Summary

This Request for Proposal (RFP) No. 717466 is issued by Energy Northwest, a Joint Operating Agency and Municipal Corporation in Washington State, for the replacement of circulating water expansion joints at Columbia Generating Station during Refuel Outage 28. The project involves removing and installing three expansion joints (CW-EJ-1A, 1B, and 1C), each 90 inches in diameter, which are located between circulating water pumps and main circulating water valves. All work will be performed underwater within the circulating water basin, with contractors' divers removing existing bolting (136 studs per joint, torqued to no greater than 250 lbs.) using a HYTORC torque/tensioning system, rigging and lifting each joint onto flatbed trucks for warehouse transport, and providing underwater video camera systems for observation and documentation. A mandatory site visit is scheduled for November 17, 2026, at 11:00 a.m. at Columbia Generating Station in Richland, Washington. Questions must be submitted by December 8, 2026, with proposals due by December 17, 2026, at 1:00 p.m. The contract period extends from the signing date through April 29, 2027, with work anticipated to occur during the outage period beginning in April 2027.

Contractors must submit firm fixed-price proposals and comply with Washington State prevailing wage requirements effective September 1, 2026, with apprentice utilization requirements of at least 15 percent of labor hours for public works projects exceeding $1.5 million. Evaluation criteria include general qualifications (10%), commercial qualifications (10%), technical qualifications (45%), and price (35%), with proposals assessed using a pass/rejection methodology for mandatory and commercial qualifications and a raw scoring scale of 0–5 for technical qualifications. Bidders must hold an active Washington State contractor license, possess Industrial Insurance coverage, maintain Washington Unified Business Identifier and Employment Security Department numbers, and comply with Inflation Reduction Act prevailing wage requirements. A performance and payment bond equal to 100 percent of the total contract price is required, with five percent retainage held until work completion and state agency approvals. Bidders must attend the mandatory site visit, complete required certifications including OSHA statistical reports, provide equivalent experience references, and submit detailed means and methods, project schedules, proposed subcontractors, and site-specific safety and health plans. Contractor personnel must obtain Unescorted Access (green badge) certification to Columbia's Protected Area, which may require up to 40 hours for background investigations, drug screening, psychological evaluations, and training.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL (RFP) NO. 717466

Procurement Quality Level:0

FOR

REPLACEMENT OF CIRCULATING WATER EXPANSION JOINTS

AT

ENERGY NORTHWEST

COLUMBIA GENERATING STATION

MANDATORY SITE VISIT November 17, 2026

QUESTIONS DUE BY December 8, 2026

PROPOSAL DUE BY December 17, 2026

RFP No. 717466

Pursuant to Revised Code of Washington (RCW) §43.52.565, Energy Northwest, a Joint Operating Agency and Municipal Corporation in the State of Washington, is soliciting competitive proposals from qualified Bidders for the Direct Current charger and Containment Monitoring System (CMS) upgrade project during Refuel Outage 28 at Columbia Generating Station (Columbia).

Work performed in Washington State only: Work performed by craft personnel (i.e. laborers, millwrights, pipefitters, and boilermakers, etc.) in the State of Washington are subject to prevailing wage requirements pursuant to chapter 39.12 RCW. If the Work will be performed in Washington State, Bidders must hold an active Washington State contractor license at the time of bid submission in order to be eligible to submit a proposal for this procurement.

Energy Northwest makes no guarantee as to any actual or minimum amount of Work to be performed. Work is directed at the sole discretion and benefit of Energy Northwest.

Energy Northwest reserves the right, without qualification, to select any proposal as a basis for negotiation, to reject all proposals and to exercise its discretion and apply its judgment with respect to any proposal submitted. This Request for Proposal (RFP) does not commit Energy Northwest to pay any costs incurred in connection with any proposal, or to contract for any Work.

There is no commitment on the part of Energy Northwest to accept the lowest priced proposal or any conditions imposed by a Bidder as a requirement of acceptance of their proposal. The proposal to be accepted shall be at the sole discretion of Energy Northwest.

Information submitted to Energy Northwest in response to this RFP becomes public record under the Revised Code of Washington. Without exception by the presenting Party, the information is subject to public disclosure pursuant to the Washington State Public Records Act. Energy Northwest may unilaterally release or exempt information from public disclosure. In the event a Bidder seeks to withhold information from public disclosure, it shall hold Energy Northwest harmless from any damages or costs, including attorney’s fees and statutory awards imposed by any court or regulatory authority. Energy Northwest shall not be liable for any inadvertent public disclosure of information, despite the exercise of reasonable care.

Bidders shall thoroughly examine and be familiar with the RFP documents. Submittal of a proposal shall constitute an acknowledgement upon which Energy Northwest may rely that the Bidder has thoroughly examined and is familiar with these documents. Failure or neglect to receive or examine these documents shall in no way relieve Bidder from any obligation with respect to the proposal or these documents. No claim for additional compensation is allowed for lack of knowledge of the RFP documents.

This RFP is comprised of:

• Section I – Contractor Selection Procedure

• Section II – Proposal Submission Format and Content

• Section III – Statement of Work

• Section IV – Cost Proposal Form

• Section V – Sample Contract Document

• Exhibit “A” – Certification of Compliance with Wage Payment Statutes

• Exhibit “B” – OSHA Statistical Report

• Exhibit “C” – Proposed Subcontractors

• Exhibit “D” – Sample Final Statement and General Release

MANDATORY PROCUREMENT SITE VISIT

Examination date: November 17, 2026, 11:00am (local time, Richland WA). Procurement Specialist will provide further details and required forms to be completed to those who are interested in participating. Contact Steven Lund, Procurement Specialist at slund@energy-northwest.com for further information.

Arrangements will be made by Energy Northwest to allow prospective Bidders access to the site for the purpose of making preliminary inspections. Availability of and access to the Site is otherwise limited;

therefore, the Bidders are advised to plan their inspections and preliminary measurements for the date specified.

Date: November 17, 2026

Time: 11:00am (local time, Richland WA)

Location: Energy Northwest

Columbia Generating Station 76 N. Power Plant Loop

Richland, WA 99354

Meeting Room: Building No. 26 – Deschutes Conference Room No. 2-247

Progression of Site Examination: Bidders shall meet at the aforementioned date, time and location provide by Procurement Specialist to kick-off the mandatory examination of Site. Bidders who have been cleared to receive a RED Badge will be escorted to the Protected Area to examine the work site.

Bidders attending the mandatory site examination shall bring required personal protective equipment (PPE), including a hard hat, safety glasses and safety shoes containing upper leather or steel/composite toes. Energy Northwest will not be providing any PPE.

Essential information: Energy Northwest allows each Bidder to send a maximum of two representatives to the site tour that will include areas in the Protected Area. Bidder shall submit the “Energy Northwest Visitor Log” form provided by the Procurement Specialist for each person attending the examination of site to Josh Traun via email at jjtraun@energy-northwest.com by November 10th, 2026, no later than 12:00pm (local time, Richland WA) to coordinate access to the Protected Area.

Bidders, do not sign the form prior to submitting the document. The form is signed at the Protected Area security checkpoint.

Bidders who do not submit the form will not be authorized to participate in the portion of the Site tour within the Protected Area.

Bidder shall satisfy itself concerning the nature and the location of the Work, the general and local conditions, particularly those affecting transportation, disposal, handling and storage of materials, availability of labor and applicable wage rates, water and electric power, roads, climate conditions and seasons, and physical conditions at the actual work site and project area as a whole, the equipment and facilities needed preliminary to and during Work prosecution, and all other matters which can in any way affect the Work or the cost thereof.

mailto:slund@energy-northwest.com mailto:slund@energy-northwest.com mailto:jjtraun@energy-northwest.com

Failure of the Bidder to acquaint itself with all available information shall not relieve Bidder of the responsibility for properly estimating both the difficulties and the costs of successfully performing the Work.

RFP QUESTIONS AND RESPONSES

This is an opportunity to seek clarification or information regarding the requirements of this RFP.

Submit questions via email to the Procurement Specialist no later than 12:00pm (local time, Richland WA) on December 8, 2026, Questions after this date will not receive a response.

Steven Lund, Procurement Specialist Phone No. 509.377.8696 slund@energy-northwest.com

The Procurement Specialist will provide answers to the questions via an Addendum to all Bidders.

PROPOSAL DUE DATE:

Submit proposals to Steven Lund, Procurement Specialist no later than 1:00pm (local time, Richland WA) on December 17, 2026. Proposals shall be submitted by email at slund@energy-northwest.com.

RFP SECTION I

CONTRACTOR SELECTION PROCEDURE

Bidders should submit all information necessary for Energy Northwest to evaluate the proposal in accordance with the prerequisites, technical and commercial evaluation factors set forth in this RFP.

Only those proposals which meet these requirements will be given further consideration.

A. PURPOSE

Energy Northwest will utilize the following guidelines in the selection of Bidders.

1. The purpose of the selection will constitute an objective and impartial procedure in that all interested Bidders are evaluated against the same criteria.

2. The criteria utilized in evaluating prospective Bidders shall relate to the competence and qualifications of the Bidders being considered so that the Bidders selected shall constitute the best qualified of those considered in the sole judgment of Energy

3. The procedures employed shall ensure that companies owned by women and minorities are provided with full and equitable opportunity for participation in the selection process.

B. PROCEDURE

1. Energy Northwest shall publish in a newspaper of statewide and/or local circulation an announcement inviting all interested Bidders to indicate their interest in submitting a proposal for the Work described in the RFP. The announcement will state a date by which proposals and supporting documentation must be received.

a. RFP Questions and Responses: This is an opportunity to seek clarification or information regarding the requirements of this RFP. Submit questions via email to the Procurement Specialist no later than 1:00pm (Local Time Richland, WA) on December 8, 2026. Questions after this date will not receive a response. The Procurement Specialist will provide answers to the questions via an Addendum to all Bidders.

b. Proposal Due Date: Submit proposals to the Procurement Specialist no later than 1:00pm (Local Time Richland, WA) on December 17, 2026, Proposals shall be submitted by email to slund@energy-northwest.com.

2. Proposals received by the stated due date and time will undergo a structured, multi-phase evaluation conducted by Energy Northwest. Each proposal will be evaluated against predefined criteria using a pass/rejection methodology and a quantitative, weighted scoring model. Bidders must provide sufficient detail in their submissions to allow evaluators to accurately assess, based on the methodology below, Bidder’s overall responsiveness in areas of technical knowledge, experience, management, staff and schedule as outlined in RFP Section II.

a. Mandatory qualifications will be evaluated on a pass/rejection basis. Failure to meet any mandatory requirement will result in automatic rejection of the proposal.

mailto:sjackson@energy-northwest.com

b. Commercial qualifications will be evaluated on a yes/no basis. Consistent with scoring methodology, a “yes” response will receive three points and a “no” response will receive one point.

c. Technical qualifications reflect factors other than price, as authorized under

RCW §43.52.565. Evaluators will assign a raw score from 0 to 5 for each technical evaluation criterion. Scores will reflect the demonstrated quality, completeness, clarity, and responsiveness of Bidder’s proposal to the requirements outlined in RFP Section II.

i. Score of 5 – Significantly exceeds requirements outlined; with superior, verifiable value; minimal risk; compelling differentiators and outcomes (e.g., proven results, innovative yet feasible approach, quantified benefits, exceptional references, robust risk mitigation, high quality experience). If pricing is related, this score may be used to differentiate Bidders as determined by Energy Northwest.

ii. Score of 4 – Exceeds requirements outlined; presents clear, credible solutions; lower risk; well-documented, tailored approach (e.g., strong methodology, strong risk mitigation, relevant experience, measurable performance commitments). If pricing is related, this score may be used to differentiate Bidders as determined by Energy

iii. Score of 3 – Meets minimum requirements with adequate detail;

manageable risk; demonstrates reasonable understanding; may lack differentiators (e.g., clear plan, standard approach, baseline compliance, typical references, limited innovation). If pricing is related, this score may be used to differentiate Bidders as determined by Energy Northwest.

iv. Score of 2 – Marginal response; some requirements addressed but with notable gaps; moderate to high risk; limited detail; questionable feasibility without clarification. If pricing is related, this score may be used to differentiate Bidders as determined by Energy Northwest.

v. Score of 1 – Deficient response; major deficiencies resulting in low probability of successful performance; vague plan; significant misalignment with scope; failure to address critical risks. If pricing is related, this score may be used to differentiate Bidders as determined by Energy Northwest.

vi. Score of 0 – Does not meet requirements. Proposal may be considered unresponsive and not eligible for award consideration based on this criterion (e.g., missing required sections, failure to submit required forms, excessive or unacceptable exceptions).

d. Weighted Scoring Calculation. Each technical criterion is assigned a weighting factor expressed as a percentage of the total available points. For each criterion, the raw score (0–5) assigned by evaluators will be multiplied by the applicable weighting factor to produce the criterion’s weighted score.

The sum of all weighted scores will constitute the Bidder’s total technical score used to determine ranking and competitive range.

Score Formula: Raw Score (0–5) × Criterion Weight = Weighted Score

e. Evaluator Criteria. Energy Northwest will evaluate proposals using the weighted criteria listed below. Bidders are responsible for providing comprehensive, detailed responses for each criterion to ensure accurate scoring and full consideration.

Evaluation Criteria Weighted Average%

General Qualifications 10%

Commercial Qualifications 10%

Technical Qualifications 45%

Price 35%

3. Based on the proposals submitted and evaluated, Energy Northwest may elect to perform Bidder interviews. All Bidders which have submitted a proposal that are deemed to be responsible will be provided with an opportunity for an interview.

Interviews may be held remotely, or in person at the sole discretion of Energy Northwest. Bidders will receive more information regarding how to prepare for the interview if selected to participate.

4. After completion of the interviews, Energy Northwest may either choose the Bidder deemed to be qualified, responsive, responsible, and most advantageous to perform the required Work or Energy Northwest may provide an opportunity for Bidders to submit a Best and Final Offer (BAFO).

5. After the submittal of a BAFO, if requested, there will be no further opportunity for clarification, refinement, and/or discussions. Energy Northwest will review and evaluate the BAFOs. Energy Northwest will select the Bidder whose proposal is in the best interest of and most advantageous for Energy Northwest if any.

6. Bidder shall thoroughly examine and be familiar with the BAFO documents. Submittal of a BAFO shall constitute an acknowledgement upon which Energy Northwest may rely that the Bidder has thoroughly examined and is familiar with these documents. Failure or neglect to receive or examine these documents shall in no way relieve Bidder from any obligation with respect to the proposal or these documents. No claim for additional compensation will be allowed, which is based on lack of knowledge of the BAFO documents.

7. Energy Northwest reserves the right, without qualification, to select any BAFO as a basis for negotiation, to reject all BAFO’s and to exercise its discretion and apply its judgment with respect to any BAFO submitted. This BAFO does not commit Energy Northwest to pay any costs incurred in connection with any BAFO, or to contract for any Work. There is no commitment on the part of Energy Northwest to accept the lowest priced BAFO or any conditions imposed by a contractor as a requirement of acceptance of their BAFO. The BAFO to be accepted shall be at the sole discretion of Energy Northwest.

8. Information submitted to Energy Northwest in response to this BAFO becomes public record under the Revised Code of Washington. Without exception by the presenting Party, the information is subject to public disclosure pursuant to the Washington State Public Records Act. Energy Northwest may unilaterally release or exempt information from public disclosure. In the event a proposer seeks to withhold information from public disclosure, it shall hold Energy Northwest harmless from any damages or costs, including attorney’s fees and statutory awards imposed by any court or regulatory authority. Energy Northwest shall not be liable for any inadvertent public disclosure of information, despite the exercise of reasonable care.

C. WRITTEN BID PROTEST PROCEDURES

1. Purpose: These protest procedures are included in this RFP to provide a prompt, fair and equitable administrative remedy to all Bidders regarding alleged substantive errors or omissions in the RFP or regarding any decision by Energy Northwest to award the Contract, to declare a Bid non-responsive, or to find a Bidder not responsible.

2. Form of Protest: In order to be considered, a protest shall be in writing and shall include:

(1) the name, street address, telephone, fax number and email address of the aggrieved party and/or their authorized representative; (2) the RFP title and number under which the protest is submitted; (3) the economic interest of the aggrieved party in the Contract to be awarded under the RFP; (4) a detailed description of the specific grounds for the protest and any supporting documents;, (5) the specific ruling or relief requested; and (6) evidence that all persons with a financial interest in the procurement have been given notice of the protest or if such persons are unknown, a written statement to that effect. In the event the protesting party asserts the responsibility of any other Bidder as a ground for protest, it must address in detail the specific responsibility criteria identified in the particular RFP and, absent such specific responsibility criteria, the matters addressed in chapters 39.04 and 39.06 RCW pertaining to Bidder and/or Subcontractor responsibility. The transmittal envelope must clearly identify the RFP number on its face and be labeled as a “Bid Protest.” No protest will be considered by Energy Northwest if all Bids are rejected or if the protest is received after award of the Contract as contemplated by this RFP. The protest shall be provided to Energy Northwest, General Counsel at Kootenai Building, MD 1020, 76 North Power Plant Loop, Richland, Washington 99354; Attention: Esther Andrews, SVP/Chief Compliance Officer; 509.377.6020.

3. Timing:

A. Prior to Bid Opening or Due Date: Protests based on the specifications or other terms in the RFP Documents which are apparent on the face of said documents must be received by Energy Northwest no later than 10 calendar days prior to the date established for submittal of Bids. Protests based on other circumstances must be received by Energy Northwest within five calendar days after the protesting Bidder knows or should have known of the facts and circumstances upon which the protest is based. In no event shall a protest be considered if all Bids are rejected or after award of the Contract.

B. After Bid Opening and Prior to Award: Within two full business days (the equivalent of 16 business hours) after the advertised date and time of Bid opening, as amended (Saturday, Sunday, and legal holidays excluded), any party planning to protest must file a written notice of such intention with the

Energy Northwest General Counsel. If no notice is received by the Energy Northwest General Counsel within the two business days, all eligible protestors will be considered to have waived their right to protest. Notice of intention must stipulate (1) name, address, and phone number of the aggrieved party; (2) the RFP number and title under which the protest is submitted; and (3) the intended grounds for the protest.

The complete protest, prepared according to the criteria set forth herein (and consistent with the criteria set forth in subsection I.16.B above), must be received by the Energy Northwest General Counsel within two business days (16 business hours) after the date and time of receipt of the notice of protest.

After the two business days have passed from Bid opening date/time, Energy Northwest will proceed as follows:

If a notice of intent to protest was filed with the Energy Northwest General Counsel during the two business days following Bid opening, the Energy Northwest General Counsel’s may make the following determination:

i. Suspend the award decision to allow consideration of the protest before award is made; or

ii. Declare intent to award and wait a minimum of two business days (sixteen business hours as defined above) before entering into a contract. Written notice of intent to execute a contract shall be met by either one of the following methods: (1) public posting by Energy Northwest with a named intent to award indicated on the posted tabulation, made public or accessible to the public by telephone and/or posting on the Energy Northwest internet location designated for Bid results; or (2) an Energy Northwest memorandum request to authorize award to the apparent successful Bidder. The first memorandum request submitted either to the Energy Northwest Executive Board (if applicable) or official or employee with delegated approval authority shall be considered notice of intention to award.

iii. After Bid opening, only Bidders that submitted a Bid, subcontractors, or others that can show a substantial economic interest in the Bid award and who are aggrieved, are eligible to protest. After Bid opening, protests are limited to issues related to Bid opening, evaluation of the Bids, and intention to award decisions, and are further limited to those items that were not known or could not have been reasonably known prior to Bid opening. Such issues that were known or should have reasonably been known must have been protested prior to Bid opening and are no longer eligible as an issue of protest.

Only protests stipulating an issue of fact concerning the following subjects shall be considered:

▪ A matter of bias, discrimination or conflict of interest on the part of the evaluator;

▪ Errors in computing the score or Bid Price upon which award decisions are based; or

▪ Non-compliance with procedures described in the solicitation for the opening and award itself.

4. Review by Energy Northwest:

A. Energy Northwest shall promptly consider the protest based on the written submittal. In its sole discretion, Energy Northwest may give notice of the protest to other interested parties, including other Bidders. Energy Northwest reserves the right to resolve or to attempt to resolve any protest that concerns the form or content of the solicitation and which protest was received before the Bid due date or Bid opening through written addenda to the Bid documents.

B. Energy Northwest may, in its sole discretion, elect to hold a hearing regarding the protest. A hearing will not, however, generally be held unless Energy Northwest believes it would be helpful to the resolution of the Protest. At the hearing, the aggrieved party will be given a reasonable opportunity to present relevant evidence and to make legal arguments. Other interested parties may also be given the opportunity to do so. The hearing will generally be recorded, and Energy Northwest will maintain an official record of all documentary evidence presented at the hearing. Energy Northwest will issue a written final decision on any submitted Protest. In making its decision, Energy Northwest may consult with others and consider information relating to the protest from any source, including other interested parties. A copy of the final decision will be provided to the aggrieved party, and any other party as may be required, by either: (i) personal service; (ii) facsimile; or, (iii) email, with telephonic confirmation.

C. The determination by Energy Northwest shall either:

1. Find the protest lacking in merit and uphold Energy Northwest’s action;

or

2. Find only minor technical or harmless errors in Energy Northwest’s acquisition process and determine Energy Northwest to be in substantial compliance and therefore reject the protest; or

3. Find merit in the protest and pursue correction including correcting the errors and reevaluating the Bids, and/or reissuing the solicitation to begin a new process; or

4. Make other findings and determine other courses of action, as appropriate.

D. Stay of Award of the Contract: Energy Northwest will stay award of the Contract for two business days following the issuance of its final decision. The term “business day” shall mean any day on which Energy Northwest is open for regularly conducted business.

E. Appeal: Any appeal must be filed within two business days of the determination being delivered by the Energy Northwest General Counsel to the aggrieved party. An appeal must be in writing and submitted to the Energy Northwest General Counsel. The written statement of appeal must provide a substantial basis for an appeal, based on the information submitted as part of the original protest. New information or basis of protest will not be considered during the appeal process. This shall be the final appeal provided to the protestor. The protest shall be considered by the Energy Northwest General Counsel who shall consider all facts and issues, and shall issue a final decision on behalf of Energy Northwest. If the aggrieved party appeals the decision, then the subsequent determination by the Energy Northwest General Counsel shall be final and conclusive. The notice shall be provided to Energy Northwest General Counsel at Kootenai Building, MD 1020, 76 North Power Plant Loop, Richland, Washington 99354; Attention: Esther Andrews, SVP/Chief Compliance Officer

(509) 377-6020.

F. Strict Compliance: Strict compliance with these protest procedures is essential in furtherance of the public interest. Any aggrieved party that fails to comply strictly with these protest procedures is deemed, by such failure, to have waived and relinquished forever any right or claim with respect to alleged irregularities in connection with the solicitation or award of the Contract.

RFP SECTION II

PROPOSAL SUBMISSION FORMAT AND CONTENT

In order to facilitate evaluation of Bidders proposal, Energy Northwest requires that Bidder responses be formatted to the following outline. Failure to comply with this format and omission of the requested content may be cause for Bidders proposal rejection without consideration.

A. MANDATORY QUALIFICATIONS

1. The following are mandatory requirements and will be evaluated on a pass/rejection basis. Failure to meet any mandatory requirement will result in automatic rejection of proposal.

a. Bidder has attended the mandatory site visit.

b. Bidder has completed and signed the signed Cost Proposal Form.

c. Pursuant to chapter 5.50 RCW verifying under penalty of perjury, the Bidder shall complete, sign and submit the Exhibit “A” - Certification of Compliance with Wage Payment Statutes with the RFP Documents.

d. Declare on the Cost Proposal Form, Bidder’s current certificate of registration number as a contractor in compliance with RCW §39.04.350 (RCW 18.27 general contractor, RCW 18.106 plumbing, RCW 70.87 elevator), which must be in effect at the time of RFP due date.

e. Bidder shall submit a Firm Fixed Price table itemizing the Total Proposal Price.

B. COMMERCIAL QUALIFICATIONS (RESPONSIBLE)

All items will be evaluated on a yes/no basis. Consistent with scoring methodology, a “yes” response will receive three points and a “no” response will receive one point.

1. Pursuant to RCW §39.04.350, Bidder must meet the following Bidder responsibility criteria to be considered a responsible Bidder. Bidder shall:

a. Declare on the Cost Proposal Form, Bidder’s current certificate of registration number as a contractor in compliance with RCW §39.04.350 (RCW 18.27 general contractor, RCW 18.106 plumbing, RCW 70.87 elevator), which must be in effect at the time of RFP due date.

b. Declare on the Cost Proposal Form, Bidder’s current Washington Unified

Business Identifier number.

c. Declare on the Cost Proposal Form, the Bidder has Industrial Insurance

(workers’ compensation) coverage for the Bidder’s employees working in Washington State, as required in Title 51 RCW.

d. Declare on the Cost Proposal Form, the Bidder has a Washington Employment Security Department number, as required in Title 50 RCW.

e. Declare on the Cost Proposal Form, the Bidder has a Washington Department of Revenue state excise tax registration number, as required in Title 82 RCW.

f. Declare on the Cost Proposal Form, Bidder has not been disqualified from performing Work on any state or federal contracts as detailed in RCW §39.12.065 (3).

Note: If yes, Bidder shall submit information on previous Contracts in which they were disqualified.

g. Declare on the Cost Proposal Form, Bidder has received Prevailing Wage and

Public Works training or is exempt. Use the web address below to learn more about Contractor Training.

h. Declare on the Cost Proposal Form, Bidder has not been found out of compliance with apprenticeship utilization requirements.

C. COMMERCIAL QUALIFICATIONS (RESPONSIVE & QUALIFIED)

2. Pursuant to RCW §39.04.350 (2), responsive and qualified Bidder shall provide the following supplemental Bidder’s data for proposal evaluation. Bidder shall:

a. Declare on the Cost Proposal Form, the Bidder has thoroughly reviewed the specifications, laws and ordinances governing the Work contemplated.

b. Declare on the Cost Proposal Form, Bidder has performed similar Work for a nuclear power generating facility.

c. Declare on the Bid Form, Bidder has thoroughly reviewed the requirements of the Inflation Reduction Act.

d. Declare on the Bid Form does, Bidder have a record of Nuclear Regulatory Commission (NRC) violations.

i. If the Bidder does have violations, Bidder shall submit on a separate document these violations. This document shall include but not limited to.

ii. Dates,

iii. Descriptions,

iv. Corrective actions,

v. Status.

vi. In the case of Bidder having NRC violations, failure to provide this document may result in the bid being deemed non‑responsive.

e. Bidder shall submit a completed 2026 W-9 form.

f. Declare on the Cost Proposal Form if Bidder has submitted exceptions to Energy Northwest’s Appendix “D” – General Provisions. Energy Northwest will not engage in a lengthy negotiation of the General Provisions. Extensive or material exceptions will result in Bidder’s proposal being declared non-responsive. Exceptions thereto must be clearly defined in “track changes” in the MS WORD documents (Appendix “D”) supplied by Energy Northwest.

Any exception taken must have a comment in the document describing why the exception is being submitted.

g. Declare on the Bid Form, Bidder has previously negotiated terms with

Energy Northwest in which they intend to utilize in the course of this Work. If previously negotiated terms are already in place, mark “No” on the Bid Form for above question and “Yes” on the Bid Form for this question.

D. TECHNICAL QUALIFICATIONS

Evaluators will assign a raw score from 0 to 5 for each technical evaluation criterion.

Scores will reflect the demonstrated quality, completeness, clarity, and responsiveness of Bidder’s proposal to the requirements outlined in RFP Section I.

1. Pursuant to RCW §43.52.565, technical qualifications reflect factors other than price.

a. Equivalent experience: Bidder shall submit a minimum of three recent or current customers (nuclear power generating facilities, or Federal Government projects (Department of Defense, Department of Energy, Corps of Engineers, or other Utilities) where similar Work was performed. Include the following:

i. Customer name

ii. City and State

iii. Contact person(s)

iv. Phone number and email address

v. Date work was performed

b. Key Personnel: Provide the names and resumes of the actual supervisors that will be assigned to this maintenance work. The Energy Northwest team wants commitment and predictability from the Bidder that the listed supervisors will be onsite to direct the Work.

c. Means and Methods: Provide a preliminary approach and schedule for the maintenance work described in this RFP. Outline may include: planning and preparation, work order reviews, work order walkdowns, mobilization, in-processing, implementation, performance, contingency, completion, reporting and exit.

d. Tool List: Provide a tool list for the Work described in the RFP documents. Tool cost must be accounted for in Bidder’s price.

e. Occupational Safety & Health Administration (OSHA) Statistical Report: Bidder shall submit the completed OSHA safety statistics report, Exhibit “B”, showing Bidder safety performance for the past five years. This report should only include statistics for the business division of Bidder’s company that will be performing Work at Columbia. If the Bidders’ company is not required to report to OSHSA per OSHA standards 1904.1(a) (1), the Bidder shall identify this on Exhibit “B”, failure to properly identify this on Exhibit “B” could deem the Bidder as unresponsive.

Note: If Bidder’s Experience Modification Rate (EMR) or Total Recordable Incident Rate (TRIR) rating exceeds 1, their Bid may be removed from consideration upon further evaluation by Energy Northwest’s Industrial Safety department. This evaluation will review the data and weigh it against other criteria (experience, previous successful work performed, number of workers/hours worked, etc.).

f. Project Schedule: Bidder shall submit a Level 1 project schedule. Schedule shall detail activities to be performed by the Contractor containing mobilization, training, walk downs, field implementation, and demobilization.

g. Proposed Subcontractors: Proposer shall complete and submit the Proposed Subcontractor form, Exhibit “C”, indicating the Subcontractors who may perform any portion of the Work. Subcontractors may be limited to the amount of scope and value and must be registered to work in the State of Washington and meet the same requirements as the Contractor.

h. Declare on the Bid Form, Bidder has submitted a sample Site-Specific Safety and Health Plan (SSSHP).

At a minimum, the SSSHP shall address the following items:

I. Safety roles, responsibilities and expectations for employees and

Subcontractors.

II. Safety orientation process. How will the Bidder train their personnel to Energy Northwest standards and expectations?

III. Proactive steps to prevent injuries (including walkdowns, observations, using Human Performance (HU) tools such as Take 2, Job Hazard Analysis/Job Safety Analysis).

IV. Safety event and near miss reporting and documentation (follow ISPM- 1, document on Contractor’s forms, complete Condition Reports).

V. Process for pre-job briefs, Take 2 and HU tools to be used.

VI. Process for safety inspections and supervisor and peer safety observations and coaching.

VII. Process for implementation of industrial safety operating experience and lessons learned.

VIII. Process for working on or near asbestos, lead, Polychlorinated Biphenyls (PCB), silica and other health hazards.

IX. Critical work processes requiring Lock Out Tag Out, fall protection, confined space, hot work and high hazard lifts (and other Industrial Safety high risk activities).

D. TOTAL PROPOSAL PRICE

1. Proposals shall be submitted on the Cost Proposal Form in Appendix “B”. Any submittals or data which may be required by the RFP Documents to support a Bid shall be attached to the Cost Proposal Form. The Cost Proposal Form must be properly executed; all blanks must be filled in. All Proposals shall be submitted in strict compliance with the RFP Documents and the technical and commercial requirements contained herein. Proposals which do not comply with these requirements, or which contain or are conditioned upon different terms provided by the Bidder may be rejected.

Any Proposal which attempts to disclaim liability for the Bidder's negligence or to disclaim liability for damage, which arises from Bidder’s acts to person or property, may be deemed a non-responsive Proposal.

Bidder shall specifically identify by paragraph and page number and describe in detail in its Proposal each variation or departure from the RFP Document. If, in Energy Northwest's opinion, the Proposal contains material variations in or departures from the commercial terms or functional design requirements, it may be rejected as being non-responsive.

2. Prevailing wage requirements:

a. Labor provided for Work at Columbia is subject to Washington State prevailing wage requirements. Prevailing wage rates can be found on the LNI website at the following address:

https://lni.wa.gov/licensing-permits/public-works-projects/prevailing-wage-rates/

b. It shall be the sole legal and contractual obligation of the Bidder to determine the correct labor categories and wage rates when preparing its proposal for this Work as of the effective date of September 1, 2026, and if necessary, contact Labor & Industries’ (L&I) Industrial Statistician for information.

i. Labor provided under any Contract awarded hereunder is subject to

Washington State prevailing wage rates. The Bidder awarded this Work must file an intent to pay and affidavit of wages paid as required by RCW §39.12.040 and Washington Administrative Code (WAC) §296-127-026. Pursuant to L&I Law Booklet, sole proprietors must file the intent and affidavit. There is no exemption from the requirement to file the forms. Prevailing wage rates can be found on the Washington State Department of L&I website at the following address.

ii. Note: False filings of forms may result in penalties and sanctions under RCW §39.12.050. Failure to pay appropriate wages may result in penalties and sanctions under RCW §39.12.065. Energy Northwest will not be liable for any resulting difference in prevailing wages paid by the Contractor or Subcontractors.

https://lni.wa.gov/licensing-permits/public-works-projects/prevailing-wage-rates/

c. Pursuant to chapter 39.12 RCW, Contractor shall submit certified payroll reports at least once a month to L&I using the L&I online system.

E. GENERAL PRESIDENTS' PROJECT MAINTENANCE AGREEMENT

General Presidents' Project Maintenance Agreement (GPPMA) is used at Columbia for Energy Northwest personnel. Bidder shall maintain labor harmony with local trade unions.

RFP SECTION III

STATEMENT OF WORK

A.1 INTRODUCTION

A. Energy Northwest, a joint operating agency and municipal corporation in the State of Washington, operates Columbia Generating Station (Columbia), a nuclear power generating facility.

B. The Circulating Water (CW) Expansion Joint (EJ) 1A, 1B, and 1C are being replaced during Refuel Outage 28 starting in April 2027.

A.2 SCOPE OF WORK

A. The scope of work is intended to give an overview of the Work and is not inclusive of all the Work necessary to complete the project.

B. The Site location is 76 North Power Plant Loop, Richland, WA 99354, a nuclear power generating facility. The Work shall be performed both outside the Protected Area of Columbia.

C. The Circulating Water Pumps (CWPs) will not be in operation during the refueling outage work window, and water conditions are expected to be static. A Plant Service Water (TSW) pump may be operated as necessary to support outage activities. Energy Northwest will coordinate work activities to minimize personnel exposure to areas adjacent to operating pumps during the outage.

D. Remove and install three EJs for CW-EJ-1A, 1B, and 1C.

1. The EJs are 90 inches in diameter and are installed between the CWPs and the main CW Valves (V). To maintain system integrity, the circulating water basins will remain flooded throughout the work period. Accordingly, all activities associated with the removal, replacement, and installation of the EJs shall be performed underwater.

2. Contractor’s divers shall enter the Circulating Water Basin (CWB) to perform the removal of the existing nuts and bolts that are attaching the EJs to the flange. Each EJ is attached to a flange by 136 studs with a nut at each end of the stud. The studs are expected to be torqued to no greater than 250 lbs.

3. Contractor shall use a HYTORC torque/tensioning system to release bolt tension and facilitate removal of the existing bolting. As Energy Northwest will replace all existing nuts and bolts with new hardware during reassembly, there is no requirement to preserve or reuse the existing bolting.

4. Upon removal of the expansion joints from the associated flanges, Contractor shall rig and lift each expansion joint from the CWB and place it onto a flatbed truck for transport to the designated warehouse location. All rigging activities shall be performed by Contractor under the direction and oversight of qualified Energy Northwest rigging personnel.

5. During the period in which expansion joints CW-EJ-1A,1B, and 1C are removed, Contractor shall provide and operate an underwater video camera system to support observation and recording of adjustments performed on CW- V-1A,1B, and 1C.

6. Contractor shall maintain a contingency capability to deploy personnel and equipment into the CW piping downstream of the isolation valves to visually monitor the inlet side of valve CW-V-1B during valve adjustment activities. The contingency plan shall provide for continuous observation and documentation of valve movement and condition for a period of up to eight hours.

A.3 SCHEDULE OF WORK

A. The Parties will coordinate the actual start date(s). The actual dates are subject to change based on Columbia’s Refuel Outage schedule.

B. Contractor personnel should expect 40 hours of in-processing time, working four, 10-hour shifts.

C. Online and Non-Refuel Outage work hours: Contractor personnel are expected to work four, 10-hour shift work schedule. Columbia’s non-outage work schedule is Monday-Thursday dayshift from 0600 to 1630. times and workdays may be adjusted to meet project needs or deadlines. Contractors shall provide enough supervisors for all work performed at Columbia (PPM-1.4.7, available upon request). The start and end times of shifts shall be coordinated and accepted by the Parties.

D. Refuel Outage work hours: Contractor shall provide enough personnel to work 24 hours per day, rotating in a 6-day, 12-hour shift work schedule. Contractor shall provide enough qualified personnel to properly man this schedule as well as adequate coverage for days off. Contractor shall provide enough supervisors for all work performed at Columbia (PPM-1.4.7). The start and end times will be coordinated and accepted by the Parties.

A.4 DRAWINGS

A. Electronic drawings will be supplied for the Contractor's use. Contact the Technical Representative or designee for the drawing files.

B. Contractor shall use Energy Northwest drawings to delineate any sub fabrication on the drawings. The drawing(s) should be submitted to the Technical Representative or designee prior to start of fabrication to ensure the Parties agree on what is being fabricated.

C. Submit any details for review and approval that differ from those details which are provided on the drawings. All requested changes to the design shall be approved by the Technical Representative or designee prior to those changes taking place.

A.5 REFERENCES AND ATTACHMENTS

References and attachments are available upon request. Contact the Technical Representative or designee for the electronic files.

A.6 WORK ORDER INSTRUCTIONS

A. Work performed at Energy Northwest is through the workorder process. Contractor will be required to read and follow workorder instructions prepared by Energy Northwest. The workorder instructions will be provided to the Contractor prior to the Work needing to be performed. Contact the Technical Representative for workorder instructions.

B. Contractor’s onsite supervisor is responsible to review each workorder task assigned to the Work and make edits as necessary.

C. Contractor’s onsite supervisor shall agree and confirm that the Work can be performed as included in each workorder. Contractor’s onsite supervisor shall sign off on each workorder task prior to starting any Work.

D. Contractor shall ensure personnel are signed off any impairment or clearance order associated with the Work and that all paperwork is closed out in a timely manner. During Refuel Outages these actions shall be completed within 24 hours of job completion.

A.7 ENERGY NORTHWEST’S RESPONSIBILITIES

A. Supply overhead crane and crane operator.

B. Closeout all documentation and Work packages (with the assistance of the Contractor).

C. Post job report format and criteria 15 day prior to the end of the scheduled work.

D. Provide site drawings at Contractors request.

E. Provide site procedures at Contractors request.

F. Provide three Hytorc machines ( two can be used at the same time).

G. Provide high pressure Hytorc hoses.

H. Provide special wrench heads to break bolts loose (multiple sizes).

I. Provide Hytorc heads available through Columbia’s clean tool crib.

J. Provide Hytorc machine hydraulic oil.

K. Provide Hytorc nut buster.

L. Provide new nuts and bolts for the installation of the EJs.

M. Provide flatbed trailer for the placement of the EJs

N. Provide transport of EJs to Energy Northwest warehouse.

O. Supply a tri-pod unit for emergency evacuation of personnel.

A.8 CONTRACTOR’S RESPONSIBILITIES

A. Submit a detailed dive plan and emergency plan seven days after contract award.

B. All tools and equipment to safely dive into the water.

a. Approved duct tape or equivalent fastening materials as necessary to secure hoses, cables, and other work-related equipment during performance of the Work.

b. Rope for securing hoses.

c. Provide calibrated ultrasonic wall thickness measurement equipment specifically designed and rated for underwater service to obtain wall thickness readings. Instruments shall be suitable for the intended application and have current calibration documentation available upon request.

d. Provide underwater video and photographic equipment capable of documenting the condition of expansion joints CW-EJ-1A,1B, and 1C, as well as capturing photographs and video of any underwater conditions, components, or anomalies identified by the Technical Representative or designee.

C. Provide details of the underwater communication equipment and radios to be used for communications between divers and the dive trailer. Equipment specifications shall be submitted to the Technical Representative or designee prior to commencement of diving activities.

D. Any chemicals, solvents, cleaners, coatings, or other substances supplied by the

Contractor for use in the performance of the Work shall be submitted to the Technical Representative or designee for review and approval prior to being brought on site or used.

A.9 CONTRACTOR’S DELIVERABLES

A. Contractor shall complete the work in accordance with the Contract documents.

B. Contractor shall provide a complete construction schedule to the Technical Representative or designee.

C. Submit a detailed project schedule no less than 90 days prior to Work starting.

D. Prior to the first payment the Contractor shall provide the required prevailing wage intent and performance and payment bond to Melinda Soto at mjsoto@energy-

E. Prior to any Invoice approval the Contractor shall provide the required Inflation Reduction Act (IRA) documentation to Melinda Soto at mjsoto@energy-

F. Prior to Final Payment Contractor shall submit the prevailing wage affidavit to the Melinda Soto at mjsoto@energy-northwest.com. This document shall verify mailto:mjsoto@energy-northwest.com mailto:mjsoto@energy-northwest.com compliance with Washington State labor laws and ensure that all wages paid under the Contract reflect the prevailing wage standards applicable to the scope of work.

A.10 QUALITY ASSURANCE

A. Contractor shall be familiar with all features of the job site that may affect the execution of the Work. It is the expectation of Energy Northwest that all Contractors perform at or exceed industry standards and uphold all the safety standards.

B. All activities performed by the Contractor on Energy Northwest property shall be subject to the Quality Assurance (QA) requirements of Energy Northwest.

C. Hold points and inspection points noted in work orders are times in the Work process that Work must stop until and inspection is complete and the inspector has approved the Work. If the inspector approves the Work, the Work can continue. If the inspector does not approve the Work, the Work will need to be stopped and repaired.

D. Contractor is responsible for all costs associated with delays not specifically allowed in this document and costs to remediate a condition not caused by Energy Northwest.

Examples include; time necessary to obtain chemical permits for chemicals not previously identified by the Contractor, material procurement, and delays and costs associated with hazardous waste spills such as hydraulic fluid to the ground.

RFP SECTION IV

COST PROPOSAL FORM

(Do not modify the form)

NAME OF BIDDER:

(Full Legal Company Name)

NOTE: ALL SECTIONS MUST BE FILLED IN.

Mandatory Qualifications YES NO

Bidder has attended the mandatory site visit?

Bidder has completed and signed the Cost Proposal Form?

Bidder has submitted the completed and signed Exhibit “A” - Certification of Compliance with Wage Payment Statutes?

Current certificate of registration number as a contractor:

Bidder shall submit a Firm Fixed Price table itemizing the Total Proposal Price.

Commercial Qualifications (Responsible) YES NO

Certificate of registration number is in compliance

Washington State Unified Business Identifier (UBI) number:

Bidder has Industrial Insurance (workers’ compensation) coverage for the Bidder’s employees working in Washington?

Washington Employment Security Department number:

Revenue state excise tax registration number:

Bidder has not been disqualified from performing work on any state or federal contract?

Bidder has completed the required Contractor Training or is exempt?

Bidder has reviewed and acknowledged the Washington State Apprentice Utilization

Requirement language and has not been found out of compliance?

Commercial Qualifications (Responsive & Qualified) YES NO

Bidder has thoroughly reviewed the specifications, laws and ordinances governing the

Work contemplated?

Bidder can perform the Work by the required completion date?

Bidder has performed similar Work for a nuclear power generating facility?

Bidder has thoroughly…