This is a Request for Proposal (RFP) document issued by California Regional Parks for native grassland restoration services within the American River Parkway. The project involves restoration of approximately 30.4 acres of California native grasses and 1 acre of native forbs through comprehensive seedbed preparation, seeding, and establishment maintenance activities. Seedbed preparation includes disking, mowing, and herbicide treatments targeting nonnative species such as wild oat, bermuda grass, Johnson grass, soft chess, hairy vetch, yellow star-thistle, rush skeletonweed, black mustard, and Italian thistle. The contractor must provide professional services through the entire contract period ending April 30, 2030, including regular communication and coordination with Regional Parks staff and project consultants. Establishment maintenance consists of appropriately timed mowing and broadleaf-specific herbicide applications to manage weed pressure during native grass establishment.
The contract requires bidder participation in meetings and regular coordination activities with agency staff throughout the project duration. No specific pricing terms, set-asides, incumbent information, or funding source details are provided in this attachment document. Professional services and expertise in ecological restoration are essential qualifications for responding contractors, with the primary objective of reducing nonnative annual grasses and invasive weeds while establishing healthy native grassland habitat within the American River Parkway.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MMRP-1 PLER2025-00053
SACRAMENTO COUNTY
PLANNING AND ENVIRONMENTAL REVIEW
MITIGATION MONITORING AND REPORTING PROGRAM
CONTROL NUMBER: PLER2025-00053
NAME: American River Parkway (ARP) Grassland Establishment and Restoration Project
LOCATION: The project sites are located in the Woodlake Plan Area and River Bend Plan Area of the American River Parkway.
ASSESSOR’S PARCEL NUMBERS: Various
APPLICANT/OWNER: Sacramento County Department of Regional Parks 10361 Rockingham Drive, Suite 100 Sacramento, CA 95827 Attention: Zachary Skalak, Natural Resources Specialist
PROJECT DESCRIPTION: The proposed project comprises approximately 25.50 acres in the Woodlake Plan Area and approximately six (6) acres in the River Bend Plan Area of the American River Parkway (Parkway) for the restoration of native grasslands and enhancement of pollinator habitat. Project activities will include herbicide application, light discing, mowing, grazing, prescribed controlled burning, and drill seeding for native grasses and forbs. The project will not affect aquatic habitat, or require soil removal, fill, or grading, and will not result in the removal of trees. Equipment utilized for project implementation includes a pickup truck and trailer, ATV with boom sprayer, tractor with disc, tractor with drill seeder, tractor with mower, fire engine, and water trailer. The duration of project construction will be between the years 2026 through 2030, with activities limited to a few days per year.
TYPE OF ENVIRONMENTAL DOCUMENT: Memorandum to Final Subsequent Environmental Impact Report (FSEIR)
PREPARED BY: Sacramento County Planning and Environmental Review 827 7th Street, Room 225 Sacramento, CA 95814
PHONE: (916) 874-6141
MITIGATION MONITORING AND REPORTING PROGRAM
American River Parkway (ARP) Grassland Establishment and Restoration Project
MMRP-2 PLER2025-00053
ADOPTED BY: DATE:
ATTEST:___________________________________
SECRETARY/CLERK
(Insert name and title of officer)
MMRP-3 PLER2025-00053
TABLE OF MEASURES
MITIGATION MEASURE BR-12: NATIVE OAK PROTECTION
MITIGATION MEASURE BR-16: TRICOLORED BLACKBIRD
MITIGATION MEASURE BR-17: BANK SWALLOW
MITIGATION MEASURE BR-18: NESTING RAPTORS
MITIGATION MEASURE BR-19: MIGRATORY BIRDS
MITIGATION MEASURE BR-20: AMERICAN BADGER
MITIGATION MEASURE BR-22: VELB
MITIGATION MEASURE BR-23: WESTERN POND TURTLE
MITIGATION MEASURE BR-25: RARE PLANT SURVEY
MITIGATION MEASURE BR-28: WESTERN SPADEFOOT TOAD
MITIGATION MEASURE BR-29: SWAINSON’S HAWK SURVEY (TAC 2000)
MITIGATION MEASURE BR-30: BURROWING OWL
MITIGATION MEASURE BR-31: PURPLE MARTIN NEST PROTECTION
MITIGATION MEASURE CR-1: RETAIN CULTURAL FEATURES
MITIGATION MEASURE CR-2: CULTURAL RESOURCES DOCUMENTATION
MITIGATION MEASURE CR-3: ADDITIONAL REQUIREMENTS IN SENSITIVE LOCATIONS
MITIGATION MEASURE CR-4: INADVERTENT DISCOVERY OF CULTURAL RESOURCES
MITIGATION MEASURE HZ-2: OPERATION AND MAINTENANCE OF CONSTRUCTION
EQUIPMENT
MITIGATION MEASURE PS-1: COORDINATION WITH PUBLIC UTILITY PROVIDERS
MMRP-4 PLER2025-00053
PURPOSE AND PROCEDURES
Pursuant to Section 21081.6 of the Public Resources Code and Chapter 20.02 of the Sacramento County Code, a Mitigation Monitoring and Reporting Program has been established for the project entitled American River Parkway (ARP) Grassland Establishment and Restoration Project (Control Number: PLER2025-00053).
PURPOSE
The purpose of this program is to assure diligent and good faith compliance with the Mitigation Measures which have been recommended in the environmental document, and adopted as part of the project or made conditions of project approval, in order to avoid or mitigate potentially significant effects on the environment.
NOTIFICATION AND COMPLIANCE
It shall be the responsibility of the project applicant/owner to provide written notification to the Environmental Coordinator, in a timely manner, of the completion of each Mitigation Measure as identified on the following pages. The Environmental Coordinator will verify that the project is in compliance with the adopted Mitigation Monitoring and Reporting Program (MMRP). Any non-compliance will be reported to the project applicant/owner, and it shall be the project applicant’s/owner’s responsibility to rectify the situation by bringing the project into compliance and re-notifying the Environmental Coordinator. Any indication that the project is proceeding without good-faith compliance could result in the imposition of administrative, civil and/or criminal penalties upon the project applicant/owner in accordance with Chapter 20.02 of the Sacramento County Code.
PAYMENT
It shall be the responsibility of the project applicant to reimburse Planning and Environmental Review for all expenses incurred in the implementation of the Mitigation Monitoring and Reporting Program (MMRP), including any necessary enforcement actions.
COMPLETION
Pursuant to Section 20.02.060 of the Sacramento County Code, upon the determination of the Environmental Coordinator that compliance with the terms of the approved Mitigation Monitoring and Reporting Program has been achieved, and that there has been full payment of all fees for the project, the Environmental Coordinator shall record and issue a Program Completion Certificate for the project.
STANDARD PROVISIONS
The project applicant shall submit one copy of all Project Plans and Construction Specifications and/or revisions to the Environmental Coordinator prior to Board approval
MMRP-5 PLER2025-00053
to advertise Plans and Specifications. If the Environmental Coordinator determines that the Plans are not in full compliance with the adopted MMRP, the Plans shall be returned to the project applicant with a letter specifying the items of non-compliance, and instructing the applicant to revise the Plans, and then resubmit one copy of the revised Plans to the Environmental Coordinator prior to Board approval to advertise.
Additionally, the project applicant shall notify the Environmental Coordinator no later than 48 hours prior to the start of construction and no later than 24 hours after its completion. The applicant shall notify the Environmental Coordinator no later than 48 hours prior to any/all Final Inspection(s) by Sacramento County.
The project applicant shall notify the Environmental Coordinator of any pre-construction meetings. Upon notification, a determination will be made as to whether or not the Environmental Coordinator will need to attend the meeting.
The project applicant shall comply with the Mitigation Monitoring and Reporting Program for this project, including the payment of 100% of the Planning and Environmental Review Division staff costs, and the costs of any technical consultant services incurred during implementation of that Program.
MMRP-6 PLER2025-00053
MITIGATION MEASURE BR-12: NATIVE OAK PROTECTION
With the exception of the trees removed and compensated for through Mitigation Measures above, all native trees of 6 inches dbh or larger whose trunks or driplines are within 100 feet of construction activities shall be preserved and protected as follows:
A. A circle with a radius measurement from the trunk of the protected tree to the tip of its longest limb shall constitute the dripline protection area of each tree.
Limbs must not be cut back in order to change the dripline. The area beneath the dripline is a critical portion of the root zone and defines the minimum protected area of each tree. Removing limbs that make up the dripline does not change the protected area.
B. Chain link fencing or a similar protective barrier shall be installed one foot outside the driplines of the protected trees prior to initiation of project construction, in order to avoid damage to the trees and their root systems.
C. No signs, ropes, cables (except cables which may be installed by a certified arborist to provide limb support) or any other items shall be attached to the protected tree.
D. No vehicles, construction equipment, mobile home/office, supplies, materials or facilities shall be driven, parked, stockpiled or located within the dripline of the protected tree.
E. Any soil disturbance (scraping, grading, trenching, and excavation) is to be avoided within the dripline of the protected trees, unless specific authorization has been granted by the Environmental Coordinator. Where this is necessary and approved by the Environmental Coordinator, an ISA Certified Arborist will provide specifications for this work, including methods for root pruning, backfill specifications and irrigation management guidelines.
In no case shall the impact area be greater than 20% of the protected tree dripline.
F. Before grading or excavation for footings, walls, or trenching within five feet outside the driplines of protected trees, root pruning shall be required at the limits of grading or excavation to cut roots cleanly to a depth of the excavation or 36 inches (whichever is less). Roots shall be cut by manually digging a trench and cutting exposed roots with a saw, vibrating knife, rock saw, narrow trencher with sharp blades or other approved root-pruning equipment under the supervision of an ISA Certified Arborist.
G. All underground utilities and drain or irrigation lines shall be routed outside the driplines of protected trees. If lines must encroach upon the dripline, they should be tunneled or bored under the trees.
MMRP-7 PLER2025-00053
H. If temporary haul or access roads must pass within the driplines of protected trees, a roadbed of six inches of mulch or gravel shall be created to protect the soil. The roadbed shall be installed from outside of the dripline and while the soil is in a dry condition, if possible. The roadbed material shall be replenished as necessary to maintain a six-inch depth.
I. Any herbicides placed under paving materials must be safe for use around trees and labeled for that use. Any pesticides used on site must be tree-safe and not easily transported by water.
J. Drainage patterns on the site shall not be modified so that water collects or stands within, or is diverted across, the dripline of an oak tree.
K. No sprinkler or irrigation system shall be installed in such a manner that it sprays water within the dripline of the protected tree.
L. Tree pruning required for clearance during construction must be performed by an ISA Certified Arborist or Tree Worker.
M. All portions of permanent fencing that will encroach into the dripline protection area of any protected tree shall be constructed using posts set no closer than 10 feet on center. Posts shall be spaced in such a manner as to maximize the separation between the tree trunks and the posts in order to reduce impacts to the trees.
N. Trunk protection measures, per Sacramento County standards, shall be used for all protected trees where development/construction activity, including installation of fencing, occurs within 10 feet of the trunk of a tree.
O. Landscaping beneath protected oak trees may include non-plant materials such as boulders, decorative rock, wood chips, organic mulch, non-compacted decomposed granite, etc. Landscape materials shall be kept two
(2) feet away from the base of the trunk. The only plant species which shall be planted within the dripline of protected oak trees are those which are tolerant of the natural semi-arid environs of the trees. Limited drip irrigation approximately twice per summer is recommended for the understory plants.
Implementation and Notification (Action by Project Applicant):
1. Comply fully with the above measure.
2. Include the above measure verbatim as a Construction Note and incorporate it into all Plans and Specifications for the project, and submit one copy to the Environmental Coordinator for review and approval prior to the start of any construction work (including clearing and grubbing).
Verification (Action by the Environmental Coordinator):
MMRP-8 PLER2025-00053
1. Review the Project Plans prior to the start of construction. Approve Project Plans that are determined to be in compliance with all required mitigation.
2. Monitor compliance during periodic site inspections of the construction work.
3. Participate in any Final Inspection(s) as necessary.
MMRP-9 PLER2025-00053
Comments:
Completion of Mitigation Verified:
Signature: ______________________________ Date: ____________________
MMRP-10 PLER2025-00053
MITIGATION MEASURE BR-16: TRICOLORED BLACKBIRD
If construction activity (which includes clearing, grubbing, or grading) is to commence within 300 feet of suitable nesting habitat between March 1 and July 31, a survey for nesting tricolored blackbirds shall be conducted by a qualified biologist. The survey shall cover all potential nesting habitat on-site and off-site up to a distance of 300 feet from the project boundary. The survey shall occur within 30 days of the date that construction will encroach within 300 feet of suitable habitat. The biologist shall supply a brief written report (including date, time of survey, survey method, name of surveyor and survey results) to the Environmental Coordinator prior to ground disturbing activity. If no tricolored blackbird were found during the pre-construction survey, no further mitigation would be required. If an active tricolored blackbird colony is found on-site or within 300 feet of the project site the project proponent shall do the following:
A. Consult with the CDFW to determine if project activity will impact the tricolored blackbird colony(s). Provide the Environmental Coordinator with written evidence of the consultation or a contact name and number from CDFW. Implement all protective measures recommended by CDFW.
B. With CDFW permission, the applicant may avoid impacts to tricolored blackbird by establishing a 300-foot temporary setback, with fencing that prevents any project activity within 300 feet of the colony. A qualified biologist shall verify that setbacks and fencing are adequate and will determine when the colonies are no longer dependent on the nesting habitat (i.e. nestling have fledged and are no longer using habitat). The breeding season typically ends in July.
C. If tricolored blackbird habitat is permanently destroyed follow the CDFW procedure to mitigate for habitat loss, and submit documentation of the mitigation to the Environmental Coordinator.
Implementation and Notification (Action by Project Applicant):
1. Comply fully with the above measure.
2. Include the above measure verbatim as a Construction Note and incorporate it into all Plans and Specifications for the project, and submit one copy to the Environmental Coordinator for review and approval prior to the start of any construction work (including clearing and grubbing).
Verification (Action by the Environmental Coordinator):
1. Review the Project Plans prior to the start of construction. Approve Project Plans that are determined to be in compliance with all required mitigation.
MMRP-11 PLER2025-00053
MMRP-12 PLER2025-00053
MITIGATION MEASURE BR-17: BANK SWALLOW
Any construction activity within 200 feet of the bank of the American River shall comply with the following: A focused survey for bank swallow nests shall occur between April 1 and July 1 and be conducted by a qualified biologist no less than 14 days and no more than 30 days before construction commences. If active nests are found, the applicant shall consult with the CDFW for appropriate avoidance measures. If no active nests are found during the focused survey, submit a written report with date and the name of biologist to PER. Upon receiving the report, no further mitigation will be required.
Implementation and Notification (Action by Project Applicant):
1. Comply fully with the above measure.
2. Include the above measure verbatim as a Construction Note and incorporate it into all Plans and Specifications for the project, and submit one copy to the Environmental Coordinator for review and approval prior to the start of any construction work (including clearing and grubbing).
Verification (Action by the Environmental Coordinator):
1. Review the Project Plans prior to the start of construction. Approve Project Plans that are determined to be in compliance with all required mitigation.
MMRP-13 PLER2025-00053
MMRP-14 PLER2025-00053
MITIGATION MEASURE BR-18: NESTING RAPTORS
If construction activity (which includes clearing, grubbing, or grading) is to commence within 500 feet of suitable nesting habitat between February 1 and September 15, a survey for raptor nests shall be conducted by a qualified biologist. The survey shall cover all potential tree and ground nesting habitat on-site and off-site up to a distance of 500 feet from the project boundary. The survey shall occur within 30 days of the date that construction will encroach within 500 feet of suitable habitat. The biologist shall supply a brief written report (including date, time of survey, survey method, name of surveyor and survey results) to the Environmental Coordinator prior to ground disturbing activity. If no active nests are found during the survey, no further mitigation will be required. If any active nests are found, the Environmental Coordinator and California Fish and Wildlife shall be contacted to determine appropriate avoidance/protective measures. The avoidance/protective measures shall be implemented prior to the commencement of construction within 500 feet of an identified nest.
Implementation and Notification (Action by Project Applicant):
1. Comply fully with the above measure.
2. Include the above measure verbatim as a Construction Note and incorporate it into all Plans and Specifications for the project, and submit one copy to the Environmental Coordinator for review and approval prior to the start of any construction work (including clearing and grubbing).
Verification (Action by the Environmental Coordinator):
1. Review the Project Plans prior to the start of construction. Approve Project Plans that are determined to be in compliance with all required mitigation.
MMRP-15 PLER2025-00053
MMRP-16 PLER2025-00053
MITIGATION MEASURE BR-19: MIGRATORY BIRDS
For all migratory bird species not covered in other mitigation measures (including western yellow-billed cuckoo), the following guidelines shall be followed:
A. If construction activity (which includes clearing, grubbing, or grading) is to commence within 50 feet of nesting habitat between February 1 and August 31, a survey for active migratory bird nests shall be conducted no more than 14 days prior to construction by a qualified biologist.
B. Vegetation slated for removal shall be removed during the period of September through January, in order to avoid the nesting season. Any vegetation that are to be removed during the nesting season, which is February through August, shall be surveyed by a qualified biologist and will only be removed if no nesting migratory birds are found.
C. If active nest(s) are found in the survey area, a non-disturbance buffer, the size of which has been determined by a qualified biologist, shall be established and maintained around the nest to prevent nest failure. All construction activities shall be avoided within this buffer area until a qualified biologist determines that nestlings have fledged, or until September 1.
Implementation and Notification (Action by Project Applicant):
1. Comply fully with the above measure.
2. Include the above measure verbatim as a Construction Note and incorporate it into all Plans and Specifications for the project, and submit one copy to the Environmental Coordinator for review and approval prior to the start of any construction work (including clearing and grubbing).
Verification (Action by the Environmental Coordinator):
1. Review the Project Plans prior to the start of construction. Approve Project Plans that are determined to be in compliance with all required mitigation.
MMRP-17 PLER2025-00053
MMRP-18 PLER2025-00053
MITIGATION MEASURE BR-20: AMERICAN BADGER
To reduce potential impacts to American badger, the following shall be required:
A. A qualified biologist shall conduct focused surveys for American badger dens within 2 weeks prior to ground-disturbing activities in suitable habitat (i.e., undeveloped grassland) within the Parkway. The survey shall cover the limits of ground disturbance and a 100-foot buffer. Any potentially active American badger dens located during the survey that show signs of recent activity shall be evaluated (typically with remote cameras) to determine activity status.
B. If an active American badger den is detected during the breeding season (typically from March through May), then prior to construction, the qualified biologist shall establish a 100-foot no-disturbance buffer (e.g., mesh exclusion fencing, flagging, or similar) around the den. The buffer shall be maintained until the qualified biologist determines that the den is no longer active, and the young are no longer dependent upon the den for survival. If a natal den site cannot be avoided throughout the life of the project (including operations and maintenance), destruction of the natal den burrow shall only proceed after the natal den is no longer active and no badger are present within the burrow.
C. If construction occurs during the non-breeding period (i.e., typically from June through February) and an active non-natal den is found in or immediately adjacent to the construction footprint, a qualified biologist shall attempt to trap or flush the individual (e.g., passive exclusion with one-way doors) and relocate it to suitable habitat away from construction. After exclusion/relocation is completed, the vacated or unoccupied den can be excavated, and construction can proceed.
Implementation and Notification (Action by Project Applicant):
1. Comply fully with the above measure.
2. Include the above measure verbatim as a Construction Note and incorporate it into all Plans and Specifications for the project, and submit one copy to the Environmental Coordinator for review and approval prior to the start of any construction work (including clearing and grubbing).
Verification (Action by the Environmental Coordinator):
1. Review the Project Plans prior to the start of construction. Approve Project Plans that are determined to be in compliance with all required mitigation.
MMRP-19 PLER2025-00053
MMRP-20 PLER2025-00053
MITIGATION MEASURE BR-22: VELB
To reduce project impacts to the VELB habitat to a less than significant level the following mitigation measures, consistent with U.S. Fish and Wildlife Conservation Guidelines for the Valley Elderberry Longhorn Beetle, will be required:
A. For construction prior to obtaining the applicable permits allowing removal of the elderberry plants, protective measures shall apply. Prior to initiating construction, the following measures shall be completed:
B. Temporary construction fencing and flagging shall be installed at least 165 feet outside the edge of the driplines of the elderberry plants. In areas where encroachment on the 165-foot buffer has been approved by U.S. Fish and Wildlife, provide a minimum setback of at least 20 feet from the dripline of each elderberry plant and provide documentation of U.S. Fish and Wildlife approval of the reduced setback.
C. Brief contractors on the need to avoid damaging the elderberry plants and the possible penalties for not complying with these requirements.
D. Erect signs every 50 feet along the edge of the avoidance area with the following information: “This area is habitat of the valley elderberry longhorn beetle, a threatened species, and must not be disturbed. This species is protected by the Endangered Species Act of 1973, as amended. Violators are subject to prosecution, fines and imprisonment.” The signs should be clearly readable from a distance of 20 feet, and must be maintained for the duration of construction.
E. Instruct work crews about the status of the beetle and the need to protect its elderberry host plant.
F. Prior to construction within the 165-foot buffer area (or lesser buffer, as approved by U.S. Fish and Wildlife) established around the elderberry plants shrubs.
G. Implement one of the following methods (or a combination of the following two methods) to reduce impacts to the Valley Elderberry Longhorn Beetle to a less than significant level:
i) Either: Elderberry plants with one or more stems measuring 1.0 inch or greater in diameter at ground level shall be transplanted to a conservation area approved by U.S. Fish and Wildlife. The project applicant shall consult with the U.S. Fish and Wildlife on all transplantation activities and obtain all applicable permits.
And/Or:
MMRP-21 PLER2025-00053
ii) The project applicant shall compensate for the loss of elderberry plants on the site to the satisfaction of the U.S. Fish and Wildlife and shall obtain any/all applicable permit(s) from the Army Corps and the U.S.
Fish and Wildlife.
Implementation and Notification (Action by Project Applicant):
1. Comply fully with the above measure.
2. Include the above measure verbatim as a Construction Note and incorporate it into all Plans and Specifications for the project, and submit one copy to the Environmental Coordinator for review and approval prior to the start of any construction work (including clearing and grubbing).
Verification (Action by the Environmental Coordinator):
1. Review the Project Plans prior to the start of construction. Approve Project Plans that are determined to be in compliance with all required mitigation.
MMRP-22 PLER2025-00053
No herbicide within dripline Reference 2017 framework.
MMRP-23 PLER2025-00053
MITIGATION MEASURE BR-23: WESTERN POND TURTLE
To avoid impacts to western pond turtles the following measures shall apply:
A. Twenty-four hours prior to the commencement of ground-disturbing activity (i.e.
clearing, grubbing, or grading) suitable habitat within the project area shall be surveyed for western pond turtle by a qualified biologist. The survey shall include aquatic habitat and 1,650 feet of adjacent uplands surrounding aquatic habitat within the project area. The biologist shall supply a brief written report (including date, time of survey, survey method, name of surveyor and survey results) to the Environmental Coordinator prior to ground disturbing activity.
B. Construction personnel shall receive worker environmental awareness training.
This training instructs workers how to recognize western pond turtles and their habitat.
C. If a western pond turtle is encountered during active construction, all construction shall cease until the animal has moved out of the construction area on its own or relocated by a qualified biologist. If the animal is injured or trapped, a qualified biologist shall move the animal out of the construction area and into a suitable habitat area. CDFW and the Environmental Coordinator shall be notified within 24-hours that a turtle was encountered.
Implementation and Notification (Action by Project Applicant):
1. Comply fully with the above measure.
2. Include the above measure verbatim as a Construction Note and incorporate it into all Plans and Specifications for the project, and submit one copy to the Environmental Coordinator for review and approval prior to the start of any construction work (including clearing and grubbing).
Verification (Action by the Environmental Coordinator):
1. Review the Project Plans prior to the start of construction. Approve Project Plans that are determined to be in compliance with all required mitigation.
MMRP-24 PLER2025-00053
Visual survey for turtles and nests
MMRP-25 PLER2025-00053
MITIGATION MEASURE BR-25: RARE PLANT SURVEY
Rare plant surveys will be required in any wetland, marsh, or stream habitats prior to any grading, grubbing, or excavation within 250 feet of the wetland margin. The rare plant surveyor shall have:
A. experience as a botanical field investigator;
B. taxonomic experience and a knowledge of plant ecology (the surveyor should have some college coursework in plant taxonomy and ecology, and be a biological professional), and
C. familiarity with the local flora and potential rare plants in the habitats to be surveyed.
The surveys shall be conducted when the rare plants at the site will be easiest to identify (i.e. flowering stage), and when the plants reach that stage of maturity. A minimum of three site visits shall be required, during the plants’ flowering period in order to determine absence. Each site visit must be no less than 7 days apart.
Submit a written report to PER. The survey report should include a brief description of the vegetation, survey results, photographs, time spent surveying, date of surveys, a map showing the location of the survey route and any rare plant populations and copies of any rare plant occurrence forms. Notify Fish and Game and Fish and Wildlife if species are found, and apply for “take” authorization (state law section 2081 of the Fish and Game Code and federal Endangered Species Act) prior construction. Priority shall be given to transplanting individual plants to a different surface water in the Parkway, unless it can be demonstrated to the satisfaction of PER that transplantation is infeasible.
Implementation and Notification (Action by Project Applicant):
1. Comply fully with the above measure.
2. Include the above measure verbatim as a Construction Note and incorporate it into all Plans and Specifications for the project, and submit one copy to the Environmental Coordinator for review and approval prior to the start of any construction work (including clearing and grubbing).
Verification (Action by the Environmental Coordinator):
1. Review the Project Plans prior to the start of construction. Approve Project Plans that are determined to be in compliance with all required mitigation.
MMRP-26 PLER2025-00053
MMRP-27 PLER2025-00053
MITIGATION MEASURE BR-28: WESTERN SPADEFOOT TOAD
Prior to surface disturbance in suitable habitat for Western Spadefoot Toad within the proposed project activity areas, a qualified biologist shall conduct surveys to determine the presence of the western spadefoot toad (Spea hammondii).
A. Surveys shall be conducted at the appropriate time of the year (typically February-March when eggs, larvae, or tadpoles can be detected). If Western Spadefoot Toad is encountered during surveys, a site-specific avoidance, minimization, and/or relocation plan shall be prepared and ensure any measures in the approved plan are in place prior to project activities. If relocation is necessary (including out of harm’s way), Western Spadefoot Toad shall only be relocated by a qualified biologist with the appropriate state and/or federal handling authorizations.
B. Within suitable aquatic or upland western spadefoot habitat, all excavated steep-walled holes and trenches more than 6 inches deep will be covered with plywood (or similar material) or provided with one or more escape ramps constructed of earth fill or wooden planks at the end of each workday or 30 minutes prior to sunset, whichever occurs first. All steep-walled holes and trenches will be inspected each morning to ensure that no wildlife has become entrapped. All construction pipes, culverts, similar structures, construction equipment, and construction debris left overnight within suitable habitat will be inspected for western spadefoot toad.
C. If erosion control is implemented within suitable aquatic or upland western spadefoot habitat, non-entangling erosion control material will be used to reduce the potential for entrapment. Tightly woven fiber netting (mesh size less than 0.25 inch) or similar material will be used to ensure that western spadefoots are not trapped (no monofilament). Coconut coir matting and fiber rolls held together without synthetic netting containing burlap are examples of acceptable erosion control materials.
Implementation and Notification (Action by Project Applicant):
1. Comply fully with the above measure.
2. Include the above measure verbatim as a Construction Note and incorporate it into all Plans and Specifications for the project, and submit one copy to the Environmental Coordinator for review and approval prior to the start of any construction work (including clearing and grubbing).
Verification (Action by the Environmental Coordinator):
1. Review the Project Plans prior to the start of construction. Approve Project Plans that are determined to be in compliance with all required mitigation.
MMRP-28 PLER2025-00053
MMRP-29 PLER2025-00053
MMRP-30 PLER2025-00053
MITIGATION MEASURE BR-29: SWAINSON’S HAWK SURVEY (TAC
2000) If construction, grading, or project-related improvements are to commence between February 1 and September 15, focused surveys for Swainson’s hawk nests shall be conducted by a qualified biologist within a ½-mile radius of project activities, in accordance with the Recommended Timing and Methodology for Swainson’s Hawk Nesting Surveys in California’s Central Valley (Swainson’s Hawk TAC 2000). To meet the minimum level of protection for the species, surveys should be completed for the two survey periods immediately prior to commencement of construction activities in accordance with the 2000 TAC recommendations. If active nests are found, CDFW shall be contacted to determine appropriate protective measures, and these measures shall be implemented prior to the start of any activities. If no active nests are found during the focused survey, no further mitigation will be required.
Implementation and Notification (Action by Project Applicant):
1. Comply fully with the above measure.
2. Include the above measure verbatim as a Construction Note and incorporate it into all Plans and Specifications for the project, and submit one copy to the Environmental Coordinator for review and approval prior to the start of any construction work (including clearing and grubbing).
Verification (Action by the Environmental Coordinator):
1. Review the Project Plans prior to the start of construction. Approve Project Plans that are determined to be in compliance with all required mitigation.
MMRP-31 PLER2025-00053
MMRP-32 PLER2025-00053
MITIGATION MEASURE BR-30: BURROWING OWL
Prior to the commencement of construction activities (which includes clearing, grubbing, or grading) within 500 feet of annual and perennial grasslands characterized by low-grading vegetation that may be suitable habitat for Burrowing Owl, a survey for burrowing owl shall be conducted by a qualified biologist. The survey shall occur within 30 days of the date that construction will encroach within 500 feet of suitable habitat.
Surveys shall be conducted in accordance with the following:
A. A survey for burrows and owls should be conducted by walking through suitable habitat over the entire project site and in areas within 150 meters (~500 feet) of the project impact zone.
B. Pedestrian survey transects should be spaced to allow 100 percent visual coverage of the ground surface. The distance between transect center lines should be no more than 30 meters (~100 feet), and should be reduced to account for differences in terrain, vegetation density, and ground surface visibility. To efficiently survey projects larger than 100 acres, it is recommended that two or more surveyors conduct concurrent surveys.
Surveyors should maintain a minimum distance of 50 meters (~160 feet) from any owls or occupied burrows. It is important to minimize disturbance near occupied burrows during all seasons.
C. If no occupied burrows or burrowing owls are found in the survey area, a letter report documenting survey methods and findings shall be submitted to the Environmental Coordinator and no further mitigation is necessary.
D. If occupied burrows or burrowing owls are found, then a complete burrowing owl survey is required. This consists of a minimum of four site visits conducted on four separate days, which must also be consistent with the Survey Method, Weather Conditions, and Time of Day sections of Appendix D of the California Fish and Wildlife “Staff Report on Burrowing Owl Mitigation” (March 2012). Submit a survey report to the Environmental Coordinator which is consistent with the Survey Report section of Appendix D of the California Fish and Wildlife “Staff Report on Burrowing Owl Mitigation” (March 2012).
E. If occupied burrows or burrowing owls are found the applicant shall contact the Environmental Coordinator and consult with California Fish and Wildlife prior to construction, and will be required to submit a Burrowing Owl Mitigation Plan (subject to the approval of the Environmental Coordinator and in consultation with California Fish and Wildlife). This plan must document all proposed measures, including avoidance, minimization, exclusion, relocation, or other measures, and include a plan to monitor mitigation success. The California Fish and Wildlife “Staff Report on Burrowing Owl Mitigation” (March 2012) should be used in the development of the mitigation plan.
MMRP-33 PLER2025-00053
Implementation and Notification (Action by Project Applicant):
1. Comply fully with the above measure.
2. Include the above measure verbatim as a Construction Note and incorporate it into all Plans and Specifications for the project, and submit one copy to the Environmental Coordinator for review and approval prior to the start of any construction work (including clearing and grubbing).
Verification (Action by the Environmental Coordinator):
1. Review the Project Plans prior to the start of construction. Approve Project Plans that are determined to be in compliance with all required mitigation.
MMRP-34 PLER2025-00053
MMRP-35 PLER2025-00053
MITIGATION MEASURE BR-31: PURPLE MARTIN NEST PROTECTION
Prior to the commencement of construction, a survey for nesting purple martins shall be conducted by a qualified biologist during the typical nesting period (March 1 to August 15). The survey shall cover potential nesting habitat on-site and off-site up to a distance of 500 feet from the project boundary. The biologist shall supply a brief written report (including date, time of survey, survey method, name of surveyor and survey results) to the Environmental Coordinator prior to ground disturbing activity. If no nests are found during the survey, no further mitigation will be required. If any nests are found, the developer shall consult with the CDFW to design and implement appropriate avoidance measures which shall ensure that the nesting area is not disturbed, and will remain a viable nesting location in the future.
Implementation and Notification (Action by Project Applicant):
1. Comply fully with the above measure.
2. Include the above measure verbatim as a Construction Note and incorporate it into all Plans and Specifications for the project, and submit one copy to the Environmental Coordinator for review and approval prior to the start of any construction work (including clearing and grubbing).
Verification (Action by the Environmental Coordinator):
1. Review the Project Plans prior to the start of construction. Approve Project Plans that are determined to be in compliance with all required mitigation.
MMRP-36 PLER2025-00053
MMRP-37 PLER2025-00053
MITIGATION MEASURE CR-1: RETAIN CULTURAL FEATURES
Retain all important cultural features in the design of all future Parkway projects, unless doing so is proven to be infeasible to the satisfaction of PER.
Implementation and Notification (Action by Project Applicant):
1. Comply fully with the above measure.
2. Include the above measure verbatim as a Construction Note and incorporate it into all Plans and Specifications for the project, and submit one copy to the Environmental Coordinator for review and approval prior to the start of any construction work (including clearing and grubbing).
Verification (Action by the Environmental Coordinator):
1. Review the Project Plans prior to the start of construction. Approve Project Plans that are determined to be in compliance with all required mitigation.
MMRP-38 PLER2025-00053
MMRP-39 PLER2025-00053
MITIGATION MEASURE CR-2: CULTURAL RESOURCES
DOCUMENTATION
Prior to approval of grading plans or issuance of building permits, all proposed facilities projects and/or all applicable NRMP Potential Resource Management Actions within the Parkway must provide documentation that there are no cultural resources present within the construction area (including staging areas and similar). A qualified cultural resources professional shall perform a preliminary analysis of the construction area, to determine the relative sensitivity of the construction area. This need not include a formal cultural resources survey if the cultural resources investigator determines a finding of negative presence can be made from previous surveys or otherwise. If cultural resources are considered not to be present, Mitigation Measure CR-4 will still apply. If additional work is required, Mitigation Measure CR-3 and CR-4 shall apply.
Implementation and Notification (Action by Project Applicant):
1. Comply fully with the above measure.
2. Include the above measure verbatim as a Construction Note and incorporate it into all Plans and Specifications for the project, and submit one copy to the Environmental Coordinator for review and approval prior to the start of any construction work (including clearing and grubbing).
Verification (Action by the Environmental Coordinator):
1. Review the Project Plans prior to the start of construction. Approve Project Plans that are determined to be in compliance with all required mitigation.
MMRP-40 PLER2025-00053
MMRP-41 PLER2025-00053
MITIGATION MEASURE CR-3: ADDITIONAL REQUIREMENTS IN
SENSITIVE LOCATIONS
All projects including all applicable NRMP Potential Resource Management Actions that have been determined sensitive for known and/or unknown cultural resources within the construction area (which includes staging areas and similar) shall adhere to one or a combination of the following, to the satisfaction of PER:
A. Conduct an archaeological/historical survey and assessment, by a qualified professional archaeologist, of the area of direct impact. If the project area includes known resources, then the survey will assess the condition of the resource.
B. Based on this review and, as appropriate, a subsurface testing program will be developed and implemented to determine the significance of the resource.
C. Following the field investigations, a technical report describing the evaluation shall be prepared to the satisfaction of PER.
D. If based on the results of the field investigations the resource is not considered significant or important, no additional work would be required for that resource, and all construction related impacts would be considered less than significant.
E. If based on the results of the field investigations resources were identified as being significant the following mitigation would apply:
a. Total Avoidance: Redesign the proposed project as to preserve and protect all significant cultural resources. This would reduce impacts to less than significant levels.
OR, if a redesign is determined infeasible by PER, then,
b. Data Recovery: After all design options have been exhausted that would result in the preservation of significant resources, institute a data recovery program to the satisfaction of PER. Impacts to the resource would remain significant.
F. Historic or cultural resources on or in the tide and submerged lands of California fall under the jurisdiction of the California State Lands Commission;
therefore, the California State Lands Commission shall be contacted and invited to consult in the event that Potential Resource Management Actions are proposed in these areas.
Implementation and Notification (Action by Project Applicant):
1. Comply fully with the above measure.
MMRP-42 PLER2025-00053
2. Include the above measure verbatim as a Construction Note and incorporate it into all Plans and Specifications for the project, and submit one copy to the Environmental Coordinator for review and approval prior to the start of any construction work (including clearing and grubbing).
Verification (Action by the Environmental Coordinator):
1. Review the Project Plans prior to the start of construction. Approve Project Plans that are determined to be in compliance with all required mitigation.
MMRP-43 PLER2025-00053
MMRP-44 PLER2025-00053
MITIGATION MEASURE CR-4: INADVERTENT DISCOVERY OF CULTURAL
RESOURCES
Should any cultural resources, such as structural features, unusual amounts of bone or shell, artifacts, human remains, or architectural remains be encountered during any development activities and/or all applicable NRMP Potential Resource Management Actions, work shall be suspended and PER shall be immediately notified at (916) 874- 6141.
At that time, PER will coordinate any necessary investigation of the find with appropriate specialists as needed. The project applicant shall be required to implement any mitigation deemed necessary for the protection of the cultural resources. In addition, pursuant to Section 5097.97 of the State Public Resources Code and Section 7050.5 of the State Health and Safety Code, in the event of the discovery of human remains, all work is to stop and the County Coroner shall be immediately notified. If the remains are determined to be Native American, guidelines of the Native American Heritage Commission shall be adhered to in the treatment and disposition of the remains.
Historic or cultural resources on or in the tide and submerged lands of California fall under the jurisdiction of the California State Lands Commission; therefore, the California State Lands Commission shall be contacted and in the event that these resources are discovered, and shall be part of the consultation process.
Implementation and Notification (Action by Project Applicant):
1. Comply fully with the above measure.
2. Include the above measure verbatim as a Construction Note and incorporate it into all Plans and Specifications for the project, and submit one copy to the Environmental Coordinator for review and approval prior to the start of any construction work (including clearing and grubbing).
Verification (Action by the Environmental Coordinator):
1. Review the Project Plans prior to the start of construction. Approve Project Plans that are determined to be in compliance with all required mitigation.
MMRP-45 PLER2025-00053
MMRP-46 PLER2025-00053
MITIGATION MEASURE HZ-2: OPERATION AND MAINTENANCE OF
CONSTRUCTION EQUIPMENT
All construction equipment use will be conducted in accordance with applicable regulations, standards, and labels, which include requirements related to training and other factors that are protective for wildfire safety. Use and transport of this equipment will comply with applicable federal, state, and local laws and regulations. Compliance with laws and regulations will substantially reduce the potential risk for a wildland fire during construction.
Implementation and Notification (Action by Project Applicant):
1. Comply fully with the above measure.
2. Include the above measure verbatim as a Construction Note and incorporate it into all Plans and Specifications for the project, and submit one copy to the Environmental Coordinator for review and approval prior to the start of any construction work (including clearing and grubbing).
Verification (Action by the Environmental Coordinator):
1. Review the Project Plans prior to the start of construction. Approve Project Plans that are determined to be in compliance with all required mitigation.
MMRP-47 PLER2025-00053
MMRP-48 PLER2025-00053
MITIGATION MEASURE PS-1: COORDINATION WITH PUBLIC UTILITY
PROVIDERS
Prior to construction of new recreational amenities or installation of vegetation associated with revegetation and restoration efforts, Sacramento County Regional Parks shall coordinate proposed projects with the public utility providers (PG&E, SMUD, Western Area Power Authority, Regional San, SASD, etc.) which hold easements or have existing facilities within the American River Parkway for review and approval.
Implementation and Notification (Action by Project Applicant):
1. Comply fully with the above measure.
2. Include the above measure verbatim as a Construction Note and incorporate it into all Plans and Specifications for the project, and submit one copy to the Environmental Coordinator for review and approval prior to the start of any construction work (including clearing and grubbing).
Verification (Action by the Environmental Coordinator):
1. Review the Project Plans prior to the start of construction. Approve Project Plans that are determined to be in compliance with all required mitigation.
MMRP-49 PLER2025-00053
P:\2025\PLER\PLER2025-00053 American River Parkway Grassland Establishment and Restoration Project\4. Environmental Documents\PLER2025-00053_MMRP Document.docx
Comments:
| MITIGATION MONITORING AND REPORTING PROGRAM |
| Table of Measures |
| PURPOSE AND PROCEDURES |
| Purpose |
| Notification and Compliance |
| Payment |
| Completion |
| STANDARD PROVISIONS |
| Mitigation Measure BR-12: Native Oak Protection |
| Mitigation Measure BR-16: Tricolored Blackbird |
| Mitigation Measure BR-17: Bank Swallow |
| Mitigation Measure BR-18: Nesting Raptors |
| Mitigation Measure BR-19: Migratory Birds |
| Mitigation Measure BR-20: American Badger |
| Mitigation Measure BR-22: VELB |
| Mitigation Measure BR-23: Western Pond Turtle |
| Mitigation Measure BR-25: Rare Plant Survey |
| Mitigation Measure BR-28: Western Spadefoot Toad |
| Mitigation Measure BR-29: Swainson’s Hawk Survey (TAC 2000) |
| Mitigation Measure BR-30: Burrowing Owl |
| Mitigation Measure BR-31: Purple Martin Nest Protection |
| Mitigation Measure CR-1: Retain Cultural Features |
| Mitigation Measure CR-2: Cultural Resources Documentation |
| Mitigation Measure CR-3: Additional Requirements in Sensitive Locations |
| Mitigation Measure CR-4: Inadvertent Discovery of Cultural Resources |
| Mitigation Measure HZ-2: Operation and Maintenance of Construction Equipment |
| Mitigation Measure PS-1: Coordination with Public Utility Providers |