This Request for Proposals (RFP 2026-21-360) is issued by the City of Seabrook, Texas, for the procurement and installation of a complete Vapex Odor Control unit at the Main Street Lift Station. The project involves a comprehensive GOVAPEX MICRO odor control unit installation with an ENV outdoor enclosure, including site preparation, concrete pad construction, electrical connections, potable water installation, nozzle air piping, FeNT vent odor treatment assembly installation, and HVAC air conditioning system commissioning. Sealed proposals must be submitted by December 16, 2026, at 2:00 p.m. CST to the Purchasing Coordinator at 1700 First Street, Seabrook, Texas 77586, with proposals to be publicly opened and read aloud at that time. The deadline for questions is December 11, 2026. No pre-bid conference is scheduled; however, the successful contractor must coordinate with GOVAPEX for a manufacturer's two-day site visit for installation inspection, startup, and operator training. The selection date and contract commencement date are to be determined by City Council. The contract term is not specified in the document, but includes two semiannual manufacturer service visits following startup.
Evaluation will be based on best value using scoring criteria weighted as follows: Price (45 points), References (25 points), Proximity to the City of Seabrook (20 points), and Schedule (10 points). Proposals must include a lump-sum price for all work components, with a 5 percent bid bond required. The successful contractor must provide performance and payment bonds each equal to 100 percent of the awarded contract amount within ten calendar days of award. Commercial General Liability insurance of $1,000,000 per occurrence and $2,000,000 aggregate, Automobile Liability of $1,000,000 combined single limit, and Workers' Compensation as required by law must be maintained throughout the project. Proposals remain firm for sixty calendar days from the due date, and proposals may not be withdrawn for 120 calendar days after submission. The contractor must include all labor, materials, equipment, subcontractor costs, and incidentals necessary for a complete operational system. No specific set-asides, incumbents, or funding sources are identified in the RFP.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAIN STREET LIFT STATION VAPEX UNIT PROJECT
REQUEST FOR PROPOSALS
RFP# 2026-21-360
DUE DATE: December 16, 2026 AT 2:00 P.M., CST
CITY OF SEABROOK
1700 First Street
Seabrook, Texas 77586 281-291-5600
City of Seabrook Request for PROPOSALS
RFP# 2026-21-360
MAIN STREET LIFT STATION VAPEX UNIT PROJECT
Notice is hereby given that the City of Seabrook is soliciting proposals from eligible and qualified institutions for the following:
RFP# 2026-21-360 MAIN STREET LIFT STATION VAPEX UNIT PROJECT
Sealed Request for PROPOSALS for the City of Seabrook’s MAIN STREET LIFT STATION VAPEX UNIT PROJECT, Seabrook Project No. 2026-21-360 will be received until 2:00 PM on December 16, 2026 by the Purchasing Coordinator, Rebecca Howton, 1700 First St., Seabrook, Texas 77586. Proposals must be received and time stamped by the Purchasing Coordinator prior to the aforementioned time, when they will be publicly opened at Seabrook City Hall. No late proposals will be accepted. RFP documents may be obtained from the city website at www.seabrooktx.gov, through Public Purchase at www.publicpurchase.com, or through at www.civcastusa.com.
Proposals may also be submitted electronically through Public Purchase. To submit a proposal electronically, an account will need to be created in Public Purchase, and then RFP 2026-21-360 can be accessed for electronic submission. Electronic Proposals must be submitted before the 2:00 PM deadline on December 16, 2026. Please visit https://www.publicpurchase.com/gems/register/vendor/register to register/log in with Public Purchase.
PUBLISHED: Wednesday, November 25, 2026
Wednesday, December 2, 2026 http://www.seabrooktx.gov/ http://www.publicpurchase.com/ http://www.civcastusa.com/ https://www.publicpurchase.com/gems/register/vendor/register
Table of Contents
CITY OF SEABROOK RFP TIMELINE
I. INTRODUCTION
CITY OF SEABROOK PROFILE
II. PROPOSAL INSTRUCTIONS
PROPOSAL FORMAT
INSTRUCTIONS FOR RESPONDING
SELECTION CRITERIA
RECEIPT AND OPENING OF STATEMENTS
PRE-BID CONFERENCE
SCHEDULE CHANGES AND OTHER ADDENDUMS
RIGHT TO REJECT PROPOSALS
AUTHORIZED SIGNATORIES
WITHDRAWAL OF PROPOSALS
ERRORS AND OMISSIONS IN THE RFP
STATEMENT MODIFICATIONS
ERRORS AND OMISSIONS IN PROPOSALS
TERM OF PROPOSAL
FINANCIAL RESPONSIBILITY
RESERVATION OF RIGHTS BY THE CITY OF SEABROOK
NO WAIVER
REQUIRED DISCLOSURES
LAWS AND REGULATIONS
DISCLOSURE OF INTEREST
PROHIBITION ON CONTRACTS WITH CERTAIN COMPANIES
PROHIBITION ON CONTRACTS WITH COMPANIES BOYCOTTING ISRAEL
DISCLOSURE OF INTERESTED PARTIES
NON-TRANSFERABLE AGREEMENT
INDEMNIFICATION
POST-SELECTION / PRE-AWARD DOCUMENTATION PACKAGE
III. SCOPE OF SERVICES
1. Scope of work
IV. ATTACHMENTS
EXHIBIT A – Bid/Cost Proposal Form
EXHIBIT B – Required Vendor Forms
EXHIBIT C – Insurance and Bonding Requirements
EXHIBIT D – Bond Forms
CITY OF SEABROOK RFP TIMELINE
The City of Seabrook intends to follow the schedule described below to distribute the RFP and receive/evaluate responses from Respondents. The City reserves the right to alter the schedule at any time.
Event Target Date RFP Issued & First Publication November 25, 2026 Second Publication December 2, 2026 Deadline for Questions (1) December 11, 2026 Due Date for PROPOSAL Submission December 16, 2026 @ 2:00 p.m.
