This is an Addendum #1 to Request for Proposals #2025-34 issued by Clackamas County, Oregon for the Stanley Avenue Improvement Project, dated April 28, 2025. The addendum amends the original RFP by expanding the scope of work under Task 4.0 Preliminary Engineering to include two primary additions: pedestrian bridge design and existing Johnson Creek Bridge evaluation. The pedestrian bridge design work requires coordination with the Agency and City to determine bridge geometrics, alignments, profiles, and cross-sections meeting AASHTO and City standards; evaluation of appropriate pedestrian bridge structure types, sizes, and locations; provision of up to two alternative pedestrian bridge designs with preliminary cross-sections and profiles; submission of draft preliminary (30%) pedestrian bridge plans at a horizontal scale of 1" = 20' incorporating information from topographic surveys, stormwater reports, and geotechnical reports; and inclusion of pedestrian bridge draft and final plans and reports in the Design Acceptance Package along with a TS&L memo for the pedestrian bridge. The Johnson Creek Bridge evaluation requires assessment of potential safety enhancements including modification or replacement of bridge railings and evaluation of potential modifications to remove weight restrictions from the bridge, with any additional identified engineering work to be addressed during the design process.
The addendum does not specify pricing terms, set-asides, contract duration, or other financial details, as it functions solely as a clarification and expansion of the original RFP's scope of work. All other terms and conditions of the original RFP remain unchanged pursuant to this addendum.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI 6097-0 final tlh~1.pdf | ||
| RFI 6097-0 Attachments final tlh~1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PH: 503-742-5400 WWW.CLACKAMAS.US
REQUEST FOR PROPOSALS #2025-34
Stanley Avenue Improvement Project
ADDENDUM NUMBER 1
April 28, 2025
On March 26, 2025, Clackamas County (“County”) published Request for Proposals #2025-34 (“RFP”). The County has found that it is in its interest to amend the RFP through the issuance of this Addendum #1. Except as expressly amended below, all other terms and conditions of the original RFP and subsequent Addenda shall remain unchanged.
1. The follow changes are hereby added to Section 3, Scope:
a. Add Pedestrian Bridge Design to the Scope of Work under Task 4.0 Preliminary Engineering. Add the following subtasks:
• Coordinate with the Agency and City to determine pedestrian bridge geometrics, alignments, profiles and cross-sections meeting AASHTO and City standards.
• Coordinate with Agency and City to determine appropriate pedestrian bridge structure (type, size and location).
• Provide up to two alternative pedestrian bridge designs with preliminary cross-sections and profiles.
• Submit draft preliminary (30%) pedestrian bridge plans using information from the topographic survey, Stormwater Report and Geotechnical Report. Plans should be generated at a horizontal scale of 1” = 20’.
• Include pedestrian bridge draft and final plans and reports in the Design Acceptance Package.
o Add deliverable: TS&L memo for pedestrian bridge.
b. Add Existing Johnson Creek Bridge Evaluation under Task 4.0 Preliminary Engineering. Add the following subtasks:
c. Evaluate potential safety enhancements such as modification or replacement of bridge railings.
d. Evaluate potential modifications to remove the weight restriction from the bridge.
e. If additional engineering work is identified it will be addressed during the design process.
End of Addendum #1