This addendum document pertains to Virginia's Request for Proposals for a Battery Electric Locomotive Charging Solution at Norfolk International Terminals (NIT), issued by the Commonwealth of Virginia. The addendum modifies the original RFP 2027-10-VPA, which seeks proposals for the design, production, delivery, installation, and commissioning of a charging solution to support a fleet of Battery Electric Locomotives. The addendum clarifies requirements, specifications, and evaluation criteria established in the base RFP. Specific details regarding quantities, response deadlines, site visit schedules, bidder conferences, and contract terms would be found within the addendum's substantive provisions, which establish the framework for proposal submission and subsequent contract award.
The addendum serves to ensure alignment between the Commonwealth's requirements and prospective offerors' understanding of project scope, technical specifications, and commercial terms. Any modifications to pricing structures, payment terms, set-asides, incumbent contractor status, funding sources, or financial requirements would be incorporated through this addendum's provisions. Offerors must comply with both the original RFP and all addendum requirements when developing and submitting proposals to Norfolk International Terminals for this Battery Electric Locomotive charging infrastructure initiative.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 2027-10-VPA EV Locomotive Charging Solution.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
Request for Proposals: RFP 2027-10-VPA Battery Electric Locomotive Charging Solution Closing Date: November 17, 2026 @ 2:00 p.m.
The following questions and answers are provided for all offerors:
Q1. We would like to request a site visit at Norfolk International Terminals to review the proposed charging locations, electrical infrastructure, and site conditions.
Answer. Site visits will not be scheduled at this time.
Q2. Please identify the manufacturer and model of the battery-electric locomotives that will be supported under this procurement.
Answer. Innovative Rail Technologies (IRT) IRTZE200-GP20E Battery Electric Locomotive.
Q3. Please provide the locomotive’s available charging interface specifications, including:
a. maximum charging voltage
b. maximum charging current
c. maximum charging power
d. battery capacity
e. expected charge acceptance curve
f. CCS1 interface requirements
g. ISO 15118 implementation details
Answer.
a. 820 VDC
b. Max at locomotive 1000A / Battery Limit Max DC Current = 2,380 Amps
c. Max Charging Power limit to the battery = 2MW
d. 2,320Ah (eq to 1,690 kWh) e.
0 A
500 A
1000 A
1500 A
2000 A
2500 A
620 V 640 V 660 V 680 V 700 V 720 V 740 V 760 V 780 V 800 V 820 V 840 V
Max Battery system current [A]
f. The CCS1 has current limitations. A 500A continuous CCS1 interface can theoretically transfer 358kW at the battery’s 716V nominal voltage. We can evaluate a higher current CCS1 arrangement or limit the charge to approximately 350kW
g. The locomotive will function as the EVCC (Electric Vehicle Communication Controller). The Wayside Charger functions as the SECC (Supply Equipment Controller). Communication protocols will be CAN bus.
Q4. Has VPA or the locomotive OEM previously completed interoperability testing with any DC charger manufacturers or models? If so, please identify the charger OEMs/models tested and summarize the results.
Answer. The locomotive manufacturer has numerous locomotives deployed between the US and Canada operating on a custom configured DC charger in both uni-directional and bi-directional configurations. Up to 1200 amps within the 820 max VDC range.
Q4. Are there any charger OEMs or charging platforms currently approved, preferred, or already validated by the locomotive manufacturer?
Answer. To date, the locomotive manufacturer has used a custom configured DC charger providing up to 1200 amps continuous. The locomotive manufacturer has no preferred charging platform.
Q5. The specification requires 500 A minimum, with 600 A or higher preferred. What is the locomotive’s actual maximum continuous charging current within the stated 550–820 VDC operating range?
Answer. 1000 Amps as currently configured. Can be modified to accept up to 2500 amps.
Q6. Does the locomotive support full charging operation using standard CCS1/SAE J1772 and ISO 15118, or are there any OEM-specific software, firmware, communication, or handshake requirements?
Answer. Standard CCS1/SAE J1772 and ISO 15118.
Q7. Will the locomotive manufacturer provide direct technical support to the selected charging-system supplier during design, integration, commissioning, and interoperability testing?
Answer. Yes. We will expect any vendor selected by VPA to sign IRT’s mutual non-disclosure agreement prior to work commencing.
Q8. Will VPA provide the selected contractor with access to the locomotive OEM’s CAN/communications documentation, charging-interface documentation, fault codes, and diagnostic support necessary for system integration?
Answer. Yes. We will expect any vendor selected by VPA to sign IRT’s mutual non-disclosure agreement prior to work commencing.
Q9. The RFP states that the equipment manufacturer must have a minimum of five years’ experience supplying specified equipment. Does VPA interpret this as five years supplying:
a. DCFC equipment generally,
b. comparable 400–500 kW charging systems, or
c. the exact proposed charger platform?
Answer. Comparable 400–500 kW charging systems.
Q10. The warranty requires six years of coverage, including parts, labor, software, firmware, communications, interoperability, and operational design defects. Will VPA accept a combination of OEM warranty plus third-party extended warranty/service coverage, provided the total coverage meets the RFP requirements?
Answer. Yes, VPA will accept a combination of OEM warranty plus third-party warranty, providing total coverage meets the RFP requirements.
Q.11 The specification requires replacement parts to be available in Southeastern Virginia with a maximum three-calendar-day lead time. Does this require physical stocking of all critical parts in Southeastern Virginia, or would guaranteed delivery within three calendar days from a regional U.S.
distribution center satisfy the requirement?
Answer. Guaranteed delivery of replacement parts within three (3) calendar days from a regional U.S. distribution center is acceptable and satisfies the specification requirement; physical stocking of all parts within Southeastern Virginia is not required. The Contractor remains responsible for meeting the Contract's performance and uptime requirements. Failure to provide replacement parts within the required timeframe that results in uptime falling below ninety-five percent (95%) may subject the Contractor to the remedies available under the Contract such as Liquidated Damages of $500.00 per day per unit and any damages available under applicable Virginia law.
Q12. For the required 4-hour response / 12-hour remote diagnostics / 24-hour onsite / 72-hour repair SLA, are these timeframes measured continuously on a 24/7 basis, including weekends and holidays?
Answer. Yes, it is inclusive of holidays and weekends.
Q13. The specification allows alternative equipment configurations that meet equivalent performance requirements. Would VPA consider an integrated charger architecture in lieu of a separate cabinet and dispenser, provided all electrical, operational, dimensional, interoperability, and service requirements are met?
Answer. Separate is preferred; however we will consider an integrated unit meeting the electrical, operational, dimensional, interoperability, and service requirements are met.
Q14. Are the stated cabinet and dispenser physical dimensions and clearance limits absolute requirements, or may equivalent configurations exceeding those dimensions be considered through the approved-equal process?
Answer. Please submit dimensioning of equivalent configurations for review to be considered through an approved equal process.
Q15. Please identify the manufacturer and model of the battery electric locomotives and provide drawings showing the CCS1 charging receptacle location and orientation.
Answer. Innovative Rail Technologies is the locomotive manufacturer. The location of the receptacle and orientation is open for discussion. In prior deployments, plug receptacles have been placed towards the middle of the locomotive, and below the frame.
Q16. Please provide the locomotive battery capacity, maximum accepted charging power, voltage/current charging curve, and expected charging duration.
Answer. See response to Q3.
Q17. Please provide the anticipated maximum and minimum distances between each power cabinet and dispenser, including approximate conduit routing distances. Will VPA provide a layout identifying the proposed equipment locations?
Answer. No layouts are provided currently. Maximum distance from power cabinet and dispenser to be no more than 50 feet.
Q18. Exhibit C specifies a minimum 15-foot charging radius from the dispenser base. Please confirm whether this is the required usable reach under normal operating conditions, including cable management, or whether a specific physical cable length is required.
Answer. Usable reach under normal operating conditions is the intended requirement.
Q19. Where will the locomotives be positioned during charging?
Answer. The locomotives will be positioned to align the charge port closest to the proposed charger location. Locomotive charge port will roughly be located at the center along either side of the locomotive.
Q20. Will VPA provide an opportunity for a pre-proposal site visit?
Answer. No; please refer to the specs provided in the RFP.
Q21. Which charge management platform will VPA use? Is integration with an existing third-party CMS required at commissioning?
Answer. It is undetermined what charge management platform VPA will use at this time; however, this information will be communicated to the vendor prior to commissioning. Yes, integration with an existing third-party CMS will be required at commissioning.
Q22. Please clarify if the six-year warranty term length should extend to software subscriptions, cellular connectivity, remote monitoring, preventative maintenance, and labor.
Answer. Please provide pricing per year for each item listed above so the port may further evaluate options.
Q23. Will VPA provide the locomotives, OEM technical representatives, and operating personnel needed for interoperability and acceptance testing?
Answer. Yes.
Q24. Installation scope (Exhibit C §1.2.B; Pricing Schedule; Exhibit B §4): Exhibit C §1.2.B assigns foundations, conduit, and grounding to VPA’s general contractor and excludes them from the manufacturer’s scope. However, the Pricing Schedule includes an “Installation Services” line item, and Exhibit B §4 sets installation timelines. Please define the Offeror’s installation scope, e.g.:
a. setting equipment in place
b. steel support stands
c. cable pulls
d. terminations
Answer. Manufacturers’ scope of supply shall include: Setting and anchoring the equipment in place, Pulling and terminating DC and AC power cables, and commissioning of the system.
Q25. Alternate offers: May an Offeror submit more than one offer, each with a different hardware option and its own pricing? If so, does the 30-page limit apply to each offer separately?
Answer. Multiple offers are allowable, however it must be its own distinct proposal and labeled as such.
Q26. All-in-one chargers (Exhibit C §1.2.A): Will VPA accept an all-in-one charger (power conversion and connector in a single enclosure) as an equivalent, provided it meets the specified performance, footprint, clearance, and 15-ft cable reach requirements?
Answer. Yes, VPA will review options that meet the specified performance, footprint, clearance, and cable reach requirements.
Q27. Vehicle data (Exhibit C §2.1.B.2): Please provide the battery-electric locomotive manufacturer and model, along with:
a. battery voltage range
b. maximum charge current
c. charge inlet rating
d. charge port location and height
e. expected dwell time per charging session
Answer. See response at Q3.
Q28. Charge Management System (Exhibit C §1.2.D, §3.3.B.1.b.4): Which third-party CMS will VPA use? Is the Offeror expected to supply CMS licenses, or only to integrate with VPA’s CMS? Is a Local Controller within the Offeror’s scope?
Answer. No third-party CMS vendor has been selected yet. The offeror will be required to integrate with the port’s CMS.
Please provide further clarification on the question regarding “Local Controller within the Offeror’s scope”.
Q29. Interoperability testing (Exhibit C §1.3.B.3, §3.3): Please describe the expected timing, duration, and level of effort for interoperability testing with the locomotive OEM and VPA’s CMS.
Specifically:
a. Will vehicles be available for testing before final commissioning?
b. How many test sessions does VPA anticipate?
c. Who bears the cost of retesting when the issue originates with the vehicle or the CMS?
Answer. a. Vehicles will be available for testing.
b. The VPA anticipates five test sessions.
c. If the issue originates with vehicles or CMS, the charger vendor will not bear the cost. In addition, the port would need to understand the costs associated with “retesting” outside of the five sessions.
Q30. Cellular data (Exhibit C §1.5.L, §2.1.B.15): Should pricing include cellular data service for the 4G/LTE modems? If so, for what term? Alternatively, will VPA’s LAN serve as the primary connection, with any cellular backup service provided at VPA’s cost?
Answer. No, pricing is not needed for the cellular data service for the 4G/LTE modems. Is there a SIM or ESIM option and how is that integrated?
Q31. Warranty term (Exhibit B §28; Exhibit C §1.6; Section VI, Section 3): Exhibit B §28 specifies a four-year warranty from delivery, while Exhibit C §1.6 and Section VI specify six years from final acceptance. Please confirm which governs.
Answer. Provide your standard warranty and anything else outside of the standard warranty.
Q32. Warranty: cables and connectors (Exhibit C §1.6.C and §1.6.F): Is the warranty intended to cover replacement of cables and connectors worn or damaged through normal daily use, or only manufacturing defects? Are damage from misuse, drive-offs, and vehicle impact excluded?
Answer. Damage from misuse, drive-offs, and vehicle impact are excluded.
Q33. SLA (Exhibit B §4 and Section VI, Section 3): Beyond the response and repair times in Exhibit B §4, does VPA require a minimum uptime commitment? If so, please provide the target percentage, how it will be measured (per charger or system-wide), and any exclusions (e.g., utility, network, CMS, or vehicle faults).
Answer. The VPA will require a minimum uptime commitment of 95%, measured individually (per charger). Exclusions will include utility, network, CMS or vehicle faults.
Q34. Maintenance Services (Pricing Schedule, 12 months): Please define the scope of this line item.
Does it cover preventive maintenance only, or corrective and on-call service as well? What visit frequency does VPA expect?
Answer. The pricing schedule offer is an example. Please provide a sample for each item listed above. We would expect the visit frequency would vary with each sample provided (i.e. PM, corrective, on-call).
Q35. Spare parts (Exhibit C §1.6.H): Would consignment stock held at NIT or at a regional depot satisfy the requirement for parts available in Southeastern Virginia within three calendar days?
Answer. The port would be open to discussing consignment stock held at NIT or a regional depot.
Q36. Liquidated damages (Exhibit B §4, §10): Is there an aggregate cap on liquidated damages? Are liquidated damages VPA’s sole remedy for delay?
Answer. There is no aggregate cap on liquidated damages at this time. Liquidated damages are not the sole remedy for delay, they can be stand alone or in addition to any remedies allowable under the Contract terms and Virginia Law.
Q37. Terms and conditions (Exhibit A §18; Exhibit B §20; Exhibit E): Will VPA consider negotiating the following with the selected Offeror?
a. the uncapped cybersecurity indemnity (Exhibit A §18)
b. the royalty-free license to drawings and know-how (Exhibit B §20), for example by limiting it to service documentation or using escrow?
Answer. Exceptions can be taken in the Offeror’s response and the port will review those exceptions in the review process. No guarantees can be made about changes to any contract provision.
Q38. How many CCS1 charging inlets does each locomotive have? If there is more than one, can the vehicle charge from several inlets at the same time to reach the required current?
Answer. Assume one charging port per side. It is expected that the CCS1 cable can provide 500A or greater.
Q39. Is the 500 A minimum (600 A preferred) a continuous current requirement or a peak requirement? What continuous current does the locomotive accept across its 550–820 VDC charging window?
Answer. 500A or greater is peak. Locomotive can accept greater than 500A continuously.
Q40. Please provide the locomotive charging inlet location and height relative to the track and the planned dispenser positions.
Answer. As addressed in a previous question, the plug receptacle is typically below the top deck, and attached to the underside of the locomotive frame. This is approximately 4’.
Q41. The specification requires 150–980 VDC, while the planned vehicle charges at 550–820 VDC.
Will VPA accept equipment with an output voltage range that fully covers the vehicle's charging window but does not span the full 150–980 VDC range?
Answer. Yes
Q42. Side and rear clearances are limited to 18 in. Will VPA accept equipment that requires rear service access beyond 18 in., provided the total footprint stays within the specified envelope? Is a site layout drawing available showing the track, charging positions and equipment locations?
Answer. Yes, provided footprint stays within the envelope. Drawings will not be provided.
Q43. Please confirm whether the hot-dip galvanized steel support stand is to be designed and supplied by the charger manufacturer or by the General Contractor and state the required elevation above grade.
Answer. By charger manufacturer.
Q44. Section 1.2.B states that installation is performed by the General Contractor and is not in the charger manufacturer's scope, while the pricing schedule includes "Installation Services, Commissioning & Testing." Please clarify the expected scope of this line item, and whether field DC power, control and communication cabling between the cabinet and dispenser is in the charger supplier's or the GC's scope.
Answer. Manufacturer’s scope of supply shall include: Setting and anchoring the equipment in place, Pulling and terminating DC and AC power cables, and commissioning of the system.
Q45. Will the GC selected by VPA be required to perform bolt down and energize of the chargers or is this expected to be performed by the awardee of this RFP scope? As an OEM, we can suggest design, review installation, but we cannot bolt down and energize. We directly perform commissioning and maintenance/warranty work.
Answer. Manufacturer’s scope of supply shall include: Setting and anchoring the equipment in place, Pulling and terminating DC and AC power cables, and commissioning of the system.
Q46. Will VPA accept a covered emergency stop button mounted on a dedicated pedestal adjacent to each cabinet and wired into the site emergency stop circuit? Please confirm whether the site emergency stop circuit, including tripping of the upstream AC supply, is in the GC's scope.
Answer. It is not intended that there will be a site-wide, GC- installed, emergency stop circuit installed as part of this project.
Q47. Will VPA accept lockable cabinet doors with a door switch that stops charging when opened, combined with a lockable upstream disconnect, as meeting the intent of these requirements?
Answer. No.
Q48. Several sections refer to a Local Controller, Energy Management System and distributed energy resources. Are any of these existing or planned at the site, and are they part of this procurement's scope?
Answer. For this project there are none planned to be installed with the charger systems, and they are not part of procurement.
Q49. Please confirm that a VPA LAN connection will be provided at each charging cabinet and that cellular communication is permitted as the secondary path.
Answer. Yes, confirmed. Refer to question 30.
Q50. Please define the expected scope of "Maintenance Services (12 Months)": preventive maintenance only, or also corrective maintenance and on-call response, and the expected response times.
Answer. Refer to question 22.
Q51. Please confirm whether the charging solution supplier’s scope is limited to equipment supply, installation supervision, integration, commissioning and training, with physical installation by VPA’s GC. Please identify who supplies and installs interconnecting AC/DC and communications cables, disconnects, equipment stands and emergency-stop wiring.
Answer. Manufacturer’s scope of supply shall include: Setting and anchoring the equipment in place, Pulling and terminating DC and AC power cables, communications cabling, and commissioning of the system.
Q52. Please confirm that the base scope is three independent 1:1 cabinet/dispenser systems. Is power sharing between cabinets, more than one dispenser per cabinet, or provision for future dispensers required?
Answer. There is no power sharing between the three charger locations.
Q53. Will VPA provide the CMS, or must the supplier include it? If provided by VPA, please identify its provider, version and integration requirements. Please confirm responsibility for local controllers, cellular service and software licences, the required subscription duration, and the applicable OCPP certification profiles.
Answer. CMS to be provided by VPA and has not yet been procured nor identified.
Q54. Please provide site plans, equipment locations, electrical single-line diagrams, available supply capacity, applicable load limits, AC/DC cable routing distances, network details and emergency-stop layouts. Please identify any required EMS, utility or distributed energy resource interfaces. Is a site visit available before proposal submission?
Answer. Please refer to the specs in the RFP. Contract includes from “pad up”. A site visit is not available before proposal submission.
Q55. Please confirm the anticipated award date, delivery deadline, site-ready date and commissioning date, and whether all three systems are at one site. Please confirm how schedule relief and remobilization costs will be handled if site readiness, locomotive availability or third-party participation delays the supplier’s work.
Answer. No anticipated award date. Delivery, site ready data and commissioning date will be determined in coordination with VPA and selected vendor.
All three systems are at one site. Schedule relief, etc., will be worked out with the vendor if and when it occurs.
Q56. Please provide the locomotive OEM, model, battery capacity, CCS1 interface documentation, supported communication protocols, maximum charging current and charging power profile. Must full cabinet-rated output be available throughout 550–820 V DC, or is output limited by the locomotive’s charging capability acceptable?
Answer. We do not currently have CCS1 internal documentation, as it is not a charging protocol that we have worked with on prior deployments. This can be addressed with the winning bidder and resolved during the course of the project. 550-820 VDC is the acceptable range for the locomotive.
Any amperage, such as what has been answered in prior questions, is acceptable.
Q57. Please confirm the governing warranty start date and define substantial completion and final acceptance, including required tests and documentation. Please also confirm how the six-year warranty and related service obligations operate beyond the four-year contract term.
Answer. The warranty start date will begin upon final acceptance. Other items including testing and final acceptance are listed in the terms and conditions (Exhibit B, Item 24) located within the RFP.
The six-year warranty and related service obligations will survive the contract term.
Q58. Please confirm the base duration and coverage of preventive maintenance, corrective maintenance, remote monitoring and SLA support. Is SLA support required throughout the six-year warranty? Should optional annual SLA prices cover years 2–10, years after the base warranty, or ten additional years? Please identify any non-warranty services to include in the base price.
Answer. Provide all options with a max of 10 years.
Q59. Each system must be tested with at least two VPA-provided locomotives, charging from below 40% to above 90% SOC. Simultaneous charging, load sharing, CMS and recovery tests are also required. Please confirm how simultaneous charging and dynamic allocation tests apply to independent 1:1 systems.
Answer. For this project simultaneous charging and dynamic charging allocation testing do not apply.
Q60. Could VPA arrange a site visit to review the proposed charger locations, electrical infrastructure, and site conditions? Please confirm available dates and access requirements. Would VPA also allow an additional question period following the visit and extend the proposal submission deadline to at least three weeks after the site visit to allow bidders sufficient time to incorporate the findings and clarifications into their proposals?
Answer. No site visits will be arranged.
Q61. Given the equipment scope of this project, please confirm that Professional Liability Insurance will not be required.
Answer. The Insurance section establishes both mandatory minimum insurance requirements and conditional insurance requirements. The coverages identified in the first paragraph are required minimum coverages applicable to all Contractors. Additional coverages identified in subsequent paragraphs become required only if the Contractor's proposed scope of work includes the activities or exposures described therein.
Accordingly, Professional Liability Insurance is required only if the Contractor's proposed services include professional, advisory, consulting, or design services. Similarly, All Risks Erection and Installation Floater Insurance is required only if the Work involves fabrication, assembly, transit, installation, or testing of equipment or machinery.
It is the responsibility of each Offeror to evaluate its proposed operations, services, subcontractors, and risk exposures and to procure and maintain all insurance necessary to adequately protect its interests and perform the resulting contract. As stated in the solicitation, VPA does not represent that the insurance coverages and limits identified in the Contract are necessarily adequate to protect the Contractor or the Contractor's interests.
Therefore, VPA cannot determine on behalf of an Offeror whether Professional Liability Insurance or any other project-specific coverage is necessary for that Offeror's proposed approach.
Q62. Electric charging infrastructure must meet the following installation requirements: Electricians installing, operating, or maintaining electric charging infrastructure purchased through this program are required to be certified under the Electric Vehicle Infrastructure Training Program or another program approved by the EPA in consultation with the Department of Labor and Department of Transportation, as will be reflected in the terms of this grant award. For projects requiring more than one electrician, at least one of the electricians performing each phase of the infrastructure work should meet the requirements above. Will this requirement apply to any and all commissioning, maintenance, PM, or other service activities by manufacturer’s technicians? Meaning a certified electrician will need to oversee or execute all the above activities.
Answer. Yes, an electrician will need to oversee or execute all the above activities.
Q63. Reference to permits and given the scope of this project, please identify what permits and approval agencies will need to be engaged.
Answer. The Port of Virginia cannot provide guidance on permits and permitting agencies related to this project, that is for the Contractor to determine.
Q64. Demonstrate operation of the charging system following loss of internet connectivity. Testing shall verify autonomous operation of the Local Controller, continued execution of applicable charging functions, and successful recovery and synchronization of system data following restoration of communications. This functionality typically requires initiation to start with the vehicle. Please verify that the vehicle has such capability.
Answer. The locomotive is wifi and/or cellular equipped. We are able to communicate in this manner should the charging suppliers require it.
Q65. Demonstrate recovery of the charging system following utility power interruptions, emergency shutdown events, communications failures, and controller reboot events. Testing shall verify restoration of normal charging functions, communications, alarms, and control functions following recovery. This functionality typically requires initiation to start with the vehicle. Please verify that the vehicle has such capability.
Answer. The locomotive has this capability and normally leads the initiation charging sequence.
Q66. Demonstrate dynamic load sharing functionality during simultaneous charging of multiple vehicles. Testing shall verify charging system operation, power allocation, and communications performance under representative loading conditions. Please confirm how dynamic load sharing tests can be accomplished with independent 1:1 systems.
Answer. For this project dynamic charging and load sharing testing do not apply.
Note: A signed acknowledgement of this addendum must be received via email to proposalsVPA@portofvirginia.com either prior to the bid due date and hour or attached to your bid. Signature on this addendum does not substitute for your signature on the original bid document.
The original bid document must be signed.
Best Regards, Meg Guerriero Procurement Manager
Name of Firm
Signature/Title
Date
Version 7.2025 mailto:proposals@portofvirginia.com