RFP 47PM0024R0004 Title V Emissions - Boiler Tuning Services.pdf

PDF 6 MB Posted

Attached to
Title V Emission and Boiler Tuning Services Federal contract opportunity
Solicitation number
47PM0024R0004
Issued by
General Services Administration Public Buildings Service National Capital Region

About this file

This request for proposal solicits Title V emissions and boiler tuning services. The General Services Administration Public Buildings Service National Capital Region seeks these services for the Central Heating and Refrigeration Plant located in Washington, D.C. The contractor must provide relative accuracy test audits, preventative maintenance including linearity testing and opacity monitoring, and annual boiler tuning to comply with Clean Air Act and other environmental regulations. The base period of performance is April 1, 2024 through March 31, 2025 with four optional one-year extensions. Pricing is fixed for the initial and option years. Proposals are due by January 29, 2024 with award anticipated thereafter.

View the file

Other files for this federal contract opportunity

Other files attached to Title V Emission and Boiler Tuning Services, newest first.
File Type Posted
Solicitation Amendment 47PM0024R0004_0003 2024 02 08.pdf PDF
Solicitation Amendment 47PM0024R0004_0002 2024 01 23.pdf PDF
Solicitation Amendment 47PM0024R0004_0001 2024 01 19.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NUMBER: 47PM0024R0004

SERVICE: Title V Emissions and Boiler Tuning Service Contract

LOCATION(S): Central Heating & Refrigeration Plant (CHRP) Heating Operation & Transmission Division (HOTD): 325 13th Street, SW Washington, DC 20024

PERIOD OF PERFORMANCE:

Base - April 1, 2024, through March 31, 2025 Option I – April 1, 2025, through March 31, 2026 Option II – April 1, 2026, through March 31, 2027 Option III – April 1, 2027, through March 31, 2028 Option IV – April 1, 2028, through March 31, 2029

SOLICITATION ISSUE DATE: December 22, 2023 OFFER RECEIPT DATE/TIME: January 29, 2024, 1:00 PM EST

NCR Title V Emissions and Boiler Tuning Services Contract Specification Central

Heating & Refrigeration Plant (CHRP) Heating Operation Transmission Division

(HOTD)

A. SOLICITATION/CONTRACT FORM

A.1 STANDARD FORMS

Refer to the attached SF 1449, Solicitation/Contract/Order for Commercial Items. Complete and return the SF 1449 with your price proposal. Please find the SF1449 after this page.

A.1.1 Interpretation The captions or headings in this RFP are strictly for convenience and shall not be considered in interpreting this RFP and the resulting Contract. Words in this RFP that import the singular connotation shall be interpreted as plural, and words that import the plural connotation shall be interpreted as singular, as the identity of the parties or objects referred to may require. The words “include”, “includes”, and “including” mean include, includes, and including “without limitation” and “without limitation by specification.” The words “hereof”, “herein”, and “hereunder” and words of similar import refer to this RFP and the resulting contract as a whole and not to any particular provision of this RFP/Contract. Except as the context otherwise indicates, all references to “Attachments” and “Sections” refer to Attachments and Sections of this RFP/Contract.

A.2 Pre-Proposal Information and Activities A.2.1 Pre-Proposal Conference A Pre-Proposal Conference for Offerors will be conducted for the purpose of answering questions regarding this solicitation. Information presented by the Government at the Pre-Proposal Conference shall not constitute a change to the terms and conditions of this solicitation and/or the resulting Contract and associated specifications. The GSA shall only communicate changes to the terms of the solicitation and associated specifications in writing via amendment or modification. If an amendment is issued by the GSA, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.

A.2.2 Pre-Proposal Conference Site Visit The GSA shall conduct Site Visits for the benefit of Offerors. Site Visits will enable Offerors to examine site conditions. Site Visits will be offered over a one-day period according to the following schedule: Thursday, January 10, 2024, by 10:00am EST. Offerors shall submit the name, phone number, and employer of each Site Visit participant, not to exceed three (3) visitors per company, to Mrs. Ingrid Blair, Contracting Officer, at Ingrid.blair@gsa.gov on Monday, January 8, 2024 by 2:00 PM EST. Offerors shall coordinate with the designated Government representative regarding parking, security screening, and any other such details and requirements. Said representative shall be assigned at a later date; Offerors will be notified.

Offerors shall wear steel closed-toe shoes and full-length pants during the Site Visit; loose fitting clothing (e.g., ties, scarves) is prohibited.

A.2.3 Requests for Information Offerors shall submit any and all questions regarding the site visit for this solicitation in the form of Requests for Information (RFIs). Offerors shall submit RFIs in writing only to Ingrid Blair, Contracting Officer, at Ingrid.blair@gsa.gov. GSA will post all RFIs, and respective responses will be posted in writing under this solicitation on the SAM.gov under the contract opportunities. All questions shall be submitted no later than January 15, 2024 by 2:00 PM EST.

mailto:Ingrid.blair@gsa.gov

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

RFQ IFB RFP

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NAICS:

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8 (A)

EDWOSB

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

47PM0024R0004, Standard Form Page 2

EQWPSA-24-0002 15

47PM0024R0004

Ingrid Blair (202) 379-8333

WPH1B 100

WPH1B

GSA, PBS R11 Office of Acquisition Building Services Division (BSD) 1800 F St. NW, 4th Floor Washington, DC 20405

Washington, DC 20405 USA

See below for additional information

Please see attached

Ingrid Blair

561210

GSA, PBS R11 Office of Acquisition Building Services Division (BSD) 1800 F St. NW, 4th Floor Washington, DC 20405 USA

GSA, PBS R11 Office of Acquisition Building Services Division (BSD) 1800 F St. NW, 4th Floor Washington, DC 20405

WPH1B

STANDARD FORM 1449 (REV. 2/2012) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE 42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

47PM0024R0004, Standard Form Page 3

PAGE

GENERAL SERVICES ADMINISTRATION

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f) services to complete the Relative Accuracy Test Audit in and supervision to perform a Relative Accuracy Test Audit

PoP: 04/01/2024 - 03/31/2025

When the CHRP can coordinate release of more than one boiler

PoP: 04/01/2024 - 03/31/2025

Services including all of the necessary labor, equipment, PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS boiler. The audit shall include NOx, CO, and O2. (price up and tear-down for performance of Relative Accuracy Test mobilization). The contractor shall provide professional

Contract Type: Firm Fixed Price mobilization - Base Year

Contract Type: Firm Fixed Price

Deliverable include NOx, CO, and O2. (price based on single boiler per stack emissions monitoring equipment of one additional

Preparation, travel to and from CHRP, travel expenses, set

Regulations, Title 40 Part 60 and Part 75. The audit shall

RATA Testing, single boiler - Base Year

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

Discounted price for additional RATA tests on a single EA

EA

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

statement of work (SOW) dated 10/5/2023.

labor, equipment, and supervision to perform a RATA on the

Mobilization & Demobilization for RATA - Base Year

20003

Deliverable

Deliverable single boiler at the CHRP as specified in Code Of Federal the Relative Accuracy Test Audit in accordance with the shall furnish at a discounted rate all of the necessary

20407-0001

(RATA) on the stack emissions monitoring equipment of a contractor shall provide professional services to complete

10/05/2023.

EA

20407-0001 accordance with the statement of work (SOW) dated 10/5/2023.

Place of Performance: 13TH & C STS SW WASHINGTON, DC for testing during a single mobilization, the contractor

Place of Performance: 13TH & C STS SW WASHINGTON, DC

Contract Type: Firm Fixed Price based on a second or third RATA test per mobilization). The

Audits in accordance with the statement of work (SOW) dated

47PM0024R0004, Standard Form Page 4

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

EA

testing visit. Additional site visits in a quarter are

20407-0001 statement of work dated 10/5/2023.

Perform quarterly on stack opacity lens audits for all 6

Contract Type: Firm Fixed Price

Place of Performance: 13TH & C STS SW WASHINGTON, DC

Deliverable

20407-0001

EA

calendar quarter billed on the date of primary linearity troubleshooting, and repair services in accordance with the

Quarterly Opacity Monitor Audits Base Yr

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

20407-0001 boiler CEMS for NOx, CO, and O2. Flat, fixed rate per with the statement of work dated 10/5/2023.

Place of Performance: 13TH & C STS SW WASHINGTON, DC

Quarterly preventive maintenance and linearity testing for 6

PoP: 04/01/2024 - 03/31/2025 maintenance, linearity testing, opacity testing, emergency

Deliverable

Place of Performance: 13TH & C STS SW WASHINGTON, DC visits in a quarter are mobilization fee only in accordance

Contract Type: Firm Fixed Price

PoP: 04/01/2024 - 03/31/2025

20407-0001

Mobilization/Demobilization to perform quarterly preventive work dated 10/5/2023.

Quarterly Linearity Testing Base Year

PoP: 04/01/2024 - 03/31/2025 the date of primary opacity testing visit. Additional site

Place of Performance: 13TH & C STS SW WASHINGTON, DC

Contract Type: Firm Fixed Price

EA

Mobilizations to HOTD for Linearity Testing - Base Year

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

mobilization fee only in accordance with the statement of

EA

Deliverable boiler COMS. Flat, fixed rate per calendar quarter billed on

PoP: 04/01/2024 - 03/31/2025

Off Stack, Clear Stack Opacity Monitor Audits Base Yr

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

47PM0024R0004, Standard Form Page 5

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

Each contract period (year) is based on ten (10) days for

The contractor shall provide material, equipment, manpower, Contract Type: Firm Fixed Price

20407-0001 description herein and in the SOW dated 10/5/2023.

Boiler Tuning Services - Base Year

Place of Performance: 13TH & C STS SW WASHINGTON, DC

Audits in accordance with the statement of work (SOW) dated based on a tri-annual requirement schedule to be completed boilers are operating on ultra-low sulfur diesel fuel oil.

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

Place of Performance: 13TH & C STS SW WASHINGTON, DC the tasks (boiler/fuel/report) completed from the

LS

PoP: 04/01/2025 - 03/31/2026 combustion analysis on each of the six (6) boilers while the up and tear-down for performance of Relative Accuracy Test boiler COMS on units 1, 2, 3, 4, 5, and 6. This task is are operating on natural gas, and boiler tuning and/or

Deliverable

PoP: 04/01/2024 - 03/31/2025

(one for each boiler on each fuel). Invoicing shall reflect

Contract Type: Firm Fixed Price

Preparation, travel to and from CHRP, travel expenses, set

20407-0001

Perform off stack, clear stack opacity lens audits for

Contract Type: Firm Fixed Price

10/5/2023.

day, (8 regular hours and 2 overtime hours), plus 12 reports analysis on each of the six (6) boilers while the boilers

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

Mobilization & Demobilization for RATA - Opt 1

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

EA

and supervision to perform boiler tuning and/or combustion

Deliverable completion in accordance with the statement of work dated

Place of Performance: 13TH & C STS SW WASHINGTON, DC site visits of a two (2) man crew for ten (10) hours per

PoP: 04/01/2024 - 03/31/2025

Deliverable

20407-0001

10/05/2023.

in calendar year 2024. To be billed per stack upon

47PM0024R0004, Standard Form Page 6

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

When the CHRP can coordinate release of more than one boiler

PoP: 04/01/2025 - 03/31/2026 mobilization). The contractor shall provide professional

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

boiler. The audit shall include NOx, CO, and O2. (price

Contract Type: Firm Fixed Price

Deliverable

Services including all of the necessary labor, equipment, mobilization - Opt 1 include NOx, CO, and O2. (price based on single boiler per

Deliverable stack emissions monitoring equipment of one additional statement of work dated 10/5/2023.

Discounted price for additional RATA tests on a single

20407-0001

RATA Testing, single boiler - Opt 1

EA

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

Regulations, Title 40 Part 60 and Part 75. The audit shall statement of work (SOW) dated 10/5/2023.

labor, equipment, and supervision to perform a RATA on the troubleshooting, and repair services in accordance with the

Place of Performance: 13TH & C STS SW WASHINGTON, DC

Deliverable the Relative Accuracy Test Audit in accordance with the single boiler at the CHRP as specified in Code Of Federal shall furnish at a discounted rate all of the necessary

20407-0001 maintenance, linearity testing, opacity testing, emergency

PoP: 04/01/2025 - 03/31/2026 contractor shall provide professional services to complete

EA

Place of Performance: 13TH & C STS SW WASHINGTON, DC

Mobilization/Demobilization to perform quarterly preventive

(RATA) on the stack emissions monitoring equipment of a accordance with the statement of work (SOW) dated 10/5/2023.

for testing during a single mobilization, the contractor services to complete the Relative Accuracy Test Audit in

EA

Contract Type: Firm Fixed Price based on a second or third RATA test per mobilization). The

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

Mobilizations to HOTD for Linearity Testing - Opt 1 and supervision to perform a Relative Accuracy Test Audit

47PM0024R0004, Standard Form Page 7

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

Perform quarterly on stack opacity lens audits for all 6

Contract Type: Firm Fixed Price calendar quarter billed on the date of primary linearity

Deliverable

11021

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

(one for each boiler on each fuel). Invoicing shall reflect are operating on natural gas, and boiler tuning and/or

Place of Performance: 13TH & C STS SW WASHINGTON, DC

EAQuarterly Opacity Monitor Audits Opt 1 boiler CEMS for NOx, CO, and O2. Flat, fixed rate per

20407-0001 with the statement of work dated 10/5/2023.

day, (8 regular hours and 2 overtime hours), plus 12 reports analysis on each of the six (6) boilers while the boilers

PoP: 04/01/2025 - 03/31/2026

20407-0001

Deliverable

Quarterly preventive maintenance and linearity testing for 6

Place of Performance: 13TH & C STS SW WASHINGTON, DC visits in a quarter are mobilization fee only in accordance site visits of a two (2) man crew for ten (10) hours per and supervision to perform boiler tuning and/or combustion work dated 10/5/2023.

Contract Type: Firm Fixed Price

PoP: 04/01/2025 - 03/31/2026

LS

Quarterly Linearity Testing Opt 1 the date of primary opacity testing visit. Additional site

Place of Performance: 13TH & C STS SW WASHINGTON, DC

Each contract period (year) is based on ten (10) days for

The contractor shall provide material, equipment, manpower, Contract Type: Firm Fixed Price

PoP: 04/01/2025 - 03/31/2026 boilers are operating on ultra-low sulfur diesel fuel oil.

mobilization fee only in accordance with the statement of boiler COMS. Flat, fixed rate per calendar quarter billed on testing visit. Additional site visits in a quarter are

Boiler Tuning Services - Opt 1

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

the tasks (boiler/fuel/report) completed from the combustion analysis on each of the six (6) boilers while the

20407-0001

EA

47PM0024R0004, Standard Form Page 8

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

2002 RATA Testing, single boiler - Opt 2

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

Mobilization & Demobilization for RATA - Opt 2

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

Regulations, Title 40 Part 60 and Part 75. The audit shall

Deliverable labor, equipment, and supervision to perform a RATA on the

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

Deliverable single boiler at the CHRP as specified in Code Of Federal

EA

shall furnish at a discounted rate all of the necessary

20407-0001

20407-0001

Deliverable

Place of Performance: 13TH & C STS SW WASHINGTON, DC

10/05/2023.

20407-0001 accordance with the statement of work (SOW) dated 10/5/2023.

(RATA) on the stack emissions monitoring equipment of a for testing during a single mobilization, the contractor

Place of Performance: 13TH & C STS SW WASHINGTON, DC

Audits in accordance with the statement of work (SOW) dated description herein and in the SOW dated 10/5/2023.

services to complete the Relative Accuracy Test Audit in

Place of Performance: 13TH & C STS SW WASHINGTON, DC and supervision to perform a Relative Accuracy Test Audit

PoP: 04/01/2026 - 03/31/2027

When the CHRP can coordinate release of more than one boiler

PoP: 04/01/2026 - 03/31/2027 mobilization). The contractor shall provide professional

Contract Type: Firm Fixed Price mobilization - Opt 2

PoP: 04/01/2025 - 03/31/2026 up and tear-down for performance of Relative Accuracy Test

Services including all of the necessary labor, equipment, EA

Preparation, travel to and from CHRP, travel expenses, set

EA

Contract Type: Firm Fixed Price include NOx, CO, and O2. (price based on single boiler per stack emissions monitoring equipment of one additional

Discounted price for additional RATA tests on a single

Contract Type: Firm Fixed Price

47PM0024R0004, Standard Form Page 8

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

PoP: 04/01/2026 - 03/31/2027 maintenance, linearity testing, opacity testing, emergency

PoP: 04/01/2026 - 03/31/2027

Deliverable

Quarterly preventive maintenance and linearity testing for 6

Mobilization/Demobilization to perform quarterly preventive visits in a quarter are mobilization fee only in accordance

20407-0001

EA

contractor shall provide professional services to complete

Contract Type: Firm Fixed Price

Contract Type: Firm Fixed Price work dated 10/5/2023.

Quarterly Linearity Testing Opt 2 the date of primary opacity testing visit. Additional site

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

Place of Performance: 13TH & C STS SW WASHINGTON, DC based on a second or third RATA test per mobilization). The

Deliverable

Mobilizations to HOTD for Linearity Testing - Opt 2

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

mobilization fee only in accordance with the statement of

EA

boiler COMS. Flat, fixed rate per calendar quarter billed on

PoP: 04/01/2026 - 03/31/2027 boiler. The audit shall include NOx, CO, and O2. (price testing visit. Additional site visits in a quarter are

EA

Deliverable

20407-0001 statement of work dated 10/5/2023.

Perform quarterly on stack opacity lens audits for all 6

Contract Type: Firm Fixed Price calendar quarter billed on the date of primary linearity troubleshooting, and repair services in accordance with the

Quarterly Opacity Monitor Audits Opt 2 statement of work (SOW) dated 10/5/2023.

20407-0001

Place of Performance: 13TH & C STS SW WASHINGTON, DC

Place of Performance: 13TH & C STS SW WASHINGTON, DC

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

boiler CEMS for NOx, CO, and O2. Flat, fixed rate per with the statement of work dated 10/5/2023.

the Relative Accuracy Test Audit in accordance with the

47PM0024R0004, Standard Form Page 10

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

Deliverable

Each contract period (year) is based on ten (10) days for

The contractor shall provide material, equipment, manpower, 10/05/2023.

20407-0001 boilers are operating on ultra-low sulfur diesel fuel oil.

(RATA) on the stack emissions monitoring equipment of a

Place of Performance: 13TH & C STS SW WASHINGTON, DC

Contract Type: Firm Fixed Price description herein and in the SOW dated 10/5/2023.

Boiler Tuning Services - Opt 2

Audits in accordance with the statement of work (SOW) dated

Place of Performance: 13TH & C STS SW WASHINGTON, DC and supervision to perform a Relative Accuracy Test Audit the tasks (boiler/fuel/report) completed from the

PoP: 04/01/2027 - 03/31/2028

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

(one for each boiler on each fuel). Invoicing shall reflect combustion analysis on each of the six (6) boilers while the up and tear-down for performance of Relative Accuracy Test

PoP: 04/01/2026 - 03/31/2027

Services including all of the necessary labor, equipment, Contract Type: Firm Fixed Price are operating on natural gas, and boiler tuning and/or

Deliverable

Preparation, travel to and from CHRP, travel expenses, set

20407-0001

LS __________

EA

Contract Type: Firm Fixed Price

EA

day, (8 regular hours and 2 overtime hours), plus 12 reports

RATA Testing, single boiler - Opt 3

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

Mobilization & Demobilization for RATA - Opt 3 site visits of a two (2) man crew for ten (10) hours per

Place of Performance: 13TH & C STS SW WASHINGTON, DC analysis on each of the six (6) boilers while the boilers

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

and supervision to perform boiler tuning and/or combustion

Deliverable single boiler at the CHRP as specified in Code Of Federal

20407-0001

PoP: 04/01/2026 - 03/31/2027

47PM0024R0004, Standard Form Page 11

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f) based on a second or third RATA test per mobilization). The

When the CHRP can coordinate release of more than one boiler

PoP: 04/01/2027 - 03/31/2028

Mobilizations to HOTD for Linearity Testing - Opt 3

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

mobilization - Opt 3

Deliverable mobilization). The contractor shall provide professional

103011 boiler. The audit shall include NOx, CO, and O2. (price

Contract Type: Firm Fixed Price

Deliverable

20407-0001 stack emissions monitoring equipment of one additional statement of work dated 10/5/2023.

include NOx, CO, and O2. (price based on single boiler per labor, equipment, and supervision to perform a RATA on the

Discounted price for additional RATA tests on a single

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

20407-0001

EA

statement of work (SOW) dated 10/5/2023.

Place of Performance: 13TH & C STS SW WASHINGTON, DC troubleshooting, and repair services in accordance with the

Regulations, Title 40 Part 60 and Part 75. The audit shall

Place of Performance: 13TH & C STS SW WASHINGTON, DC

Deliverable the Relative Accuracy Test Audit in accordance with the shall furnish at a discounted rate all of the necessary

PoP: 04/01/2027 - 03/31/2028 maintenance, linearity testing, opacity testing, emergency

PoP: 04/01/2027 - 03/31/2028 for testing during a single mobilization, the contractor

Contract Type: Firm Fixed Price accordance with the statement of work (SOW) dated 10/5/2023.

20407-0001

EA

contractor shall provide professional services to complete

EA

Place of Performance: 13TH & C STS SW WASHINGTON, DC

Mobilization/Demobilization to perform quarterly preventive

Contract Type: Firm Fixed Price

Quarterly Linearity Testing Opt 3

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

services to complete the Relative Accuracy Test Audit in

47PM0024R0004, Standard Form Page 12

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

Perform quarterly on stack opacity lens audits for all 6

Contract Type: Firm Fixed Price completion in accordance with the statement of work dated

Quarterly Opacity Monitor Audits Opt 3 and supervision to perform boiler tuning and/or combustion

PoP: 04/01/2027 - 03/31/2028 calendar quarter billed on the date of primary linearity

Deliverable

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

in calendar year 2027. To be billed per stack upon

20407-0001

EA

The contractor shall provide material, equipment, manpower, with the statement of work dated 10/5/2023.

Contract Type: Firm Fixed Price boiler CEMS for NOx, CO, and O2. Flat, fixed rate per visits in a quarter are mobilization fee only in accordance

LS

Deliverable based on a tri-annual requirement schedule to be completed

Place of Performance: 13TH & C STS SW WASHINGTON, DC

Boiler Tuning Services - Opt 3

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

20407-0001

Quarterly preventive maintenance and linearity testing for 6 boiler COMS on units 1, 2, 3, 4, 5, and 6. This task is work dated 10/5/2023.

PoP: 04/01/2027 - 03/31/2028 the date of primary opacity testing visit. Additional site

Deliverable

Perform off stack, clear stack opacity lens audits for boiler COMS. Flat, fixed rate per calendar quarter billed on

20407-0001 mobilization fee only in accordance with the statement of

Place of Performance: 13TH & C STS SW WASHINGTON, DC

Contract Type: Firm Fixed Price

PoP: 04/01/2027 - 03/31/2028

10/5/2023.

Off Stack, Clear Stack Opacity Monitor Audits Opt 3 analysis on each of the six (6) boilers while the boilers

Place of Performance: 13TH & C STS SW WASHINGTON, DC testing visit. Additional site visits in a quarter are

EA

47PM0024R0004, Standard Form Page 13

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

10/05/2023.

20407-0001 description herein and in the SOW dated 10/5/2023.

(RATA) on the stack emissions monitoring equipment of a

Place of Performance: 13TH & C STS SW WASHINGTON, DC

Place of Performance: 13TH & C STS SW WASHINGTON, DC

Place of Performance: 13TH & C STS SW WASHINGTON, DC services to complete the Relative Accuracy Test Audit in boilers are operating on ultra-low sulfur diesel fuel oil.

Audits in accordance with the statement of work (SOW) dated the tasks (boiler/fuel/report) completed from the and supervision to perform a Relative Accuracy Test Audit

PoP: 04/01/2028 - 03/31/2029

PoP: 04/01/2028 - 03/31/2029 up and tear-down for performance of Relative Accuracy Test mobilization). The contractor shall provide professional combustion analysis on each of the six (6) boilers while the

EA

Preparation, travel to and from CHRP, travel expenses, set

PoP: 04/01/2027 - 03/31/2028

(one for each boiler on each fuel). Invoicing shall reflect

Services including all of the necessary labor, equipment, Contract Type: Firm Fixed Price

Contract Type: Firm Fixed Price include NOx, CO, and O2. (price based on single boiler per

Contract Type: Firm Fixed Price are operating on natural gas, and boiler tuning and/or

RATA Testing, single boiler - Opt 4 day, (8 regular hours and 2 overtime hours), plus 12 reports

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

Mobilization & Demobilization for RATA - Opt 4

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

Regulations, Title 40 Part 60 and Part 75. The audit shall

Deliverable

EA

site visits of a two (2) man crew for ten (10) hours per

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

Deliverable

Deliverable single boiler at the CHRP as specified in Code Of Federal

20407-0001

20407-0001 accordance with the statement of work (SOW) dated 10/5/2023.

Each contract period (year) is based on ten (10) days for

47PM0024R0004, Standard Form Page 14

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

4011 Mobilizations to HOTD for Linearity Testing - Opt 4

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

boiler. The audit shall include NOx, CO, and O2. (price

Deliverable

44012

Deliverable

PoP: 04/01/2028 - 03/31/2029 testing visit. Additional site visits in a quarter are mobilization - Opt 4 stack emissions monitoring equipment of one additional

20407-0001 statement of work dated 10/5/2023.

Contract Type: Firm Fixed Price

20407-0001 calendar quarter billed on the date of primary linearity

Discounted price for additional RATA tests on a single

Place of Performance: 13TH & C STS SW WASHINGTON, DC statement of work (SOW) dated 10/5/2023.

labor, equipment, and supervision to perform a RATA on the

Place of Performance: 13TH & C STS SW WASHINGTON, DC troubleshooting, and repair services in accordance with the

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

boiler CEMS for NOx, CO, and O2. Flat, fixed rate per the Relative Accuracy Test Audit in accordance with the

PoP: 04/01/2028 - 03/31/2029

EA

shall furnish at a discounted rate all of the necessary maintenance, linearity testing, opacity testing, emergency

PoP: 04/01/2028 - 03/31/2029

Deliverable

Quarterly preventive maintenance and linearity testing for 6

Contract Type: Firm Fixed Price

EA

Contract Type: Firm Fixed Price work dated 10/5/2023.

for testing during a single mobilization, the contractor contractor shall provide professional services to complete

Mobilization/Demobilization to perform quarterly preventive

EA

based on a second or third RATA test per mobilization). The

Quarterly Linearity Testing - Opt 4

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

Place of Performance: 13TH & C STS SW WASHINGTON, DC mobilization fee only in accordance with the statement of

When the CHRP can coordinate release of more than one boiler

47PM0024R0004, Standard Form Page 15

OF

ITEM NO.

(a)

SUPPLIES OR SERVICES

(b)

QUANTITY

ORDERED

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f) combustion analysis on each of the six (6) boilers while the

Deliverable

PoP: 04/01/2028 - 03/31/2029

(one for each boiler on each fuel). Invoicing shall reflect

20407-0001

Quarterly Opacity Monitor Audits - Opt4 are operating on natural gas, and boiler tuning and/or with the statement of work dated 10/5/2023.

Contract Type: Firm Fixed Price day, (8 regular hours and 2 overtime hours), plus 12 reports analysis on each of the six (6) boilers while the boilers and supervision to perform boiler tuning and/or combustion

4013 EA

Place of Performance: 13TH & C STS SW WASHINGTON, DC visits in a quarter are mobilization fee only in accordance

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

site visits of a two (2) man crew for ten (10) hours per

PoP: 04/01/2028 - 03/31/2029

20407-0001

Deliverable the date of primary opacity testing visit. Additional site

Each contract period (year) is based on ten (10) days for

The contractor shall provide material, equipment, manpower, 20407-0001 description herein and in the SOW dated 10/5/2023.

Boiler Tuning Services - Opt 4 boiler COMS. Flat, fixed rate per calendar quarter billed on

Contract Type: Firm Fixed Price boilers are operating on ultra-low sulfur diesel fuel oil.

PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS

Place of Performance: 13TH & C STS SW WASHINGTON, DC the tasks (boiler/fuel/report) completed from the

LS

Perform quarterly on stack opacity lens audits for all 6

47PM0024R0004, Standard Form Page 16

B. SERVICES, ORDERING AND PRICES

B.1 GENERAL

The Contractor shall provide all management, supervision, labor, materials, supplies, and equipment (except as otherwise provided), and shall plan, schedule, coordinate, and assure effective performance of all services described herein.

B.2 TRAVEL

Travel shall not be reimbursable, except as provided in the following paragraphs: The services required by this contract are expected to be within the geographic boundaries of the GSA National Capital Region (NCR). The NCR includes the District of Columbia; the city of Baltimore, the counties of Montgomery, Prince Georges, Howard, Anne Arundel, and Baltimore in Maryland; the cities of Alexandria, Falls Church, Fairfax, and Manassas, and the counties of Arlington, Fairfax, Prince William, and Loudoun in Virginia. There will be no reimbursement for travel within the GSA NCR.

Any reimbursable travel to be allowed must be authorized by the Contracting Officer (CO) in advance as a contract change order. The Contracting Officer’s Representative (COR) and the Contractor shall establish, through bilateral contract modification, the allowable travel reimbursement per visit to sites in cities or locations outside of the GSA NCR. In negotiating the fixed price for such travel, the allowable per diem cost shall not exceed the rates set forth in the Federal Travel Regulations in effect at the time that the work order is negotiated.

In addition, all travel by privately owned vehicles outside of the GSA NCR will be reimbursed on Federal Travel Regulations mileage rates.

No travel reimbursement outside of GSA/NCR will be allowed unless the Contractor provides sufficient written evidence of costs incurred, including receipts, registers or other information as may be required by the Contracting Officer’s Representative.

B.3 CONTRACT EFFECTIVE PERIOD

● Base Period: 365 days after date of award

● Option 1: 365 days after date of option exercise

● Option 2: 365 days after date of option exercise

● Option 3: 365 days after date of option exercise

● Option 4: 365 days after date of option exercise

B.4 PLACE OF PERFORMANCE

The services to be provided by this contract shall be performed at the following facility:

General Services Administration Heating Operation and Transmission Division Central Heating and Refrigeration Plant 325 13th Street, SW Washington, DC 20228

B. SERVICES, ORDERING AND PRICES

B.5 FIRM FIXED PRICE

Contractors shall quote a price for all contract line items in order to be considered for award. See Schedule C for the complete scope of services.

For the price evaluation, the Government will evaluate price proposals of offerors for award purposes by adding the total price for all options and additional services to the total price for the Base Contract. Award of options will not obligate the Government to exercise them.

B.6 ADDITIONAL SERVICES\

(a) Additional services that may be required will be procured through the issuance of contract purchase orders as requirements occur. Contract purchase orders will be issued using the GSA Form 300, titled “Order for Supplies and Services.” A GSA Form 300-A may be used for continuation sheets when necessary. Attachments forming part of each contract work order may also be used for lengthy statements of work, etc. All contract purchase orders will be priced with an appropriate fixed dollar value and indicate a performance period for the required services. The purchase order performance period may extend beyond the expiration date of the current contract effective period (The end date for either the base year or exercised option years whichever is latest). Purchase orders, and associated contract modifications, must be signed by the Contracting Officer to be valid. The SF30 will also be used to modify purchase orders when necessary.

B.7 PROPOSAL REQUIREMENTS

a. Proposals in response to this solicitation shall be submitted and evaluated based on price and qualifications/evaluation factors. Refer to Section L and Section M.

b. In the business proposal, each proposer must include a price for the initial 12-month period and for each of the four (4) option periods in order to be considered for award. Also, each Proposer must submit a proposal for each line item for the initial year and each option year.

c. Proposers shall price the option requirements for the four (4) additional option periods by assuming that the minimum hourly wages and fringe benefits established by the Administrator of the Wage and Hour Division of the United States Department of Labor for the initial 12-month period of performance will apply to the additional option periods of performance.

d. Do not include any allowance for any contingency to cover increased cost for which adjustments are pro- vided for under the “Price Adjustment” clause contained in Section I. In the event the Government exercises the option(s), the contract price(s) will be adjusted upward or downward at the time the option is exercised in accordance with FAR 52.222-44 entitled “Fair Labor Standards Act and Service Contract Act – Price Adjustment” found in Section I, Contract Clauses.

e. In order to be considered for award, the proposer must acknowledge receipt of each amendment issued (if any) under this solicitation by submitting 1 signed and dated copy of the Standard Form 30 (Amendment of Solicitation/Modification of Contract) issued for each amendment.

f. Executive Order 12989, Economy and Efficiency in Government Procurement Through Compliance with Certain Immigration and Naturalization Act provisions, is in effect and must be complied with under any contract(s) resulting from this Invitation for Proposals. In accordance with Executive Order 12989, Contractors are responsible for compliance with immigration laws and hereby notified that any and all suspect- ed infractions shall be reported to the Immigration and Naturalization Service.

g. Offerors are cautioned that any proposal may be rejected as non-responsive if it is materially unbalanced as to prices for the basic requirement and the option period. A proposal is unbalanced when it is based on prices significantly less than the costs for some work and prices that are overstated for other work.

NOTE: This package should be read in its entirety to ensure that the proposer is fully cognizant of all of the contract requirements.

B.8 PROPOSAL SUBMISSIONS

NOTE: All proposals shall be submitted electronically in response to this solicitation.

TECHNICAL PROPOSAL AND PRICE PROPOSAL SHALL BE MARKED SEPARATE.

Technical proposal Responses/substantiation for all three (3) Evaluation Factors:

1. 1. Management Plan

a. Quality Control Personnel/Primary Service Representative

b. Supporting Back-Office Instrumentation & Maintenance Shop

2. Prior Experience & Qualifications

3. Past Performance

Price Proposal Standard Form 1449 (submit with original signatures) Supplies or Services and Prices for the Base/Initial and four (4) Option Periods Acknowledgment of all amendments, if any Representations and Certifications (if not available through SAM at: https://sam.gov/ (Reference FAR 52.212-3) GSA527 Contractor's Qualifications and Financial Information (upload from SAM file or retrieve from:

https://www.gsa.gov/reference/forms/contractors-qualifications-and-financial-information

Pricing and qualifications, modifications and amendments to the submitted original proposal are to being acknowledged, or requests for withdrawal of a proposal shall be submitted electronically to the contracting officer email address below:

Ingrid J. Blair, Contracting Officer Ingrid.blair@gsa.gov

C. DESCRIPTION/SPECIFICATION/STATEMENT OF WORK

C.1.0 INTRODUCTION

The United States General Services Administration (GSA) Heating Operation and Transmission District (HOTD) owns and operates the Central Heating and Refrigeration Plant (CHRP). The GSA-CHRP produces chilled water and steam to comfort nearly 90 quasi-government buildings in the District of Columbia. The plant complies with the DC and Federal environmental regulations.

These regulations required that HOTD burns natural gas as primary fuel and No. 2 grade low-sulfur fuel oil as back-up fuel during an interrupt of natural gas supply by the natural gas supplier, Washington Gas.

The GSA-HOTD has five (5) boilers and a cogeneration unit 5C. Units 1, 2, and 6 are rated at 250 MMBtu/hr. Units 3 and 4 are rated at 500 MMBtu/hr. Unit 5C is rated at 326 MMBtu/hr. Because the GSA CHRP undergone boiler modification and reconstruction, the plant is required to comply with the New Source Performance Standard (NSPS) requirements – (Parts 60 and parts 75). These regulations required the GSA-CHRP to install and operate a continuous emissions monitoring system (CEMS) and a continuous opacity monitoring system (COMS) to comply with applicable emissions limits. Additionally, the plant is a major source because it emits more than 25 tons of NOx per year. Any source that emits more than 25 tons of NOx per year in the District of Columbia is classified as a major source. While the EPA’s NOx Budget program (NPB) has long ended, the District of Columbia did require that three boilers at the GSA-CHRP will continue to comply with the NBP because each of those boilers has heat-input exceeding 250 MMBtu/Hr.

heat-input limit. Therefore, Boilers 3, 4, and 5C are subject to the requirements of the NOX Budget Program, which is 40 CFR Part 75. Because of the stringency of 40 CFR Part 75, all quality control and quality assurance (QC/QA) services on the CEMS system, including linearity and relative accuracy testing audit (RATA) services, shall be performed in accordance with 40 CFR Part 75.

The United States Environmental Protection Agency’s Clean Air Act, as outlined in the Code of Federal Regulations, 40 CFR Parts 60, 70 (Title V program) 75, and Part 70, established emission standards for the following pollutants (NOX, SO2, PM, CO, VOC) in Lbs./MMBtu and Visible Emissions (Opacity), 6-minute average data in percent (%).

HOTD is required to continuously monitor NOx to comply with a 0.2 Lbs./MMBtu per every two hours, using the CEMS to comply. The CEMS serves all six units and are identical systems installed by the Environmental Systems Corporation (ESC), Inc and runs on an ESC-proprietary software, StackVision. There are six (6) separate NOX analyzers, six

(6) separate CO analyzers, six (6) separate remote O2 analyzers, and three (3) data logger/controllers assigned to boiler pairs (1-2, 3-4, & 5-6). All units are tied together into a common ESC data acquisition system.

C.1.1 Scope of Work/Technical Specifications The purpose of this technical specification (TS) is to identify and retain a contractor for the purpose of providing a single point of contact for a consolidated Title V CEMS preventive maintenance and boiler tuning service contract which includes the following service requirements:

C. DESCRIPTION/ SPECIFICATION/ STATEMENT OF WORK

1. CEMS Relative Accuracy Test Audit (RATA) Service Requirements

2. Preventive Maintenance and Linearity Testing Services for the CEMS and Opacity Monitors

3. Annual Boiler Tuning Service Requirements

The Contractor shall provide management, supervision, labor, materials, equipment, and supplies (shipping & handling) and shall be responsible for the efficient, effective, and satisfactory tested operation, scheduled and unscheduled maintenance, repair of equipment and systems, as determined through testing and tuning services on boilers, CEMS and COMS located within the property line of the following locations:

GSA Central Heating and Refrigeration Plant (GSA CHRP) at 325 13th Street, SW, Washington, DC 20228.

The categories of work include testing and certifying equipment in accordance with applicable environmental regulations. These service requirements are detailed in the sections C.1.2, C.1.3 and C.1.4 below:

More emphasis is placed on the Contractor’s self-management of quality, not the usual external inspection by Government Inspectors, although that is a part of this Contract as well. All parties should act proactively to reduce service cost, therein providing an incentive for the Contractor.

The Contractor, through innovation, technology, or other means, shall perform the required CEMS/COMS equipment testing and boiler tuning maintenance by following our Guiding Principles for Sustainable Existing Buildings:

1. Employ Integrated Assessment, Operation and Management Principles

a. In conjunction with the Contract Officer (CO) or designee establish operational performance goals for energy, water, material use and recycling, and indoor environmental quality, and ensure incorporation of these goals throughout the lifecycle of this Contract.

b. Ensure that decisions are carried out with regard to sustainable operations.

c. Use low emitting materials VOC (Volatile organic compounds) or other for maintenance. In particular, use products that have low pollutant emissions, adhesives, sealants, and solvents.

d. Use products meeting or exceeding EPA’s recycled content recommendations. For more information, see EPA’s Comprehensive Procurement Guideline website.

e. Use materials with the highest content level per USDA’s bio-based content recommendations for maintenance of or use in the building.

f. Use environmentally sustainable products that have a lesser or reduced effect on human health and the environment. See the Green Products Compilation.

g. Eliminate the use of ozone depleting compounds where alternative environmentally sustainable products are available consistent with the Clean Air Act.

2. Optimize Energy Performance – GSA is in the process of optimizing energy performance through many means and processes. Operate all equipment to optimize efficiency to reduce energy use and otherwise seek operating costs reductions wherever possible.

3. Protect and Conserve Water where possible inside and outside. Metering systems may be already installed or will be installed in government buildings to aid in reducing consumption. Where available, use EPA’s WaterSense-labeled products or other water conserving products.

4. Be aware that the building(s) and management involved with this Contract may be in the process of establishing processes, instituting plans, and operational procedures to meet energy efficiency goals either through receiving an ENERGY STAR rating, Smart Building/ Building Link technology, or comparable programs. The Contractor will play an integral part of obtaining these goals and should be aware of the programs and processes.

5. The purpose of partnering is to adopt procedures wherein the Contract and Government work together in achieving Contract objectives. Partnering involves the development of a cooperative management team that seeks to identify compatible interests, and common goals and objectives.

6. This is a fixed-price Contract and while working with the Government in obtaining goals the Contractor is motivated to find improved methods of performance in order to increase its profits. Results of an effective partnership should reflect a “mutual win” situation.

C.1.2 Relative Accuracy Test Audits (RATA)

The purpose of RATA is to compare emissions and other applicable data from the host facility's Continuous Emissions Monitor System (CEMS) to a simultaneously collected reference method test data from a contractor’s CEMS in order to assess the accuracy of the host facility’s (GSA- CHRP) CEMS readings.

The CEMS at the CHRP consists of equipment operated under software made by ESC that is housed in a rack enclosure in a dedicated room on the 5th floor at the plant, the CEMS Room.

Each stack has a dedicated CEMS that monitors, on a dilution extractive principal, the discharge of NOx, Carbon Monoxide (CO), O2 diluent gas, and opacity. Each stack CEMS utilizes the respective unit's fuel flow meters, including the Heat Recovery Steam Generator (HRSG) duct burner’s gas fuel flow meters for Unit 5C, to calculate that unit's total Heat Input. All stack gas analyzers and fuel flow meters have been installed and certified in accordance with the applicable requirements set forth in 40 CFR Part 60 and 40 CFR Part 75. The Plant utilizes an ESC model 1402 dilution probe for the sampling of NOx. The sample is diluted with clean instrument air at the probe. O2 is sampled separately using a different type of probe. There are six (6) Thermo Electron Instruments (TEI) Model 42i NOx Analyzers, six (6) AMP Cherokee model DFC- 100R Dilution Flow Controllers, six (6) Teledyne model T300 CO analyzers, and six (6) Ametek-produced WDG-V AMEVision HMI Host/Display O2 Analyzers. The CHRP CEMS utilizes three ESC model 8864 Data Loggers. The boilers are configured in pairs (1&2; 3&4 and 5&6) and each pair is assigned to a single Data Logger. A central server PC uses XML capable StackVision software on the data acquisition and handling system (DAHS) to collect and store plant environmental-related data and organize the data into required reporting format for regulatory agencies.

Summary Description of the CEMS

Each CEMS contains the following equipment:

• Dilution Sampling Probe

• Unheated Umbilical

• Dilution Control Panel

• Zero Air Supply

• Calibration Gas System and associated components

• Data loggers

• Analyzers

• Data Acquisition and Handling System (DAHS) – Server

The Opacity monitors at the CHRP consist of equipment made by Teledyne Monitor Labs: Light Hawk, model 560 Compliance Opacity/Dust monitor. The optical head and retro-reflector assemblies are housed in rugged aluminum investment castings. The optical head contains the active electronics necessary to produce an electro-dynamic pulsed LED light source across the stack/duct to retro-reflectors assembly and to detect transmitted light. The miniature retroreflector in combination with an overfill light source precludes misalignment concerns on the stack or duct.

C.1.2.1 RATA Test Protocol

Contractor shall provide test protocol, 30 days prior to RATA scheduled date, to be submitted to the District of Columbia DDOE,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .