RFP 220000000372 Northeastern Energy Multi-Facility Decommissioning Project.docx

DOCX document 178 KB Posted

Attached to
RFP Northeastern Facility - St. Clair Co
Solicitation number
RFP - 761 - 230000000372
Issued by
St. Clair County, Michigan

About this file

This document is a Request for Proposal (RFP) issued by the Michigan Department of Environment, Great Lakes, and Energy for the Northeastern Energy Multi-Facility Decommissioning, Flowline Purging and Removal, and Site Restoration Project in Casco Township, St. Clair County. The project includes decommissioning and removal of above-ground piping, electrical infrastructure, and other equipment from 17 different oil and gas facilities formerly operated by Northeastern Energy Corp. The RFP provides detailed information about each facility, including tank sizes, contents, and site conditions. Mandatory pre-proposal meetings will be held on November 28, 2022, and proposals are due by December 8, 2022. The State will evaluate proposals based on technical criteria and pricing, and the contract is anticipated to begin at a later unspecified date.

The RFP does not provide details on pricing terms or funding sources. It notes that the State may consider a bidder's qualified disabled veteran/service-disabled veteran owned business status under Michigan law. The RFP also outlines protest and debriefing procedures, as well as requirements for confidentiality and public disclosure of proposal information.

View the file

Other files

File Type Posted
RFP 230000000372 Q_ —
Attachment 1-Pre-Bid Meeting Location.pdf PDF
Wage Determination St. Clair County.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Michigan.gov/MiProcurement proposal instructions Department of Department of Environment, Great Lakes, and Energy Northeastern Energy Multi-Facility Decommissioning, Flowline Purging and Removal, and Site Restoration Project Casco Township, Saint Clair County

Request for Proposal No. 230000000372 Solicitation Manager Name: Lisa VanOstran Direct Phone: 517-599-7680 Email: vanostranl@michigan.gov

This is a Request for Proposal (RFP) for:

Multi-Facility decommissioning, flowline purging and removal, and site restoration at the Baumgarten-Rewalt TB, Rewalt-Teltow TB, Schulz 3 TB, Smith 2 CTB, Lindke Smith B1 CTB, Lyszcyk 2 CTB, Schomberg Bousson CTB, Shissler CTB, Spurlock CTB, Burmann TB, Blazczak TB, Blazczak B TB, Reske 0-1 TB, Ringel 2 CTB, Baumgarten CTB, Taetz 0-2 TB, and the Jablonski CTB. In addition, this RFP includes removing scrap at the Thueme 1 well, removing joints of tubing at the Burman 0-1 well. AAll terms, conditions, specifications agreed upon during the RFP process remain in effect for this project.

RFP Timeline

Event
Time
Date
RFP issue date
N/A
Friday, November 18, 2022
Pre-proposal meeting
10:00 a.m. Eastern
Monday, November 28, 2022
Deadline for bidders to submit questions about this RFP
3:00 p.m. Eastern
Wednesday, November 30, 2022
Anticipated date the State will post answers to bidder questions on www.michigan.gov/SIGMAVSS
Friday, December 2, 2022
Proposal deadline*
3:00 p.m. Eastern
Thursday, December 8, 2022
Anticipated contract begin date

TBD

*A bidder’s proposal received at 3:00:01 p.m. Eastern is late and subject to disqualification.

This RFP is subject to change. Check www.michigan.gov/SIGMAVSS for current information.

1. PROPOSAL PREPARATION. The State recommends reading all RFP materials prior to preparing a proposal, particularly these Proposal Instructions and the Vendor Questions Worksheet. Bidders must follow these Proposal Instructions and provide a complete response to the items indicated in the table below. References and links to websites or external sources may not be used in lieu of providing the information requested in the RFP within the proposal. Include the bidder’s company name in the header of all documents submitted with your proposal. Note that all documents and information submitted as part of a proposal will become public record immediately upon receipt by the State. Proposals received by the State may be posted on the State’s publicly available website after bidders are notified of the award recommendation.

RFP Structure and Documentation

Document
Description
Bidder Response Instructions
Cover Page
Provides RFP title and number, important dates, and contact information for Solicitation Manager
Informational
Proposal Instructions
Provides RFP instructions to bidders
Informational
Confidential Treatment Form
Required verification on whether bidder’s proposal contains confidential information
Bidder to complete and submit by proposal deadline
Vendor Questions Worksheet
Questions to bidders on background and experience
Bidder to complete and submit by proposal deadline
Schedule A – Statement of Work
Statement of work
Bidder to complete and submit by proposal deadline
Schedule B – Pricing
Pricing for goods and services sought by the State through this RFP
Bidder to complete and submit by proposal deadline
Attachment 1
Site Location and Site LayoutInformational
Contract Terms
Provides legal terms for a contract awarded through this RFP
Deemed accepted by bidder unless information required in the Evaluation Process section of this document is submitted by proposal deadline

2. CONTACT INFORMATION FOR THE STATE. The sole point of contact for the State concerning this RFP is listed on the Cover Page. Contacting any other State personnel, agent, consultant, or representative about this RFP may result in bidder disqualification.

3. MANDATORY PRE-PROPOSAL MEETING.

A pre-proposal meeting will be held on Monday, November 28, 2022, at 10:00 a.m. Eastern. Only those Contractors who attend the meeting will be able to submit a proposal. The meeting will be held at the project site:

Smith 2 CTB. The lease road is located 0.13 miles west of the intersection of Meisner Road and Hessen Road on the south side of Meisner Road, in Casco Township, Saint Clair County. A map is provided in this RFP for reference. Please note, it is the contractor’s responsibility to bring all maps and figures for location of facilities and lease roads. Also, the contractor will be responsible for gathering their own information during the Pre-Bid Meeting to assist in the submittal of a competitive bid for this project. The State of Michigan will not be escorting the group of contractors to other locations beyond the Pre-Bid Meeting location. The meeting will start promptly at 10:00 a.m. Eastern.

The purpose of the pre-proposal meeting is to discuss the RFP and the work to be performed and may include an inspection of the facility to receive the goods or services sought in this RFP. Statements made by the Solicitation Manager or designee at a pre-proposal meeting are not considered modifications to the RFP. If, however, the Solicitation Manager determines modifications to the RFP are warranted after the meeting, modifications will be posted in writing on www.michigan.gov/SIGMAVSS as explained in the Modifications section of this document.

4. MODIFICATIONS. The State may modify this RFP at any time. Modifications will be posted on www.michigan.gov/SIGMAVSS. This is the only method by which the RFP may be modified.

5. QUESTIONS. Bidder questions about this RFP must be emailed to the Solicitation Manager or posted on www.michigan.gov/SIGMAVSS no later than the time and date specified on the Cover Page. In the interest of transparency, only written questions are accepted. Answers to questions will be posted on www.michigan.gov/SIGMAVSS. Submit questions using the format below; a Microsoft Excel format or similar is suggested.

Q #
Document and Section
Page #
Bidder Question

6. DELIVERY OF PROPOSAL.

Electronic – The bidder must submit its proposal, all attachments, and any modifications or withdrawals electronically through www.michigan.gov/SIGMAVSS. The price proposal should be saved separately from all other proposal documents. The bidder should submit all documents in a modifiable (native) format (examples include but are not limited to Microsoft Word or Excel and Google Docs or Sheets). In addition to submitting documents in a modifiable format, the bidder may also submit copies of documents in PDF. Attachment file size is limited to 6 MB per document. Bidder’s failure to submit a proposal as required may result in disqualification. The proposal and attachments must be fully uploaded and submitted prior to the proposal deadline. Do not wait until the last minute to submit a proposal, as the SIGMA VSS system requires the creation of an account and entry of certain information, in addition to uploading and submitting the materials. The SIGMA VSS system will not allow a proposal to be submitted after the proposal deadline identified in the solicitation Closing On/Closing Date fields (Summary view/Detail view), even if a portion of the proposal has been uploaded.

Questions on how to submit information or how to navigate in the SIGMA VSS system can be answered by calling (517) 284-0540 or (888) 734-9749. The Solicitation Manager will not provide assistance related to the submittal of the proposal and all attachments on the day of the proposal deadline. Responsibility for a complete submission lies with the bidder. Note that all documents and information submitted in any manner as part of a proposal will become public record immediately upon receipt by the State. Proposals received may be posted by the State on the State’s publicly available website after bidders are notified of the award recommendation.

7. EVALUATION PROCESS. The State will evaluate each proposal based on the following factors:

Technical Evaluation Criteria
Weight
1.
Vendor Questions Worksheet
30
2.
Schedule A, Statement of Work, Section 3.2 Key Personnel
40
3.
Schedule A, Statement of Work, Sections 4.1 Project Plan
30
Total
100

Proposals receiving 80 or more technical evaluation points will have pricing evaluated and considered for award.

The State may utilize all bidder information, without regard to a proposal’s technical score, to determine fair market value for goods or services sought. The State is not obligated to accept the lowest price proposal. If applicable, the State’s evaluation will include consideration of a bidder’s qualified disabled veterans/service-disabled veteran owned business(QDV/SDVOB) status under MCL 18.1261(8). Additional information on the SDVOB preference is available at: Michigan.gov/SDVOB.

The State strongly encourages strict adherence to the Contract Terms. The State reserves the right to deem a bid non-responsive for failure to accept the Contract Terms. Nevertheless, the bidder may submit proposed changes to the Contract Terms in track changes (i.e., visible edits) with an explanation of the bidder’s need for each proposed change. Failure to include track changes with an explanation of the bidder’s need for the proposed change constitutes the bidder’s acceptance of the Contract Terms. General statements, such as that the bidder reserves the right to negotiate the terms and conditions, may be considered non-responsive. Failure to respond timely to requests for proposed changes to Contract Terms during ongoing negotiations may be cause for disqualification.

The State may but is not required to conduct an on-site visit to tour and inspect the bidder’s facilities; require an oral presentation of the bidder's proposal; conduct interviews, research, reference checks, and background checks; and request additional price concessions at any point during the evaluation process.

8. NOTICE OF DEFICIENCY. The State reserves the right to issue a Notice of Deficiency to bidders if the State determines after the proposal deadline that a portion of the RFP was deficient, unclear, or ambiguous. Failure to respond to a Notice of Deficiency timely may be cause for disqualification.

9. CLARIFICATION REQUEST. The State reserves the right to issue a Clarification Request to a bidder to clarify its proposal if the State determines the proposal is not clear. Failure to respond to a Clarification Request timely may be cause for disqualification.

10. RESERVATIONS. The State reserves the right to:

a. Disqualify a bidder for failure to follow these instructions.

b. Discontinue the RFP process at any time for any or no reason. The issuance of an RFP, your preparation and submission of a proposal, and the State’s subsequent receipt and evaluation of your proposal does not commit the State to award a contract to you or anyone, even if all the requirements in the RFP are met.

c. Consider late proposals if: (i) no other proposals are received; (ii) no complete proposals are received; (iii) the State received complete proposals, but the proposals did not meet mandatory minimum requirements or technical criteria; or (iv) the award process fails to result in an award.

d. Consider an otherwise disqualified proposal if no other proposals are received.

e. Disqualify a proposal based on: (i) information provided by the bidder in response to this RFP; (2) the bidder’s failure to complete registration on www.michigan.gov/SIGMAVSS ; or (3) if it is determined that a bidder purposely or willfully submitted false or misleading information in response to the RFP.

f. Consider prior performance with the State in making its award decision.

g. Consider overall economic impact to the State when evaluating proposal pricing and in the final award recommendation. This includes but is not limited to: considering principal place of performance, number of Michigan citizens employed or potentially employed, dollars paid to Michigan residents, Michigan capital investments, job creation, tax revenue implications, and economically disadvantaged businesses.

h. Consider total-cost-of-ownership factors (e.g., transition and training costs) when evaluating proposal pricing and in the final award recommendation.

i. Refuse to award a contract to any bidder that has failed to pay State taxes or has outstanding debt with the State.

j. Enter into negotiations with one or more bidders on price, terms, technical requirements, or other deliverables.

k. Award multiple, optional-use contracts, or award by Contract Activity.

l. Evaluate the proposal outside the scope identified in the Evaluation Process section of this document if the State receives only one proposal.

11. AWARD RECOMMENDATION. The contract will be awarded to the responsive and responsible bidder who offers the best value to the State, as determined by the State. Best value will be determined by the bidder meeting the minimum point threshold and offering the best combination of the factors stated in the Evaluation Process section of this document, and price, as demonstrated by the proposal. The State will post an Award Recommendation and Evaluation Synopsis on www.michigan.gov/SIGMAVSS or in the manner it was originally published

12. DEBRIEF MEETING AND BID PROTEST. The State will post an Award Recommendation and Evaluation Synopsis which will provide instructions on how to request a debrief meeting.

If you wish to initiate a protest of the award, you must submit your written protest to the Solicitation Manager no later than 5:00 p.m. Eastern, 3 business days after posting the Award Recommendation and Evaluation Synopsis. The State reserves the right to adjust this timing and will publish any change.

Additional information about the protest process is available at DTMB - Programs and Policies (michigan.gov) under the “Bidder Protests” link.

13. STATE ADMINISTRATIVE BOARD. Contracts equal to $250,000 or greater than require approval by the State Administrative Board. The State Administrative Board’s decision is final; however, its approval does not constitute a contract. The award process is not complete until the awarded contractor receives a contract fully executed by all parties.

14. GENERAL CONDITIONS. The State will not be liable for any costs, expenses, or damages incurred by a bidder participating in this solicitation. The bidder agrees that its proposal will be considered an offer to do business with the State in accordance with its proposal, including the Contract Terms, and that its proposal will be irrevocable and binding for a period of 180 calendar days from date of submission. If a contract is awarded to the bidder, the State may, at its option, incorporate any part of the bidder’s proposal into a contract. This RFP is not an offer to enter into a contract. This RFP may not provide a complete statement of the State’s environment or contain all matters upon which agreement must be reached. The bidder understands that their proposal will become public record immediately upon receipt by the State. Other than verified trade secrets, proposals submitted via www.michigan.gov/SIGMAVSS are the State’s property.

15. CONFIDENTIAL TREATMENT FORM AND THE FREEDOM OF INFORMATION ACT. As a public record, all portions of the bidder’s proposal and resulting contract are subject to disclosure as required under Michigan’s Freedom of Information Act (FOIA), MCL 15.231, et seq. However, the State may exempt some information from disclosure as permitted by law. Under MCL 18.1261(13)(b), records containing “a trade secret as defined under section 2 of the uniform trade secrets act, 1998 PA 448, MCL 445.1902,” are exempt from disclosure under FOIA. In addition, “financial or proprietary information” submitted with a bidder’s proposal is exempt from disclosure under FOIA. A bidder’s failure to comply with this Section is grounds for rejecting a bidder’s proposal as non-responsive. As a part of its proposal, each bidder must follow the procedure below.

SUBMIT A COMPLETED “CONFIDENTIAL TREATMENT FORM” (CT FORM) WITH YOUR BID. Completion and submission of the CT Form is required regardless of whether the bidder seeks confidential treatment of information. Failure to submit a completed CT Form may be cause for disqualification from the solicitation process. If a bidder fails to properly complete and submit the CT Form or otherwise fails to follow CT Form instructions, the proposal may be publicly disclosed in its entirety without redaction after an award recommendation.

Complete and sign Section 1 of the CT Form if the bidder does NOT request confidential treatment of information contained in its proposal; or

i. Complete and sign Section 2 of the CT Form if the bidder requests confidential treatment of certain information. Bidder must also submit a “Public Copy” of the proposal with the trade secret, financial, and proprietary information redacted and clearly labeled as the “Public Copy.”

Failure to complete and sign a CT Form may result in disqualification of the bidder. If a bidder fails to properly complete and submit the CT Form or otherwise fails to follow the CT Form instructions, the proposal, in its entirety, will be treated as a “Public Copy” and may be publicly disclosed by the State without redaction after bidders have been notified of an award recommendation

b. FOIA REQUESTS. If a FOIA request is made for a bidder’s proposal, the Public Copy may be distributed to the public along with the bidder’s CT Form. The CT Form is a public document and serves as an explanation for the redactions to the Public Copy. Do not put any trade secret, financial, or proprietary information in the CT Form. Do not redact the CT Form itself.

c. NO ADVICE. The State will not advise a bidder as to the nature or content of documents entitled to protection from disclosure under FOIA or other laws, as to the interpretation of such laws, or as to the definition of trade secret or financial or proprietary information. Nothing contained in this provision will modify or amend requirements and obligations imposed on the State by FOIA or other applicable law.

d. FAILURE TO REQUEST CONFIDENTIAL TREATMENT. Failure to request material be treated as confidential as specified herein relieves the State, its agencies, and personnel from any responsibility for maintaining material in confidence.

e. Bids containing a request to maintain an entire proposal as confidential may be rejected as non-responsive. Bidders may not request confidential treatment with respect to resumes, pricing, and marketing materials. The State reserves the right to determine whether material designated as exempt by a bidder falls under MCL 18.1261 or other applicable FOIA exemptions. If a FOIA request is made for materials that the bidder has identified as trade secret, financial, or proprietary information, the State has the final authority to determine whether the materials are exempt from disclosure under FOIA.

f. Bidder forever releases the State, its departments, subdivisions, officers, and employees from all claims, rights, actions, demands, damages, liabilities, expenses and fees, which arise out of or relate to the disclosure of all or a portion of bidder’s proposal submitted under this RFP. Bidder must defend, indemnify and hold the State, its departments, subdivisions, officers, and employees harmless, without limitation, from and against all actions, claims, losses, liabilities, damages, costs, attorney fees, and expenses (including those required to establish the right to indemnification), arising out of or relating to any FOIA request, including potential litigation and appeals, related to the portion of bidder’s proposal submitted under this RFP that bidder has identified as a trade secret, or financial or proprietary information. The State will notify bidder in writing if indemnification is sought. The State is entitled to: (i) regular updates on proceeding status; (ii) participate in the defense of the proceeding; (iii) employ its own counsel; and to (iv) retain control of the defense, or any portion thereof, if the State deems necessary. Bidder will not, without the State’s written consent (not to be unreasonably withheld), settle, compromise, or consent to the entry of any judgment in or otherwise seek to terminate any claim, action, or proceeding. If a State employee, official, or law is involved or challenged, the State may control the defense of that portion of the claim. Any litigation activity on behalf of the State, or any of its subdivisions under this Section, must be coordinated with the Department of Attorney General. An attorney designated to represent the State may not do so until approved by the Michigan Attorney General and appointed as a Special Assistant Attorney General.

confidential treatment form INSTRUCTIONS. Bidder must complete either Section 1 or Section 2 of this CT Form and sign where indicated. Do not complete both sections. This CT Form must be signed by the individual who signed the bidder’s proposal. A completed CT Form must be submitted with your proposal, regardless of whether your proposal contains confidential information.

Failure to submit a completed CT Form with your bid is grounds for rejecting the proposal as non-responsive. If a bidder fails to properly complete and submit the CT Form or otherwise fails to follow CT Form Instructions, the proposal, in its entirety, will be treated as a “Public Copy” and may be publicly disclosed by the State without redaction after bidders have been notified of an award recommendation. See the Confidential Treatment Form and The Freedom of Information Act (FOIA) sections of the Proposal Instructions for additional information Section 1. CONFIDENTIAL TREATMENT IS NOT REQUESTED This section must be completed, signed, and submitted with the proposal if the bidder does not request confidential treatment of any material contained in the proposal. If this section is completed, do not complete Section 2. CONFIDENTIAL TREATMENT IS REQUESTED.

By signing below, the bidder affirms that confidential treatment of material contained in their proposal is not requested.

RFP Number

RFP Title

Signature

Date

Printed Name, Title, Company

Section 2. CONFIDENTIAL TREATMENT IS REQUESTED This section must be completed, signed, and submitted with the proposal if bidder requests confidential treatment of any material contained in the proposal. Submission of a completed CT Form is required to request confidential treatment. If this section is completed, do not complete Section 1. CONFIDENTIAL TREATMENT IS NOT REQUESTED.

Provide the information in the table below. Bidder may add rows or additional pages using the same format shown in the table. Bidder must specifically identify the information to be protected as confidential and state the reasons why protection is necessary.

The CT Form will not be considered fully complete unless, for each confidentiality request, the bidder: (1) identifies the Proposal Page #, Section #, and Paragraph #, (2) identifies whether the material is a Trade Secret (TS), Proprietary Financial Information (FI), or Proprietary Information (PI), and (3) explains the specific legal grounds that support treatment of the material as TS, FI, or PI. Bidders must provide a complete justification as to how the material falls within the scope of an applicable FOIA exemption or relevant case law. Bidders must not simply cite to an applicable exemption or case name. Bidders must also provide the contact information for the person at their organization authorized to respond to inquiries by the State concerning the material.

Bidder must also submit a “Public Copy” of the proposal with the trade secret, financial, and proprietary information redacted and clearly labeled as the “Public Copy”.

(1) Proposal Page #, Section #, Paragraph # (2) Material is Trade Secret (TS), Proprietary Financial Information (FI), Proprietary Information (PI) (3) Applicable FOIA Exemption with Written Justification (4) Bidder Contact Information

By signing below, the bidder affirms that confidential treatment of material contained in their proposal is requested and has attached to this form a redacted “Public Copy” of the bidder’s proposal.

RFP Number

RFP Title

Signature

Date

Printed Name, Title, Company vendor questions worksheet Provide a detailed response to each question. “You” and “company” refers to the bidder.

Information Sought
Bidder Response

1. Contact Information

Bidder’s sole contact person during the RFP process. Include name, title, address, email, and phone number.

Person authorized to receive and sign a resulting contract. Include name, title, address, email, phone number and vendor customer code in SIGMA VSS.

2. Company Background Information

Legal business name and address. Include business entity designation, e.g., sole proprietor, Inc., LLC, or LLP.

What state was the company formed in?

Phone number.

Website address.

Number of years in business.

Number of employees.

Legal business name and address of parent company, if any.

Has there been a recent change in organizational structure (e.g., management team) or control (e.g., merger or acquisition) of your company? If the answer is yes: (a) explain why the change occurred and (b) how this change has affected your company.

Discuss your company’s history. Has growth been organic, through mergers and acquisitions, or both?

Has bidder ever been debarred, suspended, or disqualified from bidding or contracting with any entity, including the State of Michigan? If yes, provide the date, the entity, and details about the situation.

Has your company been a party to litigation against the State of Michigan? If the answer is yes, then state the date of initial filing, case name and court number, and jurisdiction.

Within the last 5 years, has your company or any of its related business entities defaulted on a contract or had a contract terminated for cause? If yes, provide the date, contracting entity, type of contract, and details about the termination or default.

State your gross annual sales for each of the last 5 years.

If receiving a contract under this RFP will increase your gross revenue by more than 25% from last year’s sales, explain how the company will scale-up to manage this increase.

Describe partnerships and strategic relationships you think will bring significant value to the State.

State the physical address of the place of business that would have primary responsibility for this account if bidder is awarded a contract under this RFP.

3. Qualified Disabled Veteran/Service-Disabled Veteran-Owned Business Program

Under MCL 18.1261, a “qualified disabled veteran” means a business entity that is 51% or more owned by 1 or more veterans with a service-connected disability. A “service-connected disability” means a disability incurred or aggravated in the line of duty in the active military, naval, or air service as described in 38 USC 101(16). Are you a qualified disabled veteran?
Enter YES or NO.

To demonstrate qualification as a qualified disabled veteran, you must provide:

(a) Proof of service and conditions of discharge (DD214 or equivalent);

(b) Proof of service-connected disability (DD214 if the disability was documented at discharge or Veterans Administration Rating Decision Letter or equivalent if the disability was documented after discharge); and

(c) Legal documents setting forth the ownership of the business entity.

In lieu of the documentation identified above, you may provide proof of certification by the National Veterans Business Development Council.

Enter the names of documents submitted with your proposal to demonstrate status as a qualified disabled veteran.

4. Participation in RFP Development or Evaluation

Did your company, an employee, agent, or representative of your company, or any affiliated entity participate in developing any component of this solicitation? For purposes of this question, business concerns, organizations, or individuals are affiliates of each other if, directly or indirectly: (1) either one controls or has power to control the other or (2) a third-party controls or has the power to control both. Indicia of control include, but are not limited to, interlocking management or ownership, identity of interests among family members, shared facilities or equipment, and common use of employees.
Enter YES or NO.

If you enter “YES”, you are not eligible for contract award or to work as a subcontractor for the awarded vendor.

If you are awarded a contract under this solicitation, in order to provide the goods or services required under a resulting contract, do you intend to partner or subcontract with a person or entity that assisted in the development of this solicitation?
Enter YES or NO.

If you enter “YES,” you are not eligible for contract award. An awarded vendor may not partner or subcontract with anyone to provide goods and services required under a resulting contract if that subcontractor or partner assisted in the development of this solicitation.

Will your company, or an employee, agent, or representative of your company, participate in the evaluation of the proposals received in response to this RFP?
Enter YES or NO.

If you enter “YES”, you are not eligible for contract award or to work as a subcontractor for the awarded vendor.

5. State of Michigan Experience and Prior Experience

Does your company have experience working with the State of Michigan? If so, please provide a list (including the contract number) of the contracts you hold or have held with the State for the last 10 years.

Describe at least 3 relevant experiences from the last 5 years supporting your ability to successfully manage a contract of similar size and scope for the work described in this RFP.

Experience 1

Company name.

Contact name.

Contact role at time of project.

Contact phone.

Contact email.

City.

State.

Zip.

1. Project name and description of the scope of the project.

2. What role did your company play?

3. How is this project experience relevant to the subject of this RFP?

Dollar value.

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained.

Experience 2

Company name.

Contact role at time of project.

City.

1. Project name and description of the scope of the project.

Dollar value.

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained.

Experience 3

Company name.

Contact role at time of project.

City.

1. Project name and description of the scope of the project.

Dollar value.

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained.

6. Standard Contract Terms

Bidder must affirm agreement with the attached Contract Terms. If not in agreement, written exceptions in accordance with the Evaluation Process section of the Proposal Instructions must be provided with Bidder’s proposal.

7. Michigan Economic Impact

Number of employees currently employed at locations within the State of Michigan.

Number of additional employees to be employed at locations within the State of Michigan if awarded this Contract (if any).

Minimum wage paid to employees employed at locations within the State of Michigan.

Average wage paid to employees employed at locations within the State of Michigan.

Percentage of employees employed at locations within the State of Michigan that are covered by employer-provided health insurance.

8. Labor, Antidiscrimination and Environmental Laws Compliance

Bidder must disclose any violations of state or federal labor, antidiscrimination and employment laws and regulations received within the past five years.

Bidder must disclose any violations of state or federal environmental laws and regulations received within the past five years.

9. Supplier Diversity

Does your company have a supplier diversity program or training?
Enter YES or NO.
Bidder agrees that if Bidder is awarded a contract with a dollar amount of $500,000 or greater from this RFP, Bidder shall provide a copy of their current EEO-1 demographic report provided that Bidder meets Federal requirements to file an EEO-1 report.
Enter YES or NO.

10. Other

Classification of Employees. I certify that the company has properly classified its employees in accordance with federal/state labor and employment laws.
Enter YES or NO.
Abusive Labor Practices. The Contractor certifies that it will not furnish any Deliverable that was produced fully or partially by forced labor, forced or indentured child labor, or indentured servitude.
Enter YES or NO.
Certification of Michigan Business - Public Act 431 of 1984, Sec. 268. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, filed a Michigan Business Tax Corporate Income Tax Return. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, filed a Michigan Income Tax return showing income generated in, or attributed to the State of Michigan. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, withheld Michigan Income Tax from compensation paid to the company’s owners and remitted the tax to the Michigan Department of Treasury.
Enter YES or NO.
Iran Linked Business- Public Act 517 of 2012. I certify that the Company is not an Iran-Linked business as defined by Public Act 517 of 2012.
Enter YES or NO.
Clean Corporate Citizen. I certify that the Company is a Clean Corporate Citizen as defined by the Environmental Protection Act, 1994 PA 451.
Enter YES or NO.
Convict Labor. The Contractor certifies that if using convict labor, it is complying with all applicable state and federal laws and policies.
Enter YES or NO.
SOM Debt/Tax Payment. All SOM tax/debts. I certify that all applicable State of Michigan taxes are paid, and that no outstanding debt is owed to the State of Michigan.
Enter YES or NO.
Authorization to Verify Information Provided by Vendor. I authorize the State to verify that all information provided in this registration, in bidding and contracting documents, and any attachments or supplement documents and processes are accurate.
Enter YES or NO.

11. Response to State Requests

Bidder agrees to respond, by established deadlines, to all requests from the State including but not limited to, clarification requests, notices of deficiency, and proposed changes to Contract Terms.
Enter YES or NO.

Contractor must enter company name here.

Schedule A – statement of work contract activities Northeastern Energy Multi-Facility Decommissioning, Flowline Purging and Removal, and Site Restoration Project Casco Township, Saint Clair County

Request for Proposal No. 230000000372 This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term “Contractor” in this document refers to a bidder responding to this RFP, as well as the Contractor who is awarded the contract. The term “bidder” is used to identify where specific responses to the RFP are required.

The Contractor must respond to each requirement or question and explain how it will fulfill each requirement. Attach any supplemental information and appropriately reference within your response.

IMPORTANT NOTE TO CONTRACTORS/BIDDERS: There are specific requirements for which acceptance must be simply acknowledged through a checkbox(es), and others that require further explanation. Click one checkbox and complete the entries as identified.

1. Requirements

1.1. General Requirements

This project includes decommissioning the facility and the removal of all above ground piping, and the removal of all electrical infrastructure associated with the following facilities that was formerly operated by Northeastern Energy Corp.:

Facility Name
Facility Number
County
Operator of Record
Comments

Baumgarten-Rewalt TB

1081
Saint Clair
Orphan Facility
Two 200 bbl tanks in an unlined dike. Dike has lots of vegetation. Tanks sound empty and no signs of release. Load out area is a half steel drum that is partially covered. Drum is mostly full and close to overflowing to the ground. One vertical treater in an unlined dike full of vegetation. One 150 bbl tank in the same unlined dike - empty and no issues observed. One 200 bbl tank out of service and vegetation is almost as tall as tank. Farm tap near well with horizontal separator with some oil staining below.

Rewalt Teltow TB

1122
Saint Clair
Orphan Facility
Two 200 bbl tanks in an unlined dike with tall vegetation throughout. One vertical separator in shallow unlined dike. No spills, leaks, or odor observed.
Schulz 3 TB
1154
Saint Clair
Orphan Facility
OW staff conducting field inspection to prepare bid document. TeNorm= background uR/hr. Methane (peak reading from Eagle 2)=0 ppm. Access road good, vegetation will need to be cleared. Equipment: 1-300 bbl fiberglass tank, concrete pad. One 300 bbl fiberglass tank in an unlined dike. Found while driving down Hessen Road. Area is overgrown and dike area had vegetation throughout. Potential areas of stressed vegetation. No staining observed. Concrete pad on the south side outside of the dike.
Facility Name
Facility/ Permit #
County
Operator of Record
Comments
Smith 2 CTB
1151
Saint Clair
Orphan Facility
Two 200 bbl tanks in an unlined dike - overgrown. East tank sounds empty, west tank sounds like fluids are still present. Two 55 gallon drums under load out with fluids and okay. One vertical separator in an unlined dike. A lot of extra equipment is laying around at the boneyard (tanks, ladder, trucks, tractor, multiple sheds, pump jacks, drums, etc.).

Lindke Smith B1 CTB

1119
Saint Clair
Orphan Facility
Meter shed OK, vertical treater in unlined dike with knock-out vessel OK. Two 300 bbl tanks in semi-lined dike OK. Uncovered 55 gal drum for catch basin overflowed oily liquids. Entire site very overgrown. Access road rutted and overgrown.

Lyszcyk 2 CTB

1120
Saint Clair
Orphan Facility
Meter shed is in okay condition. Vertical treater in an unlined dike covered in vegetation. Two 200 bbl tanks in unlined dike covered in vegetation. Tanks are very rusty, but in okay condition. One covered 55-gallon drum at loadout. Site is very rutted and difficult to walk through.

Schomberg Bousson CTB

1123
Saint Clair
Orphan Facility
Two 200 bbl tanks in an unlined dike very overgrown with phragmites. The western tank sounds empty but appears to have rusted out at the bottom near the haft. Some stained soil observed in a small area. Both tanks very rusty.

Shissler CTB

1124
Saint Clair
Orphan Facility
Knock out vessel in small diked area with cradles for horizontal tank. Shed is okay, but rusty and dented. Slight gassy odor observed, unable to locate source.

Spurlock CTB

1125
Saint Clair
Orphan Facility
Two 300 bbl tanks is an unlined dike. Dike is overgrown with phragmites. A separate dike that appears to have held a heater previously. Area is completely overgrown. No spills, leaks, or odor observed.

Burmann TB

1082
Saint Clair
Orphan Facility
Tanks removed, piping left

Blazczak TB

922
Saint Clair
Orphan Facility
Vertical separator in overgrown unlined dike with a 100 bbl tank. Tank is fiberglass and empty. Separator is in okay condition. Two 200 bbl tanks in overgrown unlined dike. Both tanks are rusty, but sound empty. No spills, leaks, or odor observed. Load out area is a covered metal drum.

Blazczak B TB

924
Saint Clair
Orphan Facility
Vertical separator in an small unlined dike. Small 20 bbl tank on the ground outside of containment. Two 200 bbl tanks in an unlined dike. Tanks are in okay condition, but rusty. Load out area is covered 55 gallon drum with oil on the top and spilling to the ground.

Reske 0-1 TB

944
Saint Clair
Orphan Facility
Vertical separator in small unlined dike. Dike is completely overgrown. No spills, leaks, or odor observed. One 100 bbl tank near separator with no signs of leaks, spills, or odor. Two 200 bbl tanks are rusty in an unlined dike that is completely overgrown. No spills, leaks, or odor observed. Oil residue on top of the covered drum at the load out area.

Ringel 2 CTB

3391
Saint Clair
Orphan Facility
2 -210 bbl stock tanks. Heavily vegetated with fragmites, 5-10 uR/hr, CH4 50ppm is background. 1 H/T and a meter shed. 1 small separator and a line heater. All background readings CH4 at 15 ppm. Took pics.

Baumgarten CTB

969
Saint Clair
Orphan Facility
Tanks removed 2019/2020, other equipment remains

Taetz 0-2 TB

945
Saint Clair
Orphan Facility
2 - 210 bbl tanks (empty), 1 vertical separator (empty). No detections for H2S, CH4 and TENORM. Good access from Marine City Hwy. Crude oil spill (<.5bbl) near loadout piping observed.
Dennis Thueme 1-A TB (Venture Oil and Gas, Inc.)
958
Saint Clair
Orphan Facility
One 200 bbl tank in unlined dike. Tank is approximately half full of oil. Theft hatch partially open with odor observed as you walk up to the tank. Tape measure next to hatch. Separator and out of service tank also on the ground.
Burman 0-1
PN 21703
Saint Clair
Orphan Well
Well site is restored, 6 joints of tbg. remain on ground
Thueme 1
PN 23463
Saint Clair
Orphan Well
Well plugged, scrap on ground

For bidding purposes, it is estimated that this project will take approximately 135 days.

The purpose of this Statement of Work (SOW) is to complete the following at all facility locations:

· Mobilize all necessary equipment and personnel to the site to complete the SOW

· Decommission (remove, demolish, scrap, salvage, properly dispose) of all facility infrastructure including buildings, meter sheds, above ground piping, items inside buildings, tanks, and facility processing equipment

· Remove all electrical infrastructure, fencing, and any other items related to the facilities in this project

· Pump out tank fluids and sludges and fluids and sludges from associated equipment, clean tanks and equipment as necessary, collect fluids and sludges for proper disposal at a permitted disposal well or landfill disposal facility

· To the extent possible, remove all associated flowlines with the facilities. Backfill with clean fill, and reseed as necessary

· EGLE will assist with procuring any necessary waste profiles at a disposal facility, if liquid or solid waste disposal becomes necessary.

· Restore facility locations (backfill with clean fill, grade location to original grade, and reseed if necessary).

· Contractor will provide documentation of 40-hour OSHA training certificates for all appropriate personnel

· EGLE will be the listed Generator for waste disposal purposes. Oilfield waste is exempt and is considered Non-Hazardous Oilfield Waste under Part 111

· Contractor will provide EGLE with copies of all waste manifests, and daily summary logs

· Contractor will assist in scrapping and/or re-sale of facility equipment and will follow all applicable rules of this contract with the State of Michigan. See rules and regulations for Scrap and Salvage items.

· Contractor will provide EGLE with a brief Summary Report, which will document all activities completed, any liquid and sludge wastes removed and daily work activity sheets.

For the purposes of this SOW, the following project assumptions will apply:

· EGLE will secure site access.

· An EGLE On-Site Coordinator (OSC) may be onsite during the course of the project. The EGLE OSC has the authority to direct work at all times. The Contractor's Site Superintendent is the point of contact between the EGLE and the Contractor during site work. A Site Superintendent will be onsite at all times during site work. The EGLE OSC will only discuss project matters with the Site Superintendent. The Site Superintendent must direct work with his/her Contractor at the overall direction of the EGLE.

· The Site Superintendent will brief the EGLE OSC once per day on project progress and cost expenditures incurred to date on the project Notes:

Prior to mobilization, a pre-construction meeting will be conducted with the successful vendor to review and confirm items.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder must describe how they comply with the above requirement(s):

2. Acceptance

2.1. Final Acceptance

Final acceptance of a project’s services and deliverables is achieved when:

· EGLE certifies that all work associated with the project is completed, records have been submitted to the State’s satisfaction, and any required guarantees have been provided by the Contractor.

· Proof, identified by project name and invoice number, is received by EGLE and Contract Compliance Inspector that all subcontractors associated with or connected with the work on the project assignment have been paid in full.

· Proof is received by the Contract Compliance Inspector that all entities which incurred damage or loss (e.g., owners of property, including growing crops damaged by contract activities, etc.) have been reimbursed by the Contractor, as directed by EGLE.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

3. Staffing

3.1. Contractor Representative

The Contractor must appoint an individual specifically assigned to State of Michigan accounts, who will respond to State inquiries regarding the Contract Activities, answer questions related to ordering and delivery, etc. (the “Contractor Representative”).

The Contractor must notify the Contract Administrator at least 30 calendar days before removing or assigning a new Contractor Representative.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder must identify its Contractor Representative:

3.2. Key Personnel

The Contractor must appoint at least one individual who will be directly responsible for the day-to-day operations of the Contract (“Key Personnel”). Key Personnel must be specifically assigned to the State account, be knowledgeable on the contractual requirements, and respond to State inquiries within 24 hours.

The State has the right to recommend and approve in writing the initial assignment, as well as any proposed reassignment or replacement, of any Key Personnel. Before assigning an individual to any Key Personnel position, Contractor will notify the State of the proposed assignment, introduce the individual to the State’s Project Manager, and provide the State with a resume and any other information about the individual reasonably requested by the State. The State reserves the right to interview the individual before granting written approval. In the event the State finds a proposed individual unacceptable, the State will provide a written explanation including reasonable detail outlining the reasons for the rejection. The State may require a 30-calendar day training period for replacement personnel.

Contractor will not remove any Key Personnel from their assigned roles on this Contract without the prior written consent of the State. The Contractor’s removal of Key Personnel without the prior written consent of the State is an unauthorized removal (“Unauthorized Removal”). An Unauthorized Removal does not include replacing Key Personnel for reasons beyond the reasonable control of Contractor, including illness, disability, leave of absence, personal emergency circumstances, resignation, or for cause termination of the Key Personnel’s employment. Any Unauthorized Removal may be considered by the State to be a material breach of this Contract, in respect of which the State may elect to terminate this Contract for cause under the Termination for Cause section of the Standard Contract Terms. It is further acknowledged that an Unauthorized Removal will interfere with the timely and proper completion of this Contract, to the loss and damage of the State, and that it would be impracticable and extremely difficult to fix the actual damage sustained by the State as a result of any Unauthorized Removal. Therefore, Contractor and the State agree that in the case of any Unauthorized Removal in respect of which the State does not elect to exercise its rights under Termination for Cause, Contractor will issue to the State the corresponding credits set forth below (each, an “Unauthorized Removal Credit”):

i. For the Unauthorized Removal of any Key Personnel designated in the applicable Statement of Work, the credit amount will be $25,000 per individual if Contractor identifies a replacement approved by the State and assigns the replacement to shadow the Key Personnel who is leaving for a period of at least 30-calendar days before the Key Personnel’s removal.

ii. If Contractor fails to assign a replacement to shadow the removed Key Personnel for at least 30-calendar days, in addition to the $25,000 credit specified above, Contractor will credit the State $833.33 per calendar day for each day of the 30-calendar day shadow period that the replacement Key Personnel does not shadow the removed Key Personnel, up to $25,000 maximum per individual. The total Unauthorized Removal Credits that may be assessed per Unauthorized Removal and failure to provide 30-calendar days of shadowing will not exceed $50,000 per individual.

Contractor acknowledges and agrees that each of the Unauthorized Removal Credits assessed above: (i) is a reasonable estimate of and compensation for the anticipated or actual harm to the State that may arise from the Unauthorized Removal, which would be impossible or very difficult to accurately estimate; and (ii) may, at the State’s option, be credited or set off against any fees or other charges payable to Contractor under this Contract.

The Contractor must identify the Key Personnel, indicate where they will be physically located, describe the functions they will perform, and provide current chronological résumés.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

A. The Contractor must identify all Key Personnel that will be assigned to this contract in the table below which includes the following:

1. Name and title of staff that will be designated as Key Personnel.

2. Key Personnel years of experience in the current classification.

3. Identify which of the required key personnel positions they are fulfilling.

4. Key…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .