RFP 26_0100_7 .pdf
PDF 354 KB Posted
- Solicitation number
- PE-77548-NONST-2027-000000408
- Issued by
- Chatham County, Georgia
About this file
This is a Request for Proposals (RFP) issued by Chatham County, Georgia for an annual contract to provide underground utility locating and marking fiber services for the county's telecommunications utilities. The county solicits qualified vendors to receive and manage underground utility locate requests from Georgia's Utility Notification Center (GA811), perform field locating and marking of approximately 75 miles of underground fiber conduit, and document all work in compliance with O.C.G.A 25-9 and Georgia Public Service Commission rules. Proposals must be submitted online through the county's procurement portal by 5:00 P.M. on September 30, 2026. The evaluation process occurs in two steps: initial proposal evaluation based on qualifications, technical approach, MBE/WBE participation, cost, and references, with potential interviews for shortlisted firms. No specific award date is stated, but the successful proposer must execute a contract within 30 days of notice of award.
The cost proposal must include unit pricing for four service categories: Normal Locate Rate (per ticket, maximum 300 feet per request), No Conflict Rate (cleared without site visit), Hourly Rate (outside normal scope work), and Hourly Overtime Rate (work exceeding eight hours daily or outside 7:00 A.M. to 5:00 P.M. Monday-Friday). The contractor is responsible for all labor, equipment, software, vehicles, locating technology, GPS systems, and mapping software compatible with GA811 systems. The contractor must respond to locate requests within 48 hours of receipt and notify the county within two hours of discovering damaged facilities or un-locatable utilities. The contractor is liable for civil penalties and damages resulting from negligent locate work and must retain records for at least six months. Monthly invoicing is required with itemized reporting of locate requests completed by rate type. Chatham County is tax-exempt, and preference is given to local businesses and minority- or women-owned enterprises.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chatham County Purchasing &
Contracting Department 1117 Eisenhower Drive, Suite C, Savannah, Georgia 31406
(912) 790-1618
REQUEST FOR PROPOSALS
RFP NO. 26-0100-7
Annual Contract for Underground Utility Locating and Marking
Fiber Services
PROPOSALS RECEIVED BY: 5:00 P.M., SEPTEMBER 30, 2026
CHATHAM COUNTY, GEORGIA
OFFICE OF THE PURCHASING DIRECTOR
1117 EISENHOWER DRIVE, SUITE C
SAVANNAH, GEORGIA 31406
(912) 790-1618
DATE: August 31, 2026 RFP NO.: 26-0100-7
GENERAL INFORMATION FOR REQUEST FOR PROPOSALS
This is an invitation to submit a proposal to supply Chatham County with services as indicated herein. Proposals shall be submitted on-line on the County’s procurement portal https://chathamcountyga.bonfirehub.com/portal up to 5:00 P.M., September 30, 2026. The
Purchasing Director reserves the right to reject any and all proposals and to waive formalities.
Instructions for preparation and submission of a qualification proposal are contained in the Request for Proposal package. Please note that specific forms for submission of a proposal are required.
Any changes to the conditions and specifications must be in the form of a written addendum to be valid; therefore, the Purchasing Director will issue a written addendum to document approved changes. For good and sufficient reason, up to 24 hours before the advertised deadline, the County may extend the response schedule. An addendum will be issued setting forth the new date and time.
Chatham County has an equal opportunity procurement policy. Chatham County seeks to ensure that all segments of the business community have access to providing services needed by County programs. The County affirmatively works to encourage utilization of disadvantaged and minority business enterprises in our procurement activities. The County provides equal opportunity for all businesses and does not discriminate against any persons or businesses regardless of race, color, religion, age, sex, national origin or handicap. The County expects its contractors to make maximum feasible use of minority businesses and qualified minority employees. The terms
"disadvantaged business", "minority business enterprise", and "minority person" are more specifically defined and explained in the Chatham County Purchasing Ordinance.
SECTION I
INSTRUCTIONS TO PROPOSERS
1.1 PURPOSE: The purpose of this document is to provide general and specific information for use in submitting a qualification proposal to supply Chatham County with services as described herein. All proposals are governed by the Code of Chatham County, Chapter 4, https://chathamcountyga.bonfirehub.com/portal
Article IV, and the laws of the State of Georgia.
1.2 HOW TO PREPARE PROPOSALS: All proposals shall be:
A. Proposers are encouraged to review carefully all provisions and attachments of this document prior to submission. Each proposal constitutes an offer and may not be withdrawn except as provided herein.
1.3 HOW TO SUBMIT PROPOSALS: All proposals shall be:
A. Submitted on-line on the County’s procurement portal at:
** In submitting their proposal, the proposer certifies that he/she has carefully read all related Request for
Proposal documents and agrees to comply with all provisions.
B. If a proposer is unable to submit their proposal on-line, they should notify the procurement contact for the solicitation at least one week prior to proposals being due to receive instructions. The County is seeking to conduct all solicitations on-line. The phone number for Purchasing and Contracting is 912-790-1618.
1.4 HOW TO SUBMIT AN OBJECTION: Objections from Offerors to this Request for
Proposals and/or these specifications should be brought to the attention of the County
Purchasing Director in the following manner:
A. When a pre-proposal conference is scheduled, the Proposer may object in writing any time prior to or at the pre-proposal conference.
B. When a pre-proposal conference is not scheduled, the Proposer shall object in writing not less than five (5) days prior to the Date for submission.
