This file comprises architectural construction drawings and specifications prepared by Zaxis Architectural P.C. for Roswell Park Comprehensive Cancer Center (RPCCC) in Buffalo, New York, for the replacement of the roof system on Building 11 (Power Plant). The project scope encompasses removal and replacement of the existing EPDM roof membrane system on approximately 16,400 square feet of roof area across three distinct sections: the lower power plant roof (concrete plank deck), upper power plant roof (metal deck), and stair penthouse roof (metal deck). The project includes installation of a 90 mil EPDM fully adhered roofing system with R-33 rigid insulation, cover board, vapor barrier, and associated flashings and penetration details. Additional work includes installation of perimeter aluminum fascia and coping, 1.5-inch schedule 40 pipe railing (approximately 230 linear feet), replacement of roof drains and leaders, new aluminum gutters and downspouts, painting of structural steel elements, concrete pad installation for cooling tower dripping, and provision of walkway pads. A pre-bid meeting is scheduled for Friday, November 13, 2026, at 10:00 AM at the Cell & Virus Building, 141 High Street, Buffalo, NY 14263, with a site tour included. Questions must be submitted by 12:00 PM on Friday, November 20, 2026, and responses will be communicated by addendum. Prospective bidders should email Rob Henschel at rob.henschel@roswellpark.org with "RFP #27-26" in the subject line.
The drawings specify detailed demolition requirements, field verification protocols, and manufacturer-approved installation standards. Previous contractors awarded identical or substantially similar contracts include Titan Roofing, Weaver Roofing, and Jameson Roofing. The procurement includes a Service-Disabled Veteran-Owned Business (SDVOB) goal of 6.00% and Minority/Women Business Enterprise (MWBE) contracting goals totaling 30.00%. The project contains complex existing conditions including cooling towers, mechanical equipment, piping infrastructure, and electrical systems that must be coordinated and protected throughout construction. The contractor is responsible for providing overhead scaffolding protection for facility staff during roof demolition work and must coordinate daily with RPCCC operations to maintain emergency access and equipment functionality. Unit pricing is required for potential supplemental work including deficient wood blocking replacement, masonry repointing, low-area deck infill, roof drain inserts, and curb modifications. All work must conform to manufacturer specifications and warranty requirements established by the basis of design manufacturer representative.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 27-26 PP Roof Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4245 UNION ROAD, SUITE 210
BUFFALO, NEW YORK 14225
P:716.923.0133 F:716.923.0136
BUILDING DATA
CS-101 COVER SHEET
DRAWING INDEX
POWER PLANT
BUILDING 11
architectural, p.c.
CONSTRUCTION TYPE: TYPE 1A
APPROXIMATE ROOF AREA: 16,400 +/- SF - BUILDING FOOTPRINT
NUMBER OF STORIES: THREE STORIES PLUS MECHANICAL PENTHOUSES
SPRINKLER SYSTEM: FULLY SPRINKLERED
ELM & CARLTON
BUFFALO, NY 14263
(716) 845-2300
ROSWELL PARK CAMPUS BUILDING MAP
POWER PLANT (BUILDING 11)
ROOF REPLACEMENT
RPCCC PROJECT NO. 11-21-001
ROSWELL PARK COMPREHENSIVE CANCER CENTER
ELM & CARLTON STREETS
BUFFALO, NEW YORK 14263
ARCHITECTURAL
A-101 ROOF PLAN
A-102 DETAILS
A-103 DETAILS
A-201 TYPICAL DETAILS
POWER PLANT
DUMPSTER AND
STAGING
COORDINATE W/
OWNER
CARLTON STREET
7N
CARLTON STREET
HIGH STREET
VIRGINIA STREET
EL
LI
C O
TT
S
TR
EE
T
N . O
AK
S
TR
EE
T
M
IC
H
IG
AN
A
VE
N
U E
EL
M
S
TR
EE
T
DRAWING No.
PROJECT No: 20-027
DATE: 6-30-2020
R
EV
IS
IO
N S
D
AT
E N o.-
CS-101
ZA
XI
S
AR
C H
IT
EC
TU
R
AL
P
.C
TH
IS
D O
C U
M
EN
T, A
N D
T H
E
ID
EA
S
AN
D
D
ES
IG
N
S
IN
C O
R
PO
R
AT
ED
H
ER
EI
N , A
R E
TH
E
PR
O
PE
R
TY
O
F
ZA
XI
S
AR
C
H
IT
EC
TU
R
AL
P .C
U N
AU
TH
O R
IZ
ED
R
EP
R O
D U
C
TI
O N
, A
LT
ER
AT
IO
N
O R
A D
D
IT
IO
N
T O
A N
Y D
R
AW
IN
G
D
ES
IG
N , S
PE
C
IF
IC
AT
IO
N , P
LA
N
O R
R
EP
O R
T
IN
W H
O
LE
O R
IN
P
AR
T
W
IT
H O
U T
TH
E
EX
PR
ES
S
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
ZA
XI
S
AR
C H
IT
EC
TU
R
AL
P
.C . I
S
PR
O H
IB
IT
ED
B
Y
SE
C
TI
O N
9, P
R O
VI
SI
O N
O
F
TH
E N
EW
Y
O R
K
ST
AT
E
ED
U
C
AT
IO
N
L
AW
PO
W
ER
P
LA
N
T R
O O
F R
EP
LA
C
EM
EN
T
R O
SW
EL
L
PA
R K
C O
M
PR
EH
EN
SI
VE
C
AN
C
ER
C
EN
TE
R
EL
M
C
AR
LT
O N
S
TR
EE
TS
, B U
FF
AL
O , N
Y
IS
SU
ED
F
O R
S
U
BM
IS
SI
O N
8-
-2
IS
SU
ED
F O
R B
ID
-1 6-
AutoCAD SHX Text architecture . planning . . planning . planning . . consulting
SCALE :
ROOF PLAN
1/8" = 1'-0''
8 98.7
D.3
D.2
D
B
A
BB
DD
AC
CC
COOLING TOWER COOLING TOWER COOLING TOWER COOLING TOWER
COOLING TOWER
COOLING TOWER
RD
RD
RD
RD
RD
AA
COOLING TOWER COOLING TOWER
P-20
P-21
P-22
P-23
P-24
P-25
P-26
P-27
P-31
P-32
P-33
P-43 P-44P-45
P-46
P-47
P-48
P-49
P-50
CAP
P-51P-52P-53P-55P-54P-56
+/- 106'-4"
- 1
'-0
- 8
'-1
+/- 10'-10"+/- 47'-2"
34B
A
C
D
E
1 2 3 4 5 6 7
DN
7.1 7.2 7.8
P-2 P-3
P-1
P-4
P-5P-6
EX.
CAP
EXIST
CAP
EX.
CAP
RDRD
P-7
UP
DN
UP
DN
DN DN
P-8
P-9
P-10
P-11
P-12
P-13
P-14
P-15
P-16
P-17
P-18
P-19
P-28
P-29
P-30
P-35
P-36 P-37 P-38P-39 P-40 P-41 P-42
+/- 44'-5"
- 1
8' -1
0"
- 7
2' -0
+/- 120'-0"
- 9
'-6
4A
5 5
8 8
R
ID
G E
R
ID
G E
A-103
A-102
A-103
A-103
A-103
A-103
A-103
A-103
A-103
A-103
A-103
HIGH
A-103
LOW
A-103
7 LOW
A-102
A-102
A-102
A-102
HIGH
A-102
A-102
A-102
A-102
LOW
A-102
LOW
8"
8" 8"
8"
2'-0"
8"
2A
EXISTING DUCT
CONTINUES TO
THE EXISTING
CHIMNEY
P-34
TYP
LOW HEAD-ROOM NOTIFICATION:
THE EXISTING COOLING TOWERS, PLATFORM STRUCTURE ALONG WITH HORIZONAL PIPING
AND DUCTWORK ABOVE THE ROOF DECK CREATE A LOW HEAD-ROOM CONDITION.
SIM
SIM
LOWER ROOF
AREA
UPPER ROOF
AREA
STAIR
PENTHOUSE
ROOF AREA
4A
4A
4B
4B
4B
4B
4B
15 15 15 15 15 15
D1
D1
2-LINES COMBINED
A-103
D1
D1
D1
D1
14A
TYP
14A
TYP
TYP
TYP
TYP
2A
P-D P-E
P-C
TYP
TYP
EX.
CAP
RIDGE
TYP19
TYP
A-102 A
TYP
D1
D3
D3 D3 D3
D1
D1
18 18
18 18
18A
18A
1918A
14141414
14 14 14 14
DIRECTION OF PITCH FOR TAPERED
ROOF INSULATION OR EXISTING
STRUCTURE
PRIMARY ROOF DRAIN
EXISTING SMOKE HATCH
EXISTING ROOF ACCESS HATCH
EXISTING VENT/ PIPE PENETRATION OR
STRUCTURAL SUPPORT FOR COOLING
TOWER, DUCTWORK OR PIPING
EXISTING EXHAUST FAN
PROVIDE 30"x30" WALKWAY PADS AS
INDICATED ON PLAN.
DARK GRAY SHADING REPRESENTS
CRICKETS AT 12" PER FOOT
LIGHT GRAY SHADING REPRESENTS
SLOPED STRUCTURAL DECK
2" ± PER FOOT WITH FLAT INSULATION
CROSS HATCH REPRESENTS FLAT
STRUCTURAL DECK AND TAPERED
INSULATION 14" PER FOOT
PHOTOGRAPH REFER TO
SPECIFICATION SECTION 003119
EXISTING CONDITION INFORMATION
GUARDRAIL
STRUCTURAL COLUMN WITH POURABLE
SEALER POCKET
ROOF PLAN LEGEND
PX
SMOKE
HATCH
GENERAL NOTES:
A. ALL DIMENSIONS ARE SHOWN FOR BASIS OF SCOPE
OF WORK - FIELD VERIFICATION IS REQUIRED FOR
ALL WORK.
B. CONTRACTOR SHALL PROVIDE A MINIMUM 12" THICK
EXTERIOR GRADE PLYWOOD FOR ROOF
PROTECTION AT ALL FOOT TRAFFIC THAT OCCURS
OR FOR ALL WORK THAT OCCUR ABOVE COMPLETED
INSTALLATION AREAS.
C. ALL WORK MUST BE IN ACCORDANCE WITH
MANUFACTURER REQUIREMENTS. PROVIDE
POSITIVE ROOF DRAINAGE. DRAINAGE CRICKETS
ARE SHOWN FOR REFERENCE AND SHALL BE
COORDINATED WITH THE MANUFACTURE FOR
PROPER LOCATION AND SIZE. PONDING IS NOT
ACCEPTABLE, ALL PONDING/POOLING OF SURFACE
WATER WILL REQUIRE CORRECTIVE ACTION.
D. ALL NON-STANDARD DETAILS HAVE BEEN REVIEWED
WITH THE MANUFACTURER REPRESENTATIVE TO BE
CERTAIN THE PROJECT MEETS WITH THE BASIS OF
DESIGN MANUFACTURE WARRANTY REQUIREMENTS.
IF THE CONTRACTOR IDENTIFIES A NON-STANDARD
DETAIL CONDITION NOT INCLUDED IN THE
CONTRACT DOCUMENTS, THE CONTRACTOR SHALL
OBTAIN THE MANUFACTURER'S APPROVAL OF THE
INSTALL PRIOR TO PERFORMING THE WORK.
E. FIELD VERIFY ALL EXISTING ROOF PENETRATIONS
AND INSTALL MANUFACTURER STANDARD
FLASHINGS WHETHER SHOWN ON THE DRAWINGS
OR LOCATED IN THE FIELD DURING CONSTRUCTION.
F. ALL DEBRIS SHALL BE REMOVED FROM THE
PROJECT AREA AND ADJACENT ROOF AND AT GRADE
AREAS, INCLUDING BUT NOT LIMITED TO;
FASTENERS, EXTRA MATERIALS, TOOLS, EQUIPMENT,
SAFETY, ETC. THE CONTRACTOR SHALL SCHEDULE A
WALK-THRU WITH THE OWNER SPECIFICALLY TO
REVIEW WORK AREA CLEAN-UP, PRIOR TO
TURN-OVER OF THE PROJECT.
GENERAL DEMOLITION NOTES:
A. IT IS THE INTENT OF THE CONTRACT DOCUMENTS TO
REMOVE THE ENTIRE EXISTING EPDM ROOF SYSTEM TO
THE EXISTING CONCRETE OR METAL DECK. THE
DEMOLITION/ REMOVAL WORK SHALL INCLUDE BUT IS NOT
LIMITED TO THE FOLLOWING.
1. LOWER POWER PLANT ROOF: BASED ON THE BASIS OF
DESIGN MANUFACTURER REPRESENTATIVE'S FIELD
INVESTIGATION THE EXISTING ROOF SYSTEM CONSIST
OF :
· EPDM ROOF MEMBRANE
· 1
2" FIBERBOARD COVER BOARD
· 2-LAYERS OF RIGID INSULATION (EPS)
- ONE LAYER IS 2" THICK AND
- ONE LAYER IS 1 12" THICK
(MECHANICALLY FASTENED THRU
CONCRETE PLANK DECK WITH
TOGGLE BOLTS)
· VAPOR BARRIER
· 1
2" GYPSUM BOARD (SIMILAR TO DENSDECK)
· CONCRETE ROOF DECK
2. UPPER POWER PLANT ROOF AND STAIR PENTHOUSE:
BASED ON THE BASIS OF DESIGN MANUFACTURER
REPRESENTATIVE'S FIELD INVESTIGATION OF THE
UPPER ROOF LEVEL, THE EXISTING ROOF SYSTEM
CONSIST OF :
· EPDM ROOF MEMBRANE
· 1
2" FIBERBOARD COVER BOARD
· 2-LAYERS OF RIGID INSULATION (EPS)
- ONE LAYER IS 2" THICK AND
- ONE LAYER IS 1 12" THICK
· VAPOR BARRIER
· 1
2" GYPSUM BOARD (SIMILAR TO DENSDECK)
· METAL ROOF DECK
B. IT IS THE THE INTENT OF THE CONSTRUCTION DOCUMENTS
TO REMOVE THE EXISTING VAPOR BARRIER LOCATED
BETWEEN THE RIGID INSULATION (OR ANY BACKER
BOARDS) AND THE CONCRETE ROOF DECK ENTIRELY,
EXPOSING THE DECK FOR INSTALLATION OF NEW WORK.
C. REMOVE AND DISPOSE OF ALL EXISTING GRAVEL STOPS,
FASCIA, COPING, COUNTER FLASHING, TERMINATION BARS,
EXPANSION JOINT MATERIALS FASTENERS, ETC. ENTIRELY.
D. ALL EXISTING LEAD COATED COPPER THROUGH WALL
FLASHING SHALL REMAIN, UNLESS SPECIFICALLY STATED
OTHERWISE. THE CONTRACTOR SHALL CONTACT THE
OWNER AND ARCHITECT IF A CONFLICT OCCURS DUE TO
THE INCREASE IN THE HEIGHT DUE TO THE INCREASE IN
THE THICKNESS OF THE RIGID INSULATION
E. EXISTING WOOD BLOCKING IS SCHEDULED TO REMAIN.
REVIEW THE CONDITION OF THE WOOD BLOCKING WITH
THE OWNER AND MANUFACTURER'S REPRESENTATIVE IF
ANY WOOD BLOCKING IS TO BE DETERMINED TO BE IN
DEFICIENT CONDITION, ISSUE A WRITTEN COST PROPOSAL
FOR THE COST OF REMOVAL AND REPLACEMENT BASED ON
THE SUBMITTED UNIT PRICING.
F. REVIEW THE CONDITION OF EACH BRICK WALL AND EACH
CONCRETE BLOCK (CMU) WITH THE OWNER & ROOF
MEMBRANE MANUFACTURE REPRESENTATIVE WHERE
EXISTING ROOFING MATERIAL HAS BEEN REMOVED AND
WHERE ROOFING MEMBRANE IS SCHEDULED TO BE
INSTALLED. WHERE DEFICIENT CONDITIONS ARE IDENTIFIED
ISSUE A WRITTEN PROPOSAL FOR THE COST OF
REPOINTING BASED ON THE SUBMITTED UNIT PRICING FOR
EACH MATERIAL.
G. PRIOR TO INSTALLING THE NEW ROOF SYSTEM REMOVE
ALL LOOSE MATERIAL AND DEBRIS FROM ALL SURFACES
SCHEDULED TO RECEIVE NEW ROOF SYSTEMS. IF
STRUCTURAL DEFICIENCIES ARE IDENTIFIED NOTIFY THE
ARCHITECT AND OWNER IMMEDIATELY TO DETERMINE THE
COURSE OF ACTION.
H. MOVE AND DISCARD ALL EXISTING WALKWAY PADS.
I. COORDINATE DEMOLITION WITH NEW WORK AND PROVIDE
ALL NECESSARY REMOVALS FOR PROPER INSTALLATION
OF NEW WORK
KEYED NOTES:
LOWER POWER PLANT ROOF (FLAT STRUCTURE PLANK DECK):
REMOVE EXISTING ROOFING ENTIRELY AS INDICATED TO EXISTING
CONCRETE PLANK DECK AND REPLACE WITH 90 MIL EPDM ROOF
SYSTEM - FULLY ADHERED, 3/8" COVER BOARD, MINIMUM
AVERAGE R-33 RIGID TAPERED INSULATION 1/4" PER FOOT AND
VAPOR BARRIER. PROVIDE TAPERED INSULATION (AND CRICKETS)
MINIMUM THICKNESS TO PROVIDE POSITIVE DRAINAGE
UPPER POWER PLANT ROOF AND STAIR PENTHOUSE ROOF
(SLOPED STRUCTURE): REMOVE EXISTING ROOFING ENTIRELY AS
INDICATED TO EXISTING METAL DECK AND REPLACE WITH 90 MIL
EPDM ROOF SYSTEM - FULLY ADHERED, 3/8" COVER BOARD,
MINIMUM R-33 RIGID INSULATION (FLAT), VAPOR BARRIER AND 5 8"
GYPSUM DECK BOARD. PROVIDE TAPERED INSULATION TO
PROVIDE POSITIVE DRAINAGE.
STAIR PENTHOUSE ROOF:
REMOVE EXISTING ROOFING ENTIRELY AS INDICATED TO EXISTING
METAL DECK AND REPLACE WITH 90 MIL EPDM ROOF SYSTEM -
FULLY ADHERED, 3/8" COVER BOARD, 3" (R-20±) RIGID INSULATION
(FLAT), VAPOR BARRIER AND 5 8" GYPSUM DECK BOARD. PROVIDE
TAPERED INSULATION TO PROVIDE POSITIVE DRAINAGE.
REMOVE EXISTING GRAVEL STOP/ COPING ENTIRELY. EXISTING
WOOD BLOCKING IS SCHEDULED TO REMAIN. CONTRACTOR
SHALL PROVIDE UNIT COST IN THEIR BID FOR NEW WOOD
BLOCKING MATERIAL IF FOUND TO BE DEFICIENT UPON REMOVAL
OF THE GRAVEL STOP/COPING
PROVIDE CONTINUOUS PERIMETER PRE-FINISHED ALUMINUM
FASCIA COVER. REFER TO DETAILS 6 & 6D/A-103. COLOR SHALL BE
SELECTED BY THE OWNER
PROVIDE CONTINUOUS PERIMETER PRE-FINISHED COPING. VIF,
COORDINATE SIZE; WIDTH AND HEIGHT SHALL MATCH EXISTING
REFER TO DETAILS 1 & 1D - 2 & 2D - 5 & 5D /A-102. COLOR SHALL
SELECTED BY THE OWNER.
PROVIDE 1-1/2" Ø SCHEDULE 40 PIPE RAILING, 42" HIGH MINIMUM
ABOVE THE FINISHED ROOF. REFER TO DETAIL 6/A-103. PAINT
RAILING UPON COMPLETION W/ TWO FINISH COATS. PAINT COLOR
SHALL BE BLACK. FOR BIDDING PURPOSES THERE ARE
APPROXIMATELY 230''-0"± LINEAR FEET OF RAILING.
EXISTING ROOF ACCESS HATCH (OR SMOKE HATCH (VIF) TO
REMAIN. THE ASSOCIATED CURBS SHALL BE RAISED TO A
MINIMUM HEIGHT REQUIRED BY THE ROOF MANUFACTURER FOR
PROPER WEATHER TIGHT/WARRANTY INSTALLATION.
EXISTING GUTTER AND DOWNSPOUT SHALL BE REMOVED AND
DISCARDED AND REPLACED WITH NEW ALUMINUM GUTTER,
DOWNSPOUT AND SPLASH BLOCK. REFER TO DETAIL 5 & 5D/A-102
REMOVE THE EXISTING ROOF DRAIN STRAINER DOME AND
CLAMPING RING AND DISCARD. THE EXISTING ROOF DRAIN BOWL
AND ROOF DRAIN LEADER SHALL REMAIN. REMOVE AND REPLACE
THE EXISTING STRAINER DOME, CLAMPING RING, FASTENERS AND
ASSOCIATED ITEMS. INSPECT THE ROOF DRAIN BOWL FOR
CRACKS AND DEFICIENCIES. WHERE REMAINING ROOF DRAIN
COMPONENTS ARE DETERMINED TO IN DAMAGED OR
UNSATISFACTORY CONDITION, PROVIDE HEAVY DUTY
ALUMINATOR RETROFIT INSERT PER UNIT PRICING REFER TO
DETAILS A-1, A-2 & A-3/A-201
PROVIDE NEW ROOF DRAIN AND RAIN LEADER. TIE NEW LEADER
INTO EXISTING ADJACENT ROOF DRAIN LEADER. REFER TO
PLUMBING PLAN ON THIS DRAWING AND REFER TO DETAIL A1 & A2
/A-201
EXISTING EXPANSION JOINT BETWEEN THE LOWER AND UPPER
ROOF AREAS, REMOVE ENTIRELY AND REPLACE REFER TO
DETAILS 7 & 7D/A-103
EXISTING WALL MOUNTED ELECTRICAL RECEPTACLE AND
CONDUIT. TEMPORARILY REMOVE FASTENERS FOR INSTALLATION
OF ROOF SYSTEM AND REINSTALL
EXISTING GALVANIZED STAIRS, LANDING AND STRUCTURAL
FRAMING. SHALL REMAIN - MODIFY THE BOTTOM TREAD AND
STRINGER BE DETAIL 11/A-103
PROVIDE VERTICAL TERMINATION BAR ADJACENT TO THE
EXISTING METAL WALL PANELS. INSTALL PER MANUFACTURERS
WRITTEN INSTRUCTIONS
EXISTING COOLING TOWER DUNNAGE PLATFORM STRUCTURAL
STEEL COLUMNS WITH POURABLE SEALER POCKET. REMOVE AND
DISCARD ALL EXISTING SEALER AND PROVIDE NEW POURABLE
SEALER PER DETAIL C/A-201.
· PAINT EACH STEEL COLUMN, SUPPORT CONNECTIONS TO THE
PLATFORM - COLOR SELECTED BY THE OWNER. REMOVE ALL
RUST AND PROVIDE:
- PROVIDE 1 LAYER OF PRIMER
- PROVIDE 2 LAYERS OF FINISH COAT
EXISTING COOLING TOWER EQUIPMENT, PIPING AND DUCT
PENETRATIONS SHALL REMAIN PROVIDE FIELD FLASHING PER
DETAIL F/A-201 OR MANF. STANDARD FOR LOW EXISTING
FLASHING. DO NOT DISCONNECT PIPING /DUCTS FROM COOLING
TOWERS WITHOUT APPROVAL FROM OWNER
APPROXIMATE LOCATION OF COOLING TOWER PIPING
MODIFICATION AND CLEAN-OUT. REFER TO DETAIL A/A-102 FOR
SPLASH AREA AND CATCHMENTS AND CONTAINMENT ZONE
DETAILS
PROVIDE 8 EIGHT ADDITIONAL CONCRETE PADS FOR COOLING
TOWER DRIPPING PADS AND ICE PREVENTION - LOCATIONS TO BE
SELECTED BY OWNER
STRUCTURAL STEEL RAISED DUCT/BREACHING PLATFORM SHALL
REMAIN. PROVIDE FIELD APPLIED FLASHING F/A-201 AT ROOF
MEMBRANE PENETRATION AND PAINT ALL EXISTING STEEL:
· REMOVE ALL RUST
· PROVIDE 1 LAYER OF PRIMER
· PROVIDE 2 LAYERS OF FINISH COAT
· COLOR: BLACK
ALL EXISTING (REMAINING) YELLOW ROOF TOP PIPING/DUCT
SHALL BE REPAINTED YELLOW (WHETHER SPECIFICALLY KEYED
OR NOT). REMOVE ALL RUST AND PROVIDE:
· PROVIDE 1 LAYER OF PRIMER
· PROVIDE 2 LAYERS OF FINISH COAT
PAINT EXISTING ROOF TOP MECHANICAL PIPE/DUCT YELLOW.
REMOVE ALL RUST AND PROVIDE:
· PROVIDE 1 LAYER OF PRIMER
· PROVIDE 2 LAYERS OF FINISH COAT
EXISTING VENTILATION STACK SHALL REMAIN. PROVIDE PROPER
TERMINATION DETAILS C & F/A-201
EXISTING VENT, PIPING, CONDUIT, ROOF PENETRATIONS, ETC.
REFER TO DETAIL F & I/A-201. PLUMBING VENTS SHALL EXTEND 18"
MIN. ABOVE THE FINISHED ROOF. PROVIDE EXTENSION AS
REQUIRED BY MANF.
ABANDONED MECHANICAL CURB - REMOVE THE EXISTING CURB
ENTIRELY AND ALL ASSOCIATED BLOCKING, INFILL OPEN PER
DETAIL 10/A-103
EXISTING MECH. EQUIPMENT AND DUCTWORK PENETRATIONS ON
EXIST. CURB OR RAILS: ALL EXISTING MECHANICAL EQUIPMENT
AND ASSOCIATED CURBS SHALL BE RAISED TO A MINIMUM HEIGHT
REQUIRED BY THE ROOF MANUFACTURER FOR PROPER WEATHER
TIGHT/WARRANTY INSTALLATION. TEMPORARILY REMOVE AND
REINSTALL THE EXISTING UNITS, INCLUDING EXTENDING AND
RECONNECTING ANY CONDUIT, WIRING, PIPING, PLUMBING, ETC.
PROVIDE CURB EXTENDERS/ADAPTORS. VIF EXISTING
CONDITIONS. PRIOR TO ANY EQUIPMENT SHUT DOWN
COORDINATE WITH RPCCC. REFER TO DETAIL 10/A-103
EXISTING FALL PROTECTION ANCHOR POINTS SHALL REMAIN.
PROVIDE PIPE FLASHING PER DETAIL I/A-201
APPROXIMATE EDGE OF EXISTING PERIMETER LIGHT WEIGHT
CONCRETE FILL - SLOPED (VIF)
PROVIDE WALKWAY PADS AT ALL ACCESS HATCHES AND AT THE
BOTTOM OF ALL STAIRS AND DUNNAGE PLATFORM LADDERS - VIF
ALL LOCATIONS. ALSO ON THE UPPER ROOF, PROVIDE A
CONTINUOUS WALKWAY FROM THE PENTHOUSE DOOR, ENTIRELY
AROUND BOTH DUNNAGAE PLATFORM FOR CLARITY SOME
WALKWAY PADS ARE NOT SHOWN, COORDINATE THE EXACT
LOCATION WITH THE OWNER.
4A
4B
14A
2A
18A
A
C
D
1 2 3 4 5 6 7
RD
RD
B
SCALE :
PLUMBING PLAN - POWER PLANT LOWER ROOF
1/8" = 1'-0''
NOTES:
1. COLUMN LINES SHOWN FOR REFERENCE BASED ON THE ORIGINAL BUILDING DESIGN DOCUMENTS.
2. CORE DRILL THE EXISTING CONCRETE PLANK IN THE CENTER OF THE 2'-0" WIDE PLANK AND A MIN. OF 12" FROM THE LONG EDGE.
3. THERE IS A SIGNIFICANT AMOUNT OF EXISTING MECHANICAL, PLUMBING AND ELECTRICAL EQUIPMENT ALONG WITH SUB-STRUCTURE BEAMS
AND SYSTEMS DIRECTLY BELOW THE POWER PLANT ROOF. THE CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY AVOIDING CONFLICTS WITH THE EXISTING CONDITIONS AND COORDINATE WITH THE OWNER LOCATION OF THE NEW ROOF DRAIN AND THE EXACT ROUTE FOR THE NEW ROOF DRAIN LEADER SEWER PIPING AND THE TOTAL QUANTITY OF LINEAR FEET. THE DISTANCE INDICATED DOES NOT INCLUDE ANY VERTICAL PIPING OR CONSIDERATION FOR CONFLICTS WITH EXISTING CONDITIONS. THE CONTRACTOR SHALL PROVIDE THE TOTAL QUANTITY OF PIPING AND INSULATION REQUIRED TO COMPLETE THE WORK AT NO ADDITIONAL COST TO THE OWNER.
4" UP TO R.D.
(EXISTING)
RD
4" UP TO R.D.
(NEW)
4" UP TO R.D.
(EXISTING)
EXISTING 4" ROOF DRAIN
LEADER, INSULATED
EXISTING
CLEAN OUT
PROVIDE
CLEAN OUT
PROVIDE 4" CAST
IRON PIPE W/ 1"
MIN. PIPE
INSULATION WRAP
SLOPE:
MIN. 14" PER FOOT
EXISTING DECK PREPARATION AND
LOW AREA INFILL:
(REFER TO THE SPECIFICATIONS)
WHERE THE EXISTING CONCRETE ROOF DECK
STRUCTURE IS LEVEL AND UPON INSTALLATION
OF THE VAPOR BARRIER AND WEATHER-TIGHT
CONDITIONS, PREPARE ROOF DECK ELEVATION
SHOP DRAWING(S), UTILIZING TOPOGRAPHIC
SURVEY QUALITY ELECTRONIC EQUIPMENT WITH
"LASER LEVELING". DETERMINE LOW AREAS
PRIOR TO INSTALLING RIGID INSTALLATION AND
INFILL THE LOW AREAS WITH SELF-LEVELING
CEMENTIOUS MATERIAL, PER UNIT PRICING
KEYED DEMOLITION NOTES:
REMOVE THE EXISTING ABANDON ROOF
PENETRATIONS ENTIRELY, INCLUDING BUT NOT
LIMITED TO; ALL PIPING FLASHINGS, CURBS,
FASTENERS, ETC. TO BELOW THE ROOF DECK.
INFILL OPENING PER DETAIL 10/A-103.
· COORDINATE WITH THE OWNER THE EXACT
DEPTH BELOW THE ROOF DECK BASED ON
ACCESS TO EACH PIPE BELOW THE DECK.
CAP TERMINATED/ABANDONED PIPE BELOW
THE DECK (IF STILL EXISTING)
· REMOVE ALL ABANDONED ROOF TOP
PIPING/EQUIPMENT. CUT ASSOCIATED DECK
MOUNTED SUPPORTS FLUSH WITH THE
EXISTING CONCRETE ROOF DECK
REMOVE THE EXISTING ROOF ACCESS HATCH
ENTIRELY INCLUDING BUT NOT LIMITED TO;
FLASHINGS, CURBS, FASTENERS. INFILL
OPENING PER DETAIL 10/A-103. REMOVE THE
EXISTING ACCESS LADDER ENTIRELY, INCLUDING
BUT NOT LIMITED TO; ALL FASTENERS AND
SUPPORTS.
EXISTING ABANDONED ROOF PENETRATION.
REPUTED TO BE INTEGRAL RAISED CONCRETE
CURBS. UPON REMOVAL OF THE EXISTING ROOF
SYSTEM, REVIEW WITH THE OWNER AND
ARCHITECT THE EXISTING PENETRATION INFILL.
· BASE SCOPE OF WORK - REFER TO THE
DETAIL REFERENCED ON THE ROOF PLAN
· UNIT PRICE: UPON FIELD REVIEW IF THE
EXISTING CURB IS METAL OR WOOD - NOT
CONCRETE - THEN INFILL THE OPENING PER
DETAIL 10/A-103
· UNIT PRICE: UPON FIELD REVIEW, IF THE
CURB IS RAISED CONCRETE - THE CURB
SHALL REMAIN. REVIEW THE EXISTING
PENETRATION INFILL WITH THE ARCHITECT
AND OWNER AND IF DETERMINED TO BE IN
POOR CONDITION - THEN INFILL THE OPENING
PER DETAIL 10/A-103
D1
D0
D2
D3
PROVIDE OVERHEAD PROTECTION FOR ROSWELL STAFF DURING REMOVAL OF THE EXISTING TOGGLE STYLE
THRU-BOLT AND PLATE INSULATION FASTENERS ON THE LOW ROOF AREA:
THE LOW ROOF AREA CONTAINS AN EXISTING TOGGLE STYLE FASTENER SYSTEM SECURING THE ROOF INSULATION AND COVER-BOARD SYSTEM.
DURING THE ROOF REMOVAL PROCESS, THE EXISTING TOGGLES SHALL BE REMOVED COMPLETELY AND ALLOWED TO DROP TO THE FLOOR AREA BELOW.
THE CONTRACTOR SHALL HAVE AT LEAST ONE FULL TIME PERSON AT ALL TIMES LOCATING, COLLECTING AND DISPOSING OF ALL TOGGLES AND
FASTENERS AND DEBRIS.
THE CONTRACTOR SHALL ERECT AND MAINTAIN A SCAFFOLDING SYSTEM AT THE LOCATIONS SHOWN ON THE FIRST FLOOR PLAN. THE MINIMUM CLEAR HEIGHT SHALL BE 7'-0" (AFF). THE EXACT LENGTH DIMENSIONS TO BE CONFIRMED IN THE FIELD. THE WIDTH SHALL BE A STANDARD SCAFFOLDING WIDTH (5'-0"), TO PROTECT THE ROSWELL STAFF WHILE PERFORMING THEIR NORMAL DAILY ACTIVITIES INCLUDING, BUT NOT LIMITED TO; CIRCULATE AROUND THE EQUIPMENT, OBSERVER THE EQUIPMENT, GENERAL MAINTENANCE ON THE EQUIPMENT. THE SCAFFOLDING SUPPORTS SHALL NOT INTERFERE WITH ACCESS TO CONTROLS, VALVES, ACCESS PANELS, WATER SOFTENER FOR SALT DISPENSING, ETC.
THE CONTRACTOR SHALL COORDINATE DAILY WITH THE OWNER AND STAFF OF THE POWER PLANT DURING DEMOLITION WORK.
A MINIMUM TWO EMERGENCY EXITS WILL BE MADE AVAILABLE TO ALL STAFF AT ALL TIME. THE CONTRACTOR WILL POST SIGNAGE TO DESIGNATE THE WORK AREA INCLUDE EXTERIOR SIGNAGE ON THE DOORS WHEN ENTRY NEEDS TO BE RE-ROUTE AROUND THE WORK AREAS
THE OWNER SHALL NOTIFY THE CONTRACTOR IF AN EQUIPMENT EMERGENCY ARISES AND ACCESS IS NECESSARY WITHIN THE DEMOLITION AREA. THE CONTRACTOR SHALL STOP WORK IN THE EMERGENCY AREA. THE CONTRACTOR CAN MAKE NO CLAIM FOR ADDITIONAL COST IF AN EMERGENCY OCCURS.
CIRCULATION PATHWAYS:
PROVIDE OVERHEAD SCAFFOLDING
PROTECTION IN THE AREAS SHOWN ON THIS
FIRST FLOOR PLAN PER THE BELOW
OVERHEAD PROTECTION NOTES
120'± (VIF)
(V
IF
(V
IF
SCALE :
OVERHEAD PROTECTION PLAN - FIRST FLOOR
1/16" = 1'-0''
A-101
4245 UNION ROAD, SUITE 210
BUFFALO, NEW YORK 14225
P: 716.923.0133 F: 716.923.0136
ROOF PLAN
DATE: 5-28-20
SCALE: AS SHOWN
DRAWN BY: GLG
CHECKED BY:
PROJECT No: 20-027
DRAWING No.
DRAWING TITLE:
No. REVISIONS DATE architectural, p.c.
ROSWELL PARK
COMPREHENSIVE CANCER
CENTER
BUFFALO, NY 14263
(716) 845-2300
ELM & CARLTON
LOCATED AT:
ROSWELL PARK
COMPREHENSIVE CANCER
CENTER
BUFFALO, NEW YORK
POWER PLANT
ROOF REPLACEMENT
RPCI # 11-21-001
ISSUED FOR 100% SUBMISSION 8-25-2026
- ISSUED FOR BID 10-16-2026
1 REV - TOGGLE BOLT NOTE 11-3-2026
AutoCAD SHX Text
ZAXIS ARCHITECTURAL P.C.
AutoCAD SHX Text THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, ARE THE PROPERTY OF ZAXIS ARCHITECTURAL P.C. UNAUTHORIZED REPRODUCTION, ALTERATION OR ADDITION TO ANY DRAWING, DESIGN, SPECIFICATION, PLAN OR REPORT IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF ZAXIS ARCHITECTURAL P.C. IS PROHIBITED BY SECTION 7209, PROVISION 2 OF THE NEW YORK STATE EDUCATION LAW.
EXIST WALL
CONST.
EXISTING METAL ROOF DECK SHALL REMAIN
EXISTING METAL PANEL FACADE
SHALL REMAIN
EXISTING METAL STUD FRAMING
AND STRUCTURAL STEEL TO
REMAIN
PRE-FINISHED ALUMINUM
COPING MATCH EXISTING
PROFILE, CLEAT SYSTEM,
SIZE AND COLOR
SCALE :
PARAPET DETAIL 5
PROVIDE 2-LAYERS OF CONTINUOUS 2 x WOOD
BLOCKING
EXISTING METAL STUD FRAMING AND
STRUCTURAL STEEL TO REMAIN
EXISTING METAL PANEL FACADE
SHALL REMAIN
EXIST WALL
CONST.
EXISTING METAL FASCIA TRIM SHALL REMAIN
VI
F
SEALANT
CONTINUOUS TERMINATIN BAR
PROVIDE ALUMINUM GUTTER AND DOWN
SPOUT MATCH EXISTING PROFILE AND COLOR
EPDM 90 MIL ROOFING MEMBRANE ON
8" COVER BOARD ON
3" (R-30 ±) OF RIGID INSUL. R-30 ± (FLAT) ON
VAPOR BARRIER ON
8" GYPSUM DECK BOARD
EXISTING STRUCTURE SLOPES
4" PER FOOT
ROOFING MEMBRANE ADHERED
TO METAL WALL PANEL SYSTEM
AND WRAPPED OVER THE
PARAPET - COORDINATE WITH
ROOF MEMBRANE
MANUFACTURER
EXIST WALL
CONST.
EXISTING METAL ROOF DECK
EXISTING METAL PANEL FACADE
SHALL REMAIN
EXISTING METAL STUD FRAMING
AND W 6 x 15 STRUCTURAL
STEEL TO REMAIN
EXISTING STEEL BEAM
EXISTING 12" METAL FORM DECK (VERTICAL) SHALL REMAIN
EXISTING GYPSUM SHEATHING SHALL REMAIN INTACT.
EXISTING WOOD BLOCKING SHALL REMAIN
REVIEW CONDITION AND REPLACE DEFICIENT
MATERIAL PER UNIT PRICING
EPDM 90 MIL ROOFING MEMBRANE ON
8" COVER BOARD ON
AVERAGE R-33 RIGID INSUL. (FLAT) ON
VAPOR BARRIER ON
8" GYPSUM DECK BOARD
LAP SEALANT
SCALE :
PARAPET DETAIL 1
ROOF MEMBRANE SHALL BE ADHERED
TO OSB BOARDSHEATHING AND
WRAPPED OVER THE PARAPET WOOD
BLOCKING
PROVIDE 716" OSB BACKER BOARD
4" M
IN
M
AT
C H
EX
IS
T
VI
F
PRE-FINISHED ALUMINUM
COPING
EXISTING C9 x 13.4 CONT.
EXIST WALL
CONST.
EXISTING METAL ROOF DECK SHALL REMAIN
EXISTING METAL PANEL FACADE
SHALL REMAIN
EXISTING METAL STUD FRAMING
AND STRUCTURAL STEEL TO
REMAIN
EXISTING ROOFING MEMBRANE/ COVER BOARD,
INSULATION / VAPOR BARRIER AND GYPSUM
DECK BOARD. TO BE REMOVED ENTIRELY DOWN
TO EXISTING METAL ROOF DECK
REMOVE AND DISCARD ROOFING MEMBRANE
ADHERED TO EXISTING METAL WALL PANEL AND
WRAPPED OVER THE PARAPET
REMOVE AND DISCARD
EXISTING METAL COPING
SCALE :
PARAPET DEMOLITION DETAIL 5D
REMOVE AND DISCARD THE EXISTING METAL
GUTTER AND ALL FASTENERS
EXISTING METAL STUD FRAMING AND
STRUCTURAL STEEL TO REMAIN
EXISTING METAL PANEL FACADE
SHALL REMAIN
EXIST WALL
CONST.
EXISTING WOOD BLOCKING SHALL REMOVED
AND DISCARDED
EXISTING METAL FASCIA SHALL REMAIN. REVIEW
CONDITION WITH OWNER AND REPLACE IF
DETERMINED TO BE DETERIORATED
VI
F
REMOVE AND DISCARD EXISTING METAL
FLASHING
EXISTING STRUCTURE
SLOPES 14" PER FOOT
EXIST WALL
CONST.
EXISTING METAL ROOF DECK
EXISTING METAL PANEL FACADE
SHALL REMAIN
6"
EXISTING STEEL BEAM
EXISTING ROOFING MEMBRANE/ COVER BOARD,
INSULATION / VAPOR BARRIER AND GYPSUM
DECK BOARD. TO BE REMOVED ENTIRELY DOWN
TO EXISTING METAL ROOF DECK
REMOVE AND DISCARD ROOFING MEMBRANE
ADHERED TO COVER BOARD AND WRAPPED
OVER THE PARAPET WOOD BLOCKING
REMOVE AND DISCARD EXISTING METAL COPING
EXISTING COVER BOARD (PRESUMED TO BE
GYPSUM VIF) SHEATHING SHALL REMAIN INTACT.
CONTRACTOR SHALL PROVIDE UNIT COST FOR
ADDITIONAL GYPSUM SHEATHING IF FOUND TO BE
DETERIORATED.
EXISTING WOOD BLOCKING SHALL REMAIN
INTACT. CONTRACTOR SHALL PROVIDE UNIT
COST FOR ADDITIONAL WOOD BLOCKING IF
FOUND TO BE DETERIORATED.
VI
F
EXISTING 12" METAL FORM DECK (VERTICAL)
SHALL REMAIN INTACT
SCALE :
PARAPET DEMOLITION DETAIL 1D
EXISTING METAL STUD FRAMING
AND W 6 x 15 STRUCTURAL
STEEL TO REMAIN
EXISTING C9 x 13.4 CONT.
EXIST WALL
CONST.
EXISTING METAL ROOF DECK
EXISTING STEEL BEAM
EXISTING ROOFING MEMBRANE/ COVER BOARD,
INSULATION / VAPOR BARRIER AND GYPSUM
DECK BOARD. TO BE REMOVED ENTIRELY DOWN
TO EXISTING METAL ROOF DECK
REMOVE AND DISCARD ROOFING MEMBRANE
ADHERED TO CMU AND WRAPPED OVER THE
PARAPET WOOD BLOCKING
REMOVE AND DISCARD EXISTING METAL COPING
EXISTING WOOD BLOCKING SHALL REMAIN
INTACT. CONTRACTOR SHALL PROVIDE UNIT
COST FOR ADDITIONAL WOOD BLOCKING IF
FOUND TO BE DETERIORATED.
6" VI
F
EXISTING METAL PANEL
FACADE SHALL REMAIN
EXISTING CMU WALL
TO REMAIN
SCALE :
PARAPET DEMOLITION DETAIL 2D
EXIST WALL
CONST.
EXISTING METAL ROOF DECK
EXISTING STEEL BEAM
EXISTING METAL PANEL FACADE
SHALL REMAIN
EXISTING CMU WALL TO REMAIN
PRE-FINISHED ALUMINUM
COPING
ROOFING MEMBRANE ADHERED TO OSB
BOARD SHEATHING AND WRAPPED OVER
THE PARAPET WOOD BLOCKING
EPDM 90 MIL ROOFING MEMBRANE ON
8" COVER BOARD ON
AVERAGE R-33 RIGID INSUL. (FLAT) ON
VAPOR BARRIER ON
8" GYPSUM DECK BOARD
LAP SEALANT
SCALE :
PARAPET DETAIL 2
PROVIDE 716" OSB BACKER BOARD
M
AT
C H
EX
IS
T
VI
F
4" M
IN
EXISTING WOOD BLOCKING SHALL REMAIN
REVIEW CONDITION AND REPLACE DEFICIENT
MATERIAL PER UNIT PRICING
SCALE :
DETAIL AT STAIR TOWER 3D
DEMOLITION - TRANSITION
EXISTING METAL ROOF DECK
EXISTING STEEL BEAM
EXISTING ROOFING MEMBRANE/ COVER
BOARD, INSULATION / VAPOR BARRIER
AND GYPSUM DECK BOARD. TO BE
REMOVED ENTIRELY DOWN TO EXISTING
METAL ROOF DECK
EXISTING METAL PANEL FACADE
SHALL REMAIN
REMOVE AND DISCARD ROOFING
MEMBRANE ADHERED TO CONCRETE
BULKHEAD
EXISTING DIAMOND PLATE STAIR
LANDING SHALL REMAIN
EXISTING CMU
WALL TO REMAIN
EXISTING CONCRETE
BULKHEAD TO REMAIN
EXISTING METAL ROOF DECK
EXISTING STEEL BEAM
EPDM 90 MIL ROOFING MEMBRANE ON
8" COVER BOARD ON
AVERAGE R-33 RIGID INSUL. (FLAT) ON
VAPOR BARRIER ON
8" GYPSUM DECK BOARD
LAP SEALANT
CONTINUOUS 1" WIDE TERMINATION BAR
SECURED TO EXISTING CONCRETE BULKHEAD
ROOFING MEMBRANE ADHERED TO CMU
EXISTING METAL PANEL FACADE
SHALL REMAIN
SCALE :
DETAIL AT STAIR TOWER 3
TRANSITION
EXISTING DIAMOND PLATE STAIR
LANDING SHALL REMAIN
EXISTING CMU
WALL TO REMAIN
EXISTING CONCRETE
BULKHEAD TO REMAIN
SCALE :
DOOR THRESHOLD DETAIL 4
EXISTING
EXISTING METAL ROOF DECK
EXISTING STEEL BEAM
EXISTING METAL PANEL FACADE BEYOND
EXISTING DIAMOND
PLATE STAIR
LANDING SHALL
REMAIN
EXISTING CMU
WALL TO REMAIN
EXISTING INSULATED HOLLOW METAL DOOR AND
DOOR FRAME SHALL REMAIN
FINISHED FLOOR
STAIR PENTHOUSE
CONTINUOUS 1" WIDE TERMINATION BAR
PROVIDE NEW METAL COUNTER-FLASHING.
METAL COUNTER-FLASHING AND EPDM
ROOF MEMBRANE SHALL EXTEND UNDER
NEW THRESHOLD.
EPDM 90 MIL ROOFING MEMBRANE ON
8" COVER BOARD ON
AVERAGE R-33 RIGID INSUL. (FLAT) ON
VAPOR BARRIER ON
8" GYPSUM DECK BOARD
LAP SEALANT
ROOFING MEMBRANE ADHERED TO CMU
REMOVE AND REPLACE THE EXISTING ALUMINUM
THRESHOLD. FIELD VERIFY EXISTING SIZE AND
MATCH. BASIS OF DESIGN: NATIONAL GUARD 425E
PROVIDE THE FOLLOWING TO THE EXISTING DOOR
1 - BOTTOM SWEEP - PEMKO 217 SERIES "U" SHAPED
DOOR SHOE W/ PEMKO PRENE OR BULBUS INSERT
SCALE :
DOOR THRESHOLD DETAIL 4D
DEMOLITION - EXISTING
EXISTING METAL ROOF DECK
EXISTING STEEL BEAM
EXISTING ROOFING MEMBRANE/ COVER
BOARD, INSULATION / VAPOR BARRIER AND
GYPSUM DECK BOARD. TO BE REMOVED
ENTIRELY DOWN TO EXISTING METAL ROOF
DECK
EXISTING METAL PANEL FACADE BEYOND
REMOVE AND DISCARD ROOFING MEMBRANE
ADHERED TO CONCRETE BULKHEAD
EXISTING DIAMOND PLATE STAIR
LANDING SHALL REMAIN
EXISTING CMU WALL
TO REMAIN
EXISTING INSULATED HOLLOW METAL DOOR AND
DOOR FRAME SHALL REMAIN
REMOVE AND DISCARD EXISTING THRESHOLD
REMOVE AND DISCARD THE EXISTING BENT
PLATEFINISHED FLOOR
STAIR PENTHOUSE
3" X 3" ECO-EDGE DRAIN BAR
- CONTINUOUS AROUND THE
CLEAN-OUT SPLASH ZONE
ROOF DRAIN SUMP
4'x4' LOCATION
VARIES
SURFACE
DRAINAGE AT
ROOF DRAIN
2'-0" X 2'-0" CONCRETE
PAD, TYP.
HORZ. EDGE OF
DRAIN BAR
EXISTING COOLING TOWER
VALVE APPEARS TO BE
ABOVE THE DUNNAGE
PLATFORM VIF EXACT
LOCATION
EXISTING COOLING
TOWER PIPING
FROM DUNNAGE
PLATFORM ABOVE
NOTE:
THE EXISTING CLEAN-OUT/FLUSHING LOCATION FOR
THE COOLING TOWER APPEARS TO BE DIRECTLY
ABOVE OR ADJACENT TO AN EXISTING ROOF DRAIN
(VIF). MODIFY THE PIPING AS FOLLOWS:
1. REMOVE A PORTION OF THE EXISTING PVC PIPING
TO THE 90 ° ELBOW AT THE VERTICAL PIPE
2. PROVIDE AND CONNECT A 45° PIPE
3. CENTER THE CONCRETE SPLASH BLOCK AS
SHOWN
4. FIELD COORDINATE WITH OWNER ANY CONFLICTS
WITH THE SPLASH BLOCK LOCATION. A CHANGE
IN THE PIPE REMOVAL AMOUNT FOR A CLEAR
LANDING ARE IS ACCEPTABLE MODIFICATION.
5. REMOVE HANGERS WHERE NO LONGER
REQUIRED
1'-0"±
TYP
PROVIDE PIPING
PER THE
ELEVATION
REMOVE EXISTING
PIPING AND
ASSOCIATED
HANGERS AWAY
FROM ROOF DRAIN
PLAN
ASCALE :
COOLING TOWER CLEAN-OUT AND FLUSHING
SPLASH AND DEBRIS CONTAINMENT AREA DIAGRAM
1/2" = 1'-0''
COOLING TOWER
PIPING FROM
DUNNAGE PLATFORM
ABOVE
FINISHED ROOF
2'-0" X 2'-0" CONCRETE
PAD SPLASH ZONE
REFER TO PLAN
PROVIDE SUPPORT HANGER FROM
DUNNAGE PLATFORM ABOVE
3" X 3" ECO-EDGE DRAIN BAR
ROOF MEMBRANE PROTECTION PAD
· OVERLAP AND SECURE DRAIN BAR
· ALSO UNDER CONCRETE PADS
PROVIDE PVC PIPING - MATCH
EXIST SIZE AND MATERIAL.
LOWER TO REDUCE HEIGHT OF
OUTFLOW DROP. PROVIDE
HINGED FLAP VENT
8" -1
0"
REMOVE A PORTION OF
THE EXISTING PIPING
ELEVATION
A-102
4245 UNION ROAD, SUITE 210
BUFFALO, NEW YORK 14225
P: 716.923.0133 F: 716.923.0136
DETAILS
DATE: 8-28-2020
SCALE: AS SHOWN
DRAWN BY: DHH
CHECKED BY:
PROJECT No: 20-027
DRAWING No.
DRAWING TITLE:
No. REVISIONS DATE architectural, p.c.
ROSWELL PARK
COMPREHENSIVE CANCER
CENTER
BUFFALO, NY 14263
(716) 845-2300
ELM & CARLTON
LOCATED AT:
ROSWELL PARK
COMPREHENSIVE CANCER
CENTER
BUFFALO, NEW YORK
POWER PLANT
ROOF REPLACEMENT
RPCI # 11-21-001
ISSUED FOR 100% SUBMISSION 8-25-2026
- ISSUED FOR BID 10-16-2026
AutoCAD SHX Text 1 1/2" = 1'-0''
AutoCAD SHX Text xxxxxxx
AutoCAD SHX Text 1 1/2" = 1'-0''
AutoCAD SHX Text 1 1/2" = 1'-0''
AutoCAD SHX Text 1 1/2" = 1'-0''
AutoCAD SHX Text 1 1/2" = 1'-0''
AutoCAD SHX Text 1 1/2" = 1'-0''
AutoCAD SHX Text 1 1/2" = 1'-0''
AutoCAD SHX Text
XXXXXX
AutoCAD SHX Text 1 1/2" = 1'-0''
AutoCAD SHX Text 1 1/2" = 1'-0''
AutoCAD SHX Text
XXXXXX
AutoCAD SHX Text 1 1/2" = 1'-0''
AutoCAD SHX Text
ZAXIS ARCHITECTURAL P.C.
AutoCAD SHX Text THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, ARE THE PROPERTY OF ZAXIS ARCHITECTURAL P.C. UNAUTHORIZED REPRODUCTION, ALTERATION OR ADDITION TO ANY DRAWING, DESIGN, SPECIFICATION, PLAN OR REPORT IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF ZAXIS ARCHITECTURAL P.C. IS PROHIBITED BY SECTION 7209, PROVISION 2 OF THE NEW YORK STATE EDUCATION LAW.
SCALE :
ROOF GUARDRAIL DETAIL 6
REPUTED TO BE CERAMIC GLAZED
CEMENTIOUS ASBESTOS BOARD. DO NOT
DISTURB
8"
VI
F
C O
VE
R
N
EW
FA
ST
EN
ER
EPDM 90 MIL REINFORCED ROOFING MEMBRANE ON
8" COVER BOARD ON
AVERAGE R-30 RIGID INSUL. TAPERED ON
VAPOR BARRIER
PRE-FINISHED ALUMINUM FASCIA COVER
WATER CUT-OFF MASTIC
EXISTING CONCRETE PLANK ROOF DECK (FLAT)
EXISTING CONCRETE FILL (FORMING THE
PERIMETER SLOPE) SHALL REMAIN
EXISTING STEEL BEAM
EXISTING WOOD BLOCKING SHALL REMAIN
INTACT.
4'-6"
1 12" DIA. PIPE RAIL (PAINTED BLACK) - VERTICAL POSTS
TO BE 6'-0" OC MAX. W/ 8"x8"x3
16" BASE PLATE & (4) 14"
EXPANSION ANCHORS INTO EXIST CONCRETE PLANK
DECK. REFER TO PLAN FOR LOCATION
1' -9
1'-0"1'-0" 8"
PIPE BOOT FLASHING WITH CLAMP AND
SEALANT AT TOP - FLASH PER
MANUFACTURERS WRITTEN INSTRUCTIONS.
NOTE: THE PIPE BOOT SHALL NOT BE
CUT/SPLIT DURING INSTALLATION TO
MAINTAIN MONOLITHIC FORM FOR WEATHER
TIGHT CONDITION
PERIMETER EDGE FASCIA AND
6" MIN.
FROM EDGE OF CONC. PLANK (VIF)
REFER TO PLAN DETAIL 6B/A-301
PRE-FINISHED ALUMINUM FASCIA
OVERLAY OF EXISTING METAL FASCIA -
SECURE TO EXISTING BLOCKING AND CLIP
HEM END TO BASE OF EXISTING FLASHING
· DESIGN INTENT: DO NOT DISTURB THE
ASBESTOS CONTAINING WALL PANELS
INCLUDING THE EXISTING FLASHING AND
BLOCKING
· REFER TO ENLARGED DETAIL FOR
CLARITY
LOWER PORTION OF EXISTING
METAL FASCIA SHALL REMAIN
ENLARGED FASCIA DETAIL 6A
3' -6
" M
IN
1' -9
REMOVE AND DISCARD EXISTING METAL FASCIA
EXISTING WOOD BLOCKING SHALL REMAIN
INTACT. CONTRACTOR SHALL PROVIDE UNIT
COST FOR ADDITIONAL WOOD BLOCKING IF
FOUND TO BE DETERIORATED.
LOWER PORTION OF EXISTING METAL FASCIA
SHALL REMAIN
REPUTED TO BE CERAMIC GLAZED CEM.
ASBESTOS BOARD. DO NOT DISTURB
EXISTING CONCRETE PLANK ROOF DECK
(FLAT)
EXISTING CONCRETE FILL (FORMING THE
SLOPE) SHALL REMAIN
EXISTING STEEL BEAM
EXISTING ROOFING MEMBRANE/ COVER BOARD /
INSULATION, TO BE REMOVED ENTIRELY DOWN
TO EXISTING CONCRETE PLANK ROOF DECK.
THE EXISTING FASTENERS ARE THROUGH BOLT
WITH TOGGLES AND SHALL BE REMOVED.
SCALE :
PERIMETER EDGE FASCIA DETAIL 6D
DEMOLITION
EXISTING WOOD BLOCKING SHALL REMAIN INTACT.
EXISTING CONCRETE PLANK ROOF DECK
(FLAT)
EXISTING CONCRETE FILL (FORMING THE
SLOPE) SHALL REMAIN
EXISTING STEEL BEAM
SCALE :
EXISITNG EXPANSION JOINT DETAIL 7
DEMOLITION
EXISTING METAL PANEL FACADE AND
CLOSURE TRIM SHALL REMAIN
EXISTING CMU WALL SHALL REMAIN
CONTINUOUS 1" WIDE TERMINATION BAR
COMPRESSIBLE EXPANSION JOINT TUBE
FIRE SAFING INSULATION WITH INSULATION RETAINER
EPDM 90 MIL REINFORCED ROOFING MEMBRANE ON
8" COVER BOARD ON
AVERAGE R-33 RIGID INSUL. TAPERED ON
VAPOR BARRIER
ROOFING MEMBRANE ADHERED TO OSB BACKER
BOARD
16" OSB BACKER BOARD
EXISTING WOOD BLOCKING SHALL REMAIN
INTACT. CONTRACTOR SHALL PROVIDE UNIT
COST FOR ADDITIONAL WOOD BLOCKING IF
FOUND TO BE DETERIORATED.
EXISTING CONCRETE PLANK ROOF DECK
(FLAT)
EXISTING CONCRETE FILL (FORMING THE
SLOPE) SHALL REMAIN
EXISTING STEEL BEAM
SCALE :
EXISITNG EXPANSION JOINT DETAIL 7D
DEMOLITION
REMOVE AND DISCARD THE EXISTING EPDM
EXPANSION BELLOW AND EXPANSION JOINT
COMPONENTS
REMOVE AND DISCARD ROOFING MEMBRANE
ADHERED TO COVER BOARD AND WRAPPED
OVER THE PARAPET WOOD BLOCKING
REMOVE AND DISCARD THE EXISTING FIRE
SAFING MATERIAL
REMOVE AND DISCARD THE EXISTING METAL
COUNTER FLASHING
REMOVE AND DISCARD THE EXISTING SEALANT
EXISTING METAL PANEL FACADE AND
CLOSURE TRIM SHALL REMAIN
EXISTING CMU WALL SHALL REMAIN
EXISTING ROOFING MEMBRANE/ COVER BOARD /
INSULATION, TO BE REMOVED ENTIRELY DOWN
TO EXISTING CONCRETE PLANK ROOF DECK.
THE EXISTING FASTENERS ARE THROUGH BOLT
WITH TOGGLES AND SHALL BE REMOVED.
LAP SEALANT
PROVIDE TWO LAYERS OF 2x4 WOOD BLOCKING
AROUND THE PERIMETER OF THE EXISTING
RAISED MECHANICAL CURB
EPDM 90 MIL REINFORCED ROOFING MEMBRANE ON
8" COVER BOARD ON
AVERAGE R-33 RIGID INSUL. TAPERED ON
VAPOR BARRIER
EPDM 90 MIL REINFORCED ROOFING MEMBRANE ON
8" COVER BOARD ON
2.6" - MIN. R-15 RIGID INSUL. TAPERED ON
VAPOR BARRIER
SCALE :
EXISTING RAISED CONCRETE CURB 9
ROOFING MEMBRANE ADHERED TO OSB BOARD
SHEATHING AND WRAPPED OVER THE CURB
PROVIDE 716" OSB BACKER BOARD
OVER EXISTING CONCRETE CURB
SLOPE 14" PER FOOT
NOTE:
PROVIDE 5 8" GYPSUM
DECK IF THE INFILL IS
METAL DECK SURFACE
LAP SEALANT
ROOFING MEMBRANE ADHERED TO OSB BOARD
SHEATHING AND WRAPPED OVER THE CURB
PROVIDE 716" OSB BACKER BOARD
OVER EXISTING CONCRETE CURB
PROVIDE TWO LAYERS OF 2x4 WOOD BLOCKING
AROUND THE PERIMETER OF THE EXISTING
RAISED MECHANICAL CURB
EPDM 90 MIL REINFORCED ROOFING MEMBRANE ON
8" COVER BOARD ON
AVERAGE R-30 RIGID INSUL. TAPERED ON
VAPOR BARRIER
EPDM 90 MIL REINFORCED ROOFING MEMBRANE ON
8" COVER BOARD ON
2.6" - MIN. R-15 RIGID INSUL. TAPERED ON
VAPOR BARRIER
SCALE :
EXISTING RAISED CONCRETE CURB 8
EXISTING MECHANICAL EXHAUST FAN ON
EXISTING MECHANCIAL CURB
ROOFING MEMBRANE ADHERED TO 38" COVER
BOARD SHEATHING AND WRAPPED OVER THE
CURB
SHEET METAL FLASHING
SLOPE
4" PER FT
NOTE:
PROVIDE 5 8" GYPSUM
DECK IF THE INFILL IS
METAL DECK SURFACE
1 12" METAL DECK, 22 GAUGE MIN. IN ONE CONTINUOUS
PIECE AND BE IN CONFORMANCE WITH ASTM A611,
GRADE C, D, OR E. PROVIDE A SHOP COAT OF PRIMER
PAINT ON FRESHLY CLEANED AND PHOSPHATIZED
STEEL
SCALE :
ROOF PENETRATION REMOVAL AND INFILL DETAIL FROM ROOF SIDE
N.T.S. 10
REMOVE EXISTING ROOF
PENETRATION
PROVIDE 12" EXPANSION BOLT
(2) PER SIDE - EQUAL SPACED
PROVIDE 3"x5"x5
16" LLV CONT. TYP
PROVIDE 3"x4"x5
16" LLH CONT. TYP
(WELD TO 3"x5" ANGLE)
PROVIDE 1/2-INCH SECUROCK SUBSTRATE BOARD
(THERMAL BARRIER) MECHANICALLY FASTENED EVERY
1.3 SQ.FT. O.C. MAX. TO METAL DECK INFILL
PROVIDE AVERAGE R-33 RIGID
INSULATION
PROVIDE CONTINUOUS VAPOR RETARDER
PROVIDE SPECIFIED ROOF SYSTEM
PROVIDE 3 8" INCH (SECUROCK) COVER
BOARD IN LOW RISE FOAM ADHESIVE
BEADS SPACED 6-INCHES O.C.
NOTES:
1. MAX. SIZE 4'X4' - CONTACT ARCHITECT IF PENETRATION IS LARGER
2. ROUND PENETRATIONS - PROVIDE BENT PLATES OF EQUIVALENT
SIZE AND CURVED TO MATCH RADIUS OF OPENING
EXISTING OPENING BELOW DECK
SUPPORT IS UNKNOWN - VIF
1 12" METAL DECK, 22 GAUGE MIN. IN ONE CONTINUOUS
PIECE AND BE IN CONFORMANCE WITH ASTM A611,
GRADE C, D, OR E. PROVIDE A SHOP COAT OF PRIMER
PAINT ON FRESHLY CLEANED AND PHOSPHATIZED
STEEL OVERLAP METAL DECK MIN. 8" AND WELD PER
METAL DECK INDUSTRY STANDARD
REMOVE EXISTING ROOF
PENETRATION
PROVIDE 1/2-INCH SECUROCK SUBSTRATE BOARD
(THERMAL BARRIER) MECHANICALLY FASTENED EVERY
1.3 SQ.FT. O.C. MAX. TO METAL DECK INFILL
PROVIDE AVERAGE R-33 RIGID
INSULATION
PROVIDE CONTINUOUS VAPOR RETARDER
PROVIDE SPECIFIED ROOF SYSTEM
PROVIDE3
8" INCH (SECUROCK) COVER
BOARD
EXISTING OPENING BELOW DECK
SUPPORT IS UNKNOWN - VIF
EXISTING CONCRETE PLANK DECK
EXISTING METAL DECK
NOTE:
SPRAY ON FIRE PROOFING TO ALL
STRUCTURAL STEEL FRAMING REQUIRED
FOR THE UPPER ROOF PENETRATION INFILL
AS FOLLOWS:
MINIMUM 3-HOUR FIRE RATING REQUIRED
PROVIDE MINIMUM 1 7 8" THICKNESS
REQUIRED PER UL DESIGN NO. P750
PREPARE AND PRIME SURFACE PER MANF.
REQUIREMENTS FOR PROPER ADHESION.
MANF - PRE-FINISHED
ALUMINUM
FASCIA COVER
EXIST. WOOD
BLOCKING TYP.
EPDM ROOF SYSTEM
LOWER PORTION
OF EXISTING
METAL FASCIA
SHALL REMAINPRE-FINISHED ALUMINUM
FASCIA OVERLAY OF
EXISTING METAL FASCIA
EDGE OF
ROOF DECK
PREFINISHED ALUMINUM
(GRAVEL STOP) FASCIA COVER
1 12" DIA. VERTICAL
PIPE RAIL POST
6"
MIN.
6" M
IN
BASE PLATE AND
FASTENERS PER
SECTION 6/A-103
PRECAST CONCRETE
PLANK EDGE
GUARDRAILS SHALL BE
LOCATED A MIN. OF 6"
FROM EDGE OF PLANK (VIF)
APPROXIMATE EDGE OF EXISTING
PERIMETER SLOPED LIGHTWEIGHT
CONCRETE FILL (VIF)
1 12" DIA. VERTICAL
PIPE RAIL POST
TOP AND MID
RAIL ABOVE
6' -0
M
AX
AD
JU
ST
S
PA
C
IN
G
B
AS
ED
O
N S
IZ
E
AN
D
L O
C
AT
IO
N
O F
PR
EC
AS
T
C O
N C
R
ET
E
PA
N
EL
S (V
IF
SCALE :
ROOF GUARDRAIL LAYOUT PLAN 6B
11SCALE :
STAIR MODIFICATION DETAIL
3" = 1'-0''
TOP LINE OF EXISTING
CONCRETE DECK
LINE OF EXISTING EPDM
ROOF
APPROX. LINE OF NEW
ROOF SYSTEM,
COORDINATE WITH
TAPERED INSULATION
VI
F
PROVIDE NEW GALVANIZED STEEL OPEN
GRATE SERRATED TREAD TO MATCH
EXISTING, INCLUDED WELDED SUPPORT
ANGLE
A PORTIO OF THE EXISTING GALV STEEL STAIR
STRINGER SHALL BE REMOVED - TO 1"± ABOVE THE
NEW ROOF ELEVATION VIF
EXISTING TREAD TO REMAIN
EXISTING TREAD AND ANGLE SUPPORT TO
BE REMOVED DUE TO INCREASED
INSULATION LEVEL
NOTES:
1. PAINT ALL WELDS AND SCRATCHED
GALVANIZED SURFACE WITH
GALVANIZED REPAIR PAINT.
VI
F
EXISTING GALV. STEEL HANDRAIL
SUPPORT POST SHALL REMAIN
EXISTING WELDED ANGLE SUPPORT TO
REMAIN
WELD A NEW 14" STEEL GALVANIZED
PLATE TO THE REMAIN STAIR STRINGER
CHANNEL - VIF SIZE OF PLATE
A-103
4245 UNION ROAD, SUITE 210
BUFFALO, NEW YORK 14225
P: 716.923.0133 F: 716.923.0136
DETAILS
DATE: 8-28-2020
SCALE: AS SHOWN
DRAWN BY: DHH
CHECKED BY:
PROJECT No: 20-027
DRAWING No.
DRAWING TITLE:
No. REVISIONS DATE architectural, p.c.
ROSWELL PARK
COMPREHENSIVE CANCER
CENTER
BUFFALO, NY 14263
(716) 845-2300
ELM & CARLTON
LOCATED AT:
ROSWELL PARK
COMPREHENSIVE CANCER
CENTER
BUFFALO, NEW YORK
POWER PLANT
ROOF REPLACEMENT
RPCI # 11-21-001
ISSUED FOR 100% SUBMISSION 8-25-2026
- ISSUED FOR BID 10-16-2026
AutoCAD SHX Text 1 1/2" = 1'-0''
AutoCAD SHX Text
XXXXX
AutoCAD SHX Text
XXXXX
AutoCAD SHX Text 1 1/2" = 1'-0''
AutoCAD SHX Text 1 1/2" = 1'-0''
AutoCAD SHX Text
XXXXXX
AutoCAD SHX Text 1 1/2" = 1'-0''
AutoCAD SHX Text 1 1/2" = 1'-0''
AutoCAD SHX Text 1 1/2" = 1'-0''
AutoCAD SHX Text
XXXXX
AutoCAD SHX Text
XXXXX
AutoCAD SHX Text 1/2" = 1'-0''
AutoCAD SHX Text
ZAXIS ARCHITECTURAL P.C.
AutoCAD SHX Text THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, ARE THE PROPERTY OF ZAXIS ARCHITECTURAL P.C. UNAUTHORIZED REPRODUCTION, ALTERATION OR ADDITION TO ANY DRAWING, DESIGN, SPECIFICATION, PLAN OR REPORT IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF ZAXIS ARCHITECTURAL P.C. IS PROHIBITED BY SECTION 7209, PROVISION 2 OF THE NEW YORK STATE EDUCATION LAW.
EPDM MEMBRANE
FLASHING
CARLISLE FASTENER & SEAM
FASTENING PLATE, MAX. 12"
(305mm) O.C.
MIN. 3" (76mm) WIDE SecurTAPE IN
CONJUNCTION WITH EPDM PRIMER
SURE-SEAL BONDING
ADHESIVE OR CAV-GRIP III
ESCALE :
PARAPET / CURB WITH
SEPARATE MEMBRANE FLASHING
3" = 1'-0''
8" COVER BOARD
WOOD NAILER
1-1/2" (38mm) RING SHANK NAILS @ 6" (152mm) O.C.
MAX.
6" (152mm) WIDE
PRESSURE-SENSITIVE CURED
COVER STRIP OR OVERLAYMENT
STRIP WITH EPDM PRIMER
9" (229mm) WIDE
PRESSURE-SENSITIVE
ELASTOFORM FLASHING IN
CONJUNCTION WITH EPDM
PRIMER
SecurSEAL DRIP EDGE
OR FASCIA
GSCALE :
WITH 90-MIL MEMBRANE OR
WARRANTIES GREATER THAN 20-YEAR
3" = 1'-0''
SecurSeal 200 DRIP EDGE FASCIA- PROJECTS
LAP SEALANT
ANCHOR BAR WITH
PRE-DRILLED,
SLOTTED HOLES @
12" (305mm) O.C.
HEX-HEAD FASTENERS
MAXIMUM 12" (305mm)
O.C.
WOOD NAILER
WATER CUT-OFF
MASTIC
FASCIA COVER
DSCALE :
CARLISLE SecurEDGE 3000
3" = 1'-0''
2" SHEET METAL
EXTENSION
EXISTING POURABLE
SEALANT POCKET (TO
REMAIN)
EXISTING
MATERIAL
(TO REMAIN)
PRESSURE-SENSITIVE
ELASTOFORM FLASHING
IN CONJUNCTION WITH
EPDM PRIMER
CARLISLE POURABLE
SEALER
PE
N
ET
R
AT
IO
N
MIN. 9" WIDE (229mm)
PRESSURE-SENSITIVE
ELASTOFORM FLASHING
LAP SEALANTEPDM
PRIMER
SEALANT
RAIN HOOD
UP TO 30 YEARSUP TO 20 YEARS
CSCALE :
EXTENDED POURABLE SEALER POCKET
3" = 1'-0''
EPDM MEMBRANE
FLASHING
SURE-SEAL BONDING
ADHESIVE
SHEET METAL FLASHING
MIN. 3" (76mm) WIDE SecurTAPE IN CONJUNCTION
WITH EPDM PRIMER
MAXIMUM 12"(305mm)
O.C. SPACING
CARLISLE FASTENER
& SEAM FASTENING
PLATE, MAX. 12"
(305mm) O.C.
1/8" (3mm) TO 1" (25mm) MAX.
JSCALE :
CURB FLASHINGS
3" = 1'-0''
CARLISLE FASTENER &
SEAM FASTENING PLATE,
MAX. 12" (305mm) O.C.
HOT AIR-WELD, 1-1/2"
(38mm) MIN. BEYOND
FASTENING PLATES
THERMOPLASTIC PRE-MOLDED
PIPE FLASHING
WATER CUT-OFF MASTIC
STAINLESS STEEL
CLAMPING RING
INCLUDED
3/4" (19mm) TO 8" (203mm)
ISCALE :
PRE-MOLDED PIPE FLASHING
3" = 1'-0''
WHEN A PRE-MOLDED PIPE SEAL IS NOT FEASIBLE, PROJECTS WITH 25 & 30-YEAR
WARRANTIES REQUIRE ALL ROUND PIPE PENETRATIONS & STRUCTURAL STEEL TUBING TO
BE WRAPPED WITH THREE LAYERS OF PRESSURE-SENSITIVE ELASTOFORM FLASHING,
TERMINATED WITH A STAINLESS STEEL CLAMPING RING & SEALED WITH CONTINUOUS LAP
SEALANT (AS SHOWN).
PROTECTIVE STRIP
OF EPDM
STAINLESS STEEL CLAMPING
RING
LAP SEALANT
PRESSURE-SENSITIVE
ELASTOFORM FLASHING IN
CONJUNCTION WITH EPDM
PRIMER
FSCALE :
TYPICAL FIELD FLASHING DETAIL
3" = 1'-0''
3" 3"
1"
1 2"
LAP SEALANT
SecurEdge 200 & 300
NOTES:
1. MEMBRANE MUST BE
EXTENDED AT CORNERS TO
PROVIDE COMPLETE
COVERAGE OF THE TOP WALL
SURFACE.
COPING
20 GA. GALVANIZED ANCHOR
CLIPS @ 6 FEET (183cm) O.C.
CONCEALED SPLICE PLATE
AT EACHJOINT OF COPING
HEX-HEAD FASTENERS
HSCALE :
CARLISLE SecurEDGE 200 & 300 COPINGS
3" = 1'-0''
CARLISLE HP TERM BAR NAIL-IN 6"
(15cm) O.C. FASTENING
RECOMMENDED.
CARLISLE TERMINATION BAR
CARLISLE UNIVERSAL SINGLE-PLY
SEALANT OR SEALANT
WATER CUT-OFF MASTIC- MUST BE HELD
UNDER CONSTANT COMPRESSION.
APPLICABLE BONDING ADHESIVE
NOTES:
1. APPLY ON HARD SMOOTH
SURFACE ONLY; NOT FOR
USE ON EXPOSED WOOD.
2. DO NOT WRAP
TERMINATION BAR AROUND
CORNERS.
MIN. 1/4" (1cm)
MAX. 1/2" (1.5cm)
LSCALE :
MEMBRANE TERMINATION
3" = 1'-0''
NOTES:
1. FASTENING OF METAL
TERMINATION BAR MUST PROVIDE
CONSTANT COMPRESSION ON
WATER CUT-OFF MASTIC.
2. ALLOW MEMBRANE SHEET TO
EXTEND 1/2" (1.5cm) MINIMUM
BELOW THE METAL TERMINATION
BAR.
3. DETAIL NOT FOR USE WITH DESIGN
"B" (BALLASTED STONE ASSEMBLY).
SURE-SEAL TERMINATION BAR
FASTENED 6" (15cm) MAX.
GUTTER
WOOD NAILER
UNIVERSAL SINGLE-PLY SEALANT
WATER CUT-OFF MASTIC
BSCALE :
GUTTER AND METAL EDGE
TERMINATION DETAIL
3" = 1'-0''
TYP. ROOF DRAIN
SCALE: 1 1/2" = 1'-0"
REINFORCING MEMBRANE PLY EXTEND
3" BEYOND LEAD
INSTALL A MINIMUM 8" WIDE BED OF MASTIC ONTO THE DRAIN FLANGE AND OUT
ONTO THE INSULATION PRIOR TO EMBEDDING THE FIELD BASE MEMBRANE PLY INTO
THE MASTIC. AFTERWARD, APPLY ANOTHER BED OF MASTIC ON TOP OF THE BASE
PLY PRIOR TO THE APPLICATION OF THE PRIMED DRAIN LEAD FLASHING.
WHEN POSSIBLE INSTALL MINIMUM 4' DRAIN SUMP IN ANY ONE
DIRECTION-OR THAT ADDITIONAL TAPER TO PROVIDE POSITIVE
DRAINAGE.
THERMAL INSULATION,
COVERBOARD AND ROOFING
PLIES APPLIED TO DECK AS
SPECIFIED OR REQUIRED
DRAIN FLASHING, FIELD BASE,
REINFORCING AND MEMBRANE
PLIES EXTEND UNDER CLAMPING
RING AND TURN LEAD DOWN
INTO BOWL 1" MIN.
DRAIN BOWL
CLAMPING RING
30" SQUARE MINIMUM, 2 1/2 LB. TO 4
LB. LEAD OR 16 OZ. COPPER FLASHING
SET IN BED OF SOPREMA MASTIC,
PRIME TOP SURFACE BEFORE
INSTALLING REINFORCING PLY
DRAIN STRAINER
DRAIN PROVIDE EXTENSION
COLLARS TO EXISTING ROOF
DRAIN LEADER TO REMAIN
A-1
ROOF DRAIN DIAGRAM
NOTES:
1. ALL BOLTS OR CLAMPS MUST BE IN PLACE
TO PROVIDE CONSTANT COMPRESSION ON
WATER CUT-OFF MASTIC.
2. THE HOLE IN THE MEMBRANE SHALL
EXCEED THE DIAMETER OF THE DRAIN PIPE,
BUT SHALL BE NO LESS THAN 1/2" (1.5cm)
FROM THE ATTACHMENT POINTS OF THE
DRAIN CLAMPING RING.
3. REMOVE EXISTING LEAD, FLASHING
MATERIAL & ENSURE THE DRAIN RING IS
COMPLETELY CLEAN DOWN TO BARE
METAL.
4. FIELD SPLICES MUST BE LOCATED AT LEAST
6" (15cm) OUTSIDE THE DRAIN SUMP.
5. INSULATION TAPER SHALL NOT BE
GREATER THAN 6" (15cm) IN 12" (30cm)
HORIZONTAL.
6. DETAIL IS A DIAGRAM OF THE EXISTING
CONDITION. CONTRACTOR SHALL FIELD
VERIFY CONDITION AND PROVIDE INTENDED
REPLACEMENT AS INDICATED
GREATER THAN
DIMENSION "X"
MIN. 1/2" (1.5cm)
DIMENSION
"X"
DRAIN PIPE
A-2SCALE :
TYPICAL ROOF DRAIN DETAIL
3" = 1'-0''
DETAIL PER RECORD
AS-BUILT CONDITIONS,
VERIFY FIELD CONDITIONS
WATER CUT-OFF
MASTIC
CLAMPING RING
STRAINER DOME
EXISTING DRAIN BOWL TO REMAIN
PUNCH BOLT HOLE IN
EPDM DO NOT CUT
EXISTING ROOF DRAIN
LEADER/PIPE TO REMAIN
EXISTING DECK SUPPORT TO REMAIN
EXISTING DECK
24" MINIMUM SUMP
14" (356mm) DIAMETER DRAIN
STRAINER (ELEVATED TO SHOW
CLAMPING RING)
PRE-PUNCHED METAL
FLANGE
WATER CUT-OFF
MASTIC
HP FASTENER,
(FASTEN TO DECK)
STRAINER SECUREMENT
BRACKETS
MECHANICAL
BACK-FLOW CONE
EXISTING DRAIN LEADER
SUMPED METAL CLAMPING
RING AND FASTENER (LIMIT OF
CARLISLE WARRANTY)
SCALE :
ALUMINATOR RETROFIT DRAIN INSERT A-3
8" CDX PLYWOOD
ALTERNATE - USE ONLY WHEN
DETERMINED THE STANDARD ROOF
DRAIN INSTALLATION WILL RESULT
IN A DEFICIENT CONDITION
AVERAGE R-33 RIGID INSUL
TAPERED
8" SECUROCK COVERBOARD
VAPOR BARRIER
EPDM 90 MIL ROOFING
MEMBRANE
TYPICAL LOWER ROOF SYSTEM
SCALE :
EXISTING CONCRETE PLANK
8" SECUROCK COVERBOARD
VAPOR BARRIER
EPDM 90 MIL ROOFING
MEMBRANE
K-2
TYPICAL UPPER ROOF SYSTEM
SCALE :
EXISTING METAL DECK
EXIST. CONCRETE
PLANK ROOF DECK
MIN R-33 RIGID INSUL
FLAT
5/8" GYPSUM DECK BOARD
EXISTING METAL ROOF DECK
K-1
PENTHOUSE SIMILAR
A-201
4245 UNION ROAD, SUITE 210
BUFFALO, NEW YORK 14225
P: 716.923.0133 F: 716.923.0136
TYPICAL
DETAILS
DATE: 7-16-20
SCALE: AS SHOWN
DRAWN BY: GLG
CHECKED BY:
DRAWING No.
DRAWING TITLE:
No. REVISIONS DATE architectural, p.c.
ROSWELL PARK
COMPREHENSIVE CANCER
CENTER
BUFFALO, NY 14263
(716) 845-2300
ELM & CARLTON
GENERAL NOTES:
1. TYPICAL DETAILS ARE INCLUDED FOR
REFERENCES BASIS OF DESIGN CARLISLE
EPDM 90 MIL ROOFING. WHERE AN
ALTERNATE MANUFACTURER IS PROVIDED.
THE CONTRACTOR SHALL PROVIDE THAT
MANUFACTURER'S TYPICAL DETAILS.
PROJECT No: 20-027
LOCATED AT:
ROSWELL PARK
COMPREHENSIVE CANCER
CENTER
BUFFALO, NEW YORK
POWER PLANT
ROOF REPLACEMENT
RPCI # 11-21-001
ISSUED FOR 100% SUBMISSION 8-25-2026
- ISSUED FOR BID 10-16-2026
AutoCAD SHX Text
XXXXX
AutoCAD SHX Text
XXXX
AutoCAD SHX Text
XXXX
COLD PIPE
COLD PIPE
AutoCAD SHX Text <180°F (82°C)
AutoCAD SHX Text
XXXXXX
AutoCAD SHX Text
XXX
AutoCAD SHX Text xxxxxxx
AutoCAD SHX Text
XXXX XXX
AutoCAD SHX Text
XXXXXXXXXXXXX
XXXX
AutoCAD SHX Text
XXXXX
AutoCAD SHX Text
XXXX
AutoCAD SHX Text
XXXXXXX
AutoCAD SHX Text
XXXXXXX
AutoCAD SHX Text 1 1/2" = 1'-0''
AutoCAD SHX Text 1 1/2" = 1'-0''
AutoCAD SHX Text 1 1/2" = 1'-0''
AutoCAD SHX Text
ZAXIS ARCHITECTURAL P.C.
AutoCAD SHX Text THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, ARE THE PROPERTY OF ZAXIS ARCHITECTURAL P.C. UNAUTHORIZED REPRODUCTION, ALTERATION OR ADDITION TO ANY DRAWING, DESIGN, SPECIFICATION, PLAN OR REPORT IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF ZAXIS ARCHITECTURAL P.C. IS PROHIBITED BY SECTION 7209, PROVISION 2 OF THE NEW YORK STATE EDUCATION LAW.
FIRST FLOOR 0 21 3 54 10 2015 25
ROSWELL PARK CANCER INSTITUTE
Buffalo, New York 14203 www.roswellpark.org
Elm & Carlton Streets
No.
Date:
Date:
Approved By:
Drawn By:
Revision Date
Revisions:
POWER PLANT (PP)
BLDG # 11
FIRST FLOOR
2024-11-1800
Saroj 2021-06-22
N
S Nepali -Base Plan
Drawing No.Project No.
FLOOR PLAN PP-1
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
ST-1
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
ST-2
AutoCAD SHX Text
WORKROOM
AutoCAD SHX Text 1-07
AutoCAD SHX Text
290 SF
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 1-08
AutoCAD SHX Text
214 SF
AutoCAD SHX Text
HIGH VOLTAGE
AutoCAD SHX Text
SWITCHGEAR
AutoCAD SHX Text 1-05
AutoCAD SHX Text
1596 SF
AutoCAD SHX Text
BOILER
AutoCAD SHX Text
ROOM
AutoCAD SHX Text 1-00
AutoCAD SHX Text
CHILLER
AutoCAD SHX Text
ROOM
AutoCAD SHX Text 1-09
AutoCAD SHX Text
4770 SF
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
ST-3
AutoCAD SHX Text
BREAK
AutoCAD SHX Text
ROOM
AutoCAD SHX Text 1-02
AutoCAD SHX Text
90 SF
AutoCAD SHX Text
SHOP
AutoCAD SHX Text
LAB
AutoCAD SHX Text 1-03
AutoCAD SHX Text
125 SF
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
ROOM
AutoCAD SHX Text 1-04
AutoCAD SHX Text
206 SF
AutoCAD SHX Text
UP
AutoCAD SHX Text
CONTROL
AutoCAD SHX Text
ROOM
AutoCAD SHX Text 1-01
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
11-PP
AutoCAD SHX Text
SCALE:
am24832 Polygon am24832 Polygon am24832 Polygon am24832 Rectangle am24832 Callout
SCAFFOLD TO ALLOW FOR ACCESS TO WATER SOFTENER FOR SALT DISPENSING
am24832 Rectangle am24832 Callout
PATHS ARE ONE SCAFFOLD WIDTH WIDE
| 20-027 Power Plant Roof - Issued for Bid - Drawings -10-16-2026 (Rev 1) |
| 20-027 A-102 Roswell Power Plant roof DETAILS |
| Sheets and Views |
| A-102 |
| 20-027 A-103 Roswell Power Plant roof DETAILS |
| Sheets and Views |
| A-103 |
| 20-027 A-201 Roswell Power Plant roof DETAILS |
| Sheets and Views |
| A-201 |
| 20-027 CS-1 COVER SHEET.pdf |
| Sheets and Views |
| COVER SHEET |
| 20-027 A-101 Roswell Powerplant roof REV -2 (11-3-26).pdf |
| Sheets and Views |
| A-101 |
| POWER PLANT (1) First Floor - Scaffold Path |
| Sheets and Views |
| BASE PLAN |
File details come from the government source that posted it. Updated .