This document is a Request for Proposal (RFP) issued by the Michigan Department of Transportation (MDOT) for HMA overlay and waterproofing membrane removal on the Eastbound Blue Water Bridge in the City of Port Huron, St. Clair County. The scope of work includes cold milling the existing HMA overlay and waterproofing membrane, and reinstalling HMA on a 200' x 10' test area of the bridge deck. The RFP has an issue date of August 10, 2023, with a proposal deadline of August 21, 2023, and an anticipated contract start date of September 8, 2023. The work must be completed by October 1, 2023.
The RFP requires bidders to be currently listed as MDOT Prequalified Contractors in the N9-1A (Bridge Deck Repair) and Cb (Hot Mix Asphalt/Bituminous Paving) categories. Pricing will be firm for the entire contract term, and payment will be made through Electronic Funds Transfer. The State may assess liquidated damages if the work is not completed on time. The contract will be awarded to the responsive and responsible bidder with the lowest price.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Michigan.gov/MiProcurement proposal instructions Department of Transportation HMA Overlay and Waterproofing Membrane Removal on EB Blue Water Bridge, in City of Port Huron Request for Proposal No. 230000002938 Solicitation Manager Name: Laura Dotson Direct Phone: 517- 230-1612 Email: DotsonL2@michigan.gov
This is a Request for Proposal (RFP) for services to perform HMA cold milling of existing deck overlay, removal of waterproofing member, and placement of HMA on the EB Blue Water Bridge, in City of Port Huron.
RFP Timeline
| Event |
| Time |
| Date |
RFP issue date
| Thursday, August 10, 2023 |
| Deadline for bidders to submit questions about this RFP |
| 12:00 p.m. Eastern |
| Tuesday, August 15, 2023 |
| Anticipated date the State will post answers to bidder questions on www.michigan.gov/SIGMAVSS |
| Wednesday, August 16, 2023 |
| Proposal deadline* |
| 3:00 p.m. Eastern |
| Monday, August 21, 2023 |
| Anticipated contract begin date |
| Friday, September 8, 2023 |
| Work completion deadline |
| N/A |
| October 1, 2023 |
*A bidder’s proposal received at 3:00:01 p.m. Eastern is late and subject to disqualification.
This RFP is subject to change. Check www.michigan.gov/SIGMAVSS for current information.
1. PROPOSAL PREPARATION. The State recommends reading all RFP materials prior to preparing a proposal, particularly these Proposal Instructions and the Vendor Questions Worksheet. Bidders must follow these Proposal Instructions and provide a complete response to the items indicated in the RFP Structure and Documentation table below. References and links to websites or external sources may not be used in lieu of providing the information requested in the RFP within the proposal. Include the bidder’s company name in the header of all documents submitted with your proposal. Note that all documents and information submitted as part of a proposal will become public record immediately upon receipt by the State. Proposals received by the State may be posted on the State’s publicly available website after bidders are notified of the award recommendation.
RFP Structure and Documentation
| Document |
| Description |
| Bidder Response Instructions |
| Cover Page |
| Provides RFP title and number, important dates, and contact information for Solicitation Manager |
| Informational |
| Proposal Instructions |
| Provides RFP instructions to bidders |
| Informational |
| Confidential Treatment Form |
| Required verification on whether bidder’s proposal contains confidential information |
| Bidder to complete and submit by proposal deadline |
| Vendor Questions Worksheet |
| Questions to bidders on background and experience |
| Bidder to complete and submit by proposal deadline |
| Schedule A – Statement of Work |
| Statement of work |
| Bidder to complete and submit by proposal deadline |
| Schedule B – Pricing |
| Pricing for goods and services sought by the State through this RFP |
| Bidder to complete and submit by proposal deadline |
| Contract Terms |
| Provides legal terms for a contract awarded through this RFP |
| Deemed accepted by bidder unless information required in the Evaluation Process section of this document is submitted by proposal deadline |
| Attachment 1 – Work Area |
| Provides map location of work area |
| Informational |
| Attachment 1 B04-3 Plan |
| Plan view of work area |
| Informational |
| Attachment 1 B04-3 TYP 001 |
| Cross Section of work area |
| Informational |
| Attachment 2 – Special Provision |
| Special Provision for Test Removal of the HMA Overlay and Waterproofing Membrane |
| Informational |
| Attachment 3 –Employee Vetting Form |
| U.S. Customs and Protection requirement for work on Blue Water Bridge |
| Bidder to complete and submit after award, prior to work beginning. |
2. CONTACT INFORMATION FOR THE STATE. The sole point of contact for the State concerning this RFP is listed on the Cover Page. Contacting any other State personnel, agent, consultant, or representative about this RFP may result in bidder disqualification.
3. MODIFICATIONS. The State may modify this RFP at any time. Modifications will be posted on www.michigan.gov/SIGMAVSS. This is the only method by which the RFP may be modified.
4. QUESTIONS. Bidder questions about this RFP must be emailed to the Solicitation Manager, Laura Dotson at DotsonL2@michigan.gov no later than the time and date specified on the Cover Page. In the interest of transparency, only written questions are accepted. Answers to questions will be posted on www.michigan.gov/SIGMAVSS. Submit questions using the format below; a Microsoft Excel format or similar is suggested.
| Q # |
| Document and Section |
| Page # |
| Bidder Question |
5. DELIVERY OF PROPOSAL.
Electronic – The bidder must submit its proposal, all attachments, and any modifications or withdrawals electronically through www.michigan.gov/SIGMAVSS. The price proposal should be saved separately from all other proposal documents. The bidder should submit all documents in a modifiable (native) format (examples include but are not limited to Microsoft Word or Excel and Google Docs or Sheets). In addition to submitting documents in a modifiable format, the bidder may also submit copies of documents in PDF. Attachment file size is limited to 6 MB per document. Bidder’s failure to submit a proposal as required may result in disqualification. The proposal and attachments must be fully uploaded and submitted prior to the proposal deadline. Do not wait until the last minute to submit a proposal, as the SIGMA VSS system requires the creation of an account and entry of certain information, in addition to uploading and submitting the materials. The SIGMA VSS system will not allow a proposal to be submitted after the proposal deadline identified in the solicitation Closing On/Closing Date fields (Summary view/Detail view), even if a portion of the proposal has been uploaded.
Questions on how to submit information or how to navigate in the SIGMA VSS system can be answered by calling (517) 284-0540 or (888) 734-9749. The Solicitation Manager will not provide assistance related to the submittal of the proposal and all attachments on the day of the proposal deadline. Responsibility for a complete submission lies with the bidder. Note that all documents and information submitted in any manner as part of a proposal will become public record immediately upon receipt by the State. Proposals received may be posted by the State on the State’s publicly available website after bidders are notified of the award recommendation.
6. MANDATORY MINIMUM REQUIREMENTS. To avoid disqualification, the bidder must currently be listed as a MDOT Prequalified Contractor in the following categories:
N9-1A (Bridge Deck Repair) Cb (Hot Mix Asphalt/Bituminous Paving) (Subclassification)
The list of Prequalified Contractors may be found at MDOT - Doing Business with MDOT (state.mi.us).
If the bidder is not prequalified in the required categories, they must indicate in its proposal a currently listed prequalified contractor(s) as the subcontractor(s).
Only proposals meeting the mandatory minimum requirements will be considered for evaluation.
7. EVALUATION PROCESS The State will evaluate each proposal on a PASS/FAIL basis based on the following criteria:
| Criteria |
| PASS/FAIL |
| 1. |
| Confidential Treatment Form is complete and signed |
| Pass/Fail |
| 2. |
| Vendor Questions are complete |
| Pass/Fail |
| 3. |
| Schedule A is complete |
| Pass/Fail |
| 4. |
| Schedule B is complete |
| Pass/Fail |
| 5 |
| Agreement with Standard Contract Terms |
| Pass/Fail |
The State may utilize all bidder information to determine fair market value for goods or services sought. If applicable, the State’s evaluation will include consideration of a bidder’s qualified disabled veterans/service-disabled veteran owned business(QDV/SDVOB) status under MCL 18.1261(8). Additional information on the SDVOB preference is available at: Michigan.gov/SDVOB The State strongly encourages strict adherence to the Contract Terms. The State reserves the right to deem a bid non-responsive for failure to accept the Contract Terms. Nevertheless, the bidder may submit proposed changes to the Contract Terms in track changes (i.e., visible edits) with an explanation of the bidder’s need for each proposed change. Failure to include track changes with an explanation of the bidder’s need for the proposed change constitutes the bidder’s acceptance of the Contract Terms. General statements, such as that the bidder reserves the right to negotiate the terms and conditions, may be considered non-responsive. Failure to respond timely to requests for proposed changes to Contract Terms during ongoing negotiations may be cause for disqualification.
The State may but is not required to conduct an on-site visit to tour and inspect the bidder’s facilities; require an oral presentation of the bidder's proposal; conduct interviews, research, reference checks, and background checks; and request additional price concessions at any point during the evaluation process.
8. NOTICE OF DEFICIENCY. The State reserves the right to issue a Notice of Deficiency to bidders if the State determines after the proposal deadline that a portion of the RFP was deficient, unclear, or ambiguous. Failure to respond to a Notice of Deficiency timely may be cause for disqualification.
9. CLARIFICATION REQUEST. The State reserves the right to issue a Clarification Request to a bidder to clarify its proposal if the State determines the proposal is not clear. Failure to respond to a Clarification Request timely may be cause for disqualification.
10. RESERVATIONS. The State reserves the right to:
a. Disqualify a bidder for failure to follow these instructions.
b. Discontinue the RFP process at any time for any or no reason. The issuance of an RFP, your preparation and submission of a proposal, and the State’s subsequent receipt and evaluation of your proposal does not commit the State to award a contract to you or anyone, even if all the requirements in the RFP are met.
c. Consider late proposals if: (i) no other proposals are received; (ii) no complete proposals are received; (iii) the State received complete proposals, but the proposals did not meet mandatory minimum requirements or technical criteria; or (iv) the award process fails to result in an award.
d. Consider an otherwise disqualified proposal if no other proposals are received.
e. Disqualify a proposal based on: (i) information provided by the bidder in response to this RFP; (2) the bidder’s failure to complete registration on www.michigan.gov/SIGMAVSS ; or (3) if it is determined that a bidder purposely or willfully submitted false or misleading information in response to the RFP.
f. Consider prior performance with the State in making its award decision.
g. Consider overall economic impact to the State when evaluating proposal pricing and in the final award recommendation. This includes but is not limited to: considering principal place of performance, number of Michigan citizens employed or potentially employed, dollars paid to Michigan residents, Michigan capital investments, job creation, tax revenue implications, and economically disadvantaged businesses.
h. Consider total-cost-of-ownership factors (e.g., transition and training costs) when evaluating proposal pricing and in the final award recommendation.
i. Refuse to award a contract to any bidder that has failed to pay State taxes or has outstanding debt with the State.
j. Enter into negotiations with one or more bidders on price, terms, technical requirements, or other deliverables.
k. Award multiple, optional-use contracts, or award by Contract Activity.
l. Evaluate the proposal outside the scope identified in the Evaluation Process section of this document if the State receives only one proposal.
11. AWARD RECOMMENDATION. The contract will be awarded to the responsive and responsible bidder who receives a PASS for each criterion and has the lowest price.
The State will post an Award Recommendation and Evaluation Synopsis on www.michigan.gov/SIGMAVSS or in the manner that the solicitation was originally published.
12. DEBRIEF MEETING AND BID PROTEST. The State will publish an Award Recommendation and Evaluation Synopsis which will provide instructions on how to request a debrief meeting.
If you wish to initiate a protest of the award, you must submit your written protest to Carol Rademacher at RademacherC@michigan.gov no later than 4:00 p.m., 3 business days after posting the Award Recommendation and Evaluation Synopsis on SIGMA VSS. The State reserves the right to adjust this timing and will publish any change.
Additional information about the protest process is available at DTMB - Programs and Policies (michigan.gov) under the “Bidder Protests” link.
13. STATE ADMINISTRATIVE BOARD. Contracts equal to $250,000 or greater than require approval by the State Administrative Board. The State Administrative Board’s decision is final; however, its approval does not constitute a contract. The award process is not complete until the awarded contractor receives a contract fully executed by all parties.
14. GENERAL CONDITIONS. The State will not be liable for any costs, expenses, or damages incurred by a bidder participating in this solicitation. The bidder agrees that its proposal will be considered an offer to do business with the State in accordance with its proposal, including the Contract Terms, and that its proposal will be irrevocable and binding for a period of 90 calendar days from date of submission. If a contract is awarded to the bidder, the State may, at its option, incorporate any part of the bidder’s proposal into a contract. This RFP is not an offer to enter into a contract. This RFP may not provide a complete statement of the State’s environment or contain all matters upon which agreement must be reached. The bidder understands that their proposal will become public record immediately upon receipt by the State. Other than verified trade secrets, proposals submitted via www.michigan.gov/SIGMAVSS are the State’s property.
15. CONFIDENTIAL TREATMENT FORM AND THE FREEDOM OF INFORMATION ACT. As a public record, all portions of the bidder’s proposal and resulting contract are subject to disclosure as required under Michigan’s Freedom of Information Act (FOIA), MCL 15.231, et seq. However, the State may exempt some information from disclosure as permitted by law. Under MCL 18.1261(13)(b), records containing “a trade secret as defined under section 2 of the uniform trade secrets act, 1998 PA 448, MCL 445.1902,” are exempt from disclosure under FOIA. In addition, “financial or proprietary information” submitted with a bidder’s proposal is exempt from disclosure under FOIA. A bidder’s failure to comply with this Section is grounds for rejecting a bidder’s proposal as non-responsive. As a part of its proposal, each bidder must follow the procedure below.
a. SUBMIT A COMPLETED “CONFIDENTIAL TREATMENT FORM” (CT FORM) WITH YOUR BID. Completion and submission of the CT Form is required regardless of whether the bidder seeks confidential treatment of information. Failure to submit a completed CT Form may be cause for disqualification from the solicitation process. If a bidder fails to properly complete and submit the CT Form or otherwise fails to follow CT Form instructions, the proposal may be publicly disclosed in its entirety without redaction after an award recommendation.
i. Complete and sign Section 1 of the CT Form if the bidder does NOT request confidential treatment of information contained in its proposal; or
ii. Complete and sign Section 2 of the CT Form if the bidder requests confidential treatment of certain information. Bidder must also submit a “Public Copy” of the proposal with the trade secret, financial, and proprietary information redacted and clearly labeled as the “Public Copy.”
iii. Failure to complete and sign a CT Form may result in disqualification of the bidder. If a bidder fails to properly complete and submit the CT Form or otherwise fails to follow the CT Form instructions, the proposal, in its entirety, will be treated as a “Public Copy” and may be publicly disclosed by the State without redaction after bidders have been notified of an award recommendation.
b. FOIA REQUESTS. If a FOIA request is made for a bidder’s proposal, the Public Copy may be distributed to the public along with the bidder’s CT Form. The CT Form is a public document and serves as an explanation for the redactions to the Public Copy. Do not put any trade secret, financial, or proprietary information in the CT Form. Do not redact the CT Form itself.
c. NO ADVICE. The State will not advise a bidder as to the nature or content of documents entitled to protection from disclosure under FOIA or other laws, as to the interpretation of such laws, or as to the definition of trade secret or financial or proprietary information. Nothing contained in this provision will modify or amend requirements and obligations imposed on the State by FOIA or other applicable law.
d. FAILURE TO REQUEST CONFIDENTIAL TREATMENT. Failure to request material be treated as confidential as specified herein relieves the State, its agencies, and personnel from any responsibility for maintaining material in confidence.
e. Bids containing a request to maintain an entire proposal as confidential may be rejected as non-responsive. Bidders may not request confidential treatment with respect to resumes, pricing, and marketing materials. The State reserves the right to determine whether material designated as exempt by a bidder falls under MCL 18.1261 or other applicable FOIA exemptions. If a FOIA request is made for materials that the bidder has identified as trade secret, financial, or proprietary information, the State has the final authority to determine whether the materials are exempt from disclosure under FOIA.
f. Bidder forever releases the State, its departments, subdivisions, officers, and employees from all claims, rights, actions, demands, damages, liabilities, expenses and fees, which arise out of or relate to the disclosure of all or a portion of bidder’s proposal submitted under this RFP. Bidder must defend, indemnify and hold the State, its departments, subdivisions, officers, and employees harmless, without limitation, from and against all actions, claims, losses, liabilities, damages, costs, attorney fees, and expenses (including those required to establish the right to indemnification), arising out of or relating to any FOIA request, including potential litigation and appeals, related to the portion of bidder’s proposal submitted under this RFP that bidder has identified as a trade secret, or financial or proprietary information. The State will notify bidder in writing if indemnification is sought. The State is entitled to: (i) regular updates on proceeding status; (ii) participate in the defense of the proceeding; (iii) employ its own counsel; and to (iv) retain control of the defense, or any portion thereof, if the State deems necessary. Bidder will not, without the State’s written consent (not to be unreasonably withheld), settle, compromise, or consent to the entry of any judgment in or otherwise seek to terminate any claim, action, or proceeding. If a State employee, official, or law is involved or challenged, the State may control the defense of that portion of the claim. Any litigation activity on behalf of the State, or any of its subdivisions under this Section, must be coordinated with the Department of Attorney General. An attorney designated to represent the State may not do so until approved by the Michigan Attorney General and appointed as a Special Assistant Attorney General.
confidential treatment form INSTRUCTIONS. Bidder must complete either Section 1 or Section 2 of this CT Form and sign where indicated. Do not complete both sections. This CT Form must be signed by the individual who signed the bidder’s proposal. A completed CT Form must be submitted with your proposal, regardless of whether your proposal contains confidential information Failure to submit a completed CT Form with your bid is grounds for rejecting the proposal as non-responsive. If a bidder fails to properly complete and submit the CT Form or otherwise fails to follow CT Form Instructions, the proposal, in its entirety, will be treated as a “Public Copy” and may be publicly disclosed by the State without redaction after bidders have been notified of an award recommendation. See the Confidential Treatment Form and The Freedom of Information Act (FOIA) sections of the Proposal Instructions for additional information.
Section 1. CONFIDENTIAL TREATMENT IS NOT REQUESTED This section must be completed, signed, and submitted with the proposal if the bidder does not request confidential treatment of any material contained in the proposal. If this section is completed, do not complete Section 2. CONFIDENTIAL TREATMENT IS REQUESTED By signing below, the bidder affirms that confidential treatment of material contained in their proposal is not requested.
230000002938 RFP Number
HMA Overlay and Waterproofing Membrane Removal on EB BWB RFP Title
Signature
Date
Printed Name, Title, Company
Section 2. CONFIDENTIAL TREATMENT IS REQUESTED This section must be completed, signed, and submitted with the proposal if bidder requests confidential treatment of any material contained in the proposal. Submission of a completed CT Form is required to request confidential treatment. If this section is completed, do not complete Section 1. CONFIDENTIAL TREATMENT IS NOT REQUESTED.
Provide the information in the table below. Bidder may add rows or additional pages using the same format shown in the table. Bidder must specifically identify the information to be protected as confidential and state the reasons why protection is necessary.
The CT Form will not be considered fully complete unless, for each confidentiality request, the bidder: (1) identifies the Proposal Page #, Section #, and Paragraph #, (2) identifies whether the material is a Trade Secret (TS), Proprietary Financial Information (FI), or Proprietary Information (PI), and (3) explains the specific legal grounds that support treatment of the material as TS, FI, or PI. Bidders must provide a complete justification as to how the material falls within the scope of an applicable FOIA exemption or relevant case law. Bidders must not simply cite to an applicable exemption or case name. Bidders must also provide the contact information for the person at their organization authorized to respond to inquiries by the State concerning the material.
Bidder must also submit a “Public Copy” of the proposal with the trade secret, financial, and proprietary information redacted and clearly labeled as the “Public Copy”.
(1) Proposal Page #, Section #, Paragraph # (2) Material is Trade Secret (TS), Proprietary Financial Information (FI), Proprietary Information (PI) (3) Applicable FOIA Exemption with Written Justification (4) Bidder Contact Information
By signing below, the bidder affirms that confidential treatment of material contained in their proposal is requested and has attached to this form a redacted “Public Copy” of the bidder’s proposal.
230000002938 RFP Number
HMA Overlay and Waterproofing Membrane Removal on EB BWB RFP Title
Signature
Date
Printed Name, Title, Company vendor questions worksheet Provide a detailed response to each question. “You” and “company” refers to the bidder.
Bidders responding to solicitations for MDOT’s Prequalification Maintenance Contracting (PMC) are not required respond to the grayed-out questions in Sections #2, #5, and #7.
| Information Sought |
| Bidder Response |
1. Contact Information
Bidder’s sole contact person during the RFP process. Include name, title, address, email, and phone number.
Person authorized to receive and sign a resulting contract. Include name, title, address, email, phone number and vendor customer code in SIGMA VSS.
2. Company Background Information
Legal business name and address. Include business entity designation, e.g., sole proprietor, Inc., LLC, or LLP.
What state was the company formed in?
Phone number.
Website address.
Number of years in business.
Number of employees.
Legal business name and address of parent company, if any.
Has there been a recent change in organizational structure (e.g., management team) or control (e.g., merger or acquisition) of your company? If the answer is yes: (a) explain why the change occurred and (b) how this change has affected your company.
Has bidder ever been debarred, suspended, or disqualified from bidding or contracting with any entity, including the State of Michigan? If yes, provide the date, the entity, and details about the situation.
Has your company been a party to litigation against the State of Michigan? If the answer is yes, then state the date of initial filing, case name and court number, and jurisdiction.
Within the last 5 years, has your company or any of its related business entities defaulted on a contract or had a contract terminated for cause? If yes, provide the date, contracting entity, type of contract, and details about the termination or default.
State your gross annual sales for each of the last 5 years.
If receiving a contract under this RFP will increase your gross revenue by more than 25% from last year’s sales, explain how the company will scale-up to manage this increase.
Describe partnerships and strategic relationships you think will bring significant value to the State.
State the physical address of the place of business that would have primary responsibility for this account if bidder is awarded a contract under this RFP.
| Bidder affirms that any business types identified on its SIGMA VSS profile, including those eligible for Geographically Disadvantaged Business Enterprise (GDBE) and Michigan Supplier Community Program (MiSC), are valid. |
| Choose an item. |
| 3. Qualified Disabled Veteran/Service-Disabled Veteran-Owned Business Program |
| Under MCL 18.1261, a “qualified disabled veteran” means a business entity that is 51% or more owned by 1 or more veterans with a service-connected disability. A “service-connected disability” means a disability incurred or aggravated in the line of duty in the active military, naval, or air service as described in 38 USC 101(16). Are you a qualified disabled veteran? |
| Choose an item. |
| To demonstrate qualification as a qualified disabled veteran, you must provide: |
(a) Proof of service and conditions of discharge (DD214 or equivalent);
(b) Proof of service-connected disability (DD214 if the disability was documented at discharge or Veterans Administration Rating Decision Letter or equivalent if the disability was documented after discharge); and
(c) Legal documents setting forth the ownership of the business entity.
In lieu of the documentation identified above, you may provide proof of certification by the National Veterans Business Development Council.
Enter the names of documents submitted with your proposal to demonstrate status as a qualified disabled veteran.
4. Participation in RFP Development or Evaluation
| Did your company, an employee, agent, or representative of your company, or any affiliated entity participate in developing any component of this solicitation? For purposes of this question, business concerns, organizations, or individuals are affiliates of each other if, directly or indirectly: (1) either one controls or has power to control the other or (2) a third-party controls or has the power to control both. Indicia of control include, but are not limited to, interlocking management or ownership, identity of interests among family members, shared facilities or equipment, and common use of employees. |
| Choose an item. |
If you enter “YES”, you are not eligible for contract award or to work as a subcontractor for the awarded vendor.
| If you are awarded a contract under this solicitation, in order to provide the goods or services required under a resulting contract, do you intend to partner or subcontract with a person or entity that assisted in the development of this solicitation? |
| Choose an item. |
If you enter “YES,” you are not eligible for contract award. An awarded vendor may not partner or subcontract with anyone to provide goods and services required under a resulting contract if that subcontractor or partner assisted in the development of this solicitation.
| Will your company, or an employee, agent, or representative of your company, participate in the evaluation of the proposals received in response to this RFP? |
| Choose an item. |
If you enter “YES”, you are not eligible for contract award or to work as a subcontractor for the awarded vendor.
5. State of Michigan Experience and Prior Experience
Does your company have experience working with the State of Michigan? If so, please provide a list (including the contract number) of the contracts you hold or have held with the State for the last 10 years.
Describe at least 3 relevant experiences from the last 5 years supporting your ability to successfully manage a contract of similar size and scope for the work described in this RFP.
Experience 1
Company name.
Contact name.
Contact role at time of project.
Contact phone.
Contact email.
City.
State.
Zip.
1. Project name and description of the scope of the project.
2. What role did your company play?
3. How is this project experience relevant to the subject of this RFP?
Dollar value.
Start and end date (mm/yy – mm/yy)
Status (completed, live, other – specify phase)
Results obtained.
Experience 2
Company name.
Contact role at time of project.
City.
1. Project name and description of the scope of the project.
Dollar value.
Start and end date (mm/yy – mm/yy)
Status (completed, live, other – specify phase)
Results obtained.
Experience 3
Company name.
Contact role at time of project.
City.
1. Project name and description of the scope of the project.
Dollar value.
Start and end date (mm/yy – mm/yy)
Status (completed, live, other – specify phase)
Results obtained.
6. Standard Contract Terms
Bidder must affirm agreement with the attached Contract Terms. If not in agreement, written exceptions in accordance with the Evaluation Process section of the Proposal Instructions must be provided with Bidder’s proposal.
7. Michigan Economic Impact
Number of employees currently employed at locations within the State of Michigan.
Number of additional employees to be employed at locations within the State of Michigan if awarded this Contract (if any)
Minimum wage paid to employees employed at locations within the State of Michigan.
Average wage paid to employees employed at locations within the State of Michigan.
Percentage of employees employed at locations within the State of Michigan that are covered by employer-provided health insurance.
8. Labor, Antidiscrimination and Environmental Laws Compliance
Bidder must disclose any violations of state or federal labor, antidiscrimination and employment laws and regulations received within the past five years.
Bidder must disclose any violations of state or federal environmental laws and regulations received within the past five years.
9. Supplier Diversity
| Does your company have a supplier diversity program or training? |
| Choose an item. |
| Bidder agrees that if Bidder is awarded a contract with a dollar amount of $500,000 or greater from this RFP, Bidder shall provide a copy of their current EEO-1 demographic report provided that Bidder meets Federal requirements to file an EEO-1 report. |
| Choose an item. |
| 10. Other |
| Classification of Employees. I certify that the company has properly classified its employees in accordance with federal/state labor and employment laws. |
| Choose an item. |
| Abusive Labor Practices. The Contractor certifies that it will not furnish any Deliverable that was produced fully or partially by forced labor, forced or indentured child labor, or indentured servitude. |
| Choose an item. |
| Certification of Michigan Business- Public Act 431 of 1984, Sec. 268. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, filed a Michigan Business Tax Corporate Income Tax Return. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, filed a Michigan Income Tax return showing income generated in, or attributed to the State of Michigan. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, withheld Michigan Income Tax from compensation paid to the company’s owners and remitted the tax to the Michigan Department of Treasury. |
| Choose an item. |
| Iran Linked Business- Public Act 517 of 2012. I certify that the Company is not an Iran-Linked business as defined by Public Act 517 of 2012. |
| Choose an item. |
| Clean Corporate Citizen. I certify that the Company is a Clean Corporate Citizen as defined by the Environmental Protection Act, 1994 PA 451. |
| Choose an item. |
| Convict Labor. The Contractor certifies that if using convict labor, it is complying with all applicable state and federal laws and policies. |
| Choose an item. |
| SOM Debt/Tax Payment. All SOM tax/debts. I certify that all applicable State of Michigan taxes are paid, and that no outstanding debt is owed to the State of Michigan. |
| Choose an item. |
| Authorization to Verify Information Provided by Vendor. I authorize the State to verify that all information provided in this registration, in bidding and contracting documents, and any attachments or supplement documents and processes are accurate. |
| Choose an item. |
| 11. Response to State Requests |
| Bidder agrees to respond, by established deadlines, to all requests from the State including but not limited to, clarification requests, notices of deficiency, and proposed changes to Contract Terms. |
| Choose an item. |
SCHEDULE A – STATEMENT OF WORK CONTRACT ACTIVITIES
Request for Proposal No.230000002938 HMA Overlay and Waterproofing Membrane Removal on EB Blue Water Bridge, in City of Port Huron This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term “Contractor” in this document refers to a bidder responding to this RFP, as well as the Contractor who is awarded the contract. The term “Bidder” is used to identify where specific responses to the RFP are required.
The Contractor must respond to each requirement or question and explain how it will fulfill each requirement. Attach any supplemental information and appropriately reference within your response.
IMPORTANT NOTE TO CONTRACTORS/BIDDERS: There are specific requirements for which acceptance must be simply acknowledged through a checkbox(es), and others that require further explanation. Click the appropriate checkbox and complete the entries as appropriate.
BACKGROUND
Michigan Department of Transportation (MDOT), Blue Water Bridge is seeking a Prequalified Maintenance Contractor to perform HMA overlay and waterproofing membrane removal by cold milling and reinstalling HMA on the Eastbound Blue Water Bridge (BWB), EB I-94/I-69 St. Clair River, (B04-3 of 77111), in the City of Port Huron, St. Clair County.
There is currently a Construction Manager / General Contractor (CMGC) preconstruction services contract for work including replacement of the HMA deck overlay and waterproofing membrane, cleaning and coating of superstructure steel, rehabilitation of expansion joints, concrete curb repairs, substructure epoxy crack injection, and concrete surface coating of substructure units on the EB BWB.
To eliminate project risk and help determine effort, the project team is utilizing a PMC to perform HMA overlay and waterproofing membrane removal during design to ensure the correct equipment is specified and the removal effort known.
A 200’ x 10’ test area will be provided on the bridge deck shoulder to test if a fine toothed cold milling machine that minimizes vibration on the long span, complex structure can be used on an upcoming project where the overlay and waterproofing membrane will be removed on the U.S. portion of the structure.
SCOPE
The scope of work includes HMA overlay and waterproofing membrane removal by cold milling and reinstalling HMA on a portion of the Eastbound BWB. See Attachment 1 for the location of the cold milling and paving limits. See Attachment 2 for the special provision required to perform this work. See Attachment 3 for the Contractor employee vetting form required if selected.
The HMA mix design will be HMA, 4EL or as approved by the Engineer.
Work shall occur on a Saturday and/or Sunday after award until October 1, 2023. Prior to commencement of work, the BWB staff shall be contacted at least five (5) business days in advance to coordinate the inspection of the work.
· Carrie Warren, MDOT BWB, 313-287-1458, WarrenC1@michigan.gov
· Dave Smith, MDOT BWB, 810-434-3274, smithd134@michigan.gov
1. Requirements The Contractor (or subcontractor) must be currently listed as a MDOT Prequalified Contractor, in the following categories:
N9-1A (Bridge Deck Repair) Cb (Hot Mix Asphalt/Bituminous Paving) (Subclassification)
1.1. General Requirements
A. The Contractor shall provide all labor, materials/supplies, equipment, tools, supervision, and any incidental services or items required to perform the Contract Activities.
B. Except where otherwise indicated within this Schedule A, all materials and workmanship shall be in accordance with the MDOT Standard Specifications for Construction, 2020 Edition (see MDOT - Standard Specifications for Construction (state.mi.us)), and the special provisions contained herein.
C. Contract Activities require personnel to comply with High Visibility clothing requirements. All workers must wear high-visibility safety apparel as specified in the Michigan Manual of Uniform Traffic Control Devices (see MDOT - Transportation Standards and Special Details (state.mi.us)), Sections 6D.03 and 6E.02.
D. The Contractor must not leave equipment and/or store equipment overnight on any trunkline, State right-of-way, or public recreational property during the performance of the Contract. The Contractor must protect motorists from any materials or equipment stored inside the closure.
E. All local noise, dust, and work-hour ordinances shall apply to the Contract.
F. MDOT will not be responsible for any cost associated with the disposal of any service provided in this Contract. MDOT will not be responsible for any citations, fines or tickets received, while performing Contract activities.
G. Contractor shall protect the safety and health of the public, state employees, State property and property of the local unit of government during the performance of this Contract.
H. The Contractor shall conduct and supervise work as to ensure its completion in accordance with the terms of the Contract and the approved project schedule.
1.2. Specific Requirements
A. Milling and HMA Overlay.
1) All milling and paving work must be performed per Section 501 of the MDOT 2020 Standard Specifications for Construction except where modified under Attachment 2.
2) Work consists of full lane width milling of the surface at an average depth of 2 3/8” including the waterproofing membrane, through multiple passes to ensure no damage is done to the concrete bridge deck and placement of 4EL HMA.
3) The Contractor will provide the personnel and testing equipment necessary to perform the required tests for quality control. All costs associated with the work are included in the unit prices of the relevant items and will not be paid separately.
B. Night Work will not be permitted.
1.3. Traffic Control
A. Traffic control will be provided on the bridge under the current maintenance of traffic configuration where westbound traffic is being maintained on the eastbound structure. This traffic pattern provides a closure at the cold milling and paving area identified in Attachment 1.
Bidder Response:
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
Bidder must describe how they comply with the above requirement(s):
2. Service Requirements
2.1. Timeframes
A. All Contract Activities must be completed on a Sunday, by October 1, 2023, when the existing traffic control remains in place unless otherwise approved by the Engineer.
B. Once work commences, Contract Activities must be performed and completed under continuous operations.
C. The Contractor will coordinate work with the BWB staff as described under the Scope of Work.
D. The Contractor must provide Contract activities during the hours of 7:00 a.m. to 7:00 p.m. unless otherwise approved by the Engineer.
Bidder Response:
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
3. Acceptance
3.1. Acceptance, Inspection, and Testing
MDOT will use the following criteria to determine acceptance of the Contract Activities:
A. Visual inspection of HMA overlay and waterproofing membrane cold milling process to ensure no damage is done to concrete deck below and to ensure that the fine tooth cold milling equipment is adequate to remove the overlay and waterproofing membrane.
B. MDOT will perform quality assurance.
3.2. Final Acceptance
MDOT will determine final acceptance of the work performed and ensure conformance to the MDOT 2020 Standard Specifications for Construction and Schedule A.
Bidder Response:
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
4. Staffing
4.1. Key Personnel
The Contractor must appoint individuals who will be directly responsible for the day-to-day operations of the Contract (“Key Personnel”). Key Personnel must be specifically assigned to the State account, be knowledgeable on the contractual requirements, and respond to State inquiries within 24 hours.
Contractor will not remove any Key Personnel from their assigned roles on this Contract without the prior written consent of MDOT.
The following positions shall be identified as Key Personnel: Project Manager, Project Superintendent, Safety Supervisor, 24 Hour Contact, and Damage Claim Officer.
Project Manager:
Name
Title
Office Phone
Mobile Phone
Email Address
Project Superintendent:
Name
Title
Office Phone
Mobile Phone
Email Address
Safety Supervisor:
Name
Title
Office Phone
Mobile Phone
Email Address
24 Hour Contact Person:
Name
Title
Office Phone
Mobile Phone
Email Address
Damage Claim Officer:
Name
Title
Office Phone
Mobile Phone
Email Address
4.2. Disclosure of Subcontractors
If the Contractor intends to utilize subcontractors, the Contractor must disclose the following:
· The legal business name; address; telephone number; a description of subcontractor’s organization and the services it will provide; and information concerning subcontractor’s ability to provide the Contract Activities.
· The relationship of the subcontractor to the Contractor.
· Whether the Contractor has a previous working experience with the subcontractor. If yes, provide the details of that previous relationship.
A complete description of the Contract Activities that will be performed or provided by the subcontractor.
Bidder must provide detailed information as requested in the above requirement(s).
The legal business name, address, telephone number of the subcontractor(s).
A description of subcontractor’s organization and the services it will provide and information concerning subcontractor’s ability to provide the Contract Activities.
The relationship of the subcontractor to the Bidder.
| Is the subcontractor a GDBE? |
| Choose an item. |
| Whether the Bidder has a previous working experience with the subcontractor. |
If yes, provide the details of that previous relationship.
A complete description of the Contract Activities that will be performed or provided by the subcontractor.
Of the total bid, the price of the subcontractor’s work.
Bidder must provide information based on the work performed by all subcontractors
Total percentage of work that will be performed by subcontractors:
Total percentage of subcontracted work that will be performed by GDBE subcontractors:
4.3. Security
The Contractor will be subject the following security procedures:
A. All employees working on the BWB must be approved by the U.S. Customs and Border Protection prior to accessing the site. The Contractor must submit employee information including employees’ full name, date of birth, country citizenship, country of birth, gender, passport country (if applicable), passport number (if applicable), alien registration number (if applicable), driver's license number, driver’s license state, and NEXUS/FAST card (if applicable). See Attachment 3.
Submit employee documentation for vetting to Dave Smith at least two weeks prior to the start of work.
B. Additional security language may be included in any contract with the BWB due to confidentiality concerns.
Bidder Response:
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
Bidder must explain any additional security measures in place to ensure the security of the State and its facilities:
5. Project Management
5.1. Project Plan
The Contractor will carry out this project under the direction and control of the Program Manager.
· Dave Smith, MDOT BWB, 810-434-3274, smithd134@michigan.gov
Within 30 calendar days of the Effective Date, the Contractor must submit a final project plan to the Program Manager for approval. The plan must include: (a) the Contractor's organizational chart with names and title of personnel assigned to the project, which must align with the staffing stated in accepted proposals; and (b) the project breakdown showing sub-projects, tasks, timeline, and resources required.
5.2. Meetings
A. Prior to the start of work, the Contractor must attend a preconstruction meeting with the Engineer. The Engineer will determine the day, time, and place for the preconstruction meeting. The meeting will be conducted after project award and may be rescheduled if there are delays in the award of the project. The Contractor’s named subcontractor(s) may be required to be at the preconstruction meeting if such items materially affect the work schedule.
B. The State may request other meetings, as it deems appropriate.
Bidder Response:
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
6. Pricing
6.1. Price Term
Pricing is firm for the entire length of the Contract.
No separate payment will be made for any Item that is not specifically set forth on Schedule B.1 and all costs therefore shall be included in the prices named on Schedule B.1 for the various appurtenant Items of Work.
Bidder Response:
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
7. Ordering
7.1. Authorizing Document
The appropriate authorizing document for the Contract will be mutually signed State-issued Purchase Order Contract.
Bidder Response:
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
8. Invoice and Payment
8.1. Invoice Requirements
All invoices submitted to the State must include: (a) date; (b) purchase order; (c) quantity; (d) description of the Contract Activities; (e) unit price; (f) shipping cost (if any); (g) vendor-generated invoice number and (h) total price. Overtime, holiday pay, and travel expenses will not be paid.
Along with each invoice, the Contractor must submit (a) applicable inspector daily logs and (b) HMA delivery tickets.
8.2. Payment Methods
The State will make payment for Contract Activities. As required by MCL 18.1283, the State will only disburse payments under this Contract through Electronic Funds Transfer (EFT).
The Contractor is responsible for ensuring current banking information is entered in the State vendor website: https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService.
8.3. Procedure
All invoices must be submitted via e-mail to: David Smith at smithd134@michigan.gov Bidder Response:
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
9. Bonds Prior to Contract execution, the Contractor must furnish performance and lien bonds each for not less than 100% of the total contract price. The bonds must be on forms provided by MDOT. The bonds must meet the requirements of Michigan law and MDOT and include other items such as the Powers of Attorney and Endorsement as specified by MDOT. The same surety responsible for writing the performance bond must write the lien bond. It is the Contractor’s responsibility to ensure that the lien bond conforms with the terms of MCL 570.101 et seq.
Bidder Response:
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
10. Liquidated Damages Late or improper completion of the Contract Activities will cause loss and damage to the State and it would be impracticable and extremely difficult to fix the actual damage sustained by the State. Therefore, if there is late or improper completion of the Contract Activities the State is entitled to collect liquidated damages in the amount specified in MDOT 2020 Standard Specifications for Construction, Table 108-1 for each calendar day past the 30-day completion timeframe and/or past September 30, 2023. Damages will continue to be assessed for each calendar day Contractor fails to remedy the late or improper completion of the Work.
Table 108-1: Schedule of Liquidated Damages For Department Oversight
| Original Contract Amount |
| Amount per |
Calendar Day
| From More Than |
| To and Including |
| $0 |
| $100,000 |
| $500 |
| $100,000 |
| $500,000 |
| $800 |
| $500,000 |
| $1,000,000 |
| $1,000 |
| $1,000,000 |
| $5,000,000 |
| $1,500 |
| $5,000,000 |
| $15,000,000 |
| $2,000 |
| Over $15,000,000 |
| $4,000 |
Bidder Response:
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
SCHEDULE B PRICING
Request for Proposal (RFP) No. 230000002938
HMA Overlay and Waterproofing Membrane Removal on EB Blue Water Bridge, in City of Port Huron
1. The Contractor must provide a pricing schedule for the proposed…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .