RFP 27-26 Power Plant Roof Replacement - Architectural Drawings

This file comprises architectural construction drawings and specifications prepared by Zaxis Architectural P.C. for Roswell Park Comprehensive Cancer Center (RPCCC) in Buffalo, New York, for the replacement of the roof system on Building 11 (Power Plant). The project scope encompasses removal and replacement of the existing EPDM roof membrane system on approximately 16,400 square feet of roof area across three distinct sections: the lower power plant roof (concrete plank deck), upper power plant roof (metal deck), and stair penthouse roof (metal deck). The project includes installation of a 90 mil EPDM fully adhered roofing system with R-33 rigid insulation, cover board, vapor barrier, and associated flashings and penetration details. Additional work includes installation of perimeter aluminum fascia and coping, 1.5-inch schedule 40 pipe railing (approximately 230 linear feet), replacement of roof drains and leaders, new aluminum gutters and downspouts, painting of structural steel elements, concrete pad installation for cooling tower dripping, and provision of walkway pads. A pre-bid meeting is scheduled for Friday, November 13, 2026, at 10:00 AM at the Cell & Virus Building, 141 High Street, Buffalo, NY 14263, with a site tour included. Questions must be submitted by 12:00 PM on Friday, November 20, 2026, and responses will be communicated by addendum. Prospective bidders should email Rob Henschel at rob.henschel@roswellpark.org with "RFP #27-26" in the subject line.

The drawings specify detailed demolition requirements, field verification protocols, and manufacturer-approved installation standards. Previous contractors awarded identical or substantially similar contracts include Titan Roofing, Weaver Roofing, and Jameson Roofing. The procurement includes a Service-Disabled Veteran-Owned Business (SDVOB) goal of 6.00% and Minority/Women Business Enterprise (MWBE) contracting goals totaling 30.00%. The project contains complex existing conditions including cooling towers, mechanical equipment, piping infrastructure, and electrical systems that must be coordinated and protected throughout construction. The contractor is responsible for providing overhead scaffolding protection for facility staff during roof demolition work and must coordinate daily with RPCCC operations to maintain emergency access and equipment functionality. Unit pricing is required for potential supplemental work including deficient wood blocking replacement, masonry repointing, low-area deck infill, roof drain inserts, and curb modifications. All work must conform to manufacturer specifications and warranty requirements established by the basis of design manufacturer representative.

View the file

Other files

File Type Posted
RFP 27-26 PP Roof Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4245 UNION ROAD, SUITE 210

BUFFALO, NEW YORK 14225

P:716.923.0133 F:716.923.0136

BUILDING DATA

CS-101 COVER SHEET

DRAWING INDEX

POWER PLANT

BUILDING 11

architectural, p.c.

CONSTRUCTION TYPE: TYPE 1A

APPROXIMATE ROOF AREA: 16,400 +/- SF - BUILDING FOOTPRINT

NUMBER OF STORIES: THREE STORIES PLUS MECHANICAL PENTHOUSES

SPRINKLER SYSTEM: FULLY SPRINKLERED

ELM & CARLTON

BUFFALO, NY 14263

(716) 845-2300

ROSWELL PARK CAMPUS BUILDING MAP

POWER PLANT (BUILDING 11)

ROOF REPLACEMENT

RPCCC PROJECT NO. 11-21-001

ROSWELL PARK COMPREHENSIVE CANCER CENTER

ELM & CARLTON STREETS

BUFFALO, NEW YORK 14263

ARCHITECTURAL

A-101 ROOF PLAN

A-102 DETAILS

A-103 DETAILS

A-201 TYPICAL DETAILS

POWER PLANT

DUMPSTER AND

STAGING

COORDINATE W/

OWNER

CARLTON STREET

7N

CARLTON STREET

HIGH STREET

VIRGINIA STREET

EL

LI

C O

TT

S

TR

EE

T

N . O

AK

S

TR

EE

T

M

IC

H

IG

AN

A

VE

N

U E

EL

M

S

TR

EE

T

DRAWING No.

PROJECT No: 20-027

DATE: 6-30-2020

R

EV

IS

IO

N S

D

AT

E N o.-

CS-101

ZA

XI

S

AR

C H

IT

EC

TU

R

AL

P

.C

TH

IS

D O

C U

M

EN

T, A

N D

T H

E

ID

EA

S

AN

D

D

ES

IG

N

S

IN

C O

R

PO

R

AT

ED

H

ER

EI

N , A

R E

TH

E

PR

O

PE

R

TY

O

F

ZA

XI

S

AR

C

H

IT

EC

TU

R

AL

P .C

U N

AU

TH

O R

IZ

ED

R

EP

R O

D U

C

TI

O N

, A

LT

ER

AT

IO

N

O R

A D

D

IT

IO

N

T O

A N

Y D

R

AW

IN

G

D

ES

IG

N , S

PE

C

IF

IC

AT

IO

N , P

LA

N

O R

R

EP

O R

T

IN

W H

O

LE

O R

IN

P

AR

T

W

IT

H O

U T

TH

E

EX

PR

ES

S

W R

IT

TE

N A

U

TH

O R

IZ

AT

IO

N

O F

ZA

XI

S

AR

C H

IT

EC

TU

R

AL

P

.C . I

S

PR

O H

IB

IT

ED

B

Y

SE

C

TI

O N

9, P

R O

VI

SI

O N

O

F

TH

E N

EW

Y

O R

K

ST

AT

E

ED

U

C

AT

IO

N

L

AW

PO

W

ER

P

LA

N

T R

O O

F R

EP

LA

C

EM

EN

T

R O

SW

EL

L

PA

R K

C O

M

PR

EH

EN

SI

VE

C

AN

C

ER

C

EN

TE

R

EL

M

C

AR

LT

O N

S

TR

EE

TS

, B U

FF

AL

O , N

Y

IS

SU

ED

F

O R

S

U

BM

IS

SI

O N

8-

-2

IS

SU

ED

F O

R B

ID

-1 6-

AutoCAD SHX Text architecture . planning . . planning . planning . . consulting

SCALE :

ROOF PLAN

1/8" = 1'-0''

8 98.7

D.3

D.2

D

B

A

BB

DD

AC

CC

COOLING TOWER COOLING TOWER COOLING TOWER COOLING TOWER

COOLING TOWER

COOLING TOWER

RD

RD

RD

RD

RD

AA

COOLING TOWER COOLING TOWER

P-20

P-21

P-22

P-23

P-24

P-25

P-26

P-27

P-31

P-32

P-33

P-43 P-44P-45

P-46

P-47

P-48

P-49

P-50

CAP

P-51P-52P-53P-55P-54P-56

+/- 106'-4"

- 1

'-0

- 8

'-1

+/- 10'-10"+/- 47'-2"

34B

A

C

D

E

1 2 3 4 5 6 7

DN

7.1 7.2 7.8

P-2 P-3

P-1

P-4

P-5P-6

EX.

CAP

EXIST

CAP

EX.

CAP

RDRD

P-7

UP

DN

UP

DN

DN DN

P-8

P-9

P-10

P-11

P-12

P-13

P-14

P-15

P-16

P-17

P-18

P-19

P-28

P-29

P-30

P-35

P-36 P-37 P-38P-39 P-40 P-41 P-42

+/- 44'-5"

- 1

8' -1

0"

- 7

2' -0

+/- 120'-0"

- 9

'-6

4A

5 5

8 8

R

ID

G E

R

ID

G E

A-103

A-102

A-103

A-103

A-103

A-103

A-103

A-103

A-103

A-103

A-103

HIGH

A-103

LOW

A-103

7 LOW

A-102

A-102

A-102

A-102

HIGH

A-102

A-102

A-102

A-102

LOW

A-102

LOW

8"

8" 8"

8"

2'-0"

8"

2A

EXISTING DUCT

CONTINUES TO

THE EXISTING

CHIMNEY

P-34

TYP

LOW HEAD-ROOM NOTIFICATION:

THE EXISTING COOLING TOWERS, PLATFORM STRUCTURE ALONG WITH HORIZONAL PIPING

AND DUCTWORK ABOVE THE ROOF DECK CREATE A LOW HEAD-ROOM CONDITION.

SIM

SIM

LOWER ROOF

AREA

UPPER ROOF

AREA

STAIR

PENTHOUSE

ROOF AREA

4A

4A

4B

4B

4B

4B

4B

15 15 15 15 15 15

D1

D1

2-LINES COMBINED

A-103

D1

D1

D1

D1

14A

TYP

14A

TYP

TYP

TYP

TYP

2A

P-D P-E

P-C

TYP

TYP

EX.

CAP

RIDGE

TYP19

TYP

A-102 A

TYP

D1

D3

D3 D3 D3

D1

D1

18 18

18 18

18A

18A

1918A

14141414

14 14 14 14

DIRECTION OF PITCH FOR TAPERED

ROOF INSULATION OR EXISTING

STRUCTURE

PRIMARY ROOF DRAIN

EXISTING SMOKE HATCH

EXISTING ROOF ACCESS HATCH

EXISTING VENT/ PIPE PENETRATION OR

STRUCTURAL SUPPORT FOR COOLING

TOWER, DUCTWORK OR PIPING

EXISTING EXHAUST FAN

PROVIDE 30"x30" WALKWAY PADS AS

INDICATED ON PLAN.

DARK GRAY SHADING REPRESENTS

CRICKETS AT 12" PER FOOT

LIGHT GRAY SHADING REPRESENTS

SLOPED STRUCTURAL DECK

2" ± PER FOOT WITH FLAT INSULATION

CROSS HATCH REPRESENTS FLAT

STRUCTURAL DECK AND TAPERED

INSULATION 14" PER FOOT

PHOTOGRAPH REFER TO

SPECIFICATION SECTION 003119

EXISTING CONDITION INFORMATION

GUARDRAIL

STRUCTURAL COLUMN WITH POURABLE

SEALER POCKET

ROOF PLAN LEGEND

PX

SMOKE

HATCH

GENERAL NOTES:

A. ALL DIMENSIONS ARE SHOWN FOR BASIS OF SCOPE

OF WORK - FIELD VERIFICATION IS REQUIRED FOR

ALL WORK.

B. CONTRACTOR SHALL PROVIDE A MINIMUM 12" THICK

EXTERIOR GRADE PLYWOOD FOR ROOF

PROTECTION AT ALL FOOT TRAFFIC THAT OCCURS

OR FOR ALL WORK THAT OCCUR ABOVE COMPLETED

INSTALLATION AREAS.

C. ALL WORK MUST BE IN ACCORDANCE WITH

MANUFACTURER REQUIREMENTS. PROVIDE

POSITIVE ROOF DRAINAGE. DRAINAGE CRICKETS

ARE SHOWN FOR REFERENCE AND SHALL BE

COORDINATED WITH THE MANUFACTURE FOR

PROPER LOCATION AND SIZE. PONDING IS NOT

ACCEPTABLE, ALL PONDING/POOLING OF SURFACE

WATER WILL REQUIRE CORRECTIVE ACTION.

D. ALL NON-STANDARD DETAILS HAVE BEEN REVIEWED

WITH THE MANUFACTURER REPRESENTATIVE TO BE

CERTAIN THE PROJECT MEETS WITH THE BASIS OF

DESIGN MANUFACTURE WARRANTY REQUIREMENTS.

IF THE CONTRACTOR IDENTIFIES A NON-STANDARD

DETAIL CONDITION NOT INCLUDED IN THE

CONTRACT DOCUMENTS, THE CONTRACTOR SHALL

OBTAIN THE MANUFACTURER'S APPROVAL OF THE

INSTALL PRIOR TO PERFORMING THE WORK.

E. FIELD VERIFY ALL EXISTING ROOF PENETRATIONS

AND INSTALL MANUFACTURER STANDARD

FLASHINGS WHETHER SHOWN ON THE DRAWINGS

OR LOCATED IN THE FIELD DURING CONSTRUCTION.

F. ALL DEBRIS SHALL BE REMOVED FROM THE

PROJECT AREA AND ADJACENT ROOF AND AT GRADE

AREAS, INCLUDING BUT NOT LIMITED TO;

FASTENERS, EXTRA MATERIALS, TOOLS, EQUIPMENT,

SAFETY, ETC. THE CONTRACTOR SHALL SCHEDULE A

WALK-THRU WITH THE OWNER SPECIFICALLY TO

REVIEW WORK AREA CLEAN-UP, PRIOR TO

TURN-OVER OF THE PROJECT.

GENERAL DEMOLITION NOTES:

A. IT IS THE INTENT OF THE CONTRACT DOCUMENTS TO

REMOVE THE ENTIRE EXISTING EPDM ROOF SYSTEM TO

THE EXISTING CONCRETE OR METAL DECK. THE

DEMOLITION/ REMOVAL WORK SHALL INCLUDE BUT IS NOT

LIMITED TO THE FOLLOWING.

1. LOWER POWER PLANT ROOF: BASED ON THE BASIS OF

DESIGN MANUFACTURER REPRESENTATIVE'S FIELD

INVESTIGATION THE EXISTING ROOF SYSTEM CONSIST

OF :

· EPDM ROOF MEMBRANE

· 1

2" FIBERBOARD COVER BOARD

· 2-LAYERS OF RIGID INSULATION (EPS)

- ONE LAYER IS 2" THICK AND

- ONE LAYER IS 1 12" THICK

(MECHANICALLY FASTENED THRU

CONCRETE PLANK DECK WITH

TOGGLE BOLTS)

· VAPOR BARRIER

· 1

2" GYPSUM BOARD (SIMILAR TO DENSDECK)

· CONCRETE ROOF DECK

2. UPPER POWER PLANT ROOF AND STAIR PENTHOUSE:

BASED ON THE BASIS OF DESIGN MANUFACTURER

REPRESENTATIVE'S FIELD INVESTIGATION OF THE

UPPER ROOF LEVEL, THE EXISTING ROOF SYSTEM

CONSIST OF :

· EPDM ROOF MEMBRANE

· 1

2" FIBERBOARD COVER BOARD

· 2-LAYERS OF RIGID INSULATION (EPS)

- ONE LAYER IS 2" THICK AND

- ONE LAYER IS 1 12" THICK

· VAPOR BARRIER

· 1

2" GYPSUM BOARD (SIMILAR TO DENSDECK)

· METAL ROOF DECK

B. IT IS THE THE INTENT OF THE CONSTRUCTION DOCUMENTS

TO REMOVE THE EXISTING VAPOR BARRIER LOCATED

BETWEEN THE RIGID INSULATION (OR ANY BACKER

BOARDS) AND THE CONCRETE ROOF DECK ENTIRELY,

EXPOSING THE DECK FOR INSTALLATION OF NEW WORK.

C. REMOVE AND DISPOSE OF ALL EXISTING GRAVEL STOPS,

FASCIA, COPING, COUNTER FLASHING, TERMINATION BARS,

EXPANSION JOINT MATERIALS FASTENERS, ETC. ENTIRELY.

D. ALL EXISTING LEAD COATED COPPER THROUGH WALL

FLASHING SHALL REMAIN, UNLESS SPECIFICALLY STATED

OTHERWISE. THE CONTRACTOR SHALL CONTACT THE

OWNER AND ARCHITECT IF A CONFLICT OCCURS DUE TO

THE INCREASE IN THE HEIGHT DUE TO THE INCREASE IN

THE THICKNESS OF THE RIGID INSULATION

E. EXISTING WOOD BLOCKING IS SCHEDULED TO REMAIN.

REVIEW THE CONDITION OF THE WOOD BLOCKING WITH

THE OWNER AND MANUFACTURER'S REPRESENTATIVE IF

ANY WOOD BLOCKING IS TO BE DETERMINED TO BE IN

DEFICIENT CONDITION, ISSUE A WRITTEN COST PROPOSAL

FOR THE COST OF REMOVAL AND REPLACEMENT BASED ON

THE SUBMITTED UNIT PRICING.

F. REVIEW THE CONDITION OF EACH BRICK WALL AND EACH

CONCRETE BLOCK (CMU) WITH THE OWNER & ROOF

MEMBRANE MANUFACTURE REPRESENTATIVE WHERE

EXISTING ROOFING MATERIAL HAS BEEN REMOVED AND

WHERE ROOFING MEMBRANE IS SCHEDULED TO BE

INSTALLED. WHERE DEFICIENT CONDITIONS ARE IDENTIFIED

ISSUE A WRITTEN PROPOSAL FOR THE COST OF

REPOINTING BASED ON THE SUBMITTED UNIT PRICING FOR

EACH MATERIAL.

G. PRIOR TO INSTALLING THE NEW ROOF SYSTEM REMOVE

ALL LOOSE MATERIAL AND DEBRIS FROM ALL SURFACES

SCHEDULED TO RECEIVE NEW ROOF SYSTEMS. IF

STRUCTURAL DEFICIENCIES ARE IDENTIFIED NOTIFY THE

ARCHITECT AND OWNER IMMEDIATELY TO DETERMINE THE

COURSE OF ACTION.

H. MOVE AND DISCARD ALL EXISTING WALKWAY PADS.

I. COORDINATE DEMOLITION WITH NEW WORK AND PROVIDE

ALL NECESSARY REMOVALS FOR PROPER INSTALLATION

OF NEW WORK

KEYED NOTES:

LOWER POWER PLANT ROOF (FLAT STRUCTURE PLANK DECK):

REMOVE EXISTING ROOFING ENTIRELY AS INDICATED TO EXISTING

CONCRETE PLANK DECK AND REPLACE WITH 90 MIL EPDM ROOF

SYSTEM - FULLY ADHERED, 3/8" COVER BOARD, MINIMUM

AVERAGE R-33 RIGID TAPERED INSULATION 1/4" PER FOOT AND

VAPOR BARRIER. PROVIDE TAPERED INSULATION (AND CRICKETS)

MINIMUM THICKNESS TO PROVIDE POSITIVE DRAINAGE

UPPER POWER PLANT ROOF AND STAIR PENTHOUSE ROOF

(SLOPED STRUCTURE): REMOVE EXISTING ROOFING ENTIRELY AS

INDICATED TO EXISTING METAL DECK AND REPLACE WITH 90 MIL

EPDM ROOF SYSTEM - FULLY ADHERED, 3/8" COVER BOARD,

MINIMUM R-33 RIGID INSULATION (FLAT), VAPOR BARRIER AND 5 8"

GYPSUM DECK BOARD. PROVIDE TAPERED INSULATION TO

PROVIDE POSITIVE DRAINAGE.

STAIR PENTHOUSE ROOF:

REMOVE EXISTING ROOFING ENTIRELY AS INDICATED TO EXISTING

METAL DECK AND REPLACE WITH 90 MIL EPDM ROOF SYSTEM -

FULLY ADHERED, 3/8" COVER BOARD, 3" (R-20±) RIGID INSULATION

(FLAT), VAPOR BARRIER AND 5 8" GYPSUM DECK BOARD. PROVIDE

TAPERED INSULATION TO PROVIDE POSITIVE DRAINAGE.

REMOVE EXISTING GRAVEL STOP/ COPING ENTIRELY. EXISTING

WOOD BLOCKING IS SCHEDULED TO REMAIN. CONTRACTOR

SHALL PROVIDE UNIT COST IN THEIR BID FOR NEW WOOD

BLOCKING MATERIAL IF FOUND TO BE DEFICIENT UPON REMOVAL

OF THE GRAVEL STOP/COPING

PROVIDE CONTINUOUS PERIMETER PRE-FINISHED ALUMINUM

FASCIA COVER. REFER TO DETAILS 6 & 6D/A-103. COLOR SHALL BE

SELECTED BY THE OWNER

PROVIDE CONTINUOUS PERIMETER PRE-FINISHED COPING. VIF,

COORDINATE SIZE; WIDTH AND HEIGHT SHALL MATCH EXISTING

REFER TO DETAILS 1 & 1D - 2 & 2D - 5 & 5D /A-102. COLOR SHALL

SELECTED BY THE OWNER.

PROVIDE 1-1/2" Ø SCHEDULE 40 PIPE RAILING, 42" HIGH MINIMUM

ABOVE THE FINISHED ROOF. REFER TO DETAIL 6/A-103. PAINT

RAILING UPON COMPLETION W/ TWO FINISH COATS. PAINT COLOR

SHALL BE BLACK. FOR BIDDING PURPOSES THERE ARE

APPROXIMATELY 230''-0"± LINEAR FEET OF RAILING.

EXISTING ROOF ACCESS HATCH (OR SMOKE HATCH (VIF) TO

REMAIN. THE ASSOCIATED CURBS SHALL BE RAISED TO A

MINIMUM HEIGHT REQUIRED BY THE ROOF MANUFACTURER FOR

PROPER WEATHER TIGHT/WARRANTY INSTALLATION.

EXISTING GUTTER AND DOWNSPOUT SHALL BE REMOVED AND

DISCARDED AND REPLACED WITH NEW ALUMINUM GUTTER,

DOWNSPOUT AND SPLASH BLOCK. REFER TO DETAIL 5 & 5D/A-102

REMOVE THE EXISTING ROOF DRAIN STRAINER DOME AND

CLAMPING RING AND DISCARD. THE EXISTING ROOF DRAIN BOWL

AND ROOF DRAIN LEADER SHALL REMAIN. REMOVE AND REPLACE

THE EXISTING STRAINER DOME, CLAMPING RING, FASTENERS AND

ASSOCIATED ITEMS. INSPECT THE ROOF DRAIN BOWL FOR

CRACKS AND DEFICIENCIES. WHERE REMAINING ROOF DRAIN

COMPONENTS ARE DETERMINED TO IN DAMAGED OR

UNSATISFACTORY CONDITION, PROVIDE HEAVY DUTY

ALUMINATOR RETROFIT INSERT PER UNIT PRICING REFER TO

DETAILS A-1, A-2 & A-3/A-201

PROVIDE NEW ROOF DRAIN AND RAIN LEADER. TIE NEW LEADER

INTO EXISTING ADJACENT ROOF DRAIN LEADER. REFER TO

PLUMBING PLAN ON THIS DRAWING AND REFER TO DETAIL A1 & A2

/A-201

EXISTING EXPANSION JOINT BETWEEN THE LOWER AND UPPER

ROOF AREAS, REMOVE ENTIRELY AND REPLACE REFER TO

DETAILS 7 & 7D/A-103

EXISTING WALL MOUNTED ELECTRICAL RECEPTACLE AND

CONDUIT. TEMPORARILY REMOVE FASTENERS FOR INSTALLATION

OF ROOF SYSTEM AND REINSTALL

EXISTING GALVANIZED STAIRS, LANDING AND STRUCTURAL

FRAMING. SHALL REMAIN - MODIFY THE BOTTOM TREAD AND

STRINGER BE DETAIL 11/A-103

PROVIDE VERTICAL TERMINATION BAR ADJACENT TO THE

EXISTING METAL WALL PANELS. INSTALL PER MANUFACTURERS

WRITTEN INSTRUCTIONS

EXISTING COOLING TOWER DUNNAGE PLATFORM STRUCTURAL

STEEL COLUMNS WITH POURABLE SEALER POCKET. REMOVE AND

DISCARD ALL EXISTING SEALER AND PROVIDE NEW POURABLE

SEALER PER DETAIL C/A-201.

· PAINT EACH STEEL COLUMN, SUPPORT CONNECTIONS TO THE

PLATFORM - COLOR SELECTED BY THE OWNER. REMOVE ALL

RUST AND PROVIDE:

- PROVIDE 1 LAYER OF PRIMER

- PROVIDE 2 LAYERS OF FINISH COAT

EXISTING COOLING TOWER EQUIPMENT, PIPING AND DUCT

PENETRATIONS SHALL REMAIN PROVIDE FIELD FLASHING PER

DETAIL F/A-201 OR MANF. STANDARD FOR LOW EXISTING

FLASHING. DO NOT DISCONNECT PIPING /DUCTS FROM COOLING

TOWERS WITHOUT APPROVAL FROM OWNER

APPROXIMATE LOCATION OF COOLING TOWER PIPING

MODIFICATION AND CLEAN-OUT. REFER TO DETAIL A/A-102 FOR

SPLASH AREA AND CATCHMENTS AND CONTAINMENT ZONE

DETAILS

PROVIDE 8 EIGHT ADDITIONAL CONCRETE PADS FOR COOLING

TOWER DRIPPING PADS AND ICE PREVENTION - LOCATIONS TO BE

SELECTED BY OWNER

STRUCTURAL STEEL RAISED DUCT/BREACHING PLATFORM SHALL

REMAIN. PROVIDE FIELD APPLIED FLASHING F/A-201 AT ROOF

MEMBRANE PENETRATION AND PAINT ALL EXISTING STEEL:

· REMOVE ALL RUST

· PROVIDE 1 LAYER OF PRIMER

· PROVIDE 2 LAYERS OF FINISH COAT

· COLOR: BLACK

ALL EXISTING (REMAINING) YELLOW ROOF TOP PIPING/DUCT

SHALL BE REPAINTED YELLOW (WHETHER SPECIFICALLY KEYED

OR NOT). REMOVE ALL RUST AND PROVIDE:

· PROVIDE 1 LAYER OF PRIMER

· PROVIDE 2 LAYERS OF FINISH COAT

PAINT EXISTING ROOF TOP MECHANICAL PIPE/DUCT YELLOW.

REMOVE ALL RUST AND PROVIDE:

· PROVIDE 1 LAYER OF PRIMER

· PROVIDE 2 LAYERS OF FINISH COAT

EXISTING VENTILATION STACK SHALL REMAIN. PROVIDE PROPER

TERMINATION DETAILS C & F/A-201

EXISTING VENT, PIPING, CONDUIT, ROOF PENETRATIONS, ETC.

REFER TO DETAIL F & I/A-201. PLUMBING VENTS SHALL EXTEND 18"

MIN. ABOVE THE FINISHED ROOF. PROVIDE EXTENSION AS

REQUIRED BY MANF.

ABANDONED MECHANICAL CURB - REMOVE THE EXISTING CURB

ENTIRELY AND ALL ASSOCIATED BLOCKING, INFILL OPEN PER

DETAIL 10/A-103

EXISTING MECH. EQUIPMENT AND DUCTWORK PENETRATIONS ON

EXIST. CURB OR RAILS: ALL EXISTING MECHANICAL EQUIPMENT

AND ASSOCIATED CURBS SHALL BE RAISED TO A MINIMUM HEIGHT

REQUIRED BY THE ROOF MANUFACTURER FOR PROPER WEATHER

TIGHT/WARRANTY INSTALLATION. TEMPORARILY REMOVE AND

REINSTALL THE EXISTING UNITS, INCLUDING EXTENDING AND

RECONNECTING ANY CONDUIT, WIRING, PIPING, PLUMBING, ETC.

PROVIDE CURB EXTENDERS/ADAPTORS. VIF EXISTING

CONDITIONS. PRIOR TO ANY EQUIPMENT SHUT DOWN

COORDINATE WITH RPCCC. REFER TO DETAIL 10/A-103

EXISTING FALL PROTECTION ANCHOR POINTS SHALL REMAIN.

PROVIDE PIPE FLASHING PER DETAIL I/A-201

APPROXIMATE EDGE OF EXISTING PERIMETER LIGHT WEIGHT

CONCRETE FILL - SLOPED (VIF)

PROVIDE WALKWAY PADS AT ALL ACCESS HATCHES AND AT THE

BOTTOM OF ALL STAIRS AND DUNNAGE PLATFORM LADDERS - VIF

ALL LOCATIONS. ALSO ON THE UPPER ROOF, PROVIDE A

CONTINUOUS WALKWAY FROM THE PENTHOUSE DOOR, ENTIRELY

AROUND BOTH DUNNAGAE PLATFORM FOR CLARITY SOME

WALKWAY PADS ARE NOT SHOWN, COORDINATE THE EXACT

LOCATION WITH THE OWNER.

4A

4B

14A

2A

18A

A

C

D

1 2 3 4 5 6 7

RD

RD

B

SCALE :

PLUMBING PLAN - POWER PLANT LOWER ROOF

1/8" = 1'-0''

NOTES:

1. COLUMN LINES SHOWN FOR REFERENCE BASED ON THE ORIGINAL BUILDING DESIGN DOCUMENTS.

2. CORE DRILL THE EXISTING CONCRETE PLANK IN THE CENTER OF THE 2'-0" WIDE PLANK AND A MIN. OF 12" FROM THE LONG EDGE.

3. THERE IS A SIGNIFICANT AMOUNT OF EXISTING MECHANICAL, PLUMBING AND ELECTRICAL EQUIPMENT ALONG WITH SUB-STRUCTURE BEAMS

AND SYSTEMS DIRECTLY BELOW THE POWER PLANT ROOF. THE CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY AVOIDING CONFLICTS WITH THE EXISTING CONDITIONS AND COORDINATE WITH THE OWNER LOCATION OF THE NEW ROOF DRAIN AND THE EXACT ROUTE FOR THE NEW ROOF DRAIN LEADER SEWER PIPING AND THE TOTAL QUANTITY OF LINEAR FEET. THE DISTANCE INDICATED DOES NOT INCLUDE ANY VERTICAL PIPING OR CONSIDERATION FOR CONFLICTS WITH EXISTING CONDITIONS. THE CONTRACTOR SHALL PROVIDE THE TOTAL QUANTITY OF PIPING AND INSULATION REQUIRED TO COMPLETE THE WORK AT NO ADDITIONAL COST TO THE OWNER.

4" UP TO R.D.

(EXISTING)

RD

4" UP TO R.D.

(NEW)

4" UP TO R.D.

(EXISTING)

EXISTING 4" ROOF DRAIN

LEADER, INSULATED

EXISTING

CLEAN OUT

PROVIDE

CLEAN OUT

PROVIDE 4" CAST

IRON PIPE W/ 1"

MIN. PIPE

INSULATION WRAP

SLOPE:

MIN. 14" PER FOOT

EXISTING DECK PREPARATION AND

LOW AREA INFILL:

(REFER TO THE SPECIFICATIONS)

WHERE THE EXISTING CONCRETE ROOF DECK

STRUCTURE IS LEVEL AND UPON INSTALLATION

OF THE VAPOR BARRIER AND WEATHER-TIGHT

CONDITIONS, PREPARE ROOF DECK ELEVATION

SHOP DRAWING(S), UTILIZING TOPOGRAPHIC

SURVEY QUALITY ELECTRONIC EQUIPMENT WITH

"LASER LEVELING". DETERMINE LOW AREAS

PRIOR TO INSTALLING RIGID INSTALLATION AND

INFILL THE LOW AREAS WITH SELF-LEVELING

CEMENTIOUS MATERIAL, PER UNIT PRICING

KEYED DEMOLITION NOTES:

REMOVE THE EXISTING ABANDON ROOF

PENETRATIONS ENTIRELY, INCLUDING BUT NOT

LIMITED TO; ALL PIPING FLASHINGS, CURBS,

FASTENERS, ETC. TO BELOW THE ROOF DECK.

INFILL OPENING PER DETAIL 10/A-103.

· COORDINATE WITH THE OWNER THE EXACT

DEPTH BELOW THE ROOF DECK BASED ON

ACCESS TO EACH PIPE BELOW THE DECK.

CAP TERMINATED/ABANDONED PIPE BELOW

THE DECK (IF STILL EXISTING)

· REMOVE ALL ABANDONED ROOF TOP

PIPING/EQUIPMENT. CUT ASSOCIATED DECK

MOUNTED SUPPORTS FLUSH WITH THE

EXISTING CONCRETE ROOF DECK

REMOVE THE EXISTING ROOF ACCESS HATCH

ENTIRELY INCLUDING BUT NOT LIMITED TO;

FLASHINGS, CURBS, FASTENERS. INFILL

OPENING PER DETAIL 10/A-103. REMOVE THE

EXISTING ACCESS LADDER ENTIRELY, INCLUDING

BUT NOT LIMITED TO; ALL FASTENERS AND

SUPPORTS.

EXISTING ABANDONED ROOF PENETRATION.

REPUTED TO BE INTEGRAL RAISED CONCRETE

CURBS. UPON REMOVAL OF THE EXISTING ROOF

SYSTEM, REVIEW WITH THE OWNER AND

ARCHITECT THE EXISTING PENETRATION INFILL.

· BASE SCOPE OF WORK - REFER TO THE

DETAIL REFERENCED ON THE ROOF PLAN

· UNIT PRICE: UPON FIELD REVIEW IF THE

EXISTING CURB IS METAL OR WOOD - NOT

CONCRETE - THEN INFILL THE OPENING PER

DETAIL 10/A-103

· UNIT PRICE: UPON FIELD REVIEW, IF THE

CURB IS RAISED CONCRETE - THE CURB

SHALL REMAIN. REVIEW THE EXISTING

PENETRATION INFILL WITH THE ARCHITECT

AND OWNER AND IF DETERMINED TO BE IN

POOR CONDITION - THEN INFILL THE OPENING

PER DETAIL 10/A-103

D1

D0

D2

D3

PROVIDE OVERHEAD PROTECTION FOR ROSWELL STAFF DURING REMOVAL OF THE EXISTING TOGGLE STYLE

THRU-BOLT AND PLATE INSULATION FASTENERS ON THE LOW ROOF AREA:

THE LOW ROOF AREA CONTAINS AN EXISTING TOGGLE STYLE FASTENER SYSTEM SECURING THE ROOF INSULATION AND COVER-BOARD SYSTEM.

DURING THE ROOF REMOVAL PROCESS, THE EXISTING TOGGLES SHALL BE REMOVED COMPLETELY AND ALLOWED TO DROP TO THE FLOOR AREA BELOW.

THE CONTRACTOR SHALL HAVE AT LEAST ONE FULL TIME PERSON AT ALL TIMES LOCATING, COLLECTING AND DISPOSING OF ALL TOGGLES AND

FASTENERS AND DEBRIS.

THE CONTRACTOR SHALL ERECT AND MAINTAIN A SCAFFOLDING SYSTEM AT THE LOCATIONS SHOWN ON THE FIRST FLOOR PLAN. THE MINIMUM CLEAR HEIGHT SHALL BE 7'-0" (AFF). THE EXACT LENGTH DIMENSIONS TO BE CONFIRMED IN THE FIELD. THE WIDTH SHALL BE A STANDARD SCAFFOLDING WIDTH (5'-0"), TO PROTECT THE ROSWELL STAFF WHILE PERFORMING THEIR NORMAL DAILY ACTIVITIES INCLUDING, BUT NOT LIMITED TO; CIRCULATE AROUND THE EQUIPMENT, OBSERVER THE EQUIPMENT, GENERAL MAINTENANCE ON THE EQUIPMENT. THE SCAFFOLDING SUPPORTS SHALL NOT INTERFERE WITH ACCESS TO CONTROLS, VALVES, ACCESS PANELS, WATER SOFTENER FOR SALT DISPENSING, ETC.

THE CONTRACTOR SHALL COORDINATE DAILY WITH THE OWNER AND STAFF OF THE POWER PLANT DURING DEMOLITION WORK.

A MINIMUM TWO EMERGENCY EXITS WILL BE MADE AVAILABLE TO ALL STAFF AT ALL TIME. THE CONTRACTOR WILL POST SIGNAGE TO DESIGNATE THE WORK AREA INCLUDE EXTERIOR SIGNAGE ON THE DOORS WHEN ENTRY NEEDS TO BE RE-ROUTE AROUND THE WORK AREAS

THE OWNER SHALL NOTIFY THE CONTRACTOR IF AN EQUIPMENT EMERGENCY ARISES AND ACCESS IS NECESSARY WITHIN THE DEMOLITION AREA. THE CONTRACTOR SHALL STOP WORK IN THE EMERGENCY AREA. THE CONTRACTOR CAN MAKE NO CLAIM FOR ADDITIONAL COST IF AN EMERGENCY OCCURS.

CIRCULATION PATHWAYS:

PROVIDE OVERHEAD SCAFFOLDING

PROTECTION IN THE AREAS SHOWN ON THIS

FIRST FLOOR PLAN PER THE BELOW

OVERHEAD PROTECTION NOTES

120'± (VIF)

(V

IF

(V

IF

SCALE :

OVERHEAD PROTECTION PLAN - FIRST FLOOR

1/16" = 1'-0''

A-101

4245 UNION ROAD, SUITE 210

BUFFALO, NEW YORK 14225

P: 716.923.0133 F: 716.923.0136

ROOF PLAN

DATE: 5-28-20

SCALE: AS SHOWN

DRAWN BY: GLG

CHECKED BY:

PROJECT No: 20-027

DRAWING No.

DRAWING TITLE:

No. REVISIONS DATE architectural, p.c.

ROSWELL PARK

COMPREHENSIVE CANCER

CENTER

BUFFALO, NY 14263

(716) 845-2300

ELM & CARLTON

LOCATED AT:

ROSWELL PARK

COMPREHENSIVE CANCER

CENTER

BUFFALO, NEW YORK

POWER PLANT

ROOF REPLACEMENT

RPCI # 11-21-001

ISSUED FOR 100% SUBMISSION 8-25-2026

- ISSUED FOR BID 10-16-2026

1 REV - TOGGLE BOLT NOTE 11-3-2026

AutoCAD SHX Text

ZAXIS ARCHITECTURAL P.C.

AutoCAD SHX Text THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, ARE THE PROPERTY OF ZAXIS ARCHITECTURAL P.C. UNAUTHORIZED REPRODUCTION, ALTERATION OR ADDITION TO ANY DRAWING, DESIGN, SPECIFICATION, PLAN OR REPORT IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF ZAXIS ARCHITECTURAL P.C. IS PROHIBITED BY SECTION 7209, PROVISION 2 OF THE NEW YORK STATE EDUCATION LAW.

EXIST WALL

CONST.

EXISTING METAL ROOF DECK SHALL REMAIN

EXISTING METAL PANEL FACADE

SHALL REMAIN

EXISTING METAL STUD FRAMING

AND STRUCTURAL STEEL TO

REMAIN

PRE-FINISHED ALUMINUM

COPING MATCH EXISTING

PROFILE, CLEAT SYSTEM,

SIZE AND COLOR

SCALE :

PARAPET DETAIL 5

PROVIDE 2-LAYERS OF CONTINUOUS 2 x WOOD

BLOCKING

EXISTING METAL STUD FRAMING AND

STRUCTURAL STEEL TO REMAIN

EXISTING METAL PANEL FACADE

SHALL REMAIN

EXIST WALL

CONST.

EXISTING METAL FASCIA TRIM SHALL REMAIN

VI

F

SEALANT

CONTINUOUS TERMINATIN BAR

PROVIDE ALUMINUM GUTTER AND DOWN

SPOUT MATCH EXISTING PROFILE AND COLOR

EPDM 90 MIL ROOFING MEMBRANE ON

8" COVER BOARD ON

3" (R-30 ±) OF RIGID INSUL. R-30 ± (FLAT) ON

VAPOR BARRIER ON

8" GYPSUM DECK BOARD

EXISTING STRUCTURE SLOPES

4" PER FOOT

ROOFING MEMBRANE ADHERED

TO METAL WALL PANEL SYSTEM

AND WRAPPED OVER THE

PARAPET - COORDINATE WITH

ROOF MEMBRANE

MANUFACTURER

EXIST WALL

CONST.

EXISTING METAL ROOF DECK

EXISTING METAL PANEL FACADE

SHALL REMAIN

EXISTING METAL STUD FRAMING

AND W 6 x 15 STRUCTURAL

STEEL TO REMAIN

EXISTING STEEL BEAM

EXISTING 12" METAL FORM DECK (VERTICAL) SHALL REMAIN

EXISTING GYPSUM SHEATHING SHALL REMAIN INTACT.

EXISTING WOOD BLOCKING SHALL REMAIN

REVIEW CONDITION AND REPLACE DEFICIENT

MATERIAL PER UNIT PRICING

EPDM 90 MIL ROOFING MEMBRANE ON

8" COVER BOARD ON

AVERAGE R-33 RIGID INSUL. (FLAT) ON

VAPOR BARRIER ON

8" GYPSUM DECK BOARD

LAP SEALANT

SCALE :

PARAPET DETAIL 1

ROOF MEMBRANE SHALL BE ADHERED

TO OSB BOARDSHEATHING AND

WRAPPED OVER THE PARAPET WOOD

BLOCKING

PROVIDE 716" OSB BACKER BOARD

4" M

IN

M

AT

C H

EX

IS

T

VI

F

PRE-FINISHED ALUMINUM

COPING

EXISTING C9 x 13.4 CONT.

EXIST WALL

CONST.

EXISTING METAL ROOF DECK SHALL REMAIN

EXISTING METAL PANEL FACADE

SHALL REMAIN

EXISTING METAL STUD FRAMING

AND STRUCTURAL STEEL TO

REMAIN

EXISTING ROOFING MEMBRANE/ COVER BOARD,

INSULATION / VAPOR BARRIER AND GYPSUM

DECK BOARD. TO BE REMOVED ENTIRELY DOWN

TO EXISTING METAL ROOF DECK

REMOVE AND DISCARD ROOFING MEMBRANE

ADHERED TO EXISTING METAL WALL PANEL AND

WRAPPED OVER THE PARAPET

REMOVE AND DISCARD

EXISTING METAL COPING

SCALE :

PARAPET DEMOLITION DETAIL 5D

REMOVE AND DISCARD THE EXISTING METAL

GUTTER AND ALL FASTENERS

EXISTING METAL STUD FRAMING AND

STRUCTURAL STEEL TO REMAIN

EXISTING METAL PANEL FACADE

SHALL REMAIN

EXIST WALL

CONST.

EXISTING WOOD BLOCKING SHALL REMOVED

AND DISCARDED

EXISTING METAL FASCIA SHALL REMAIN. REVIEW

CONDITION WITH OWNER AND REPLACE IF

DETERMINED TO BE DETERIORATED

VI

F

REMOVE AND DISCARD EXISTING METAL

FLASHING

EXISTING STRUCTURE

SLOPES 14" PER FOOT

EXIST WALL

CONST.

EXISTING METAL ROOF DECK

EXISTING METAL PANEL FACADE

SHALL REMAIN

6"

EXISTING STEEL BEAM

EXISTING ROOFING MEMBRANE/ COVER BOARD,

INSULATION / VAPOR BARRIER AND GYPSUM

DECK BOARD. TO BE REMOVED ENTIRELY DOWN

TO EXISTING METAL ROOF DECK

REMOVE AND DISCARD ROOFING MEMBRANE

ADHERED TO COVER BOARD AND WRAPPED

OVER THE PARAPET WOOD BLOCKING

REMOVE AND DISCARD EXISTING METAL COPING

EXISTING COVER BOARD (PRESUMED TO BE

GYPSUM VIF) SHEATHING SHALL REMAIN INTACT.

CONTRACTOR SHALL PROVIDE UNIT COST FOR

ADDITIONAL GYPSUM SHEATHING IF FOUND TO BE

DETERIORATED.

EXISTING WOOD BLOCKING SHALL REMAIN

INTACT. CONTRACTOR SHALL PROVIDE UNIT

COST FOR ADDITIONAL WOOD BLOCKING IF

FOUND TO BE DETERIORATED.

VI

F

EXISTING 12" METAL FORM DECK (VERTICAL)

SHALL REMAIN INTACT

SCALE :

PARAPET DEMOLITION DETAIL 1D

EXISTING METAL STUD FRAMING

AND W 6 x 15 STRUCTURAL

STEEL TO REMAIN

EXISTING C9 x 13.4 CONT.

EXIST WALL

CONST.

EXISTING METAL ROOF DECK

EXISTING STEEL BEAM

EXISTING ROOFING MEMBRANE/ COVER BOARD,

INSULATION / VAPOR BARRIER AND GYPSUM

DECK BOARD. TO BE REMOVED ENTIRELY DOWN

TO EXISTING METAL ROOF DECK

REMOVE AND DISCARD ROOFING MEMBRANE

ADHERED TO CMU AND WRAPPED OVER THE

PARAPET WOOD BLOCKING

REMOVE AND DISCARD EXISTING METAL COPING

EXISTING WOOD BLOCKING SHALL REMAIN

INTACT. CONTRACTOR SHALL PROVIDE UNIT

COST FOR ADDITIONAL WOOD BLOCKING IF

FOUND TO BE DETERIORATED.

6" VI

F

EXISTING METAL PANEL

FACADE SHALL REMAIN

EXISTING CMU WALL

TO REMAIN

SCALE :

PARAPET DEMOLITION DETAIL 2D

EXIST WALL

CONST.

EXISTING METAL ROOF DECK

EXISTING STEEL BEAM

EXISTING METAL PANEL FACADE

SHALL REMAIN

EXISTING CMU WALL TO REMAIN

PRE-FINISHED ALUMINUM

COPING

ROOFING MEMBRANE ADHERED TO OSB

BOARD SHEATHING AND WRAPPED OVER

THE PARAPET WOOD BLOCKING

EPDM 90 MIL ROOFING MEMBRANE ON

8" COVER BOARD ON

AVERAGE R-33 RIGID INSUL. (FLAT) ON

VAPOR BARRIER ON

8" GYPSUM DECK BOARD

LAP SEALANT

SCALE :

PARAPET DETAIL 2

PROVIDE 716" OSB BACKER BOARD

M

AT

C H

EX

IS

T

VI

F

4" M

IN

EXISTING WOOD BLOCKING SHALL REMAIN

REVIEW CONDITION AND REPLACE DEFICIENT

MATERIAL PER UNIT PRICING

SCALE :

DETAIL AT STAIR TOWER 3D

DEMOLITION - TRANSITION

EXISTING METAL ROOF DECK

EXISTING STEEL BEAM

EXISTING ROOFING MEMBRANE/ COVER

BOARD, INSULATION / VAPOR BARRIER

AND GYPSUM DECK BOARD. TO BE

REMOVED ENTIRELY DOWN TO EXISTING

METAL ROOF DECK

EXISTING METAL PANEL FACADE

SHALL REMAIN

REMOVE AND DISCARD ROOFING

MEMBRANE ADHERED TO CONCRETE

BULKHEAD

EXISTING DIAMOND PLATE STAIR

LANDING SHALL REMAIN

EXISTING CMU

WALL TO REMAIN

EXISTING CONCRETE

BULKHEAD TO REMAIN

EXISTING METAL ROOF DECK

EXISTING STEEL BEAM

EPDM 90 MIL ROOFING MEMBRANE ON

8" COVER BOARD ON

AVERAGE R-33 RIGID INSUL. (FLAT) ON

VAPOR BARRIER ON

8" GYPSUM DECK BOARD

LAP SEALANT

CONTINUOUS 1" WIDE TERMINATION BAR

SECURED TO EXISTING CONCRETE BULKHEAD

ROOFING MEMBRANE ADHERED TO CMU

EXISTING METAL PANEL FACADE

SHALL REMAIN

SCALE :

DETAIL AT STAIR TOWER 3

TRANSITION

EXISTING DIAMOND PLATE STAIR

LANDING SHALL REMAIN

EXISTING CMU

WALL TO REMAIN

EXISTING CONCRETE

BULKHEAD TO REMAIN

SCALE :

DOOR THRESHOLD DETAIL 4

EXISTING

EXISTING METAL ROOF DECK

EXISTING STEEL BEAM

EXISTING METAL PANEL FACADE BEYOND

EXISTING DIAMOND

PLATE STAIR

LANDING SHALL

REMAIN

EXISTING CMU

WALL TO REMAIN

EXISTING INSULATED HOLLOW METAL DOOR AND

DOOR FRAME SHALL REMAIN

FINISHED FLOOR

STAIR PENTHOUSE

CONTINUOUS 1" WIDE TERMINATION BAR

PROVIDE NEW METAL COUNTER-FLASHING.

METAL COUNTER-FLASHING AND EPDM

ROOF MEMBRANE SHALL EXTEND UNDER

NEW THRESHOLD.

EPDM 90 MIL ROOFING MEMBRANE ON

8" COVER BOARD ON

AVERAGE R-33 RIGID INSUL. (FLAT) ON

VAPOR BARRIER ON

8" GYPSUM DECK BOARD

LAP SEALANT

ROOFING MEMBRANE ADHERED TO CMU

REMOVE AND REPLACE THE EXISTING ALUMINUM

THRESHOLD. FIELD VERIFY EXISTING SIZE AND

MATCH. BASIS OF DESIGN: NATIONAL GUARD 425E

PROVIDE THE FOLLOWING TO THE EXISTING DOOR

1 - BOTTOM SWEEP - PEMKO 217 SERIES "U" SHAPED

DOOR SHOE W/ PEMKO PRENE OR BULBUS INSERT

SCALE :

DOOR THRESHOLD DETAIL 4D

DEMOLITION - EXISTING

EXISTING METAL ROOF DECK

EXISTING STEEL BEAM

EXISTING ROOFING MEMBRANE/ COVER

BOARD, INSULATION / VAPOR BARRIER AND

GYPSUM DECK BOARD. TO BE REMOVED

ENTIRELY DOWN TO EXISTING METAL ROOF

DECK

EXISTING METAL PANEL FACADE BEYOND

REMOVE AND DISCARD ROOFING MEMBRANE

ADHERED TO CONCRETE BULKHEAD

EXISTING DIAMOND PLATE STAIR

LANDING SHALL REMAIN

EXISTING CMU WALL

TO REMAIN

EXISTING INSULATED HOLLOW METAL DOOR AND

DOOR FRAME SHALL REMAIN

REMOVE AND DISCARD EXISTING THRESHOLD

REMOVE AND DISCARD THE EXISTING BENT

PLATEFINISHED FLOOR

STAIR PENTHOUSE

3" X 3" ECO-EDGE DRAIN BAR

- CONTINUOUS AROUND THE

CLEAN-OUT SPLASH ZONE

ROOF DRAIN SUMP

4'x4' LOCATION

VARIES

SURFACE

DRAINAGE AT

ROOF DRAIN

2'-0" X 2'-0" CONCRETE

PAD, TYP.

HORZ. EDGE OF

DRAIN BAR

EXISTING COOLING TOWER

VALVE APPEARS TO BE

ABOVE THE DUNNAGE

PLATFORM VIF EXACT

LOCATION

EXISTING COOLING

TOWER PIPING

FROM DUNNAGE

PLATFORM ABOVE

NOTE:

THE EXISTING CLEAN-OUT/FLUSHING LOCATION FOR

THE COOLING TOWER APPEARS TO BE DIRECTLY

ABOVE OR ADJACENT TO AN EXISTING ROOF DRAIN

(VIF). MODIFY THE PIPING AS FOLLOWS:

1. REMOVE A PORTION OF THE EXISTING PVC PIPING

TO THE 90 ° ELBOW AT THE VERTICAL PIPE

2. PROVIDE AND CONNECT A 45° PIPE

3. CENTER THE CONCRETE SPLASH BLOCK AS

SHOWN

4. FIELD COORDINATE WITH OWNER ANY CONFLICTS

WITH THE SPLASH BLOCK LOCATION. A CHANGE

IN THE PIPE REMOVAL AMOUNT FOR A CLEAR

LANDING ARE IS ACCEPTABLE MODIFICATION.

5. REMOVE HANGERS WHERE NO LONGER

REQUIRED

1'-0"±

TYP

PROVIDE PIPING

PER THE

ELEVATION

REMOVE EXISTING

PIPING AND

ASSOCIATED

HANGERS AWAY

FROM ROOF DRAIN

PLAN

ASCALE :

COOLING TOWER CLEAN-OUT AND FLUSHING

SPLASH AND DEBRIS CONTAINMENT AREA DIAGRAM

1/2" = 1'-0''

COOLING TOWER

PIPING FROM

DUNNAGE PLATFORM

ABOVE

FINISHED ROOF

2'-0" X 2'-0" CONCRETE

PAD SPLASH ZONE

REFER TO PLAN

PROVIDE SUPPORT HANGER FROM

DUNNAGE PLATFORM ABOVE

3" X 3" ECO-EDGE DRAIN BAR

ROOF MEMBRANE PROTECTION PAD

· OVERLAP AND SECURE DRAIN BAR

· ALSO UNDER CONCRETE PADS

PROVIDE PVC PIPING - MATCH

EXIST SIZE AND MATERIAL.

LOWER TO REDUCE HEIGHT OF

OUTFLOW DROP. PROVIDE

HINGED FLAP VENT

8" -1

0"

REMOVE A PORTION OF

THE EXISTING PIPING

ELEVATION

A-102

4245 UNION ROAD, SUITE 210

BUFFALO, NEW YORK 14225

P: 716.923.0133 F: 716.923.0136

DETAILS

DATE: 8-28-2020

SCALE: AS SHOWN

DRAWN BY: DHH

CHECKED BY:

PROJECT No: 20-027

DRAWING No.

DRAWING TITLE:

No. REVISIONS DATE architectural, p.c.

ROSWELL PARK

COMPREHENSIVE CANCER

CENTER

BUFFALO, NY 14263

(716) 845-2300

ELM & CARLTON

LOCATED AT:

ROSWELL PARK

COMPREHENSIVE CANCER

CENTER

BUFFALO, NEW YORK

POWER PLANT

ROOF REPLACEMENT

RPCI # 11-21-001

ISSUED FOR 100% SUBMISSION 8-25-2026

- ISSUED FOR BID 10-16-2026

AutoCAD SHX Text 1 1/2" = 1'-0''

AutoCAD SHX Text xxxxxxx

AutoCAD SHX Text 1 1/2" = 1'-0''

AutoCAD SHX Text 1 1/2" = 1'-0''

AutoCAD SHX Text 1 1/2" = 1'-0''

AutoCAD SHX Text 1 1/2" = 1'-0''

AutoCAD SHX Text 1 1/2" = 1'-0''

AutoCAD SHX Text 1 1/2" = 1'-0''

AutoCAD SHX Text

XXXXXX

AutoCAD SHX Text 1 1/2" = 1'-0''

AutoCAD SHX Text 1 1/2" = 1'-0''

AutoCAD SHX Text

XXXXXX

AutoCAD SHX Text 1 1/2" = 1'-0''

AutoCAD SHX Text

ZAXIS ARCHITECTURAL P.C.

AutoCAD SHX Text THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, ARE THE PROPERTY OF ZAXIS ARCHITECTURAL P.C. UNAUTHORIZED REPRODUCTION, ALTERATION OR ADDITION TO ANY DRAWING, DESIGN, SPECIFICATION, PLAN OR REPORT IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF ZAXIS ARCHITECTURAL P.C. IS PROHIBITED BY SECTION 7209, PROVISION 2 OF THE NEW YORK STATE EDUCATION LAW.

SCALE :

ROOF GUARDRAIL DETAIL 6

REPUTED TO BE CERAMIC GLAZED

CEMENTIOUS ASBESTOS BOARD. DO NOT

DISTURB

8"

VI

F

C O

VE

R

N

EW

FA

ST

EN

ER

EPDM 90 MIL REINFORCED ROOFING MEMBRANE ON

8" COVER BOARD ON

AVERAGE R-30 RIGID INSUL. TAPERED ON

VAPOR BARRIER

PRE-FINISHED ALUMINUM FASCIA COVER

WATER CUT-OFF MASTIC

EXISTING CONCRETE PLANK ROOF DECK (FLAT)

EXISTING CONCRETE FILL (FORMING THE

PERIMETER SLOPE) SHALL REMAIN

EXISTING STEEL BEAM

EXISTING WOOD BLOCKING SHALL REMAIN

INTACT.

4'-6"

1 12" DIA. PIPE RAIL (PAINTED BLACK) - VERTICAL POSTS

TO BE 6'-0" OC MAX. W/ 8"x8"x3

16" BASE PLATE & (4) 14"

EXPANSION ANCHORS INTO EXIST CONCRETE PLANK

DECK. REFER TO PLAN FOR LOCATION

1' -9

1'-0"1'-0" 8"

PIPE BOOT FLASHING WITH CLAMP AND

SEALANT AT TOP - FLASH PER

MANUFACTURERS WRITTEN INSTRUCTIONS.

NOTE: THE PIPE BOOT SHALL NOT BE

CUT/SPLIT DURING INSTALLATION TO

MAINTAIN MONOLITHIC FORM FOR WEATHER

TIGHT CONDITION

PERIMETER EDGE FASCIA AND

6" MIN.

FROM EDGE OF CONC. PLANK (VIF)

REFER TO PLAN DETAIL 6B/A-301

PRE-FINISHED ALUMINUM FASCIA

OVERLAY OF EXISTING METAL FASCIA -

SECURE TO EXISTING BLOCKING AND CLIP

HEM END TO BASE OF EXISTING FLASHING

· DESIGN INTENT: DO NOT DISTURB THE

ASBESTOS CONTAINING WALL PANELS

INCLUDING THE EXISTING FLASHING AND

BLOCKING

· REFER TO ENLARGED DETAIL FOR

CLARITY

LOWER PORTION OF EXISTING

METAL FASCIA SHALL REMAIN

ENLARGED FASCIA DETAIL 6A

3' -6

" M

IN

1' -9

REMOVE AND DISCARD EXISTING METAL FASCIA

EXISTING WOOD BLOCKING SHALL REMAIN

INTACT. CONTRACTOR SHALL PROVIDE UNIT

COST FOR ADDITIONAL WOOD BLOCKING IF

FOUND TO BE DETERIORATED.

LOWER PORTION OF EXISTING METAL FASCIA

SHALL REMAIN

REPUTED TO BE CERAMIC GLAZED CEM.

ASBESTOS BOARD. DO NOT DISTURB

EXISTING CONCRETE PLANK ROOF DECK

(FLAT)

EXISTING CONCRETE FILL (FORMING THE

SLOPE) SHALL REMAIN

EXISTING STEEL BEAM

EXISTING ROOFING MEMBRANE/ COVER BOARD /

INSULATION, TO BE REMOVED ENTIRELY DOWN

TO EXISTING CONCRETE PLANK ROOF DECK.

THE EXISTING FASTENERS ARE THROUGH BOLT

WITH TOGGLES AND SHALL BE REMOVED.

SCALE :

PERIMETER EDGE FASCIA DETAIL 6D

DEMOLITION

EXISTING WOOD BLOCKING SHALL REMAIN INTACT.

EXISTING CONCRETE PLANK ROOF DECK

(FLAT)

EXISTING CONCRETE FILL (FORMING THE

SLOPE) SHALL REMAIN

EXISTING STEEL BEAM

SCALE :

EXISITNG EXPANSION JOINT DETAIL 7

DEMOLITION

EXISTING METAL PANEL FACADE AND

CLOSURE TRIM SHALL REMAIN

EXISTING CMU WALL SHALL REMAIN

CONTINUOUS 1" WIDE TERMINATION BAR

COMPRESSIBLE EXPANSION JOINT TUBE

FIRE SAFING INSULATION WITH INSULATION RETAINER

EPDM 90 MIL REINFORCED ROOFING MEMBRANE ON

8" COVER BOARD ON

AVERAGE R-33 RIGID INSUL. TAPERED ON

VAPOR BARRIER

ROOFING MEMBRANE ADHERED TO OSB BACKER

BOARD

16" OSB BACKER BOARD

EXISTING WOOD BLOCKING SHALL REMAIN

INTACT. CONTRACTOR SHALL PROVIDE UNIT

COST FOR ADDITIONAL WOOD BLOCKING IF

FOUND TO BE DETERIORATED.

EXISTING CONCRETE PLANK ROOF DECK

(FLAT)

EXISTING CONCRETE FILL (FORMING THE

SLOPE) SHALL REMAIN

EXISTING STEEL BEAM

SCALE :

EXISITNG EXPANSION JOINT DETAIL 7D

DEMOLITION

REMOVE AND DISCARD THE EXISTING EPDM

EXPANSION BELLOW AND EXPANSION JOINT

COMPONENTS

REMOVE AND DISCARD ROOFING MEMBRANE

ADHERED TO COVER BOARD AND WRAPPED

OVER THE PARAPET WOOD BLOCKING

REMOVE AND DISCARD THE EXISTING FIRE

SAFING MATERIAL

REMOVE AND DISCARD THE EXISTING METAL

COUNTER FLASHING

REMOVE AND DISCARD THE EXISTING SEALANT

EXISTING METAL PANEL FACADE AND

CLOSURE TRIM SHALL REMAIN

EXISTING CMU WALL SHALL REMAIN

EXISTING ROOFING MEMBRANE/ COVER BOARD /

INSULATION, TO BE REMOVED ENTIRELY DOWN

TO EXISTING CONCRETE PLANK ROOF DECK.

THE EXISTING FASTENERS ARE THROUGH BOLT

WITH TOGGLES AND SHALL BE REMOVED.

LAP SEALANT

PROVIDE TWO LAYERS OF 2x4 WOOD BLOCKING

AROUND THE PERIMETER OF THE EXISTING

RAISED MECHANICAL CURB

EPDM 90 MIL REINFORCED ROOFING MEMBRANE ON

8" COVER BOARD ON

AVERAGE R-33 RIGID INSUL. TAPERED ON

VAPOR BARRIER

EPDM 90 MIL REINFORCED ROOFING MEMBRANE ON

8" COVER BOARD ON

2.6" - MIN. R-15 RIGID INSUL. TAPERED ON

VAPOR BARRIER

SCALE :

EXISTING RAISED CONCRETE CURB 9

ROOFING MEMBRANE ADHERED TO OSB BOARD

SHEATHING AND WRAPPED OVER THE CURB

PROVIDE 716" OSB BACKER BOARD

OVER EXISTING CONCRETE CURB

SLOPE 14" PER FOOT

NOTE:

PROVIDE 5 8" GYPSUM

DECK IF THE INFILL IS

METAL DECK SURFACE

LAP SEALANT

ROOFING MEMBRANE ADHERED TO OSB BOARD

SHEATHING AND WRAPPED OVER THE CURB

PROVIDE 716" OSB BACKER BOARD

OVER EXISTING CONCRETE CURB

PROVIDE TWO LAYERS OF 2x4 WOOD BLOCKING

AROUND THE PERIMETER OF THE EXISTING

RAISED MECHANICAL CURB

EPDM 90 MIL REINFORCED ROOFING MEMBRANE ON

8" COVER BOARD ON

AVERAGE R-30 RIGID INSUL. TAPERED ON

VAPOR BARRIER

EPDM 90 MIL REINFORCED ROOFING MEMBRANE ON

8" COVER BOARD ON

2.6" - MIN. R-15 RIGID INSUL. TAPERED ON

VAPOR BARRIER

SCALE :

EXISTING RAISED CONCRETE CURB 8

EXISTING MECHANICAL EXHAUST FAN ON

EXISTING MECHANCIAL CURB

ROOFING MEMBRANE ADHERED TO 38" COVER

BOARD SHEATHING AND WRAPPED OVER THE

CURB

SHEET METAL FLASHING

SLOPE

4" PER FT

NOTE:

PROVIDE 5 8" GYPSUM

DECK IF THE INFILL IS

METAL DECK SURFACE

1 12" METAL DECK, 22 GAUGE MIN. IN ONE CONTINUOUS

PIECE AND BE IN CONFORMANCE WITH ASTM A611,

GRADE C, D, OR E. PROVIDE A SHOP COAT OF PRIMER

PAINT ON FRESHLY CLEANED AND PHOSPHATIZED

STEEL

SCALE :

ROOF PENETRATION REMOVAL AND INFILL DETAIL FROM ROOF SIDE

N.T.S. 10

REMOVE EXISTING ROOF

PENETRATION

PROVIDE 12" EXPANSION BOLT

(2) PER SIDE - EQUAL SPACED

PROVIDE 3"x5"x5

16" LLV CONT. TYP

PROVIDE 3"x4"x5

16" LLH CONT. TYP

(WELD TO 3"x5" ANGLE)

PROVIDE 1/2-INCH SECUROCK SUBSTRATE BOARD

(THERMAL BARRIER) MECHANICALLY FASTENED EVERY

1.3 SQ.FT. O.C. MAX. TO METAL DECK INFILL

PROVIDE AVERAGE R-33 RIGID

INSULATION

PROVIDE CONTINUOUS VAPOR RETARDER

PROVIDE SPECIFIED ROOF SYSTEM

PROVIDE 3 8" INCH (SECUROCK) COVER

BOARD IN LOW RISE FOAM ADHESIVE

BEADS SPACED 6-INCHES O.C.

NOTES:

1. MAX. SIZE 4'X4' - CONTACT ARCHITECT IF PENETRATION IS LARGER

2. ROUND PENETRATIONS - PROVIDE BENT PLATES OF EQUIVALENT

SIZE AND CURVED TO MATCH RADIUS OF OPENING

EXISTING OPENING BELOW DECK

SUPPORT IS UNKNOWN - VIF

1 12" METAL DECK, 22 GAUGE MIN. IN ONE CONTINUOUS

PIECE AND BE IN CONFORMANCE WITH ASTM A611,

GRADE C, D, OR E. PROVIDE A SHOP COAT OF PRIMER

PAINT ON FRESHLY CLEANED AND PHOSPHATIZED

STEEL OVERLAP METAL DECK MIN. 8" AND WELD PER

METAL DECK INDUSTRY STANDARD

REMOVE EXISTING ROOF

PENETRATION

PROVIDE 1/2-INCH SECUROCK SUBSTRATE BOARD

(THERMAL BARRIER) MECHANICALLY FASTENED EVERY

1.3 SQ.FT. O.C. MAX. TO METAL DECK INFILL

PROVIDE AVERAGE R-33 RIGID

INSULATION

PROVIDE CONTINUOUS VAPOR RETARDER

PROVIDE SPECIFIED ROOF SYSTEM

PROVIDE3

8" INCH (SECUROCK) COVER

BOARD

EXISTING OPENING BELOW DECK

SUPPORT IS UNKNOWN - VIF

EXISTING CONCRETE PLANK DECK

EXISTING METAL DECK

NOTE:

SPRAY ON FIRE PROOFING TO ALL

STRUCTURAL STEEL FRAMING REQUIRED

FOR THE UPPER ROOF PENETRATION INFILL

AS FOLLOWS:

MINIMUM 3-HOUR FIRE RATING REQUIRED

PROVIDE MINIMUM 1 7 8" THICKNESS

REQUIRED PER UL DESIGN NO. P750

PREPARE AND PRIME SURFACE PER MANF.

REQUIREMENTS FOR PROPER ADHESION.

MANF - PRE-FINISHED

ALUMINUM

FASCIA COVER

EXIST. WOOD

BLOCKING TYP.

EPDM ROOF SYSTEM

LOWER PORTION

OF EXISTING

METAL FASCIA

SHALL REMAINPRE-FINISHED ALUMINUM

FASCIA OVERLAY OF

EXISTING METAL FASCIA

EDGE OF

ROOF DECK

PREFINISHED ALUMINUM

(GRAVEL STOP) FASCIA COVER

1 12" DIA. VERTICAL

PIPE RAIL POST

6"

MIN.

6" M

IN

BASE PLATE AND

FASTENERS PER

SECTION 6/A-103

PRECAST CONCRETE

PLANK EDGE

GUARDRAILS SHALL BE

LOCATED A MIN. OF 6"

FROM EDGE OF PLANK (VIF)

APPROXIMATE EDGE OF EXISTING

PERIMETER SLOPED LIGHTWEIGHT

CONCRETE FILL (VIF)

1 12" DIA. VERTICAL

PIPE RAIL POST

TOP AND MID

RAIL ABOVE

6' -0

M

AX

AD

JU

ST

S

PA

C

IN

G

B

AS

ED

O

N S

IZ

E

AN

D

L O

C

AT

IO

N

O F

PR

EC

AS

T

C O

N C

R

ET

E

PA

N

EL

S (V

IF

SCALE :

ROOF GUARDRAIL LAYOUT PLAN 6B

11SCALE :

STAIR MODIFICATION DETAIL

3" = 1'-0''

TOP LINE OF EXISTING

CONCRETE DECK

LINE OF EXISTING EPDM

ROOF

APPROX. LINE OF NEW

ROOF SYSTEM,

COORDINATE WITH

TAPERED INSULATION

VI

F

PROVIDE NEW GALVANIZED STEEL OPEN

GRATE SERRATED TREAD TO MATCH

EXISTING, INCLUDED WELDED SUPPORT

ANGLE

A PORTIO OF THE EXISTING GALV STEEL STAIR

STRINGER SHALL BE REMOVED - TO 1"± ABOVE THE

NEW ROOF ELEVATION VIF

EXISTING TREAD TO REMAIN

EXISTING TREAD AND ANGLE SUPPORT TO

BE REMOVED DUE TO INCREASED

INSULATION LEVEL

NOTES:

1. PAINT ALL WELDS AND SCRATCHED

GALVANIZED SURFACE WITH

GALVANIZED REPAIR PAINT.

VI

F

EXISTING GALV. STEEL HANDRAIL

SUPPORT POST SHALL REMAIN

EXISTING WELDED ANGLE SUPPORT TO

REMAIN

WELD A NEW 14" STEEL GALVANIZED

PLATE TO THE REMAIN STAIR STRINGER

CHANNEL - VIF SIZE OF PLATE

A-103

4245 UNION ROAD, SUITE 210

BUFFALO, NEW YORK 14225

P: 716.923.0133 F: 716.923.0136

DETAILS

DATE: 8-28-2020

SCALE: AS SHOWN

DRAWN BY: DHH

CHECKED BY:

PROJECT No: 20-027

DRAWING No.

DRAWING TITLE:

No. REVISIONS DATE architectural, p.c.

ROSWELL PARK

COMPREHENSIVE CANCER

CENTER

BUFFALO, NY 14263

(716) 845-2300

ELM & CARLTON

LOCATED AT:

ROSWELL PARK

COMPREHENSIVE CANCER

CENTER

BUFFALO, NEW YORK

POWER PLANT

ROOF REPLACEMENT

RPCI # 11-21-001

ISSUED FOR 100% SUBMISSION 8-25-2026

- ISSUED FOR BID 10-16-2026

AutoCAD SHX Text 1 1/2" = 1'-0''

AutoCAD SHX Text

XXXXX

AutoCAD SHX Text

XXXXX

AutoCAD SHX Text 1 1/2" = 1'-0''

AutoCAD SHX Text 1 1/2" = 1'-0''

AutoCAD SHX Text

XXXXXX

AutoCAD SHX Text 1 1/2" = 1'-0''

AutoCAD SHX Text 1 1/2" = 1'-0''

AutoCAD SHX Text 1 1/2" = 1'-0''

AutoCAD SHX Text

XXXXX

AutoCAD SHX Text

XXXXX

AutoCAD SHX Text 1/2" = 1'-0''

AutoCAD SHX Text

ZAXIS ARCHITECTURAL P.C.

AutoCAD SHX Text THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, ARE THE PROPERTY OF ZAXIS ARCHITECTURAL P.C. UNAUTHORIZED REPRODUCTION, ALTERATION OR ADDITION TO ANY DRAWING, DESIGN, SPECIFICATION, PLAN OR REPORT IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF ZAXIS ARCHITECTURAL P.C. IS PROHIBITED BY SECTION 7209, PROVISION 2 OF THE NEW YORK STATE EDUCATION LAW.

EPDM MEMBRANE

FLASHING

CARLISLE FASTENER & SEAM

FASTENING PLATE, MAX. 12"

(305mm) O.C.

MIN. 3" (76mm) WIDE SecurTAPE IN

CONJUNCTION WITH EPDM PRIMER

SURE-SEAL BONDING

ADHESIVE OR CAV-GRIP III

ESCALE :

PARAPET / CURB WITH

SEPARATE MEMBRANE FLASHING

3" = 1'-0''

8" COVER BOARD

WOOD NAILER

1-1/2" (38mm) RING SHANK NAILS @ 6" (152mm) O.C.

MAX.

6" (152mm) WIDE

PRESSURE-SENSITIVE CURED

COVER STRIP OR OVERLAYMENT

STRIP WITH EPDM PRIMER

9" (229mm) WIDE

PRESSURE-SENSITIVE

ELASTOFORM FLASHING IN

CONJUNCTION WITH EPDM

PRIMER

SecurSEAL DRIP EDGE

OR FASCIA

GSCALE :

WITH 90-MIL MEMBRANE OR

WARRANTIES GREATER THAN 20-YEAR

3" = 1'-0''

SecurSeal 200 DRIP EDGE FASCIA- PROJECTS

LAP SEALANT

ANCHOR BAR WITH

PRE-DRILLED,

SLOTTED HOLES @

12" (305mm) O.C.

HEX-HEAD FASTENERS

MAXIMUM 12" (305mm)

O.C.

WOOD NAILER

WATER CUT-OFF

MASTIC

FASCIA COVER

DSCALE :

CARLISLE SecurEDGE 3000

3" = 1'-0''

2" SHEET METAL

EXTENSION

EXISTING POURABLE

SEALANT POCKET (TO

REMAIN)

EXISTING

MATERIAL

(TO REMAIN)

PRESSURE-SENSITIVE

ELASTOFORM FLASHING

IN CONJUNCTION WITH

EPDM PRIMER

CARLISLE POURABLE

SEALER

PE

N

ET

R

AT

IO

N

MIN. 9" WIDE (229mm)

PRESSURE-SENSITIVE

ELASTOFORM FLASHING

LAP SEALANTEPDM

PRIMER

SEALANT

RAIN HOOD

UP TO 30 YEARSUP TO 20 YEARS

CSCALE :

EXTENDED POURABLE SEALER POCKET

3" = 1'-0''

EPDM MEMBRANE

FLASHING

SURE-SEAL BONDING

ADHESIVE

SHEET METAL FLASHING

MIN. 3" (76mm) WIDE SecurTAPE IN CONJUNCTION

WITH EPDM PRIMER

MAXIMUM 12"(305mm)

O.C. SPACING

CARLISLE FASTENER

& SEAM FASTENING

PLATE, MAX. 12"

(305mm) O.C.

1/8" (3mm) TO 1" (25mm) MAX.

JSCALE :

CURB FLASHINGS

3" = 1'-0''

CARLISLE FASTENER &

SEAM FASTENING PLATE,

MAX. 12" (305mm) O.C.

HOT AIR-WELD, 1-1/2"

(38mm) MIN. BEYOND

FASTENING PLATES

THERMOPLASTIC PRE-MOLDED

PIPE FLASHING

WATER CUT-OFF MASTIC

STAINLESS STEEL

CLAMPING RING

INCLUDED

3/4" (19mm) TO 8" (203mm)

ISCALE :

PRE-MOLDED PIPE FLASHING

3" = 1'-0''

WHEN A PRE-MOLDED PIPE SEAL IS NOT FEASIBLE, PROJECTS WITH 25 & 30-YEAR

WARRANTIES REQUIRE ALL ROUND PIPE PENETRATIONS & STRUCTURAL STEEL TUBING TO

BE WRAPPED WITH THREE LAYERS OF PRESSURE-SENSITIVE ELASTOFORM FLASHING,

TERMINATED WITH A STAINLESS STEEL CLAMPING RING & SEALED WITH CONTINUOUS LAP

SEALANT (AS SHOWN).

PROTECTIVE STRIP

OF EPDM

STAINLESS STEEL CLAMPING

RING

LAP SEALANT

PRESSURE-SENSITIVE

ELASTOFORM FLASHING IN

CONJUNCTION WITH EPDM

PRIMER

FSCALE :

TYPICAL FIELD FLASHING DETAIL

3" = 1'-0''

3" 3"

1"

1 2"

LAP SEALANT

SecurEdge 200 & 300

NOTES:

1. MEMBRANE MUST BE

EXTENDED AT CORNERS TO

PROVIDE COMPLETE

COVERAGE OF THE TOP WALL

SURFACE.

COPING

20 GA. GALVANIZED ANCHOR

CLIPS @ 6 FEET (183cm) O.C.

CONCEALED SPLICE PLATE

AT EACHJOINT OF COPING

HEX-HEAD FASTENERS

HSCALE :

CARLISLE SecurEDGE 200 & 300 COPINGS

3" = 1'-0''

CARLISLE HP TERM BAR NAIL-IN 6"

(15cm) O.C. FASTENING

RECOMMENDED.

CARLISLE TERMINATION BAR

CARLISLE UNIVERSAL SINGLE-PLY

SEALANT OR SEALANT

WATER CUT-OFF MASTIC- MUST BE HELD

UNDER CONSTANT COMPRESSION.

APPLICABLE BONDING ADHESIVE

NOTES:

1. APPLY ON HARD SMOOTH

SURFACE ONLY; NOT FOR

USE ON EXPOSED WOOD.

2. DO NOT WRAP

TERMINATION BAR AROUND

CORNERS.

MIN. 1/4" (1cm)

MAX. 1/2" (1.5cm)

LSCALE :

MEMBRANE TERMINATION

3" = 1'-0''

NOTES:

1. FASTENING OF METAL

TERMINATION BAR MUST PROVIDE

CONSTANT COMPRESSION ON

WATER CUT-OFF MASTIC.

2. ALLOW MEMBRANE SHEET TO

EXTEND 1/2" (1.5cm) MINIMUM

BELOW THE METAL TERMINATION

BAR.

3. DETAIL NOT FOR USE WITH DESIGN

"B" (BALLASTED STONE ASSEMBLY).

SURE-SEAL TERMINATION BAR

FASTENED 6" (15cm) MAX.

GUTTER

WOOD NAILER

UNIVERSAL SINGLE-PLY SEALANT

WATER CUT-OFF MASTIC

BSCALE :

GUTTER AND METAL EDGE

TERMINATION DETAIL

3" = 1'-0''

TYP. ROOF DRAIN

SCALE: 1 1/2" = 1'-0"

REINFORCING MEMBRANE PLY EXTEND

3" BEYOND LEAD

INSTALL A MINIMUM 8" WIDE BED OF MASTIC ONTO THE DRAIN FLANGE AND OUT

ONTO THE INSULATION PRIOR TO EMBEDDING THE FIELD BASE MEMBRANE PLY INTO

THE MASTIC. AFTERWARD, APPLY ANOTHER BED OF MASTIC ON TOP OF THE BASE

PLY PRIOR TO THE APPLICATION OF THE PRIMED DRAIN LEAD FLASHING.

WHEN POSSIBLE INSTALL MINIMUM 4' DRAIN SUMP IN ANY ONE

DIRECTION-OR THAT ADDITIONAL TAPER TO PROVIDE POSITIVE

DRAINAGE.

THERMAL INSULATION,

COVERBOARD AND ROOFING

PLIES APPLIED TO DECK AS

SPECIFIED OR REQUIRED

DRAIN FLASHING, FIELD BASE,

REINFORCING AND MEMBRANE

PLIES EXTEND UNDER CLAMPING

RING AND TURN LEAD DOWN

INTO BOWL 1" MIN.

DRAIN BOWL

CLAMPING RING

30" SQUARE MINIMUM, 2 1/2 LB. TO 4

LB. LEAD OR 16 OZ. COPPER FLASHING

SET IN BED OF SOPREMA MASTIC,

PRIME TOP SURFACE BEFORE

INSTALLING REINFORCING PLY

DRAIN STRAINER

DRAIN PROVIDE EXTENSION

COLLARS TO EXISTING ROOF

DRAIN LEADER TO REMAIN

A-1

ROOF DRAIN DIAGRAM

NOTES:

1. ALL BOLTS OR CLAMPS MUST BE IN PLACE

TO PROVIDE CONSTANT COMPRESSION ON

WATER CUT-OFF MASTIC.

2. THE HOLE IN THE MEMBRANE SHALL

EXCEED THE DIAMETER OF THE DRAIN PIPE,

BUT SHALL BE NO LESS THAN 1/2" (1.5cm)

FROM THE ATTACHMENT POINTS OF THE

DRAIN CLAMPING RING.

3. REMOVE EXISTING LEAD, FLASHING

MATERIAL & ENSURE THE DRAIN RING IS

COMPLETELY CLEAN DOWN TO BARE

METAL.

4. FIELD SPLICES MUST BE LOCATED AT LEAST

6" (15cm) OUTSIDE THE DRAIN SUMP.

5. INSULATION TAPER SHALL NOT BE

GREATER THAN 6" (15cm) IN 12" (30cm)

HORIZONTAL.

6. DETAIL IS A DIAGRAM OF THE EXISTING

CONDITION. CONTRACTOR SHALL FIELD

VERIFY CONDITION AND PROVIDE INTENDED

REPLACEMENT AS INDICATED

GREATER THAN

DIMENSION "X"

MIN. 1/2" (1.5cm)

DIMENSION

"X"

DRAIN PIPE

A-2SCALE :

TYPICAL ROOF DRAIN DETAIL

3" = 1'-0''

DETAIL PER RECORD

AS-BUILT CONDITIONS,

VERIFY FIELD CONDITIONS

WATER CUT-OFF

MASTIC

CLAMPING RING

STRAINER DOME

EXISTING DRAIN BOWL TO REMAIN

PUNCH BOLT HOLE IN

EPDM DO NOT CUT

EXISTING ROOF DRAIN

LEADER/PIPE TO REMAIN

EXISTING DECK SUPPORT TO REMAIN

EXISTING DECK

24" MINIMUM SUMP

14" (356mm) DIAMETER DRAIN

STRAINER (ELEVATED TO SHOW

CLAMPING RING)

PRE-PUNCHED METAL

FLANGE

WATER CUT-OFF

MASTIC

HP FASTENER,

(FASTEN TO DECK)

STRAINER SECUREMENT

BRACKETS

MECHANICAL

BACK-FLOW CONE

EXISTING DRAIN LEADER

SUMPED METAL CLAMPING

RING AND FASTENER (LIMIT OF

CARLISLE WARRANTY)

SCALE :

ALUMINATOR RETROFIT DRAIN INSERT A-3

8" CDX PLYWOOD

ALTERNATE - USE ONLY WHEN

DETERMINED THE STANDARD ROOF

DRAIN INSTALLATION WILL RESULT

IN A DEFICIENT CONDITION

AVERAGE R-33 RIGID INSUL

TAPERED

8" SECUROCK COVERBOARD

VAPOR BARRIER

EPDM 90 MIL ROOFING

MEMBRANE

TYPICAL LOWER ROOF SYSTEM

SCALE :

EXISTING CONCRETE PLANK

8" SECUROCK COVERBOARD

VAPOR BARRIER

EPDM 90 MIL ROOFING

MEMBRANE

K-2

TYPICAL UPPER ROOF SYSTEM

SCALE :

EXISTING METAL DECK

EXIST. CONCRETE

PLANK ROOF DECK

MIN R-33 RIGID INSUL

FLAT

5/8" GYPSUM DECK BOARD

EXISTING METAL ROOF DECK

K-1

PENTHOUSE SIMILAR

A-201

4245 UNION ROAD, SUITE 210

BUFFALO, NEW YORK 14225

P: 716.923.0133 F: 716.923.0136

TYPICAL

DETAILS

DATE: 7-16-20

SCALE: AS SHOWN

DRAWN BY: GLG

CHECKED BY:

DRAWING No.

DRAWING TITLE:

No. REVISIONS DATE architectural, p.c.

ROSWELL PARK

COMPREHENSIVE CANCER

CENTER

BUFFALO, NY 14263

(716) 845-2300

ELM & CARLTON

GENERAL NOTES:

1. TYPICAL DETAILS ARE INCLUDED FOR

REFERENCES BASIS OF DESIGN CARLISLE

EPDM 90 MIL ROOFING. WHERE AN

ALTERNATE MANUFACTURER IS PROVIDED.

THE CONTRACTOR SHALL PROVIDE THAT

MANUFACTURER'S TYPICAL DETAILS.

PROJECT No: 20-027

LOCATED AT:

ROSWELL PARK

COMPREHENSIVE CANCER

CENTER

BUFFALO, NEW YORK

POWER PLANT

ROOF REPLACEMENT

RPCI # 11-21-001

ISSUED FOR 100% SUBMISSION 8-25-2026

- ISSUED FOR BID 10-16-2026

AutoCAD SHX Text

XXXXX

AutoCAD SHX Text

XXXX

AutoCAD SHX Text

XXXX

COLD PIPE

COLD PIPE

AutoCAD SHX Text <180°F (82°C)

AutoCAD SHX Text

XXXXXX

AutoCAD SHX Text

XXX

AutoCAD SHX Text xxxxxxx

AutoCAD SHX Text

XXXX XXX

AutoCAD SHX Text

XXXXXXXXXXXXX

XXXX

AutoCAD SHX Text

XXXXX

AutoCAD SHX Text

XXXX

AutoCAD SHX Text

XXXXXXX

AutoCAD SHX Text

XXXXXXX

AutoCAD SHX Text 1 1/2" = 1'-0''

AutoCAD SHX Text 1 1/2" = 1'-0''

AutoCAD SHX Text 1 1/2" = 1'-0''

AutoCAD SHX Text

ZAXIS ARCHITECTURAL P.C.

AutoCAD SHX Text THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, ARE THE PROPERTY OF ZAXIS ARCHITECTURAL P.C. UNAUTHORIZED REPRODUCTION, ALTERATION OR ADDITION TO ANY DRAWING, DESIGN, SPECIFICATION, PLAN OR REPORT IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF ZAXIS ARCHITECTURAL P.C. IS PROHIBITED BY SECTION 7209, PROVISION 2 OF THE NEW YORK STATE EDUCATION LAW.

FIRST FLOOR 0 21 3 54 10 2015 25

ROSWELL PARK CANCER INSTITUTE

Buffalo, New York 14203 www.roswellpark.org

Elm & Carlton Streets

No.

Date:

Date:

Approved By:

Drawn By:

Revision Date

Revisions:

POWER PLANT (PP)

BLDG # 11

FIRST FLOOR

2024-11-1800

Saroj 2021-06-22

N

S Nepali -Base Plan

Drawing No.Project No.

FLOOR PLAN PP-1

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

ST-1

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

ST-2

AutoCAD SHX Text

WORKROOM

AutoCAD SHX Text 1-07

AutoCAD SHX Text

290 SF

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 1-08

AutoCAD SHX Text

214 SF

AutoCAD SHX Text

HIGH VOLTAGE

AutoCAD SHX Text

SWITCHGEAR

AutoCAD SHX Text 1-05

AutoCAD SHX Text

1596 SF

AutoCAD SHX Text

BOILER

AutoCAD SHX Text

ROOM

AutoCAD SHX Text 1-00

AutoCAD SHX Text

CHILLER

AutoCAD SHX Text

ROOM

AutoCAD SHX Text 1-09

AutoCAD SHX Text

4770 SF

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

ST-3

AutoCAD SHX Text

BREAK

AutoCAD SHX Text

ROOM

AutoCAD SHX Text 1-02

AutoCAD SHX Text

90 SF

AutoCAD SHX Text

SHOP

AutoCAD SHX Text

LAB

AutoCAD SHX Text 1-03

AutoCAD SHX Text

125 SF

AutoCAD SHX Text

LOCKER

AutoCAD SHX Text

ROOM

AutoCAD SHX Text 1-04

AutoCAD SHX Text

206 SF

AutoCAD SHX Text

UP

AutoCAD SHX Text

CONTROL

AutoCAD SHX Text

ROOM

AutoCAD SHX Text 1-01

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

11-PP

AutoCAD SHX Text

SCALE:

am24832 Polygon am24832 Polygon am24832 Polygon am24832 Rectangle am24832 Callout

SCAFFOLD TO ALLOW FOR ACCESS TO WATER SOFTENER FOR SALT DISPENSING

am24832 Rectangle am24832 Callout

PATHS ARE ONE SCAFFOLD WIDTH WIDE

20-027 Power Plant Roof - Issued for Bid - Drawings -10-16-2026 (Rev 1)
20-027 A-102 Roswell Power Plant roof DETAILS
Sheets and Views
A-102
20-027 A-103 Roswell Power Plant roof DETAILS
Sheets and Views
A-103
20-027 A-201 Roswell Power Plant roof DETAILS
Sheets and Views
A-201
20-027 CS-1 COVER SHEET.pdf
Sheets and Views
COVER SHEET
20-027 A-101 Roswell Powerplant roof REV -2 (11-3-26).pdf
Sheets and Views
A-101
POWER PLANT (1) First Floor - Scaffold Path
Sheets and Views
BASE PLAN