified by the Building Commissioning Association, Association of Energy Engineers, or comparable organization, possess Professional Engineer and/or S1 Connecticut licenses, and have minimum ten years of field experience as a commissioning agent. Preferred qualifications include principal commissioning authority experience on at least three comparable projects, expertise in HVAC systems and energy management controls, knowledge of building operations and maintenance, and experience with total building commissioning including data systems and specialty systems. Compensation is provided as a fixed lump-sum fee allocated across design phase, construction phase, and occupancy and operations phase, with hourly rates available only for authorized additional services beyond the original scope. The firm must maintain general liability insurance of $1,000,000 per occurrence with $2,000,000 aggregate, automobile liability of $1,000,000 combined single limit, professional liability of $1,000,000 for each claim and aggregate, and workers' compensation at statutory limits. The City of Waterbury is an Equal Opportunity and Affirmative Action employer; no set-asides are specified in this RFP. Proposers must submit six paper copies plus one electronic copy of qualifications separately from a sealed fee proposal, with all responses remaining valid for 90 days after submission.

View the file

Other files

File Type Posted
RFP 8960- Wtby_Nov_23_26_solicitation_doc.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Final JPY 11.19.26

CITY OF WATERBURY REQUEST FOR PROPOSAL NO. 8960

FOR

COMMISSIONING SERVICES

FOR

RENOVATIONS TO

THE ROBERTO CLEMENTE INTERNATIONAL DUAL LANGUAGE SCHOOL

RFP RESPONSES DUE ON JANUARY 7, 2027, BY 11:00 A.M.

AND MUST BE SUBMITTED TO:

City Of Waterbury Purchasing Department

Room 103 235 Grand Street

Waterbury CT, 06702 Attention: Kevin McCaffery Director of Purchasing

A. Background and Intent

Pursuant to this Request for Proposal (the "RFP"), the Waterbury Development Corporation ("WDC") on behalf of the City of Waterbury (the "City") are seeking proposals from qualified third-parties (each a “respondent” or, collectively, “respondents”) to engage a commissioning agent to provide commissioning services ("CxA", "Consultant" or "Firm") for renovation and construction of the Roberto Clemente International Dual Language School (the "Project") located at 116 Beecher Ave. Waterbury, CT 06705. RFP responses should be addressed and delivered to:

Kevin McCaffery Director Of Purchasing

Room 103 235 Grand Street

Waterbury, CT 06702

B. Scope of Services Kevin McCaffery

To provide CxA services for the Project. The successful respondent will act in the City's best interests and work in conjunction with the Project Architect, General Contractor, and WDC.

The estimated building's square footage is 47,451 SF as listed below:

i. General Classrooms 15,571SF.

ii. Administration 6,621 SF.

iii. Arts 2,339 SF.

iv. Gymnasium 7,285 SF.

v. Media Center/Library 1,046 SF.

vi. Food Service 2,287 SF.

vii. Net Circulation Factor 12,302

The intent of this project is the expansion, renovation, and reconfiguration of the Roberto Clemente International Dual Language School campus, including the adaptive reuse of the existing convent building and its integration with the current elementary school building. The City intends for the Project to combine elementary and middle school grade levels on a single campus, modernize facilities to current educational, safety, and accessibility standards, and provide fully code-compliant, secure, and educationally appropriate spaces for students and staff.

The CxA will plan, manage, perform, and report on the commissioning activities, utilizing the reporting formats and standardized forms provided by the CxA whenever required. The CxA will submit deliverable reports to the City according to an agreed-upon commissioning services schedule. All commissioning tasks shall be conducted in a transparent manner with the involvement of City officials, including the building engineer and operations staff. All information required to meet the State of Connecticut's building code along with conformance with Connecticut High-Performance Building Standards.

Full design documents and specifications are being developed by Kaestle Boos Associates, Inc. The construction documents will be released, bid and a Construction Manager at Risk selected to complete construction. The City will engage the CxA, which shall report directly to WDC as Project Manager and the City’s representative.

The commissioned systems shall include all systems required by the Connecticut High Performance Building regulations, including, but not limited to:

i. Heating, ventilation, air conditioning, and refrigeration systems and associated Controls;

ii. Lighting and day-lighting controls;

iii. Domestic hot and cold-water system;

iv. Sprinkler system

v. Renewable energy systems;

vi. Energy management system;

vii. Emergency power system; and

viii. Building envelope system.

C. Qualifications and Expectations of the Commissioning Agent

1. The successful respondent must possess the following qualifications:

a. Be an independent, third-party individual or firm that is not a member of or otherwise affiliated with the designer/architect, Construction Manager at Risk, or otherwise affiliated with the construction team. This restriction shall not apply to the provision of owner's representative services;

b. Possess certification as a commissioning authority by the Building Commissioning

Association, the Association of Energy Engineers, or, in the City's sole judgment, a comparable certifying organization;

c. Possess all relevant Connecticut licenses, including a Professional Engineer and/or S1 license; and

d. Possess a minimum of ten (10) full years of field experience as a commissioning agent.

2. The City may consider other relevant factors such as:

a. Experience as the principal commissioning authority for at least three projects of comparable size, type, and scope;

b. Experience in the operation and troubleshooting of HVAC systems and energy management control systems;

c. Knowledge of building operation and maintenance and O&M training;

d. Knowledge of national building & fire codes, as well as water-based fire extinguishing systems, detection systems, and alarms systems;

e. Knowledge of test and balance of both air and water systems;

f. Experience with energy-efficient equipment design and control strategy optimization;

g. Experience with total building commissioning approach including building envelope, data and communication systems, and other specialty systems;

h. Experience in monitoring and analyzing system operation using an energy management control system trending and stand-alone data logging equipment;

i. Verbal communication and writing skills, as well as, organization and the ability to work with both management and trade contractors;

j. Experience in writing commissioning specifications; and

k. Membership with the Building Commissioning Association.

The required expertise for this RFP will be based on the skill and experience set of the full team submitting the proposal. A member of the respondent will be the designated commissioning authority and will be required to coordinate all commissioning activities.

The commissioning authority must have significant in-building commissioning experience, including technical and management expertise on projects of similar scope.

If the commissioning authority or prime firm does not have sufficient skills to commission a specific system, the prime firm shall subcontract with a qualified party to do so.

Commissioning is required as one quality measure of the construction of the Project in order to ensure that the final building meets the original intent of the City's design. The respondent is free to suggest changes and improvements to this process. The following is a summary of the commissioning process and scope of work the City requests for this project.

3. Energy Use & Assessment:

In addition to the commissioning services noted above, the Commissioning Agent shall have certified energy managers on staff to work alongside the project team. The

Commissioning Agent and energy manager shall meet regularly with the Owner and design team to review the design team's energy model, design strategies to ensure an efficient and optimized design and recommend alternative systems for consideration. The

Commissioning Agent shall also be experienced partnering with the local utility company and working with Energy programs to help maximize the City's available incentives. The design assessment shall include Lighting, Heating, Ventilation, and Air Conditioning

("HVAC"), Domestic Hot Water ("DHW'), Plug loads, implementation of photovoltaics and energy saving systems etc. in a clear and concise report describing a variety of Energy

Efficiency Optimization Strategies including modifications to system controls, building automation, and operational upgrades.

D. Commissioning Process during Design

The commissioning process activities completed by the commissioning authority during the design phase shall include, at a minimum, the following:

a. Assist the City in development of the Project requirements documentation for clarity and completeness;

b. Review and comment on the Basis of Design with regard to the Project requirements;

c. Participate in at least one (1) Integrated design meeting prior to the development of contract documentation;

d. Participate in meetings, design workshops, and design phase meetings during the design phase;

e. Develop full commissioning specifications for all commissioned equipment.

Coordinate this with the architect and engineers and integrate the commissioning specifications into the overall project specification package. The specifications shall follow the intent of ASHRAE Guideline 0-2019The Commissioning Process and ASHRAE/IES Standard 202-2024. The commissioning specification will include a detailed description of the responsibilities of all parties, details of the commissioning process; reporting and documentation requirements (including formats), alerts to coordination issues, deficiency resolution, construction checklist and startup requirements, the functional testing process, and specific functional test requirements , including testing conditions and acceptance criteria for each piece of equipment commissioned;

f. Conduct one (1) controls integration meeting during the design phase;

g. Conduct one (1) focused design review of the drawings and specifications prior to the design development documents phase. Participate in one meeting to review and discuss written design review comments;

h. Conduct one (1) focused design review of the drawings and specifications prior to the construction documents phase and participate in one meeting to review and discuss written design review comments; and

i. Perform the following additional commissioning design review at Design

Development and Construction Document completion of the drawings and specifications:

(i) Develop a commissioning plan encompassing the Design, Construction, Occupancy, and Operations Phases.

(ii) Determine the commissioning requirements and activities to include in the construction documents, with review by the design team, for integration into the project's construction specifications.

(iii) Attend a minimum of three (3) meetings to coordinate and address energy usage and assessment noted in section 1.

E. Commissioning Process during the Construction Phase

The commissioning process activities accomplished by the commissioning authority during the construction phase shall include, at a minimum, the following:

a. Participate in one (1) pre-bid meeting and answer commissioning related RFls during the bidding process;

b. Participate in one (1) integrated design meeting prior to the start of the construction phase;

c. Organize the commissioning process components and conduct a pre-bid and pre construction meeting where the commissioning process requirements are reviewed with the commissioning team;

d. Coordinate and direct commissioning activities in a logical, sequential and efficient manner using consistent protocols, clear and regular communications and consultations with all necessary parties, frequently updated timelines, schedules, and technical expertise;

e. Perform site visits, as necessary, to observe component and system installations.

Accomplish a statistical review of construction focusing on the design intent and the quality process. Attend selected planning and job-site meetings to obtain information on construction progress. Review construction-meeting minutes for revisions/substitutions relating to the design intent;

f. Perform monthly visual inspections of the exterior architectural masonry elements and insulation materials for conformance to specifications and construction plans and in conformance to site mockups. Respondent to assume twenty-four (24) months of construction;

g. With necessary assistance and review from the installing contractors and NE, develop and write construction checklists. Submit to for approval to the program manager and

City;

h. Organize and conduct periodic commissioning team meetings necessary to plan, develop the scope, coordinate, schedule activities and resolve problems.

