RFP 2026-118 - General Contractor Services for Mary Shepard Place Phase 1.pdf
PDF 1 MB Posted
- Solicitation number
- #2026-118
- Issued by
- Hartford County, Connecticut
About this file
This Request for Proposals (RFP) is issued by the Housing Authority of the City of Hartford (HACH) and Trinity MSP Development LLC for general contractor services to construct the Mary Shepard Place (MSP) Phase 1 project located at 88 Wooster Street in Hartford, Connecticut. The project involves hazardous-material abatement and demolition of existing buildings, environmental remediation, and construction of eleven three-story wood-framed residential buildings containing 81 rental units (42 units in Phase 1A and 39 units in Phase 1B), a 3,400-square-foot community building, site improvements, streetwork, and associated utilities. The RFP was issued on October 26, 2026, with a submission deadline of December 9, 2026, at 4:00 PM. An optional pre-proposal meeting and site visit will be held on November 5, 2026, at 9:30 AM at the project location; no individual site visits will be offered. The deadline for Requests for Interpretation is November 17, 2026, at 4:00 PM. Contractor selection is anticipated for the week of January 4, 2027, subject to board approval. The selected contractor must deliver the turnkey project within 24 months after issuance of a notice to proceed, currently estimated for completion in Q2 2029, with construction anticipated to begin in summer 2027. The contact person is Josh Dickens at 617.398.2540 or jdickens@trinityfinancial.com.
The project utilizes a Guaranteed Maximum Price (GMP) contract model with separate AIA Document A102-2017 and A201-2017 agreements for each ownership entity. Contractor general requirements shall not exceed six percent of the cost of work, overhead shall not exceed two percent, and profit/GMP fee shall not exceed six percent. The combined GMP must include all permit fees, bond premiums, prevailing wage compliance, and insurance costs. Financing sources include 9% and 4% Low-Income Housing Tax Credits, Federal Solar Investment Tax Credits, Connecticut Housing Finance Authority (CHFA) Opportunity Fund, DOH FLEX State Subordinate Financing, DECD Community Investment Fund, DECD Urban Act Funds, DECD Brownfields Municipal Grant Program, and AFL-CIO Housing Investment Trust financing. The project is subject to Connecticut prevailing wage requirements and federal Davis-Bacon wage rates. The City of Hartford requires 15% of construction work be awarded to minority-owned businesses and 15% of project work hours be performed by minority and female tradespeople, with 30% of work hours performed by Hartford residents. Connecticut requires 25% of the estimated $28.6-million state-funded portion be awarded to small business enterprises, with 6.25% set aside for minority-, women-, and disadvantaged-business-owned enterprises. The selected contractor must comply with AFL-CIO Housing Investment Trust labor requirements, including use of union labor affiliated with the Building and Construction Trades Council, and participate in a Project Labor Agreement. The project includes employment goals requiring Priority Workers to perform at least 10% of total labor hours, Targeted Priority Workers to perform at least 3%, and good-faith outreach efforts for Priority Business participation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Trinity MSP Development LLC One Beacon Street, Suite 22100 Boston, MA 02108
Housing Authority of the City of Hartford
180 John D Wardlaw Way Hartford, CT 06106
Request for Proposals (“RFP”)
General Contractor Services Mary Shepard Place Phase 1, Hartford, CT 06120
RFP #2026-118
PROJECT TYPE: New Construction
ISSUE DATE: October 26, 2026
SUBMISSION DEADLINE: December 9 @ 4:00 PM
CONTACT PERSON: Josh Dickens 617.398.2540 jdickens@trinityfinancial.com mailto:jdickens@trinityfinancial.com
Table of Contents
1.0 INVITATION
2.0 SCOPE OF WORK
2.1 Project Background
2.2 MSP Phase 1 Scope of Work
2.3 Bidding Documents and Scope Control
2.4 Sustainable and Energy Performance Requirements
2.5 Site Conditions and Occupied Property
2.6 General Requirements
2.6.1 Maintenance of Work Area
2.6.2 Temporary Utilities
2.6.3 Safety and Security
2.6.4 Access
2.6.5 Prevailing Wage Requirements
2.6.6 Contract Bonds
2.7 Financing
3.0 SCHEDULES
3.1 RFP Schedule
3.2 Proposed Project Schedule
4.0 CONSTRUCTION APPROACH
4.1 AFL-CIO Housing Investment Trust and Labor Requirements
4.2 Community-Based Approach
4.3 MSP Phase 1 Employment and Contracting Requirements
4.3.1 Implementation and Enforcement
4.3.2 City of Hartford Requirements
4.3.3 State of Connecticut Requirements
4.3.4 Contract Compliance and Reporting
4.3.5 CHFA Regulations
4.4 Contract Award
4.5 Form of Contract
4.6 Permit Fees
4.7 Insurance Requirements
4.8 General Requirements, Overhead, Profit and Bond Premiums
4.9 Build America Buy America (BABA)
4.10 Wage Rates
4.11 Connecticut Sales Tax Exemption
5.0 SUBMISSION INSTRUCTIONS
5.1 Submission Deadline
5.2 Representations
5.3 Submittal Documents
5.3 HACH Administrative and Compliance Forms
5.3.1 Required to be submitted with the Proposal
5.3.2 Acknowledged with the Proposal and complied with after Award
5.4 Requests For Interpretation (RFI)
5.5 Evaluation Criteria
5.6 Co-Development Team’s Rights
5.7 Questions
Appendix A: Definitions
Appendix B: Proposed Form of AFL-CIO HIT Certificate
Appendix C: MSP Phase 1 Employment & Contracting Plan
Appendix D: Bidder Assumptions, Qualifications and Value-Engineering
1.0 INVITATION
The Housing Authority of the City of Hartford and Trinity MSP Development LLC, (the “Co-Development Team”) are seeking Proposals for the construction of its Mary Shepard Place (MSP) Phase 1 project (the “MSP Phase 1” or “Project”) located at 88 Wooster Street in Hartford, Connecticut. The Project is expected to receive financing involving the AFL- CIO Housing Investment Trust and will be subject to the labor requirements described in Section 4.0 of the RFP. Interested, qualified, licensed and insured AFL-CIO Contractors who have successfully demonstrated their ability and experience on comparable projects are invited to submit a Proposal.
The selected Contractor will be expected to: (1) provide all services required to deliver a turnkey Project no later than 24 months after issuance of a notice to proceed; and (2) maximize the participation of local, minority-, and women-owned businesses and individuals in the completion of the Project.
The RFP package is available on request by contacting Josh Dickens at jdickens@trinityfinancial.com.
Proposals must be submitted electronically to both Joshua Dickens at jdickens@trinityfinancial.com and bids@hartfordhousing.org no later than 4:00 pm on Wednesday, December 9, 2026.
All Proposers are strongly encouraged to visit the Site prior to the due date of Proposals to familiarize themselves with the Site and its context. A pre-bid conference will be held on November 5, 2026 at 9:30 am at the Project location (88 Wooster Street Hartford, Connecticut). Attendance is optional but highly recommended, as the conference will include the only guided site visit offered to Proposers. No individual guided site visits will be scheduled. Proposers should examine all conditions affecting the Work requested. All questions must be submitted no later than 4:00 pm on November 17, 2026 and should be directed to jdickens@trinityfinancial.com and copied to bids@hartfordhousing.org.
The Co-Development Team reserves the right to reject any or all Proposals, to waive informalities or irregularities in any bid, to advertise a new RFP, to cancel this RFP, to proceed to do the Work by other means, as may be determined to be in the best interest of the Authority.
Only those Proposals determined to be submitted by Responsible Contractors will be evaluated. Capitalized terms used in this RFP have the meanings stated in Appendix A.
Unless the context requires otherwise, defined terms include the singular and plural forms of the term.
2.0 SCOPE OF WORK
2.1 Project Background
Trinity Financial, Inc. was selected by the Housing Authority of the City of Hartford (HACH) in October 2025 to serve as Co-Developer of the MSP Redevelopment. The overall MSP mailto:jdickens@trinityfinancial.com mailto:jcurran@tmo.com mailto:bids@hartfordhousing.org mailto:jcurran@tmo.com mailto:bids@hartfordhousing.org redevelopment contemplates the demolition of existing improvements and construction of approximately 159 multifamily rental units in 23 residential buildings, together with a community building, new streets, open space, parking, utilities and associated site improvements. The MSP redevelopment is planned as two principal construction phases:
the 81-unit (MSP Phase 1) on the northern portion of the Site and the 78-unit (MSP Phase
2) on the southern portion of the Site.
This solicitation is for MSP Phase 1 only. MSP Phase 2 and any future homeownership phase are not included in the Work, except to the extent that the Bidding Documents require temporary work, utility continuity, access, protection, coordination or other measures necessary to permit the remaining portion of MSP Redevelopment to continue operating until subsequent phases are constructed.
2.2 MSP Phase 1 Scope of Work
MSP Phase 1 generally includes:
2.2.1 Hazardous-material abatement and demolition of the existing community building and five existing residential buildings identified in the Bidding Documents;
2.2.2 Environmental remediation and soil management within the MSP Phase 1 work area;
2.2.3 Construction of eleven three-story, wood-framed residential buildings containing a total of 81 rental units, consisting of (6) one-bedroom, (55) two-bedroom and (20) three-bedroom units;
2.2.4 Construction of an approximately 3,400-square-foot freestanding community building;
2.2.5 Construction of associated site improvements, including grading, landscaping, surface parking, pedestrian improvements, utilities, stormwater facilities, new Street C and new Street D and the portions of new Street A and new Street B included in the Bidding Documents. Streets A, B, C and D will be built on private land, but are intended for conveyance to the City once completed and accepted by the City;
2.2.6 Public-way and off-site improvements specified in the Bidding Documents, including required coordination with the City of Hartford, the Metropolitan District Commission, Eversource and applicable telecommunications and utility providers;
2.2.7 Coordination and installation of fire alarm, data, communications, security, access-control and other low-voltage systems included in the Bidding Documents;
2.2.8 Temporary grading, access, protection, utility continuity and other measures required to maintain safe operation of the occupied portions of the MSP Redevelopment outside the MSP Phase 1 work area; and
2.2.9 All other labor, materials, equipment, supervision, coordination, testing, permits, services and incidental work required by the Bidding Documents for a complete and operational Project.
MSP Phase 1 is divided for ownership and financing purposes into the 42-unit Phase 1A component and the 39-unit Phase 1B component. Phase 1A and Phase 1B will be owned by separate legal entities, and the selected Contractor will be required to enter into a separate Contract with each Applicable Owner for the portion of the Work attributable to that component. Notwithstanding the separate ownership and Contracts, the Co- Development Team intends to select one Contractor through this RFP to perform the Work as one coordinated construction project under a unified construction schedule, site-logistics plan and project-management approach, so that all aspects of the Contract, including, but not limited to, progress and payment is essentially administered as if the Project was constructed under one contract.
The Proposer shall submit one combined Guaranteed Maximum Price (GMP) for all of MSP Phase 1 and shall provide the cost breakdowns and other information required by the Bid Form and Bidding Documents to allow the Co-Development Team to allocate that combined GMP between Phase 1A and Phase 1B. The aggregate of the amounts allocated to the two Contracts, including the allocated share of common and shared Work, shall equal the combined GMP accepted through this RFP. The allocation of costs between the two Contracts will not expand the overall scope of the Work or increase the combined GMP, except through a modification authorized in accordance with the applicable Contract Documents.
2.3 Bidding Documents and Scope Control
The preceding description is a summary provided for the convenience of Proposers and is not intended to limit or modify the Work. The complete scope of the Work is established by the procurement and Bidding Documents, including this RFP, the Plans and associated Project Manual, and written addenda.
Proposers are responsible for reviewing the Bidding Documents and including in the proposed GMP all Work shown, specified or reasonably inferable, as necessary to produce the results indicated by the Bidding Documents.
If a Proposer identifies ambiguity, discrepancy, omission or conflict among the Bidding Documents, the Proposer shall submit a timely written Request for Interpretation in accordance with Section 5.4 and Project Manual Section 00 63 13.13. The issuance of a written addendum is the only pre-Proposal interpretation that will modify the solicitation requirements.
2.4 Sustainable and Energy Performance Requirements
The Project is intended to comply with the sustainability and energy requirements identified in the Bidding Documents, including, as applicable:
2.4.1 The Energize Connecticut Residential New Construction Program;
2.4.2 The 2020 Enterprise Green Communities Criteria;
2.4.3 ENERGY STAR Multifamily New Construction requirements;
2.4.4 Solar-ready rooftop photovoltaic system for future system contemplated through the Connecticut Green Bank structure; and
2.4.5 Broadband access for all residential units.
The Plans, Specifications and other Bidding Documents establish the Contractor’s detailed obligations concerning these programs and systems.
2.5 Site Conditions and Occupied Property
The MSP Phase 1 Work area is anticipated to be vacated before a notice to proceed is issued and the hazardous-material abatement and demolition commence. Other portions of the MSP Redevelopment site, including the area planned for MSP Phase 2, will remain occupied and operational during the construction of MSP Phase. The Contractor shall coordinate the Work to maintain required access, utilities, emergency response, security and safe separation between construction activities and occupied areas, as more fully described in the Bidding Documents.
2.6 General Requirements
2.6.1 Maintenance of Work Area
The Contractor shall keep the working area sufficiently clear of equipment, material, and implements of service to prevent endangering persons and damage to the HACH’s property and to avoid an unsightly condition. Removal of such items shall be performed promptly upon completion of Work. All debris and other waste materials shall be removed from the Site and disposed of legally. The Contractor shall not use HACH’s facilities for disposal of debris and waste materials.
2.6.2 Temporary Utilities
The Contractor shall include in the Proposal coordination, cost, installation and removal of any temporary utility connections required to perform the Work, including for weather conditions.
2.6.3 Safety and Security
While the MSP Phase 1 portion of the Site will be vacant before the Work is undertaken, MSP Phase 2 will continue to be occupied. The Contractor shall comply with all laws, ordinances, rules and regulations applicable to the Work. The Contractor shall provide adequate protection for all persons and all HACH personnel within the working area or approaches thereto and shall furnish and erect temporary barricades, including construction fencing. All construction-related activities shall be contained to the MSP Phase 1 portion of the Site. The Contractor shall implement a motion and burglary detection system once the Project begins vertical construction.
2.6.4 Access
The Contractor, its employees, subcontractors, or other representatives, have no tenancy and shall be admitted to the grounds of the MSP Phase 1 only for the proper execution of the Work.
Contractor shall take particular care in preserving the integrity of the adjacent sites and ensure consistency of his or her work in order to maintain the overall appearance of the community. Contractor shall minimize dust and noise from any construction activities.
2.6.5 Prevailing Wage Requirements
The Contractor and all Subcontractors of every tier shall comply with the prevailing-wage, certified-payroll and labor-standards requirements applicable to the Work, including the Connecticut prevailing-wage requirements and, for purposes of preparing the Proposal, the federal Davis-Bacon and Related Acts requirements identified in the Bidding Documents. See 4.10 for further instruction.
2.6.6 Contract Bonds
As a condition of Contract execution, the selected Contractor shall furnish a performance bond and a payment bond for each Contract. Each performance bond shall be in a penal sum equal to one hundred percent (100%) of the GMP allocated to the applicable Contract, and each payment bond shall be in a penal sum equal to one hundred percent (100%) of the GMP allocated to the applicable Contract. The payment bond shall secure payment for labor, materials and equipment furnished in connection with the applicable Work.
The bonds shall be issued by a surety authorized to conduct business in the State of Connecticut and acceptable to the Applicable Owners, CHFA and the other applicable construction lenders and funding sources. The bonds shall name the parties and include any dual-obligee or other riders required by the Applicable Owners, CHFA, the construction lenders, investors or other funding sources. The form and substance of the bonds shall be subject to approval before execution of the applicable Contract.
The Contractor shall maintain the bonds throughout performance of the Work and any applicable correction or warranty period required by the Contract Documents. If the applicable Contract Sum is increased, the Contractor shall increase the penal sums of the corresponding bonds when required by the Applicable Owner or applicable funding source. All bond premiums and related costs shall be included in the combined GMP.
2.7 Financing
Financing for this Project is being provided or contemplated by the following sources. As such the Successful Contractor will be obligated to fulfill any and all associated requirements under such funding program, including the execution of any required certifications.
9% Low-Income Housing Tax Credits 4% Low-Income Housing Tax Credits with associated Tax-Exempt Bonds Federal Solar ITC Equity CHFA Opportunity Fund DOH FLEX State Subordinate Financing DECD Community Investment Fund DECD Urban Act Funds
DECD Brownfields Municipal Grant Program AFL-CIO Housing Investment Trust (administered by DOH)
3.0 SCHEDULES
3.1 RFP Schedule
The following is the schedule for the RFP process. Please note that this schedule is subject to change. Only those changes to the schedule issued via written addendum are contractual.
Release RFP October 26
Optional Pre-Proposal Meeting/Site Visit* November 5 at 9:30 am
RFIs Due Date November 17 no later than 4:00 pm
RFI Responses Issued November 24
Electronic RFP Responses Due December 9 no later than 4:00 pm
Interviews for Contractors deemed Responsible December 17, 18, 21 and 22
Contractor Selection** Week of January 4, 2027
Pre-Construction Kick-Off Meeting Week of January 11, 2027
Receive all permitting comments and finalize Construction Drawings
January and February 2027
Finalize Construction Pricing March 2027
* Proposers wishing to visit the Site must take advantage of the opportunity at this meeting. No other times will be made available; no requests for individual tours will be granted.
** Subject to approval by the Boards of HACH and its affiliates.
3.2 Proposed Project Schedule
Relocation of Residents February 2027 – May 2027
Anticipated Financial Closing, Construction Start, including Abatement and Demolition
Summer 2027
Construction Completion 24 months from Notice to Proceed, currently estimated to be Q2 2029
4.0 CONSTRUCTION APPROACH
4.1 AFL-CIO Housing Investment Trust and Labor Requirements
The Co-Development Team anticipates that the Project will receive financing involving the American Federation of Labor and Congress of Industrial Organizations Housing Investment Trust (“HIT”). The Project is therefore expected to be constructed in accordance with the HIT labor requirements described in the Certificate of Borrower and Contractor included as Appendix B.
Under that Certificate, the Borrower and selected Contractor will certify that all covered onsite construction work will be performed only by persons represented by unions currently affiliated with the applicable local Building and Construction Trades Council, AFL-CIO, the Building and Construction Trades Department, AFL-CIO, or unions that were so affiliated as of January 1, 2001. The selected Contractor will also be required to contract only with Subcontractors of every tier that agree to satisfy the applicable requirements of the Certificate.
The Project is also expected to be covered by a Project Labor Agreement (PLA) negotiated with the applicable Building and Construction Trades Council. The PLA has not yet been negotiated or finalized and is not included in this RFP. Respondents must demonstrate their ability and willingness to perform the Project in accordance with the HIT labor requirements, execute the Certificate of Borrower and Contractor, and participate in good faith in the development and implementation of the PLA.
Proposers shall identify in their proposals any assumptions or qualifications relating to the anticipated labor requirements using Appendix D of this RFP. The Contract award will be conditioned upon completion of labor arrangements acceptable to the Co-Development Team, the Applicable Owners, the selected Contractor, the applicable Building and Construction Trades Council, and the Project’s financing sources.
4.2 Community-Based Approach
Successful communities arise from close collaboration with their design partners, community stakeholders, and residents. The Authority has developed and maintained residential communities in the City of Hartford since 1938, guided by their vision to be a catalyst for change in the successful creation of strong communities and families.
Throughout its nearly 40-year history, Trinity has had an excellent track record in utilizing MBE/WBE firms and employing minorities, women and local residents in the construction and management of its properties. The firm has always welcomed opportunities to reinvest in local communities above and beyond the “bricks and mortar” of their projects.
Providing attractive business opportunities to area businesses and decent jobs to local residents only serves to strengthen the local economy and enhances long-term value creation.
The Co-Development Team intends for the Project to create meaningful employment, training, apprenticeship and contracting opportunities for Mary Shepard Place residents, other HACH-assisted residents, low-income Hartford residents and qualifying local businesses. These objectives will be implemented through the MSP Phase 1 Employment and Contracting Plan included as Appendix C of this RFP, in coordination with the AFL- CIO Labor Requirements, the Project Labor Agreement, applicable collective bargaining agreements and applicable State of Connecticut, City of Hartford and Project financing requirements.
The Co-Development Team believes that successful projects cannot be achieved in isolation from residents and other stakeholders affected by the project, nor can it be achieved by perfunctory contact with the stakeholders. Meaningful, regular, and interactive contact amongst all the parties must be established and maintained during the construction and close-out processes. The Co-Development Team anticipates the selected Contractor will engage in multiple sessions with residents and community members and will document these efforts with regards to outreach, participation, issues raised and follow-up tasks before and during construction to facilitate information sharing and updates on the Project to allow for a better-informed community. The Co- Development Team similarly anticipates the selected Contractor will assign a project manager as the primary point of contact accessible to the Co-Development Team, the community and other stakeholders.
4.3 MSP Phase 1 Employment and Contracting Requirements
The MSP Phase 1 Employment and Contracting Plan (Employment Plan) included as Appendix C to this RFP establishes the Project’s employment, training, apprenticeship, contracting, outreach, reporting and good-faith-effort requirements. The Employment Plan applies to the Contractor and all Subcontractors of every tier performing Work under either of the two MSP Phase 1 Contracts. The selected Contractor will be responsible for administering the Employment Plan across both Contracts as one coordinated construction effort.
The Co-Development Team does not presently anticipate that HUD Section 3 requirements independently apply to construction of the Project. The Employment Plan is therefore a Project-specific requirement that will become a contractual obligation of the selected Contractor; it is not a representation that the Project is a Section 3 project under 24 C.F.R. Part 75. References in the Employment Plan to HUD Section 3 definitions or labor-hour benchmarks are used only as practical models for identifying and measuring the opportunities HACH intends the Project to create.
The Employment Plan will be administered in coordination with the AFL-CIO Labor
Requirements, the PLA, applicable collective bargaining agreements, City of Hartford requirements, State of Connecticut requirements, prevailing-wage laws, apprenticeship requirements and other applicable funding and financing requirements. The requirements will be reconciled before execution of the Contracts to clarify overlapping definitions, priorities, referral procedures, documentation and reporting obligations and, to the maximum extent practicable, to avoid conflicting or duplicative administration.
Proposers shall include in their combined Guaranteed Maximum Price all costs of complying with the Employment Plan and the other labor, apprenticeship, employment, contracting, outreach and reporting requirements expressly identified in this RFP and its addenda. Subsequent coordination, consolidation or administrative reconciliation of the disclosed requirements will not, by itself, constitute a change in the Work or entitle the Contractor to an adjustment of the combined Guaranteed Maximum Price, either Contract Sum or the Contract Time. Any material revision that increases the Contractor’s cost or obligations will be addressed by addendum before award or, if imposed after award, in accordance with the applicable Contract modification procedures.
4.3.1 Implementation and Enforcement
The numerical goals contained in the Employment Plan are Project-specific goals and are not HUD Section 3 requirements. Failure to attain a numerical goal will not, by itself, constitute a default, provided that the Contractor timely performs and documents the outreach, recruitment, referral, contracting, reporting and other good-faith efforts required by the Employment Plan. Failure to implement the Employment Plan, submit required reports, maintain required records, cooperate with compliance monitoring or undertake required corrective measures may constitute a default under the applicable Contract.
Before commencing construction, the selected Contractor shall coordinate with the Co- Development Team and the designated Employment Plan administrator to establish implementation procedures, reporting formats and a compliance schedule. The Contractor shall administer these requirements across both Contracts as one coordinated construction effort and shall require its Subcontractors of every tier to provide the information and cooperation necessary for compliance.
4.3.2 City of Hartford Requirements
The City of Hartford requires contractors to set aside at least 15% of the total construction work for MBEs.
The City of Hartford requires at least 15% of the total project work hours, by trade, shall be worked by minority and female trades-workers.
Thirty percent of the total project work hours shall be worked by Hartford residents.
Please see: https://www.hartfordct.gov/Government/Departments/Finance/Procurement for City of Hartford Affirmative Action and Equal Employment Opportunity Contractual requirements and goals.
4.3.3 State of Connecticut Requirements
https://www.hartfordct.gov/Government/Departments/Finance/Procurement
The State of Connecticut requires projects to set a goal of at least twenty-five per cent (25%) of the estimated $28.6-million state-funded portion of the Contract be awarded to eligible Subcontractors holding current small business enterprise (SBE) certification from the CT Department of Administrative Services (DAS) under the provisions of C.G.S. 4a- 60g. Of the portion of contracts set aside for SBEs, a goal of twenty-five percent (25%) (or 6.25% of the value of the entire Contract funded by the state) must be set aside for awards to eligible contractors holding current MBE, WBE and/or DBE owned businesses). The Contractor must make good faith efforts to employ MBEs as Subcontractors and suppliers of materials on such projects.
The Contractor will also be required to adhere to any CHFA-specific hiring goals and/or requirements, including, but not limited to, CHFA’s Very Low Income (VLI) policy.
The selected Contractor will be required to work with the Co-Development Team to create and implement a local hiring program. Further, the Contractor will be required to perform community outreach for local hiring purposes and will document these efforts with regards to outreach, participation, issues raised and follow-up tasks and will produce monthly MBE/WBE and local hiring reports. The Co-Development Team will provide respondents with an opportunity to provide further details as may be needed for the Project. The selected Contractor is required to submit a CHRO Contract Compliance Regulations Notification to Bidders Form with their submission.
4.3.4 Contract Compliance and Reporting
The Project is expected to receive financing from multiple public sources and will be subject to the contract-compliance, reporting and recordkeeping requirements imposed by the applicable funding and financing sources.
By submitting a Proposal, each Proposer acknowledges the requirements disclosed in this RFP and the Bidding Documents and agrees, if selected, to comply with those requirements and to incorporate applicable compliance, reporting and recordkeeping obligations into its Subcontracts and purchase orders. The selected Contractor shall provide the certifications, reports, payroll records, utilization information and other documentation required by the Applicable Owners, HACH and the applicable funding and financing sources.
4.3.5 CHFA Regulations
The Project is required to adhere to CHFA construction guidelines, including construction cost limitations. For 2026 Construction Criteria, please visit the CHFA website at https://www.chfa.org/developers/design-and-construction-criteria/. Respondents unwilling or unable to perform within the CHFA guidelines should not apply.
4.4 Contract Award
Contractor selection is conditional upon execution of all required funding awards, a balanced sources and uses, applicable HACH approvals, formation and authorization of the Applicable Owners, financing approvals, financial closing and execution of the Applicable Owner–Contractor agreements. Selection does not create a Contract, https://www.chfa.org/developers/design-and-construction-criteria/ https://www.chfa.org/developers/design-and-construction-criteria/ authorize commencement of the Work or impose liability upon either Owner. Each Contract will be entered into directly by the Applicable Owner and will not be assigned to the Co-Development Team.
4.5 Form of Contract
Each Applicable Owner will enter into a separate construction contract with the selected Contractor using AIA Document A102–2017, as modified by the parties, with AIA Document A201–2017 as the General Conditions. Each Contract will establish a Guaranteed Maximum Price (GMP) and will be subject to review and approval by CHFA and the other applicable funding sources.
4.6 Permit Fees
Proposers shall include in the combined GMP all permit, connection, inspection, sign-off and similar fees required for the Work, including building permits, utility connection fees, road-improvement permits, water and sewer connection or tap fees, and permit fees incurred by Subcontractors. To the extent these costs are not separately identified on the Bid Form, Proposers shall separately identify them on the applicable “Building Permit,” “Other Fees” or appropriate trade line of the CHFA Exploded Trade Payment Breakdown included as Exhibit K to the Project Manual.
4.7 Insurance Requirements
The selected Contractor shall obtain and maintain the insurance required by the Insurance Requirements included in Exhibit H-10 of the Project Manual. Proposers shall review those requirements and include in the combined Guaranteed Maximum Price all premiums and other costs necessary to comply with them.
The Insurance Requirements remain subject to review by the Applicable Owners, CHFA, the construction lenders and the Investor Limited Partners. Any revisions issued before the Proposal deadline will be communicated by addendum.
4.8 General Requirements, Overhead, Profit and Bond Premiums
The Bid Form requires Proposers to separately state the percentages and amounts included in the combined GMP for Contractor’s General Requirements, overhead and profit. Contractor’s General Requirements shall not exceed six percent (6%) of the Cost of the Work, Contractor’s overhead shall not exceed two percent (2%) of the Cost of the Work, and Contractor’s profit or GMP fee shall not exceed six percent (6%) of the Cost of the Work, calculated in accordance with the Bid Form and Exhibit K.
The combined GMP shall include all premiums and other costs associated with the performance and payment bonds required by Section 2.6.6. Bond premiums shall be separately identified on the “Bond Premium” line of Exhibit K.
4.9 Build America Buy America (BABA)
BABA will not apply to the Project.
4.10 Wage Rates
The Connecticut prevailing-wage schedule and federal Davis-Bacon wage decision are included as Exhibits H-9.1 and H-9.2 of the Project Manual. For purposes of preparing the Proposal, Proposers shall compare the total basic hourly wage and fringe benefits under both wage determinations for each worker classification and include in the combined GMP not less than the higher applicable total. The GMP shall also include all costs associated with applicable payroll administration, certified-payroll reporting, recordkeeping and other labor-standards requirements.
A Proposer with a question concerning a wage determination, worker classification (including a missing classification), wage rate or labor standard shall submit a written Request for Interpretation in accordance with Section 5.4 of this RFP and Document 00 63 13.13 of the Project Manual before the applicable deadline. Questions requiring a determination by a governmental agency or labor-standards administrator will be referred to the appropriate authority. Only a written addendum may modify or clarify the Bidding Documents applicable to all Proposers.
If an official classification and wage-rate determination for a missing worker classification is received before the Proposal deadline, it will be communicated to all Proposers by addendum. If it is not received before that deadline, the Proposer shall include its assumed wages and fringe benefits in the GMP and disclose the following details in Appendix D:
the proposed worker classification and a description of the Work to be performed;
the hourly base-wage rate used in preparing the GMP;
each fringe benefit and the hourly value assigned to it;
the resulting total hourly wage-and-fringe-benefit amount;
the estimated number of labor hours or other quantity assumed; and the total amount included in the GMP for the affected Work.
The Proposer’s pricing assumption does not constitute approval of the classification or wage rate by the Co-Development Team, an Applicable Owner or the responsible governmental agency. After Contract award, the wage determinations incorporated into each executed Contract will govern the applicable Work, subject to any modification required by law or an applicable funding source. The successful Contractor shall promptly pursue, under the applicable Contract Documents, any additional classification or wage-rate determination needed for Work not adequately covered by an incorporated wage determination. Any adjustment resulting from a subsequent official determination will be addressed under the applicable Contract Documents.
4.11 Connecticut Sales Tax Exemption
The Project has received a Facility Approval Letter from the Connecticut Department of Revenue Services supporting use of CERT-126, Exempt Purchases of Tangible Personal Property for Low- and Moderate-Income Housing Facilities.
Proposers shall prepare their combined GMP on the basis that purchases qualifying under CERT-126 will be exempt from Connecticut sales and use taxes.
Each Proposer is responsible for determining which purchases qualify for the exemption and shall include in its combined GMP all sales, use and other taxes applicable to purchases that are not exempt. The selected Contractor and its Subcontractors shall comply with the documentation, certificate, invoice-marking and record-retention requirements applicable to exempt purchases.
5.0 SUBMISSION INSTRUCTIONS
5.1 Submission Deadline
Proposals must be submitted electronically to both Joshua Dickens at jdickens@trinityfinancial.com and bids@hartfordhousing.org no later than 4:00 pm on Wednesday, December 9, 2026.
5.2 Representations
By submitting a proposal, the Contractor represents that he/she understands the RFP and the Bidding Documents including the Plans and Specifications and all addenda issued during this RFP, has visited the Site and made themselves familiar with the Site and is familiar with the proposed Contract form.
By submitting a proposal, the Contractor also represents that their Proposal is valid until the Anticipated Financial Closing as shown in Section 3.2, plus six months.
5.3 Submittal Documents
The tabbed submission format below is provided to assist all respondents in correctly preparing and submitting a responsive RFP. Responses missing any of the following documents may be deemed incomplete and may not be considered at the discretion of the Co-Development Team.
Responsive proposals shall consist of and be organized with the following labeled tabs:
Tab Item Notes A Cover Letter Include a letter that demonstrates the
Contractor’s commitment and understanding of the Work.
B Determination of Responsibility
Submit a Responsibility Statement addressing each pass/fail criterion in Section 5.5 and providing supporting documentation or specific cross-references to the applicable portions of Tabs E, F and I. The statement shall include:
a current surety letter stating the Proposer’s single-project and aggregate bonding capacity and confirming its ability to furnish mailto:jcurran@tmo.com the required bonds;
a description of the Proposer’s current workload and available personnel, equipment and financial capacity to perform the Work within the proposed schedule;
disclosure of any pending material litigation, arbitration or administrative proceeding that could reasonably affect the Proposer’s ability to perform the Work;
disclosure of relevant defaults, terminations, liquidated-damages assessments, material delays, surety claims and significant unresolved construction claims; and confirmation that the Proposer is eligible to receive an award and is not suspended, debarred or otherwise ineligible.
The AIA A305 and financial statements required in Tab E, the project-performance information required in Tab F and the certifications required in Tab I may be incorporated by reference and need not be duplicated in Tab B.
C Price Proposal Architect’s Bid Form – Cost – Plus - Fee (Project Manual Document 00 41 33)
CHFA Exploded Trade Payment Breakdown, provided in the Project Manual as Exhibit K.
Form of Assumptions, Qualifications and Value-Engineering (Appendix D). Note, Assumptions and Qualifications may explain the proposer’s interpretation of the Plans and Specifications/Project Manual but may not exclude required Work, condition the proposed price on an alternative scope or substitute an individualized value-engineering proposal for the required base Work. Any material exception may render the proposal nonresponsive.
Value-Engineering proposals may be submitted using Appendix D and must be acted on by the Architect during the bid phase, prior to inclusion in the GMP.
Substitutions must be individually submitted during the RFI process as prescribed in Sections 00 26 00 and 00 26 01 of the Project Manual and acted on by the Architect during the bid phase, prior to inclusion in the
GMP.
D Detailed Project Schedule Please provide a detailed project schedule, including critical path items and any items missing from the RFP that could impact the schedule. Please assume that all MSP Phase 1 residents are relocated before abatement and demolition can begin. The schedule should include a detailed logistics, staging and sequencing plan of the abatement and demolition work, including buildings and the decommissioned underground utilities, including but not limited, to steam tunnels. Please discuss the challenges to the tentative project schedule and any cost implications for winter conditions, if necessary.
E Project Team/Organizational Chart, Qualifications & Financial Capacity
An organization chart indicating the names and résumés for the proposed management and construction staff, including but not limited to, the principal-in-charge, project manager, job superintendent, and affirmative action officer.
These team members will be expected to participate in pre-construction activities and throughout construction and cannot be replaced without express permission of the Co- Development Team for the replacement.
In this tab include an AIA A305 (Contractor’s Qualification Statement) and audited financial statements (or equivalent). Note, financial statements can be submitted under separate cover and marked as proprietary.
F Comparable Projects & References
Provide information concerning at least three comparable projects completed or substantially completed within the past ten years, preferably including projects undertaken for a public housing authority or involving LIHTC, CHFA, DOH, DECD, HUD or comparable public financing. For each project, provide:
1. project name, location, owner, architect and reference contact information;
2. project description, delivery method, unit count and principal funding sources;
3. original contract amount and final contract amount;
4. the number and aggregate dollar amount of approved change orders;
5. a brief description of the principal reasons for the change orders, identifying, as applicable, owner-directed scope changes, design or coordination changes, unforeseen site conditions, regulatory requirements or other and describe;
6. original contractual date for Substantial Completion and actual date of Substantial Completion;
7. the aggregate number of days added to the Contract Time and the principal reasons for any extensions;
8. any liquidated damages, defaults, terminations, surety claims or significant unresolved claims; and
9. the proposed project team members, if any, who worked on the comparable project.
If the final cost or completion date is not yet available, identify the current contract amount, current anticipated completion date and the reason the project remains incomplete.
G Contractor Approach to Providing Required Services
A description of the Contractor’s approach to implementation that will achieve scheduling efficiency, construction quality and cost control.
The Contractor should also describe the level and types of construction services that your firm is able to offer the Project. The selected Contractor is also expected to coordinate all city infrastructure improvements and tie-ins.
H Employment & Contracting Implementation Approach
Please provide a preliminary Economic Opportunity Plan identifying strategy, staff, and/or consultants to be retained by the Contractor and implemented to meet the project goals set forth in Appendix C and other MBE/WBE/DBE/SBE compliance goals.
I Required Certifications, Licenses & Forms
Any Contractor certifications, registrations, licenses, and forms included in Appendix E. This includes good standing certificates, tax and labor compliance certifications, and certifications regarding suspension, debarment and eligibility.
5.3 HACH Administrative and Compliance Forms
The administrative, responsibility, labor-standards and contract-compliance forms required by HACH are included as Attachments E-1 through E-13. Inclusion of a federal or HUD form does not, by itself, represent that the Project is subject to federal procurement requirements, HUD Section 3 or another federal program requirement.
HACH is requiring these forms for ease of administrative, responsibility, disclosure and contract-compliance purposes.
5.3.1 Required to be submitted with the Proposal
H-1 Certification Regarding EEO and Nondiscrimination
H-2 Certification Regarding OSHA
H-3 Contractor Qualification/Experience Statement
H-4 CHRAO Notification to Bidders
H-7 Certification of Payment to Influence Federal Transactions (form
HUD_50071)
H-8 Disclosure of Lobbying Activities (standard form LLL)
5.3.2 Acknowledged with the Proposal and complied with after Award
H-5 CHFA Housing Design and Construction Criteria
H-6 CHRO Contract Compliance Regulations
H-9 Labor Standards Compliance Requirements
H-9.1 Residential State Prevailing Wage Rates as of 7-1-26
H9.2 Davis Bacon Wage Decision
H-10 Insurance Requirements
5.4 Requests For Interpretation (RFI)
All Requests for Interpretation (RFIs) shall be submitted using the Request for Interpretation form included in Project Manual Section 00 63 13.13 and directed to Joshua Dickens at jdickens@trinityfinancial.com, with a copy to bids@hartfordhousing.org. RFIs must be submitted no later than 4:00 pm on November 17th. RFIs with responses, along with any comments from the City of Hartford that are a result of the building permit review process, will be sent to all Proposers and incorporated into the RFP as an Addendum (or multiple addendums) on or before November 24th.
5.5 Evaluation Criteria
In determining responsibility, the Co-Development Team will review the Responsibility Statement submitted in Tab B, together with the information provided elsewhere in the mailto:jdickens@trinityfinancial.com
Proposal. To be deemed responsible, a Proposer must demonstrate that it:
Has adequate financial resources to perform the Contract, or the ability to obtain those resources.
Can comply with the required or proposed construction schedule, taking into consideration the proposer’s existing commercial and governmental commitments.
Has a satisfactory record of past performance.
Has a satisfactory record of integrity and business ethics.
Has the necessary organization, experience, accounting and operational controls, and technical skills to perform the Contract, or the ability to obtain them.
Has the necessary production, construction, and technical equipment and facilities to perform the Contract, or the ability to obtain them.
Is otherwise qualified and eligible to receive an award under applicable laws and regulations.
Is not suspended, debarred, or otherwise ineligible at the federal or state level and is not subject to a HUD-imposed Limited Denial of Participation.
HACH may request documentation or clarification that is reasonably necessary to complete its responsibility determination. Only proposals submitted by Responsible Contractors will proceed to comparative evaluation and scoring. If a Proposer is determined to be non-responsible, the Co-Development Team will prepare a written determination stating the reasons for that conclusion, include it in the procurement file, and advise the Proposer of the determination.
The Proposals submitted by Responsible Contractors will then be comparatively evaluated and scored using the criteria below. Evaluated construction price will be determined from the GMP stated on the Architect’s Bid Form, Project Manual Section 00 41 33, together with the pricing detail provided in the CHFA Exploded Trade Payment Breakdown included as Exhibit K to the Project Manual and any assumptions or clarifications disclosed in Appendix D of this RFP.
Evaluation factor
Weight
Evaluated construction price 70%
Relevant GC experience and past performance 15%
Project team, capacity and schedule 10%
Employment & Contracting Implementation Approach 5%
Total 100%
Responsible Contractors may be invited for an interview in mid-late December, as shown in the RFP Schedule included in Section 3.1, so please mark your calendars to ensure your availability.
Any contractor selection or designation is conditional and creates no Contract, notice to proceed or Owner liability until formation and authorization of the Applicable Owners, financing approvals, financial closing and execution of the Applicable Owner–Contractor agreements. The selected Contractor’s designation will be contingent upon verification of SAM.gov, Connecticut exclusion or debarment lists and any HUD Limited Denial of Participation, and approval by the boards of HACH and its affiliates.
5.6 Co-Development Team’s Rights
The Co-Development Team reserves the right, in its sole discretion and subject to applicable procurement requirements, to:
1) reject any or all Proposals when determined to be in the best interests of the Project;
2) cancel, suspend, modify or reissue this RFP;
3) request clarifications or additional information necessary to evaluate a Proposal or determine a Proposer’s responsibility;
4) waive informalities and minor irregularities that do not affect price, quantity, quality, delivery, the material requirements of this RFP or the fair and equal treatment of Proposers;
5) verify references, qualifications, past performance, financial capacity, bonding capacity and other information relevant to a Proposer’s responsibility or evaluation.
The Co-Development Team may contact references identified in the Proposal and other persons or entities known to, identified by or otherwise discovered by the Co- Development Team as having relevant knowledge of the Proposer’s performance, qualifications or business practices. The Co-Development Team may consider information obtained from those sources, provided that the information is reasonably related to the stated responsibility or evaluation criteria;
6) negotiate with the highest-ranked Responsible Proposer concerning nonmaterial terms, clarifications and the final Contract Documents, provided that the negotiations do not alter the material basis on which Proposals were evaluated or prejudice the other Proposers; and
7) make no award if the Co-Development Team determines that an award would not be in the best interests of the Project.
A request for clarification shall not permit a Proposer to revise its proposed GMP, cure a material omission, make a nonresponsive Proposal responsive or obtain an unfair competitive advantage. No selection, notice of intent to award or negotiation shall create a Contract or authorize commencement of the Work. If materially adverse information obtained from a source other than a reference identified by the Proposer may affect the selection decision, the Co-Development Team may request clarification or a response from the Proposer before completing its evaluation.
5.7 Questions
All questions regarding this RFP shall be directed in writing to Josh Dickens (jdickens@trinityfinancial.com) with a copy to bids@hartfordhousing.org. No verbal questions will be accepted.
Appendix A: Definitions
Certain capitalized terms used in this RFP have the meanings stated below or where first defined in the RFP. Unless the context requires otherwise, each defined term includes its singular and plural forms.
“Addenda” are written or graphic instruments issued by the Architect, which, by additions, deletions, clarifications, or corrections, modify or interpret the Bidding Documents.
An “Alternate Bid” (or “Alternate”) is an amount stated in the Bid to be added to or deducted from, or that does not change, the Base Bid if the corresponding change in the Work, as described in the Bidding Documents, is accepted.
“AFL-CIO Labor Requirements” means the labor requirements applicable to the Project in connection with the anticipated participation of the AFL-CIO Housing Investment Trust, including the requirements stated in the Certificate of Borrower and Contractor (Appendix B of this RFP) and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .