RFP 24_023 Addendum 1.pdf
PDF 144 KB Posted
- Solicitation number
- PE-66098-NONST-2024-000000010
- Issued by
- Fulton County, Georgia
About this file
This document is Addendum Number 1 for Request for Proposal (RFP) #24-023 S2122 GLENRIDGE DRIVE SIDEPATH (HAMMOND DRIVE TO WELLINGTON TRACE) issued by the City of Sandy Springs. The addendum includes answers to questions and updates to the original RFP. The project involves the design and construction of a new sidepath along Glenridge Drive from Hammond Drive to Wellington Trace. The due date for responses to the RFP has been changed from November 3rd, 2023 at 2:00 P.M. to November 3rd, 2023 at 4:30 P.M. The addendum also clarifies requirements, such as the need for utility impact analysis reports, utility research and relocation, survey limits, wetlands identification, and intersection design at impacted areas. It confirms that the contractor will be responsible for providing the traffic control plan, and that the design must include future connections across Hammond Drive and Glenridge Drive.
The addendum does not provide any information on pricing terms, set asides, incumbents, funding requirements or sources, or other financial details. It focuses solely on technical requirements and clarifications to the original RFP.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24_023 S2122 Glenridge Drive Sidepath (Hammon.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum Number 1
RFP #24-023 S2122 GLENRIDGE DRIVE SIDEPATH (HAMMOND DRIVE TO WELLINGTON TRACE)
COMPLETE THIS ADDENDUM, SIGN and SUBMIT with the RFP
RESPONSE DUE DATE: November 3rd, 2023 at 4:30 P.M.
To All Prospective Offerors: In reference to the RFP listed above, the following answers to questions, additions, deletions, and changes are hereby incorporated into the RFP:
The close time for RFP 24-023 changed from November 3rd, 2023 at 2:00 P.M. to November 3rd, 2023 at
4:30 P.M.
Updates**
Question 1: Will the City of Sandy Spring require No Conflict letters and/or utility agreements for relocations if the new trail conflicts with existing utilities?
Answer: Yes
Question 2: Confirm that the city will need Utility Impact Analysis Reports (how utilities are impacted and cost resolution) for relocation is needed.
Answer: Yes
Question 3: Will the city provide records research for the utilities and easements, or should the prime assume all research to be self-provided.
Answer: Prime assumes all research.
Question 4: Please confirm if a Pole data table is required. Could we provide pole IDs and confirm services attached to the pole in leu of a PDT.
Answer: Follow GDOT Plan Development Process (PDP)
Question 5: The limits for Survey are currently described in a linear fashion. Could we get a further definition of the corridor width limits of the survey? i.e. RW to RW or 20’ beyond RW on West side of road for example.
Answer: Right-of-Way (RW) on the west side to 50’ beyond existing ROW on the east side of Glenridge
Drive.
Question 6: Is there an estimated number of affected parcels that will require new easement and/or RW takes that will be requiring individual easement or RW plats for?
Answer: No
Question 7: Should Survey RW staking be considered for just the estimated number of affected parcels or throughout the entire corridor?
Answer: Right-of-Way staking for the entire corridor.
Question 8: Will the project be exempt from Sandy Springs water quality requirements due to this being a linear project?
Answer: Yes
Question 9: Will the City require the design to include detention to offset the additional impervious cover of the pedestrian path.
Answer: It’s not anticipated that the design will need detention.
Question 10: Will the project team need to provide an environmental survey to identify any possible wetlands in the area.
Answer: Yes
Question 11: Will the City require a traffic control plan to be provided by the engineer, or will this be provided by the contractor.
Answer: The contractor will be required to provide the traffic control plan.
Question 12: Will the City require the design team to provide intersection designs at impacted intersections or will a signal plan showing the new pole locations be enough.
Answer: The City will require the design team to provide intersection designs at impacted intersections.
Question 13: Will designs need to include future connections across Hammond Drive and Glenridge
Drive
Answer: Yes, coordination will need to take place with the S2193 Hammond Drive Corridor Project.
Question 14: Will overhead connectivity need to be shown by the SUE provider.
Answer: Yes
I hereby acknowledge receipt of Addendum Number 1 for 24-023 S2122 Glenridge Drive Sidepath
(Hammond Drive to Wellington Trace) and have incorporated the changes into my response for the above mentioned RFP.
COMPANY NAME:
CONTACT PERSON:
ADDRESS:
CITY: _________________________________STATE: ___________ ZIP: ________________________
PHONE: ________________ FAX: _______________
EMAIL ADDRESS: ______________________________________
SIGNATURE: ____________________________________________
DATE: ______________________________________