Selection Date – Council Award of Contract TBD Contract Commencement TBD
I. INTRODUCTION
The City of Seabrook is soliciting proposals from qualified contractor(s) capable of procuring and installing a complete Vapex Odor Control unit at our Main Street lift station site.
CITY OF SEABROOK PROFILE
The City of Seabrook, Texas (the City) was incorporated in 1961, as a Home Rule City operating under the Council-Manager form of government. The City Council is composed of a Mayor and six City Council Members, elected at large and serve the entire City for four-year terms. The City is a nestled along Galveston Bay, approximately 30 miles north of Galveston and south of Houston on State Highway 146.
II. PROPOSAL INSTRUCTIONS
By submitting a proposal in response to this RFP, Respondents will be deemed to agree to execute the contract to be provided by the Owner at a later date and abide by all mandatory terms and service provisions contained therein.
PROPOSAL FORMAT
Respondents’ Proposal packet must contain the materials listed below. Respondents may utilize this section as a “checklist” to assure completeness prior to submitting a sealed packet.
INSTRUCTIONS FOR RESPONDING
1. Required Contents. The most qualified respondent should have extensive experience in projects as detailed in the Scope of Work. Please provide the following in your proposal:
a. Cover letter and introduction including the name, phone number and email address of the person(s) authorized to represent the company regarding all matters related to the RFP.
b. Table of Contents - clearly identify what part of the RFP is being addressed in each section of the submittal.
c. Statement of Project Understanding.
d. Acknowledgement that the selected company will enter into a Professional Services
Agreement with the City of Seabrook, subject to Council approval.
e. Location at which work will be performed.
f. List current and past projects similar to this completed by your company, with emphasis on municipal or other government projects. List should include a brief description of the project. Please include contact information for reference checks.
g. Information regarding the candidate company’s current and projected workload and its ability to meet project schedules and be available.
h. Describe any contracts for services awarded to your company that have been canceled or terminated for unsatisfactory performance in any respect and a phone number and contact person for that organization. Please also provide a description of any legal proceedings involving your company related any municipal client or municipal projects that were unresolved or active January 1, 2010, to present.
i. Complete and Return all required Vendor Forms found in Exhibit B.
j. Complete and return the Bid/Cost Proposal Form (Exhibit A) including all required pricing information.
k. Complete and return the Bid Bond Form in Exhibit D.
SELECTION CRITERIA
One Respondent, who offers the overall “Best Value” to the City of Seabrook, as determined by the City in its sole discretion, will be selected as firm to provide the services. Following the receipt of proposals, the City will rank respondents’ proposals based on the criteria provided below.
Scoring Criteria Maximum Score Weight
Price 45 References 25 Proximity of Respondent to The City of Seabrook 20 Schedule 10 Total Points 100
RECEIPT AND OPENING OF STATEMENTS
Bids should be submitted to:
City of Seabrook Attn: Purchasing Coordinator 1700 First St.
Seabrook, TX 77586
Bids must be submitted in a sealed envelope marked:
RFP 2026-21-360 “MAIN STREET LIFT STATION VAPEX UNIT PROJECT”
Proposals may also be submitted electronically through Public Purchase. To submit a proposal electronically, an account will need to be created in Public Purchase, and then RFP 2026-21-360 can be accessed for electronic submission. Electronic proposals must be submitted before the 2:00 PM deadline on December 16, 2026. Please visit https://www.publicpurchase.com/gems/register/vendor/register to register or login with Public Purchase.
At the appointed time, Proposals will be publicly opened and read aloud.
Any RFP received after the time and date specified shall not be considered.
PRE-BID CONFERENCE
No pre-bid conference is scheduled for this project at this time.
SCHEDULE CHANGES AND OTHER ADDENDUMS
The City may modify the RFP prior to the Proposals due date by issuing written addendum(s). All addendum(s) will be issued via Public Purchase, Civcast, and on the City’s website, www.seabrooktx.gov, according to the schedule outlined the RFP Timeline. The City reserves the right to alter this schedule at any time as necessary.
Notwithstanding this provision, Respondents shall be responsible for ensuring that their Proposals reflect any and all addendum(s) issued by the City prior to the proposal due date regardless of when the Proposal is submitted.
https://www.publicpurchase.com/gems/register/vendor/register http://www.seabrooktx.gov/
Therefore, the City recommends that Respondents review the addendum(s) issued by the City prior to submitting Proposals to determine if Respondents have received and responded to all addendum(s).
RIGHT TO REJECT PROPOSALS
The City of Seabrook reserves the right to select the Respondent whose Proposal, in the sole judgment of the City, best meets the needs of the City based upon the criteria enumerated in the Selection Criteria. The City reserves the right to reject any and all Proposals, to waive any non-material irregularities or informalities in any Proposals and to accept or reject any proposed item or combination of items.
AUTHORIZED SIGNATORIES
Personnel who execute the cover letter to the Proposal or any other associated documents must be authorized signatories with the full and requisite authority to represent their company and to enter into a binding Agreement with the City of Seabrook.
WITHDRAWAL OF PROPOSALS
After the deadline for submission, all Proposals shall be firm offers and may not be withdrawn for one-hundred twenty (120) calendar days.
ERRORS AND OMISSIONS IN THE RFP
Respondents are responsible for carefully and thoroughly reviewing all portions of this RFP. Respondents are to promptly notify the City, in writing, if Respondents discover any ambiguity, discrepancy, omission or other error in the RFP. Any such notification should be directed by e-mail to the Purchasing Coordinator, at purchasing@seabrooktx.gov promptly after discovery but in no event later than ten (10) working days prior to the deadline for receipt of Proposals.
STATEMENT MODIFICATIONS
Any Respondent may modify their RFP by sealed written communication or electronically through Public Purchase, at any time, provided such communication is received by the Purchasing Department at 1700 First St., Seabrook, Texas 77586, prior to the bid due date, December 16, 2026 at 2:00 PM.
No changes or alterations to Proposals will be accepted after the due date, however, under certain circumstances, a Respondent may be able to withdraw an RFP if it contains a substantial mistake that would cause a great hardship if enforced against the Respondent.
ERRORS AND OMISSIONS IN PROPOSALS
Failure by the City to object to an error, omission or deviation in Respondents’ Proposals will in no way modify the RFP or excuse the Contractor from full compliance with the specifications of the RFP or any Agreement negotiated pursuant to the RFP.
TERM OF PROPOSAL
Submission of a Proposal signifies that the proposed services and prices (if applicable) are valid for sixty (60) calendar days from the Proposal due date and that the quoted prices (if applicable) are genuine and not the result of collusion or any other anti-competitive activity.
FINANCIAL RESPONSIBILITY
The City of Seabrook accepts no financial responsibility for any costs incurred by the business in responding to this RFP. Submitted Proposals will become the property of the City and may be used by the City in any manner deemed appropriate by the City of Seabrook.
RESERVATION OF RIGHTS BY THE CITY OF SEABROOK
The issuance of this RFP does not constitute an agreement by the City of Seabrook that any Agreement will be actually entered into by the City. The City of Seabrook expressly reserves the right at any time to:
1. Waive or correct any defect or informality in any response or Proposal.
2. Reissue a RFP;
3. Prior to submission deadline for Proposals, modify all or any portion of the RFP, including the requirements for contents or format of the Proposals;
4. Procure any materials, equipment or services specified in this RFP by any other means; or
5. Determine that no Agreement will be pursued.
NO WAIVER
No waiver by the City of Seabrook of any provision of this RFP shall be implied from any failure by the City to recognize or act on account of any failure by Respondents to observe any provision of this RFP.
REQUIRED DISCLOSURES
LAWS AND REGULATIONS
The Respondents’ attention is directed to the fact that all applicable state laws, federal laws, municipal ordinances, and the rules and regulations of all authorities having jurisdiction over such services shall apply to the contract throughout, and they will be deemed to be included in the contract the same as though therein written out in full.
DISCLOSURE OF INTEREST
Chapter 176 of the Texas Local Government Code requires that any person who enters or seeks to enter into a contract for the sale or purchase of property, goods or services with a local government entity and who has an employment or other business relationship with a local government officer or a family member of an officer, as described by Texas Local Government Code Section 176.006 shall file a complete Conflict of Interest Questionnaire with the Purchasing Coordinator within seven (7) days after the latter: 1) the date the person begins discussions or negotiations to enter into a contract, including submission of a bid or proposal, or 2) the date the person becomes aware of facts that require the statement to be filed. The Conflict of Interest Questionnaire (Form CIQ) is provided for you in this bid document. Completed Conflict of Interest Questionnaire's should be included in your bid submission. Please consult your own legal advisor if you have questions regarding the statute or this form.
PROHIBITION ON CONTRACTS WITH CERTAIN COMPANIES
Pursuant to Section 2252.151 of the Texas Government Code, as of September 1, 2017, a governmental entity may not enter into a contract with companies that engage in business with Iran, Sudan, or known foreign terrorist organizations. These companies will be identified on a list prepared and maintained by the Texas State Comptroller.
PROHIBITION ON CONTRACTS WITH COMPANIES BOYCOTTING ISRAEL
Pursuant to Section 2270 if the Texas Government Code, as of September 1, 2017, a governmental entity may not enter into a contract for goods or services unless the contract contains a written verification from the company that it does not boycott Israel and will not boycott Israel during the term of the contract. A completed House Bill 89 Verification Form include will be required prior to award of bid.
DISCLOSURE OF INTERESTED PARTIES
Pursuant to Section 2252 of the Texas Local Government Code, as of January 1, 2016, any business entity entering into a contract with a local government that requires approval of the governing body must submit a Disclosure of Interested Parties to the local government prior to the execution of the contract. The Texas Ethics Commission (TEC) has adopted a form for the Disclosure of Interested Parties, FORM 1295. The TEC has created a website SOQ for business entities to submit the required information.
The City of Seabrook requires Form 1295 to be filed electronically by the business entity and acknowledged electronically by the City of Seabrook before entering into any contract requiring the approval of the City Council. The business entity must go to the Texas Ethics Commission Website http://www.ethics.state.tx.us and follow the login directions. The following information is required:
A. Identification Number: 2026-21-360
B. MAIN STREET LIFT STATION VAPEX UNIT PROJECT
When the form has been completed, the system will generate a Certificate number and filed date. Please print the form, have it notarized and send it in with your bid response. NO HAND WRITTEN 1295 FORMS WILL BE ACCEPTED. The receipt of this form in no way guarantees an award of contract.
NON-TRANSFERABLE AGREEMENT
The Respondent shall not assign or transfer, whether by an assignment or novation, any of its rights, duties, benefits, obligations, liabilities, or responsibilities under this Contract without the prior written consent of the City Manager who is hereby authorized to give such consent by the City Council of the City; provided, however, that assignments to banks or other financial institutions may be made without consent of the City.
Furthermore, in the event of a merger, consolidation or transfer of all or substantially all of the assets of Contractor, the surviving or resulting corporation or transferee of Respondent’s assets shall be bound by and shall have the benefit of the provisions of this Contract only upon the prior written consent of the City Manager. No assignment or novation of this Contract shall be valid unless the assignment or novation expressly provides that the assignment of any of the Respondent’s rights or benefits under the Contract is subject to a prior lien for labor performed, services rendered, and materials, tools, and equipment supplied for the performance of the work under this Contract in favor of all persons, firms, or corporations rendering such labor or services or supplying such materials, tools, or equipment.
INDEMNIFICATION
THE CONTRACTOR HEREBY AGREES TO AND SHALL INDEMNIFY, HOLD HARMLESS, AND DEFEND THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CLAIMS, LOSSES, DAMAGES, DEMANDS, CAUSES OF ACTION, SUITS AND LIABILITY OF EVERY KIND, INCLUDING ALL EXPENSES OF LITIGATION, COURT COSTS AND ATTORNEYS' FEES, FOR INJURY TO OR DEATH OF ANY PERSON, FOR LOSS OF USE OR REVENUE, OR FOR DAMAGE TO ANY PROPERTY ARISING OUT OF OR IN CONNECTION WITH THE ACTUAL OR ALLEGED MALFUNCTION, DESIGN OR WORKMANSHIP IN THE MANUFACTURE OF EQUIPMENT, THE FULFILLMENT OF CONTRACT, OR THE BREACH OF ANY EXPRESS OR IMPLIED WARRANTIES UNDER THIS CONTRACT. SUCH INDEMNITY SHALL APPLY WHERE THE CLAIMS, LOSSES, DAMAGES, CAUSES OF ACTION, SUITS OR LIABILITY ARISE IN PART FROM (I) THE JOINT NEGLIGENCE OF THE CITY AND THE CONTRACTOR, AND/OR THEIR RESPECTIVE OFFICERS, AGENTS AND/OR EMPLOYEES OR (II) THE SOLE NEGLIGENCE OF THE CONTRACTOR, ITS OFFICERS, AGENTS AND EMPLOYEES. IT IS THE EXPRESSED INTENTION OF THE PARTIES HERETO, BOTH CONTRACTOR AND THE CITY, THAT THE INDEMNITY PROVIDED FOR IN THIS PARAGRAPH IS INDEMNITY BY CONTRACTOR TO INDEMNIFY AND PROTECT THE CITY FROM THE CONSEQUENCE OF (I) THE CITY'S OWN NEGLIGENCE WHERE THAT NEGLIGENCE IS A CONCURRING CAUSE WITH THAT OF THE CONTRACTOR OF THE INJURY, DEATH OR DAMAGE AND/OR (II) THE CONTRACTOR’S OWN NEGLIGENCE WHERE THAT NEGLIGENCE IS THE SOLE CAUSE OF THE INJURY, DEATH, OR DAMAGE. FURTHERMORE, THE INDEMNITY PROVIDED FOR IN THIS PARAGRAPH SHALL HAVE NO SOQ TO ANY CLAIM, LOSS, DAMAGE, AND CAUSE OF ACTION, SUIT AND LIABILITY WHERE IN INJURY, DEATH OR DAMAGE RESULTS FROM THE SOLE NEGLIGENCE OF THE CITY UNMIXED WITH THE FAULT OF ANY OTHER PERSON OR ENTITY. IN THE EVENT ANY ACTION OR PROCEEDING IS BROUGHT AGAINST THE CITY BY REASON OF ANY OF THE ABOVE, THE CONTRACTOR AGREES AND COVENANTS TO DEFEND THE ACTION OR PROCEEDING BY COUNSEL ACCEPTABLE TO THE CITY. THE INDEMNITY PROVIDED FOR HEREIN SHALL SURVIVE THE TERMINATION OR
EXPIRATION OF THIS AGREEMENT.
POST-SELECTION / PRE-AWARD DOCUMENTATION PACKAGE
The apparent successful proposer shall provide the following documents within ten (10) business days after written request by the City, or within another period stated by the City. The City may withhold award, contract execution, notice to proceed, or reimbursement-supported work until the required package is complete and acceptable:
1. Executed City contract and all required contract exhibits, schedules, certifications, and acknowledgments.
2. Certificate(s) of insurance meeting the RFP and contract requirements, together with endorsements when required by the City.
3. BONDS. If the resulting agreement constitutes a public work contract for which bonds are required by Texas Government Code Chapter 2253 or other applicable law, the apparent successful proposer shall furnish required performance and payment bonds before beginning work. The City may require bond forms and surety information as part of the pre-award package. Bond premiums and related costs shall be separately identified in the Bid/Cost Proposal Sheet and included in the Total Base Bid.
III. SCOPE OF SERVICES
A. INTENT
The City of Seabrook is soliciting proposals from qualified contractor(s) capable of procuring and installing a complete Vapex Odor Control unit at our Main Street lift station site.
B. PROJECT SPECIFICS
1. Scope of work
1.1 Site Preparation and Equipment Pad
1. Inspect the proposed installation location at the Main Street Lift Station and verify existing site conditions, available clearances, utility connections, and accessibility.
2. Coordinate the final equipment location with the City and GOVAPEX representative before beginning installation.
3. Prepare and construct a reinforced concrete equipment pad meeting the manufacturer's minimum requirements.
4. Provide a level, stable mounting surface suitable for supporting the equipment and environmental enclosure.
5. Provide stainless-steel anchoring assemblies for mounting the ENV enclosure.
6. Install the enclosure using 316 stainless-steel threaded anchors, nuts, washers, and associated hardware in accordance with manufacturer requirements.
7. Maintain a minimum clearance of 36 inches around each side of the ENV enclosure for maintenance and access.
8. Locate the equipment a minimum of 25 feet from the treatment area, or as far away as reasonably possible, subject to field conditions and manufacturer approval.
9. Protect existing lift station equipment, electrical installations, piping, pavement, and other site improvements during construction.
10. Restore all disturbed areas to their original or better condition upon completion.
1.2 ENV Enclosure and Odor Control Unit Installation
1. Receive, unload, inspect, and install the GOVAPEX MICRO odor control unit and ENV outdoor enclosure.
2. Verify that all manufacturer-supplied equipment and accessories are received and free of shipping damage.
3. Mount and secure the ENV enclosure to the prepared concrete equipment pad.
4. Install the GOVAPEX MICRO unit within the ENV enclosure in accordance with the manufacturer's installation instructions.
5. Maintain required service clearances and provide unobstructed access to all equipment access panels, electrical disconnects, and maintenance components.
6. Provide and install all necessary mounting hardware, supports, and accessories.
7. Ensure all installed materials are compatible with the corrosive wastewater environment.
1.3 Electrical Installation
Provide all electrical labor, materials, wiring, conduit, disconnects, breakers, and associated components necessary for a complete electrical installation.
Important: The equipment shall not be energized or operated until inspected and authorized by a GOVAPEX-certified technician.
1.4 Potable Water Supply Installation
1. Provide a potable water connection to the ENV enclosure.
2. Provide a minimum ¾-inch garden-hose-type connection within 36 inches of the enclosure.
3. Install an accessible water shutoff valve.
4. Install an approved backflow prevention device in accordance with applicable plumbing codes and
City requirements.
5. Provide all necessary piping, fittings, supports, and connections.
6. Verify water supply pressure and flow before startup.
1.5 Nozzle Air Piping and Tubing Installation
Provide and install all piping necessary to connect the odor control unit to the atomizing nozzle locations within the lift station.
Work shall include:
1. Furnish and install the required air piping with sweep fittings.
2. Furnish and install required piping and associated fittings as necessary for the nozzle air system.
3. Install the supplied true-union ball check valve with the flow direction arrow oriented upward.
4. Install the manufacturer-supplied tubing insertion assembly, including the PVC tee, reducer bushing, and tubing bulkhead fitting.
5. Route the PVC air piping from the ENV enclosure to the nozzle locations.
6. Install tees at the required nozzle locations and extend piping to within approximately 30 inches of each nozzle location.
7. Provide the required flexible connections and nozzle mounting assemblies.
8. Install the manufacturer-supplied HV flexible nozzle mounting plates and associated piping.
9. Provide a access opening at each nozzle location, with the center of each opening located a minimum of 8 inches from interior walls.
10. Secure each nozzle mounting plate using appropriate corrosion-resistant fasteners.
11. Route the manufacturer-supplied oxidant and water tubing through the PVC nozzle air piping.
12. Maintain separate, continuous tubing runs for each nozzle. Tubing shall not be cut and spliced within the nozzle air piping.
13. Properly identify and label tubing for nozzle(s).
14. Install the supplied protective zipper cable sheath around the applicable tubing and cables.
15. Seal and secure all piping penetrations to prevent water intrusion and maintain the integrity of the lift station structure.
Nozzle locations shall be coordinated with the City and GOVAPEX representative to provide the longest unobstructed spray coverage while maintaining safe access for future inspection and maintenance.
Note: The GOVAPEX-certified technician shall furnish, attach, position, and make final adjustments to the nozzles during startup. The Contractor shall provide all required piping, tubing routing, nozzle mounting assemblies, and installation preparation.
1.6 FeNT Vent Odor Treatment Installation
Install the manufacturer-supplied FeNT vent odor treatment assembly at the designated lift station vent location.
Work shall include:
1. Inspect the existing vent configuration and verify compatibility with the supplied FeNT assembly.
2. Coordinate the installation configuration using the supplied components.
3. Prepare the vent mounting surface and provide all required installation labor and materials.
4. Provide the required PVC mounting flange and seal.
5. Secure the assembly using stainless-steel mounting hardware.
6. Install and secure the FeNT media cartridge and aluminum weather-protection cap.
7. Ensure the assembly is properly secured, weather-resistant, and accessible for future media replacement.
8. Verify that the installation does not obstruct the existing vent or interfere with normal lift station operation.
Where required, prepare the mounting surface with an epoxy coating suitable for wastewater applications in accordance with manufacturer recommendations.
The FeNT assembly shall be installed in accordance with the manufacturer's approved installation details and the existing site conditions.
1.7 Environmental Enclosure Air Conditioning
1. Install the manufacturer-supplied 12,000 BTU mini-split air conditioning system associated with the ENV enclosure.
2. Install the indoor and outdoor air conditioning components and associated mounting hardware.
3. Provide required refrigerant piping, condensate drainage, and electrical connections.
4. Have the air conditioning system started, charged, balanced, and commissioned by a licensed HVAC technician.
5. Provide documentation confirming the air conditioning system is operational.
The air conditioning system is not started or maintained by GOVAPEX personnel. This work shall be performed by a qualified HVAC contractor.
2. MANUFACTURER INSTALLATION INSPECTION AND STARTUP
The Contractor shall coordinate directly with GOVAPEX to schedule the manufacturer's installation inspection, startup, and operator training.
The following shall be completed before the manufacturer arrives:
• Odor control unit and ENV enclosure installed and anchored.
• Dedicated electrical circuits connected and inspected.
• Potable water connection installed and operational.
• Nozzle air piping and tubing installed.
• FeNT vent assembly installed.
• Protective cable sheathing installed.
• Air conditioning system serviced and authorized for operation by a licensed HVAC technician.
• All required connections completed and accessible for inspection.
The manufacturer shall provide a two-day site visit for installation inspection, equipment startup, and operator training.
Manufacturer services shall include:
1. Inspect the installed equipment and associated connections.
2. Identify any deficiencies requiring correction before startup.
3. Verify proper installation in accordance with manufacturer requirements.
4. Attach and position atomizing nozzles.
5. Start the odor control system and verify proper operation.
6. Adjust water, air, and oxidant flow rates as required.
7. Verify the operation of the system controls, safety interlocks, and alarm functions.
8. Verify system operating status and confirm the equipment is functioning properly.
9. Provide a minimum of two hours of operational monitoring following startup.
10. Provide operator training for designated City personnel.
11. Provide the manufacturer's Certificate of Proper Installation.
12. Provide written documentation of completed startup and commissioning activities.
The Contractor shall correct any installation deficiencies identified during the manufacturer's inspection before final acceptance.
3. TESTING AND FINAL ACCEPTANCE
Upon completion of installation and startup, the Contractor shall coordinate with the City and manufacturer to demonstrate that the system is operational.
Final acceptance shall include:
1. Verification that all equipment is properly installed and secured.
2. Verification of electrical connections, water supply, piping, and tubing.
3. Verification of both nozzle assemblies and their operation.
4. Verification of the FeNT vent treatment assembly.
5. Verification of the ENV enclosure air conditioning system.
6. Verification of system controls, alarms, and safety interlocks.
7. Confirmation of proper system startup by a GOVAPEX-certified technician.
8. Completion of operator training.
9. Delivery of all required manufacturer documentation.
10. Removal of construction debris and restoration of disturbed areas.
The Contractor shall demonstrate that all components are operational and that the installation has been completed in accordance with the approved submittal and manufacturer installation requirements.
4. PROJECT CLOSEOUT AND DELIVERABLES
Prior to final acceptance, the Contractor shall provide the City with:
• Manufacturer's Certificate of Proper Installation.
• Manufacturer's startup and commissioning report.
• Electrical inspection and testing documentation.
• HVAC startup and commissioning documentation.
• Equipment warranty documentation.
• GOVAPEX operation and maintenance manuals.
• Manufacturer's recommended maintenance schedule.
• Spare parts inventory and identification.
• Record drawings or as-built documentation showing equipment location, electrical connections, water connections, piping routes, and nozzle locations.
• Documentation of operator training.
• Contact information for manufacturer technical support and warranty service.
5. WARRANTY AND POST-INSTALLATION SERVICES
The Contractor shall provide all manufacturer warranty documentation associated with the supplied equipment.
The submitted GOVAPEX warranty identifies a factory equipment warranty of twelve (12) months from startup or eighteen (18) months from shipment, whichever occurs first, subject to the manufacturer's warranty conditions.
The project specifications also identify two (2) semiannual manufacturer service visits following startup.
The Contractor shall coordinate these visits with GOVAPEX and the City and confirm that they are included in the project price.
The Contractor shall provide the City with written confirmation of the warranty commencement date and the scheduled manufacturer service visits.
6. GENERAL REQUIREMENTS
1. All work shall be performed in a professional and workmanlike manner and in accordance with applicable federal, state, and local regulations.
2. The Contractor shall comply with applicable electrical, plumbing, building, and safety codes.
3. All materials installed within the wastewater environment shall be suitable for exposure to hydrogen sulfide, moisture, and other corrosive conditions.
4. All stainless-steel fasteners and mounting hardware shall be Type 316 stainless steel where required by the manufacturer.
5. The Contractor shall coordinate all work with the City's Public Works Department before beginning construction.
6. Lift station operations shall remain functional throughout construction unless otherwise authorized by the City.
7. Any required shutdowns, bypass pumping, or interruptions to lift station operations shall be coordinated and approved by the City in advance.
8. The Contractor shall maintain appropriate site safety measures and provide all required confined-space, electrical, and hazardous-atmosphere precautions.
9. No personnel shall enter the wet well or other confined spaces without the required permits, atmospheric testing, safety equipment, and approved entry procedures.
10. The Contractor shall be responsible for protecting existing utilities and improvements and repairing any damage resulting from its work.
11. Any deviations from the approved manufacturer submittal or installation requirements shall require prior written approval from the City.
7. ITEMS TO BE INCLUDED IN CONTRACTOR'S PROPOSAL
The Contractor's proposal shall include all labor, materials, equipment, installation, subcontractor costs, and incidentals necessary to complete the project.
The proposal shall separately identify, at a minimum:
1. Concrete equipment pad preparation and construction.
2. GOVAPEX equipment installation and anchoring.
3. Electrical service and connections.
4. Potable water service and backflow prevention.
5. PVC nozzle air piping and associated fittings.
6. Nozzle mounting assemblies and tubing installation.
7. FeNT vent odor treatment assembly installation.
8. ENV enclosure air conditioning installation and HVAC commissioning.
9. Manufacturer inspection, startup, and operator training.
10. Testing, commissioning, and project closeout.
11. Manufacturer's two semiannual service visits.
The Contractor shall identify any exclusions, assumptions, additional costs, or work required beyond the scope described herein.
IV. ATTACHMENTS
(PAGE INTENTIONALLY LEFT BLANK)
EXHIBIT A – Bid/Cost Proposal Form
RFP 2026-21-360 | MAIN STREET LIFT STATION VAPEX UNIT PROJECT
BIDDER INFORMATION
Legal Company Name: __________________________________________________________
Address: _______________________________________________________________________
Contact Person: ______________________________ Phone: _____________________________
Email: _________________________________________________________________________
BASE BID PRICING
Provide a lump-sum price for each component of the complete Main Street Lift Station GOVAPEX MICRO odor control unit installation. Pricing shall include all labor, materials, equipment, subcontractors, coordination, testing, and incidentals required by Section III of the RFP. Do not omit costs necessary for a complete and operational system.
Item Description of Work Lump-Sum Amount 1 Concrete equipment pad preparation and construction
2 GOVAPEX MICRO unit and ENV enclosure installation and anchoring
3 Electrical service and connections $ ______________ 4 Potable water service and backflow prevention
5 PVC nozzle air piping and associated fittings
6 Nozzle mounting assemblies and tubing installation
7 FeNT vent odor treatment assembly installation
8 ENV enclosure air conditioning installation and HVAC commissioning
9 Manufacturer inspection, startup, and operator training
10 Testing, commissioning, and project closeout
11 Two (2) semiannual manufacturer service visits
12 Bond premiums and related costs (included in Total Base Bid)
TOTAL BASE BID $ ______________
Include all costs in the Total Base Bid, including the separately stated bond premiums; do not double-count bond costs. Identify any proposed exclusions, assumptions, additional costs, or work outside the specified scope in an attachment. Any exclusions are subject to City review and acceptance.
PROJECT SCHEDULE
Estimated calendar days to complete installation after Notice to Proceed: __________ days Earliest anticipated mobilization after Notice to Proceed: __________ calendar days Estimated calendar days from installation completion to manufacturer startup: __________ days
BID ACKNOWLEDGMENT
By signing, the undersigned certifies that the pricing submitted includes the specified work, acknowledges the RFP requirements and any addenda identified below, and is authorized to submit this proposal on behalf of the bidder.
The required bid bond is five percent (5%) of the total proposed bid amount, as stated in Exhibit B.
Addenda acknowledged (numbers): __________________________________________________
Authorized Signature: _______________________________ Date: _______________________
EXHIBIT B – Required Vendor Forms
1700 First Street, Seabrook TX 77586 281.291.5600 ph 281.291.5690 fax www.seabrooktx.gov
City of Seabrook 1700 First Street
Seabrook, TX 77586
Vendor Setup
This packet provides the necessary forms to be considered as a City of
Seabrook vendor. Below is a checklist of forms that must be completed and returned to the Purchasing Department.
Document List (Please make sure all are complete and signed)*
City of Seabrook Vendor Application Vendor Statement of Agreement IRS Form W-9 Texas State Form CIQ House Bill 89 Verification Form EFT/ACH Payment Authorization (Available Upon Request)
*If vendor employees will be on city property, please include a Certificate of Insurance.
kshannahan Typewritten Text Vendor Name: ______________________________ kshannahan Sticky Note Marked set by kshannahan kshannahan Typewritten Text
Vendor Application
Vendor Name: ____________________________________________
Primary Address: ______________________________
Remit to Address: ______________________________
Tax ID Number: _________________________________
Primary Contact Name: _________________________________
Primary Contact Title: __________________________________
Phone: _________________________ Email: ____________________
Website: ________________________________________
Types of Goods/Services:
Discount %: ________________
(IF AVAILABE FOR ALL PURCHASES)
Additional/Special Information:
Payment Terms - Vendor Statement of Agreement
The City of Seabrook requires all vendors who desire to conduct business with the City to complete the Vendor Setup Packet. In addition, the following City of Seabrook policy items must be agreed to by an authorized representative of the vendor.
1. All invoices, statements, and other correspondence must be sent via email to payables@seabrooktx.gov or by mail to the following address:
City of Seabrook Accounts Payable 1700 First Street
Seabrook, Texas 77586
2. All invoices are paid no later than 30 days past the later of the invoice received date or date of acceptance of the product or service by an authorized City representative, in compliance with the Prompt Payment Act, provided the invoice is mailed to the above address.
3. Invoices for product all purchases over $100 must include the Purchase Order Number.
Purchase Orders of any kind by phone are NOT permitted.
My signature below certifies that I am an authorized representative of the vendor named on the W-9, and that my company agrees to abide by the policy statements unless otherwise agreed to in writing.
Printed Name: _______________________ Title: _________________________
Signature: ___________________________ Date: _________________________ kshannahan Typewritten Text Vendor Name:
kshannahan Typewritten Text
Revised 11/30/2015Form provided by Texas Ethics Commission www.ethics.state.tx.us
FORM CIQ
OFFICE USE ONLYThis questionnaire reflects changes made to the law by H.B. 23, 84th Leg., Regular Session.
This questionnaire is being filed in accordance with Chapter 176, Local Government Code, by a vendor who has a business relationship as defined by Section 176.001(1-a) with a local governmental entity and the vendor meets requirements under Section 176.006(a).
By law this questionnaire must be filed with the records administrator of the local governmental entity not later than the 7th business day after the date the vendor becomes aware of facts that require the statement to be filed. See Section 176.006(a-1), Local Government Code.
A vendor commits an offense if the vendor knowingly violates Section 176.006, Local Government Code. An offense under this section is a misdemeanor.
CONFLICT OF INTEREST QUESTIONNAIRE
For vendor doing business with local governmental entity
Date Received
A. Is the local government officer or a family member of the officer receiving or likely to receive taxable income, other than investment income, from the vendor?
Yes No
B. Is the vendor receiving or likely to receive taxable income, other than investment income, from or at the direction of the local government officer or a family member of the officer AND the taxable income is not received from the local governmental entity?
Yes No
Check this box if the vendor has given the local government officer or a family member of the officer one or more gifts as described in Section 176.003(a)(2)(B), excluding gifts described in Section 176.003(a-1).
Signature of vendor doing business with the governmental entity Date
Name of vendor who has a business relationship with local governmental entity.1
Check this box if you are filing an update to a previously filed questionnaire. (The law requires that you file an updated completed questionnaire with the appropriate filing authority not later than the 7th business day after the date on which you became aware that the originally filed questionnaire was incomplete or inaccurate.)
3 Name of local government officer about whom the information is being disclosed.
Name of Officer
Describe each employment or other business relationship with the local government officer, or a family member of the officer, as described by Section 176.003(a)(2)(A). Also describe any family relationship with the local government officer.
Complete subparts A and B for each employment or business relationship described. Attach additional pages to this Form CIQ as necessary.
Describe each employment or business relationship that the vendor named in Section 1 maintains with a corporation or other business entity with respect to which the local government officer serves as an officer or director, or holds an ownership interest of one percent or more.
Revised 11/30/2015Form provided by Texas Ethics Commission www.ethics.state.tx.us
CONFLICT OF INTEREST QUESTIONNAIRE
For vendor doing business with local governmental entity
A complete copy of Chapter 176 of the Local Government Code may be found at http://www.statutes.legis.state.tx.us/ Docs/LG/htm/LG.176.htm. For easy reference, below are some of the sections cited on this form.
Local Government Code § 176.001(1-a): "Business relationship" means a connection between two or more parties based on commercial activity of one of the parties. The term does not include a connection based on:
(A) a transaction that is subject to rate or fee regulation by a federal, state, or local governmental entity or an agency of a federal, state, or local governmental entity;
(B) a transaction conducted at a price and subject to terms available to the public; or
(C) a purchase or lease of goods or services from a person that is chartered by a state or federal agency and that is subject to regular examination by, and reporting to, that agency.
Local Government Code § 176.003(a)(2)(A) and (B):
(a) A local government officer shall file a conflicts disclosure statement with respect to a vendor if:
(2) the vendor:
(A) has an employment or other business relationship with the local government officer or a family member of the officer that results in the officer or family member receiving taxable income, other than investment income, that exceeds $2,500 during the 12-month period preceding the date that the officer becomes aware that
(i) a contract between the local governmental entity and vendor has been executed;
or
(ii) the local governmental entity is considering entering into a contract with the vendor;
(B) has given to the local government officer or a family member of the officer one or more gifts that have an aggregate value of more than $100 in the 12-month period preceding the date the officer becomes aware that:
(i) a contract between the local governmental entity and vendor has been executed; or
(ii) the local governmental entity is considering entering into a contract with the vendor.
Local Government Code § 176.006(a) and (a-1)
(a) A vendor shall file a completed conflict of interest questionnaire if the vendor has a business relationship with a local governmental entity and:
(1) has an employment or other business relationship with a local government officer of that local governmental entity, or a family member of the officer, described by Section 176.003(a)(2)(A);
(2) has given a local government officer of that local governmental entity, or a family member of the officer, one or more gifts with the aggregate value specified by Section 176.003(a)(2)(B), excluding any gift described by Section 176.003(a-1); or
(3) has a family relationship with a local government officer of that local governmental entity.
(a-1) The completed conflict of interest questionnaire must be filed with the appropriate records administrator not later than the seventh business day after the later of:
(1) the date that the vendor:
(A) begins discussions or negotiations to enter into a contract with the local governmental entity; or
(B) submits to the local governmental entity an application, response to a request for proposals or bids, correspondence, or another writing related to a potential contract with the local governmental entity; or
(2) the date the vendor becomes aware:
(A) of an employment or other business relationship with a local government officer, or a family member of the officer, described by Subsection (a);
(B) that the vendor has given one or more gifts described by Subsection (a); or
(C) of a family relationship with a local government officer.
House Bill 89 VERIFICATION
I hereby affirm that I am an authorized agent of _____________________________________ hereafter referred to as company, do hereby affirm that the company named-above, under the provisions of Subtitle F, Title 10, Government Code Chapter 2270:
1. Does not boycott Israel currently; and
2. Will not boycott Israel during the term of the contract/agreement if awarded under this Request for Proposal.
Pursuant to Section 2270.001, Texas Government Code:
1. “Boycott Israel” means refusing to deal with, terminating business activities with, or otherwise taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations specifically with Israel, or with a person or entity doing business in Israel or in an Israeli-controlled territory, but does not include an action made for ordinary business purposes; and
2. “Company” means a for-profit sole proprietorship, organization, association, corporation, partnership, joint venture, limited partnership, limited liability partnership, or any limited liability company, including a wholly owned subsidiary, majority-owned subsidiary, parent company or affiliate of those entities or business associations that exist to make a profit.
DATE SIGNATURE OF COMPANY REPRESENTATIVE
Form W•9 (Rev. March 2024)
Department of the Treasury Internal Revenue Service
Request for Taxpayer Identification Number and Certification
Go to www.irs.gov/FormW9 for instructions and the latest information.
Before you begin. For guidance related to the purpose of Form W-9, see Purpose of Form below
Give form to the requester. Do not send to the IRS.
1 Name of entity/individual. An entry is required. (For a sole proprietor or disregarded entity, enter the owner's name on line 1, and enter the business/disregarded entity's name on line 2.)
2 Business name/disregarded entity name, if different from above.
Q) 3a Check the appropriate box for federal tax classification of the entity/individual whose name is entered on line 1. Check 4 Exemptions (codes apply only to Ol only one of the following seven boxes. certain entities, not individuals; "' Q.
□ D C corporation see instructions on page 3):
C Individual/sole proprietor D S corporation □ Partnership D Trusl/estate
• Ill □ LLC. Enter the tax classification (C = C corporation, S = S corporation, P = Partnership) Exempt payee code (if any) Q) C:
.%~ Note: Check the "LLC" box above and, in the entry space, enter the appropriate code (C, S, or P) for the tax ___ 0 classification of the LLC, unless it is a disregarded entity. A disregarded entity should instead check the appropriate Exemption from Foreign Account Tax .. ::i
0 .. box for the tax classification of its owner. Compliance Act (FATCA) reporting C Ill □ Other (see instructions) code (if any) 'C: .s Q. 0
;;:: 3b If on line 3a you checked "Partnership" or "Trusl/estate," or checked "LLC" and entered "P" as its tax classification, ·c:; (Applies to accounts maintained and you are providing this form to a partnership, trust, or estate in which you have an ownership interest, check CD outside the United States.)
~ □ this box if you have any foreign partners, owners, or beneficiaries. See instructions Q)
5 Address (number, street, and apt. or suite no.). See instructions. Q) Requester's name and address (optional)
6 City, state, and ZIP code
7 List account number(s) here (optional)
• !i:1 •• Taxpayer Identification Number (TIN)
Enter your TIN in the appropriate box. The TIN provided must match the name given on line 1 to avoid I Social security number I
[Il]-ITJ-1 I I I I backup withholding. For individuals, this is generally your social security number (SSN). However, for a resident alien, sole proprietor, or disregarded entity, see the instructions for Part I, later. For other entities, it is your employer identification number (EIN). If you do not have a number, see How to get a TIN, later.
or j Employer identification number
Note: If the account is in more than one name, see the instructions for line 1. See also What Name and Number To Give the Requester for guidelines on whose number to enter.
Certification Under penalties of perjury, I certify that:
1. The number shown on this form is my correct taxpayer identification number (or I am waiting for a number to be issued to me); and
2.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .