RFP 24_PW08 Safe Streets for All Grant Implem.pdf

PDF 887 KB Posted

Attached to
Safe Streets for All Grant Implementation
Solicitation number
PE-66097-NONST-2024-000000023
Issued by
Fulton County, Georgia

About this file

This document is a Request for Proposals (RFP) issued by the City of Milton, Georgia for "Safe Streets for All Grant Implementation" services. The City is seeking qualifications and proposals from interested parties to provide supplementary planning and engineering services to support further development of the Local Road Safety Plan. This includes three primary tasks: 1) Completing a federally-compliant ADA Transition Plan, 2) Developing a demonstration project to install traffic calming devices at two of the City's roundabouts, and 3) Developing concepts for operational and safety improvements along two of the City's major north-south corridors. The City's budget for these three tasks is $1.1 million, which includes the 20% local match. All federal funding must be spent within 24 months of the grant executed by the Federal Highway Administration (FHWA).

The City intends to shortlist the top-ranked 3-5 statement of qualification submittals and award the contract to the top-ranked proposal among the shortlisted parties. Proposals are due by 2:00 PM EST on July 23, 2024. The City will award the contract on or around September 4, 2024. The contract will require compliance with federal regulations, including Buy America, non-discrimination, and disadvantaged business enterprise provisions.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF MILTON REQUEST FOR PROPOSALS

(THIS IS NOT AN ORDER)

RFP Number:

24-PW08

RFP Title:

Safe Streets for All Grant Implementation

Due Date and Time: July 23, 2024, by 2:00 pm EST

*Link for virtual announcement of proposals received in response to this RFP will be posted as a “Communication” under this solicitation listing on the City’s procurement portal, BidNet Direct

Number of Pages: 64

ISSUING DEPARTMENT INFORMATION

Issue Date: June 27, 2024 City of Milton Public Works Department 2006 Heritage Walk Milton, GA 30004

Phone: 678-242-2500

Website: www.miltonga.gov

INSTRUCTIONS TO OFFERORS

Electronic Submittal: **Proposals must be submitted electronically via Milton’s BidNet procurement portal/platform at www.miltonga.gov/finance/bids-rfps

If you have not registered as a vendor via BidNet we encourage you to register. There is no cost to join, and you will be notified of any potential bid opportunities with the City of Milton as well as other agencies who are part of the Georgia Purchasing Group.

Mark Envelope/Package:

RFP Number: 24-PW08 Name of Company or Firm Special Instructions:

Deadline for Written Questions July 9, 2024, by 5:00 PM EST

Submit questions online via the BidNet Direct procurement portal at www.miltonga.gov/finance/bids-rfps

IMPORTANT: SEE STANDARD TERMS AND CONDITIONS

OFFERORS MUST COMPLETE THE FOLLOWING

Offeror Name/Address: Authorized Offeror Signatory:

(Please print name and sign in ink) Offeror Phone Number: Offeror FAX Number:

Offeror Federal I.D. Number: Offeror E-mail Address:

OFFERORS MUST RETURN THIS COVER SHEET WITH RFP RESPONSE

http://www.miltonga.gov/ http://www.miltonga.gov/

2 | RFP 24-PW08

TABLE OF CONTENTS

Offeror’s RFP Checklist

Disclosure Form

Proposal Letter

Contractor Affidavit and Agreement (E-Verify)

Schedule of Events

Section 1: Project Overview and Instructions

Section 2: RFP Standard Information

Section 3: Scope of Services

Section 4: Offeror Qualifications

Section 5: Cost Proposal

Section 6: Evaluation Criteria

Appendix A with Federal Requirements

Section 7: Standard Contract Information

Sample Standard Contract

3 | RFP 24-PW08

OFFEROR’S RFP CHECKLIST

The 10 Most Critical Things to Keep in Mind When Responding to an RFP for the City of Milton

1. Read the entire document. Note critical items such as: mandatory requirements; supplies/services required; submittal dates; number of copies required for submittal; funding amount and source; contract requirements (i.e., contract performance security, insurance requirements, performance and/or reporting requirements, etc.).

2. Note the procurement officer's name, address, phone numbers and e-mail address. This is the only person you are allowed to communicate with regarding the RFP and is an excellent source of information for any questions you may have.

3. Attend the pre-qualifications conference if one is offered. These conferences provide an opportunity to ask clarifying questions, obtain a better understanding of the project, or to notify the City of any ambiguities, inconsistencies, or errors in the RFP.

4. Take advantage of the “question and answer” period. Submit your questions to the procurement officer by the due date listed in the Schedule of Events and view the answers given in the formal “addenda” issued for the RFP. All addenda issued for an RFP are posted on the City’s website at http://www.miltonga.gov/finance/bids-rfps will include all questions asked and answered concerning the

RFP.

5. Follow the format required in the RFP when preparing your response. Provide point-by-point responses to all sections in a clear and concise manner.

6. Provide complete answers/descriptions. Read and answer all questions and requirements. Don’t assume the City or evaluation committee will know what your company capabilities are or what items/services you can provide, even if you have previously contracted with the City. The submittals are evaluated based solely on the information and materials provided in your response.

7. Use the forms provided, i.e., cover page, sample budget form, certification forms, etc.

8. Check the website for RFP addenda. Before submitting your response, check the City’s website at http://www.miltonga.gov/finance/bids-rfps to see whether any addenda were issued for the RFP. If so, you must submit a signed cover sheet for each addendum issued along with your RFP response.

9. Review and read the RFP document again to make sure that you have addressed all requirements. Your original response and the requested copies must be identical and be complete. The copies are provided to the evaluation committee members and will be used to score your response.

10. Submit your response on time. Note all the dates and times listed in the Schedule of Events and within the document and be sure to submit all required items on time. Late submittal responses are never accepted.

This checklist is provided for assistance only and should not be submitted with Offeror’s response.

http://www.miltonga.gov/finance/bids-rfps%20to

4 | RFP 24-PW08

CITY OF MILTON DISCLOSURE FORM

MUST BE RETURNED WITH PROPOSAL

This form is for disclosure of campaign contributions and family member relations with City of Milton officials/employees.

Please complete this form and return it as part of your RFP package when it is submitted.

Name of Offeror

Name and the official position of the Milton Official to whom the campaign contribution was made (Please use a separate form for each official to whom a contribution has been made in the past two (2) years.)

List the dollar amount/value and description of each campaign contribution made over the past two (2) years by the Applicant/Opponent to the named Milton Official.

Amount/Value Description

Please list any family member that is currently (or has been employed within the last 12 months) by the City of Milton and your relation:

5 | RFP 24-PW08

RFP# 24-PW08

PROPOSAL LETTER

We propose to furnish and deliver all the deliverables and services named in the Request for Proposal (24-PW08), Safe Streets for All Grant Implementation.

It is understood and agreed that we have read the City’s specifications shown or referenced in the RFP and that this proposal is made in accordance with the provisions of such specifications.

By our written signature on this proposal, we guarantee and certify that all items included meet or exceed any and all such City specifications. We further agree, if awarded a contract, to deliver goods and services which meet or exceed the specifications. The City reserves the right to reject any or all proposals, waive technicalities, and informalities, and to make an award in the best interest of the City.

PROPOSAL SIGNATURE AND CERTIFICATION

I understand collusive bidding is a violation of State and Federal Law and can result in fines, prison sentences, and civil damage awards. I agree to abide by all conditions of the proposal and certify that I am authorized to sign for my company. I further certify that the provisions of the Official Code of Georgia Annotated, Sections 45-10-20 et. seq. have not been violated and will not be violated in any respect.

Authorized Signature Date

Print/Type Name

Print/Type Company Name Here

6 | RFP 24-PW08

CONTRACTOR AFFIDAVIT AND AGREEMENT

STATE OF GEORGIA

CITY OF MILTON

By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm, or corporation which is engaged in the physical performance of services on behalf of the City of Milton has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91.

Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10-91(b).

Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

E-Verify Number

Date of Authorization

I hereby declare under penalty of perjury that the foregoing is true and correct.

Executed on , , 20 in (city), (state).

Name of Contractor Signature of Authorized Officer or Agent

Safe Streets for All Grant Implementation Name of Project

City of Milton, Georgia Name of Public Employer

Printed Name and Title of Authorized Officer or Agent

SUBSCRIBED AND SWORN BEFORE ME ON

THIS THE DAY OF ,20 .

NOTARY PUBLIC

[NOTARY SEAL]

My Commission Expires:

7 | RFP 24-PW08

SCHEDULE OF EVENTS

Task Date

Issue RFP June 27, 2024

Site Visit (recommended, but not mandatory) n/a

Deadline for Questions July 9, 2024, by 5:00 p.m. EST

Answers Posted by the City (Addendum)

On or about, July 16, 2024

Proposals Due By 2:00 p.m. EST on July 23, 2024

Award Contract September 4, 2024 (proposed)

NOTE: PLEASE CHECK THE CITY WEBSITE (http://www.miltonga.gov/finance/bids-rfps) FOR ADDENDA AND SCHEDULE UPDATES.

8 | RFP 24-PW08

SECTION 1: PROJECT OVERVIEW AND INSTRUCTIONS

1.0 PROJECT SUMMARY AND STATEMENT OF INTENT

The City of Milton is requesting qualifications and proposals from interested parties to provide supplementary planning and engineering services to support further development of the Local Road Safety Plan. This will include three primary tasks. 1) Complete a federally-compliant ADA Transition Plan which includes data collection, identification of physical obstacles that limit accessibility of all publicly owned facilities to individuals with disabilities, recommendations on how to solve the obstacles, and a financially-constrained schedule to implement the recommendations. 2) Develop a demonstration project to install traffic calming devices at two of the City’s roundabouts. This will include extensive data collection to determine what operational and safety issues are currently happening at the roundabouts, selection of countermeasures designed to solve the issues, and data collection after the countermeasures are installed to determine effectiveness. 3) Develop concepts for operational and safety improvements along two of the City’s major north-south corridors, Hopewell Road and Freemanville Road. This will likely include data collection, road safety audits, and concept work to develop future scopes and budgets for future projects. This effort will also include coordination with partners from Georgia Tech who will be using real-world roadway geometry extraction and evidence-based safety condition assessments with low-cost mobile devices and machine learning (NCHRP IDEA Project 214).

The City’s intent is to shortlist the top-ranked 3-5 statement of qualification submittals and award the contract to the top-ranked proposal among the shortlisted parties. Technical proposals will only be requested from the shortlisted parties.

The City’s intent is to begin Tasks 1 and 2 as quickly as possible after contract award. Task 3 will begin once Tasks 1 and 2 are far enough along to determine the remaining federal funding for Task 3.

The City’s budget for the three (3) tasks above is $1.1 Million which includes the 20% local match. All federal funding must be spent within 24 months of the grant executed by FHWA.

This RFP will assume that date is June 1, 2026.

1.1 SINGLE POINT OF CONTACT

From the date this Request for Proposals (RFP) is issued until a Contractor is selected, Offerors are not allowed to communicate with any City staff or elected officials regarding this procurement except at the direction of Honor Motes, Procurement Manager. Any unauthorized contact may disqualify the Offeror from further consideration. Contact information for the single point of contact is:

Procurement Office: Honor Motes, Procurement Manager Address: 2006 Heritage Walk, Milton, GA 30004 Telephone Number: 678-242-2507 E-mail Address: honor.motes@miltonga.gov mailto:honor.motes@miltonga.gov

9 | RFP 24-PW08

1.2 REQUIRED REVIEW

A. Review RFP.

Offerors should carefully review the instructions; mandatory requirements, specifications, standard terms and conditions, and standard contract set out in this RFP and promptly notify the procurement office identified above via e-mail of any ambiguity, inconsistency, unduly restrictive specifications, or error which they discover upon examination of this RFP.

B. Form of Questions.

Offerors with questions or requiring clarification or interpretation of any section within this RFP must submit their questions via the solicitation link on BidNet Direct, the procurement portal on the City’s website, on or before 5 PM (EST) on July 9, 2024.

Each question must provide clear reference to the section, page, and item in question. Questions received after the deadline may not be considered.

C. City’s Answers.

The City will provide an official written answer to all questions on or about July 16, 2024.

The City's response will be by formal written addendum. Any other form of interpretation, correction, or change to this RFP will not be binding upon the City. Any formal written addendum will be posted alongside the posting of the RFP at http://www.miltonga.gov/finance/bids-rfps .Offerors must sign and return any addendum with their RFP response.

D. Standard Contract.

By submitting a response to this RFP, Offeror agrees to acceptance of the City’s standard contract. Much of the language included in the standard contract reflects requirements of State law. Requests for exceptions to the standard contract terms, or any added provisions must be submitted to the procurement office referenced above by the date for receipt of written/e-mailed questions or with the Offeror’s RFP response and must be accompanied by an explanation of why the exception is being taken and what specific effect it will have on the Offeror’s ability to respond to the RFP or perform the contract. The City reserves the right to address non-material, minor, insubstantial requests for exceptions with the highest scoring Offeror during contract negotiation. Any material, substantive, important exceptions requested and granted to the standard terms and conditions and standard contract language will be addressed in any formal written addendum issued for this RFP and will apply to all Professionals submitting a response to this RFP.

E. Mandatory Requirements.

To be eligible for consideration, an Offeror must meet the intent of all mandatory requirements. The City will determine whether an Offeror’s RFP response complies with the intent of the requirements. RFP responses that do not meet the full intent of all requirements listed in this RFP may be subject to point reductions during the evaluation process or may be deemed non- responsive.

1.3 NON-DISCRIMINATION

All qualified applicants will receive consideration without regard to age, handicap, religion, creed or belief, political affiliation, race, color, sex, or national origin.

10 | RFP 24-PW08

1.4 SUBMITTING PROPOSALS

Consultants must organize their proposal into sections that follow the following format.

A. Submittal Requirements.

Proposals shall include the following:

1. City of Milton request for proposal cover page (information entered and signed:

first page of this document)

2. City of Milton Disclosure form (signed)

3. City of Milton Proposal letter (information entered)

4. Statement of Qualifications Submittal

Each Statement of Qualifications Shall Contain:

a. No more than six (6) pages

b. Cover page(s), table of contents, tabs, and required forms do not count toward the page limit

c. Minimum of 11-point font

d. Cover letter – introductory remarks and proposal summary (1 page)

e. Design Team – include project staffing, list any proposed subconsultants, qualifications of the design team, and what sets the team apart

f. Related Projects and References – Describe any similar projects with references and the degree of involvement of the team

g. Key personnel resumes may be included in the appendix. Appendix items will not count toward page limit.

5. Technical Proposal Submittal

Each Technical Proposal Shall Contain:

a. No more than fifteen (15) pages

b. Minimum of 11-point font

c. Electronic submittal in PDF format, no hard copies are required

d. Cover letter – introductory remarks and proposal summary (1 page)

e. Work Plan – Describe team’s plans to provide the requested services, and a description of the proposed methodology to accomplish the required tasks

f. Schedule – Provide a schedule to complete tasks 1-3 that meets the terms of the City’s grant agreement requirements

6. Qualifications and related project information in the proposal will be used in the scoring.

7. Applicable Addenda Acknowledgement Forms (if necessary)

Consultants must organize their proposal into sections that follow the format of Section 1.4 and Section 5.0.

11 | RFP 24-PW08

B. Failure to Comply with Instructions.

Offerors failing to comply with these instructions may be subject to point deductions. The City may also choose to not evaluate, may deem non-responsive, and/or may disqualify from further consideration any qualifications that do not follow this RFP format, are difficult to understand, are difficult to read, or are missing any requested information.

C. Electronic Submittal Required and Deadline for Receipt of Proposals.

Proposals must be submitted electronically via Milton’s BidNet procurement portal/platform at www.miltonga.gov/finance/bids-rfps by 2:00 PM on July 23, 2024.

Proposals will be opened at approximately 2:30 p.m. and names of Firms will be announced. *Link for virtual announcement of proposals received in response to this RFP will be posted as a “Communication” under this solicitation listing on the City’s procurement portal, BidNet Direct.

D. Late Proposals.

Regardless of cause, late proposals will not be accepted and will automatically be disqualified from further consideration. It shall be the Offeror’s sole risk to assure proposals are submitted via the BidNet Direct procurement portal by the designated time. Late proposals will not be accepted.

1.5 OFFEROR'S CERTIFICATION

By submitting a response to this RFP, Offeror agrees to an understanding of and compliance with the specifications and requirements described in this RFP.

1.6 COST OF PREPARING PROPOSALS

A. City Not Responsible for Preparation Costs.

The costs for developing and delivering responses to this RFP and any subsequent presentations of the proposal as requested by the City are entirely the responsibility of the Offeror. The City is not liable for any expense incurred by the Offeror in the preparation and presentation of their proposals.

B. All Timely Submitted Materials Become City Property.

All materials submitted in response to this RFP become the property of the City of Milton and are to be appended to any formal documentation, which would further define or expand any contractual relationship between the City and Offeror resulting from this RFP process.

SECTION 2: RFP STANDARD INFORMATION

2.0 AUTHORITY

This RFP is issued under the authority of the City of Milton. The RFP process is a procurement option allowing the award to be based on stated evaluation criteria. The RFP states the relative importance of all evaluation criteria. No other evaluation criteria, other than as outlined in the RFP, will be used.

12 | RFP 24-PW08

2.1 OFFEROR COMPETITION

The City encourages free and open competition among Offerors. Whenever possible, the City will design specifications, proposal requests, and conditions to accomplish this objective, consistent with the necessity to satisfy the City’s need to procure technically sound, cost-effective services and supplies.

2.2 RECEIPT OF PROPOSALS AND PUBLIC INSPECTION

A. Public Information.

All information received in response to this RFP, including copyrighted material, is deemed public information and will be made available for public viewing and copying after the time for receipt of qualifications has passed, and the award has been made, with the following four exceptions: (1) bona fide trade secrets meeting confidentiality requirements that have been properly marked, separated, and documented; (2) matters involving individual safety as determined by the City of Milton; (3) any company financial information requested by the City of Milton to determine vendor responsibility, unless prior written consent has been given by the Offeror; and (4) other constitutional protections.

B. Procurement Officer Review of Proposals.

Upon opening the submittals received in response to this RFP, the procurement office will review the proposals and separate out any information that meets the referenced exceptions in Section 2.2(A) above, providing the following conditions have been met:

1. Confidential information is clearly marked and separated from the rest of the submittal.

2. An affidavit from an Offeror’s legal counsel attesting to and explaining the validity of the trade secret claim is attached to each submittal containing trade secrets. Please contact Honor Motes, Procurement Manager, for additional information.

Information separated out under this process will be available for review only by the procurement office, the evaluation committee members, and limited other designees. Offerors must be prepared to pay all legal costs and fees associated with defending a claim for confidentiality in the event of a “right to know” (open records) request from another party.

2.3 CLASSIFICATION AND EVALUATION OF PROPOSALS

A. Initial Classification of Proposals as Responsive or Nonresponsive.

Proposals may be found nonresponsive at any time during the evaluation process or contract negotiation, if any of the required information is not provided; the submitted price is found to be excessive or inadequate as measured by criteria stated in the RFP; or the qualification is not within the specifications described and required in the RFP. If a qualification is found to be nonresponsive, it will not be considered further.

13 | RFP 24-PW08

B. Determination of Responsibility.

The procurement office will determine if an Offeror has met the standards of responsibility. Such a determination may be made at any time during the evaluation process and through contract negotiation if information surfaces that would result in a determination of nonresponsive.

C. Evaluation of Proposals.

The evaluation committee will evaluate the remaining proposals and recommend whether to award the contract to the highest scoring Offeror or, if necessary, to seek discussion/negotiation to determine the highest scoring Offeror. All responsive proposals will be evaluated based on stated evaluation criteria. In scoring against stated criteria, the City may consider such factors as accepted industry standards and a comparative evaluation of all other qualified RFP responses. These scores will be used to determine the most advantageous offering to the City.

D. Completeness of Proposals.

Selection and award will be based on the Offeror’s proposals and other items outlined in this RFP. Submitted responses may not include references to information located elsewhere, such as Internet websites or libraries, unless specifically requested. Information or materials presented by Offerors outside the formal response or subsequent discussion/negotiation, if requested, will not be considered, will have no bearing on any award, and may result in the Offeror being disqualified from further consideration.

E. Opportunity for Discussion/Negotiation and/or Oral Presentation/Product

Demonstration.

After receipt of all proposals and prior to the determination of the award, the City may initiate discussions with one or more Offerors should clarification or negotiation be necessary. Offerors may also be required to make an oral presentation and/or product demonstration to clarify their RFP response or to further define their offer. In either case, Offerors should be prepared to send qualified personnel to Milton, Georgia to discuss technical and contractual aspects of the submittal. Oral presentations and product demonstrations, if requested, shall be at the Offeror’s expense.

F. Best and Final Offer The “Best and Final Offer” is an option available to the City under the RFP process which permits the City to request a “best and final offer” from one or more offerors if additional information is required to make a final decision.

Offerors may be contacted asking that they submit their “best and final offer,” which must include any and all discussed and/or negotiated changes. The City reserves the right to request a “best and final offer” for this RFP, if any, based on price/cost alone.

G. Evaluation Committee Recommendation for Contract Award.

The evaluation committee will provide a written recommendation for contract award.

14 | RFP 24-PW08

H. Request for Documents Notice.

Upon concurrence with the evaluation committee’s recommendation for contract award, the procurement officer may issue a “Request for Documents Notice” to the highest scoring Offeror to obtain the required insurance documents, contract performance security, and any other necessary documents. Receipt of the “Request for Documents Notice” does not constitute a contract and no work may begin until a contract signed by all parties is in place.

I. Contract Negotiation.

The procurement officer and/or city department representatives may begin contract negotiation with the responsive and responsible Offeror whose submittal achieves the highest score and is, therefore, the most advantageous to the City. If contract negotiation is unsuccessful or the highest scoring Offeror fails to provide necessary documents or information in a timely manner, or fails to negotiate in good faith, the City may terminate negotiations and begin negotiations with the next highest scoring Offeror.

J. Contract Award.

Contract award, if any, will be made to the highest scoring Offeror who provides all required documents and successfully completes contract negotiation.

2.4 RIGHTS RESERVED

While the City has every intention to award a contract as a result of this RFP, issuance of the RFP in no way constitutes a commitment by the City of Milton to award and execute a contract. Upon a determination such actions would be in its best interest, the City, in its sole discretion, reserves the right to:

1. Modify, cancel, or terminate this RFP,

2. Reject any or all proposals received in response to this RFP,

3. Select an Offeror without holding interviews,

4. Waive any undesirable, inconsequential, or inconsistent provisions of this RFP which would not have significant impact on any submittal,

5. To request further documentation or information, and to discuss an RFP submittal for any purpose to answer questions or to provide clarification,

6. Award a portion of this RFP or not award any portion of this RFP if it is in the best interest of the City not to proceed with contract execution; or

7. If awarded, terminate any contract in accordance with the terms and conditions of the contract if the City determines adequate funds are not available.

15 | RFP 24-PW08

SECTION 3: SCOPE OF PROJECT

3.0 PROJECT LOCATION

This effort will include analysis of specified roundabouts and corridors and accessibility of all of the city right of way and city-owned facilities which includes parks and buildings.

3.1 GENERAL SCOPE OF SERVICES

It shall be the Consultant’s responsibility to design, prepare, assemble and coordinate the necessary documents to complete the project. The completed design must comply with all applicable local, state, and federal environmental laws and regulations.

At a minimum, the following standards shall be utilized for the project:

a. Georgia Department of Transportation (GDOT) Design Policy Manual (current edition), and applicable addenda.

b. Georgia Department of Transportation (GDOT) Standards and Specifications (current edition), and applicable addenda.

c. AASHTO Standards, latest edition and applicable addenda, including Design of Pavement Structures, Policy on Geometric Design of Highways and Streets, Roadside Design Guide, and applicable addenda.

d. Manual on Uniform Traffic Control Devices (MUTCD) 11th edition

e. Public Right of Way Accessibility (PROWAG) final rule from the US Access Board.

f. Federal Highway Administration Guides.

g. City of Milton Code of Ordinances.

3.2 BACKGROUND

The City of Milton is requesting qualifications and proposals from interested parties to provide supplementary planning and engineering services to support further development of a Local Road Safety Plan. This will include three primary tasks. 1) Complete a federally-compliant ADA Transition Plan which includes data collection, identification of physical obstacles that limit accessibility of all publicly owned facilities to individuals with disabilities, recommendations on how to solve the obstacles, and a financially-constrained schedule to implement the recommendations. 2) Develop a demonstration project to install traffic calming devices at two of the city’s roundabouts. This will include extensive data collection to determine what operational and safety issues are currently happening at the roundabouts, selection of countermeasures designed to solve the issues, and data collection after the countermeasures are installed to determine effectiveness. 3) Develop concepts for operational and safety improvements along two of the City’s major north-south corridors, Hopewell Road and Freemanville Road. This will likely include data collection, road safety audits, and concept work to develop future scopes and budgets for future projects. This effort will also include coordination with partners from Georgia Tech who will be using real-world roadway geometry extraction and evidence-based safety condition assessments with low-cost mobile devices and machine learning (NCHRP IDEA Project 214).

The Local Road Safety Plan was adopted by Mayor and City Council in August 2022. Local Road Safety Plan

$1 Million in federal funding was awarded to the City of Milton based on the three (3) tasks listed above. The City will contribute 20 % matching funds for the projects.

https://www.miltonga.gov/home/showpublisheddocument/6146/637999731675030000 https://www.miltonga.gov/home/showpublisheddocument/6146/637999731675030000

16 | RFP 24-PW08

LRSP Vision and Mission The City has determined a vision and mission for the LRSP that aligns with the City’s 2021 Strategic Plan.

• LRSP Vision Statement The City of Milton will have a transportation system that is safe, offers a diversity of travel, and that allows our citizens to traverse safely and calmly throughout our city.

• LRSP Mission Statement The City of Milton proactively strives through our Local Road Safety Plan to address roadway concerns through a combination of engineering, enforcement, education, and emergency services to strategically make our roadways as safe as possible.

Community Engagement and Survey The City of Milton has an engaged community. Extensive public involvement was completed in 2021 and 2022 to guide the development of the Local Road Safety Plan. All three tasks in this scope should include a public outreach component.

The stakeholders and partners will be engaged throughout this process will include:

• Community

• Public Works Staff

• Police Department Traffic Staff

• Communications Department

• Mayor and City Council

• Georgia Department of Transportation

• Federal Highway Administration (for guidance)

3.3 SPECIFIC SCOPE OF SERVICES

Task 1: ADA Transition Plan Complete a federally-compliant ADA Transition Plan which includes data collection, identification of physical obstacles that limit accessibility of all city owned facilities to individuals with disabilities, recommendations on how to solve the obstacles, and a financially-constrained schedule to implement the recommendations. For this scope, the City will be treating the latest MUTCD and PROWAG guidance as final while the approvals through DOJ and DOT happen.

A key component of this task will be the proposed data collection methodology and scope.

All data collected in this task will need to be provided in a format that can be input to the City’s GIS ESRI software and asset management platform (OpenGov) as seamlessly as possible.

The City may also supplement this contract with additional local funding to expand the scope of data being collected beyond what is required for the ADA Transition Plan, in order to provide more data to the OpenGov tool. This could include but is not limited to: an update to the 2010 stormwater inventory, signs, striping, and pavement condition. *Future Optional Task 4.

The City may also supplement this contract with additional grant funding to add a Facilities Condition Assessment to the scope. The proposals should clearly identify whether they have the capability to deliver this as additional effort. It will not be included in the City’s proposal evaluation review. *Future Optional Task 5.

17 | RFP 24-PW08

Task 2: Traffic Calming Demonstration Project Develop a demonstration project to install traffic calming devices at two of the City’s roundabouts. This will include extensive data collection to determine what operational and safety issues are currently happening at the roundabouts, selection of countermeasures designed to solve the issues, and data collection after the countermeasures are installed to determine effectiveness.

Two of the City’s roundabouts will be selected for this demonstration project after a cursory review of the current conditions. Staff expects that Hopewell Road at Thompson Road and Hopewell Road at Bethany Bend will likely be chosen based on resident feedback and a review of the data since both roundabouts were opened to traffic.

This task will include all data collection needed from a research perspective to conclude whether the countermeasures were effective or not. Staff will also need a toolbox of countermeasures with expected outcomes to apply to other intersections once this effort is completed.

The purchase and installation of traffic calming devices that will be monitored as a part of this task will be contracted separately by the City.

Task 3: Freemanville Road and Hopewell Road Concept Development Develop concepts for operational and safety improvements along two of the City’s major north-south corridors, Hopewell Road and Freemanville Road. This will likely include data collection, road safety audits, and concept work to develop future scopes and budgets for future projects. This effort will also include coordination with partners from Georgia Tech who will be using real-world roadway geometry extraction and evidence-based safety condition assessments with low-cost mobile devices and machine learning (NCHRP IDEA Project 214).

The contract with Georgia Tech will be separate from this scope and handled by the City of Milton. The City expects that both parties will work cooperatively.

Staff intends to spend all remaining federal funding towards advancement of projects along these two corridors that will improve operations and improve safety for all users. A key portion of this effort will be determining how to best accommodate active transportation needs along the two corridors while reducing the ability for vehicles to travel 10-20+ mph over the posted speed limit.

18 | RFP 24-PW08

SECTION 4: OFFEROR PROPOSALS

4.0 CITY’S RIGHT TO INVESTIGATE

The City may make such investigations as deemed necessary to determine the ability of the Offeror to provide the supplies and/or perform the services specified.

4.1 OFFEROR INFORMATIONAL REQUIREMENTS

Firms interested in providing the services described in this RFP should be able to demonstrate experience in the areas described in Section 3.

19 | RFP 24-PW08

SECTION 5: COST PROPOSAL:

Intentionally Omitted at this Stage/Phase ~ Qualifications-Based Selection for federal funds

*Cost will only be requested from the highest ranked Offeror from the Proposal Evaluation Process*

20 | RFP 24-PW08

SECTION 6: EVALUATION CRITERIA

6.0 EVALUATION CRITERIA

The evaluation committee will review and evaluate the proposals according to the following criteria:

• A selection team for the City will initially evaluate and score all submittals received.

• Proposals not meeting the minimum requirements and those who are non-responsive will not be considered.

• A Cost Proposal will be only be requested from the highest ranked firm at the end of the proposal evaluation process.

Statement of Qualifications Criteria:

Qualifications of the Design Team 25 pts.

• Organizational strength and stability

• Education and experience of the assigned staff

• Key personnel’s level of involvement

• Proximity and availability of key personnel

Related Projects and References 25 pts.

• Experience and technical competence on similar projects

• Previous experience as a design team

• Quality of the final work product

• Ability to meet the schedule

Work Plan 50 pts.

• Community outreach plan

• Project approach

• Project innovations

• Schedule

• Maximizing the amount of work product developed from Task 3

21 | RFP 24-PW08

**Interviews will only be considered from the short-listed firms from the technical evaluation**

Total Possible Points Available are 100 points.

1. Interviews and Product Demonstration

If applicable, short-listed Vendors will be invited to make a presentation to City of Milton.

At this time, they can provide live demonstrations and discuss the benefits with the City. A question and answer will follow the presentation.

2. Final Ranking Upon completion of the interviews and demonstrations, the evaluation committee will rank the short-listed proposals based on a combination of the evaluation scores and presentation scores. The top-ranked proposal will be recommended for contract award, pending successful negotiations.

22 | RFP 24-PW08

Appendix A: Federal Requirements To City of Milton Request for Proposals/Statement of Qualifications

RFP 24-PW08, Safe Streets for All Grant Implementation

B-5

APPENDIX A

During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the “contractor”) agrees as follows:

1. Compliance with Regulations: The contractor (hereinafter includes consultants) will comply with the Acts and the Regulations relative to Non-discrimination in Federally-assisted programs of the U.S. Department of Transportation, Federal Highway Administration (FHWA), as they may be amended from time to time, which are herein incorporated by reference and made a part of this contract.

2. Non-discrimination: The contractor, with regard to the work performed by it during the contract, will not discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The contractor will not participate directly or indirectly in the discrimination prohibited by the Acts and the Regulations, including employment practices when the contract covers any activity, project, or program set forth in Appendix B of 49 C.F.R. Part 21.

3. Solicitations for Subcontracts, Including Procurements of Materials and Equipment:

In all solicitations, either by competitive bidding, or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials, or leases of equipment, each potential subcontractor or supplier will be notified by the contractor of the contractor’s obligations under this contract and the Acts and the Regulations relative to Non-discrimination on the grounds of race, color, or national origin.

4. Information and Reports: The contractor will provide all information and reports required by the Acts, the Regulations, and directives issued pursuant thereto and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Recipient or the FHWA to be pertinent to ascertain compliance with such Acts, Regulations, and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish the information, the contractor will so certify to the Recipient or the FHWA, as appropriate, and will set forth what efforts it has made to obtain the information.

5. Sanctions for Noncompliance: In the event of a contractor’s noncompliance with the

Non-discrimination provisions of this contract, the Recipient will impose such contract sanctions as it or the FHWA may determine to be appropriate, including, but not limited to:

a. withholding payments to the contractor under the contract until the contractor complies; and/or

b. cancelling, terminating, or suspending a contract, in whole or in part.

6. Incorporation of Provisions: The contractor will include the provisions of paragraphs one through six in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts, the Regulations and directives issued pursuant

B-6 thereto. The contractor will take action with respect to any subcontract or procurement as the Recipient or the FHWA may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, that if the contractor becomes involved in, or is threatened with litigation by a subcontractor, or supplier because of such direction, the contractor may request the Recipient to enter into any litigation to protect the interests of the Recipient. In addition, the contractor may request the United States to enter into the litigation to protect the interests of the United States.

B-11

APPENDIX E

During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the “contractor”) agrees to comply with the following non-discrimination statutes and authorities; including but not limited to:

Pertinent Non-Discrimination Authorities:

Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin); and 49 C.F.R. Part 21.

The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects);

Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits discrimination on the basis of disability); and 49 C.F.R. Part 27;

The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits discrimination on the basis of age);

Airport and Airway Improvement Act of 1982, (49 U.S.C. § 471, Section 47123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex);

The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms “programs or activities” to include all of the programs or activities of the Federal-aid recipients, sub-recipients and contractors, whether such programs or activities are Federally funded or not);

Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 U.S.C. §§ 12131 – 12189) as implemented by Department of Transportation regulations at 49 C.F.R. Parts 37 and 38;

The Federal Aviation Administration’s Non-discrimination statute (49 U.S.C. § 47123) (prohibits discrimination on the basis of race, color, national origin, and sex);

Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, which ensures nondiscrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations;

Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100);

Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. § 1681 et seq).

23 | RFP 24-PW08

Certifications Regarding Conflict of Interest; Tax Delinquency; Lobbying

By submitting a bid, each contractor certifies that to the best of its knowledge no circumstances exist which will cause a conflict of interest in performing the services required by this ITB, that no employee of the City, nor any member thereof, nor any public agency or official affected by the proposed contract for services has any pecuniary interest in the business of the firm or its subcontractor(s), and that no person associated with the firm or its subcontractor(s) has any interest that would conflict in any manner or degree with the performance of the proposed contract.

By submitting a bid, the bidder certifies the accuracy of the following two statements: (1) The bidder represents that it is not a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability. (2) The bidder represents that it is not a corporation that was convicted of a criminal violation under any Federal law within the preceding 24 months.

By submitting a bid, the bidder certifies, to the best of his or her knowledge and belief, that:

(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the bidder, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.

(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions.

(3) The undersigned shall require that the language of this certification be included in the award documents for all sub-awards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all sub-recipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by section 1352, title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

24 | RFP 24-PW08

Equal Opportunity

All work procured and performed must strictly comply with federal Equal Employment Opportunity requirements (Executive Order No. 11246 and amendments and supplements to that Order). More details regarding these requirements are found in Exhibit N.1 to the Sample Contract attached to the RFP.

25 | RFP 24-PW08

Standard Federal Equal Employment Opportunity Construction Contract Specifications (Executive Order 11246)

1. As used in these specifications:

a. “Covered area” means the geographical area described in the solicitation from which this contract resulted;

b. “Director” means Director, Office of Federal Contract Compliance Programs, United States Department of Labor, or any person to whom the Director delegates authority;

c. “Employer identification number” means the Federal Social Security number used on the Employer's Quarterly Federal Tax Return, U.S. Treasury Department Form 941.

d. “Minority” includes:

(i) Black (all persons having origins in any of the Black African racial groups not of Hispanic origin);

(ii) Hispanic (all persons of Mexican, Puerto Rican, Cuban, Central or South American or other Spanish Culture or origin, regardless of race);

(iii) Asian and Pacific Islander (all persons having origins in any of the original peoples of the Far East, Southeast Asia, the Indian Subcontinent, or the Pacific Islands); and

(iv) American Indian or Alaskan Native (all persons having origins in any of the original peoples of North America and maintaining identifiable tribal affiliations through membership and participation or community identification).

2. Whenever the Contractor, or any Subcontractor at any tier, subcontracts a portion of the work involving any construction trade, it shall physically include in each subcontract in excess of $10,000 the provisions of these specifications and the Notice which contains the applicable goals for minority and female participation and which is set forth in the solicitations from which this contract resulted.

3. If the Contractor is participating (pursuant to 41 CFR 60-4.5) in a Hometown Plan approved by the U.S.

This is the start of the file's text. The full file is on GovTribe.