RFP-718609-R28-4.16kV-Cable-Testing-Services-10.13.26.pdf

PDF 284 KB Posted

Attached to
RFP 4. 16 Kilovolt Cable Testing Services
Solicitation number
718609
Issued by
Asotin County, Washington

About this file

This Request for Proposal (RFP No. 718609) is issued by Energy Northwest, a Joint Operating Agency and Municipal Corporation of the State of Washington, soliciting competitive proposals for 4.16 kilovolt cable testing services at Columbia Generating Station in Richland, Washington. The work involves diagnostic testing of selected medium-voltage cables to evaluate insulation condition and determine serviceability as part of the facility's Life Cycle Management Program. The scope includes Very Low Frequency (VLF) Tan Delta testing and VLF high-voltage alternating current signal withstand or partial discharge monitored withstand testing on a minimum of 99 shielded, 5kV-rated cables of varying conductor sizes (66 500 MCM, 24 350 MCM, 9 250 MCM, and 6 4/0 conductors). Each cable must be tested a minimum of two times, with written test reports issued after each individual test. A procurement video conference is scheduled for October 26, 2026, at 10:00 a.m. (Richland time). Questions are due by November 2, 2026, and proposals are due by November 16, 2026, at 1:00 p.m. (Richland time). The estimated start date for Refuel Outage 28 is March 17, 2027, with contract completion required by June 30, 2027. Work will be performed both online and during the refuel outage, with online work on a 4x10 schedule (Monday-Thursday, 6:00 a.m. to 4:30 p.m.) and outage work on a rotating 6x12 schedule, 24 hours per day.

Proposals will be evaluated based on Commercial Qualifications (20%), Technical Qualifications and Experience (50%), and Price (30%). Bidders must submit completed and signed Bid Forms, declare their Washington Unified Business Identifier number, confirm they have not been disqualified from state or federal contracts, provide detailed organizational information including an executive summary and organizational chart with key personnel qualifications, submit a Supplier Leadership and Safety Culture Self-Assessment aligned with INPO document 26-001, provide evidence of equivalent project experience from the past five years (minimum two projects), and include OSHA safety statistics (Exhibit B) for the past five years. Bidders must also declare whether they have performed similar work for nuclear power generating facilities and provide comprehensive labor wage breakdowns using a provided rate sheet. All contractor personnel must obtain Unescorted Access (green badge) certification to Columbia's Protected Area, which may require up to 40 hours per person and includes background investigations, drug and alcohol screening, FBI fingerprinting, psychological evaluation, and credit report review. The contractor is responsible for all equipment, testing methods, technical expertise, personnel mobilization, and logistics, but is not permitted to perform hands-on work such as making connections or terminations. Contractor personnel will remain employees of the contractor and not of Energy Northwest. All proposals become public record under Washington State law, and extensive or material exceptions to Energy Northwest's General Provisions may result in proposals being declared non-responsive.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL NO. 718609

Procurement Quality Level: 0

FOR

4.16 KILOVOLT CABLE TESTING SERVICES

AT

COLUMBIA GENERATING STATION

VIDEO CONFERENCE OCTOBER 26, 2026

QUESTIONS DUE BY NOVEMBER 2, 2026

PROPOSAL DUE DATE NOVEMBER 16, 2026

RFP No. 718609

Energy Northwest, a Joint Operating Agency and Municipal Corporation of the State of Washington, is soliciting competitive proposals from experienced, qualified Bidders to provide

4.16 kilovolt (kV) cable testing services for Energy Northwest, specifically at Columbia Generating Station (Columbia) during Refuel Outage 28.

Energy Northwest reserves the right, without qualification, to select any proposal as a basis for negotiation, to reject all proposals and to exercise its discretion and apply its judgment with respect to any proposal submitted. This Request for Proposal (RFP) does not commit Energy Northwest to pay any costs incurred in connection with any proposal, or to contract for any Work.

There is no commitment on the part of Energy Northwest to accept the lowest priced proposal or any conditions imposed by a Bidder as a requirement of acceptance of their proposal. The proposal to be accepted shall be at the sole discretion of Energy Northwest.

Information submitted to Energy Northwest in response to this RFP becomes public record under the Revised Code of Washington (RCW). The information is subject to public disclosure pursuant to the Washington State Public Records Act. Energy Northwest may unilaterally release or exempt information from public disclosure. In the event a Bidder seeks to withhold information from public disclosure, it shall hold Energy Northwest harmless from any damages or costs, including attorney’s fees and statutory awards imposed by any court or regulatory authority.

Energy Northwest shall not be liable for any inadvertent public disclosure of information, despite the exercise of reasonable care.

Bidder shall thoroughly examine and be familiar with the RFP documents. Submittal of a proposal shall constitute an acknowledgement upon which Energy Northwest may rely that the Bidder has thoroughly examined and is familiar with these documents. Failure or neglect to receive or examine these documents shall in no way relieve Bidder from any obligation with respect to the proposal or these documents. No claim for additional compensation will be allowed which is based on lack of knowledge of the RFP documents.

This RFP is comprised of:

• Section I – Bid Submission Format and Content

• Section II – Contractor Selection Procedure

• Section III – Statement of Work

• Section IV – Bid Form

• Section V – Sample Contract Document

PROCUREMENT VIDEOCONFERENCE

Video conference date: October 26, 2026, 10:00am (Local time, Richland WA). Procurement Specialist will provide further details to those who are interested in participating.

Bidder shall satisfy itself concerning the nature and the location of the Work.

• Scope of Work

• Technical details

• Climate conditions

• Physical conditions at the actual work site

• Transportation

• Handling and storage of materials

• Other matters that may affect the Work or the cost thereof.

Failure of the Bidder to acquaint itself with all available information shall not relieve Bidder of the responsibility for properly estimating both the difficulties and the costs of successfully performing the Work.

Questions:

Any discussion and questions relative to this RFP shall be reduced to writing and directed to the Procurement Specialist listed below no later than 1:00pm (local, Richland, WA) on November 2, 2026. Questions after this date will not receive a response.

Submit questions to:

Steven Lund Procurement Specialist Phone: 509.377.8696 slund@energy-northwest.com

To the extent practical, written answers to questions asked will be made available to all Bidders.

Bidder shall satisfy itself concerning the nature and the location of the Work, the general and local conditions, the equipment and supplies needed for the execution of Work, and all other matters which can in any way affect the Work or the cost thereof. Failure of the Bidder to acquaint itself with all available information regarding any applicable condition shall not relieve him/her of the responsibility for properly estimating both the difficulties and the costs of successfully performing the Work.

Proposal Due Date:

Note: When a proposal is emailed, it is the Bidder’s responsibility to verify that the proposal was received by the Procurement Specialist prior to the proposal due date/time by calling the Procurement Specialist designated below. Any proposals received after the RFP due date/time may be rejected as non-responsive.

There is always a risk of emails being delayed or not reaching their intended destination for a variety of reasons, including but not limited to internet connectivity issues, system cyber security or technical limitations such as size and file type limitations or protocols where an email is treated by the system as spam or investigated for a virus or malware resulting in the email being rejected by the system or is transmitted to the recipients inbox late.

Proposals shall be submitted to the Procurement Specialist listed below no later than 1:00pm (local, Richland, WA) on November 16, 2026.

Submit proposals to:

Steven Lund Procurement Specialist Phone: 509.377.8696 slund@energy-northwest.com mailto:slund@energy-northwest.com

RFP SECTION I

PROPOSAL SUBMISSION FORMAT AND CONTENT

In order to facilitate evaluation of Bidders proposal, Energy Northwest requires that Bidder responses be formatted to the following outline. Failure to comply with this format and omission of the requested content may be cause for Bidders proposal rejection without consideration.

A. GENERAL QUALIFICATIONS

Bidder shall submit information about Bidder’s organization including, at a minimum, the following:

1. Executive Summary: Information about your organization in which Energy

Northwest can gain an understanding of the capacity of the organization to perform the work. Examples of information include size of company, location of headquarters and closest office to service Columbia, division charged with responding, staffing capability, response time, support services and cost control experience.

2. Organizational Chart: Bidder shall provide a detailed organizational chart showing key personnel positions that will respond during the performance of the Work.

a. Key Personnel: Name, title, certification(s) and resume of proposed personnel that will be directly involved with Work. Examples may include:

• Primary contact for this Work

• Project manager(s)

• Principal engineer(s)

3. Supplier Leadership & Safety Culture Self-Assessment: In alignment with the Institute of Nuclear Power Operators (INPO) document 26-001, Energy Northwest requests information from Bidders to support excellence in nuclear safety and performance.

Bidder shall submit a concise self-assessment demonstrating how its leadership systems and work practices align to industry good-practice principles for nuclear supplier performance and utility partnership. This self-assessment will be evaluated as part of proposal responsiveness and technical merit and is intended to inform partnership practices; it is not, by itself, a contractual specification, but will be referenced as the expectations of the awarded Bidder’s overall culture. The self-assessment shall address, at a minimum:

a. Safety Culture: How leadership establishes and reinforces behaviors that prioritize nuclear safety, fosters a questioning attitude, and encourages transparent reporting without retaliation, including examples of recent actions and outcomes.

b. Integrated Risk Management (IRM): How risks are identified, analyzed, and managed throughout planning and execution; thresholds for escalation; and the means for joint risk reviews with Energy Northwest.

c. Technical Conscience: How the organization ensures sound engineering judgement, independent technical challenge, and timely stop-work decisions when conditions do not meet nuclear safety expectations.

d. Learning and Operating Experience (OE): How operating experience (industry and site) is gathered, analyzed, shared, and embedded into procedures and work instructions.

e. Team Effectiveness & Accountability: How leaders and teams align common goals, decision rights, and performance accountability; how behaviors are observed and reinforced in the field.

B. COMMERCIAL QUALIFICATIONS

1. Required or RFP shall be rejected: Submit completed and signed Bid Form (RFP Section IV). If the Bid Form is modified or not signed, the submitted proposal will be rejected.

2. Declare on the Cost Proposal Form, Bidder has not been disqualified from performing Work on any state or federal contracts as detailed in RCW §39.12.065 (3).

3. Declare on the Cost Proposal Form, Bidder’s current Washington Unified Business Identifier number.

4. Declare on the Cost Proposal Form, Bidder has submitted exceptions to Energy Northwest’s Appendix “D” – General Provisions. Exceptions thereto must be clearly defined in “track changes” in the MS WORD documents (Appendix “D”) supplied by Energy Northwest. Any exception taken must have a comment in the document describing why the exception is being submitted.

Note: Energy Northwest will not engage in lengthy negotiation of the General Provisions. Extensive or material exceptions may result in Bidder’s proposal being declared non-responsive. If exceptions are not submitted with Bid, no further negotiation on Appendix “D” will be performed at time of Contract award.

C. TECHNICAL QUALIFICATIONS AND EXPERIENCE

Bidder to provide an overview of experience and background specific to the requested Work described in RFP Section III – Statement of Work.

1. Declare on the Cost Proposal Form, the Bidder has thoroughly reviewed the specifications, laws and ordinances governing the Work contemplated.

2. Equivalent Project Experience: Bidder shall submit a detailed description of the Bidder’s previous experience involving Work similar to that described in RFP Section III in the last five years. Bidder to submit a minimum of two equivalent projects. Project description to include, but not limited to, the following:

Customer name Address

Contact person Phone number and email address Dollar value of the project Completed on budget Completed on time

3. Declare on the Cost Proposal Form, has Bidder performed similar Work for a nuclear power generating facility?

4. Provide a comprehensive breakdown of labor wages for the required position(s), utilizing the provided rate sheet, and identify the personnel classifications that will be used to complete the work.

5. Occupational Safety & Health Administration (OSHA) Statistical Report: Bidder shall submit the completed OSHA safety statistics report, Exhibit “B”, showing Bidder safety performance for the past five years. This report should only include statistics for the business division of Bidder’s company that will be performing Work at Columbia. If the Bidders’ company is not required to report to OSHSA per OSHA standards 1904.1(a) (1), the Bidder shall identify this on Exhibit “B”, failure to properly identify this on Exhibit “B” could deem the Bidder as unresponsive.

Note: If Bidder’s Experience Modification Rate (EMR) or Total Recordable Incident Rate (TRIR) rating exceeds 1, their Bid may be removed from consideration upon further evaluation by Energy Northwest’s Industrial Safety department. This evaluation will review the data and weigh it against other criteria (experience, previous successful work performed, number of workers/hours worked, etc.).

B. PRICE

Bidder shall complete and submit the Bid Form in RFP Section IV as part of the RFP evaluation criteria. The Bid Form shall be included in Appendix “B” in the Contract Documents at the time of Contract Award.

Bidder shall review the appendices in the Sample Contract, RFP Section V to validate that the Bidder has accounted for all costs associated with this Work.

RFP SECTION II

CONTRACTOR SELECTION PROCEDURE

Bidders should submit all information necessary for Energy Northwest to evaluate the proposal in accordance with the prerequisites, technical and commercial evaluation factors set forth in this RFP. Only those proposals which meet these requirements will be given further consideration.

A. PURPOSE

Energy Northwest will utilize the following guidelines in the selection of a Bidder for the requested Service or Work:

1. The purpose of the selection will constitute an objective and impartial procedure in which all interested Bidders are evaluated against the same criteria.

2. The criteria utilized in evaluating prospective Bidders shall relate to the competence and qualifications of the Bidders being considered so that the Bidder selected shall constitute the best qualified of those considered in the sole judgment of Energy Northwest.

3. The procedures employed shall ensure that companies owned by women and minorities are provided with full and equitable opportunity for participation in the selection process.

B. PROCEDURE

1. Energy Northwest shall publish in a newspaper of statewide and/or local circulation an announcement inviting all interested Bidders to indicate their interest in submitting a proposal for the Work described in the RFP. The announcement will state a date by which proposals and supporting documentation must be received.

2. The qualification and proposal documents will be reviewed and evaluated by Energy

Northwest. Energy Northwest will choose the Bidder deemed to be the best qualified, responsive and responsible to perform the required Work. A short list of Bidders may be selected for individual interviews if one clearly superior Bidder cannot be selected from the qualifications submitted.

3. In arriving at a selection, Energy Northwest will review and evaluate the information provided by all interested Bidders in response to the public announcement. The evaluation criteria, including the relevant weighting of each criteria, is provided in the following list. Each Bidder submitting a proposal should include sufficient information for Energy Northwest to evaluate the Bidder’s qualification in each area.

4. Bidder’s proposal shall be based upon all terms, conditions and specifications of this RFP. The interests of Energy Northwest shall be protected by negotiation of contract terms and conditions that are fair and reasonable. Any exceptions thereto must be clearly defined. Extensive or material exceptions may result in Bidder’s proposal being declared nonresponsive.

Evaluation Criteria Weighted

Average %

Commercial Qualifications 20

Technical Qualifications & Experience 50

Price 30

RFP SECTION III

SCOPE OF WORK

A.1 INTRODUCTION

Energy Northwest, a joint operating agency and municipal corporation, operates Columbia, a nuclear power generating facility. Energy Northwest is undertaking a series of equipment upgrades as part of the Columbia Generating Station Life Cycle Management Program. This effort includes the replacement of the normal (auxiliary) transformers and the start-up transformer responsible for supplying line power to multiple switchgear systems. The new transformer components will modify the native voltage of the incoming line power, necessitating the replacement of the medium-voltage switchgear assemblies, E-SM-1, E-SM-2, and E-SM-3, to ensure compatibility with the revised power configuration and to resolve existing equipment health concerns related to aging infrastructure and available short-circuit margin.

These switchgear units are located in the turbine building at the 471’ elevation on the west end.

To support this upgrade effort, Energy Northwest requires an experienced and competent contractor to perform diagnostic testing of selected medium-voltage cables. Due to known concerns with cable insulation integrity, the diagnostic testing will evaluate insulation condition and determine ongoing serviceability. The contractor shall provide all necessary equipment, testing methods, and technical expertise to assess the current state of the cable insulation and deliver clear findings and recommendations.

A.2 SCOPE OF WORK

A. The scope of work is intended to give an overview of the Work and is not inclusive of all the Work necessary to complete the project.

B. The Site location is 76 North Power Plant Loop, Richland, WA 99354, a nuclear power generating facility. The Work shall be performed inside the Protected Area of Columbia.

Note: Contractor shall use the above address when determining the appropriate tax rate in accordance with Section B.5.

C. Contractor shall provide a Project Manager to act as the primary point of contact for Energy Northwest and oversee all project activities for the duration of the work.

D. Contractor shall coordinate with Energy Northwest on an as-needed basis until the project is complete.

E. Contractor shall prepare and coordinate cable-testing equipment, personnel, and logistics, ensuring testing during Refuel Outage 28.

F. Contractor shall provide and operate its own equipment necessary to perform its work, but is not otherwise permitted to perform any hands-on work, including making connections, terminations, or determinations.

G. Testing shall be conducted to determine the condition and serviceability of existing cables, as well as verify proper installation of newly installed cables. Required testing includes:

1. Very low frequency (VLF) Tan Delta.

2. VLF high-voltage alternating current (AC) signal withstand or partial discharge monitored withstand.

H. Determination of fault location is excluded from this scope. If a cable does not pass testing, the entire cable run will be replaced.

I. Contractor shall test the following shielded, 5kV-rated Okonite Pink ethylene propylene rubber (EPR) single-conductor cables a minimum of two times:

1. Sixty-six (66) 500 MCM conductors.

2. Twenty-four (24) 350 MCM conductors.

3. Nine (9) 250 MCM conductors.

4. Six (6) 4/0 conductors.

J. Contractor shall issue a written test report to the Energy Northwest Technical

Representative after completion of each individual test.

K. Energy Northwest Technical Representative will oversee all testing performed by

Contractor.

A.3 SCHEDULE OF WORK

A. Estimated start date of Refuel Outage 28: March 17, 2027.

B. Technical Representative or designee will coordinate with Contractor for the mobilization of personnel and start dates.

C. Online and non-Refuel Outage work hours: Contractor personnel are expected to work a 4x10 schedule. Columbia’s non-outage work schedule is Monday-Thursday dayshift from 0600 to 1630. Times and workdays may be adjusted to meet project needs or deadlines. Contractor shall provide enough qualified oversight during all project activities and shifts. C

D. Refuel Outage work hours: Contractor shall provide enough personnel to work 24 hours per day, rotating a 6x12 schedule. Contractor shall provide enough qualified personnel to properly man this schedule as well as adequate coverage for days off. The start and end times will be coordinated and accepted by the Parties.

A.4 ENERGY NORTHWEST’S RESPONSIBILITIES

A. Provide a Project Manager to manage all project-related activities.

B. Review all deliverables to ensure accuracy, completeness, and compliance with project requirements.

C. Coordinate with all project parties as needed to support effective communication and project execution.

D. Provide oversight to Contractor personnel throughout the work.

E. Connect testing equipment to cables and systems to be tested.

A.5 CONTRACTOR’S RESPONSIBILITIES

A. Maintain ongoing communication with the Energy Northwest project team, providing updates and requesting information as often as necessary or as directed by the Technical Representative or designee, to support timely and effective completion of the Work.

B. Designate a single point of contact (project manager) responsible for coordinating all project activities, ensuring clear communication pathways between Contractor and Energy Northwest.

C. Provide all testing equipment and qualified personnel to properly operate the testing equipment.

A.6 CONTRACTOR’S DELIVERABLES

Contractor shall submit a test report to the Energy Northwest Technical Representative indicating the Tan Delta results and recommended actions.

A.7 QUALITY ASSURANCE

A. Contractor shall apply Energy Northwest’s established quality assurance standards to thoroughly review and document the specification, ensuring all content, particularly technical provisions, undergoes the required checks, validations, and independent verification for accuracy and completeness.

RFP SECTION IV

COST PROPOSAL FORM

(Do not modify the form)

NAME OF BIDDER:

(Full Legal Company Name)

General Qualifications YES NO

Executive Summary?

Organizational chart & key personnel?

Commercial Qualifications Must be filled in

Washington State Unified Business Identifier (UBI) number:

YES NO

Disqualified from performing work on any state or federal contract?

Submitted exceptions to General Provisions in Appendix “D?

Technical Qualifications YES NO

Reviewed the specifications, laws and ordinances governing the Work?

Perform similar Work for a nuclear facility?

Equivalent experience?

Provided Rate Sheet?

Addendums received and have been considered in preparing this proposal?

The attached table is available for Bidder’s use and may be adjusted as needed for Bidder to submit their proposed rates. Alternatively, Bidder may submit their standard rate sheet in place of this table, and as a separate attachment with their proposal.

Fixed hourly billing rates shall be in US Dollars and include all i) payroll, payroll taxes and fringe benefits; ii) all reproduction and printing costs including electronic media; iii) communications costs including all phones, faxes, internet, postage, shipping, delivery, couriers; iv) computer, software, printers, scanners, office machines and related costs of operations including consumables; v) insurance costs; v) indirect and overhead burden; and vi) profit.

BIDDER:

(Full Legal Company Name)

STREET ADDRESS:

CITY, STATE & ZIP CODE:

PHONE NO.:

EMAIL ADDRESS:

BY:

(Type or Print Name)

TITLE:

SIGNED:

DATE:

Bidder affirms that by signing this Bid Form, Bidder clearly understands the Work as described in the RFP and any published addendums. Bidder has the required resources to complete the Work in the designated period of time.

Note: Failure to sign the Bid Form above shall result in rejection of the R

RFP SECTION V

SAMPLE CONTRACT

CONTRACT NO.

Procurement Quality Level:

ENERGY NORTHWEST

76 N. Power Plant Loop Richland, WA 99354 Phone: 509.372.5000 and

Company Address hereinafter referred to as “Contractor”, hereby agree as follows:

1. INTRODUCTION

Energy Northwest, a joint operating agency and municipal corporation, operates Columbia Generating Station (Columbia), a nuclear power generating facility. Energy Northwest is undertaking a series of equipment upgrades as part of Columbia’s Life Cycle Management Program. This effort includes the replacement of the normal (auxiliary) transformers and the start-up transformer responsible for supplying line power to multiple switchgear systems. The new transformer components will modify the native voltage of the incoming line power, necessitating the replacement of the three medium-voltage switchgear assemblies (E-SM-1, E-SM-2, and E-SM-3) to ensure compatibility with the revised power configuration and to resolve existing equipment health concerns related to aging infrastructure and available short-circuit margin.

These switchgear units are located in the turbine building at the 471’ elevation on the west end.

To support this upgrade effort, Energy Northwest requires a technical proposal package for diagnostic testing of selected medium-voltage cables. Due to known concerns with cable insulation integrity, the diagnostic testing will evaluate insulation condition and determine ongoing serviceability. Contractor shall provide all necessary equipment, testing methods, and technical expertise to assess the current state of the cable insulation and deliver clear findings and recommendations.

2. CONTRACT TIME

The period of performance shall commence at Contract Award and shall be complete by June 30, 2027, or upon termination pursuant to Appendix “D” of the Contract.

3. INCORPORATED DOCUMENTS

The following documents are incorporated into this Contract:

• Appendix “A” - Statement of Work

• Appendix “B” - Schedule of Payments

• Appendix “C” - Special Provisions

• Appendix “D” - General Provisions

• Attachment 1 - Rate Sheet

• Attachment 2 - INPO 26-001

All drawings, papers or specifications annexed or referred to herein shall be deemed as part of this Contract.

4. NOTICES

Any notice or other communication under this Contract given by either Party shall be sent via email to the email address listed below, or mailed, properly addressed and stamped with the required postage, to the intended recipient at the address and to the attention of the person specified below and shall be deemed served when received and not mailed. Either Party may from time to time change such address by giving the other Party notice of such change.

Energy Northwest Contractor

76 N. Power Plant Loop PO Box 968, Richland, WA 99352 509.372.5000

Contractor shall maintain an emergency contact in which this person is available 24/7 in the case of a true emergency (no “trunk line” phone numbers, only direct contact information). Energy Northwest shall use the following provided emergency contact information solely for the purpose of facilitating immediate communication in the event of an emergency related to Contractor’s personnel during the performance of this Contract.

Contractor Emergency Representative Name Phone No.

email@email.com

For commercial questions please contact Steven Lund, Procurement Specialist at

509.377.8696 or email slund@energy-northwest.com.

5. EXECUTION

IN WITNESS WHEREOF, the Contractor and Energy Northwest have executed this Contract each by its proper respective officers and officials thereunto duly authorized the date written below.

mailto:email@email.com

APPENDIX “A” – STATEMENT OF WORK

Will be inserted after Contract Award notification.

APPENDIX “B” – SCHEDULE OF PAYMENTS

B.1 PRICING

Bid Form to be inserted after Contract Award notification.

B.2 SALES TAX

Washington State retail sales tax shall apply to this Contract.

B.3 COMPENSATION AND PAYMENT

A. Contractor may submit an invoice to Energy Northwest for approval and payment for Work satisfactorily completed. The total amount paid to Contractor for Work performed shall not exceed the Sum of $ USD, including Washington State sales tax, unless an Amendment authorizing the same is issued in accordance with Appendix “D” of the Contract Documents. The Technical Representative or designee shall verify the invoice for payment purposes.

Invoices may be submitted electronically to:

accountspayable@energy-northwest.com and slund@energy-northwest.com

B. Incomplete or improper invoices may be returned to the Contractor for corrections.

mailto:accountspayable@energy-northwest.com

APPENDIX “C” – SPECIAL PROVISIONS

C.1 COMMENCING WORK

Specific instructions will be inserted into the Contract Document.

C.2 ENERGY NORTHWEST’S HOURS OF OPERATION

A. Energy Northwest’s week is designated as Saturday through Friday. Core business hours are 8:00am to 3:30pm (Pacific Time), Monday through Friday.

B. Energy Northwest legal holidays are as follows: New Year's Day, President’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day after Thanksgiving, Christmas Eve and Christmas Day. If a holiday falls on a Friday or Saturday, it will be observed on the previous Thursday. If a holiday falls on a Sunday, it will be observed on the following Monday.

C.3 CONTRACTOR PERSONNEL AND SITE ACCESS

A. Contractor personnel shall be certified for Unescorted Access (UA) to Columbia.

UA is also referred to as a green badge and is required to enter the Protected Area to perform the Work.

Depending on the individual’s basis for action in the Personal Access Database System (PADS), the individual may not require all the requirements listed below to be certified for UA. A Personal History Questionnaire (PHQ) is mandatory for all applicants regardless of their basis for action in PADS. UA may include, but is not limited to, the following:

1. Background investigation shall proceed after Access Authorization receives the completed electronic PHQ. Access Authorization shall conduct a review of the completed background investigation results.

2. Valid (non-expired) enhanced state issued driver’s license / enhanced state identification card or non-expired U.S Passport.

3. Fitness for Duty drug and breath alcohol screening.

4. Criminal history submittal (fingerprints) to the Federal Bureau of

Investigation (FBI) and returned results reviewed against the individuals listed legal action(s) in their PHQ.

5. Psychological evaluation/review, which may include a clinical interview.

6. Credit report submittal/review against the individuals completed PHQ.

7. Computer based training to include other required training as applicable to the Work.

B. UA requirements may require up to 40 hours per person to complete, however that will be determined prior to mobilization when the individual’s basis for action in

PADS is received by the in-processing coordinator. Energy Northwest shall perform site training necessary for UA for the Contractor’s personnel. Badging for UA shall be coordinated through the Technical Representative or designee at least three weeks, prior to mobilization.

C. English proficiency is required for all individuals granted access to Columbia’s exclusion area. This is necessary to ensure operational and worker safety. For UA to non-exclusion areas, English proficiency may be required if it is a bona fide occupational qualification, per Energy Northwest procedure SWP-SEC-07.

D. Energy Northwest has the sole discretion and authority to approve and disapprove all Contractor personnel required to perform the Work. Energy Northwest retains authority to waive any training, qualification and/or experience requirement.

Technical Representative or designee may direct Contractor to remove, and Contractor shall remove, any Contractor personnel that have been previously approved. The termination of Contractor personnel shall be at the sole discretion of Energy Northwest.

E. In the case personnel supplied by the Contractor fail to complete the Access

Authorization pre-screening process to determine fitness for duty, or in any manner fail the pre-access screening program and is considered not to be trustworthy and reliable, Contractor is obligated to replace such personnel at their own cost. In addition, any personnel supplied by the Contractor that have their UA later terminated or revoked for cause, the return travel expenses for the denied person are also at the Contractor’s expense.

F. Notwithstanding any other provision of the Contract, personnel furnished by the

Contractor shall remain and perform as employees of the Contractor and shall in no sense be considered employees of Energy Northwest. All documentation and communication pertaining to the Contractor employee shall have the designation “Contractor Employee”

G. Contractor personnel’s UA will be terminated by the Technical Representative or designee per SWP-SEC-07 requirements.

C.4 REPORT FOR WORK/WORK LOCATION

A. Technical Representative or designee will be responsible for establishing and coordinating the applicable reporting location, orientation, and, if required, the Pre-job/Post Award Conference Checklist. The Work herein will be performed on Energy Northwest property and under technical supervision of the Technical Representative or designee.

Contractor personnel shall review the following information prior to their arrival and properly inspect any vehicle(s), that will be on Energy Northwest property to ensure no contraband or prohibited related items listed below are not in their possession or anywhere in their company or personal vehicle(s).

When accessing Columbia, in accordance with Benton County Code, Chapter 13.01, Code of Federal Regulations 10CFR26, and Energy Northwest Security

Operations procedure SWP-SEC-03 Contractor personnel and vehicles are subject to search for contraband and prohibited items.

Contraband and Prohibited items include, but are not limited to:

• Firearms to include live and spent ammunition

• Explosives

• Incendiary devices

• Chemical agents and self-defense sprays (mace, pepper spray, etc.)

• Tasers or other like self-defense items

• Alcoholic beverages

• Kombucha and other ‘no-alcohol’ beverages

• Marijuana/Cannabis

• Illegal drugs and controlled substances without prescription

• Prescription medications must be in the original container and belong to a member of the Contractor’s crew.

• Clubs such as blackjacks, nightsticks and tomahawks

• Knives/cutlery must conform to all Federal and State requirements

• Contraband defined as “goods having been imported or exported illegally”

• Any paraphernalia related to the above listed items

Any of the above found in a vehicle or on a person will constitute denial to Site access and possible legal action.

Possession of contraband or prohibited items either on one’s person, in their privately owned vehicle or company vehicle is a violation of Benton County Code, Chapter 13.01, Code of Federal Regulations 10CFR26, and Energy Northwest Security Operations procedure SWP-SEC-03 will constitute denial to Site access and possible legal action.

B. Portable Media & Digital Device Cyber Security Restrictions

1. Contractor shall comply with Energy Northwest’s procedures, GBP-IS-27 and SWP-CSW-15 for all media and digital devices.

a. Portable media includes, but is not limited to, USB drives, portable hard drives, CDs, DVDs, and compact flash memory cards that do not contain independent programmable functionality.

b. Portable devices include, but are not limited to, laptops, tablets, cell phones, smart phones, and other digital test equipment that use a combination of hardware, firmware, and/or software to execute internally stored programs.

i. Laptop Restrictions: Laptops used with Columbia plant equipment are subject to the laptop hardening, labeling, and protection requirements of SWP-CSW-15.

2. Pursuant to SWP-CSW-15, any electronic devices that are required to be used in the Power Block or connect to plant equipment at Columbia shall be coordinated with the Technical Representative or designee and Cyber Security personnel prior to use.

C. Personnel Site Access

1. Contractor personnel accessing the Site with or without a badge will need to coordinate the reporting location for work activities with the Technical

2. In accordance with Benton County Code, Chapter 13.01, Energy Northwest reserves the right to perform random vehicle searches at the Site.

Personnel can be restricted for 20-60 minutes while the search is performed.

D. Protected Area - Personnel Access

1. Contractor personnel accessing the Protected Area without a badge must be escorted by green badge personnel with escort training. Access must be coordinated 24 hours in advance.

2. Contractor personnel accessing the Protected Area with a badge will be required to stop at the Protected Area Access Point (PAAP) for badge verification and hand geometry. Personnel access can take 5-20 minutes depending on the number of personnel in line.

E. Protected Area - Equipment Access

No equipment deliveries searches performed before 7:00am. Security searches are performed during the hours of 7:00am to 2:00pm, Monday through Friday.

Personnel should have the Technical Representative’s or designee’s name and phone number to enable the security officer to verify access. Deliveries can be restricted to the check point for 60-120 minutes depending on the number of vehicles in line.

Advance coordination with Security and the Technical Representative or designee can expedite the entrance into the Protected Area.

F. Protected Area – Small Tools and Equipment Access

Some small tools and equipment can be hand carried or carted through the Protected Area security check point. Verify with the Technical Representative or designee and/or Security prior to arriving at the security check point, to determine if the small tools or equipment can be x-rayed.

C.5 SUPPLIER PERFORMANCE & PARTNERSHIP PLAN

Upon request from Energy Northwest, Contractor shall submit a Supplier Performance & Partnership Plan consistent with its proposal. The Plan shall establish joint governance, cadence of leadership reviews, risk thresholds and escalation, Operating Experience (OE) capture and sharing, and independent technical challenge expectations. Upon Energy Northwest approval, the Plan becomes a performance oversight instrument; failure to maintain practices and outcomes may affect payments and/or constitute a performance deficiency.

C.6 INTEGRATED RISK MANAGEMENT

A. Purpose and Applicability

1. Integrated Risk Management (IRM) governs how risks are identified, analyzed, controlled, monitored, and escalated throughout planning and execution of the Work. IRM applies to Contractor and all Subcontractors for all activities performed under this Contract. The objective is event-free, risk-informed execution with transparent communication and timely decision-making consistent with nuclear industry good-practice principles.

B. Program Requirements

1. IRM Plan: Upon request from Energy Northwest, Contractor shall submit an IRM Plan that describes: risk taxonomy; scoring methodology;

governance; thresholds and escalation; integration with pre-job briefs and procedures; and alignment with OE. Upon approval by Energy Northwest, the IRM Plan becomes a performance oversight instrument.

2. Risk Register: Contractor shall establish and maintain a living risk register for the Work that, at a minimum, includes unique risk ID and description;

owner; probability and consequence ratings; current residual risk;

mitigations/controls; status; next review date; and linkage to applicable procedures, work orders, drawings, and OE. The register shall be updated whenever conditions change and reviewed with Energy Northwest at the cadence in Section C.6.D.

3. Risk Assessment and Pre-Job Integration: Contractor shall perform documented risk assessments during planning and prior to execution, integrating Job Hazard Analyses/Job Safety Analyses (JHA/JSA), Human Performance (HU) tools, and applicable OE. Assessments shall identify critical steps, defenses, hold points, and verification methods. Pre-job briefs shall communicate the assessed risks and controls to all involved personnel.

C. Critical Evolution Gates

Before initiating any critical evolution (including but not limited to high-hazard lifts, confined space entry, energized work, hot work, work at height, or evolutions designated by Energy Northwest), Contractor shall:

1. Conduct a joint risk review with the Technical Representative or designee.

2. Verify control implementation and readiness (procedures, permits, qualifications, tooling, staging, independent checks).

3. Confirm go/no-go decision points and stop-work criteria.

4. Obtain documented concurrence from Contractor’s on-site supervisor and the Technical Representative or designee prior to execution.

D. Governance and Joint Reviews

1. Cadence: Contractor shall hold weekly IRM working reviews and monthly leadership reviews with Energy Northwest to examine the risk register, emerging issues, trend data, and corrective-action effectiveness. Minutes and action logs shall be maintained and provided upon request.

2. Emergent Risk: Contractor shall promptly convene an ad-hoc joint review for any emergent risk that exceeds escalation thresholds or degrades safety margin.

E. Early-Warning Notifications and Escalation

1. Thresholds: Contractor shall immediately notify the Technical Representative or designee upon any of the following:

a. Residual risk transitions to High/Red after controls.

b. Mitigations become ineffective or unavailable for a Moderate/Amber or High/Red risk.

c. Precursors to HU events or near misses indicate increasing risk

(trend or leading indicators).

d. OE indicates an unrecognized hazard or degraded defense relevant to the Work.

2. Timeliness and Format: Notifications shall be made within one hour for conditions in E.1.a and E.1.b, and within 24 hours for conditions in E.1.c and E.1.d, using email to the Technical Representative or designee, accompanied by a brief risk statement, current controls, and proposed recovery actions.

3. Stop-Work. Contractor shall self-initiate stop-work when residual risk is

High/Red or when defenses are not reliable. Resume only after joint review and written concurrence by the Technical Representative or designee.

F. Risk Controls Implementation and Verification

1. Contractor shall implement risk controls as specified in procedures and work orders and shall verify control effectiveness using independent checks or peer reviews where appropriate. Deviations from planned controls require prior approval from Energy Northwest.

G. Metrics and Reporting

1. Contractor shall submit a monthly IRM summary that includes risk distribution (by category and severity), movements in residual risk, control effectiveness, leading indicators, HU metrics and event-free days, and corrective-action status. Contractor shall analyze trends and propose adjustments to controls and governance based on data.

H. Records and Audit

1. IRM records (plans, registers, assessments, reviews, notifications, minutes, and actions) are project quality records and shall be retained per Contract requirements. Energy Northwest, including Corporate/Independent Oversight, may review IRM records and observe IRM practices; Contractor shall support such access and timely resolution of identified gaps.

I. Interface with Appendix “A”

1. IRM establishes baseline expectations across all Work. Scope-specific hazards, hold points, and acceptance criteria shall be identified in the Statement of Work (Appendix A), and shall remain consistent with this clause.

J. Performance and Remedies

1. Failure to maintain approved IRM practices, thresholds, and reporting may affect payments, trigger corrective-action plans, or constitute a performance deficiency under the Contract. Energy Northwest may require additional controls or suspend work until risks are reduced to acceptable levels

C.7 HUMAN PERFORMANCE & EVENT-FREE OPERATIONS

Contractor shall utilize site-standard HU tools (pre-job briefs, peer checks, procedure use and adherence, error-prevention techniques) and shall report HU indicators monthly, including event-free days, event significance, trends, and corrective-action status.

Contractor shall promptly analyze and correct negative trends and share lessons learned with Energy Northwest. Data shall align to recognized industry criteria for HU event significance to ensure consistency of reporting.

C.8 OPERATING EXPERIENCE

Contractor shall capture, analyze, and share relevant industry and site OE during performance of the Work. OE submissions shall include cause, conditions, defenses, learning points, and recommended changes to procedures or work instructions. Contractor shall integrate approved OE into the Work and brief affected personnel, down to the lowest level appropriate, prior to execution.

C.9 INDEPENDENT OVERSIGHT ACCESS

Energy Northwest personnel shall have reasonable access to observe Contractor work as an independent oversight, review relevant documents and data, and provide observations.

Contractor shall support such access and promptly address identified performance gaps.

This access reinforces self-awareness and continuous improvement and does not modify Contract scope or authority.

C.10 SUBCONTRACTOR FLOW-DOWN

Contractor shall flow down to critical Subcontractors the expectations for leadership behaviors, IRM, technical challenge, HU, and OE sharing described in Appendix “C” and the approved Supplier Performance & Partnership Plan. Contractor shall verify Subcontractor implementation through oversight and metrics and shall provide such evidence upon request.

C.11 WORKMANSHIP AND MATERIALS

A. Unless otherwise directed by the Technical Representative or designee or expressly provided for by the specifications issued under this Contract:

1. All workmanship shall be free of defects and faults.

2. All materials, equipment and supplies incorporated in the work are to be:

a. New and of the most suitable grade of their respective kinds for the purpose.

b. In accordance with any applicable drawings and specifications where materials, equipment and supplies are referred to in the specifications as “equal to” and particular standard, the Technical Representative or designee shall decide the question of equality.

c. Installed to the satisfaction of and with the approval of the Technical

C.12 PROJECT MONITORING

Technical Representative or designee will be the prime contact during the performance of the Work for responding to questions, ensuring that Energy Northwest responds to Contractor needs that are within the contract scope, and verifying the completion of the Work.

Technical Representative or designee will be responsible for monitoring and providing technical guidance, establishing and coordinating the reporting location and should be contacted regarding questions or problems of a technical nature.

In no event, however, will an understanding or agreement, modification, Amendment, or any deviation from the terms of the Contract be effective or binding upon Energy Northwest unless formalized by the Procurement Specialist prior to any deviation from the terms of the Contract. On all matters that pertain to Contract terms, the Contractor shall contact the Procurement Specialist specified in the Contract documents. When in the opinion of the Contractor, the Technical Representative or designee requests or directs efforts outside the existing SOW of the Contract; the Contractor shall promptly notify the Procurement Specialist. The Technical Representative or designee does not possess any explicit, apparent, or implied authority to modify the Contract documents.

APPENDIX “D” – GENERAL PROVISIONS

General Provisions shall be provided to the Contractor in a separate document.