This document is Addendum #2 for RFP #251-26-130 from Wake County Public School System (WCPSS), providing a comprehensive question and answer document for a solicitation covering Bi-Directional Antenna Systems (BDAS) installation, annual maintenance, remote monitoring, and emergency responder communication system recertification. The RFP covers 72 existing school sites, with the potential for additional sites as new schools are constructed or existing schools are remodeled. The bid due date has been extended to April 9, 2025, and the contract will focus on maintenance, monitoring, and certification of existing systems, with no new installations planned. Site visits will not be scheduled prior to the proposal deadline, and contractors will be required to obtain WCPSS badges for site access.
The procurement is exclusively for maintenance of existing emergency communication systems, with corrective repairs to be performed on a time and materials basis and quotes submitted to WCPSS staff for approval. No comprehensive inventory of existing systems currently exists, and the incumbent vendor currently owns and operates the monitoring system. The RFP specifies that any new systems required by code for new construction or renovations will be handled by the general contractor for each entity. Vendors are expected to meet State Fire Code service levels, provide remote monitoring with an internet interface, and be prepared to conduct annual recertification testing, typically during school hours with potential for after-hours work at no additional cost.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP #251-26-130 - ADDENDUM #2 Page 1 of 8
Questions for RFP #251-26-130 – Bi-Directional Antenna Systems Installation, Annual
Maintenance, Remote Monitoring, and Required Recertification of Emergency Responder
# Reference Vendor Question Answers
1 Can we get a list of schools with addresses with BDA solutions?
List is at the end of this Addendum.
2 Can we get iBwave or As-Builts for all 72 schools that have BDAs?
https://drive.google.com/drive/folders/1H4sAH4MaoLzpICVli7Gn2DVPr tsbGjxS?usp=sharing
3 Can we get the latest inspection report for each of the
72 schools?
https://drive.google.com/drive/folders/1H4sAH4MaoLzpICVli7Gn2DVPr tsbGjxS?usp=sharing
4 Can we get square feet per building? https://drive.google.com/drive/folders/1H4sAH4MaoLzpICVli7Gn2DVPr tsbGjxS?usp=sharing
5 Does Wake County Schools plan to add more schools to the list for monitoring?
Yes, as new schools are built or existing schools are remodeled, they will need to be monitored.
6 Will there be any security or badging required by the winning company?
Yes, WCPSS creates contractor badges for vendors.
7 Will site visits or walkthroughs be allowed or scheduled prior to the proposal deadline?
Due to time constraints, we don’t believe this can be done. Note in your bid any implications this has on your offer.
8 Can you provide square footage or floor plans for any of the 72 existing school sites requiring BDAS/DAS support?
https://drive.google.com/drive/folders/1H4sAH4MaoLzpICVli7Gn2DVPr tsbGjxS?usp=sharing
9 Are there any specific schools prioritized for installation?
All sites are installed, but there is remediation that needs to be performed in a prioritized list.
10 Are existing BDAS systems currently used? If so, can you provide details on current platforms?
https://drive.google.com/drive/folders/1H4sAH4MaoLzpICVli7Gn2DVPr tsbGjxS?usp=sharing
11 RFP Section, GeneralPage
Number 2
Is this RFP intended to cover the entire Wake County
Public School System (WCPSS), or is it focused solely the existing 73 BDS systems areas currently installed in the schools?
BDAs are not installed in every school. This RFP is for the existing systems and any new systems that come online. Currently, there are four new schools under construction and two renovations.
https://drive.google.com/drive/folders/1H4sAH4MaoLzpICVli7Gn2DVPrtsbGjxS?usp=sharing https://drive.google.com/drive/folders/1H4sAH4MaoLzpICVli7Gn2DVPrtsbGjxS?usp=sharing https://drive.google.com/drive/folders/1H4sAH4MaoLzpICVli7Gn2DVPrtsbGjxS?usp=sharing https://drive.google.com/drive/folders/1H4sAH4MaoLzpICVli7Gn2DVPrtsbGjxS?usp=sharing https://drive.google.com/drive/folders/1H4sAH4MaoLzpICVli7Gn2DVPrtsbGjxS?usp=sharing https://drive.google.com/drive/folders/1H4sAH4MaoLzpICVli7Gn2DVPrtsbGjxS?usp=sharing https://drive.google.com/drive/folders/1H4sAH4MaoLzpICVli7Gn2DVPrtsbGjxS?usp=sharing https://drive.google.com/drive/folders/1H4sAH4MaoLzpICVli7Gn2DVPrtsbGjxS?usp=sharing https://drive.google.com/drive/folders/1H4sAH4MaoLzpICVli7Gn2DVPrtsbGjxS?usp=sharing
RFP #251-26-130 - ADDENDUM #2 Page 2 of 8
12 RFP Section, GeneralPage
Number 3
Are there any distinct service requirements or specifications tailored specifically for Elementary, Middle, or High schools that need to be addressed?
No.
13 RFP Section, SCOPE
OF WORK
Page Number 4
Are there any existing Emergency Responder
Communication Coverage systems at these sites
ERCC is synonymous with BDAs for this RFP.
14 RFP Section, SCOPE
OF WORK
Page Number 4
Are there any structural or electrical constraints that need to be considered during installation of Bi-
Directional Antenna Systems (BDAS) or Distributed
Antenna Systems (DAS))
Yes. These are specified in https://www.wcpss.net/cms/lib/NC01911451/Centricity/Domain/91/De sign%20Guidelines_24_25.pdf BDA details on page 219, “28 40 00 BI-
DIRECTIONAL AMPLIFIER SYSTEM”
15 RFP Section, SCOPE
OF WORK
Page Number 4
What are the specific school sites included in this project. Additionally, if available, please share the design or layout for any of the schools, or for all 72 locations
The school list is below.
16 RFP Section, SCOPE
OF WORK
Page Number 4
Will there be a Service Level Agreement (SLA) for uptime and performance
Service Level needs to meet State Fire Code.
17 RFP Section, SCOPE
OF WORK
Page Number 4
Could you please share the existing details of the remote monitoring system, including the current monitoring specifications, tools in use, and the key metrics being tracked
The current monitoring system is owned, maintained, and operated by the incumbent vendor.
18 RFP Section, SCOPE
OF WORK
Page Number 4
Could you please elaborate on the scope of this proposal in terms of the Emergency Responder
Communication Coverage systems. Specifically, Fire
Responder (FNET) would like more details on the following aspects: The integration process on how the
Fire Responder/Public Safety Radio Signal Boosters
(BDAS/DAS systems) will be integrated into existing infrastructure.
https://www.wcpss.net/cms/lib/NC01911451/Centricity/Domain/91/De sign%20Guidelines_24_25.pdf BDA details on page 219, “28 40 00 BI-
DIRECTIONAL AMPLIFIER SYSTEM”
19 RFP Section, DELIVERABLES
Page Number 5
What is the timeline for deploying the BDAS/DAS system across all applicable school sites.
Systems are already installed at the specified sites.
https://www.wcpss.net/cms/lib/NC01911451/Centricity/Domain/91/Design%20Guidelines_24_25.pdf https://www.wcpss.net/cms/lib/NC01911451/Centricity/Domain/91/Design%20Guidelines_24_25.pdf https://www.wcpss.net/cms/lib/NC01911451/Centricity/Domain/91/Design%20Guidelines_24_25.pdf
RFP #251-26-130 - ADDENDUM #2 Page 3 of 8
20 RFP Section, DELIVERABLES
Page Number 5
Can we get the rough outline process for verifying compliance with fire safety regulations throughout the installation phase
Systems are already installed and certified.
21 RFP Section, DELIVERABLES
Page Number 5
Should the drawings include both schematic and layout views of all components.
Yes.
22 RFP Section, SCOPE
OF WORK
Page Number 4
Is this RFP intended to cover the entire Wake County
Public School System (WCPSS), or is it focused solely on the existing 73 BDS systems areas currently installed in the schools?
This is for maintenance of existing installed systems.
23 The Proposal Instructions on page 5 reference system design, propagation maps, installation schedules, and other elements typically associated with a DAS design/build proposal. Can you confirm whether there is a DAS design/build component to this project, or should the proposal focus solely on monitoring and maintenance?
Focus solely on monitoring, maintenance, and certification.
24 What is the make and model of the current BDAs installed at each of the schools?
https://drive.google.com/drive/folders/1H4sAH4MaoLzpICVli7Gn2DVPr tsbGjxS?usp=sharing
25 What are the names and physical addresses of the locations to be monitored and maintained?
See list below
26 Is there a badging requirement for technicians accessing any of the WCPSS sites?
Yes, with badges provided by WCPSS
27 Will technicians performing site inspections need vehicle identification signage or special access for on-site parking?
No.
28 Are there specific hours during which on-site inspections may be conducted?
Normal working hours are acceptable, and after-hours is also an option.
29 How should technicians gain access to telecom rooms or areas where BDAs and related equipment are installed?
We will provide access.
30 Are the current systems fully updated with the latest
OEM firmware/software and maintenance releases?
We are not sure.
RFP #251-26-130 - ADDENDUM #2 Page 4 of 8
31 Are the systems currently under a maintenance agreement and in good working condition?
There is no maintenance agreement and there are known faults that are to be addressed.
32 Does the County currently maintain a full complement of spare parts for the systems in case of failure?
No
33 Are there any after-hours service requirements for addressing system faults? If so, how is after-hours building access coordinated?
No after-hours requirements unless they would disrupt the instructional day. We can coordinate any extraordinary needs.
34 In order to ensure a thorough and accurate response to the Scope of Work and these questions, we respectfully request a two-week extension to the proposal submission deadline.
Bid Due Date has been extended to April 9, 2025.
35 Scope of Work, There is a reference to installation, will there be any new BDAs installed under this RFP? Is so, how many and what location and will plans be provided prior to bidding?
No.
36 Scope of Work, For the “BDAs in 72 Schools” can we get a list of each location and the manufacturer of the BDA hardware in place? Do you have the interface password credentials for each unit?
The list is provided below. We do not have a comprehensive inventory of existing systems, and uncertain of passwords.
37 System Monitoring, For the remote monitoring technology, will there be
Internet data access available to utilize or shall we plan on a providing a remote connection via other means?
Yes, an internet interface (ethernet) will be provided.
38 System Monitoring, For Remote diagnostics Reports, what frequency do you want the reports, as needed or what sort of time interval?
We would welcome your suggested periodicity.
39 Recertification and
Fire Code
Compliance, Page 4
For Annual Recertification testing, shall any tests need to be done during the stated working hours M-F 8-6 and what access will be granted during class time to classrooms space that needs to be tested? Will testing personnel be able to work independently or will they be required to be escorted by school personnel? If with personnel, how many personnel at a time will be available at any given time?
Testing will need to be scheduled on an individual basis, typically during school hours. If it is preferred by the vendor, and at no additional cost, work can be performed after instructional hours (typically after 3pm) to provide more flexibility.
40 Training, Page 5 How often will we be required to give training and to approximately how many people?
The training requirement is limited to, and associated with, any access to vendor’s monitoring/alert system, maintenance and inspection
RFP #251-26-130 - ADDENDUM #2 Page 5 of 8 workflow, or other details. It would be limited to a few individuals. It is not intended to be a technical or operational training.
41 Deliverables, Page 5 Does the term “fully operational BDAs and DAS system” mean that we are to deliver new BDA systems or ensure currently installed systems are working? If the requirement to ensure all 72 systems are working, how are repair and hardware of non-working systems to be handled initially?
See note 2 below. Corrective repairs will be performed on a time / materials basis. Vendor will submit a quote to WCPSS staff of corrective actions for approval. WCPSS reserves the right to seek additional quotes for materials more than $1,000.
42 Specific Proposal
Instructions, Section
1.II, Page 5
Do you want us to provide a sample “signal propagation prediction plans, system riser diagram,…” or do you want us to provide this for 72 current BDAs or some number of proposed new BDAs?
This is not a requirement.
43 Specific Proposal
Instructions, Section
1.III, Page 5
Do you want cable testing reports for all cables currently installed on all 72 BDAs?
This is not a requirement.
School Name: School Address:
Alston Ridge ES 11555 Green Level Church Road, Cary, NC 27519
Alston Ridge MS 7833 Fussell Ave, Cary, NC 27519
Apex Friendship ES 7901 Humie Olive Rd, Apex, NC 27502
Apex Friendship HS 7801 Humie Olive Road, Apex NC 27502
Apex Friendship MS 7701 Humie Olive Rd, Apex, NC 27502
Apex HS 1501 Laura Duncan Rd, Apex, NC 27502
Athens Drive HS 1420 Athens Dr, Raleigh, NC 27606
Ballentine ES 1651 McLaurin Ln, Fuquay-Varina, NC 27526
Barton Pond ES 12004 Strickland Rd, Raleigh, NC 27613
Baucom ES (New School) 400 Hunter St, Apex, NC 27502
Beaverdam ES 3591 Tarheel Club Rd, Raleigh, NC 27604
RFP #251-26-130 - ADDENDUM #2 Page 6 of 8
Brassfield ES 2001 Brassfield Rd, Raleigh, NC 27614
Brooks ES 700 Northbrook Dr, Raleigh, NC 27609
Broughton HS 723 St Marys St, Raleigh, NC 27605
Bryan Road ES 8317 Bryan Rd, Garner, NC 27529
Buckhorn Creek ES 5651 Honeycutt Rd, Holly Springs, NC 27540
Cary HS 638 Walnut St, Cary, NC 27511
East Garner MS 6301 Jones Sausage Rd, Garner, NC 27529
East Wake HS 5101 Rolesville Rd, Wendell, NC 27591
Enloe HS 128 Clarendon Crescent, Raleigh, NC 27610
Fuquay Varina HS 201 Bengal Blvd, Fuquay-Varina, NC 27526
Fuquay Varina MS (New School) 1201 Bowling Rd, Fuquay-Varina, NC 27526
Garner HS 2101 Spring Dr, Garner, NC 27529
Green ES 5307 Six Forks Rd, Raleigh, NC 27609
Green Hope HS 2500 Carpenter Upchurch Rd, Cary, NC 27519
Green Level HS 7600 Roberts Rd, Cary, NC 27519
Herbert Akins MS 2275 Herbert Akins Rd, Fuquay-Varina, NC 27526
Heritage HS 1150 Forestville Rd, Wake Forest, NC 27587
Hilburn Drive Academy 7100 Hilburn Dr, Raleigh, NC 27613
Hilltop Needmore ES (New School) 4575 Hilltop Needmore Fuquay-Varina, NC 27526
Holly Grove MS 1401 Avent Ferry Rd, Holly Springs, NC 27540
Holly Ridge MS 950 Holly Springs Rd, Holly Springs, NC 27540
Holly Springs HS 5329 Cass Holt Rd, Holly Springs, NC 27540
Knightdale HS 100 Bryan Chalk Ln, Knightdale, NC 27545
Leesville Road HS 8410 Pride Way, Raleigh, NC 27613
RFP #251-26-130 - ADDENDUM #2 Page 7 of 8
Lincoln Heights ES 307 Bridge St, Fuquay-Varina, NC 27526
Longview HS 318 N King Charles Rd A, Raleigh, NC 27610
Lufkin Road MS 1002 Lufkin Rd, Apex, NC 27539
Middle Creek HS 123 Middle Creek Park Ave, Apex, NC 27539
Millbrook HS 2201 Spring Forest Rd, Raleigh, NC 27615
Mills Park MS 441 Mills Park Dr, Cary, NC 27519
North Garner MS 720 Powell Dr, Garner, NC 27529
North Ridge ES 7120 Harps Mill Rd, Raleigh, NC 27615
Neuse River MS 2700 Old Milburnie Rd, Raleigh, NC 27604
Oakview ES 11500 Holly Springs New Hill Rd, Apex, NC 27539
Parkside ES 332 Parkside Valley Dr, Morrisville, NC 27560
Philips HS 1923 Milburnie Rd, Raleigh, NC 27610
Pine Hollow MS 5365 Bartram Pl, Raleigh, NC 27617
Pleasant Grove ES 3605 Pleasant Grove Church Rd, Morrisville, NC 27560
Rex Road ES (New School) 6125 Rex Rd, Holly Springs, NC 27540
Riverbend MS 5601 Wallace Martin Wy, Raleigh, NC 27616
Rogers Lane ES 201 N Rogers Ln, Raleigh, NC 27610
Rolesville ES 307 S Main St, Rolesville, NC 27571
Rolesville HS 1099 E Young St, Rolesville, NC 27571
Salem MS 6150 Old Jenks Rd, Apex, NC 27523
Sanderson HS 5500 Dixon Dr, Raleigh, NC 27609
South Garner HS 8228 Hebron Church Rd, Garner, NC 27529
South Lakes ES 1449 Old Honeycutt Rd, Fuquay-Varina, NC 27526
Southeast Raleigh ES 1436 Rock Quarry Rd, Raleigh, NC 27610
RFP #251-26-130 - ADDENDUM #2 Page 8 of 8
Stough ES 4210 Edwards Mill Rd, Raleigh, NC 27612
Vandora Springs ES 1300 Vandora Springs Rd, Garner, NC 27529
Wake Forest HS 420 W Stadium Ave, Wake Forest, NC 27587
Wakefield HS 2200 Wakefield Pines Dr, Raleigh, NC 27614
Wake STEM Early College 2205 Walnut St, Cary, NC 27518
West Lake ES 4500 W Lake Rd, Apex, NC 27539
West Lake MS 4600 W Lake Rd, Apex, NC 27539
West Millbrook MS 8115 Strickland Rd, Raleigh, NC 27615
White Oaks ES 1512 White Oak Church Rd, Apex, NC 27523
Willow Springs HS 1704 Old Honeycutt Rd, Fuquay-Varina, NC 27526
Woods Creek ES 7451 Woods Creek Rd, Apex, NC 27539
York ES 5201 Brookhaven Dr, Raleigh, NC 27612
1. WCPSS Construction Design Guidelines:
BDA details on page 219, “28 40 00 BI-DIRECTIONAL AMPLIFIER SYSTEM”