This Request for Proposal (RFP #320-240426AG) is issued by the City of Rocky Mount, North Carolina Housing & Community Development Department for housing repair and urgent repair services to assist moderate-income homeowners. The scope of work includes HVAC, plumbing, carpentry, painting, drywall, floor coverings, electrical, and roofing repairs tailored to individual properties. The RFP was issued on May 18, 2026, with proposals due by June 3, 2026, at 2:00 p.m. ET. A mandatory pre-bid site visit is required on May 26, 2026, from 9:00 a.m. to 12:00 p.m. at 331 S. Franklin Street, Rocky Mount, NC 27804, with strict on-time attendance enforcement. Late arrivals will not be permitted to sign in, and bids from unrepresented vendors will not be accepted. Written questions must be submitted by May 28, 2026, at 5:00 p.m., with responses posted as addenda by May 29, 2026. The contract award date and estimated completion dates are to be determined. Contractors are responsible for all permits and debris removal, and roof replacement work requires a two-year warranty.

The maximum project budgets are $20,000 for Housing Repair/Urgent Housing Repairs and $40,000 to $50,000 for H.O.M.E Project Repairs (depending on lead-based paint presence). The project is funded through the 2023-2025 Biennium Appropriation of the NC General Assembly State Grant. All contractors must comply with North Carolina Renovate, Repair and Paint (RRP) Rule requirements for pre-1978 properties and provide RRP firm certification and renovator letters. Contractors must include all overhead and profit in individual items and provide at least three professional references demonstrating similar scope and satisfactory performance. All materials must be new with no reused items. Historic district guidelines apply to affected properties, requiring consultation with the Community Development Rehab Specialist before work begins. Proposals should be addressed to Attn: RFP #320-240426AG, City of Rocky Mount Purchasing—Alicia Gaines, 331 S. Franklin Street, Rocky Mount, NC 27802, and may be submitted via U.S. Mail, FedEx, UPS, or hand delivery only.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HOUSING & COMMUNITY DEVELOPMENT

THE CENTER OF IT ALL

Request for Proposal #: 320-240426AG

Housing Repair and Urgent Repair

Date of Issue: 05/18/2026

Proposal Due Date: 06/03/2026

At 02:00 P.M. ET

Direct all inquiries concerning this RFP to:

Alicia Gaines

Alicia.Gaines@rockymountnc.gov

252-972-1227

Attendance of bidders at pre-bid meetings on the job site is required. No bids will be accepted from any vendor not represented at the pre-bid meeting.

mailto:Alicia.Gaines@rockymountnc.gov

RFP 320-240426AG

Contents

EXECUTION PAGE: PROPOSAL/ACCEPTANCE FORM

I. PROGRAM INFORMATION

II. SCOPE OF WORK

III. PROJECT SCHEDULE

IV. MANDATORY SITE VISIT

V. QUESTIONS

VI. PROPOSAL SUBMITTAL

VII. AUTHORIZED SIGNATURE REQUIREMENT

VIII. REFERENCES

IX. CITY’S RIGHTS AND OPTIONS

ATTACHMENT A: PRICING

ATTACHMENT C: SUPPLEMENTARY GENERAL CONDITIONS

ATTACHMENT D: SUPPLEMENTAL VENDOR INFORMATION

EXECUTION PAGE: PROPOSAL/ACCEPTANCE FORM

In compliance with this Request for Quote, and subject to all the conditions herein, the undersigned Vendor offers and agrees to furnish and deliver any or all items upon which prices are quoted, at the prices set opposite each item within the time specified herein. By executing this quote, the undersigned Vendor certifies that this quote is submitted competitively and without collusion (G.S. 143-54), that none of its officers, directors, or owners of an unincorporated business entity has been convicted of any violations of Chapter 78A of the General Statutes, the

Securities Act of 1933, or the Securities Exchange Act of 1934 (G.S. 143-59.2), and that it is not an ineligible

Vendor as set forth in G.S. 143-59.1. False certification is a Class I felony. Furthermore, by executing this quote, the undersigned certifies to the best of Vendor’s knowledge and belief, that it and its principals are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered transactions by any Federal or State department or City department. As required by G.S. 143-48.5, the undersigned Vendor certifies that it, and each of its sub-contractors for any Contract awarded as a result of this

RFQ, complies with the requirements of Article 2 of Chapter 64 of the NC General Statutes, including the requirement for each employer with more than 25 employees in North Carolina to verify the work authorization of its employees through the federal E-Verify system. G.S. 133-32 and Executive Order 24 (2009) prohibit the offer to, or acceptance by, any City Employee associated with the preparing plans, specifications, estimates for public

Contract; or awarding or administering public Contracts; or inspecting or supervising delivery of the public Contract of any gift from anyone with a Contract with the City , or from any person seeking to do business with the City . By execution of any response in this quote, you attest, for your entire organization and its employees or agents, that you are not aware that any such gift has been offered, accepted, or promised by any employees of your organization. Do you have a financial interest or tangible personal benefit with a city of Rocky Mount employee, officer, or agent? ____ Yes ____ No If yes note the employee, officer, or agent; department; and the perceived or actual conflict of interest.

_______________________________________________________________ Failure to execute/sign quote prior to submittal shall render quote invalid and it WILL BE REJECTED. Late quotes cannot be accepted.

VENDOR:

STREET ADDRESS: P.O. BOX: ZIP:

CITY & STATE & ZIP: TELEPHONE

NUMBER:

TOLL FREE TEL. NO:

PRINCIPAL PLACE OF BUSINESS ADDRESS IF DIFFERENT FROM ABOVE (SEE INSTRUCTIONS TO

VENDORS ITEM #11):

PRINT NAME & TITLE OF PERSON SIGNING ON BEHALF

OF VENDOR:

RRP Certification? Circle one: Yes No

VENDOR’S AUTHORIZED SIGNATURE: DATE: EMAIL:

Offer valid for at least 60 days from date of proposal opening, unless otherwise stated here: ______ days. Project must begin within 60 days of the opening at the rates proposed in Attachment A.

ACCEPTANCE OF QUOTE

If any or all parts of this quote are accepted by the City of Rocky Mount, an authorized representative of the City of

Rocky Mount shall affix his/her signature hereto and this document and all provisions of this Request for Quote along with the Vendor response and the written results of any negotiations shall then constitute the written agreement between the parties. A copy of this acceptance will be forwarded to the successful Vendor(s).

CITY OF ROCKY MOUNT

STANDARD FORM OF INFORMAL CONTRACT

AND GENERAL CONDITIONS

FOR

Project ID# - RFP 320-240426AG

I. PROGRAM INFORMATION

The goal of this program is to promote neighborhood stability and preserve the existing supply of single-family homes by assisting moderate income homeowners with repairs to their homes.

This project is supported by the 2023-2025 Biennium Appropriation of the NC General Assembly State

Grant.

The max budget for this project is as follows:

• Housing Repair/Urgent Housing Repairs up to $20,000

• H.O.M.E Project Repairs $40,000 (Non-Lead) to $50,000 (Lead)

II. SCOPE OF WORK

The scope of work includes but is not limited to the following: HVAC, Plumbing, Carpentry, Painting &

Wallpaper, Drywall & Plaster, Floor Coverings, Electrical, and Roofing Repairs. The scope is specific to each home.

III. PROJECT SCHEDULE

Event Responsibility Date and Time

Issue RFP City Monday 05/18/2026

Mandatory Pre-bid/Site Visit City Tuesday 05/26/2026 9:00 am – 12:00 pm

Submit Written Questions Contractor Thursday 05/28/2026 5:00 pm

Provide Response to Questions/Addendum

Deadline

City Friday 05/29/2026

Submit Proposals Contractor Wednesday 06/03/2026 2:00 pm

Contract Award City TBD

Estimated Completion Date Contractor TBD

IV. MANDATORY SITE VISIT

Mandatory Pre-Bid Meeting

Date: 05/26/2026 Time: 9:00 am – 12:00 pm Contact #: 252-972-1227

Instructions: It shall be MANDATORY that each Vendor representative be present for a pre-bid site visit on May

26, 2026. Attendees shall meet promptly at 9:00 a.m. Eastern Time at 331 S. Franklin Street, Rocky Mount, NC

27804. All attendees must sign in upon arrival and clearly indicate the prospective Vendor represented on the sign in sheet. LATE ARRIVALS WILL NOT BE ALLOWED TO SIGN IN, NOR SHALL THEIR BID BE CONSIDERED. Late arrivals may be excluded from the meeting room until all on-time attendees have completed sign-in, and the sign-in sheet secured. Once the sign-in process is complete, all other persons wishing to attend may do so to the extent that space and circumstances allow. On-time attendance will be strictly enforced.

The purpose of this visit is for all prospective Vendors to apprise themselves with the conditions and requirements which will affect the performance of the work called for by this Request for Proposals. Vendors shall stay for the duration of the site visit. No allowances will be made for unreported conditions that a prudent Vendor would recognize as affecting the work called for or implied by this bid.

Vendors are cautioned that any information released to attendees during the site visit, other than that involving the physical aspects of the facility referenced above, and which conflicts with, supersedes, or adds to requirements in this Invitation for Bid, must be confirmed by written addendum before it can be considered to be a part of this bid.

V. QUESTIONS

Written questions shall be e-mailed to Alicia.Gaines@rockymountnc.gov prior to close of business on the date specified in the proposal schedule. Contractors will enter “RFP #320-240426AG – Questions” as the subject for the email.

Questions received prior to the submission deadline date, responses, and any additional terms deemed necessary by the City of Rocky Mount will be posted in the form of an addendum to the City of Rocky Mount https://www.rockymountnc.gov/Bids.aspx website(s) and the North Carolina Department of Administration website https://evp.nc.gov/solicitations/ and shall become an Addendum to this RFP. No information, instruction or advice provided orally or informally by any City personnel, whether made in response to a question or otherwise concerning this RFP, shall be considered authoritative or binding. Vendors shall rely only on written material contained in an Addendum to this RFP.

Inquiries submitted no later than the date and time noted in the project schedule. Questions answered verbally will be followed up by written addenda as deemed necessary; oral interpretations shall have no effect.

VI. PROPOSAL SUBMITTAL

Contractors interested in performing the services requested must submit the following information:

a) One (1) copy of their RFP response, including name, address, and phone number of contact person, along with signed receipt pages of any addenda released in conjunction with this RFP and the RFP document.

1. RFP responses shall be addressed to:

Attn: RFP #320-240426AG City of Rocky Mount Purchasing- Alicia Gaines 331 S. Franklin Street Rocky Mount, NC 27802

All RFP responses shall be received by the date and time noted in the schedule on page 4. RFP responses may be sent via US Mail, FedEx, UPS, or hand-delivered. Faxed and emailed RFP responses will not be accepted.

VII. AUTHORIZED SIGNATURE REQUIREMENT

All proposals, bids, or other offers must be signed by an individual authorized to bind the firm contractually. The City reserves the right to request documentation showing evidence of signatory authority (e.g., corporate resolution, operating agreement, power of attorney, or other verification). Failure to provide such documentation upon request may result in disqualification of the offer or rejection of the executed contract.

mailto:Alicia.Gaines@rockymountnc.gov https://www.rockymountnc.gov/Bids.aspx https://evp.nc.gov/solicitations/

VIII. REFERENCES

Vendors shall provide at least three (3) different references for which your company has provided services of similar size and scope to that proposed herein. The city of Rocky Mount may contact these users to determine the Services provided are substantially similar in scope to those proposed herein and Contractor’s performance has been satisfactory. The information obtained shall be considered in the evaluation of the quote. If city of Rocky Mount references are provided it cannot be counted towards your three (3) required references but may be included in addition to.

COMPANY NAME CONTACT NAME TELEPHONE NUMBER EMAIL

Optional: City of Rocky

Mount

IX. CITY’S RIGHTS AND OPTIONS

The City reserves the following rights, which may be exercised at the City’s sole discretion:

• To supplement, amend, substitute or otherwise modify this RFP at any time;

• To cancel this RFP with or without the substitution of another RFP;

• To take any action affecting this RFP, this RFP process, or the Services or facilities subject to this RFP that would be in the best interests of the City;

• To issue additional requests for information;

• To require one or more Service Providers to supplement, clarify or provide additional information in order for the City to evaluate the Proposals submitted;

• To conduct investigations with respect to the qualifications and experience of each Service

Provider;

• To waive any defect or irregularity in any Proposal received;

• To reject any or all Proposals;

• To share the Proposals with City employees other than the Evaluation Committee or City advisory committees as deemed necessary;

• To award all, none, or any part of the Services that is in the best interest of the City, with one or more of the Service Providers responding, which may be done with or without re-solicitation.

• To discuss and negotiate with selected Service Provider(s) any terms and conditions in the

Proposals including but not limited to financial terms; and

• To enter into any Contract deemed by the City to be in the best interest of the City, with one or more of the Service Providers responding

URGENT REPAIR PROGRAM

BID DOCUMENT

2809 S. Church St, Rocky Mount

BRIEF DESCRIPTION & OWNER CONCERNS:

This home was built in 1910 and contains 805 sq ft of conditioned space with a covered front porch. The home has standing seam metal roof panels with strip sheathing. We will be removing the metal roof, installing new roof sheathing on top of the strip sheathing, and new asphalt shingles.

SPECIFICATIONS DATED: 3-2-26

INSPECTED BY: Michael Kepley

DATE OF INSPECTION: 2-25-26

ADDRESS: 2809 S. Church St, Rocky Mount 27803

General Conditions:

1. Contractors are to include all overhead and profit in the individual items.

2. The owner, after careful review, understands and accepts the scope of the work described and has initialed and dated each page of the work write-up.

3. Contractor certifies that he/she has reviewed and agrees to perform the scope of work described and has initialed and dated each page of the work write-up.

4. The contractor shall remedy any defect due to faulty material or workmanship and pay for all damage to other work resulting therefrom, which appears within one year from final payment by the City. All reported deficiencies or issues must be resolved by the Contractor whether the work of subcontractors or not. The City will not contact subcontractors to resolve issues. Further, the contractor shall furnish the owner with all manufactures and suppliers’ written warranties covering items furnished under the contract prior to release of final payment. Roof replacement work requires a two-year warranty.

5. All lead-based paint renovation activities performed for compensation in target housing shall be conducted in accordance with North Carolina Renovate, Repair and Paint (RRP) Rule and, when using US Department of Housing and Urban Development (HUD) funds, 24 CFR 35 Subpart J. To bid on a pre-1978 property, the contractor’s firm must provide all required Lead documents including RRP firm certification and renovator letter.

6. Remove from site all construction materials, tools, and debris. Sweeps clean all exterior work areas.

Vacuum all interior work areas, removing all visible dust, stains, labels and tags.

7. All painting must be of the highest quality. The surfaces must be prepared and inspected before painting.

8. The primer and topcoats must have the same tint.

9. Paint and Primer shall be the following or approved equal:

1. Sherwin Williams “Super Paint”, “Resilience”, “Duration” or “Emerald”.

All work is to comply with current North Carolina State Building Code, City of Rocky Mount Rehabilitation Standards for Single-Family Structures, performance manual guidelines and or local building, electrical and plumbing codes with inspections and permits when applicable. All work will be done in quality and workmanlike manner. All material must be new, no re-used material.

When the Work Scope calls for an item to be removed and replaced, the contractor is to secure the owner’s approval to dispose of the item rather than turning the item over to the owner.

GUIDELINES FOR RENOVATION FOR PROPERTIES IN A HISTORIC DISTRICT

The property described in the attached document is either in a local historic district (meaning that the local historic preservation ordinances apply to the exterior only), in a national historic district (meaning that the Secretary of the Interior's historic preservation standards apply to both exterior and interior work) or is an individually designated historically significant building under one of these two authorities. In any case, the following SHALL apply to the work under any contract to renovate this property and it is a condition of the use of our federal funds that these guidelines are followed.

The specifications have been written to meet these standards. If any work is added after the bids are submitted, the Contractor is eligible for a change order to cover additional costs.

In general, the following items and conditions apply to all work on historic properties:

1. Whenever possible the Contractor shall repair and reuse original materials and restore the original structure and details.

2. When new materials are specified, the Contractor shall assume (even if it is not specifically noted) that the new materials shall match as closely as possible either

• (first choice) the existing damaged materials that are being replaced, or

• (second choice) the original materials on adjacent surfaces.

3. If there are no original materials to match, the Contractor shall select new materials that are in line with the design period and style of the original structure - that is they shall "evoke" the feeling of the period of the structure.

If in doubt, ask the Community Development Rehab Specialist for guidance.

4. When new work requires penetrating the exterior walls or roof - such as with a new vent stack, roof ventilation --or hanging something modern on the outside of the structure -- such as a new electrical service panel -- penetrating pipes or modern appliances shall be located out of sight of the street or sidewalk whenever possible. Locations of new penetrations require approval of the C.D. Rehab Specialist BEFORE work begins.

5. When new equipment -- such as a new HVAC unit -- will set the equipment on the property outside of the house, the Contractor shall clear the location with the C.D. Rehab Specialist prior to beginning work on that location.

6. Where submittals are required, the Contractor shall submit materials, catalog cuts or color chips to the Rehab Specialist who will forward them to the proper historic authority for approval. Comments will be returned to the Contractor within 10 business days. The Contractor shall allow time for this process and anticipate this delay as part of his agreed schedule.

7. If the Contractor proceeds with work not in compliance with historic guidelines, without having consulted the C.D.

Rehab Specialist, and the work is rejected by the agency with historic jurisdiction, the Contractor will be liable for removing and redoing the work to the historic guidelines at his own expense.

SPECIFICATIONS BY TRADE

ROOF, CHIMNEYS

Remove the existing metal roofing and roofing components and dispose of same.

Bid Amount ________________

Install new 1/2 OSB roof sheathing over the entire roof deck.

Bid Amount ________________

Install a new Atlas Pinnacle Pristine GAF Timberline HDZ, Certainteed Landmark, or Owens Corning TruDef Duration architectural shingle roof:

Install new shingle manufacturer recommended synthetic roofing underlayment to cover the entire roof. Install manufacturer recommended hip and ridge shingles over new manufacturer recommended shingle over ridge vent.

Install all new pipe boots and exhaust vent roof flanges.

All abutments shall be step flashed and counter flashed with black or dark bronze step and counter flashing. Install kick out flashing at the bottom of roof/wall intersections.

Seal all flashing, vent stacks and flanges with BASF NP1 black paintable caulk. The roof components shall be installed according to the manufacturer's specifications and be completed in a professional manner.

The Contractor shall submit the warranty information to the manufacturer and provide the Homeowner with warranty paperwork.

Bid Amount ________________

Install flashing at all chimneys, step flashing and counter flashing, all counter flashing shall be cut into the brick.

Counter flashing shall be painted black or matching roof color. All flashing shall be completed in a professional manner.

Bid Amount ________________

Install white or black aluminum 4-in drip edge at entire perimeter of roof. The drip edge shall be installed straight and true with butt joints overlapping 1-in. Secure the drip with roofing tacks every 16-in. Install the synthetic underlayment on top of the drip edge along eaves.

Bid Amount ________________

Install continuous shingle over style ridge vent and hip and ridge shingles; ventilator to run length of structure:

install per manufacturers specifications.

Bid Amount ________________

TOTAL BID __________________

NAME OF BIDDER:

AUTHORIZED SIGNATURE:

GENERAL SPECIFICATIONS

Equivalent products can be used upon providing submittal and approval prior to installation.

NOTE: The purpose of the information listed is to generally highlight the work to be done and target items of concern. Items not shown in the specifications or any work obviously necessary to complete the project (as described by the specifications) are to be considered part of the contract.

BUILDING FLOORPLAN SKETCH

703 Nashville Ave, Rocky Mount, NC

This is a 1,120 sq ft wood clapboard siding home built in 1939. The house has a standing seam metal roof and is leaking. We will be removing the standing seam metal roof, sheathing the entire roof with OSB, and installing asphalt shingles.

SPECIFICATIONS DATED: 3-2-2026

INSPECTED BY: Michael Kepley

DATE OF INSPECTION: 2-25-2026

ADDRESS: 703 Nashville Ave, Rocky Mount, NC initialed and dated each page of the work write-up.

3. Contractor certifies that he/she has reviewed and agrees to perform the scope of work described and has initialed and dated each page of the work write-up.

4. The contractor shall remedy any defect due to faulty material or workmanship and pay for all damage to other work resulting therefrom, which appears within one year from final payment by the City. All reported deficiencies or issues must be resolved by the Contractor, whether the work of subcontractors or not. The City will not contact subcontractors to resolve issues. Further, the contractor shall furnish the owner with all manufacturers' and suppliers’ written warranties covering items furnished under the contract prior to the release of final payment. Roof replacement work requires a two-year warranty.

5. All lead-based paint renovation activities performed for compensation in target housing shall be conducted in accordance with North Carolina Renovate, Repair and Paint (RRP) Rule and, when using US Department of Housing and Urban Development (HUD) funds, 24 CFR 35 Subpart J. To bid on a pre-1978 property, the contractor’s firm must provide all required Lead documents, including RRP firm certification and renovator letter.

6. Remove from site all construction materials, tools, and debris. Sweeps clean all exterior work areas.

Vacuum all interior work areas, removing all visible dust, stains, labels and tags.

All work is to comply with the current North Carolina State Building Code, City of Rocky Mount Rehabilitation Standards for Single-Family Structures, performance manual guidelines and or local building, electrical and plumbing codes with inspections and permits when applicable. All work will be done in quality and workmanlike manner. All material must be new, no re-used material.

When the Work Scope calls for an item to be removed and replaced, the contractor is to secure the owner’s approval to dispose of the item rather than turning the item over to the owner.

GUIDELINES FOR RENOVATION FOR PROPERTIES IN A HISTORIC DISTRICT

The property described in the attached document is either in a local historic district (meaning that the local historic preservation ordinances apply to the exterior only), in a national historic district (meaning that the Secretary of the Interior's historic preservation standards apply to both exterior and interior work) or is an individually designated historically significant building under one of these two authorities. In any case, the following SHALL apply to the work under any contract to renovate this property and it is a condition of the use of our federal funds that these guidelines are followed.

The specifications have been written to meet these standards. If any work is added after the bids are submitted, the Contractor is eligible for a change order to cover additional costs.

In general, the following items and conditions apply to all work on historic properties:

1. Whenever possible the Contractor shall repair and reuse original materials and restore the original structure and details.

2. When new materials are specified, the Contractor shall assume (even if it is not specifically noted) that the new materials shall match as closely as possible either

3. If there are no original materials to match, the Contractor shall select new materials that are in line with the design period and style of the original structure - that is they shall "evoke" the feeling of the period of the structure.

If in doubt, ask the Community Development Rehab Specialist for guidance.

4. When new work requires penetrating the exterior walls or roof - such as with a new vent stack, roof ventilation --or hanging something modern on the outside of the structure -- such as a new electrical service panel -- penetrating pipes or modern appliances shall be located out of sight of the street or sidewalk whenever possible. Locations of new penetrations require approval of the C.D. Rehab Specialist BEFORE work begins.

When new equipment -- such as a new HVAC unit -- will set the equipment on the property outside of the house, the Contractor shall clear the location with the C.D. Rehab Specialist prior to beginning work on that location.

6. Where submittals are required, the Contractor shall submit materials, catalog cuts or color chips to the Rehab Specialist who will forward them to the proper historic authority for approval. Comments will be returned to the Contractor within 10 business days. The Contractor shall allow time for this process and anticipate this delay as part of his agreed schedule.

7. If the Contractor proceeds with work not in compliance with historic guidelines, without having consulted the C.D.

Rehab Specialist, and the work is rejected by the agency with historic jurisdiction, the Contractor will be liable for

Remove the existing metal roofing and roofing components and dispose of same.

Bid Amount_____________

Install new 1/2 OSB roof sheathing over the entire roof deck.

Bid Amount_____________

Install a new Atlas Pinnacle Pristine GAF Timberline HDZ, Certainteed Landmark, or Owens Corning TruDef Duration architectural shingle roof:

Install new shingle manufacturer-recommended synthetic roofing underlayment to cover the entire roof. Install manufacturer-recommended hip and ridge shingles over a new manufacturer-recommended shingle over ridge vent.

Install ice/rain guard in valleys and over the entire front porch roof deck.

Install all new pipe boots and exhaust vent roof flanges.

All abutments shall be step flashed and counter flashed with black or dark bronze step and counter flashing. Install kick out flashing at the bottom of roof/wall intersections.

Seal all flashing, vent stacks and flanges with BASF NP1 black paintable caulk. The roof components shall be installed according to the manufacturer's specifications and be completed in a professional manner.

The Contractor shall submit the warranty information to the manufacturer and provide the Homeowner with warranty paperwork.

Cost Estimate 9,965.30 Remove two chimneys below roof deck and cap and seal same with fireproof material.

Bid Amount_____________

Install white or black aluminum 4-in drip edge at entire perimeter of roof. The drip edge shall be installed straight and true with butt joints overlapping 1-in. Secure the drip with roofing tacks every 16-in. Install the synthetic underlayment on top of the drip edge along eaves.

Bid Amount_____________

Install continuous shingle over style ridge vent and hip and ridge shingles; ventilator to run length of structure:

install per manufacturers specifications.

Bid Amount_____________

Total Bid Amount________________________

NAME OF BIDDER: AUTHORIZED SIGNATURE:___________________________________________________

AUTHORIZED SIGNATURE: ___________________________________________________________________

Equivalent products can be used upon providing submittal and approval prior to installation.

NOTE: The purpose of the information listed is to generally highlight the work to be done and target items of concern. Items not shown in the specifications or any work obviously necessary to complete the project (as described by the specifications) are to be considered part of the contract.

1206 Cypress St, Rocky Mount, NC

This 1,117 sq ft brick veneer home was built in 1956. The main concern for the Homeowner is the replacement of the HVAC gas furnace AC and duct work replacement. There is debris in the crawlspace that will have to be removed and a moisture barrier to be installed. An electrical upgrade on the interior sub panel will be done.

SPECIFICATIONS DATED: 3-2-2026

INSPECTED BY: Michael Kepley

DATE OF INSPECTION: 2-25-2026

ADDRESS: 1206 Cypress St, Rocky Mount, NC initialed and dated each page of the work write-up.

3. Contractor certifies that he/she has reviewed and agrees to perform the scope of work described and has initialed and dated each page of the work write up.

4. The contractor shall remedy any defect due to faulty material or workmanship and pay for all damage to other work resulting therefrom, which appears within one year from final payment by the City. All reported deficiencies or issues must be resolved by the Contractor whether the work of subcontractors or not. The City will not contact subcontractors to resolve issues. Further, the contractor shall furnish the owner with all manufactures and suppliers’ written warranties covering items furnished under the contract prior to release of final payment. Roof replacement work requires a two-year warranty.

5. All lead-based paint renovation activities performed for compensation in target housing shall be conducted in accordance with North Carolina Renovate, Repair and Paint (RRP) Rule and, when using US Department of Housing and Urban Development (HUD) funds, 24 CFR 35 Subpart J. To bid on a pre-1978 property, the contractor’s firm must provide all required Lead documents including RRP firm certification and renovator letter.

6. Remove from site all construction materials, tools, and debris. Sweeps clean all exterior work areas.

Vacuum all interior work areas, removing all visible dust, stains, labels and tags.

All work is to comply with current North Carolina State Building Code, City of Rocky Mount Rehabilitation Standards for Single-Family Structures, performance manual guidelines and or local building, electrical and plumbing codes with inspections and permits when applicable. All work will be done in quality and workmanlike manner. All material must be new, no re-used material.

When the Work Scope calls for an item to be removed and replaced, the contractor is to secure the owner’s approval to dispose of the item rather than turning the item over to the owner.

GUIDELINES FOR RENOVATION FOR PROPERTIES IN A HISTORIC DISTRICT

The property described in the attached document is either in a local historic district (meaning that the local historic preservation ordinances apply to the exterior only), in a national historic district (meaning that the Secretary of the Interior's historic preservation standards apply to both exterior and interior work) or is an individually designated historically significant building under one of these two authorities. In any case, the following SHALL apply to the work under any contract to renovate this property and it is a condition of the use of our federal funds that these guidelines are followed.

The specifications have been written to meet these standards. If any work is added after the bids are submitted, the Contractor is eligible for a change order to cover additional costs.

In general, the following items and conditions apply to all work on historic properties:

1. Whenever possible the Contractor shall repair and reuse original materials and restore the original structure and details.

2. When new materials are specified, the Contractor shall assume (even if it is not specifically noted) that the new materials shall match as closely as possible either

3. If there are no original materials to match, the Contractor shall select new materials that are in line with the design period and style of the original structure - that is they shall "evoke" the feeling of the period of the structure.

If in doubt, ask the Community Development Rehab Specialist for guidance.

4. When new work requires penetrating the exterior walls or roof - such as with a new vent stack, roof ventilation --or hanging something modern on the outside of the structure -- such as a new electrical service panel -- penetrating pipes or modern appliances shall be located out of sight of the street or sidewalk whenever possible. Locations of new penetrations require approval of the C.D. Rehab Specialist BEFORE work begins.

5. When new equipment -- such as a new HVAC unit -- will set the equipment on the property outside of the house, the Contractor shall clear the location with the C.D. Rehab Specialist prior to beginning work on that location.

6. Where submittals are required, the Contractor shall submit materials, catalog cuts or color chips to the Rehab Specialist who will forward them to the proper historic authority for approval. Comments will be returned to the Contractor within 10 business days. The Contractor shall allow time for this process and anticipate this delay as part of his agreed schedule.

7. If the Contractor proceeds with work not in compliance with historic guidelines, without having consulted the C.D.

Rehab Specialist, and the work is rejected by the agency with historic jurisdiction, the Contractor will be liable for

FOUNDATIONS

Remove all debris from crawlspace and dispose of same. Install continuous Black 6-mil poly vapor barrier to 100% of accessible crawlspace area. Lap poly barrier up foundation wall a minimum of 4", lap seams a minimum of 6", secure with bricks. Accessible to be defined as one vertical foot. Work to include removal of all debris. To comply with local code requirements (consult with building inspector).

Bid Amount________________

ELECTRICAL

All work shall be performed by a licensed electrical contractor:

Replace the existing interior fuse panel with a new service panel with capacity equal to Code requirements for the electrical demand of the dwelling unit including all specified upgrades with main disconnect and index circuits for easy reference. Tie in complete.

Bid Amount________________

HEATING

All work shall be performed by a licensed HVAC contractor:

Seal around all floor, wall and ceiling penetrations. Install dryer venting to the exterior If the scope of work includes the installation of new HVAC equipment or replacement of existing HVAC equipment:

the work shall include any item necessary to complete the installation of said equipment, including but not limited to: removal of existing equipment, folding staircases, attic access, attic platforms, crawlspace doors, piers and /or concrete slabs. Installation of new Dryer vent or repair of existing dryer vent is required.

All equipment must meet or exceed the international residential building code.

Remove all existing heating equipment including electric baseboard heat strips, thermostats and repair with matching material.

Install a new gas-fired central heating and cooling split or package system, complete, to include controls, automatic thermostat, fans, wiring, supply/return grilles and filter etc. Insulated metal plenum'(s) with insulated metal or flex ductwork system, Duct insulation shall be R-8, (R-6 in conditioned space) and shall include a vapor barrier on the outside surface with a flame-spread rating not greater than 25 and a smoke density not greater than 50. Size in accordance with ACCA Manual J specifications. Do not use foil faced or batt insulation (commonly used for walls, ceiling, and floors) as duct insulation. Staples used to secure duct insulation shall be a minimum of 2-inch outward clinching heavy duty staples. All seams shall be sealed with vapor barrier Mastic or approved equally durable alternative. Minimum AFUE rating of 90%. Minimum SEER rating of 14.0. Delivery system ductwork shall be designed in accordance with ACCA Manual D. Insulated plenum shall be a minimum of 15' long and flex duct shall be no longer than 15' with no sharp turns or compression. System capacity, copy of sizing calculations, and duct design calculations and drawings must be submitted to the CDO for pre-approval. All work must be performed by a licensed HVAC contractor.

Bid Amount________________

Total Bid Amount_____________________

NAME OF BIDDER: ___________________________________________________________________________

NOTE: The purpose of the information listed is to generally highlight the work to be done and target items of concern. Items not shown in the specifications or any work obviously necessary to complete the project (as described by the specifications) are to be considered part of the contract.

The Occupant is responsible for boxing and protecting any breakable items. The Contractor shall be responsible for moving furniture, boxes, etc. to facilitate the work. Ensure that personal belongings are covered with painters’ plastic such as furniture and clothing when working in specific areas.

2832 Deer Run, Rocky Mount, NC

This 1985 mobile home main issue is a deteriorated subfloor in the Living Room, Kitchen/Dining Room/ Laundry.

There is also a shower stall that was started; however it was not completed.

SPECIFICATIONS DATED: 3-30-2026

INSPECTED BY: Michael Kepley

DATE OF INSPECTION: 3-17-2026

ADDRESS: 2832 Deer Run Rocky Mount, NC initialed and dated each page of the work write-up.

3. Contractor certifies that he/she has reviewed and agrees to perform the scope of work described and has initialed and dated each page of the work write up.

4. The contractor shall remedy any defect due to faulty material or workmanship and pay for all damage to other work resulting therefrom, which appears within one year from final payment by the City. All reported deficiencies or issues must be resolved by the Contractor whether the work of subcontractors or not. The City will not contact subcontractors to resolve issues. Further, the contractor shall furnish the owner with all manufactures and suppliers’ written warranties covering items furnished under the contract prior to release of final payment. Roof replacement work requires a two-year warranty.

5. All lead-based paint renovation activities performed for compensation in target housing shall be conducted in accordance with North Carolina Renovate, Repair and Paint (RRP) Rule and, when using US Department of Housing and Urban Development (HUD) funds, 24 CFR 35 Subpart J. To bid on a pre-1978 property, the contractor’s firm must provide all required Lead documents including RRP firm certification and renovator letter.

6. Remove from site all construction materials, tools, and debris. Sweeps clean all exterior work areas.

Vacuum all interior work areas, removing all visible dust, stains, labels and tags.

All work is to comply with current North Carolina State Building Code, City of Rocky Mount Rehabilitation Standards for Single-Family Structures, performance manual guidelines and or local building, electrical and plumbing codes with inspections and permits when applicable. All work will be done in quality and workmanlike manner. All material must be new, no re-used material.

When the Work Scope calls for an item to be removed and replaced, the contractor is to secure the owner’s approval to dispose of the item rather than turning the item over to the owner.

GUIDELINES FOR RENOVATION FOR PROPERTIES IN A HISTORIC DISTRICT

The property described in the attached document is either in a local historic district (meaning that the local historic preservation ordinances apply to the exterior only), in a national historic district (meaning that the Secretary of the Interior's historic preservation standards apply to both exterior and interior work) or is an individually designated historically significant building under one of these two authorities. In any case, the following SHALL apply to the work under any contract to renovate this property and it is a condition of the use of our federal funds that these guidelines are followed.

The specifications have been written to meet these standards. If any work is added after the bids are submitted, the Contractor is eligible for a change order to cover additional costs.

In general, the following items and conditions apply to all work on historic properties:

1. Whenever possible the Contractor shall repair and reuse original materials and restore the original structure and details.

2. When new materials are specified, the Contractor shall assume (even if it is not specifically noted) that the new materials shall match as closely as possible either

3. If there are no original materials to match, the Contractor shall select new materials that are in line with the design period and style of the original structure - that is they shall "evoke" the feeling of the period of the structure.

If in doubt, ask the Community Development Rehab Specialist for guidance.

4. When new work requires penetrating the exterior walls or roof - such as with a new vent stack, roof ventilation --or hanging something modern on the outside of the structure -- such as a new electrical service panel -- penetrating pipes or modern appliances shall be located out of sight of the street or sidewalk whenever possible. Locations of new penetrations require approval of the C.D. Rehab Specialist BEFORE work begins.

5. When new equipment -- such as a new HVAC unit -- will set the equipment on the property outside of the house, the Contractor shall clear the location with the C.D. Rehab Specialist prior to beginning work on that location.

6. Where submittals are required, the Contractor shall submit materials, catalog cuts or color chips to the Rehab Specialist who will forward them to the proper historic authority for approval. Comments will be returned to the Contractor within 10 business days. The Contractor shall allow time for this process and anticipate this delay as part of his agreed schedule.

7. If the Contractor proceeds with work not in compliance with historic guidelines, without having consulted the C.D.

Rehab Specialist, and the work is rejected by the agency with historic jurisdiction, the Contractor will be liable for

EXITS

Remove old caulking around exterior trim on front door. Apply NP-1 caulk around exterior trim and wipe a smooth bead.

Location: Front door exterior trim

Bid Amount_______________

WINDOWS

If the scope of work includes the replacement of windows, all windows shall meet sections R303.1, R308, R310, R613 of the international residential building code.

Tempered glass is required for windows close to exits.

Windows with grids are not required unless otherwise specified.

Alarm system connections, if existing and working, must be working after new window installation is complete.

Kitchen window is leaking around seal. Remove the window and install new butyl tape to same. Reinstall the window unit using new screws.

Location: Kitchen window

Bid Amount_______________

PORCHES

Remove existing rear stoop completely to include removal of all floor members, posts, columns, and stoop.

Remove foundation/piers.

Install a new free-standing 5' x 5' stoop and steps at the entrance, complete: Deck band to rest on pressure treated 4"x 4" posts embedded in concrete. Install new steps and handrails all around. Detail specifications: (All lumber shall be pressure treated); deck sills doubled 2" x 8" s bolted to sill plate of structure; joists: 2" x 8"s 16" OC;

flooring: 5/4 decking; deck guard-rails : top and bottom 2"x 4"s with 2" x 2"s pickets set on centers so that a 4" sphere cannot pass between any opening, height to be 36"; steps: 36" width; stringers: three 2" x 12" stringers set on masonry/concrete; treads: two 2"x 6"s spaced 1/4" apart; maximum riser: 7 1/2"; step handrails: 4"x 4" posts embedded in concrete and top and bottom 2" x 4"s with 2" x 2"s pickets set on centers so that a 4" sphere cannot pass between any opening.

Bid Amount_______________

PLUMBING

All work shall be performed by a licensed plumbing contractor:

Seal around all floor, wall and ceiling penetrations.

If the scope of work includes the installation of a new bathroom or replacement of existing bathroom fixtures, all fixtures must meet clearance standards and must meet or exceed the water usage standards of the international residential building code

Install a Elkay Dayton 20-gauge double bowl self rimming eight inch stainless steel sink, complete with water saver (1 2 to 2 gal. per minute) Delta Classic faucet (single lever), spray, basket strainers, p-trap, continuous waste supply lines, and cutoff valves.

Install 5-foot fiberglass shower set (1, 2 or 4 piece) complete; including 3 valve diverter or single lever (Delta) type controls, with water saver (2 to 2 2 gal. per minute) shower head. Matching wall surround to have integrally molded soap dish. Install rigid air block material behind unit on all exterior walls. Install an HD shower rod and plastic curtain.

Location: Left side bathroom

Make supply line and DWV line connections to the new shower and Kitchen sink. Ensure proper connections and configuration of DWV lines.

INTERIOR WALL

Telephone and cable TV connections, if existing and working must be working after interior is complete.

Install 1/2" gypsum wallboard: installed at right angles to studs. Apply joint compound per manufacturer's specifications. Finish surface to be free of defects. Carefully remove and reinstall/replace all trim work. Install corner bead where applicable. Install new crown molding.

Location(s): Left side bathroom and bedroom opposite of bathroom shower Note: Walls around shower stall may have to be furred.

Bid Amount_______________

CABINETS AND CLOSETS

Install _12__LF of new base cabinet, prefinished, (Diamond Now or approved equivalent). Cabinets to be installed plumb and true, all joints with wall to be trimmed as applicable. Install post form countertop with 4” backsplash.

Location(s): Kitchen

Bid Amount_______________

FLOORS AND STAIRS

Install Bruce 12-mm thick laminate flooring with manufacturer approved underlayment: laminate flooring shall have a minimum 25-year warranty and be Green Guard certified. Install per manufacturer's specifications. Install in adjacent closets and install metal trim at all adjacent doorways. Install standard wood quarter round molding and 3 1/4" wood baseboard. All door trim shall be undercut and flooring installed under same. Flooring shall have a price point of $3.00 per square foot.

Location(s): Living Room (~13' x 15'), Hallway (~40" x 8'), Kitchen/ Dining Room/ Laundry (~13' x 18')

Repair/replace defective floor members: remove all defective flooring, sub-flooring, joists, and replace with new materials. All replacement members within 12" of grade must be pressure treated.

Location(s): Living Room, Kitchen, Laundry

INTERIOR PAINTING

Apply two (2) coats of primer plus paint (no VOC) latex paint to all specified areas:

New interior trim, left side bathroom walls, new drywall in bedroom

Bid Amount______________

Total Bid Amount_______________

NAME OF BIDDER:___________________________________________________________________________

All work must comply with international residential building code A plastic permit box mounted on a post must be located on site

If the house is built prior to 1978, the General Contractor SHALL be a NC Certified Renovate Firm.

Equivalent products can be used upon providing submittal and approval prior to installation.

The Contractor shall set up containment walls for projects that produce a significant amount of dust. No cutting inside the home without containment walls set up.

NOTE: The purpose of the information listed is to generally highlight the work to be done and target items of concern. Items not shown in the specifications or any work obviously necessary to complete the project (as described by the specifications) are to be considered part of the contract.

NOTE: Contractor is responsible for all permits and for the removal of all renovation debris. Work must be performed in a workmanlike manner and conform to all applicable codes and to the City's rehabilitation specifications. Owner reserves the right to a limited choice of roofing, paint, vinyl, and marlite colors.

The Occupant is responsible for boxing and protecting any breakable items. The Contractor shall be responsible for moving furniture, boxes, etc. to facilitate the work. Ensure that personal belongings are covered with painters’

NOTE Contractor to pick up job sight daily.

W

D

Living Room

13'2 x15"

Kitchen/Dining Room/Laundry

13'2 x 17'7

Bedroom

Bedroom

923 Tarboro St, Rocky Mount, NC

This is a story about a half of 1980 sq ft brick veneer home built in 1950. The two main issues at the house are gas furnace HVAC replacement and an electrical subpanel upgrade.

SPECIFICATIONS DATED: 3-24-2026

INSPECTED BY: Michael Kepley

DATE OF INSPECTION: 3-17-2026

ADDRESS: 923 Tarboro St, Rocky Mount, NC initialed and dated each page of the work write-up.

3. Contractor certifies that he/she has reviewed and agrees to perform the scope of work described and has initialed and dated each page of the work write up.

4. The contractor shall remedy any defect due to faulty material or workmanship and pay for all damage to other work resulting therefrom, which appears within one year from final payment by the City. All reported deficiencies or issues must be resolved by the Contractor whether the work of subcontractors or not. The City will not contact subcontractors to resolve issues. Further, the contractor shall furnish the owner with all manufactures and suppliers’ written warranties covering items furnished under the contract prior to release of final payment. Roof replacement work requires a two-year warranty.

5. All lead-based paint renovation activities performed for compensation in target housing shall be conducted in accordance with North Carolina Renovate, Repair and Paint (RRP) Rule and, when using US Department of Housing and Urban Development (HUD) funds, 24 CFR 35 Subpart J. To bid on a pre-1978 property, the contractor’s firm must provide all required Lead documents including RRP firm certification and renovator letter.

6. Remove from site all construction materials, tools, and debris. Sweeps clean all exterior work areas.

Vacuum all interior work areas, removing all…