Commissioning meetings will be held at a minimum on a monthly basis during the construction phase and bi-weekly during system testing;

i. Review submittals concurrent with the design professional's review;

j. Work with contractors in completing construction checklists and tracking of checklist completion;

k. Verify completion of construction checklists on a periodic basis to verify that contractor's quality process is achieving the project requirements;

I. Verify systems startup by reviewing start-up reports and by selected site observation;

m. With necessary assistance and review from installing contractors, write the functional testing procedures. Submit to NE and Program Manager for review and approval;

n. Coordinate, witness, document and recommend approval of test procedure performed by installing contractors. Coordinate retesting as necessary until satisfactory performance is achieved;

o. Review the air and water systems balancing report and verify report through statistical sampling and separate field verification;

p. Maintain a master issues log and a separate testing record. Provide the design team, construction team and Program Manager with written progress reports and test results with recommended actions;

q. Document the correction and retesting of non-compliance items by the contractor;

r. Develop a system and energy management manual; and

s. Review, recommend pre-approval, and verify the training provided by the contractors.

F. Commissioning Process during the Occupancy and Operations Phase

The commissioning process activities accomplished by the commissioning authority during the occupancy and operations phase shall include, at a minimum, the following:

a. Schedule and verify deferred and seasonal testing by the contractor;

b. Complete the final commissioning process report; and

c. Return to the site at ten (10) months into the twelve (12) month warranty period.

Review with facility staff the current building operation and the condition of outstanding issues related to the original and seasonal commissioning. Also, interview facility staff and identify problems or concerns they have with operating the building as originally intended. Make suggestions for improvements and for recording these changes in the O&M manuals. Identify areas that may come under warranty or under the original construction contract. Assist facility staff in developing reports and documents and requests for services to remedy outstanding problems.

G. Additional Commissioning Authority Responsibilities

In addition to duties described above, the CxA will have the following responsibilities and authority:

a. Develop the commissioning specification for this project and submit to the architect for incorporation into the overall project documents.

b. Issue deficiency notices and verify that they have been corrected. An Issues Log will be maintained and reviewed at the commissioning meetings. Deficiencies that are not corrected in a timely manner will be reported to the Program manager through the OPM.

The CxA is not required to:

a. Establish design concept, design criteria, compliance with codes, design or general construction scheduling, cost estimating, or construction management.

The CxA may assist with problem-solving or resolving non-conformance or deficiencies, but ultimately that responsibility resides with the construction manager at risk and the design team. The CxA will report to the Program Manager through the OPM any deficiencies or discrepancies; or

b. Issue change orders; however, they do review change orders for compliance with the construction documents. Non-compliances will be reported to the Program

Manager through OPM.

H. QUALIFICATION STATEMENT

The statement of qualifications and proposal is due by the above-mentioned date. Firms are required to submit (6) copies and one (1) electronic copy of their qualifications – please be sure to complete and enclose Exhibits 2 through 5. In addition to the six (6) copies and one (1) electronic copy of the qualification packages noted above submit one (1) hard copy of the Fee Proposal Form (Exhibit 1a) and Pricing Table (Exhibit

1b) in a separate sealed envelope with the firm name referencing the "City of Waterbury

Request for Proposal for Commissioning Services for the renovation and expansion of the

Roberto Clemente International Dual Language School.”

The organization of the qualification statement is strictly enforced. Any deviation from the directions given may disqualify the respondent’s qualification statement. All information must be clear, concise and to the point. The qualification statements shall be organized as indicated in the following sections addressing all of the following:

a. Letter of Commitment: Provide a letter of interest and indicate your firm's commitment to the project and the manner in which your firm will meet or exceed all expectations.

b. Firm History: The firm must possess a minimum of ten (10) years under the same name. Submit a brief history of the firm and explain the firm's ownership structure and principals.

c. Firm's Capacity: Provide information indicating the capacity of the office that will provide the CxA service (If your firm has offices outside of Connecticut, include separate statistics for both your Connecticut office and your other offices).

a. Provide the number of professional staff members your office employs; and

b. Provide the work in place in dollars that has been managed each year for the past five (5) years.

d. Project Team: Resumes for key staff and sub-consultants assigned to the Project will be required. The resumes shall include specific information about expertise in commissioning tasks, (e.g., design reviews, specification writing, commissioning management, troubleshooting, test writing, test execution, energy management, sustainable design, etc.). Including the name(s) of the individual(s) who will serve as the lead CxA for the design phase and for the construction phase of the contract.

e. Required Experience: A description of "relevant" experience (project phasing, life cycle costing, testing, adjusting and balancing, building simulation, IAQ, campus projects, etc.) of the proposer's team in the following areas will be required. Additionally, list involvement of key team members, include

a. projects like this one;

b. O&M experience;

c. energy-efficient equipment design and control strategy optimization;

d. project and construction management; and

e. system design (specify) troubleshooting.

f. Project Approach: Provide a description of the proposed approach to managing the project expertly and efficiently, including distribution of tasks, travel, and duration of which staff will be on site during what periods of time, etc. Describe how you intend to determine the appropriate level of commissioning effort for the various systems and equipment.

g. Work Examples: As an attachment, proposer shall provide the work products listed below that members of the proposer's team developed. List the team member(s) who wrote the document and the projects on which they were used. Work from the designated CxA is preferred, including the following:

i. A commissioning plan that was executed (the process part of the plan); and

ii. An actual functional test procedure form that was executed

h. Project Fee Structure and Costs:

Provide a fixed, lump sum total cost to accomplish the work for the following phases:

design (SD, DD and CD Phases), construction, occupancy, and operations. All task amounts must include associated meetings, progress reports and direct costs

(travel, mileage, per diem, communications, etc.). Use the attached pricing table to provide a cost breakdown.

Provide an hourly rate for each team member for any work that may exceed the scope. For each phase, provide the percentage level of effort for each primary team member. Use the budget table shown (or a suitable equivalent) to provide a cost breakdown.

i. Insurance and Indemnification: Satisfy the insurance and indemnification requirements as follows:

i. The Consultant shall indemnify, defend, and hold harmless the

City, the City's Departments, Boards, Commissions, agents, officials and all affiliated entities and each of their respective members, managers, partners, officers, directors, shareholders, from and against all claims, suits, damages, losses, judgments, costs and expenses including attorney's fees arising out of or resulting from the delivery of the labor, services, equipment, materials, reports, plans, specifications, design, drawings, deliverables, incidentals, etc. provided that any such claims, suits, damages, losses, judgments, costs or expenses (i) are attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property, including the loss of use resulting there from, (ii) are alleged to be caused in whole or in part by any willful, intentional, negligent, or reckless act or omission of the

Firm, its employees, any subcontractor or consultant, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by a party indemnified hereunder; (iii) enforcement action or any claim for breach of the Firm duties hereunder or (iv) claim for intangible loss(es) including but not limited to business losses, lost profits or revenue, regardless of whether or not it is caused in part by a party indemnified hereunder.

ii. In any and all claims against the City or any of its boards, agents, employees or officers and all affiliated entities and each of their respective members, managers, partners, officers, directors and shareholders by the Firm or any employee of the Firm, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification obligation under Paragraph 9.1, above, shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Firm or any subcontractor under Worker's Compensation Acts, disability benefit acts or other employee benefit acts.

iii. The Firm understands and agrees that any insurance required by this

Contract, or otherwise provided by the Firm, shall in no way limit the responsibility to indemnify, defend, keep and hold harmless the City, its Departments and all affiliated entities and each of their respective members, managers, partners, officers, directors, shareholders, commissions, commissioners and officials as provided in this

Contract.

iv. The Firm expressly understands and agrees that any performance bond or insurance protection required by this Contract, or otherwise provided by the Firm, shall in no way limit the responsibility to indemnify, keep and save harmless and defend the City, the City's boards, agents, employees or officers and all affiliated entities and each of their respective members, managers, partners, officers, directors, shareholders, commissions and officials as provided herein.

v. Royalties and Patents. The Firm shall, for all time, secure to the City the free and undisputed right to the use of any and all patented articles and methods used in the work and shall defend at Firm's own expense any and all suits for infringement or alleged infringement of such patents, and in the event of adverse award under patent suits, the Firm shall pay such awards and hold the City harmless in connection with any patent suits that may arise as a result of installations made by the Firm and as to any award made thereunder.

vi. In the event this Contract and/or the Contractor's, or its subcontractor, work and services provisioned hereunder is/are subject to the provisions of any Federal or State statute or regulations, or the City

Charter or City Ordinance, the Firm shall indemnify, defend and hold harmless the City from any fine, penalty or other amounts imposed on the City under said statutes, regulations, Charter or Ordinances, if caused by Firm, or its subcontractor, omission or commission.

vii. The Firm shall not commence work under this Contract until all insurance required under this Section has been obtained by the Firm and such insurance has been approved by the City. The Firm shall not allow any subcontractor to commence work on any subcontract until all insurance required of any such subcontractor has been so obtained and approved by the City. Insurance shall be provided by insurers that are satisfactory to the City, authorized to do business in the State of Connecticut, that have at least an "A-" Best's Rating, and are in an A.M. Best financial size category of VII or higher. The A.M.

Best classifications are based on the most current A.M. Best

Company ratings , or an equivalent City approved rating system .

viii. At no additional cost to the City, the Firm shall purchase and maintain the insurance coverages set forth below which shall protect the City and all affiliated entities and each of their respective members, managers, partners, agents, officers, directors, commissions, officials, stakeholders, shareholders and employees from claims which may arise out of or result from the Firm's obligation under this Contract, whether such obligations are the Firm's or subcontractor, or person or entity directly or indirectly employed by said Firm or subcontractor, or by any person or entity for whose acts said Firm or subcontractor may be liable.

ix. Each insurance policy shall state that the insurance company shall agree to investigate and defend the insured against all claims for damages, even if groundless. If any insurance required herein is to be issued or renewed on a claims made form as opposed to an occurrence form, the retroactive date for coverage shall be no later than the effective date of this Contract and shall provide that in the event of cancellation or non-renewal, the discovery period for insurance claims ("Tail Coverage") shall be available for at least 60 months.

x. The following policies with stated limits shall be maintained, in full force and effect, always during which the services are to be performed by the Firm:

• General Liability Insurance: $1,000,000.00 per occurrence, $2,000,000.00 aggregate and $2,000,000.00 products and completed operations aggregate; providing coverage to protect the City for all damages arising out of bodily injuries, sickness to or death of all persons in any one accident or occurrence and for all damages arising out of destruction of property in any one accident or occurrence.

• Automobile Liability Insurance : $1,000,000.00 combined single limit (CSL); providing coverage to protect the City with respect to claims for damage for bodily injury and/or property damage arising out of ownership, maintenance, operation, use or loading and unloading of any auto including hired & non- owned autos.

• Workers' Compensation: Statutory Limits within the State of

Connecticut: Employers' Liability:

EL Each Accident: $1,000,000

EL Disease Each Employee: $1,000,000

EL Disease Policy Limit: $1,000,000

Firm shall comply with all State of Connecticut statutes as it relates to Workers' Compensation.

Professional Liability Insurance: $1,000,000.00 for each claim and $1,000,000.00 aggregate limit for professional liability (also known as errors and omissions) insurance providing coverage to the Firm.

Excess/Umbrella Liability Insurance: Excess or Umbrella insurance coverage that follows form or sits over General

Liability, Automobile Liability and Workers Compensation insurances: $1,000,000.00 each occurrence and $1,000,000.00 aggregate.

xi. Failure to Maintain Insurance: In the event the Firm fails to maintain the minimum required coverage as set forth herein, the

City may at its option purchase same and offset the Firm's invoices for the cost of said insurance.

xii. Cancellation: The City of Waterbury shall receive written notice of cancellation from the Firm at least thirty (30) calendar days prior to the date of actual cancellation, regardless of the reason for such cancellation.

xiii. Certificates of Insurance: The Firm's General and Automobile

Liability Insurance policies shall be endorsed to add the City of

Waterbury, Waterbury Board of Ed, Waterbury Development

Corporation, its Departments and all affiliated entities and each of their respective members, managers, partners, agents, officers, directors, boards, commissions, officials, stakeholders, shareholders and employees as an additional insured and provide a waiver of subrogation on all lines of coverage except

Professional Liability. The insurance afforded to the additional insured shall be primary and non-contributory insurance and the coverage and limits provided under the Firm's policies shall not be reduced or prorated by the existence of any other insurance applicable to any loss the additional insured may have suffered. At the time the Firm executes this Contract, it shall furnish to the City, subject to City approval, certificate(s) of insurance and Additional

Insured Endorsement and Waiver of Subrogation Endorsement verifying the above coverages, including the naming of the City of

Waterbury, as follows: “The City of Waterbury, its Board of

Education and Waterbury Development Corporation is listed as an

Additional Insured on a primary and non-contributory basis on all policies except Workers Compensation and Professional Liability.

All policies shall include a Waiver of Subrogation except

Professional Liability." The City's request for proposal number must be shown on the certificate of insurance. The Firm must supply replacement/renewal certificates at least thirty (30) calendar days prior to the expiration of the policy(ies). Said certificates shall contain a provision that coverage afforded under the policies shall not be cancelled or reduced for any reasons unless notice of not less than thirty (30) calendar days has been mailed to the Office of Corporation Counsel, 235 Grand Street, Waterbury, CT 06702.

xiv. Simultaneously with the execution of the Agreement with the City, the Firm shall deliver to it a copy of the Firm's insurance policies, endorsements, and riders.

I. Past Claims or Disputes: Indicate the following:

a. Any claims, disputes, or arbitration or mediation proceedings that have occurred on any projects in the last ten (10) years and who they were with; and

b. Give a status of each even if they are pending during the Agreement Period

J. Agreement Period

The agreement period for any contract or purchase order resulting from this RFP is anticipated to be from 2027 through July 2030.

K. General Information

a. The City is an Equal Opportunity and Affirmative Action employer and does not discriminate in its hiring, employment, or business practices. The City is committed to complying with the Americans with Disabilities Act of 1990 (ADA) and does not discriminate on the basis of disability, in admission to, access to, or operation of its programs, services, or activities.

b. Any contract or purchase order resulting from this RFP will be based on a two-step process. The first step will be to review and evaluate the qualifications of firms submitted in response to this RFP. The second step will involve contract negotiations with one or more firms deemed most highly qualified to perform the work needed.

c. There will be a Mandatory Information Session with respect to this RFP at

2:00 PM on 12/3/2026 at The Roberto Clemente International Dual Language

School, which is located at 116 Beecher Ave, Waterbury, CT 06705.

ATTENDANCE AND ON-TIME SIGN-IN AT THE INFORMATION SESSION IS

MANDATORY. THOSE LATE/NOT ATTENDING WILL NOT BE ELIGIBLE TO

SUBMIT A PROPOSAL.

d. There will be a Mandatory Interview Session with the shortlisted selected firms on the week of January 13, 2027, at a time to be determined.

e. Respondents must review and be prepared to sign prior to the execution of any contract with the City, the items and any forms included in Attachment A - Contract Compliance Packet.

f. All questions and communications about this Request for Qualifications and submission requirements must be directed through the City of Waterbury

ProcureWare website and must be received by 2:00 P.M. on December 9, 2026.

Prospective respondents must limit their contact regarding this RFP to Mr.

McCaffery or such other person otherwise designated by him, Responses to questions submitted by the above date or identified at any Information Session to be held in regard to this RFP, as well as, any changes or amendments to this

RFP, will be available via the City of Waterbury ProcureWare website no later than

2:00 P.M. on December 17, 2026. It shall be the responsibility of the respondent to download this information. If you have any procedural questions in this regard, please call Mr. McCaffery at (203) 574-6748.

L. Management

Any contract or purchase order resulting from this RFP will be managed by the WDC on behalf of the City.

M. Conditions

All respondents must be willing to adhere to the following conditions and must positively state this in the proposal:

a. All responses to this RFP are to be the sole property of the City. Respondents are encouraged not to include in their responses any information which is proprietary.

All materials associated with this procurement process are subject to the terms of state laws defining freedom of information and privacy and all rules, regulations and interpretations resulting from those laws.

b. Any product, whether acceptable or unacceptable, developed under any contract or purchase order awarded as a result of the RFP is to be the sole property of the

City.

c. The timing and sequence of events resulting from this RFP will ultimately be determined by the City.

d. The respondent agrees that its response will remain valid for a period of ninety (90) days after the closing date for the submission and may be extended beyond that time by mutual agreement.

e. The City may amend the terms or cancel this RFP any time prior to the execution of a contract or purchase order for these services if the City deems it to be necessary, appropriate or otherwise in the best interests of the City. Failure to acknowledge receipt of amendments, in accordance with the instructions contained in the amendments, may result in a firm's response not being considered. At his option, the City's Director of Purchasing may provide all respondents with a limited opportunity to remedy any technical deficiencies identified by the City in their initial review of responses.

f. The respondent must certify that the personnel identified in its response to this RFP will be the persons actually assigned to the project. Any additions, deletions or changes in personnel from the proposal during the course of the agreement period must be approved by the City, with the exception of personnel who have terminated employment. Replacements for personnel who have terminated employment are subject to approval by the City. At its discretion, the City may require the removal and replacement of any of the respondent's personnel who do not perform adequately, regardless of whether they were previously approved by the City.

g. That all subcontractors hired by any firm awarded a contract or purchase order as a result of this RFP must have prior approval of the City during the agreement period.

h. Any costs and expenses incurred by respondent in preparing or submitting responses are the sole responsibility of the respondent.

i. Respondents must be prepared to present evidence of experience, ability, financial standing, and any other information deemed necessary by the City to satisfactorily meet the requirements set forth or implied in the response.

j. No additions or changes to the original response will be allowed after submittal, except as may be allowed by the City, at its option, in accordance with Section I.5.

of this RFP. While changes are not permitted, clarification of responses may be required by the City at the respondent's sole cost and expense. The final price and scope of services of any contract or purchase order resulting from this RFP may be negotiated with responsible respondents.

k. Respondents may be required to give presentations to the extent necessary to satisfy the City's requirements or needs. In some cases, respondents may have to give presentations or further explanation to any RFP selection committee established by the City.

l. The respondent represents and warrants that its response is not made in connection with any other responder and is in all respects fair and without collusion or fraud. The respondent further represents and warrants that it did not participate in any part of the RFP development process, had no knowledge of the specific contents of the RFP prior to its issuance, and that no agent, representative or employee of the City participated directly in the respondent's preparation of their response.

m. All responses to the RFP must conform to instruction. Failure to include any required signatures, provide the required number of copies, to meet deadlines, answer all questions, follow the requested format, or failure to comply with any other requirements of this RFP may be considered appropriate cause for rejection of the response.

n. The respondent must accept and agree to the City's standard agreement language.

See Attachment B.

o. Any contract or purchase order resulting from this RFP process will represent the entire agreement between the respondent and the City and will supersede all prior negotiations, representations or agreements, alleged or made, between the parties.

The City shall assume no liability for payment of services under the terms of the contract or purchase order until the successful respondent is notified that the contract or purchase order has been accepted and approved by the City. Any contract resulting from this RFP may be amended only by means of a written instrument signed by the respondent and signed by the Mayor.

N. Submittal Requirements and Required Format

One (1) original (clearly identified as such) and six (6) paper copies of the response, as well as a copy of the original response in pdf format on a flash drive, must be received at the following address no later than 11:00 A.M. on January7, 2027. The separately sealed

Fee Proposal shall contain one (1) original of Exhibit 1a – Proposal Form and Exhibit 1b –

Pricing Table, together with the required detailed cost breakdown and hourly billing rates identified in Section H.h of this RFP. No pricing information shall be included in the qualifications package. The required original, copies, and electronic submission of the qualifications package shall be provided separately from the sealed Fee Proposal.

Mr. Kevin McCaffery

Director of Purchasing

Room 103

City of Waterbury

235 Grand Street Waterbury, CT 06702

Responses must set forth accurate and complete information for each of the items listed below.

At the City's discretion, failure to do so could result in disqualification.

a. Respondent Information: Please provide the following information:

i. Firm Name;

ii. Permanent main office address;

iii. Date firm organized;

iv. Legal Form of ownership. If a corporation, indicate where incorporated;

v. How many years have you been engaged in services you provide under your present name?; and

vi. Names, titles, reporting relationships, and background and experience of the principal members of your organization, including officers.

b. Experience, Expertise and Capabilities.

a. Philosophy Statement and Business Focus. A statement of the respondent's philosophy and approach in undertaking the services of the nature outlined in the RFP, as well as a description of your firm's primary business focus.

b. Summary of Relevant Experience. A listing of all projects that the respondent has completed within the last three (3) years must be provided, including architectural, design or engineering work done for municipalities or public-school systems. The following information shall be provided for each organization listed under this sub section:

• Organization name and the name, title, address and telephone number of a responsible contact person.

• Nature of services provided and dates services started and actually completed. Please indicate, for each assignment, if it was completed within the original contract timeframes. If not please explain.

• For each project, the gross cost of the agreement.

• Additionally, please list any contracts or purchase orders in the last three

(3) years between your firm and any agency of the City of Waterbury.

c. Personnel Listing. A complete listing of the key personnel anticipated to be assigned to this project by job classification, along with their resumes. Each resume shall include the individual's qualifications and experience in the subject area.

d. Conflict of Interest. Disclose any current (within the last 3 years) business, financial, personal or other types of relationships which may pose a conflict of interest.

c. Cost Information. While the purpose of this RFP is to evaluate the qualifications of respondents, it is requested that cost information is provided in separate envelope as indicated under section H.h - Project Fee Structure and Costs.

Note: The City is exempt from the payment of excise, transportation and sales taxes imposed by the Federal Government and/or the State. Such taxes must not be included in prices.

d. Information Regarding: Failure to Complete Work, Default and Litigation.

Please respond to the following questions:

a. Have you ever failed to complete any work awarded to you? If so, where and why?;

b. Have you ever defaulted on a contract? If so, where and why?;

c. Is there any pending litigation could affect your organization's ability to perform this agreement? If so, please describe;

d. Has your firm ever had a contract terminated for cause within the past five years? If yes, provide details;

e. Has your firm been named in a lawsuit related to errors and omissions within the past five years? If yes, provide details;

f. During the past seven years, has your firm ever filed for protection under the

Federal bankruptcy laws? If yes, provide details; and

g. Are there any other facts or information that could affect your firm's ability to perform the types of services being sought by the City about which the City should be aware?

e. Exceptions and Alternatives. Respondents wishing to take any exceptions to any requirement in the RFP shall state and explain such exceptions. The City may accept responses which take exception to any requirements in this RFP, or which offer any alternative to a requirement herein, as well as consider such exceptions and alternatives in evaluating responses. Any exception or alternative must be clearly delineated and cannot materially affect the substance of this Request for

Qualifications.

f. Additional Data. Any additional information which the respondent wishes to bring to the attention of the City that is relevant to this RFP.

O. Evaluation of Responses; Selection Process

a. Evaluation Criteria.

The following criteria are expected to be among those utilized in the evaluation and selection process and are only presented as a guide for the respondents in understanding the City's requirements and expectations for this project and are not necessarily all-inclusive or presented in order of importance:

i. Qualifications, experience, expertise, and capabilities of the respondent and individual team members. Background, qualifications, and previous experience of the firm and the key personnel to be assigned to the project and their demonstrated competence, experience and expertise in the scope and type of work to be performed. The type of experience, expertise, capabilities, and qualifications desired are outlined in Section C. - Qualifications of this RFP. The

City may contact one or more of the organization references listed in Section

K.2.b. of this RFP as part of assessing the experience, expertise and capabilities of the bidders or those selected as the finalist(s); and

ii. The overall quality of the response and its responsiveness to the requirements of this RFP.

b. Selection Process.

The selection shall be done in two stages. Stage one shall be a short listing of respondents based on the RFP's criteria. A Selection Committee may be established as part of this process, the committee will interview as many firms as it deems necessary to determine which firm or firms can provide the most effective services to the City. Negotiations will then commence with the successful respondent(s).

P. Rights Reserved To The City

The City reserves the right to award in part, to reject any and all responses in whole or in part for misrepresentation or if the respondent is in default of any prior City contract, or if the proposal limits or modifies any of the terms and conditions and/or specifications of the

RFP. The City also reserves the right to waive technical defects, irregularities and omissions if, in its judgment, the City's best interest will be served.

Q. Federal, State and Local Employment Requirements - Not Applicable

Contractors shall be obligated to fully comply with the attached Hiring of Waterbury

Residents on Certain Publicly Funded Construction Projects, i.e., City of Waterbury

Ordinances Chapter 34 ("Good Jobs Ordinance"), Federal Davis- Bacon Act, Federal

American Recovery and Reinvestment Act of 2009, and the Housing and Urban

Development Section 3 Clause, all as further specified in the attached City of Waterbury

Contract form.

1. The City's Good Jobs Ordinance (Code of Ordinances Chapter 34) applies to this Project. Proposer's attention is further directed to the aforesaid City of

Waterbury Ordinance, commonly referred to as the "Good Jobs Ordinance"; and

2. If applicable to this Project, the minimum wage rates as per State of Connecticut

Labor Department "Prevailing Wage Rates" and Federal Davis-Bacon Act shall govern.

R. State Set-Aside Requirements - Not Applicable

The contractor who is selected to perform this municipal public works project, funded in whole or part by the State, must comply with CONN. GEN. STAT.§§ 4a-60, 4a-60a, 4a60g, and 46a- 68b through 46a-68f, inclusive, as amended by June 2015 Special Session Public

Act 15-5. An Affirmative Action Plan must be filed with and approved by the Commission on Human Rights and Opportunities prior to the commencement of construction.

State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification from the Connecticut

Department of Administrative Services ("DAS") under the provisions of CONN. GEN.

STAT. § 4a-60g, as amended. (25% of the work with DAS certified Small and Minority owned businesses and 25% of that work with DAS certified Minority, Women and/or

Disabled owned businesses.) The contractor must demonstrate good faith effort to meet the 25% set aside goals.

For municipal public works contracts, the contractor must file a written or electronic nondiscrimination certification with the Commission on Human Rights and Opportunities.

Forms can be found at:

http://www.ct.gov/opm/cwp/view.asp?a=2982&q=390928&opmNav_GID=1806.

S. Bid Bond – Not Applicable

No bid bond, proposal bond, or other proposal security is required in connection with this

RFP.

T. Performance/Payment Bonds– Not Applicable

Performance and payment bonds are not required for the professional commissioning services solicited under this RFP.

U. RFP Attachments and Contract Documents

The following Exhibits, Attachments, and Contract Documents are included in, or issued in conjunction with this Request for Proposal and shall be reviewed and completed as necessary by all Proposers:

Exhibit 1a: Proposal Form Exhibit 1b: Pricing Table Exhibit 2: Commissioning Firm Experience Exhibit 3: Commissioning Task Experience for Similar Projects http://www.ct.gov/opm/cwp/view.asp?a=2982&q=390928&opmNav_GID=1806.

Exhibit 4: Required Disclosures Exhibit 5: Statement of References Attachment A: City of Waterbury Contract Compliance Forms Attachment B: Sample Professional Services Agreement, including the applicable

General Conditions, together with Sample Corporate and LLC Resolutions Attachment C: Addendum Acknowledgment, Certification, and Notice of

Acceptance Attachment D: Insurance Requirements Attachment F: Contractor Qualification Statement Attachment G: Special Conditions – Commissioning Agent Services (Articles SC-

1 through SC-10) There is no Attachment E.

N.B. - Proposers shall review all applicable Exhibits, Attachments, General Conditions, and Special Conditions before submitting their proposals. The successful Proposer shall comply with the requirements of the executed Professional Services Agreement and incorporated Contract Documents, subject to the order of precedence established in the Agreement.

EXHIBIT 1a - PROPOSAL FORM

REQUEST FOR PROPOSALS FOR

COMMISSIONING AGENT SERVICES FOR ROBERTO CLEMENTE

INTERNATIONAL DUAL LANGUAGE SCHOOL RENOVATION

PROPOSER'S FULL LEGAL NAME: _

PRICE PROPOSAL

Pursuant to and in full compliance with the RFP, the undersigned proposer, having reviewed having thoroughly examined each and every document comprising the RFP, including any addenda, hereby offers and agrees as follows:

To provide the products and/or services specified in, and upon the terms and conditions of, the RFP for the total sum of:

Dollars (write out in words)

ACKNOWLEDGEMENT

In submitting this Proposal Form, the undersigned proposer acknowledges that the price(s) includes all labor, materials, transportation, hauling, overhead, fees and insurances, bonds or letters of credit, profit, security, permits and licenses, and all other costs to cover the completed products and/or services called for in the RFP. Except as otherwise expressly stated in the RFP, no additional payment of any kind will be made for the products and/or services called for in the RFP.

EXHIBIT 1b: PRICING TABLE

Commissioning services Quantity included Lump-sum cost

Design Phase

Design reviews (SD, DD, CD) ___ reviews $___

Design coordination meetings ___ meetings $___

Energy Usage and assessment meetings ___ meetings $___

Commissioning plan and specifications 1 complete package $___

Other ___ ( ) $___

Construction Phase

Submittals reviews ___ reviews $___

Commissioning site inspections ___ visits $___

Commissioning coordination meetings ___ meetings $___