RFP_36C24626R0085_590-24-450.pdf
PDF 861 KB Posted
- Solicitation number
- 36C24626R0085, 590-24-450
- Issued by
- Chesapeake City, Hampton City, Virginia
About this file
This Request for Proposal (RFP) document is issued by the Hampton VA Healthcare System for construction renovation services. The project involves the renovation of four transitional residences—three located in Hampton, Virginia and one located in Norfolk, Virginia. The RFP solicits construction services to renovate these facilities, which serve as transitional housing for veterans. Specific response deadlines, site visit schedules, and bidders' conference details should be referenced within the document for prospective contractors planning to submit proposals.
This procurement is designated as a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under the North American Industry Classification System (NAICS) code 236118 for Residential Remodelers. Only certified SDVOSB firms are eligible to bid on this opportunity. The project is located in Virginia and is being conducted under federal VA healthcare system authority. Prospective bidders should review the complete RFP document for detailed specifications, pricing requirements, project scope, contract terms, and all submission requirements necessary to prepare a competitive proposal.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES NO
a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________
(hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1 67
36C24626R0085
X
590-24-450
Department of Veterans Affairs
Network Contracting Office 6
100 Emancipation Drive
Hampton VA 23667
100 Emancipation Drive
Hampton VA 23667
Daniel Spaulding 757-728-7144
REQUEST FOR PROPOSALS (FAR 15): Project 590-24-450 Renovate Transitional Residences
MAGNITUDE OF CONSTRUCTION: $2,000,000.00 to $5,000,000.00
THIS IS A 100% SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE
NAICS: 236118 Residential Remodelers
SBA SIZE STANDARD: $45.0m annual revenue
SITE VISIT: SEE SECTION ENTITLED "SITE VISIT".
QUESTIONS DUE DATE: 05:30PM EASTERN TIME, TUESDAY, SEPTEMBER 15, 2026
PROPOSAL DUE DATE: 05:30PM EASTERN TIME, FRIDAY, OCTOBER 2, 2026
VA Notice of Limitations on Subcontracting - Certificate of Compliance: To be eligible for evaluations and consideration for award, offerors must return the entire Limitations on Subcontracting Certificate of Compliance clause, VAAR 852.219-75, containing a fully completed certification at the time offers are due or the offer will be rejected.
In addition to completing the offeror 'fill-in' requirements for this clause, Offerors must insert the Offeror's name in the brackets containing the follow verbiage, "[Insert Name of Offeror]" to have a fully completed certification.
See Instructions to Offerors and Evaluation Criteria.
This action is funded by FY27 appropriation not available until after October 1, 2026. Award is subject to the availability of funds.
15 365 x x
X
1 05:30PM EDT
10-02-2026
X
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
PHONE: FAX:
28. NEGOTIATED AGREEMENT 29. AWARD Your
Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) (Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
100 Emancipation Drive
Hampton VA 23667
Financial Services Center
PO BOX 149971
Austin TX 78714-9971
512-460-5049 512-460-5221
Table of Contents
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or
Repair)
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,
ALTERATION, OR REPAIR)– BACK
A.3 STATEMENT OF WORK
A.4 PRICE/COST SCHEDULE
ITEM INFORMATION
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 INSTRUCTIONS TO OFFERORS
2.2 EVALUATION CRITERIA
2.3 SITE VISIT
2.4 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)
2.5 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE
OF THE WORK (NOV 2025) (DEVIATION)
2.6 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS (MAY 2014)
2.7 52.228-1 BID GUARANTEE (SEP 1996)
2.8 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE)
(FEB 2021)
2.9 52.233-2 SERVICE OF PROTEST (SEP 2006)
2.10 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS
REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)
2.11 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND
VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)
2.12 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
2.13 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE
(FEB 1998)
REPRESENTATIONS AND CERTIFICATIONS
3.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
3.2 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—
CERTIFICATION (NOV 2021)
GENERAL CONDITIONS
4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
4.2 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2025) (DEVIATION)
4.3 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(NOV 2025) (DEVIATION)
4.4 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL
LABOR RELATIONS ACT (NOV 2025) (DEVIATION)
4.5 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS
(DEVIATION APR 2026)
4.6 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (DEVIATION) (NOV
2025)
4.7 SUPPLEMENTAL INSURANCE REQUIREMENTS
4.8 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025)
(DEVIATION)
4.9 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED
SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)
(DEVIATION)
4.10 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—
CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)
(DEVIATION)
4.11 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
(APR 2019)
4.12 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (APR
2019) ALTERNATE I (APR 2019)
4.13 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)
4.14 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)
4.15 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT
ADMINISTRATION (OCT 2020)
4.16 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT
(SEP 2019)
4.17 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
4.18 WAGE DETERMINATION
4.19 LIST OF ATTACHMENTS
A.3 STATEMENT OF WORK
STATEMENT OF WORK
Renovate Transitional Residences
Project 590-24-450
Scope: Provide construction services for the renovation of four (4) Hampton VA
Healthcare System Transitional Residences (TR). Three (3) Transitional Residences are located in Hampton, VA, while the fourth Transitional Residence is located in
Norfolk, VA. Contractor shall perform all associated work as per attached plans and specifications.
(a) General: The following is a brief summary of the Work:
1. General residential construction
(b) Place of Performance: Tasks will be performed at Hampton and Norfolk, VA at the following locations:
• TR-1 at 1200 Stockley Gardens, Norfolk, VA 23517
• TR-2 at 18 Roland Dr., Hampton, VA 23669
• TR-3 at 301 Ireland St., Hampton, VA 23663
• TR-4 at 22 Roland Dr., Hampton, VA 23669
(c) Specific requirements (see drawings for area of work):
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build
01 33 23 Shop Drawings, Product Data, and Samples
01 35 26 Safety Requirements for Major Projects
01 42 19 Reference Standards
01 45 00 Quality Control
01 45 29 Testing Laboratory Services
01 45 35 Special Inspections
01 57 19 Temporary Environmental Controls
01 74 19 Construction Waste Management
01 91 00 General Commissioning Requirements
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition
02 82 11 Traditional Asbestos Abatement
02 83 33.13 Lead-Based Paint Removal and Disposal
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry
04 05 13 Masonry Mortaring
04 05 16 Masonry Grouting
04 20 00 Unit Masonry
DIVISION 05 – METALS
05 50 00 Metal Fabrications
05 51 00 Metal Stairs
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry
06 20 00 Finish Carpentry
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing
07 21 13 Thermal Insulation
07 31 13 Asphalt Shingles
07 31 26 Slate Shingles
07 60 00 Flashing and Sheet Metal
07 71 00 Roof Specialties
07 92 00 Joint Sealants
DIVISION 08 - OPENINGS
08 14 00 Interior Wood Doors
08 51 13 Aluminum Windows
08 80 00 Glazing
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes
09 22 16 Non-Structural Metal Framing
09 23 00 Gypsum Plastering
09 29 00 Gypsum Board
09 30 13 Ceramic/Porcelain Tiling
09 65 19 Resilient Tile Flooring
09 91 00 Painting
DIVISION 10 – SPECIALTIES
10 28 00 Toilet, Bath, and Laundry Accessories
DIVISION 11 – EQUIPMENT (NOT USED)
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades
12 32 00 Manufactured Wood Casework
12 36 00 Countertops
DIVISION 13 - SPECIAL CONSTRUCTION (NOT USED)
DIVISION 14– CONVEYING EQUIPMENT (NOT USED)
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing
22 05 12 General Motor Requirements for Plumbing Equipment
22 05 19 Meters and Gages for Plumbing Piping
22 05 23 General-Duty Valves for Plumbing Piping
22 05 33 Heat Tracing for Plumbing Piping
22 07 11 Plumbing Insulation
22 11 00 Facility Water Distribution
22 11 23 Domestic Water Pumps
22 13 00 Facility Sanitary and Vent Piping
22 33 00 Electric Domestic Water Heaters
22 40 00 Plumbing Fixtures
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC
23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment
23 05 93 Testing, Adjusting, and Balancing for HVAC
23 07 11 HVAC and Boiler Plant Insulation
23 08 00 Commissioning of HVAC Systems
23 23 00 Refrigerant Piping
23 31 00 HVAC Ducts and Casings
23 34 00 HVAC Fans
23 37 00 Air Outlets and Inlets
23 40 00 HVAC Air Cleaning Devices
23 81 43 Air-Source Unitary Heat Pumps
DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations
26 05 20 Cables
26 05 26 Grounding and Bonding for Electrical Systems
26 05 33 Raceway and Boxes for Electrical Systems
26 05 41 Underground Electrical Construction
26 24 16 Panelboards
26 27 26 Wiring Devices
26 29 21 Enclosed Switches and Circuit Breakers
26 43 13 Surge Protective Devices
26 51 00 Interior Lighting
DIVISION 27 – COMMUNICATIONS (NOT USED)
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 31 00 Fire Detection and Alarm
DIVISION 31 – EARTHWORK
31 20 11 Earthwork (Short Form)
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements
32 12 16 Asphalt Paving
32 31 23 Vinyl Fences and Gates CUSTOM
32 90 00 Planting
DIVISION 33 – UTILITIES (NOT USED)
DIVISION 34 – TRANSPORTATION (NOT USED)
DIVISION 48 – ELECTRICAL POWER GENERATION (NOT USED)
(d) Period of Performance: Contractor shall commence work under this contract promptly after Notice to Proceed (NTP), execute the work diligently, and achieve final completion and acceptance including final cleanup of the premises within three hundred sixty-five (365) calendar days including submittals.