C. The objections contemplated must pertain to both form and substance of the
Request for Proposal documents. Failure to object in accordance with the above procedure will constitute a waiver on the part of the business to protest this Request for Proposal.
1.5 ERRORS IN PROPOSALS: Proposers or their authorized representatives are expected to fully inform themselves as to the conditions, requirements, and specifications before submitting proposals. Failure to do so will be at the Proposer's own risk.
1.6 STANDARDS FOR ACCEPTANCE OF PROPOSERS FOR CONTRACT AWARD:
The County reserves the right to reject any or all Proposals and to waive any irregularities or technicalities in Proposals received whenever such rejection or waiver is in the best interest of the County. The County reserves the right to reject the Offer of a Proposer who has previously failed to perform properly or complete on time contracts of a similar nature, whom investigation shows is not in a position to perform the contract.
1.7 PROPOSER: Whenever the term "Proposer" is used, it shall encompass the "person", "business", "firm", or other party submitting a proposal to Chatham County in such capacity before a contract has been entered into between such party and the County.
1.8 COMPLIANCE WITH LAWS: The Proposer shall obtain and maintain all licenses, permits, liability insurance, workman's compensation insurance and comply with any and all other standards or regulations required by Federal, State or County statute, ordinances and rules during the performance of any contract between the Proposer and the County.
Any such requirement specifically set forth in any contract document between the Proposer and the County shall be supplementary to this section and not in substitution thereof.
1.9 CONTRACTOR: Contractor or subcontractor means any person, firm, or business having a contract with Chatham County. The Contractor of goods, material, equipment or services certifies that the firm will follow equal employment opportunity practices in connection with the awarded contract as more fully specified in the contract documents.
1.10 LOCAL PREFERENCE: The Contractor agrees to follow the local preference guidelines as specified in the contract documents, which state “The CONTRACTOR hereby agrees, as part of the consideration to Chatham County for making this Contract, that the CONTRACTOR in the carrying out of this contract will give the citizens of
Chatham County preference for employment to perform all labor required by this contract.
that the rate of wages to be paid shall not be less than legally required; and that in the purchase of materials to be used in the Work of the Project, preference shall be given to sources from within Chatham County to the maximum extent possible. The
CONTRACTOR will cause the forgoing provisions to be inserted in all subcontracts so that provisions will be binding upon each subcontractor.”.
1.11 DEBARRED FIRMS AND PENDING LITIGATION: Any potential proposer/firm listed on the Federal or State of Georgia Excluded Parties Listing (Barred from doing business) will not be considered for contract award. It is the proposer’s responsibility to inform the County should the proposer/firm be placed on the Federal or State of Georgia
Excluded Parties Listing during the proposal process. Proposers shall disclose any record of pending criminal violations (Indictment) and/or convictions, pending lawsuits, etc., and any actions that may be a conflict of interest occurring within the past five (5) years. Any proposer/firm previously defaulting or terminating a contract with the County will not be considered. Successful proposers with whom the County enters into a contract with for goods or services will notify the County if they become debarred during the course of the contract.
** All bidders or proposers are to read and complete the Disclosure of Responsibility
Statement. Failure to do so may result in your solicitation response being rejected as non-responsive.
Bidder acknowledges that in performing contract work for the Board, bidder shall not utilize any firms that have been a party to any of the above actions. If bidder has engaged any firm to work on this contract or project that is later debarred, Bidder shall sever its relationship with that firm with respect to Board contract.
1.12 PERFORMANCE EVALUATION: On April 11, 2008, the Chatham County Board of
Commissioners approved a change to the County Purchasing Ordinance requiring
Contractor/Consultant Performance Evaluations, at a minimum, annually, prior to contract anniversary date.
Should Contractor/Consultant performance be unsatisfactory, the appointed County
Project Manager for the contract may prepare a Contractor/Consultant Complaint Form or a Performance Evaluation to the County Purchasing Director.
SECTION II
PROPOSAL CONDITIONS
2.1 SPECIFICATIONS: Any obvious error or omission in specifications shall not inure to the benefit of the bidder but shall put the Proposer on notice to inquire of or identify the same to the County.
2.2 MULTIPLE PROPOSALS: No Proposer will be allowed to submit more than one offer.
Any alternate proposals must be brought to the Purchasing Director's attention during the
Pre-proposal Conference or submitted in writing at least five (5) days preceding the date for submission of proposals.
2.3 OFFERS TO BE FIRM: The Proposer warrants that terms and conditions quoted in his offer will be firm for acceptance for a period of sixty (60) days from bid date submitted, unless otherwise stated in the proposal. When requested to provide a fee proposal, fees quoted must also be firm for a sixty-day period.
2.4 COMPLETENESS: All information required by the Request for Proposals must be completed and submitted to constitute a proper proposal.
2.5 LIABILITY PROVISIONS: Where Proposers are required to enter or go into Chatham
County property to take measurements or gather other information in order to prepare the proposal as requested by the County, the Proposer shall be liable for any injury, damage or loss occasioned by negligence of the Proposer, his agent, or any person the Proposer has designated to prepare the Offer and shall indemnify and hold harmless Chatham County from any liability arising therefrom. The contract document specifies the liability provisions required of the successful Proposer in order to be awarded a contract with
Chatham County.
2.6 CERTIFICATION OF INDEPENDENT PRICE DETERMINATION: By submission of this Offer, the Proposer certifies, and in the case of a joint offer, each party thereto certifies as to its own organization, that in connection with this procurement:
(1) The prices in this offer have been arrived at independently, without consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other competitor;
(2) Unless otherwise required by law, the prices which have been quoted in this offer have not been knowingly disclosed by the Proposer and will not knowingly be disclosed by the Proposer prior to opening, directly or indirectly to any other competitor; and
(3) No attempt has been made or will be made by the Proposer to induce any other person or firm to submit or not submit an offer for the purpose of restricting competition.
2.7 AWARD OF CONTRACT: The contract, if awarded, will be awarded to that responsible
Proposer whose proposal will be most advantageous to Chatham County, price and other factors considered. The Board of Commissioners will make the determination as to which proposal best serves the interest of Chatham County.
2.8 PROCUREMENT PROTESTS: Objections and protests to any portion of the procurement process or actions of the County staff may be filed with the Purchasing
Director for review and resolution. The Chatham County Purchasing Ordinance – Part 9
– Vendor Disputes shall govern the review and resolution of all protests.
2.9 QUALIFICATION OF BUSINESS (RESPONSIBLE PROPOSER): A responsible
Proposer is defined as one who meets, or by the date of the acceptance can meet, all requirements for licensing, insurance, and service contained within this Request for
Proposals. Chatham County has the right to require any or all Proposers to submit documentation of the ability to perform the service requested.
Chatham County has the right to disqualify the proposal of any Proposer as being unresponsive or unresponsible whenever such Proposer cannot document the ability to deliver the requested service.
2.10 COUNTY TAX CERTIFICATE REQUIREMENT: A current Chatham County or municipal business license (within the State of Georgia) is required unless otherwise specified. A firm need not have a Chatham County Business License prior to submitting a proposal. However, a license must be obtained by the successful vendor prior to award of
Please contact the Chatham County Department of Building Safety and Regulatory
Services at (912) 201-4300 for additional information.
NOTE: No contract shall be awarded unless all real and personal property taxes have been paid by the successful contractor and/or subcontractor as adopted by the Board of
Commissioners on 8 April 1994.
2.11 INSURANCE PROVISIONS, GENERAL: The selected CONTRACTOR shall be required to procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the work, hereunder by the Contractor, his agents, representatives, employees or subcontractor. The cost of such insurance shall be included in the Bid.
It is every Contractor’s responsibility to provide the County Purchasing and Contracting
Department current and up-to-date Certificates of Insurance and Declaration Sheets for multiple year contracts before the end of each term. Failure to do so may be cause for termination of contract.
2.11.1 General Information that shall appear on a Certificate of Insurance:
I. Name of the Producer (Contractor’s insurance Broker/Agent).
II. Companies affording coverage (there may be several).
III. Name and Address of the Insured (this should be the Company or Parent of the firm Chatham County is contracting with).
IV. Summary of all current insurance for the insured (includes effective dates of coverage).
V. A brief description of the operations to be performed, the specific job to be performed, or contract number.
VI. Certificate Holder (This is to always include Chatham County).
Chatham County as an “Additional Insured”: Chatham County invokes the defense of “sovereign immunity.” In order not to jeopardize the use of this defense, the County is not to be included as an “Additional Insured” on insurance contracts.
2.11.2 Minimum Limits of Insurance to be maintained for the duration of the contract:
A. Commercial General Liability: Provides protection against bodily injury and property damage claims arising from operations of a Contractor or
Tenant. This policy coverage includes: premises and operations, use of independent contractor, products/completed operations, personal injury, contractual, broad form property damage, and underground, explosion and collapse hazards. Minimum limits: $1,000,000 bodily injury and property damage per occurrence and annual aggregate.
B. Worker's Compensation and Employer’s Liability: Provides statutory protection against bodily injury, sickness or disease sustained by employees of the Contractor while performing within the scope of their duties.
Employer’s Liability coverage is usually included in Worker’s
Compensation policies, and insures common law claims of injured employees made in lieu of or in addition to a Worker’s Compensation claim.
Minimum limits: $500,000 for each accident, disease policy limit, each employee and Statutory Worker’s Compensation limit.
C. Business Automobile Liability: Coverage insures against liability claims arising out of the Contractor’s use of automobiles. Minimum limit:
$1,000,000 combined single limit per accident for bodily injury and property damage. Coverage should be written on an “Any Auto” basis.
2.11.3 Special Requirements:
Claims-Made Coverage: The limits of liability shall remain the same as the occurrence basis, however, the Retroactive date shall be prior to the coincident with the date of any contract, and the Certificate of Insurance shall state the coverage is claims-made. The Retroactive date shall also be specifically stated on the
Certificate of Insurance.
A. Extended Reporting Periods: The Contractor shall provide the County with a notice of the election to initiate any Supplemental Extended
Reporting Period and the reason(s) for invoking this option.
B. Reporting Provisions: Any failure to comply with reporting provisions of the policies shall not affect coverage provided in relation to this request.
C. Cancellation: Each insurance policy that applies to this request shall be endorsed to state that it shall not be suspended, voided, or canceled, except after thirty (30) days prior to written notice by certified mail, return receipt requested, has been given to the County.
D. Proof of Insurance: Chatham County shall be furnished with certificates of insurance and with original endorsements affecting coverage required by this request. The certificates and endorsements are to be signed by a person authorized by the insurer to bind coverage on its behalf. All certificates of insurance are to be submitted prior to, and approved by, the County before services are rendered. The Contractor must ensure Certificate of Insurance are updated for the entire term of the County.
E. Insurer Acceptability: Insurance is to be placed with an insurer having an
A.M. Best’s rating of A and a five (5) year average financial rating of not less than V. If an insurer does not qualify for averaging on a five (5) year basis, the current total Best’s rating will be used to evaluate insurer acceptability.
F. Lapse in Coverage: A lapse in coverage shall constitute grounds for contract termination by the Chatham County Board of Commissioners.
G. Deductibles and Self-Insured Retention: Any deductibles or self-insured retention must be declared to, and approved by, the County. At the option of the County, either: the insurer shall reduce or eliminate such deductibles or self-insured retention as related to the County, its officials, officers, employees, and volunteers; or the Contractor shall procure a bond guaranteeing payment of related suits, losses, claims, and related investigation, claim administration and defense expenses.
2.12 INDEMNIFICATION: The PROPOSER agrees to protect, defend, indemnify, and hold harmless Chatham County, Georgia, its commissioners, officers, agents, and employees from and against any and all liability, damages, claims, suits, liens, and judgments, of whatever nature, including claims for contribution and/or indemnification, for injuries to or death of any person or persons, or damage to the property or other rights of any person or persons caused by the PROPOSER or its subproposers. The PROPOSER’s obligation to protect, defend, indemnify, and hold harmless, as set forth herein above shall include, but not be limited to, any matter arising out of any actual or alleged infringement of any patent, trademark, copyright, or service mark, or any actual or alleged unfair competition, disparagement of product or service, or other business tort of any type whatsoever, or any actual or alleged violation of trade regulations. PROPOSER further agrees to investigate, handle, respond to, provide defense for, and to protect, defend, indemnify, and hold harmless Chatham County, Georgia, at his sole expense, and agrees to bear all other costs and expenses related thereto, even if such claims, suits, etc., are groundless, false, or fraudulent, including any and all claims or liability for compensation under the Worker's
Compensation Act arising out of injuries sustained by any employee of the PROPOSER or his subcontractor or anyone directly or indirectly employed by any of them.
The PROPOSER’s obligation to indemnify Chatham County under this Section shall not be limited in any way by the agreed-upon contract price, or to the scope and amount of coverage provided by any insurance maintained by the PROPOSER.
2.13 COMPLIANCE WITH SPECIFICATION - TERMS AND CONDITIONS: The
Request for Proposals, Legal Advertisement, General Conditions and Instructions to
Proposers, Specifications, Special Conditions, Proposers Offer, Addendum, and/or any other pertinent documents form a part of the Offeror's proposal and by reference are made a part hereof.
2.14 SIGNED RESPONSE CONSIDERED AN OFFER: The submitted Response shall be considered an offer on the part of the Proposer, which offer shall be deemed accepted upon approval by the Chatham County Board of Commissioners, Purchasing Director or his designee. In case of a default on the part of the Proponent after such acceptance, Chatham
County may take such action, as it deems appropriate, including legal action for damages or lack of required performance.
2.15 NOTICE TO PROCEED: The successful proposer shall not commence work under this
Request for Proposal until a written contract is awarded and the Purchasing Director or his designee issues a Notice to Proceed. If the successful Proposer does commence any work or deliver items prior to receiving official notification, he does so at his own risk.
2.16 PAYMENT TO CONTRACTOR: Instructions for invoicing the County for service delivered to the County are specified in the contract document.
A. Questions regarding payment may be directed to the Finance Department at (912)
652-7905 or the County’s Project Manager as specified in the contract documents.
B. Contractor will be paid the agreed upon compensation upon satisfactory progress or completion of the work as more fully described in the contract document.
C. Upon completion of the work, the Contractor will provide the County with an affidavit certifying all suppliers, persons or businesses employed by the Contractor for the work performed for the County have been paid in full.
D. Chatham County is a tax-exempt entity. Every contractor, vendor, business or person under contract with Chatham County is required by Georgia law to pay State sales or use taxes for products purchased in Georgia or transported into Georgia and sold to Chatham County by contract. Please consult the State of Georgia, Department of Revenue, Sales and Use Tax Unit in Atlanta (404) 656-4065 for additional information.
2.17 LICENSES, PERMITS, AND TAXES: The price or prices for the service shall include full compensation for all fees that the proponent is or may be required to pay. Chatham
County is Tax Exempt. The Purchasing & Contracting Office upon request (912) 790-1618 will provide a Tax Exemption Certificate.
2.18 MINORITY – WOMEN BUSINESS ENTERPRISE PARTICIPATION: It is the desire of the County Board of Commissioners to increase the participation of minority (MBE) and women-owned (WBE) business in its contracting and procurement programs.
The County is committed to a policy of equitable participation for these firms by setting goals for each contract. Bidder/proposers are requested to include in their proposals a narrative describing their past accomplishments and intended actions in this area. If bidder/proposers are considering minority or women owned enterprise participation in their proposal, those firms, and their specific duties must be identified in their proposal along with the percentage(s) and dollar amount awarded to the MBE/WBE firm. Proposers may also provide demographic information regarding their employees to show their commitment to equal opportunity. If a bidder/proposer is considered for award, he/she will be asked to meet with the County Staff so that the intended MBE/WBE participation goals can be formalized and included in the subsequent contract.
If the awarded contractor is claiming minority status, the contractor shall apply for certification by Chatham County, Georgia to the Office of Minority Business Coordinator.
The Minority Business Coordinator will provide documentation of application status once approved or disapproved by Chatham County. Certification by any other government entity is acceptable if current copy of the certification is provided with this solicitation. For information on the program or MBE/WBE contractors/vendors please contact the County’s
Minority and Women Business Office 1117 Eisenhower Drive, Suite 101, Savannah, Georgia 31406, (912) 652-7860.
REQUEST FOR PROPOSALS
SECTION III
GENERAL CONDITIONS
3.1 DESCRIPTION AND OBJECTIVES: Chatham County Board of Commissioners is soliciting proposals from qualified vendor(s) to provide underground utility locating and marking fiber services via the state of Georgia’s Utility Notification Center (GA811) for the County’s telecommunications utilities. The County presents this “Request for
Proposal” to describe its needs and those criteria which will be used to determine selection of services.
3.2 METHODOLOGY: The procurement described herein may be conducted in a two-step process.
STEP ONE- ACCEPTANCE AND EVALUATION OF QUALIFICATION
PROPOSALS: All technical requirements, unless otherwise specified, must be met by the proponent or such proposal may be disqualified as being non-responsive. Proposals that are deemed incomplete as to substance and content may be returned without consideration. A shortlist of qualified firms will be developed and ranked.
Fee proposals shall be submitted along with the proposal and will be evaluated and ranked accordingly. Fee proposal should be quoted in “all inclusive” dollars. The evaluation committee will make the selection of the firm which it believes is best qualified to provide the service, fee proposal and other qualitative factors considered. It is emphasized that the firm which offers the lowest fee proposal will not necessarily be the firm selected. The selection will be made of that firm which provided the best proposal.
“Best” is defined as the best combination of qualitative factors and price proposal.
STEP TWO-INTERVIEWS: The evaluation committee may request an interview with short-listed firms. If interviews are conducted, they will be scored. It will be at the discretion of the evaluation committee on the number of firms that will interview/present.
3.3 CONFIDENTIALITY OF DOCUMENTS: Upon receipt of a proposal by the County, the proposal shall become the property of the County without compensation to the proponent, for disposition or usage by the County at its discretion (except for as provided by Georgia law for proprietary information). The details of the proposal documents will remain confidential until final award or rejection of proposals and/or protected under the restraints of law. Only final points and ranking of proposals will be openly disclosed prior to approval by the Board of Commissioners. Proponent shall have no contact with any
Department Representative or Evaluation Committee Member during and after the evaluation process. Any information contained in the proposal that is considered by the
Proponent as “proprietary” to remain confidential shall be clearly identified and justified.
3.4 CONE OF SILENCE: Lobbying of Procurement Evaluation Committee members, County Government employees, and elected officials regarding this product or service solicitation, Invitation to Bid (ITB) or Request for Proposal (RFP) or contract by any member of a proposer’s staff, or those people employed by any legal entity affiliated with an organization that is responding to the solicitation is strictly prohibited. Negative campaigning through the mass media about the current service delivery is strictly prohibited. Such actions may cause your proposal to be rejected.
3.5 COMPENSATION: The County has attempted in SECTION V to provide as much information about the project as possible to enable firms to structure their offer.
3.6 REJECTING PROPOSALS: The County reserves the right to reject any or all proposals and is not bound to accept any proposal if that proposal is contrary to the best interest of Chatham County. Similarly, the County is not bound to accept the lowest dollar proposal if the offer is not considered in the County's best interest.
3.7 COST TO PREPARE RESPONSES: The County assumes no responsibility or obligation to the respondents and will make no payment for any costs associated with the preparation or submission of the proposal.
3.8 INQUIRIES: Direct any questions related to this RFP to Ms. LaToya Lott, Procurement
Specialist, and submit all questions through the County’s procurement portal https://chathamcountyga.bonfirehub.com/portal Messages - Vendor Discussion section.
Include the RFP number, page, and paragraph number as a reference to each question.
DEADLINE FOR ALL QUESTIONS is noted on the procurement portal under Project
Details.
THE ONLY OFFICIAL ANSWER OR POSITION OF CHATHAM COUNTY WILL BE
THE ONE STATED IN WRITING.
3.9 METHOD OF SOURCE SELECTION: Chatham County is using the Competitive
Sealed Proposal method of source selection, as authorized by Part 3 of the Chatham
County Purchasing Ordinance for this procurement.
An award, if made, will be made to the responsible offeror whose proposal is most advantageous to Chatham County, taking into consideration price and other factors set forth in this Request for Proposal (RFP). The County will not use any other factors or criteria in the evaluation of the proposals received.
3.10 EQUAL EMPLOYMENT OPPORTUNITY: During the performance of this contract, the COMPANY agrees as follows:
The COMPANY will not discriminate against any employee or applicant for employment because of race, creed, color, sex, age, national origin, place of birth, physical handicap, or marital status.
SECTION IV
SPECIAL CONDITIONS
4.1 PENDING LITIGATION: Proposals will not be accepted from any company, firm, person, or party, parent subsidiary, against which Chatham County has an outstanding claim, or a financial dispute relating to prior contract performance. If the County, at any time, discovers such a dispute during any point of evaluation, the proposal will not be considered further.
4.2 EVALUATION FACTORS: Factors such as proponents’ overall capability, specialized experience, reputation, past performance on similar projects, technical competence, financial stability, ability to meet program goals, delivery under the contract terms, and fee schedule will be considered in the award recommendation. Commitment in the level of MBE/WBE firms, contractor and employees will also be considered in the evaluation of proposals.
4.3 SELECTION PROCESS: Proposals will be evaluated initially on the basis of the written document. Thus, the proposal must be complete, concise and clear as to the intent of the respondent. Further evaluation may include an oral presentation, which will be scheduled after receipt of the written proposal and approval of the shortlist.
4.4 CONTRACT: The successful respondent will be expected to execute a contract within
30 days of notice of award.
4.5 PROPOSALS MUST BE RESPONSIVE TO:
4.5.1 INTRODUCTION/COVER LETTER: You should provide no more than a two
(2) page letter of introduction. The letter should highlight or summarize whatever information you deem appropriate as a cover letter, as a minimum, this section should include the name, address, email address, and telephone number of one (1) contact to whom any correspondence should be directed. This section should include a clear statement of the Proposer’s understanding of this Request for
Proposal and the contract requirements, and how the Proposer intends to meet the requirements of this Request for Proposal. This section should also demonstrate the proposer’s understanding of the County’s goals as outlined in Section V- Scope of
Services.
4.5.2 EXPERIENCE & QUALIFICATIONS - TOTAL POSSIBLE POINTS: 30
A. Provide a summary of your firm’s organization including size, location of the corporate office, years in business, number of employees, and experience and qualifications to perform the requested services.
B. Provide a brief summary of the qualifications of those individuals who will serve with the County’s project team and state what role each team member will play.
C. Summarize experience delivering Underground Utility Locating and
Marking Fiber Services in the last five (5) years, including client name, services provided, and duration.
4.5.3 TECHNICAL APPROACH – TOTAL POSSIBLE POINTS: 25
A. Describe the policies and procedures for managing and performing underground utility locating and marking services in compliance with
O.C.G.A. § 25-9, GPSC Rules 515-9-4 and 515-9-6, and applicable local codes and ordinances.
B. Provide a detailed narrative demonstrating your understanding of the Scope of
Work and your methodology for locating and marking Chatham County’s underground telecommunications utilities, including approximately 75 miles of underground fiber conduit.
C. Describe the qualifications, certifications, training, and experience of the personnel who will perform the services, including experience with fiber optic infrastructure and GA811 locate requests.
D. Identify the equipment, locating technology, GPS systems, mapping software, vehicles, and other resources that will be used. Describe technician proficiency and equipment maintenance procedures.
E. Describe your procedures for reporting, documenting, and investigating damaged utilities, including notification protocols and incident reporting.
F. Explain how your firm will document completed locates, including GA811 ticket records, GPS coordinates, photographs, electronic records, technician notes, and record retention procedures.
G. Describe your approach to managing routine, priority, and emergency GA811 locate requests, including staffing, scheduling, communication, and quality assurance.
H. Identify potential risks or limitations that could affect service delivery and describe your mitigation strategies.
I. Describe any competitive advantages, innovative technology, specialized expertise, or unique capabilities that distinguish your firm.
J. Provide any additional information relevant to your technical approach that is not otherwise requested in this RFP
4.5.4 MBE/WBE PARTICIPATION - TOTAL POSSIBLE POINTS: 15
Commitment in the level of local MBE/WBE business/firms, subcontractors, contractors, and employees. Approach to meeting and exceeding the MBE/WBE requirements. History of Minority-owned, Women-owned business utilization in the past.
4.5.5 COST PROPOSAL – TOTAL POSSIBLE POINTS: 20
Proposers shall use the cost proposal sheet provided with detail of unit pricing broken out as an attachment. Vendors are to submit their unit pricing. Vendors should submit pricing for all components of the Underground Utility Locating and Marking Services.
The County reserves the right to request cost and scope clarification at any time throughout the selection and negotiation process.
4.5.6 REFERENCES: TOTAL POSSIBLE POINTS: 10
Please provide a minimum of three (3) references related to Underground Utility
Locating and Marking Fiber Service or similar. Please be sure that these references can attest to the company’s knowledge, quality of work, timeliness, diligence, working relationships and flexibility. Please provide the client’s name, address, phone number and the name of a contact. Chatham County is interested in the type of service(s) provided and how long that reference has been your client.
4.5.7 INTERVIEWS/PRESENTATIONS (IF REQUIRED) – TOTAL POSSIBLE
POINTS: 30
4.6 ASSIGNMENT: The PROPOSER shall not assign or transfer any interest of the contract without prior written consent of the County.
4.7 CONTRACT AWARD:
A. Successful Proponent will be asked to submit his/her firms’ contractual issues for consideration in the Chatham County contract. Proposals will become part of the
B. No work shall be performed under the contract until a contract has been fully executed by both parties. A notice to proceed will be issued by Chatham County.
SECTION V
SCOPE OF SERVICES
Annual Contract for Underground Utility Locating and Marking Services
5.2 GENERAL BACKGROUND: Chatham County Board of Commissioners is soliciting proposals from qualified vendor(s) to provide underground utility locating and marking fiber services via the state of Georgia’s Utility Notification Center (GA811) for the County’s telecommunications utilities. All locating and marking services are to be performed in accordance with O.C.G.A 25-9, GPSC Rule 515-9-4, GPSC Rule 515-9-6, and any local codes or ordinances. Chatham County, GA has approximately 75 miles of underground fiber conduit that services multiple sites throughout the county.
5.3 DEFINITIONS:
"Business days" means Monday through Friday, excluding the following holidays: New
Year's Day, Birthday of Dr. Martin Luther King, Jr., Memorial Day, Independence Day, Labor Day, Thanksgiving Day and the following Friday, Christmas Eve, and Christmas Day. Any such holiday that falls on a Saturday shall be observed on the preceding Friday.
Any such holiday that falls on a Sunday shall be observed on the following Monday.
"Business hours" means the time from 7:00 A.M. to 4:30 P.M. local time on business days.
“County” means the County of Chatham County, Ga
“Contractor” means any person, firm, or entity that is providing the services as requested in this document.
“Damage” means any impact or exposure that results in the need to repair a utility facility or sewer lateral due to the weakening or the partial or complete destruction of the facility or sewer lateral including, but not limited to, the protective coating, lateral support, cathodic protection, or the housing for the line, device, sewer lateral, or facility.
"Emergency" means a sudden or unforeseen occurrence involving a clear and imminent danger to life, health, or property; the interruption of utility services; or repairs to transportation facilities that require immediate action.
"Excavator" means any person engaged in excavating or blasting as defined in this
Code section.
"Excavating" means any operation using mechanized equipment or explosives to move earth, rock, or other material below existing grade. This includes but is not limited to augering, blasting, boring, digging, ditching, dredging, drilling, driving-in, grading, plowing-in, ripping, scraping, trenching, and tunneling. "Excavating" shall not include pavement milling or pavement repair that does not exceed the depth of the existing pavement or 12 inches, whichever is less. The term shall not include routine road or railroad maintenance activities carried out by road maintenance or railroad employees or contractors, provided that such activities occur entirely within the right of way of a public road, street, railroad, or highway of the state; are carried out with reasonable care so as to protect any utility facilities and sewer laterals placed in the right of way by permit; are carried out within the limits of any original excavation on the traveled way, shoulders, or drainage ditches of a public road, street, railroad, or highway, and do not exceed 18 inches in depth below the grade existing prior to such activities; and, if involving the replacement of existing guard rails and sign posts, replace such guard rails and sign posts in their previous locations and at their previous depth. "Excavating" shall not include farming activities.
"Extraordinary circumstances" means circumstances other than normal operating conditions which exist and make it impractical or impossible for a facility owner or operator to comply with the provisions of this chapter. Such extraordinary circumstances may include, but shall not be limited to, hurricanes, tornadoes, floods, ice and snow, and acts of God.
"Facility owner or operator" means any person or entity with the sole exception of a homeowner who owns, operates, or controls the operation of a utility facility.
"Locate request" means a communication between an excavator and the utilities protection center in which a request for designating utility facilities, sewer laterals, or both is processed.
"Locator" means a person who is acting on behalf of facility owners and operators in designating the location of the utility facilities and sewer laterals of such owners and operators.
"Positive response information system" or "PRIS" means the automated information system operated and maintained by the utilities protection center at its location that allows excavators, locators, facility owners or operators, and other affected parties to determine the status of a locate request or design locate request.
“PSC or GPSC” means the Georgia Public Service Commission.
"Tolerance zone" means the width of the utility facility or sewer lateral plus 18 inches on either side of the outside edge of the utility facility or sewer lateral on a horizontal plane.
"Utilities protection center" or "UPC" means the corporation or other organization formed by facility owners or operators to provide a joint notification service for the purpose of receiving advance notification from persons planning to blast or excavate and distributing such notifications to its affected facility owner or operator members.
"Utility facility" means an underground or submerged conductor, pipe, or structure used or installed for use in providing electric or communications service or in carrying, providing, or gathering gas, oil or oil products, sewage, waste water, storm drainage, or water or other liquids. All utility facilities shall be considered to extend up to the connection to the customer's facilities. The term does not include traffic control devices, traffic management systems, or sewer laterals.
5.4 CONTRACTOR’S PRIMARY OBJECTIVE AND RESPONSIBILITIES:
5.4.1 The selected Contractor will receive underground utility locate requests directly from the Georgia State Utility Notification Center (commonly known as “GA811”) and manage the entire telecommunications locating and marking process for Chatham County. The Contractor shall furnish all labor, supervision, tools, materials, paint, flags, equipment (including hardware and software compatible with the existing communication systems used by GA811 One-Call) and transportation to perform Underground Utilities Locating and Marking Fiber Services in accordance with O.C.G.A 25-9, GPSC Rule 515-9-4, GPSC Rule 515- 9-6, and any local codes, or ordinances.
5.4.2 Receive and respond to all Telecommunications Utility Locate request notices directed to Chatham County through GA811.
5.4.3 Provide such markings and protection as may be required, including painting, flagging, or staking.
5.4.4 All vehicles of the Contractor will prominently display the Contractor's name and emergency telephone number at all times while at work sites.
5.4.5 Notify the County’s representative within two (2) hours of the discovery of an
“Identified but Un-locatable” Underground Facility so as to advise the County’s representative of the situation. The County’s representative will determine the course of action to be taken. If no course of action is successful, the Contractor shall notify the Excavator of the presence of an Identified but Un-locatable Facility and caution the Excavator that any location information supplied may not be within the definition of Reasonable Accuracy. Contractor is not liable for any damages to Identified but Un-locatable Facilities.
5.4.6 Notify the County representative within two (2) hours of becoming aware that any
County Underground Facility has been damaged.
5.4.7 Responsible for obtaining all licenses, permits, inspections and other authorizations required for Contractor’s performance of the services.
5.4.8 Provide personnel that are proficient in the use of approved locating devices, methods, marking procedures, communicative skills, and record-keeping requirements necessary to perform the locating and marking tasks.
5.4.9 Notify the County’s representative of any discovered discrepancies or omissions in the Maps and Records or other information provided by the County. In the event that the Contractor updates County provided mapping based on field discoveries, such mapping shall be supplied to the County.
5.3.10 Retain and safeguard the County’s location Maps and Records. Records shall not be disclosed or made available to any Person not approved by the County, except as required by law. Any requests for Maps and Records shall be directed to the County’s representative.
5.3.11 Gather the needed information and submit damage reports.
5.3.12 Prepare documentation and record-keeping, including keeping proof of each locate for a period of no less than 6 months.
5.3.13 Each and every representative of the Contractor that will be responsible in any capacity to fulfilling the requests of this document must have read and understand O.C.G.A 25-9, GPSC Rule 515-9-4, and GPSC Rule 515-9-6.
5.4 LOCATING: The Contractor is required to perform the duties of this contract in accordance with Georgia Code 25-9, GPSC Rule 515-9-4, GPSC Rule 515-9-6, and any local codes, or ordinances. If a proposed excavation or demolition is planned in such proximity to an underground utility line in which the utility line may be destroyed, damaged, dislocated, or disturbed, the operator shall mark the approximate horizontal location of the underground utility line on the ground and 18 inches of either side of the underground utility line by means of stakes, paint, flags, or a combination thereof. The
Contractor shall mark the underground utility line and report the marking status to the
PRIS within 48 hours that begins at 7:00 am the next business day of the received locate request, unless the Contractor is unable to do so due to “extraordinary circumstances”
(Refer to definition section above).
If the Contractor is unable to mark the location within the time allowed under O.C.G.A
25-9-7 due to extraordinary circumstances, the Contractor shall, after declaring
Extraordinary Circumstances with Georgia 811, respond to all applicable requests with the PRIS code 3J. Notifying Georgia 811 is only one step in the process. Extraordinary
Circumstances is not fully invoked until utility members respond to any/all locate requests, during their specified time period, with that code. Once the Extraordinary
Circumstance has passed, the utility contractor must update all instances of 3J responses to the applicable PRIS code
5.5 EMERGERCY NOTIFICATIONS: Responses should be made as quick as possible to emergency notifications.
5.6 LOCATE LIABILITY O.C.G.A 25-9-9:
(a) For the purposes of this chapter, the location of utility facilities which is provided by a facility owner or operator in accordance with subsection (a) of Code Section 25-9-7 to any person must be accurate to within 18 inches measured horizontally from the outer edge of either side of such utility facilities. If any utility facility becomes damaged by an excavator due to the furnishing of inaccurate information as to its location by the facility owner or operator, such excavator shall not be subject to any liability resulting from damage to the utility facility as a result of the blasting or excavating, provided that such person complies with the requirements of Code Section 25-9-8 and there is no visible and obvious evidence to the excavator of the presence of a mismarked utility facility.
(b) Upon documented evidence that the person seeking information as to the location of utility facilities has incurred losses or expenses due to inaccurate information, lack of information, or unreasonable delays in supplying information by the facility owners or operators, the facility owners or operators shall be liable to that person for any such losses or expenses.
5.7 CIVIL PENALTIES, LOSSES AND EXPENSES: If the Contractor performing duties under this contract for the County should fail to perform duties imposed by the Georgia
Utility Facility Protection Act and Public Service Commission Rules for the Enforcement of the Underground Utility Damage Prevention Act, they are subject to the liabilities and civil penalties afforded in O.C.G.A 25-9-9 and PSM Rule 515-9-4.
All civil penalties and fees due to a violation of the Georgia Underground Facilities
Protection Act that are imposed onto the Owner/Operator due to the Contractor’s negligence, will be paid by the contractor.
Any losses or expenses that are the result of the Contractor’s negligence to properly locate, mark, respond to locate notices, or to properly notify the owner/operator and
GA811 if for any reason the utility can’t be located within 48 business hours of receiving the notice to locate will be paid by the contractor.
5.8 UNDERGROUND DAMAGE INSPECTIONS: The Contractor is required to assign a qualified person to investigate all damages to the County’s underground utilities. The
Contractor will provide a damage investigation packet; the packet will consist of a written report, copy of the locater's manifest, damage investigation drawing, and color photos. The Contractor is to prepare a locate manifest in a format acceptable and as required by the Public Service Commission (PSC). This will include an as-built type of drawing (paper or electronic) or markings with a sketch with measurements to permanent structures and color photos.
The written report is required to have the VA811 ticket number, damage date, name of excavator/Contractor, responsible party or caller, investigator, type of facility damaged, narrative of events, cause of damage, and additional comments. The damage report is due to the respective Project Manager within two weeks after the damage. The Contractor shall be required to pay restitution to the County for damages due to incorrect underground utility locating as deemed by the Project Manager. The billing request will be for time, material, and equipment. Damage investigations are to be billed one (1) hour for each investigation at the Hourly Rate. The Contractor should perform a damage report on all damages to determine fault to satisfy the PSC requirements.
5.9 REPORTS: In the event the Contractor encounters any County…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .