This Request for Proposal (RFP) is issued by the City of Commerce, Georgia, soliciting sealed proposals from qualified contractors to serve as a standby contractor for natural gas main installations and repairs within the city's service area. The City seeks proposals for labor costs associated with various gas utility installation tasks, including polyethylene gas main installation in multiple sizes and configurations, valve installations, service connections, tie-ins, and rock removal services. Proposals must be submitted in one original, one copy, and one electronic PDF version by November 6, 2026, at 3:00 p.m. local time to the City of Commerce Finance Director. The RFP timeline includes a question deadline of October 22, 2026, at 2:00 p.m. The contract will be awarded for an initial one-year term with options to renew annually for up to three additional years. The City anticipates making award recommendations to City Council following evaluation and preliminary contract negotiations, with all successful contractors required to complete operator qualification reports and submit PHMSA Drug and Alcohol Testing Data quarterly throughout the contract term.
Pricing shall be submitted on a per-linear-foot or per-unit basis for each task category and must remain unchanged for each contractual year. A bid bond equal to 5% of the base proposal and a performance bond equal to 100% of the contract amount are required. Selected vendors must provide proof of General Liability insurance of at least $1,000,000 per incident and Workers' Compensation insurance as required by Georgia state law. Proposals will be evaluated on complete proposal submission (20 points), understanding of the project (15 points), ability to meet timelines (5 points), quality of previous similar projects (20 points), and cost (40 points). All vendors must complete Georgia Security and Immigration Compliance Act affidavits verifying E-Verify participation and submit current W-9 forms and vendor master forms. The contract may be funded in whole or in part with State and Local Fiscal Recovery Funds (SLFRF), requiring compliance with applicable federal procurement, labor standards, and environmental provisions. The City reserves the right to reject any and all proposals, waive irregularities, and award based on its best interest determination.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 27-002
Gas Utility Contractor
City of Commerce P.O. Box 348
27 Sycamore Street Commerce, GA 30529 Phone: (706) 335-3164
Email: ccase@commercega.gov
SUBJECT: Request for Proposal for Gas Utility Installation
The City of Commerce is soliciting competitively sealed proposals from qualified professional service providers to furnish experienced labor and services for a standby contractor responsible for natural gas main installations and any necessary repairs within the City of Commerce service area.
Attached hereto are the general conditions, technical specifications, and submittal format:
The written requirements contained in this Request for Proposal (RFP) shall not be changed or superseded except by written addendum from The City of Commerce. Failure to comply with the written requirements for this RFP may result in disqualification of the submittal by The City of Commerce.
Submittals are to be sealed, marked with the vendor's name and address and labeled: “RFP 27-002” and delivered to:
City of Commerce P.O. Box 348
110 State Street Commerce, GA 30529 Attn: Finance Director
Due no later than November 6, 2026, by 3:00 pm local time prevailing. Any proposals received after this time will not be accepted. The City of Commerce reserves the right to reject any and all submittals, to waive any technicalities or irregularities and to award contracts based on the highest and best interest of the city.
Inquiries regarding this Request for Proposal (RFP) are encouraged to contact the Finance Director at ccase@commercega.gov.
The City of Commerce does not discriminate on the basis of disability in the admission or access to its programs or activities. Any requests for reasonable accommodations required to fully participate in any open meeting, program or activity should be directed to City Hall at 706-335-3164.
The written proposal documents supersede any verbal or written prior communications between the parties. All companies submitting a proposal will be notified in writing of award.
We look forward to your proposal and appreciate your interest in the City of Commerce.
City of Commerce
REQUEST FOR PROPOSAL
FOR
Gas Utility Installation
SUBMISSIONS ARE DUE AT THE ADDRESS SHOWN BELOW NO LATER THAN
November 6, 2026, by 3:00 pm local time prevailing
City of Commerce P.O. Box 348
110 State Street
THE RESPONSIBILITY FOR SUBMITTING A RESPONSE TO THIS RFP ON OR BEFORE
THE STATED DATE AND TIME WILL BE SOLELY AND STRICTLY THE
RESPONSIBILITY OF THE OFFEROR.
CITY OF COMMERCE, GEORGIA
REQUEST FOR QUALIFICATION
FOR
Gas Utility Installation/Repair
SECTION ONE - REQUEST FOR PROPOSAL OVERVIEW
1.0 PURPOSE
The City of Commerce desires to have a gas main installer under contract for projects that may arise each year. The contract agreement will be for one year and shall be renewable each year for up to three years.
1.1 INFORMATION TO VENDORS
RFP TIMETABLE
The anticipated schedule for the RFP is as follows:
RFP Available October 5, 2026
Deadline for questions October 22, 2026, 2:00 pm, local time prevailing
Submittal deadline November 6, 2026, 3:00 pm, local time prevailing
1.2 RFP SUBMISSION:
One (1) original, one (1) copy, and one (1) fully executable electronic copy (PDF) of the complete signed submittal must be received by submittal deadline (see 1.1). Proposals must be submitted in a sealed envelope stating on the outside, the vendor's name, address, the RFP Number and title to:
City of Commerce P.O. Box 348
27 Sycamore Street
Attention: Finance Director
Hand delivered copies may be delivered to the above address ONLY between the hours of 8:30 a.m. and 3:30 p.m. ET, Monday through Friday, excluding holidays observed by the City of Commerce.
Vendors are responsible for informing any commercial delivery service, if used, of all delivery requirements and for ensuring that the required address information appears on the outer wrapper or envelope used by such service. The Submittal must be signed by a company officer who is legally authorized to enter into a contractual relationship in the name of the vendor.
1.3 CONTACT PERSON & INQUIRES:
Vendors are encouraged to contact the Finance Director by email at ccase@commercega.gov to clarify any part of the SCOPE or purpose of this RFP, or for questions pertaining to submittal requirements. All questions that arise must be submitted prior to ten (10) business days before the submittal due date (see 1.1) and shall be directed to the contact person in writing via email. Any unauthorized contact shall not be used as a basis for responding to this RFP and also may result in the disqualification of the vendor's submittal. Vendors may not contact any elected official or other City of Commerce employee to discuss the proposal process or proposal opportunities. Contact of this nature will result in immediate disqualification of the vendor.
1.4 ADDITIONAL INFORMATION/ADDENDA
The City of Commerce will issue responses to inquiries and any other corrections or amendments it deems necessary in written addenda issued prior to the due date. Vendors should not rely on any representations, statements or explanations other than those made in this RFP or in any addendum to this RFP. Where there appears to be a conflict between the RFP and any addenda issued, the last addendum issued will prevail.
Addenda will be published at www.commercega.gov under the “Doing Business Here” tab.
Vendors are encouraged to check this site regularly for immediate access to issued addenda. RFP information can also be requested as stated above (1.3).
Vendors must acknowledge any issued addenda by including the Addenda Acknowledgement Form with the submittal. Proposals which fail to acknowledge the vendor’s receipt of any addendum will result in the rejection of the offer if the addendum contains information which substantively changes the Owner’s requirements
1.5 LATE SUBMITTAL, LATE MODIFICATIONS AND LATE WITHDRAWALS
Submittals received after the due date and time will not be considered. Modifications received after the due date will not be considered. The City of Commerce assumes no responsibility for the premature opening of a proposal not properly addressed and identified, and/or delivered to the proper designation.
1.6 REJECTION OF PROPOSALS
The City of Commerce may reject any and all submittals and reserves the right to waive any irregularities or informalities in any submittal or in the submittal procedure. Submittals received after said time or at any place other than the time and place will not be considered.
1.7 MIMINUM RFP ACCEPTANCE PERIOD
Valid submittals shall not be withdrawn for a period of 90 days from the date specified for receipt of submittals.
1.8 NON-COLLUSION AFFIDAVIT
By submitting a response to this RFP, the vendor represents and warrants that such proposal is genuine and not a sham or collusive or made in the interest or in behalf of any person not therein named and that the vendor has not directly or indirectly induced or solicited any other vendor to put in a sham proposal, or any other person, firm or corporation to refrain from submitting and that the vendor has not in any manner sought by collusion to secure to that vendor any advantage over any other vendor. By submitting a proposal, the vendor represents and warrants that no official or employee of the City of Commerce has, in any manner, an interest, directly or indirectly in the proposal or in the contract which may be made under it, or in any expected profits to arise there from.
1.9 COST INCURRED BY VENDORS
All expenses involved with the preparation and submission of the RFP to the City of Commerce, or any work performed in connection therewith is the responsibility of the vendor(s).
1.10 RFP OPENING
RFP submittal prices will be opened and reviewed by a selected committee. A list of names of firms responding to the RFP may be obtained from the Finance Director, after the RFP due date and time stated herein. There will be a public opening, and a Tally Sheet will be available on the City’s website or upon request following the deadline.
1.11 TAXES
Selected vendor will be provided with the City of Commerce Sales and Use Tax Certificate of Exemption number upon request.
1.12 VENDOR INFORMATION
All submissions shall include a completed vendor master form and current W-9. Vendors whose place of business is other than the State of Georgia may be required to provide the Purchasing Agent with copies of your state’s regulations and/or laws concerning the application of certain vendor preference requirements to vendors whose place of business is in the applicable state.
Failure to provide this information will result in the disqualification of the vendor from submitting a proposal.
1.13 INSURANCE
Selected vendor will be required to provide proof of liability and workman’s compensation insurance before work can begin on this City’s project. Workman’s Compensation Insurance should be as required by the State of Georgia. General Liability should cover $1,000,000 per incident. The vendor, if awarded a contract, shall maintain insurance coverage reflecting the minimum amounts and conditions specified by the City. In the event the vendor is a government entity or a self-insured organization, different insurance requirements may apply.
The vendor shall procure and maintain for the life of the Contract/Agreement Worker’s Compensation Insurance covering all employees with limits meeting all applicable state and federal laws. This coverage shall include Employer’s Liability with limits meeting all applicable state and federal laws. This coverage shall extend to any subcontractor that does not have their own Worker’s Compensation and Employer’s Liability Insurance. A thirty (30) day notice of cancellation is required and must be provided to the City of Commerce via Certified Mail.
1.14 TERMINATION
The City, Federal, State, and other Local government agencies may terminate this agreement in the event funds are not appropriated for it in future periods; provided, however, that funds are also not appropriated for equipment or services that replace those contracted for under this agreement.
Customer shall be obligated for any future annual period if Company is not notified in writing at least thirty (30) days prior to the beginning of the annual period for which non-appropriation is being claimed.
1.15 ANTI-DISCRIMINATION
By submitting a response to this RFP, all perspective contractors certify to The City of Commerce they will conform to the provisions of the Federal Civil Rights Act of 1964, as amended, in every contract of over $10,000 the provisions in 1.15.1 and below apply:
1.15.1 During the performance of this contract, the contractor agrees as follows:
1.15.1.1 The contractor will not discriminate against any employee or applicant for employment because of race, religion, color, sex or national origin, except where religion, sex or national origin is a bona fide occupational qualification reasonably necessary to the normal operation of the contractor. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause.
1.15.1.2. The contractor, in all solicitations or advertisements for employees placed by or on behalf of the contractor, will state that such contractor is an equal opportunity employer.
1.15.1.3. Notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this section.
1.15.1.4 The contractor will include the provisions of 1.15.1 above in every subcontract or purchase order of over $10,000 so that the provisions will be binding upon each subcontractor or vendor.
1.16 ILLEGAL IMMIGRATION REFORM AND ENFORCEMENT ACT OF 2011
Vendors submitting a response to this RFP must complete the Contractor Affidavit under O.C.G.A.
§13-10-91(b) (1) which is provided with the RFP package to verify compliance with the Illegal Immigration Reform and Enforcement Act of 2011.
1.16.1 The form must be signed by an authorized officer of the contractor or their authorized agent.
1.16.2 The form must be notarized.
1.16.3 The contractor will be required to have all subcontractors and sub-subcontractors who are engaged to complete physical performance of services under the final contract executed between the City of Commerce and the contractor complete the appropriate subcontractor and sub-subcontractor affidavits and return them to the City of Commerce a minimum of five (5) days prior to any work being accomplished by said subcontractor or sub-subcontractor. Format for this affidavit can be provided to the contractor if necessary.
1.17 SUBMISSION REQUIREMENTS
To facilitate evaluation of Proposals please submit the following:
1.17.1 One (1) fully executable electronic copy of the response (in Word or .pdf format) and any Technical Requirements (in Excel format).
1.17.2 Two (2) paper versions of the proposal. The original shall be clearly marked “original”.
1.17.3 The proposals shall be prepared with a straightforward, concise delineation of the vendor’s capabilities to satisfy the requirements of this RFP.
1.18 ACCEPTANCE
Submission of any proposal indicates acceptance of the conditions contained in the RFP unless clearly and specifically noted otherwise in the Proposal.
1.19 CITY GOVERNMENT
The City of Commerce operates under a council-manager form of government. This system of local government utilizes the strong political leadership of elected officials in the form of the City Council. The City Manager is hired to serve the council and the community and to bring the local government the benefits of training and experience in administering local projects and programs on behalf of the governing body. It is anticipated that the vendor may be required to make one or more appearances at City Council meetings to answer questions and present results. The documentation provided in this request for proposal is intended to provide a common methodology of development and basic technical skills for proposal purposes.
1.20 BONDING
1.20.1 A performance bond in the amount equal to 100% of the contract amount will be required upon contract.
1.20.2 Each proposal must be accompanied with a bid bond in an amount equal to 5% of the base proposal, payable to the City of Commerce and issued by a Corporate Surety authorized to do business in the State of Georgia, in order to guarantee that the submitter will enter into a contract to construct the project strictly within the terms and conditions stated in this proposal and in the bidding and Contract Documents, should the construction contract be awarded to him.
1.21 FUNDING
Because this project may be funded as a whole or in part with State and Local Fiscal Recovery Funds (SLFRF), all applicable provisions of Appendix II to 2 CFR Part 200 are incorporated into this Agreement. The Contractor agrees to comply with all mandatory federal requirements, including procurement, labor standards (as applicable), termination, environmental compliance, and anti-lobbying provisions.
SECTION TWO - GENERAL CONDITIONS
2.0 PURPOSE
The City of Commerce is issuing this Request for Proposal (RFP) for qualified professionals and intends to award a one-year contract for gas main installation, with an option to extend up to three additional years, each awarded annually.
2.1 CONTRACT PERIOD
City of Commerce intends to award a one-year contract for the installation of gas utility, with the option to extend up to three additional years awarded annually. To that end it requests proposals from qualified firms that meet the specifications listed herein.
2.2 CONTRACT COST DETAILS
Project labor cost shall be submitted for the following procedures and shall remain unchanged for each contractual year. These costs are per linear foot and shall be used for actual projects when they arise.
2.3 CERTIFICATIONS REQUIRED
The successful contractor shall provide details of operator qualifications for all employees that will be part of the installation or construction. The operator qualifications reports are required before any construction can begin. A copy of the successful contractor’s drug and alcohol testing plan is also required along with the latest PHMSA Drug and Alcohol Testing Data. While under contract with the City of Commerce this PHMSA Drug and Alcohol Testing Data shall be submitted to the City quarterly throughout the life of the contract.
2.4 ADMINISTRATION
The project will be administered by the City of Commerce through the Finance Director, being the main point of contact for all questions during the proposal period. The Gas Utility Director will be the main point of contact once the project is initiated.
2.5 PROCEDURES & MISC. ITEMS
2.5.1 All questions shall be submitted in writing (e-mail is preferred) and will be communicated to all firms responding to this RFP.
2.5.2 All materials submitted in connection with this RFP will be public documents and subject to the Open Records Act and all other laws of the State of Georgia, the United States of America and the open records policies of the City of Commerce. All such materials shall remain the property of the City of Commerce and will not be returned to the respondent.
2.5.3 All respondents to this RFP shall hold harmless the City of Commerce, and any of their officers and employees from all suits and claims alleged to be a result of this RFP.
The issuance of this RFP constitutes only an invitation to present a proposal. The City of Commerce reserves the right to determine, at its sole discretion, whether any aspect of a respondent's submittal meets the criteria in this RFP. The City of Commerce also reserves the right to seek clarifications, to negotiate with any vendor submitting a response, to reject any or all responses with or without cause, and to modify the procurement process and schedule. In the event that this RFP is withdrawn or the project canceled for any reason, the City of Commerce shall have no liability to any respondent for any costs or expenses incurred in connection with this RFP or otherwise.
2.5.4 Failure to submit all the mandatory forms from this RFP package shall be just cause for the rejection of the qualification package. However, the City of Commerce reserves the right to decide, on a case-by-case basis, in its sole discretion, whether or not to reject such a proposal as non-responsive.
2.5.5 Any payment terms requiring payment in less than 30 days will be regarded as requiring payment 30 days after invoice or delivery, whichever occurs last. This shall not affect offers of discounts for payment of less than 30 days, however. Payment will be processed after completion of all construction and the successful testing of all installed products.
2.5.6 In case of failure to deliver goods in accordance with the contact terms and conditions, The City of Commerce, after due oral or written notice, may procure substitute goods or services from other sources and hold the contractor responsible for any resulting additional purchasing and administrative costs. This remedy shall be in addition to any other remedies which the City of Commerce may have.
2.5.7 By submitting a qualification package, the vendor is certifying that they are not currently debarred from bidding on contracts by any agency of the State of Georgia, nor are they an agent of any person or entity that is currently debarred from submitting proposals on contacts by any agency of the State of Georgia.
2.5.8 Any contract resulting from this RFP shall be governed in all respects by the laws of the State of Georgia and any litigation with respect thereto shall be brought in the courts of the State of Georgia. The contractor shall comply with applicable federal, state, and local laws and regulations.
2.5.9 It is understood and agreed between the parties herein that the City of Commerce shall be bound hereunder only to the extent of the funds available or which may hereafter become available for the purpose of this agreement.
SECTION THREE – PROPOSAL SHEET
3.0 PROJECT PROPOSAL SHEET
Labor Performed 2027 Fiscal Year
2028 Fiscal Year
2029 Fiscal Year
2030 Fiscal Year
4-inch polyethylene gas main per ft
2-inch polyethylene gas main per ft gas main bore per ft gas main bore per ft gas main directional rock bore per ft gas main directional rock bore per ft valve installation each valve installation main tie-in each main tie-in each
1/2"-3/4" PE short side service, tap and tie over each
1/2"-3/4" PE long side service, tap and tie over each
2-inch PE short side service, tap and tie over each
2" PE long side
Labor Performed 2027 Fiscal Year
2028 Fiscal Year
2029 Fiscal Year
2030 Fiscal Year
4" PE short side
4" PE long side
2" tap, stop or bottom out steel tie in each
4" tap, stop or bottom out steel tie in each
Blast rock removal price per linear ft
1/2"-3/4" PE short side service and tap
1/2"-3/4" PE long side service and tap each
2" PE short side service and tap each
2" PE long side service and tap
Rock removal per cubic ft
SECTION FOUR – PROPOSAL FORMAT
4.0 PROPOSAL FORMAT
In order to facilitate the analysis of responses to this RFP, vendors are required to prepare their proposals in accordance with the instructions outlined in this section. Each vendor is required to submit the proposal in a sealed package. Vendors whose proposals deviate from these instructions may be considered non-responsive and may be disqualified at the discretion of the City of Commerce. Vendors should be sure they have included an electronic copy of the response as part of their proposal. Instructions relating to each part of the response to this RFP are defined in the remainder of this section.
4.1 EXECUTIVE SUMMARY AND MANDATORY SUBMITTALS
The Executive Summary portion of the response to the RFP should be limited to a brief narrative highlighting the vendor’s proposal. The summary should contain as little technical jargon as possible and should be oriented toward non-technical personnel.
4.2 COMPANY BACKGROUND
Vendors must provide the following information about their company so that the City can evaluate the vendor’s stability and ability to support the commitments set forth in response to the RFP. The City, at its option, may require a vendor to provide additional support and/or clarify requested information. The vendor should outline the company’s background, including:
4.2.1 How long the company has been in business.
4.2.2 A brief description of the company size and organization.
4.2.3 The number of and history of other government buildings constructed.
4.3 CLIENT REFERENCES
Vendors should provide at least three (3) client references that are similar in size or complexity to the City of Commerce, located in the state of Georgia. Information should include at the minimum:
name of client reference, name of agency, address, telephone, and e-mail.
4.4 PROPOSAL SHEET
An itemized breakdown in costs should be detailed in a format similar to the table in 3.0 above. This format is a minimum requirement; vendors should add additional information to give a full picture of itemized service expenses. The labor cost of placing the pole and the transfer of equipment, lines, and hardware should be separated per pole based on the construction assembly specifications attached. This itemization should reflect the tasks listed in section two (2) of this document.
4.5 ADDENDA
If revisions become necessary, the City will provide written addenda to all vendors who have received the RFP. Said addenda will be posted on the City’s website (see section 1.4 above). All addenda issued by the City must be noted on any proposals that are submitted to the City.
Vendors shall contact the City to ascertain whether any addenda have been issued. Failure to do so could result in an unresponsive proposal.
SECTION FIVE - SELECTION
5.0 FINAL SELECTION
Following review of all qualified proposals, selection of a suitable vendor, and preliminary contract negotiations, the project representative will make a recommendation to the City Council of Commerce. Following approval, the City will complete contract negotiations. The City of Commerce reserves the right to accept the response that is determined to be in the best interest of the City. The City reserves the right to reject any and or all proposals. Every vendor submitting a proposal must complete the form showing compliance with the Illegal Immigration Reform and Enforcement Act of 2011, OCGA §13-10-90(b)(1). The form is provided with this RFP.
5.1 Evaluation Method
The City will evaluate all proposals deemed responsive to this request by a committee selected by the City of Commerce. One vendor will be awarded the overall construction project and can subcontract specific tasks if needed.
5.2 Selection Criteria
Responses to this RFP will be scored according to the following criteria:
5.2.1 Complete proposal – 20 Points
5.2.2 Applicant must show complete understanding of the entire project – 15 Points
5.2.3 The ability to complete the project within the timeline provided – 5 Points
5.2.4 Quality of previous projects of a similar nature reflected in resume – 20 Points
5.2.5 Cost – 40 Points
Required Forms for Submission
EXECUTION OF PROPOSAL
DATE: ___________
The potential vendor certifies the following by placing an "X" in all blank spaces:
___ That this proposal was signed by an authorized representative of the firm.
___ That the potential Contractor has determined the cost and availability of all materials and supplies associated with performing the services outlined herein.
___ That all labor costs associated with this project have been determined, including all direct and indirect costs.
___ That the potential Contractor agrees to the conditions as set forth in this Request for Proposal with no exceptions.
Therefore, in compliance with the foregoing Request for Proposal, and subject to all terms and conditions thereof, the undersigned offers and agrees, if this proposal is accepted within sixty (60) days from the date of the opening, to furnish the services/products for the prices quoted within the time frame required. The undersigned offers and agrees to furnish any or all of the items upon which prices are quoted at the price set opposite each item, in the quantities described, delivered to the point(s) specified, in accordance with the terms and conditions set forth herein. The laws of the State of Georgia shall prevail concerning all purchases and services under this contract.
I certify that I have read and understand the terms and conditions herein except as stated below. I further state that I am and/or my company is capable, able to, and will provide the requested products and/or service described herein. I am the owner or agent of the company stated below and am authorized and empowered to contract. By my signature on this RFP, I/we guarantee and certify that all items included in my proposal meet or exceed specifications.
I certify that this quotation is made without prior understanding, agreement, or connection with any corporation, firm or person submitting a quotation for the same materials, supplies, equipment, or services and is in all respects fair and without collusion or fraud. I understand collusive bidding is a violation of State and Federal Law and can result in fines, prison sentences, and civil damage awards. I agree to abide by all conditions of the quotation and certify that I am authorized to sign this quotation for the Contractor.
Business Contact Representative
Operational Contact Representative
Vendor’s Name Federal ID #
Address
Phone Fax
Authorized Signature Date
Typed Name & Title
Subscribed and sworn to before me this ______ day of _______________, 20____.
Notary Public
ADDENDA ACKNOWLEDGEMENT
The vendor has examined and carefully studied the Request for Proposals and the following
Addenda, receipt of all of which is hereby acknowledged:
Addendum No. ______________
Addendum No ______________
Authorized Representative/Title Authorized Representative (Date) (Print or Type) (Signature)
Vendors must acknowledge any issued addenda. Proposals which fail to acknowledge the vendor’s receipt of any addendum will result in the rejection of the offer if the addendum contained information which substantively changes the Owner’s requirements.
GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT
Name of Contracting Entity: _______________________________________ Contract No. and Name: _______________________________________ Contract Date: _______________________________________
By executing this affidavit, the undersigned person or entity verifies its compliance with O.C.G.A. § 13‐10‐91, stating affirmatively that the individual, firm, or corporation which is contracting with the City of Commerce has registered with, is authorized to participate in, and is participating in the federal work authorization program commonly known as E‐Verify,* in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13‐10‐91.
The undersigned person or entity further agrees that it will continue to use the federal work authorization program throughout the contract period, and it will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the undersigned with the information required by O.C.GA. § 13‐10‐91(b).
The undersigned person or entity further agrees to maintain records of such compliance and provide a copy of each such verification to the City of Commerce at the time the subcontractor(s) is retained to perform such service.
EEV / E‐Verify User Identification Number Date of Authorization
Signed by: Authorized Officer or Agent Date (Name of Person or Entity)
Title of Authorized Officer or Agent
Printed Name of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME ON THIS THE
_____ DAY OF ______________________, 20__
________________________________________ [NOTARY SEAL]
Notary Public
My Commission Expires: ___________________
* or any subsequent replacement operated by the United States Department of Homeland Security or any equivalent federal work authorization program operated by the United States Department of Homeland Security to verify information of newly hired employees, pursuant to the Immigration Reform and Control Act of 1986 (IRCA), P.L. 99‐603
Contractor Affidavit under O.C.G.A. § 13-10-91(b)(l)
The undersigned contractor ("Contractor") executes this Affidavit to comply with O.C.G.A § 13-10-91 related to any contract to which Contractor is a party that is subject to O.C.G.A. § 13-10-91 and hereby verifies its compliance with O.C.G.A. § 13-10-91, attesting as follows:
a) The Contractor has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program;
b) The Contractor will continue to use the federal work authorization program throughout the contract period, including any renewal or extension thereof;
c) The Contractor will notify the public employer in the event the Contractor ceases to utilize the federal work authorization program during the contract period, including renewals or extensions thereof;
d) The Contractor understands that ceasing to utilize the federal work authorization program constitutes a material breach of Contract;
e) The Contractor will contract for the performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the Contractor with the information required by O.C.G.A. § 13-10-91(a), (b), and (c);
f) The Contractor acknowledges and agrees that this Affidavit shall be incorporated into any contract(s) subject to the provisions of O.C.G.A. § 13-10- 91 for the project listed below to which Contractor is a party after the date hereof without further action or consent by Contractor; and
g) Contractor acknowledges its responsibility to submit copies of any affidavits, drivers' licenses, and identification cards required pursuant to O.C.G.A. § 13-10-91 to the public employer within five business days of receipt.
Date of Authorization
Name of Project
_ E-Verify Number
_ Name of Contractor
_ Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on _________, _____, 20_____ in _______________ (city), __________ (state).
Signature of Authorized Officer or Agent
Printed Name and Title of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME
ON THIS THE _______ DAY OF _____________, 20______.
NOTARY PUBLIC
My Commission Expires: _____________________________
City of Commerce, 27 Sycamore St., Commerce, GA 30529
| RFP 27-002 Gas Utility Installation.pdf |
| City of Commerce |
| Gas Utility Installation |
| SUBMISSIONS ARE DUE AT THE ADDRESS SHOWN BELOW NO LATER THAN |
| November 6, 2026, by 3:00 pm local time prevailing |
| Gas Utility Installation/Repair |
| SECTION ONE - REQUEST FOR PROPOSAL OVERVIEW |
| 1.0 PURPOSE |
| 1.1 INFORMATION TO VENDORS |
| RFP Available October 5, 2026 |
| 1.4 ADDITIONAL INFORMATION/ADDENDA |
| 1.5 LATE SUBMITTAL, LATE MODIFICATIONS AND LATE WITHDRAWALS |
| 1.6 REJECTION OF PROPOSALS |
| 1.7 MIMINUM RFP ACCEPTANCE PERIOD |
| 1.8 NON-COLLUSION AFFIDAVIT |
| 1.9 COST INCURRED BY VENDORS |
| 1.10 RFP OPENING |
| 1.11 TAXES |
| 1.12 VENDOR INFORMATION |
| 1.13 INSURANCE |
| 1.14 TERMINATION |
| 1.15 ANTI-DISCRIMINATION |
| 1.16 ILLEGAL IMMIGRATION REFORM AND ENFORCEMENT ACT OF 2011 |
| 1.17 SUBMISSION REQUIREMENTS |
| 1.18 ACCEPTANCE |
| 1.19 CITY GOVERNMENT |
| 1.20 BONDING |
| SECTION TWO - GENERAL CONDITIONS |
| 2.0 PURPOSE |
| 2.1 CONTRACT PERIOD |
| 2.2 CONTRACT COST DETAILS |
| 2.3 CERTIFICATIONS REQUIRED |
| 2.4 ADMINISTRATION |
| 2.5 PROCEDURES & MISC. ITEMS |
| SECTION THREE – PROPOSAL SHEET |
| 3.0 PROJECT PROPOSAL SHEET |
| SECTION FOUR – PROPOSAL FORMAT |
| 4.0 PROPOSAL FORMAT |
| 4.1 EXECUTIVE SUMMARY AND MANDATORY SUBMITTALS |
| 4.2 COMPANY BACKGROUND |
| 4.3 CLIENT REFERENCES |
| 4.4 PROPOSAL SHEET |
| An itemized breakdown in costs should be detailed in a format similar to the table in 3.0 above. This format is a minimum requirement; vendors should add additional information to give a full picture of itemized service expenses. The labor cost of p... |
| 4.5 ADDENDA |
| SECTION FIVE - SELECTION |
| 5.0 FINAL SELECTION |
| 5.1 Evaluation Method |
| 5.2 Selection Criteria |
| EXECUTION OF PROPOSAL |
| Vendor Packet |
| Vendor Master.pdf |
| Contractor_Affidavit.pdf |
| ST-5 Sales Tax Exemption.pdf |
W-9
File details come from the government source that posted it. Updated .