(e) Specific site requirements: Contractor and all subcontractors shall provide proof of completion from an approved OSHA 10-hour training course (30-hour for superintendent), complete and provide certificate of training for Integrity and
Compliance Awareness Training for all Non-Revenue Staff (TMS course
43790).
No demolition is to begin in an area unless all new materials needed to complete the new work are in contractor’s possession.
(f) Work Hours: Plan construction activities during normal business hours
(Monday thru Friday, 7am to 4:30pm). No work is to be scheduled on holidays or weekends with the exception of utility outages which must be scheduled at a day/time to minimize impact on staff and patients. Work that generates noise will need to be scheduled to minimize impact on patients/staff.
(g) Construction Safety Requirements: - see attached Hampton Construction
Safety Handbook in section 01 35 26A
(h) Submittals: - see sections 01 00 00, 01 33 23, and all applicable trade sections
(i) Quality Control: - see section 01 45 00
(j) Schedules: - see section 01 32 16 .15
(k) Environmental and Waste Management: - see sections 01 57 19, and 01 74 19
A.4 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
1.00 JB __________________ __________________
Project 590-24-450: BID ITEM I (BASE BID): Contractor shall perform all associated work as per attached plans and specifications. Work shall include all labor, material, equipment, and supervision to complete all work for the renovation of four (4) Hampton VA Healthcare System Transitional Residences (TR). Three (3) Transitional Residences are located in Hampton, VA, while the fourth Transitional Residence is located in Norfolk, VA.
Contractor shall commence work under this contract promptly after Notice to Proceed (NTP), execute the work diligently, and achieve final completion and acceptance including final cleanup of the premises within three hundred sixty-five (365) calendar days including submittals.
There are no bid alternates for this project.
Contract Period: Base POP Begin: 11-02-2026 POP End: 11-01-2027 PRINCIPAL NAICS CODE: 236118 - Residential Remodelers PRODUCT/SERVICE CODE: Z2FZ - Repair or Alteration of Other Residential Buildings
MANUFACTURER PART NUMBER (MPN): 0
NATIONAL STOCK NUMBER: 0
LOCAL STOCK NUMBER: 0
GRAND TOTAL __________________
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO
BIDDERS/OFFERORS
2.1 INSTRUCTIONS TO OFFERORS
(a) GENERAL INSTRUCTIONS:
1. All proposal preparation costs will be the sole responsibility of the Offeror. The Government will not reimburse any firm for their proposal preparation cost.
2. The price, technical response and past performance of each offeror will be evaluated independently. Offerors shall separately document each of the three factors. Each of the three offer sections shall therefore be labeled with the offeror’s name, business address, and VA
Solicitation Number.
3. To ensure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including these instructions, the terms and conditions, representations and certifications, and technical and past performance requirements. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.
The offer shall consist of two (2) separate volumes:
• VOLUME I – PRICE
• VOLUME II – TECHNICAL
(b) SPECIFIC INSTRUCTIONS
1. VOLUME I - PRICE - Submit electronic PDF document(s) by email.
TAB A: General Information
a. Cover page with Solicitation Number and Project Title
b. Table of Contents
c. Company information to include: UEI Number, Cage Code, Tax ID Number, General
Contractor’s License number and State of Licensure, principle points of contact with addresses, phone numbers and email addresses.
TAB B: Offer, Guarantee, and Certifications
a. Complete the SF 1442, Blocks 14, 15, 16, 17, 19, 20A, 20B, and 20C. An official having the authority to bind your company contractually must sign and date the SF 1442 Block 20. One copy of the SF 1442 must bear an original, authorized signature. In doing so, the Offeror accedes to the contract terms and conditions as written in the RFP.
b. Complete the PRICE/COST SCHEDULE at Section A.4. Complete and submit
Attachment F – Base Offer Price Breakdown Form. Other than certified cost or pricing data may be requested if necessary to evaluate price.
c. Review and complete all fill-in clauses and provisions, as applicable.
d. Complete the clause VAAR 852.219-75 VA Notice of Limitations on Subcontracting -
Certificate of Compliance for Services and Construction. FAILURE TO COMPLETE
THIS CLAUSE WILL RESULT IN IMMEDIATE REJECTION OF THE PROPOSAL.
e. Complete and submit Attachment E – Buy American Act Compliance Certification.
f. Complete clause 52.225-9 Buy American-Construction Materials as applicable.
g. Bid Bond/Offer Guarantee (electronic pdf. file) and Surety point of contact information.
h. Acknowledge any Amendments of the solicitation.
2. VOLUME II – TECHNICAL – Submit electronic PDF document(s) by email.
The technical proposal shall be limited to no more than twenty (20) pages total.
Format as follows:
TAB A: General Information
a. Cover page with Solicitation Number and Project Title
b. Table of Contents
c. Company information to include: SAM.gov Unique Entity Identifier (UEI) Number, Cage
Code, Tax ID Number, General Contractor’s License number and State of Licensure, points of contact with addresses, phone numbers and email addresses.
TAB B: TECHNICAL FACTOR
a. General Qualifications – Technical Subfactor 1
b. Project Management Plan – Technical Subfactor 2
3. PAST PERFORMANCE FACTOR – Submission not required. The Government will review information available in the Contractor Performance Assessment Reporting System (CPARS).
(c) GENERAL INFORMATION
1. Pages exceeding the page limitations set forth will not be read or evaluated and will be removed from the proposal.
Format for proposal Volumes I & II shall be as follows:
• A page is defined as one face of an 8 ½” x 11” sheet of paper containing information.
• Typing shall not be less than font size 12.
2. Proposals are due by Friday, October 2, 2026 at 05:30PM Eastern Time. Offers shall be submitted via email to the Contracting Officer, Daniel Spaulding, at daniel.spaulding@va.gov, prior to the due date and time identified in the solicitation. Multiple emails will likely be required to submit all attachments. Server capacity is 25MB for all file attachments, per email.
3. Each response shall address each factor in the sequence listed and clearly identify which factor is being addressed.
4. There shall be no mention of costs in the Technical Proposal.
mailto:daniel.spaulding@va.gov
(d) QUESTIONS/REQUESTS FOR INFORMATION (RFIs): **The due date for RFIs is
Tuesday, September 15, 2026 by 5:30PM EST.
2.2 EVALUATION CRITERIA
1. LOWEST PRICE TECHNICALLY ACCEPTABLE (LPTA): The Government will award a contract resulting from this solicitation to the responsible Offeror whose proposal, if conforming to the solicitation, is the Lowest Priced Technically Acceptable proposal (sequential evaluation). The following factors will be used to evaluate offers. The factors are listed in order of relative importance, with the Price Factor being the most important. All evaluation factors other than cost or price, when combined, are significantly LESS important than cost or price.
1.1. VOLUME I – PRICE FACTOR
1.2. VOLUME II – TECHNICAL FACTOR
1.3. PAST PERFORMANCE FACTOR
2. BASIS FOR CONTRACT AWARD: This is a competitive Lowest Priced Technically Acceptable
(LPTA) source selection in which all evaluation factors other than price, when combined, are significantly LESS important than price. The factors other than price include both the Technical
Factor and the Past Performance Factor. Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the requirements for acceptability.
3. Regarding the below process, the terms strength, weakness and deficiency are defined as follows:
3.1. The term weakness means a flaw in the proposal that increases the risk of unsuccessful contract performance. See FAR 15.001.
3.2. The term deficiency means any part of an offer that does not conform to a material requirement of a RFP. A material requirement is one that affects price, quantity, quality, or delivery, or that the RFP requires to be met at the time of proposal submission. See FAR 15.001.
4. By submission of its offer, the Offeror accedes to all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a solicitation requirement may result in an offer being determined unacceptable (see below). The evaluation process shall proceed as follows:
5. MATERIAL REQUIREMENTS OF OFFERS
5.1. Offers will first be evaluated as to whether they meet the material requirements of the solicitation. The Contracting Officer may identify/confirm missing documentation with an offeror(s) and decide whether the offeror should/can be allowed to submit any missing/deficient documentation without adverse effect to other offerors or the timeliness of award. Offers meeting the material requirements of the solicitation will then be evaluated on the factors of
Price, Technical Capability and Price. Failure to complete and submit VAAR clause 852.219-
75 with the offer will result in immediate rejection of the proposal without further consideration.
6. VOLUME I – PRICE PROPOSAL
6.1. The price proposal shall include the completed Attachment F - Base Offer Price
Breakdown Form and other items as noted in the Instructions to Offerors section. The
Price Breakdown may be discussed during negotiations to confirm that no major work elements have been omitted. The price breakdown may also be used to conduct negotiations if discussions are held with any offerors. The Government anticipates awarding a contract without discussions, but reserves the right to hold discussions. Other than certified cost or pricing data may be requested.
6.2. The Government will evaluate offers for award purposes by reviewing the total price(s) offered, the offeror’s Attachment F Base Offer Price Breakdown form for the base proposal item. The
Government will use the committed funds amount as the control amount for price evaluation.
The control amount will not be made publicly available during evaluation and selection, due to the use of FAR Part 15 procedures, as it represents both the committed funds amount and the
Government Estimate. The Government Estimate is source selection sensitive information and will not be disclosed.
6.3. Offers will be evaluated in accordance with FAR clause 52.225-9 Buy American-Construction
Materials and FAR provision 52.225-10 Notice of Buy American Requirement-Construction
Materials. Complete FAR provision 52.225-9 Buy American-Construction Materials if applicable regarding use of foreign material. Offers shall include a completed Attachment E
– Buy American Act Compliance Certification.
6.4. Each Offeror’s price proposal will be evaluated for fairness and reasonableness, using any of the methods identified at FAR 15.404-1(b). Other than certified cost or pricing data may be requested if price fairness and reasonableness cannot be otherwise determined.
6.5. An Offeror’s proposal may be rejected if it is determined during evaluation that a significant element of work was omitted from the offeror’s price, where correction of the mistake would result in an increase of the offeror’s proposed price(s).
6.6. The Government intends to award a contract without discussions with Offerors. Therefore, the
Offeror’s initial offer should contain the Offeror’s best terms from a price and technical standpoint. The Government, however, reserves the right to conduct negotiations if deemed necessary.
7. VOLUME II – TECHNICAL CAPABILITY
7.1. The technical subfactors of offers will be evaluated based on the following “Combined
Technical/Risk Ratings”. All areas (subfactors) of the Technical Proposal must receive at least an acceptable rating for a proposal to be considered any further. Offers receiving an unacceptable technical proposal rating will be rejected.
Table – Combined Technical/Risk Ratings
Adjectival Rating Description
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
Unacceptable Proposal does not meet requirements and contains one or more deficiencies.
Proposal is not awardable.
7.2. Sub-Factor 1 – General Qualifications.
7.2.1. CRITERIA and SUBMISSION REQUIREMENTS: The prime contractor shall be (1.) a licensed General Contractor operating from within the United States, or otherwise demonstrate meeting licensure requirements according to U.S. State regulation where the firm is headquartered (“principle place of business”), relevant to the work being performed, and (2.) performs work under the applicable NAICS code, as verified in the System for
Award Management. Offeror shall provide State of Licensure and license number in a brief narrative or otherwise explain State regulation regarding the discipline of work and lack of licensing requirements for their location State.
7.2.2. The offeror shall briefly describe their business, resources and type of work performed in the past. The response will be evaluated to confirm whether the offeror is a legitimate, established business under the NAICS code assigned to this solicitation. An offeror’s inability to demonstrate in writing that it is an established business under the NAICS code may result in the technical proposal being rated as unacceptable.
7.2.3. Offerors shall include their Accord Certificate of Insurance noting the insurance types and levels required by the solicitation. Offerors shall ensure they complete and submit VAAR clause 852.219-75 with their offer to be considered for award. Failure to complete VAAR
852.219-75 will result in immediate rejection of the proposal without further consideration.
7.3. Sub-Factor 2 – Project Management Plan
7.3.1. CRITERIA and SUBMISSION REQUIREMENTS: Please provide a brief project management plan, outlining the processes, and methods by which work would be completed. The project management plan will be evaluated for sufficient initiating, planning, executing, monitoring/controlling, and closing processes to satisfy the project specifications, including the offeror’s processes for controlling the quality and timely execution of subcontractor work. Discussions may be held to address any questions regarding the project management plan. Include in the plan a list of all subcontractors and their trades on the project.
8. PAST PERFORMANCE FACTOR
8.1. Past performance information identified in the Contract Performance Assessment Reporting
System (CPARS) will be utilized to determine the quality of the offeror’s past performance as it relates to the probability of success of the required effort. Past performance will be evaluated as to how well offerors performed on federal contracts that were given CPARS assessments.
Emphasis will be on recent, relevant past performance within the last five (5) calendar years, beginning September 1, 2021, however the offeror’s CPARS records for the five-year period will be considered, generally, in identifying any substantial performance risk.
8.2. In addition to CPARS data, the Government may investigate past performance using other sources, in particular other Government databases, SAM.gov information on past awards, and interviews by email or telephone questions for Government COR, CO, or PM positions for
Contractor projects performed for the Government or for private sector projects. If the
Government collects this data, it will be on recent, relevant projects that meet the criteria above for CPARS data. If the Government collects this data, it will be used as part of the inputs to determine the past performance rating. If not, then CPARS data will be the only data used to develop past performance ratings. If adverse past performance is identified that has not been documented in CPARS, the Government will need to hold clarifications under RFO FAR
15.202(a)(2)(ii) to allow the offeror an opportunity to respond to the adverse past performance information.
8.3. Performance Rating Method
Table – Past Performance Ratings
Adjectival Rating Description
Acceptable Based on the offeror’s recent/relevant performance record, and performance records generally, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or otherwise the offeror does not have a past performance record. An offeror without a record of relevant past performance or for whom information on past performance is not available may not be evaluated favorably or unfavorably on past performance.
Unacceptable Based on the offeror’s recent/relevant performance record, and performance records generally, the Government has no expectation that the offeror will be able to successfully perform the required effort.
8.4. CRITERIA and SUBMISSION REQUIREMENTS: The Government will evaluate the records available in the Contractor Performance Assessment Reporting System (CPARS).
Project owners may be contacted to verify information provided, where necessary, and to obtain documentation regarding successful or unsuccessful performance, and to obtain information regarding the following performance areas. The offeror’s past performance records, generally, will also be reviewed in the Contractor Performance Assessment Reporting System (CPARS) for the purpose of identifying any existing derogatory records impacting on the evaluation team’s confidence in the offeror to perform the work.
2.3 SITE VISIT
SITE VISIT: One (1) organized site visit will be held. All questions shall be held for later submission to the Contracting Officer, Daniel Spaulding, at daniel.spaulding@va.gov.
a. Attendees will sign in at the start of the site visit. Attendees shall arrive up to 15 minutes early to avoid missing their opportunity to attend. The site visit will begin promptly, at the listed time.
b. Hampton VA Medical Center – The scope of work includes four (4) places of performance. Site visits will be held as follows:
i. TR-1- 1200 Stockley Gardens, Norfolk VA. 23517: Thursday Sept. 10, 2026, beginning at 9:00am Eastern Time
ii. TR-2 - 18 Roland Drive, TR-4 – 22 Roland Drive, Hampton VA 23669:
Wednesday Sept. 9, 2026, beginning at 8:30am Eastern Time
iii. TR-3 – 301 Ireland Drive, Hampton VA 23663: Wednesday Sept. 9, 2026, beginning at 1:30pm Eastern Time
c. The POC for the site visit is Alfred McDaniel, Healthcare Engineer, Hampton VA Medical
Center. Do not contact the Site Visit POC with questions about this solicitation. Submit all questions to the Contract Specialist. Potential offerors may notify the Contracting Officer if planning to attend. Provide the company name and number of participants to daniel.spaulding@va.gov.
Site Visit POC Name: Alfred McDaniel Email: Alfred.Mcdaniel@va.gov mailto:daniel.spaulding@va.gov mailto:daniel.spaulding@va.gov mailto:Alfred.Mcdaniel@va.gov
Office number: (757) 722-9961 ext 5010
2.4 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.5 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—
SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION)
(a)(1) The offeror must notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror must request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror must request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.6 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—
CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material,"
"domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials"
(Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the
Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the
Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR
52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
2.7 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury
Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of Provision)
2.8 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID
GUARANTEE) (FEB 2021)
(a) Offerors shall obtain from each person acting as an individual surety on a bid guarantee—
(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203–1; and
(2) Standard Form 28, Affidavit of Individual Surety.
(b) The Offeror shall include with its offer the information required at paragraph (a) of this provision within the timeframe specified in the provision at FAR 52.228–1, Bid Guarantee, or as otherwise established by the Contracting Officer.
(c) The Contracting Officer may release the security interest on the individual surety’s assets in support of a bid guarantee based upon evidence that the offer supported by the individual surety will not result in contract award.
(End of Provision)
2.9 52.233-2 SERVICE OF PROTEST (SEP 2006)
Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government
Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
Daniel Spaulding daniel.spaulding@va.gov Hand-Carried Address:
Department of Veterans Affairs
Contracting Office Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 Mailing Address:
Contracting Office Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision)
2.10 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS
REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)
(a) Definitions. As used in this provision—
Backhaul, covered article, covered telecommunications equipment or services, critical technology, FASCSA order, Intelligence community, interconnection arrangements, national security system, roaming, sensitive compartmented information, sensitive compartmented information system, source, and substantial or essential component have the meanings provided in the clause 52.240-91, Security Prohibitions and Exclusions.
Business operations means engaging in commerce in any form, including by acquiring, developing, maintaining, owning, selling, possessing, leasing, or operating equipment, facilities, personnel, products, services, personal property, real property, or any other apparatus of business or commerce.
Marginalized populations of Sudan means—
(1) Adversely affected groups in regions authorized to receive assistance under section 8(c) of the Darfur Peace and Accountability Act (Pub. L. 109-344) (50 U.S.C. 1701 note); and
(2) Marginalized areas in Northern Sudan described in section 4(9) of such Act.
Restricted business operations means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment
Act of 2007) conducting the business can demonstrate—
(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;
(2) Are conducted under specific authorization from the Office of Foreign Assets Control in the Department of the Treasury, or are expressly exempted under Federal law from the requirement to be conducted under such authorization;
(3) Consist of providing goods or services to marginalized populations of Sudan;
(4) Consist of providing goods or services to an internationally recognized peacekeeping force or humanitarian organization;
(5) Consist of providing goods or services that are used only to promote health or education;
or
(6) Have been voluntarily suspended.
Sensitive technology—
(1) Means hardware, software, telecommunications equipment, or any other technology that is to be used specifically—
(i) To restrict the free flow of unbiased information in Iran; or
(ii) To disrupt, monitor, or otherwise restrict speech of the people of Iran; and
(2) Does not include information or informational materials the export of which the President does not have the authority to regulate or prohibit pursuant to section 203(b)(3) of the
International Emergency Economic Powers Act (50 U.S.C. 1702(b)(3)).
(b) Procedures.
(1) Covered telecommunications and video surveillance. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities excluded from receiving federal awards for “covered telecommunications equipment or services.”
(2) FASCSA Orders.
(i) The Offeror shall search in SAM for the phrase “FASCSA order” for any covered article, or any products or services produced or provided by a source, if there is an applicable FASCSA order described in paragraph (e) of FAR 52.240-91, Security Prohibitions and Exclusions.
(ii) The Offeror shall review the solicitation for any FASCSA orders that are not in SAM but are effective and apply to the solicitation and resultant contract (see FAR 40.204-1(c)(2)).
(iii) FASCSA orders issued after the date of solicitation do not apply unless added by an amendment to the solicitation.
(c) Covered telecommunications equipment or services representations. By submission of its offer, the Offeror represents that, after conducting a reasonable inquiry (that looks at any information in the Offeror’s possession but does not need to include an internal or third-party audit)—
(1) It will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation, except as waived by the solicitation, or as disclosed in paragraph (g); and
(2) It does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services, except as waived by the solicitation, or as disclosed in paragraph (g).
(d) FASCSA Representation. By submission of this offer, the offeror represents that it has conducted a reasonable inquiry, and that the offeror does not propose to provide or use in https://www.sam.gov/ response to this solicitation any covered article, or any products or services produced or provided by a source, if the covered article or the source is prohibited by an applicable FASCSA order in effect on the date the solicitation was issued, except as waived by the solicitation, or as disclosed in paragraph (g). A reasonable inquiry will look at any information in the offeror’s possession but does not need to include an internal or third-party audit.
(e) Sudan certification. By submission of its offer, the offeror certifies, after conducting a reasonable inquiry (that looks at any information in the offeror’s possession but does not need to include an internal or third-party audit), that the offeror does not conduct any restricted business operations in Sudan.
(f) Iran Representation and Certifications.
(1) Except as provided in paragraph (f)(2) of this provision or if a waiver has been granted in accordance with FAR 40.203-3, the offeror, after conducting a reasonable inquiry (that looks at any information in the offeror’s possession but does not need to include an internal or third-party audit), by submission of its offer—
(i) Represents, to the best of its knowledge and belief, that the offeror does not export any sensitive technology to the government of Iran or any entities or individuals owned or controlled by, or acting on behalf or at the direction of, the government of Iran;
(ii) Certifies that the offeror, or any person (as defined at section 15 of the Iran Sanctions Act of 1996, Pub. L. 104-172, 50 U.S.C. 1701 note) owned or controlled by the offeror, does not engage in any activities for which sanctions may be imposed under section 5 of the Act. These sanctioned activities are in the areas of development of the petroleum resources of Iran, production of refined petroleum products in Iran, sale and provision of refined petroleum products to Iran, and contributing to Iran’s ability to acquire or develop certain weapons or technologies; and
(iii) Certifies that the offeror, and any person owned or controlled by the offeror, does not knowingly engage in any transaction that exceeds $15,000 with Iran’s Revolutionary Guard
Corps or any of its officials, agents, or affiliates, the property and interests in property of which are blocked pursuant to the International Emergency Economic Powers Act (50 U.S.C. 1701 et seq.) (see OFAC’s Specially Designated Nationals and Blocked Persons List at https://www.treasury.gov/resource-center/sanctions/SDN-List/Pages/default.aspx)
(2) Exception for trade agreements. The representation and certification requirements of paragraph (f)(1) of this provision do not apply if—
(i) This solicitation includes a trade agreements notice or certification (e.g., 52.225-6, Trade
Agreements Certificate); and
(ii) The offeror has certified that all the offered products to be supplied are designated country end products or designated country construction material.
(iii) The offeror shall email questions concerning sensitive technology to the Department of
State at CISADA106@state.gov.
(g) Disclosure.
https://www.treasury.gov/resource-center/sanctions/SDN-List/Pages/default.aspx mailto:CISADA106@state.gov
(1) If the Offeror is not able to represent compliance with the prohibitions in paragraphs (c) or
(d), then the Offeror shall disclose within 72 hours to the contracting office identified in paragraph (g)(2) the following information for each product or service not compliant:
(i) Contract number and order number, if applicable;
(ii) Identification of whether this disclosure relates to paragraph (c) on covered telecommunication equipment or services, or to paragraph (d) on FASCSA orders;
(iii) A description of the products or services that the Contractor identifies or has reason to suspect is prohibited (include brand; model number, such as the original equipment manufacturer (OEM) number, manufacturer part number, or wholesaler number; and item description, as applicable);
(iv) The entity that produced the product or service (include entity name, unique entity identifier, Contractor and Government Entity (CAGE) code, facilities responsible for design, fabrication, assembly, packaging, and test of the product, and whether the entity was the OEM or a distributor (provide manufacturer codes and distributor codes used for the product));
(v) Description of the functionality of the product or service and how that functionality impacts the risk to the product or service;
(vi) An explanation of any factors relevant to determining if the product or service should be permitted by an applicable exception, exemption, or waiver (if the offeror would like the
Government to consider a waiver);
(vii) Whether alternative…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .