RFP 25_14 ADDENDUM 2.pdf
PDF 207 KB Posted
- Attached to
- ADA- Compliant Playground Equipment
- Solicitation number
- PE-66020-NONST-2026-000000059
- Issued by
- Fulton County, Georgia
About this file
This is Addendum No. 2 for Request for Proposals (RFP) 25-14 issued by the City of South Fulton's Purchasing Department for ADA-Compliant Playground Equipment Replacements. The solicitation seeks proposals for playground equipment with multiple surfacing options, including poured-in-place rubber, engineered wood fiber, or equivalent alternatives. The pre-bid conference is scheduled for September 10, 2025, and while attendance is non-mandatory, it will be favorably considered in evaluation scoring. Proposals must be submitted electronically via BidNet by the specified deadline, with strict instructions about timely and complete uploads.
The evaluation criteria have been modified to a 100-point system, with key focus areas including compliance with scope of work (10 pts), design quality and inclusivity (25 pts), experience and qualifications (25 pts), project timeline (10 pts), a new innovation and sustainability category (10 pts), and cost (20 pts). Local vendor preferences are available for businesses with a physical office/business license in South Fulton, and additional considerations include minority-owned, women-owned, and DBE participation. Proposers must provide a maintenance plan, demonstrate use of environmentally friendly materials, and comply with specific requirements such as a Certified Playground Safety Inspector audit and assignable warranties with specified service response times.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 1 RFP 25_14 ADA Compliant Playgroun.pdf | ||
| pdf RFP 25_14 ADA_compliant Playground Equipm.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchasing Department I 4715 Frederick Dr. SW, Atlanta, GA 30336
ADDENDUM NO. 2
Solicitation No. RFP 25-14
Solicitation Title: ADA-Compliant Playground Equipment Replacements
ATTENTION ALL POTENTIAL BIDDERS:
Must Read Addendum Carefully and Follow All Instructions.
This addendum forms part of the contract documents, modifies the original bidding documents, and is as binding as if contained therein.
Return Addendum with Bid Submittal. Failure to do so may subject the Bidder to disqualification.
TO ALL PROSPECTIVE BIDDERS, PLEASE NOTE THE FOLLOWING CHANGES AND
CLARIFICATIONS:
This Addendum modifies and becomes part of the Request for Proposals (RFP) issued on September 4, 2025. Except as specifically modified by this Addendum, all other terms and conditions of the RFP remain unchanged.
1. Clarifications
• Proposals must be submitted electronically via BidNet. The City will not accept late or incomplete uploads, even if caused by system delays. Proposers are strongly encouraged to allow sufficient time for submission.
• Attendance at the Pre-Bid Conference (September 10, 2025) remains non-mandatory;
however, attendance will be considered favorably in evaluation scoring.
2. Scope of Work Revisions
• Surfacing Options: Vendors may propose more than one surfacing option (e.g., poured-in-place rubber, engineered wood fiber, or equivalent). Each option must be priced separately for comparison.
• Sustainability Requirements: Proposals must include details on the use of environmentally friendly materials, recycled content, or low-impact construction practices.
• Maintenance Plan: Proposers must submit a post-installation maintenance plan outlining preventive care, warranty servicing, and part replacement schedules.
x x https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.cityofsouthfultonga.gov%2F&data=05%7C01%7Clindell.miller%40cityofsouthfultonga.gov%7C23e2f9a62e8045020c5008dbc35be357%7Ce0f3e0436e7c4572aff6030339aec112%7C0%7C0%7C638318571653010433%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=EE3TiZKbgf3REdOICfVNp47m9ng2gHm8amBu3oyfUq4%3D&reserved=0
3. Evaluation Criteria Modification
• The Evaluation Criteria have been revised as follows (maximum 100 points):
• Compliance with Scope of Work – 10 pts
• Quality & Inclusivity of Proposed Design – 25 pts
• Experience & Qualifications – 25 pts
• Project Timeline – 10 pts
• Innovation & Sustainability – 10 pts (new)
• Cost – 20 pts
• Note: Cost weighting has been adjusted from 30 to 20 points to allow consideration of innovation and sustainability.
4. Diversity & Local Preference
• Proposers must attach proof of physical office/business license in the City of South Fulton at the time of submission to qualify for local vendor preference.
• Minority-Owned, Women-Owned, and DBE participation will be considered as part of the evaluation under “Experience & Qualifications.”
5. Contractual Modifications
• Performance Bond Replacement: If a surety is downgraded below the A.M. Best rating of A-
10 during contract performance, the Contractor must provide a replacement surety within 10 calendar days.
• Termination for Convenience: The City reserves the right to terminate the contract, in whole or in part, without penalty, if federal or state funding for the project is reduced or withdrawn.
• Price Escalation: No price increases will be allowed unless directly caused by documented federal or state regulatory changes.
6. Additional Requirements
• A Certified Playground Safety Inspector (CPSI) audit is required during and after installation.
Deficiencies must be corrected within five (5) days of notification.
• All warranties must be assignable to the City and specify maximum service response times
(no more than 10 business days).
CLARIFICATIONS / MODIFICATIONS / QUESTIONS AND ANSWERS
The City of South Fulton website is the official location for posting all solicitation addenda and contract award results. Prospective Providers are required to frequently monitor the City’s website to obtain complete and timely information. The City’s website is at https://www.cityofsouthfultonga.gov, and the Georgia Procurement Registry website is at https://ssl.doas.state.ga.us/PRSapp/PR_index.jsp. All other terms, conditions, and specifications of the solicitation remain unchanged.
Name of Company / Firm / Organization
Printed Name of Authorized Rep. / Title Signature of Authorized Representative
| 1. Clarifications |
| 2. Scope of Work Revisions |
| 3. Evaluation Criteria Modification |
| 4. Diversity & Local Preference |
| 5. Contractual Modifications |
| 6. Additional Requirements |
File details come from the government source that posted it. Updated .