- Request for Proposals (RFP) 2027-1000-0027 Center Pit Lake Groundwater Investigation
- Issued by
- Anchorage Municipality, Alaska
About this file
This is a Request for Proposals (RFP) issued by the State of Alaska Department of Natural Resources, Division of Mining, Land and Water, seeking qualified contractors to provide water investigation services at Center Pit Lake, located approximately 15 road miles east of Healy, Alaska. The RFP solicits proposals for groundwater investigation services at the specified site. Proposals must be received no later than 2:00 PM Alaska Time on July 16, 2026, as indicated by postmark or email timestamp, with late proposals subject to rejection. The winning proposal will be selected by a departmental evaluation committee based on the highest score achieved against established evaluation criteria, and all offerors will receive notification of the intent to award decision.
The RFP requires offerors to register in writing with the DNR Procurement Section via email to shawn.olsen@alaska.gov to receive subsequent addendums and solicitation updates; failure to register may result in proposal rejection. Individuals requiring auxiliary aids, services, or special modifications to submit proposals must contact the DNR Procurement Section no later than 10 calendar days prior to the proposal due date. The State of Alaska complies with Title II of the Americans with Disabilities Act of 1990. Contact information for procurement inquiries includes email at shawn.olsen@alaska.gov, telephone at 1 (907) 269-8687, or TTY/TDD access through Alaska Relay at 711.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF ALASKA
REQUEST FOR
PROPOSALS
OFFERORS ARE NOT REQUIRED TO RETURN THIS FORM.
IMPORTANT NOTICE: IF YOU RECEIVED THIS SOLICITATION FROM THE STATE OF ALASKA’S “ONLINE PUBLIC NOTICE” WEB SITE, YOU MUST REGISTER WITH THE PROCUREMENT OFFICER LISTED IN THIS DOCUMENT TO RECEIVE
NOTIFICATION OF SUBSEQUENT ADDENDUMS. FAILURE TO CONTACT THE PROCUREMENT OFFICER MAY RESULT IN THE
REJECTION OF YOUR OFFER.
ISSUED BY:
DEPARTMENT OF NATURAL RESOURCES
SUPPORT SERVICES DIVISION
PRIMARY CONTACT:
SHAWN M. OLSEN
PROCUREMENT OFFICER
SHAWN.OLSEN@ALASKA.GOV
1 (907) 269-8687
RFP 2027-1000-0027
CENTER PIT LAKE GROUNDWATER INVESTIGATION
ISSUED JUNE 25, 2026
mailto:shawn.olsen@alaska.gov
STATE OF ALASKA – REQUEST FOR PROPOSALS (RFP) RFP 2027-1000-0027
REV 08/24
TABLE OF CONTENTS
SECTION 1. INTRODUCTION & INSTRUCTIONS
SEC. 1.01 PURPOSE OF THE RFP
SEC. 1.02 BUDGET
SEC. 1.03 DEADLINE FOR RECEIPT OF PROPOSALS
SEC. 1.04 MINIMUM PRIOR EXPERIENCE
SEC. 1.05 REQUIRED REVIEW
SEC. 1.06 QUESTIONS PRIOR TO DEADLINE FOR RECEIPT OF PROPOSALS
SEC. 1.07 RETURN INSTRUCTIONS
SEC. 1.08 ENROLLMENT IN IRIS
SEC. 1.09 ASSISTANCE TO OFFERORS WITH A DISABILITY
SEC. 1.10 AMENDMENTS TO PROPOSALS
SEC. 1.11 ADDENDUMS TO THE RFP
SEC. 1.12 RFP SCHEDULE
SEC. 1.13 PRE-PROPOSAL CONFERENCE/TELECONFERENCE
SEC. 1.14 ALTERNATE PROPOSALS
SEC. 1.15 NEWS RELEASES
SECTION 2. BACKGROUND INFORMATION
SEC. 2.01 BACKGROUND INFORMATION
SECTION 3. SCOPE OF WORK & CONTRACT INFORMATION
SEC. 3.01 SCOPE OF WORK
SEC. 3.02 CONTRACT TERM AND WORK SCHEDULE
SEC. 3.03 DELIVERABLES AND DELIVERABLE DUE DATES
SEC. 3.04 CONTRACT TYPE
SEC. 3.05 PROPOSED PAYMENT PROCEDURES
SEC. 3.06 PROMPT PAYMENT FOR STATE PURCHASES
SEC. 3.07 CONTRACT PAYMENT
SEC. 3.08 CONTRACT PRICE ADJUSTMENTS
SEC. 3.09 LOCATION OF WORK
SEC. 3.10 THIRD-PARTY SERVICE PROVIDERS
SEC. 3.11 SUBCONTRACTORS
SEC. 3.12 JOINT VENTURES
SEC. 3.13 RIGHT TO INSPECT PLACE OF BUSINESS
SEC. 3.14 F.O.B. POINT
SEC. 3.15 CONTRACT PERSONNEL
SEC. 3.16 INSPECTION & MODIFICATION - REIMBURSEMENT FOR UNACCEPTABLE DELIVERABLES
SEC. 3.17 LIQUIDATED DAMAGES
SEC. 3.18 CONTRACT CHANGES - UNANTICIPATED AMENDMENTS
SEC. 3.19 NONDISCLOSURE AND CONFIDENTIALITY
SEC. 3.20 INDEMNIFICATION
SEC. 3.21 INSURANCE REQUIREMENTS
SEC. 3.22 TERMINATION FOR DEFAULT
SECTION 4. PROPOSAL FORMAT AND CONTENT
SEC. 4.01 INTRODUCTION
SEC. 4.02 PROPOSAL CONTENTS
SEC. 4.03 EXPERIENCE AND QUALIFICATIONS
SEC. 4.04 UNDERSTANDING OF THE PROJECT
SEC. 4.05 METHODOLOGY USED FOR THE PROJECT
SEC. 4.06 MANAGEMENT PLAN FOR THE PROJECT
SEC. 4.07 COST PROPOSAL
SEC. 4.08 BID BOND – PERFORMANCE BOND – SURETY DEPOSIT
SEC. 4.09 EVALUATION CRITERIA
SECTION 5. EVALUATION CRITERIA AND CONTRACTOR SELECTION
SEC. 5.01 SUMMARY OF EVALUATION PROCESS
SEC. 5.02 EVALUATION CRITERIA
SEC. 5.03 SCORING METHOD AND CALCULATION
SEC. 5.04 EXPERIENCE AND QUALIFICATIONS (20%)
SEC. 5.05 UNDERSTANDING OF THE PROJECT (10%)
SEC. 5.06 METHODOLOGY USED FOR THE PROJECT (5%)
SEC. 5.07 MANAGEMENT PLAN FOR THE PROJECT (15%)
SEC. 5.08 CONTRACT COST (40%)
SEC. 5.09 ALASKA OFFEROR PREFERENCE (10%)
SECTION 6. GENERAL PROCESS AND LEGAL INFORMATION
SEC. 6.01 INFORMAL DEBRIEFING
SEC. 6.02 ALASKA BUSINESS LICENSE AND OTHER REQUIRED LICENSES
SEC. 6.03 SITE INSPECTION
SEC. 6.04 CLARIFICATION OF OFFERORS
SEC. 6.05 DISCUSSIONS WITH OFFERORS
SEC. 6.06 EVALUATION OF PROPOSALS
SEC. 6.07 CONTRACT NEGOTIATION
SEC. 6.08 FAILURE TO NEGOTIATE
SEC. 6.09 OFFEROR NOTIFICATION OF SELECTION
SEC. 6.10 PROTEST
SEC. 6.11 APPLICATION OF PREFERENCES
SEC. 6.12 ALASKA BIDDER PREFERENCE
SEC. 6.13 ALASKA VETERAN PREFERENCE
SEC. 6.14 ALASKA MILITARY SKILLS PROGRAM PREFERENCE
SEC. 6.15 STANDARD CONTRACT PROVISIONS
SEC. 6.16 QUALIFIED OFFERORS
SEC. 6.17 PROPOSAL AS PART OF THE CONTRACT
SEC. 6.18 ADDITIONAL TERMS AND CONDITIONS
SEC. 6.19 HUMAN TRAFFICKING
SEC. 6.20 RIGHT OF REJECTION
SEC. 6.21 STATE NOT RESPONSIBLE FOR PREPARATION COSTS
SEC. 6.22 DISCLOSURE OF PROPOSAL CONTENTS
SEC. 6.23 ASSIGNMENT
SEC. 6.24 FORCE MAJEURE (IMPOSSIBILITY TO PERFORM)
SEC. 6.25 DISPUTES
SEC. 6.26 SEVERABILITY
SEC. 6.27 SUPPLEMENTAL TERMS AND CONDITIONS
SEC. 6.28 SOLICITATION ADVERTISING
SEC. 6.29 FEDERALLY IMPOSED TARIFFS
SECTION 7. ATTACHMENTS
SEC. 7.01 ATTACHMENTS
SECTION 1. INTRODUCTION & INSTRUCTIONS
SEC. 1.01 PURPOSE OF THE RFP
The Department of Natural Resources, Division of Mining, Land and Water is soliciting proposals for a qualified contractor to provide water investigation services at the Center Pit Lake, approximately 15 road miles east of Healy, Alaska; a more detailed description including scope of work is to be provided in Section 3.
SEC. 1.02 BUDGET
The Department of Natural Resources, Division of Mining, Land and Water estimates a budget of $200,000.00 dollars for completion of this project. Proposals priced at more than $300,000.00 will be considered non-responsive.
Payment for the contract is subject to funds already appropriated and identified.
SEC. 1.03 DEADLINE FOR RECEIPT OF PROPOSALS
Proposals must be received no later than 2:00 PM Alaska Time on July 16, 2026, as indicated by postmark or email timestamp and late proposals will not be considered.
SEC. 1.04 MINIMUM PRIOR EXPERIENCE
In order for offers to be considered responsive offerors must meet these minimum prior experience requirements:
• The offeror must not have had a contract terminated for cause by the State within the last three years.
• Three similar projects performing groundwater hydrology and characterization services.
• Must provide bathymetric mapping and drone/sonar-based site characterization services.
• Firm must have five years of experience providing hydrogeology and water quality investigation services.
• Firm must have at least one Professional Geologist (PG).
Offerors must detail in their proposal how they meet the minimum prior experience requirements above. Offerors that fail to identify in their proposals how they meet the prior experience requirements will be deemed non-responsive.
SEC. 1.05 REQUIRED REVIEW
Offerors should carefully review this solicitation for defects and questionable or objectionable material. Comments concerning defects and questionable or objectionable material should be made in writing and received by the Procurement Officer at least 10 days before the deadline for receipt of proposals. This will allow time for the issuance of any necessary amendments. It will also help prevent the opening of a defective proposal and exposure of offeror's proposals upon which award could not be made.
SEC. 1.06 QUESTIONS PRIOR TO DEADLINE FOR RECEIPT OF PROPOSALS
All questions must be in writing and directed to the Procurement Officer. The interested party must confirm telephone conversations in writing.
Two types of questions generally arise. One may be answered by directing the questioner to a specific section of the RFP. These questions may be answered over the telephone. Other questions may be more complex and may require a written addendum to the RFP. The Procurement Officer will make that decision.
Deadline to receive questions is July 01, 2026, by 2:00 PM Alaska Time.
PROCUREMENT OFFICER: SHAWN M. OLSEN; PHONE 1 (907) 269-8687; TDD 711 (Alaska Relay);
EMAIL: shawn.olsen@alaska.gov.
SEC. 1.07 RETURN INSTRUCTIONS
If submitting a proposal via email, the technical proposal and cost proposal must be saved as separate PDF documents and emailed to shawn.olsen@alaska.gov as separate, clearly labeled attachments, such as “Vendor A – Technical Proposal.pdf” and “Vendor A – Cost Proposal.pdf” (Vendor A is the name of the offeror). The email must contain the RFP number in the subject line.
The maximum size of a single email (including all text and attachments) that can be received by the State is 20 megabytes. If the email containing the proposal exceeds this size, the proposal must be sent in multiple emails that are each less than 20 megabytes, and each email must comply with the requirements described above.
Please note that email transmission is not instantaneous. Similar to sending a hard copy proposal, if you are emailing your proposal, the State recommends sending it ahead of time to ensure the email is delivered by the deadline for receipt of proposals.
If submitting proposals using U.S. mail, or delivery service, offerors must submit one hard copy of their proposal, in writing, to the procurement officer in a sealed package. The cost proposal included in the package must be sealed separately from the rest of the proposal and must be clearly identified. The sealed proposal package(s) must be addressed as follows:
Department of Natural Resources Support Services Division
Attention: SHAWN M. OLSEN Request for Proposal (RFP) Number: 2027-1000-0027 RFP Title: Center Pit Lake Groundwater Investigation
550 W 7th Avenue, Suite 1330 Anchorage, Alaska 99501
It is the offeror’s responsibility to contact the issuing agency at 1 (907) 269-8687 to confirm that the proposal has been received. The State is not responsible for unreadable, corrupt, or missing attachments.
mailto:shawn.olsen@alaska.gov mailto:shawn.olsen@alaska.gov
SEC. 1.08 ENROLLMENT IN IRIS
Offerors will be required to be enrolled in the State of Alaska’s Integrated Resource Information System (IRIS) database prior to the award of a contract resulting from this RFP. Enrollment can be done online at the following link: https://iris-vss.alaska.gov. Offerors who are not enrolled prior to the award of a contract will be notified by DNR Procurement. Failure of an offeror to enroll in the IRIS database will delay award of the contract and may delay issuance of contract work.
SEC. 1.09 ASSISTANCE TO OFFERORS WITH A DISABILITY
Offerors with a disability may receive accommodation regarding the means of communicating this RFP or participating in the procurement process. For more information, contact the Procurement Officer no later than 10 days prior to the deadline for receipt of proposals.
SEC. 1.10 AMENDMENTS TO PROPOSALS
Amendments to or withdrawals of proposals will only be allowed if acceptable requests are received prior to the deadline that is set for receipt of proposals. No amendments or withdrawals will be accepted after the deadline unless they are in response to the State's request in accordance with 2
AAC 12.290.
SEC. 1.11 ADDENDUMS TO THE RFP
If an addendum is issued before the deadline for receipt of proposals, the addendum will be posted on the State of Alaska Online Public Notice (OPN) website. The link to the posting of the addendum will be provided to all who were notified of the RFP and to those who have registered with the Procurement Officer after receiving the RFP from the OPN.
After receipt of proposals, if there is a need for any substantial clarification or material change in the RFP, an addendum will be issued. The addendum will incorporate the clarification or change, and a new date and time established for new or amended proposals. Evaluations may be adjusted as a result of receiving new or amended proposals.
SEC. 1.12 RFP SCHEDULE
RFP schedule set out herein represents the State’s best estimate of the schedule that will be followed. If a component of this schedule, such as the deadline for receipt of proposals, is delayed, the rest of the schedule may be shifted accordingly. All times are Alaska Time.
ACTIVITY TIME DATE
Issue Date / RFP Released June 25, 2026 Deadline for Receipt of Questions 2:00 PM July 01, 2026 Deadline for Receipt of Proposals / Proposal Due Date 2:00 PM July 16, 2026 ANTICIPATED Proposal Evaluations Complete Week of July 20, 2026 ANTICIPATED Notice of Intent to Award Week of July20, 2026 ANTICIPATED Contract Issued Week of August 03, 2026
This RFP does not, by itself, obligate the State. The State's obligation will commence when the contract is approved by the Commissioner of the Department of Natural Resources, or the Commissioner's designee. Upon written notice to the Contractor, the State may set a different starting date for the contract. The State will not be responsible for any work done by the Contractor, even work done in good faith, if it occurs prior to the contract start date set by the State.
https://iris-vss.alaska.gov/
SEC. 1.13 PRE-PROPOSAL CONFERENCE/TELECONFERENCE
Not applicable to this RFP.
SEC. 1.14 ALTERNATE PROPOSALS
Offerors may only submit one proposal for evaluation. In accordance with 2 AAC 12.830 alternate proposals (proposals that offer something different than what is asked for) will be rejected.
SEC. 1.15 NEWS RELEASES
News releases related to this RFP will not be made without prior approval of the Project Manager.
SECTION 2. BACKGROUND INFORMATION
SEC. 2.01 BACKGROUND INFORMATION
The Department of Natural Resources (DNR) is planning a reclamation project at the abandoned Center Pit, a remnant of historical coal mining activity east of Healy. The pit currently impounds water with depths reaching approximately 40 feet. DNR intends to dewater the pit to allow for reclamation activities that will eliminate the hazardous highwall and restore the site to a stable, safe condition.
During July and August 2026, DNR will construct a road to the top of the Center Pit highwall to provide safe, reliable access for state personnel, contractors, and consultants. The subsequent design and execution of the pit dewatering and reclamation excavation and embankment will require a comprehensive understanding of the pit lake hydrology, groundwater recharge, and water chemistry.
This Scope of Work defines the tasks required to support DNR in characterizing pit water and groundwater interactions to inform dewatering design, environmental compliance, and final reclamation planning.
SECTION 3. SCOPE OF WORK & CONTRACT INFORMATION
SEC. 3.01 SCOPE OF WORK
The Department of Natural Resources, Division of Mining, Land and Water is soliciting proposals for a qualified contractor to groundwater investigation of services.
The Contractor shall:
• Characterize the physical, chemical, and hydrologic properties of the water contained within the Center Pit.
• Evaluate groundwater recharge sources, rates, and pathways.
• Characterize potential subsurface zones of saturation or frozen ground with potential to impact reclamation design excavation or embankment of Center Pit and the adjacent East Coal Creek.
• Provide data and analysis necessary for designing a safe, effective pit dewatering strategy.
• Support long-term reclamation planning by understanding hydrologic conditions influencing site stability and water management.
CONTRACTOR RESPONSIBILITIES/TASKS
Task 1- Project Planning and Field Logistics:
The Contractor shall:
• Coordinate with DNR to review site access, safety protocols, and logistical constraints.
• Identify equipment, personnel, and subcontractors required for field sampling, borehole drilling, and hydrologic measurements.
• Participate in a kickoff meeting with DNR.
Task 2 – Site Assessment and Water Body Mapping:
The Contractor shall:
• Conduct an initial site visit to evaluate access routes, pit geometry, and potential sampling locations.
• Map the pit water surface area and estimate current depth profile using sonar, drone-based photogrammetry, LiDAR, or other approved methods.
• Identify groundwater seeps, inflow zones, and potential outlet pathways.
Task 3 – Water Quality Sampling and Analysis:
The Contractor shall:
• Collect water samples from multiple depth intervals and representative locations across the pit.
• Analyze samples for parameters including but not limited to: metals, pH, alkalinity, TSS, conductivity, sulfate, chloride, major ions, and any additional constituents required by Alaska DEC or applicable regulations.
• Collect field parameters (temperature, DO, turbidity, conductivity) using calibrated instruments.
• Prepare a laboratory-certified analytical data package and QA/QC summary.
Task 4 – Groundwater Recharge and Hydrologic Characterization:
The Contractor shall:
• Install temporary piezometers or monitoring wells to spatially define groundwater flow systems (if required/authorized by DNR).
• Measure groundwater levels, hydraulic gradients, and recharge rates.
• Conduct slug tests or short-duration pumping tests as needed to estimate hydraulic conductivity.
• Evaluate groundwater inflow to the pit using hydrologic modeling or mass balance calculations.
Task 5 – Dewatering Feasibility Evaluation:
The Contractor shall:
• Assess potential dewatering rates based on recharge, pit volume, and site hydraulics.
• Identify feasible pumping locations, conveyance routes, and discharge or treatment requirements.
• Recommend strategies to manage water quality during dewatering.
• Provide input on permitting needs related to water discharge, treatment, or disturbance.
Task 6 – Reporting and Deliverables:
The Contractor shall provide the following:
1. Field Sampling Plan (FSP) prior to fieldwork,
2. Interim Field Memo summarizing observations, preliminary measurements, and any deviations from plan,
3. Hydrologic and Water Quality Report including:
a. Sampling results and QA/QC,
b. Pit bathymetry and water volume estimates,
c. Groundwater recharge assessment,
d. Subsurface aquifer mapping,
e. Hydrologic model outputs (if applicable),
f. Dewatering recommendations and constraints,
g. Data tables, maps, figures, GIS layers, CAD files.
DNR RESPONSIBILITIES
DNR will:
• Provide site access permissions and coordinate with landowners or adjacent leaseholders.
• Share historic maps, mining data, and prior reports.
• Arrange access following completion of road construction in July–August 2026.
• Review contractor submissions and provide timely feedback.
SCHEDULE
• Road construction access: accessible by August 15, 2026
• Fieldwork: To be conducted immediately following confirmation of safe access
• Draft report: Within X days of field completion
• Final report: Within X days of receipt of DNR comments.
SEC. 3.02 CONTRACT TERM AND WORK SCHEDULE
The length of the contract will be from the date of award, until completion, approximately October 31, 2026.
Unless otherwise provided in this RFP, the State and the successful offeror/contractor agree: (1) that any extension of the contract excluding any exercised renewal options, will be considered as a month-to-month extension, and all other terms and conditions shall remain in full force and effect and (2) the Procurement Officer will provide notice to the Contractor of the intent to cancel such month-to-month extension at least 30 days before the desired date of cancellation. A month-to-month extension may only be executed by the Procurement Officer via a written contract amendment.
SEC. 3.03 DELIVERABLES AND DELIVERABLE DUE DATES
The Contractor shall provide the following deliverables:
1. Field Sampling Plan – within two weeks of an executed contract or negotiated and approved date,
2. Mapping/GIS files/CAD files – within four weeks of an approved field sampling plan or negotiated and approved date,
3. Water chemistry data package – within three weeks of an approved field sampling plan or negotiated and approved date,
4. Hydrologic evaluation and dewatering design support report – no later than October 15, 2026,
5. Final compiled electronic report (PDF) and all supporting data files (Excel, shapefiles, etc.) – Approximately October 31, 2026.
SEC. 3.04 CONTRACT TYPE
The resulting contract will be a Firm Fixed Price contract.
SEC. 3.05 PROPOSED PAYMENT PROCEDURES
The State will make payments based on a negotiated payment schedule. Each billing must consist of an invoice and progress report. No payment will be made until the progress report, and the invoice has been approved by the Project Manager.
SEC. 3.06 PROMPT PAYMENT FOR STATE PURCHASES
Not applicable to this RFP.
SEC. 3.07 CONTRACT PAYMENT
No payment will be made until the contract is approved by the Commissioner of the Department of Natural Resources or the Commissioner's designee. Under no conditions will the State be liable for the payment of any interest charges associated with the cost of the contract. The State is not responsible for and will not pay federal, state, or local taxes. All costs associated with the contract must be stated in U.S. currency.
Payment for agreements under $500,000.00 for the undisputed purchase of goods or services provided to a state agency, will be made within 30 days of the receipt of a proper billing or the delivery of the goods or services to the location(s) specified in the agreement, whichever is later. A late payment is subject to 1.5% interest per month on the unpaid balance. Interest will not be paid if there is a dispute or if there is an agreement that establishes a lower interest rate or precludes the charging of interest.
Any single contract payment of $1 million or higher must be accepted by the Contractor via Electronic Funds Transfer (EFT).
SEC. 3.08 CONTRACT PRICE ADJUSTMENTS
Not applicable to this RFP.
SEC. 3.09 LOCATION OF WORK
The location(s) the work is to be performed, completed, and managed will be at the Center Pit Lake, which is approximately 15 road miles east of Healy Alaska.
The State WILL NOT provide workspace for the Contractor. The Contractor must provide its own workspace.
The Contractor should include in their price proposal: transportation, lodging, and per diem costs sufficient to pay for necessary number of person(s) to make the necessary number of trip(s) to Healy, Alaska. Travel to other locations will not be required.
By signature on their proposal, the offeror certifies that all services provided under this contract by the Contractor and all subcontractors shall be performed in the United States.
If the offeror cannot certify that all work will be performed in the United States, the offeror must contact the Procurement Officer in writing to request a waiver at least 10 days prior to the deadline for receipt of proposals.
The request must include a detailed description of the portion of work that will be performed outside the United States, where, by whom, and the reason the waiver is necessary.
Failure to comply with these requirements may cause the State to reject the proposal as non-responsive or cancel the contract.
SEC. 3.10 THIRD-PARTY SERVICE PROVIDERS
Not applicable to this RFP.
SEC. 3.11 SUBCONTRACTORS
Subcontractors may be used to perform work under this contract. If an offeror intends to use subcontractors, the offeror must identify in the proposal the names of the subcontractors and the portions of the work the subcontractors will perform.
Subcontractor experience SHALL NOT be considered in determining whether the offeror meets the requirements set forth in SEC. 1.04 Prior Experience.
If a proposal with subcontractors is selected, the offeror must provide the following information concerning each prospective subcontractor within five working days from the date of the State's request:
• complete name of the subcontractor;
• complete address of the subcontractor;
• type of work the subcontractor will be performing;
• percentage of work the subcontractor will be providing;
• evidence that the subcontractor holds a valid Alaska business license;
If a subcontractor on the list did not have a valid Alaska business license at the close of the RFP, the Offeror may not use the subcontractor in the performance of the contract and shall replace the subcontractor with a subcontractor who had a valid Alaska business license at the close of the RFP.
• a written statement, signed by each proposed subcontractor, that clearly verifies that the subcontractor is committed to rendering the services required by the contract.
An offeror's failure to provide this information within the time set may cause the State to consider their proposal non-responsive and reject it. The substitution of one subcontractor for another may be made only at the discretion and prior written approval of the Project Manager.
Note that if the subcontractor will not be performing work within Alaska, they will not be required to hold an Alaska business license.
SEC. 3.12 JOINT VENTURES
Joint ventures will not be allowed.
SEC. 3.13 RIGHT TO INSPECT PLACE OF BUSINESS
At reasonable times, the State may inspect those areas of the Contractor's place of business that are related to the performance of a contract. If the State makes such an inspection, the Contractor must provide reasonable assistance.
SEC. 3.14 F.O.B. POINT
Not applicable to this RFP.
SEC. 3.15 CONTRACT PERSONNEL
Any change of the project team members or subcontractors named in the proposal must be approved, in advance and in writing, by the Project Manager or Procurement Officer. Changes that are not approved by the State may be grounds for the State to terminate the contract.
SEC. 3.16 INSPECTION & MODIFICATION - REIMBURSEMENT FOR
UNACCEPTABLE DELIVERABLES
The Contractor is responsible for the completion of all work set out in the contract. All work is subject to inspection, evaluation, and approval by the Project Manager. The State may employ all reasonable means to ensure that the work is progressing and being performed in compliance with the contract.
The Project Manager or Procurement Officer may instruct the Contractor to make corrections or modifications if needed in order to accomplish the contract’s intent. The Contractor will not unreasonably withhold such changes.
The substantial failure of the Contractor to perform the contract may cause the State to terminate the contract. In this event, the State may require the Contractor to reimburse monies paid (based on the identified portion of unacceptable work received) and may seek associated damages.
SEC. 3.17 LIQUIDATED DAMAGES
Not applicable to this RFP.
SEC. 3.18 CONTRACT CHANGES - UNANTICIPATED AMENDMENTS
During the course of this contract, the Contractor may be required to perform additional work. That work will be within the general scope of the initial contract. When additional work is required, the Project Manager will provide the Contractor with a written description of the additional work and request the Contractor to submit a firm time schedule for accomplishing the additional work and a firm price for the additional work. Cost and pricing data must be provided to justify the cost of such amendments per AS 36.30.400.
The Contractor will not commence additional work until the Procurement Officer has secured any required State approvals necessary for the amendment and issued a written contract amendment, approved by the Commissioner of the Department of Natural Resources or the Commissioner's designee.
SEC. 3.19 NONDISCLOSURE AND CONFIDENTIALITY
The Contractor agrees that all confidential information shall be used only for purposes of providing the deliverables and performing the services specified herein and shall not disseminate or allow dissemination of confidential information except as provided for in this section. The Contractor shall hold as confidential and will use reasonable care (including both facility physical security and electronic security) to prevent unauthorized access by, storage, disclosure, publication, dissemination to and/or use by third parties of, the confidential information. “Reasonable care” means compliance by the Contractor with all applicable federal and state law, including the Social Security Act and HIPAA. The Contractor must promptly notify the State in writing if it becomes aware of any storage, disclosure, loss, unauthorized access to or use of the confidential information.
Confidential information, as used herein, means any data, files, software, information or materials (whether prepared by the State or its agents or advisors) in oral, electronic, tangible or intangible form and however stored, compiled or memorialized that is classified confidential as defined by State of Alaska classification and categorization guidelines provided by the State to the Contractor or a contractor agent or otherwise made available to the Contractor or a contractor agent in connection with this contract, or acquired, obtained or learned by the Contractor or a contractor agent in the performance of this contract. Examples of confidential information include, but are not limited to: technology infrastructure, architecture, financial data, trade secrets, equipment specifications, user lists, passwords, research data, and technology data (infrastructure, architecture, operating systems, security tools, IP addresses, etc.).
If confidential information is requested to be disclosed by the Contractor pursuant to a request received by a third party and such disclosure of the confidential information is required under applicable federal or state law, regulation, governmental or regulatory authority, the Contractor may disclose the confidential information after providing the State with written notice of the requested disclosure (to the extent such notice to the State is permitted by applicable law) and giving the State opportunity to review the request. If the Contractor receives no objection from the State, it may release the confidential information within 30 days. Notice of the requested disclosure of confidential information by the Contractor must be provided to the State within a reasonable time after the Contractor’s receipt of notice of the requested disclosure and, upon request of the State, shall seek to obtain legal protection from the release of the confidential information.
The following information shall not be considered confidential information: information previously known to be public information when received from the other party; information freely available to the general public; information which now is or hereafter becomes publicly known by other than a breach of confidentiality hereof; or information which is disclosed by a party pursuant to subpoena or other legal process and which as a result becomes lawfully obtainable by the general public.
SEC. 3.20 INDEMNIFICATION
The Contractor shall indemnify, hold harmless, and defend the Contracting Agency from and against any claim of, or liability for error, omission, or negligent act of the Contractor under this agreement.
The Contractor shall not be required to indemnify the Contracting Agency for a claim of, or liability for, the independent negligence of the Contracting Agency. If there is a claim of, or liability for, the joint negligent error or omission of the Contractor and the independent negligence of the Contracting Agency, the indemnification and hold harmless obligation shall be apportioned on a comparative fault basis. “Contractor” and “Contracting Agency,” as used within this and the following article, include the employees, agents and other contractors who are directly responsible, respectively, to each. The term “independent negligence” is negligence other than in the Contracting Agency’s selection, administration, monitoring, or controlling of the Contractor and in approving or accepting the Contractor’s work.
SEC. 3.21 INSURANCE REQUIREMENTS
Without limiting Contractor's indemnification, it is agreed that Contractor shall purchase at its own expense and maintain in force at all times during the performance of services under this agreement the following policies of insurance. Where specific limits are shown, it is understood that they shall be the minimum acceptable limits. If the Contractor's policy contains higher limits, the State shall be entitled to coverage to the extent of such higher limits.
Certificates of Insurance must be furnished to the Procurement Officer prior to beginning work and must provide a notice of cancellation, non-renewal, or material change of conditions in accordance with policy provisions. Failure to furnish satisfactory evidence of insurance or lapse of the policy is a material breach of this contract and shall be grounds for termination of the Contractor's services. All insurance policies shall comply with and be issued by insurers licensed to transact the business of insurance under AS 21.
Workers' Compensation Insurance: The Contractor shall provide and maintain, for all employees engaged in work under this contract, coverage as required by AS 23.30.045, and where applicable, any other statutory obligations including but not limited to Federal U.S.L. & H.
and Jones Act requirements. The policy must waive subrogation against the State.
Commercial General Liability Insurance: Covering all business premises and operations used by the Contractor in the performance of services under this agreement with minimum coverage limits of $300,000.00 combined single limit per claim.
Commercial Automobile Liability Insurance: Covering all vehicles used by the Contractor in the performance of services under this agreement with minimum coverage limits of $300,000.00 combined single limit per claim.
Professional Liability Insurance: covering all errors, omissions, or negligent acts in the performance of professional services under this agreement. Limits required per the following schedule:
Contract Amount Minimum Required Limits Under $100,000 $300,000 per Claim/Annual Aggregate $100,000-$499,000 $500,000 per Claim/Annual Aggregate
SEC. 3.22 TERMINATION FOR DEFAULT
a. If the Project Manager or Procurement Officer determines that the Contractor has refused to perform the work or has failed to perform the work with such diligence as to ensure its timely and accurate completion, the State may, by providing written notice to the Contractor, terminate the Contractor's right to proceed with part or all the remaining work.
b. The Procurement Officer may also, by written notice, terminate this contract under Administrative Order 352 if the Contractor supports or participates in a boycott of the State of Israel.
This clause does not restrict the State's termination rights under the contract provisions of Appendix A, attached in Section 7. Attachments.
SECTION 4. PROPOSAL FORMAT AND CONTENT
SEC. 4.01 INTRODUCTION
Proposals must include the complete name and address of offeror’s firm and the name, mailing address, and telephone number of the person the State should contact regarding the proposal.
Proposals must confirm that the offeror will comply with all provisions in this RFP; and, if applicable, provide notice that the firm qualifies as an Alaskan bidder. Proposals must be signed by a company officer empowered to bind the company. An offeror's failure to include these items in the proposals may cause the proposal to be determined to be non-responsive and the proposal may be rejected.
The State discourages overly lengthy and costly proposals, however, in order for the State to evaluate proposals fairly and completely, offerors must follow the format set out in this RFP and provide all information requested.
SEC. 4.02 PROPOSAL CONTENTS
The following information must be included in all proposals.
(a) AUTHORIZED SIGNATURE All proposals must be signed by an individual authorized to bind the offeror to the provisions of the RFP. Proposals must remain open and valid for at least 90-days from the date set as the deadline for receipt of proposals.
(b) OFFEROR'S CERTIFICATION By signature on the proposal, offerors certify that they comply with the following:
A. the laws of the State of Alaska;
B. the applicable portion of the Federal Civil Rights Act of 1964;
C. the Equal Employment Opportunity Act and the regulations issued thereunder by the federal government;
D. the Americans with Disabilities Act of 1990 and the regulations issued thereunder by the federal government;
E. all terms and conditions set out in this RFP;
F. a condition that the proposal submitted was independently arrived at, without collusion, under penalty of perjury; and
G. that the offers will remain open and valid for at least 90 days.
If any offeror fails to comply with [A] through [G] of this paragraph, the State reserves the right to disregard the proposal, terminate the contract, or consider the Contractor in default.
(c) VENDOR TAX ID A valid Vendor Tax ID must be submitted to the issuing office with the proposal or within five days of the State's request.
(d) CONFLICT OF INTEREST Each proposal shall include a statement indicating whether or not the firm or any individuals working on the contract has a possible conflict of interest (e.g., currently employed by the State of Alaska or formerly employed by the State of Alaska within the past two years) and, if so, the nature of that conflict. The Procurement Officer reserves the right to consider a proposal non-responsive and reject it or cancel the award if any interest disclosed from any source could either give the appearance of a conflict or cause speculation as to the objectivity of the contract to be performed by the offeror.
(e) FEDERAL REQUIREMENTS The offeror must identify all known federal requirements that apply to the proposal, the evaluation, or the contract.
SEC. 4.03 EXPERIENCE AND QUALIFICATIONS
Offerors must provide an organizational chart specific to the personnel assigned to accomplish the work called for in this RFP; illustrate the lines of authority; designate the individual responsible and accountable for the completion of each component and deliverable of the RFP.
Offerors must provide a narrative description of the organization of the project team and a personnel roster that identifies each person who will actually work on the contract and provide the following information about each person listed:
• title,
• resume, SEC. 4.04 UNDERSTANDING OF THE PROJECT
Offerors must provide comprehensive narrative statements that illustrate their understanding of the requirements of the project and the project schedule.
SEC. 4.05 METHODOLOGY USED FOR THE PROJECT
Offerors must provide comprehensive narrative statements that set out the methodology they intend to employ and illustrate how the methodology will serve to accomplish the work and meet the State’s project schedule.
SEC. 4.06 MANAGEMENT PLAN FOR THE PROJECT
Offerors must provide comprehensive narrative statements that set out the management plan they intend to follow and illustrate how the plan will serve to accomplish the work and meet the State's project schedule.
SEC. 4.07 COST PROPOSAL
Offerors must complete and submit this Submittal Form. Proposed costs must all direct and indirect costs associated with the performance of the contract, including, but not limited to, total number of hours at various hourly rates, direct expenses, payroll, supplies, overhead assigned to each person working on the project, percentage of each person's time devoted to the project, and profit. The costs identified on the cost proposal are the total amount of costs to be paid by the State. No additional charges shall be allowed.
SEC. 4.08 BID BOND – PERFORMANCE BOND – SURETY DEPOSIT
Not applicable to this RFP.
SEC. 4.09 EVALUATION CRITERIA
All proposals will be reviewed to determine if they are responsive. Proposals determined to be responsive will be evaluated using the criterion that is set out in SECTION 5. EVALUATION CRITERIA
AND CONTRACTOR SELECTION.
SECTION 5. EVALUATION CRITERIA AND CONTRACTOR
SELECTION
THE TOTAL NUMBER OF POINTS USED TO SCORE THIS PROPOSAL IS 100
SEC. 5.01 SUMMARY OF EVALUATION PROCESS
The State will use the following steps to evaluate and prioritize proposals:
1) Proposals will be assessed for overall responsiveness. Proposals deemed non-responsive will be eliminated from further consideration.
2) A Proposal Evaluation Committee (PEC), made up of at least three State employees or public officials, will evaluate the technical portion of all responsive proposals.
3) Each responsive Technical Proposal will be sent to the PEC. No cost information will be shared or provided to the PEC.
4) The PEC will independently evaluate and score the proposals based on the degree to which they meet the stated evaluation criteria.
5) After independent scoring, the PEC will have a meeting, chaired by the Procurement Officer, where the PEC may have a group discussion prior to finalizing their scores.
6) The PEC will submit their final individual scores to the Procurement Officer, who will then compile the scores and calculate awarded points as set out in Section 5.03.
7) The Procurement Officer will calculate scores for cost proposals as set out in Section 5.08 and add those scores to the awarded points along with factoring in any Alaska preferences.
8) The Procurement Officer may ask for best and final offers from offerors susceptible for award and revise the cost scores accordingly.
9) The State will then conduct any necessary negotiations with the highest scoring offeror and award a contract if the negotiations are successful.
SEC. 5.02 EVALUATION CRITERIA
Proposals will be evaluated based on their overall value to State, considering both cost and non-cost factors as described below. Note: An evaluation may not be based on discrimination due to the race, religion, color, national origin, sex, age, marital status, pregnancy, parenthood, disability, or political affiliation of the offeror.
SEC. 5.03 SCORING METHOD AND CALCULATION
Each Proposal Evaluation Committee (PEC) member will individually evaluate and score each responsive proposal using the criteria and percentage values set out in Section 5. Each percentage value will equal one point, with the total maximum points awarded, per PEC member, for all evaluation sections not to exceed 100 points. Using only whole numbers, PEC members will start with a median score for each evaluation section. The score may either increase or decrease depending on the offeror’s response to each question for that section. As an example, if the Offeror provided responses over and above the evaluation questions in a section, they would receive a higher score. However, if the Offeror’s response fails to address all questions of a section or demonstrates some lack of understanding or competency as it relates to a question for that section, the Offeror would then receive a lower score.
SEC. 5.04 EXPERIENCE AND QUALIFICATIONS (20%)
Proposals will be evaluated against the questions set out below:
1) Questions regarding the personnel:
a) To what extent do the individuals assigned to the project have experience on similar projects?
b) Are resumes complete and do they demonstrate backgrounds that would be desirable for individuals engaged in the work the project requires?
SEC. 5.05 UNDERSTANDING OF THE PROJECT (10%)
Proposals will be evaluated against the questions set out below:
1) How well has the offeror demonstrated a thorough understanding of the purpose and scope of the project?
2) To what degree has the offeror demonstrated an understanding of the deliverables the State expects it to provide?
3) Has the offeror demonstrated an understanding of the State's time schedule and can meet it?
SEC. 5.06 METHODOLOGY USED FOR THE PROJECT (5%)
Proposals will be evaluated against the questions set out below:
1) How comprehensive is the methodology and does it depict a logical approach to fulfilling the requirements of the RFP?
2) Does the methodology interface with the time schedule in the RFP?
SEC. 5.07 MANAGEMENT PLAN FOR THE PROJECT (15%)
Proposals will be evaluated against the questions set out below:
1) How well does the management plan support all of the project requirements and logically lead to the deliverables required in the RFP?
2) How well is accountability completely and clearly defined?
3) Does it appear that the offeror can meet the schedule set out in the RFP?
4) To what degree is the proposal practical and feasible?
5) To what extent has the offeror identified potential problems?
SEC. 5.08 CONTRACT COST (40%)
Overall, a minimum of 40% of the total evaluation points will be assigned to cost. After the Procurement Officer applies any applicable preferences, the offeror with the lowest total cost will receive the maximum number of points allocated to cost per 2 AAC 12.260(c). The point allocations for cost on the other proposals will be determined using the following formula:
(Price of Lowest Cost Proposal X Maximum Points for Cost) ÷ (Cost of Each Offeror’s Proposal)
Example (Max Points for Contract Cost = 40):
Step 1 List all proposal prices, adjusted where appropriate by the application of applicable preferences claimed by the offeror.
Offeror #1 $40,000.00 Offeror #2 $42,750.00 Offeror #3 $47,500.00
Step 2 In this example, the RFP allotted 40% of the available 100 points to cost. This means that the lowest cost will receive the maximum number of points.
Offeror #1 receives 40 points.
The reason they receive that amount is because the lowest cost proposal, in this case $40,000.00, receives the maximum number of points allocated to cost, 40 points.
Offeror #2 receives 37.43 points.
$40,000.00 lowest cost x 40 maximum points for cost = 1,600,000 ÷ $42,750.00 cost of Offeror #2’s proposal = 37.43
Offeror #3 receives 33.68 points.
$40,000.00 lowest cost x 40 maximum points for cost = 1,600,000 ÷ $47,500.00 cost of Offeror #3’s proposal = 33.68
SEC. 5.09 ALASKA OFFEROR PREFERENCE (10%)
Per 2 AAC 12.260, if an offeror qualifies for the Alaska Bidder Preference, the offeror will receive an Alaska Offeror Preference. The preference will be 10% of the total points available, which will be added to the offeror’s overall evaluation score.
Example:
Step 1 Determine the number of points available to qualifying offerors under this preference:
100 Total Points Available in RFP x 10% Alaska Offeror preference = 10 Points for the preference.
Step 2 Determine which offerors qualify as Alaska bidders and thus, are eligible for the Alaska Offeror preference. For the purpose of this example, presume that all proposals have been completely evaluated based on the evaluation criteria in the RFP. The scores at this point are:
Offeror #1 83 points No Preference 0 points Offeror #2 74 points Alaska Offeror Preference 10 points Offeror #3 80 points Alaska Offeror Preference 10 points
Step 3 Add the applicable Alaska Offeror preference amounts to the offerors’ scores:
Offeror #1 83 points Offeror #2 84 points (74 points + 10 points) Offeror #3 90 points (80 points + 10 points)
Offeror #3 is the highest scoring offeror and would get the award, provided their proposal is responsive and responsible.
SECTION 6. GENERAL PROCESS AND LEGAL INFORMATION
SEC. 6.01 INFORMAL DEBRIEFING
When the contract is completed, an informal debriefing may be performed at the discretion of the Project Manager or Procurement Officer. If performed, the scope of the debriefing will be limited to the work performed by the Contractor.
SEC. 6.02 ALASKA BUSINESS LICENSE AND OTHER REQUIRED LICENSES
Prior to the award of a contract, an offeror must hold a valid Alaska business license. However, in order to receive the Alaska Bidder Preference and other related preferences, such as the Alaska Veteran Preference and Alaska Offeror Preference, an offeror must hold a valid Alaska business license prior to the deadline for receipt of proposals. Offerors should contact the Department of Commerce, Community and Economic Development, Division of Corporations, Business, and Professional Licensing, PO Box 110806, Juneau, Alaska 99811-0806, for information on these licenses. Acceptable evidence that the offeror possesses a valid Alaska business license may consist of any one of the following:
• copy of an Alaska business license;
• certification on the proposal that the offeror has a valid Alaska business license and has included the license number in the proposal;
• a canceled check for the Alaska business license fee;
• a copy of the Alaska business license application with a receipt stamp from the State's occupational licensing office; or
• a sworn and notarized statement that the offeror has applied and paid for the Alaska business license.
You are not required to hold a valid Alaska business license at the time proposals are opened if you possess one of the following licenses and are offering services or supplies under that specific line of business:
• fisheries business licenses issued by Alaska Department of Revenue or Alaska Department of Fish and Game,
• liquor licenses issued by Alaska Department of Revenue for alcohol sales only,
• insurance licenses issued by Alaska Department of Commerce, Community and Economic Development, Division of Insurance, or
• Mining licenses issued by Alaska Department of Revenue.
Prior to the deadline for receipt of proposals, all offerors must hold any other necessary applicable professional licenses required by Alaska Statute.
SEC. 6.03 SITE INSPECTION
The State may conduct on-site visits to evaluate the offeror's capacity to perform the contract. An offeror must agree, at risk of being found non-responsive and having its proposal rejected, to provide the State with reasonable access to relevant portions of its work sites. Individuals designated by the Procurement Officer at the State’s expense will make site inspection.
SEC. 6.04 CLARIFICATION OF OFFERORS
In order to determine if a proposal is reasonably susceptible for award, communications by the procurement officer or the Proposal Evaluation Committee (PEC) are permitted with an offeror to clarify uncertainties or eliminate confusion concerning the contents of a proposal. Clarifications may not result in a material or substantive change to the proposal. The evaluation by the Procurement Officer or the PEC may be adjusted as a result of a clarification under this section.
SEC. 6.05 DISCUSSIONS WITH OFFERORS
The State may conduct discussions with offerors in accordance with AS 36.30.240 and 2 AAC 12.290.
The purpose of these discussions will be to ensure full understanding of the requirements of the RFP and proposal. Discussions will be limited to specific sections of the RFP or proposal identified by the Procurement Officer. Discussions will only be held with offerors who have submitted a proposal deemed reasonably susceptible for award by the Procurement officer. Discussions, if held, will be after initial evaluation of proposals by the Procurement Officer or the PEC. If modifications are made as a result of these discussions, they will be put in writing. Following discussions, the Procurement Officer may set a time for best and final proposal submissions from those offerors with whom discussions were held. Proposals may be reevaluated after receipt of best and final proposal submissions.
If an offeror does not submit a best and final proposal or a notice of withdrawal, the offeror’s immediate previous proposal is considered the offeror’s best and final proposal.
Offerors with a disability needing accommodation should contact the…