This is a Request for Proposals (RFP) issued by the Alaska Department of Natural Resources (DNR), Division of Parks and Outdoor Recreation (DPOR) for the fabrication of a new 33-foot by 10.5-foot multi-purpose vessel to be delivered to Kodiak, Alaska. The vessel will be used for law enforcement, resource protection, public safety, trail crew transportation, and maintenance activities at Shuyak Island State Park, Afognak Island State Park, and Woody Island State Recreation site. The RFP was issued December 20, 2024, with proposals due by January 17, 2025, at 2:00 PM Alaska Time. The anticipated contract start date is February 10, 2025, with vessel delivery required within 18 months of award (approximately July 31, 2026).
The budget for this project is capped at $750,000. Offerors must demonstrate minimum qualifications including five years of aluminum vessel fabrication experience, completion of five similar vessels, and possession of a heated/sheltered fabrication facility. The evaluation criteria includes Experience and Qualifications (25%), Construction Design Plan (25%), Contract Cost (40%), and Alaska Offeror Preference (10%). The vessel must be constructed of marine-grade aluminum, capable of achieving 35 knots, have a range of 400 nautical miles, and accommodate a crew of 2-3 with seating for six persons. Various Alaska bidder, veteran, and other preferences may apply to this procurement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF ALASKA
REQUEST FOR
PROPOSALS
OFFERORS ARE NOT REQUIRED TO RETURN THIS FORM.
IMPORTANT NOTICE: IF YOU RECEIVED THIS SOLICITATION FROM THE STATE OF ALASKA’S “ONLINE
PUBLIC NOTICE” WEB SITE, YOU MUST REGISTER WITH THE PROCUREMENT OFFICER LISTED IN THIS
DOCUMENT TO RECEIVE NOTIFICATION OF SUBSEQUENT ADDENDUMS. FAILURE TO CONTACT THE
PROCUREMENT OFFICER MAY RESULT IN THE REJECTION OF YOUR OFFER.
ISSUED BY:
DEPARTMENT OF NATURAL RESOURCES
SUPPORT SERVICES DIVISION
PRIMARY CONTACT:
TAMRA M. CZERNY
PROCUREMENT OFFICER
TAMRA.CZERNY@ALASKA.GOV
1 (907) 269-8665
RFP 2025-1000-0206
MEDIUM CLASS VESSEL FABRICATION
ISSUED DECEMBER 20, 2024
THE PURPOSE OF THIS RFP IS TO PROVIDE THE STATE WITH A NEW MULTI-PURPOSE MEDIUM CLASS
VESSEL FOR THE DEPARTMENT OF NATURAL RESOURCES IN KODIAK, ALASKA.
mailto:tamra.czerny@alaska.gov
STATE OF ALASKA – REQUEST FOR PROPOSALS (RFP) 2025-1000-0206
REV 08/24
TABLE OF CONTENTS
SECTION 1. INTRODUCTION & INSTRUCTIONS
SEC. 1.01 PURPOSE OF THE RFP
SEC. 1.02 BUDGET
SEC. 1.03 DEADLINE FOR RECEIPT OF PROPOSALS
SEC. 1.04 PRIOR EXPERIENCE AND MINIMUM REQUIREMENTS
SEC. 1.05 REQUIRED REVIEW
SEC. 1.06 QUESTIONS PRIOR TO DEADLINE FOR RECEIPT OF PROPOSALS
SEC. 1.07 RETURN INSTRUCTIONS
SEC. 1.08 ENROLLMENT IN IRIS
SEC. 1.09 ASSISTANCE TO OFFERORS WITH A DISABILITY
SEC. 1.10 AMENDMENTS TO PROPOSALS
SEC. 1.11 ADDENDUMS TO THE RFP
SEC. 1.12 RFP SCHEDULE
SEC. 1.13 PRE-PROPOSAL CONFERENCE/TELECONFERENCE
SEC. 1.14 ALTERNATE PROPOSALS
SEC. 1.15 NEWS RELEASES
SECTION 2. BACKGROUND INFORMATION
SEC. 2.01 BACKGROUND INFORMATION
SECTION 3. SCOPE OF WORK & CONTRACT INFORMATION
SEC. 3.01 SCOPE OF WORK
SEC. 3.02 PROOF OF QUALIFICATION
SEC. 3.03 QUALITY OF VESSEL DESIGN
SEC. 3.04 QUALITY OF FABRICATION AND INSTALLATION
SEC. 3.05 QUALITY OF EQUIPMENT AND COMPONENTS
SEC. 3.06 CONTRACT TERM AND WORK SCHEDULE
SEC. 3.07 DELIVERABLES
SEC. 3.08 CONTRACT TYPE
SEC. 3.09 PROPOSED PAYMENT PROCEDURES
SEC. 3.10 PROMPT PAYMENT FOR STATE PURCHASES
SEC. 3.11 CONTRACT PAYMENT
SEC. 3.12 CONTRACT PRICE ADJUSTMENTS
SEC. 3.13 LOCATION OF WORK
SEC. 3.14 THIRD-PARTY SERVICE PROVIDERS
SEC. 3.15 SUBCONTRACTORS
SEC. 3.16 JOINT VENTURES
SEC. 3.17 RIGHT TO INSPECT PLACE OF BUSINESS
SEC. 3.18 F.O.B. POINT
SEC. 3.19 CONTRACT PERSONNEL
SEC. 3.20 INSPECTION & MODIFICATION - REIMBURSEMENT FOR UNACCEPTABLE DELIVERABLES
SEC. 3.21 LIQUIDATED DAMAGES
SEC. 3.22 CONTRACT CHANGES - UNANTICIPATED AMENDMENTS
SEC. 3.23 NONDISCLOSURE AND CONFIDENTIALITY
SEC. 3.24 INDEMNIFICATION
SEC. 3.25 INSURANCE REQUIREMENTS
SEC. 3.26 TERMINATION FOR DEFAULT
SECTION 4. PROPOSAL FORMAT AND CONTENT
SEC. 4.01 INTRODUCTION
SEC. 4.02 PROPOSAL CONTENTS
SEC. 4.03 EXPERIENCE AND QUALIFICATIONS
SEC. 4.04 CONSTRUCTION DESIGN PLAN
SEC. 4.05 COST PROPOSAL
SEC. 4.06 BID BOND – PERFORMANCE BOND – SURETY DEPOSIT
SEC. 4.07 EVALUATION CRITERIA
SECTION 5. EVALUATION CRITERIA AND CONTRACTOR SELECTION
SEC. 5.01 SUMMARY OF EVALUATION PROCESS
SEC. 5.02 EVALUATION CRITERIA
SEC. 5.03 SCORING METHOD AND CALCULATION
SEC. 5.04 EXPERIENCE AND QUALIFICATIONS (25%)
SEC. 5.05 CONSTRUCTION DESIGN PLAN (25%)
SEC. 5.06 CONTRACT COST (40%)
SEC. 5.07 ALASKA OFFEROR PREFERENCE (10%)
SECTION 6. GENERAL PROCESS AND LEGAL INFORMATION
SEC. 6.01 INFORMAL DEBRIEFING
SEC. 6.02 ALASKA BUSINESS LICENSE AND OTHER REQUIRED LICENSES
SEC. 6.03 SITE INSPECTION
SEC. 6.04 CLARIFICATION OF OFFERS
SEC. 6.05 DISCUSSIONS WITH OFFERORS
SEC. 6.06 EVALUATION OF PROPOSALS
SEC. 6.07 CONTRACT NEGOTIATION
SEC. 6.08 FAILURE TO NEGOTIATE
SEC. 6.09 OFFEROR NOTIFICATION OF SELECTION
SEC. 6.10 PROTEST
SEC. 6.11 APPLICATION OF PREFERENCES
SEC. 6.12 ALASKA BIDDER PREFERENCE
SEC. 6.13 ALASKA VETERAN PREFERENCE
SEC. 6.14 ALASKA MILITARY SKILLS PROGRAM PREFERENCE
SEC. 6.15 STANDARD CONTRACT PROVISIONS
SEC. 6.16 QUALIFIED OFFERORS
SEC. 6.17 PROPOSAL AS PART OF THE CONTRACT
SEC. 6.18 ADDITIONAL TERMS AND CONDITIONS
SEC. 6.19 HUMAN TRAFFICKING
SEC. 6.20 RIGHT OF REJECTION
SEC. 6.21 STATE NOT RESPONSIBLE FOR PREPARATION COSTS
SEC. 6.22 DISCLOSURE OF PROPOSAL CONTENTS
SEC. 6.23 ASSIGNMENT
SEC. 6.24 FORCE MAJEURE (IMPOSSIBILITY TO PERFORM)
SEC. 6.25 DISPUTES
SEC. 6.26 SEVERABILITY
SEC. 6.27 SUPPLEMENTAL TERMS AND CONDITIONS
SEC. 6.28 SOLICITATION ADVERTISING
SEC. 6.29 FEDERALLY IMPOSED TARIFFS
SECTION 7. ATTACHMENTS
SEC. 7.01 ATTACHMENTS
SECTION 1. INTRODUCTION & INSTRUCTIONS
SEC. 1.01 PURPOSE OF THE RFP
The Department of Natural Resources (DNR), Division of Parks and Outdoor Recreation (DPOR) is soliciting proposals for the fabrication of a new 33 ft. X 10.5 ft. multi-purpose vessel for delivery to Kodiak, Alaska; a more detailed description including scope of work is to be provided in Section 3 Scope of Work & Contract Information.
SEC. 1.02 BUDGET
The Department of Natural Resources, Division of Parks and Outdoor Recreation estimates a budget of no more than $750,000.00 dollars for completion of this project. Proposals priced at more than $750,000.00 will be considered non-responsive.
Payment for the contract is subject to funds already appropriated and identified.
SEC. 1.03 DEADLINE FOR RECEIPT OF PROPOSALS
Proposals must be received no later than 2:00 PM Alaska Time on January 17, 2025, as indicated by postmark or email timestamp and late proposals will not be considered.
SEC. 1.04 PRIOR EXPERIENCE AND MINIMUM REQUIREMENTS
In order for offers to be considered responsive offerors must meet these prior experience and minimum requirements:
• The offeror must demonstrate they have a minimum of five years of experience in aluminum vessel fabrication.
• The offeror must demonstrate that they have successfully completed a minimum of five vessels of similar design.
• The offeror must provide a project summary of the last two similarly completed projects.
The project summary must include original proposed budget and final completed budget, original proposed completion date and final completion date, and include pictures of the vessels.
• The offeror must demonstrate the vessel can be fully designed, engineered, and modeled in 3D.
• The offeror must provide welding qualifications for the persons welding the vessel.
• The offeror must have a suitable fabrication facility that is both sheltered and heated.
Offerors must detail in their proposal how they meet the prior experience and minimum requirements above. Offerors that fail to identify in their proposals how they meet the prior experience, and minimum requirements will be deemed non-responsive.
SEC. 1.05 REQUIRED REVIEW
Offerors should carefully review this solicitation for defects and questionable or objectionable material. Comments concerning defects and questionable or objectionable material should be made in writing and received by the Procurement Officer at least 10 days before the deadline for receipt of proposals. This will allow time for the issuance of any necessary amendments. It will also help prevent the opening of a defective proposal and exposure of offeror's proposals upon which award could not be made.
SEC. 1.06 QUESTIONS PRIOR TO DEADLINE FOR RECEIPT OF PROPOSALS
All questions must be in writing and directed to the Procurement Officer. The interested party must confirm telephone conversations in writing.
Two types of questions generally arise. One may be answered by directing the questioner to a specific section of the RFP. These questions may be answered over the telephone. Other questions may be more complex and may require a written addendum to the RFP. The Procurement Officer will make that decision.
Deadline to receive questions is January 03, 2025, by 2:00 PM Alaska Time.
PROCUREMENT OFFICER: TAMRA M. CZERNY; PHONE 1 (907) 269-8665; TDD 711 (Alaska Relay);
EMAIL: tamra.czerny@alaska.gov.
SEC. 1.07 RETURN INSTRUCTIONS
If submitting a proposal via email, the technical proposal and cost proposal must be saved as separate PDF documents and emailed to tamra.czerny@alaska.gov as separate, clearly labeled attachments, such as “Vendor A – Technical Proposal.pdf” and “Vendor A – Cost Proposal.pdf” (Vendor A is the name of the offeror). The email must contain the RFP number in the subject line.
The maximum size of a single email (including all text and attachments) that can be received by the State is 20mb (megabytes). If the email containing the proposal exceeds this size, the proposal must be sent in multiple emails that are each less than 20 megabytes and each email must comply with the requirements described above.
Please note that email transmission is not instantaneous. Similar to sending a hard copy proposal, if you are emailing your proposal, the State recommends sending it ahead of time to ensure the email is delivered by the deadline for receipt of proposals.
If submitting proposals using U.S. mail, or delivery service, offerors must submit one hard copy of their proposal, in writing, to the Procurement Officer in a sealed package. The cost proposal included in the package must be sealed separately from the rest of the proposal and must be clearly identified. The sealed proposal package(s) must be addressed as follows:
Department of Natural Resources Support Services Division
Attention: TAMRA M. CZERNY Request for Proposal (RFP) Number: 2025-1000-0206
RFP Title: Medium Class Vessel Fabrication 550 West 7th Avenue, Suite 1330
Anchorage, Alaska 99501 It is the offeror’s responsibility to contact the issuing agency at 1 (907) 269-8665 to confirm that the proposal has been received. The State is not responsible for unreadable, corrupt, or missing attachments.
SEC. 1.08 ENROLLMENT IN IRIS
Offerors will be required to be enrolled in the State of Alaska’s Integrated Resource Information System (IRIS) database prior to the award of a contract resulting from this RFP. Enrollment can be done online at the following link: https://iris-vss.alaska.gov. Offerors who are not enrolled prior to the award of a contract will be notified by DNR Procurement. Failure of an offeror to enroll in the IRIS database will delay award of the contract and may delay issuance of contract work.
SEC. 1.09 ASSISTANCE TO OFFERORS WITH A DISABILITY
Offerors with a disability may receive accommodation regarding the means of communicating this RFP or participating in the procurement process. For more information, contact the Procurement Officer no later than 10 days prior to the deadline for receipt of proposals.
SEC. 1.10 AMENDMENTS TO PROPOSALS
Amendments to or withdrawals of proposals will only be allowed if acceptable requests are received prior to the deadline that is set for receipt of proposals. No amendments or withdrawals will be accepted after the deadline unless they are in response to the State's request in accordance with 2 AAC 12.290.
SEC. 1.11 ADDENDUMS TO THE RFP
If an addendum is issued before the deadline for receipt of proposals, the addendum will be posted on the State of Alaska Online Public Notice (OPN) website. The link to the posting of the addendum will be provided to all who were notified of the RFP and to those who have registered with the Procurement Officer after receiving the RFP from the OPN.
After receipt of proposals, if there is a need for any substantial clarification or material change in the RFP, an addendum will be issued. The addendum will incorporate the clarification or change, and a new date and time established for new or amended proposals. Evaluations may be adjusted as a result of receiving new or amended proposals.
https://iris-vss.alaska.gov/
SEC. 1.12 RFP SCHEDULE
ACTIVITY TIME DATE
Issue Date / RFP Released December 20, 2024 Deadline for Receipt of Questions 2:00 PM January 03, 2025 Deadline for Receipt of Proposals / Proposal Due Date 2:00 PM January 17, 2025 ANTICIPATED Proposal Evaluations Complete Week of January 27, 2025 ANTICIPATED Notice of Intent to Award Week of January 27, 2025 ANTICIPATED Contract Issued Week of February 10, 2025
This RFP does not, by itself, obligate the State. The State's obligation will commence when the contract is approved by the Commissioner of the Department of Natural Resources, or the Commissioner's designee. Upon written notice to the Contractor, the State may set a different starting date for the contract. The State will not be responsible for any work done by the Contractor, even work done in good faith, if it occurs prior to the contract start date set by the State.
SEC. 1.13 PRE-PROPOSAL CONFERENCE/TELECONFERENCE
Not applicable for this RFP.
SEC. 1.14 ALTERNATE PROPOSALS
Offerors may only submit one proposal for evaluation. In accordance with 2 AAC 12.830 alternate proposals (proposals that offer something different than what is asked for) will be rejected.
SEC. 1.15 NEWS RELEASES
News releases related to this RFP will not be made without prior approval of the Project Manager.
SECTION 2. BACKGROUND INFORMATION
SEC. 2.01 BACKGROUND INFORMATION
Operational Area: Shuyak, Afognak, and Kodiak Islands (Gulf of Alaska) Alaska State Parks relies on ocean going vessels in the Kodiak area to manage Shuyak Island State Park, Afognak Island State Park, and Woody Island State Recreation site. The State has determined the requirement of a newly constructed vessel approximately 33ft in length with a walk-through cabin and beach landing door, with reasonably shallow draft designed for this dynamic environment made of marine grade aluminum would best suit the needs of the division. The marine grade aluminum design was chosen because it produces the best balance of required power, fuel and maintenance efficiency, sea worthiness, and speed needed.
A normal crew will consist of two persons, but the vessel may be occasionally operated alone. The vessel must be comfortable for a crew of 2-3 to stay on the boat for several nights but must have seating for a total of six persons, which will be required when transporting crews to or from Shuyak or Afognak Islands. This vessel must be sufficiently capable of carrying a variety of materials, supplies, and equipment on deck and inside the cabin. This vessel does not require a permanent crew; the operators and handlers could be trained relatively quickly and will have ample opportunity to maintain currency and qualification.
The vessel will be used for a multitude of missions, including by law enforcement rangers for resource protection and public safety, transporting trail crews for resource management, and maintenance repairing public use cabins and other facilities. This vessel will be the primary transportation method for Alaska State Parks staff to reach Shuyak Island State Park and Afognak Island State Park where 8 public use cabins, numerous trail heads, remote camp locations, and a remote ranger station will be accessed by beach landing.
This RFP sets forth the design and performance specifications for the vessel. The State desires to purchase a newly constructed, high-quality vessel with sea-keeping abilities required for work in Gulf of Alaska and Shelikof Strait waters. The vessel must be delivered to Kodiak, Alaska.
“The State has attempted to specify to the best of ability performance, construction, machinery, and systems necessary, but these specifications shall be considered minimum rather than comprehensive and may include omissions, errors, or components that are in conflict with one another or in conflict with the overall design. The builder shall identify any components in conflict and propose alternative suitable for the overall design to meet the mission.”
SECTION 3. SCOPE OF WORK & CONTRACT INFORMATION
SEC. 3.01 SCOPE OF WORK
The Department of Natural Resources (DNR), Division of Parks and Outdoor Recreation (DPOR) is soliciting proposals for the new construction of a high-quality seaworthy vessel required for operations. The vessel shall be built according to specifications as outlined in Scope of Work Specifications. The home port for the new vessel will be in Kodiak, Alaska. The vessel must pass all sea trials conducted by the State and be delivered to the home port upon completion.
SCOPE OF WORK SPECIFICATIONS
Vessel Performance Standards:
The vessel and all its components shall be suitable for operation everywhere in the Kodiak Archipelago nearshore waters, and surrounding waters in all seasons. The vessel must successfully operate in the following environmental conditions: Ambient air temperatures: 80 degrees F° down to -10 degrees F°, water temperatures between 30 degrees F° and 55 degrees F°, wind speeds between 0 and 30 knots, and wave heights between 0 and 6 feet.
• Hull: Welded aluminum, shallow draft. In the general design of a mono hull semi-displacement with the ability to operate in seas up to 6ft.
• Freeboard: Vessel minimum freeboard is 30 inches loaded. Freeboard shall be measured from the top of the continuous watertight deck to the water, at the lowest point on the deck edge.
• Stability: Vessel must pass a simplified stability test, per USCG Subchapter T, for worst case load condition with the vessel operating in exposed waters. Also, vessel must have a collision bulkhead, per USCG Subchapter T, and additional watertight bulkheads, spaced so that vessel will not sink if one compartment is holed.
• Cargo: Vessel must be able to carry deck loads of up to 2,500 lbs.
• Propulsion: Vessel must have twin 300hp outboard engines with dual counter and contra-rotating propellers.
• Speed: Vessel must be capable of achieving 35 knots. Cruise speed to be a minimum of 28 knots.
• Range: Vessel must have a range of 400 nautical miles minimum.
• Flying Bridge: No flying bridge required.
• Draft: Vessel draft must not exceed 40 inches.
Vessel Construction Standards The structure of the vessel shall be simple and robust in nature and must be constructed of 5086 Marine Grade aluminum plate or similar equivalent to be approved by the project manager with all welded construction. Material certificates must be provided. ABS welding standard for Aluminum vessels and ABYC standards for a vessel of this size apply. Where the State has questions or concerns about structural design, the Contractor shall provide an engineering analysis of the area in question.
Extra structure must be provided in areas of high stress. As appropriate for normal good ship building practices, stress relieving curves/radii and brackets must be provided in areas of high stress. Insert plates must be provided at points of stress concentration and hull penetration.
Doubler plates must not be substituted for insert plates. The following standards must be adhered to: Side Plating: 1/4" Aluminum plate, 5086 H116, Bottom and Transom Plating: 5/16" Aluminum plate, 5086 H116 Deck Plating: 3/16" 5052-H32.
Other structural details (such as manholes, limber holes, rat holes, water and oil stops) must be incorporated into the vessel's structure to provide proper access, drainage of water, or proper functioning of tanks and systems.
Workmanship must be to a high standard. Vessel structural fit-up must be accurate with no gaps between plate and supporting structure. End connections must be clean and free of rough edges.
Structural connections, relief holes, radiuses, and bracketing must be provided so that there are no areas of concentrated stress in the hull.
The Contractor must take whatever means are necessary to avoid inducing stain and deformation into the vessel from welding. This includes modifying welding procedures and welding and assembly sequencing. Evidence of minor structural deformation or cracking shall be cause for a partial refund to the State. Evidence of major structural deformation or cracking shall be cause for the State to terminate the contract for negligence. All internal and external spaces of the vessel must be accessible for inspection and maintenance. Inspection hatches must be waterproof, quick acting, non-plastic hatches.
All equipment installed must have reasonable access for maintenance (This item will be verified at sea trials).
Questions about space and machinery access must be addressed before construction or installation of component in question.
Installation of metals other than aluminum shall be strictly controlled. Ferrous metals must be minimized to only those required of specified equipment and must not be installed in the vessel structure, mechanical, or electrical systems unless the Contractor receives prior approval from the State. Non-aluminum fasteners must be stainless steel. Where non-aluminum metal and aluminum must be connected, such connection shall occur through a dielectric kit, or some other means to eliminate or minimize galvanic corrosion. The State shall reject, and the Contractor shall replace, any dissimilar metal installation the State believes may be susceptible to galvanic corrosion.
Vessel Construction Specifications
Hull Specifications:
• Length Overall (including outboards and anchor roller)…………………………………..……..…...TBD
• Hull Length……………………………………………………………………………………………………..………..……33’
• External Beam…..…………………………………………………………………………………………..………..….10.5’
• Hull deadrise at transom…………………………………………………………………………….…….17 degrees
• Engine drive type………………………..………..…...Twin Outboards mounted on offshore bracket
• Engine horse power Twin 300HP Contra-Rotating Dual Propeller (Suzuki 300BMD or State approved equivalent).
• Fuel capacity………………………………………………………………….…………Approximately 400 Gallons
• Bottom plating………………………………………………………….………..….…….……1/4” 5086 Aluminum
• Side plating……………..………………………………………………..…….…….…………3/16” 5086 Aluminum
• Cabin material……………….……………………………………..…….………..1/8” & 5/32” 5052 Aluminum
• Bulkhead and longitudinal material……………………..….……….….3/16” 5052 & 6061 Aluminum
• Keel material…………………………………………..……….…1/2”x4” interior – ¾”x 1” exterior flat bar
• Fuel tank material………………………………..…………………………………………….1/4” 5052 Aluminum
• Hull watertight voids……………………….……………………..4+ separate voids for maximum safety
• Collision bulkhead……………………..….…………………………………….water tight for collision safety
• Bow towing eye……………………..…….………………..Bow integrated with stainless steel bushing
• Gunnel width round cabin……..……….……..……………………………………………………………………….6”
Cabin Features:
Layout
• Full width walk-thru cabin with forward drop-down bow.
• Cabin to be 13 feet long at minimum.
• Cabin to be built out to 6-inch-wide gunnels for a full-width cabin.
• Main cabin interior layout to include two suspension helm seats, one port and one starboard.
• Starboard side helm seat with vessel controls, electronics, and electrical panels.
• Starboard aft corner to have enclosed head space with exterior access.
• Starboard side to have galley that is minimum 64” long with cooktop, refrigerator, sink, and storage.
• Port side passenger helm seat with open face glove box in dash included.
• Port side dinette with U-shaped bench seating and drop-down table.
• Finished below cabin bunk and storage area with two sleeping platforms and a light.
• Below cabin bunk area accessed through open face under dinette forward seat.
• Mechanical / electrical space below deck under forward main cabin deck with lift out access hatch.
Seating:
• Main Helm and passenger companion seat to be helm bucket seats with arm rest; slide mechanism and mechanical suspension base.
• Main helm seat to have storage space below seat in seat pedestal box with two drawer storage.
• Companion helm seat to have built in storage space below seat in pedestal box with cabinet door over storage.
• Helm seats to have built-in footrests.
• Bench seats to have storage in seat boxes with lift-out tops.
• Bench seats to have Nomar upholstered 3” bottom and 2” backrest cushions.
• Bench seats built high so that passengers can easily see out windows while seated.
Dinette:
• Dinette to be U-shaped bench seating on port side with a table in center that drops down into a bunk.
• Foot rest area to be raised with open faced storage underneath.
• Table to be solid surface with sea rails and corner clean outs.
• Table makes down into bunk and includes filler cushion.
Galley:
• Galley to be approx. 64” long along starboard side of cabin between helm and head.
• Diesel fired cook top with pot holders and blower lid attachment.
• Refrigerator included and installed under countertop.
• Microwave oven installed built in under countertop.
• Single SS sink installed under mounted under countertop with hot/cold water faucet.
• Door mounted trashcan under sink.
• Storage under sink with cabinet door with trach can in storage area.
• 4 drawer cabinet installed between sink and cooktop.
• SS paper towel holder mounted in galley.
• Galley countertop to be solid surface with raised sea-rails with corner clean outs.
Head:
• Headspace to be a 42” long x 30” wide enclosure with exterior access door.
• Head to have sliding window on outside wall.
• 12 volt flushing marine full-size head with 10-gallon black water holding tank with gravity discharge valve.
• BW toilet paper holder, 1 grab handle, and 4 coat hooks.
• Exterior aluminum head door to include locking latch keyed alike to main cabin doors.
Doors and Windows:
• Aluminum framed marine windows included:
Two forward facing windows.
Two triangle windows next to front cabin door inset.
Two starboard side windows – one slider next to helm seat, one fixed window above galley.
Two port side cabin windows – one slider next to forward helm seat, one large fixed next to dinette.
One aft wall slider window on the port side of aft cabin wall above dinette.
One aft wall slider window on starboard side in head.
• One hinged aluminum insulated cabin forward door minimum opening 26”.
• One hinged aluminum insulated cabin aft door minimum opening 30”.
• Cabin forward and aft entrance doors to have ¾ height aluminum framed windows and have hooks to latch open.
• One hinged aluminum insulated head door with no window.
• Doors must have locks and are to be keyed alike.
Interior Details:
• Cabin to be 6’5” interior finished height.
• Cabin to have under cabin storage / bunk space access.
• Cabin to have mechanical/storage room access lift out hatch in cabin floor for batteries, heater, etc. access.
• Cabin interior to be Zolatone painted (State selected color).
• Cabin upper walls to have hull liner interior carpet.
• Cabin interior overhead to be insulated with 1&½ inch foam panels and covered with a white fiberglass paneling (FRP) with composite trim strips.
• (8) Coat hooks included, 4 in the cabin and 4 in the head.
• (4) SS grab handles included.
• (2) Cup holders included, one at each helm.
Deck and Exterior Layout:
Aft Deck Features:
• Self-bailing decks aft of cabin draining to stern with scuppers out transom.
• Exterior decks to be aluminum plate with non-skid black epoxy paint.
• Deck space aft of cabin to be approximately 11 feet long.
• Transom area of boat to be traditional transom with external outboard bracket/pod for twin outboards with side swim steps and walk bridge between swim steps with outboard rigging under bridge.
• Welded aluminum motor cage to surround outboard motors.
• Cabin to have a 36-inch back wall overhang.
• 1 inch aluminum pipe railings approximately 9 inches tall running from bow bulwarks to stern.
• Port side transom door.
• Port side stern door.
• Under gunnel shelves on both sides of aft deck.
• Transom centered storage cabinet with aluminum locking storage doors. Bottom space sized to hold and secure a 2K portable generator with power hook up and vents. Top storage for tools.
• Fixed welded aluminum pipe ladder from back deck to roof.
• Mount location for 6HP outboard (State provided) for raft.
Forward Deck Features:
• Exterior decks to be aluminum plate with non-skid black epoxy paint.
• Beach landing bow door included with 26” opening and locking latches.
• Bow door to have built in ramp style finish with grip bars.
• Deck space forward of cabin to be approximately 4 feet long with 3 ½ foot long anchor locker forward.
• Self-bailing bow deck with double scuppers out front deck sides.
• 9” tall, tapered bulwarks at bow.
• Welded hawser holes in bulwarks for tie up lines.
• Anchor winch and anchor pulpit on port side bow box.
Rooftop Features:
• Roof top antennae platform included.
• Fold down radar tree mounted on rooftop platform.
• ¾” pipe rails installed on both cabin roof sides for rooftop tie downs.
• 600# capacity hydraulic deck crane mounted on top of cabin roof. Crane support pedestal to be integrated into port side aft helm station. Crane to be aluminum and stainless-steel construction with 9-foot reach and two function hydraulic systems controlling the lifting and winch.
• Clip-on electric pot puller compatible with crane use.
• 9’5” Aluminum Deck Inflatable raft (Kachemak 290) with outboard mountable transom.
• Raft lifting sling and tie downs included.
• Life raft (6 person) (Viking RescYou Coastal or State approved equivalent) installed in cradle.
Exterior Details:
• Six (6) welded 10” aluminum cleats - 3 per side.
• Aft corners of transom to have heavy duty fabricated bollard posts with cross bar for towing off stern corners or using as docking tie off cleat.
• Bracket at transom for bolt-on zinc. 6”x12” zinc included.
• ¾” x 1” aluminum flat bar welded full length of keel for added wear protection.
• All below deck inspection ports to be stainless steel style inspection plates for visual inspection and wet vac removal of condensation during inspections. All separated water tight voids will either have man hole sized access if there is space in the voids to get a person into, or the SS inspection and maintenance screw out plates for voids that a person cannot physically fit into. There will be no plastic deck hatches.
Included Features:
Decals/Graphics:
• Installation of state provided decals.
• Three vessel names and home port included.
• Two State selected colors.
Cabin Heater:
• Forced air diesel fired cabin heater with ducting to forward windows, main cabin, head, and under deck storage.
• Digital thermostat
• Ducting to forward windows, v-berth, head, and main cabin.
• Duct outlets to be closeable for zone heat control.
• Heat ducts to be insulated ducting.
• One (1) 120-volt electric SS cabin heater included.
• 120-volt heater to include built in thermostat controls.
• 120-volt heater to function on either generator or shore power input power for either supplemental or back up heat as well as constant regulated heat when on shore power in cold temps.
• 25-gallon diesel tank for heater and cook top with exterior fill port.
• Includes fuel gauge at helm.
• Racor filter for diesel system.
Anchor Gear:
• EZ-5 Anchor Drum style anchor winch system with anchor, line, chain, and installation included.
• Interior wired and exterior wireless controls included.
• Aluminum anchor guide with plastic anchor roller installed on bow at port side.
• 400’ 5/16” Spectra line
• 100’ ½” Samson strong
• 50’ 5/16” Galvanized chain
• Lewmar 33lb. Anchor
Electrical:
General:
• Electrical components by Blue Seas Company.
• All marine grade wire and connectors with heat shrink tubing and connectors used throughout.
• All terminations and switches appropriately marked.
• Boat provided with digital electrical one-line diagram with circuits and overcurrent protection labeled on diagram.
Battery System:
• (8) 12-volt Optima Yellow top sealed cell AGM 31 group (2 start bank / 6 house bank).
• Dual circuit battery switching and charging relay distribution for two bank system.
Breaker Panels:
• Blue Seas custom 360 panel with 12 space 12-volt DC breaker panel.
• Sub panel fuse blocks for individual overcurrent protection of all electronics, accessory, and lighting circuits.
• Voltage meter for each battery bank with selector switch.
Shore Power/Inverter/Charging System:
• Blue Seas 360 custom panel 120-volt AC power distribution panel.
• Source selector main breakers on AC panel for incoming shore or generator AC power.
• Voltage meter and main disconnect breaker for AC panel.
• Blue Seas 360 ELCI panel for shore power inlet protection.
• 30-amp 120-volt isolation transformer included for Shore power input system.
• 2000-watt ProMariner Pure Sine inverter with automatic shore power transfer switch.
• 60-amp ProMariner battery charger with dual outputs for two bank charging of house and start banks.
• Battery charging is automated and supplied by either shore or generator input power.
• 30 amp/120-volt shore power inlet.
• 30-amp 50-foot shore power molded cord included.
• Shore power cord dedicated storage in base of aft control console.
Lights:
• LED Navigation lights.
• LED Anchor lights.
• LED Deck flood light x 2 (one for forward deck and one for aft deck).
• LED Cabin interior and head lighting (8 lights total) (red/white lights @ helms and above dinette/galley area).
• LED light bar in mechanical room.
• Two Led light bars in storage / bunk room.
• One remote controlled Spot Light on cabin roof top forward with minimum 400,000 candlepower.
Electrical Components:
• Three 12-volt USB/USB-C outlets (one at each helm and one at galley).
• Three 120-volt electric outlets in cabin supplied by either inverter, generator, or shore power supply (one at galley, one at dinette, one at the helm) (GFCI outlet at galley).
• One deck mounted 120-volt electric outlet at aft console in weatherproof enclosure.
• Two circulation fans at forward windows.
• Two electric, self-parking and intermittent windshield wipers with wiper control at helm.
• 12-volt horn.
Electronics Package:
• Two (2) GPSMAP 8612 with Navionics + 12” LCD and installed flush in the main helm
• One (1) GPSMAP 8610 with Navionics + 10” LCD and installed flush in the passenger helm.
• Garmin Transducer installed external of transom (or State approved equivalent).
• Garmin Fantom 24 HD radar (or State approved equivalent).
• Garmin 215 VHF/ AIS radio (or State approved equivalent).
• Garmin AIS 800 Transceiver with switch to turn off transmission (or State approved equivalent).
• Garmin GPS 24XD Antennae (or State approved equivalent).
• Shakespeare 8’ VHF ant with wire and SS ratchet mount (or State approved equivalent).
• Standard Horizon 3000 hailer and PA system included with loud hailer speaker on roof and deck speaker for PA – (or State approved equivalent).
• Agency Motorola radio and supporting antennae (State supplied- builder installed).
• Starlink mobile internet hardware (State supplied- builder installed).
• SIONYX C012800 Nightwave Marine Night Vision Camera ( State supplied- builder installed).
• Necessary cables, connectors, and accessories to complete networked system– builder supplied.
Mechanical/Fuel/Plumbing:
Fuel System:
• One 400-gallon gasoline tank installed below deck.
• Fuel tank sanded and coated with a protective epoxy coating to minimize corrosion.
• USCG approved fuel lines through-out.
• Racor water/fuel separator filter for each engine.
• Fuel tank level sender and gauge for both diesel and gasoline tanks.
Fresh Water System:
• Two (2) 25-gallon plastic fresh water tanks.
• 2.9 gpm Johnson fresh water pressure pump with automatic shut of switch.
• Hot/Cold water faucet at galley sink.
• All fresh water system hot and cold supply lines and plumbing to be insulated with pipe foam wrap
• Fresh water system to have 3-way winterization valve for quick and easy purging of system in freezing temps.
• Fresh water tanks to have fluid level senders with dual gauge at galley backsplash.
Pumps:
• Johnson 5.2 gpm wash-down self-priming pump for regular salt water wash down with automatic pressure shut off switch.
• Wash down pump on/off switch at breaker panel.
• Saltwater washdown outlet with spigot valve, coiled 25-foot hose and spray nozzle.
• Salt water wash down plumbing system to have 3-way winterization bypass valve for quick and easy purging of system in freezing temps.
• Two (2) 2000 gph automatic bilge pumps below deck in cabin systems void area and generator aft compartment.
• Bilge pumps to have auto / on / off control panels with indicator lights when running.
• Bilge pumps and all other thru-hulls must be welded aluminum thru hulls.
Miscellaneous Mechanical:
• High water alarm included in mechanical room and bunk/storage area.
Propulsion/Steering:
Outboards:
• Complete installation of twin (2) 300 HP dual counter and contra-rotating prop integrated steering outboards (Black Suzuki 300BMD’s or State approved equivalent) with dual station electronic controls.
• Outboards to be 30” shaft with dual prop counter rotating lower units.
• 7” Suzuki digital display for engines at helms.
• Suzuki SPC2 electronic engine controls, harnesses, and adapters for interior controls.
• 3 blade SS props included.
Other:
• Bow thruster with controls at forward and aft helm stations.
• Lenco 12” SS 12-volt trim tabs included with control installed on dash with LED tab level indicator.
• Jack plates to accommodate shallow water operations, improve performance, and efficiency.
Steering Control System:
• Joystick system NOT required.
• 13” steel steering wheel with quick steer knob at main helm.
• 11” steel steering wheel at aft helm.
Miscellaneous:
Safety/Boat Gear:
• First aid kit, flare kit.
• Smoke alarm & CO2 detector.
• 2 fire extinguishers, one in cabin, one on deck.
• 20” hard plastic throw ring with mounting location on head door.
• 3 black G6 dock buoys with tag lines included.
• 3 black dock lines 5/8” x 25’ long included.
• Storage space location for 6 survival suits (State provided suits).
• Installation of ACR EPIRB (State provided).
Delivery/Inclusions:
• All necessary documentation and manuals provided.
• All vessel specific and manufactured equipment documentation and manuals provided and organized in file box.
• Stability test procedure and test performed by registered Naval Engineer (Coastwise Corp, Alaska) included with stability report booklet provided with delivery of vessel. Stability test procedure to include rated passenger and cargo capabilities of vessel for intended operating area.
• Vessel drawings and as-built schematics supplied in file box and digital format.
• Vessel sea trial report supplied in file box and digital format.
• Harbor moorage for one week during sea trials included.
• Sea trials fuel included.
• Black anti fouling bottom paint included.
• Boat sea trialed with State representatives at agreed upon location. Duration shall be determined by State representatives, up to three days, including overnight on vessel.
• Boat trailer not required.
• Vessel delivered to Kodiak, Alaska.
SEC. 3.02 PROOF OF QUALIFICATION
The State requires that the offeror be qualified to provide the services in the solicitation.
"Qualified" in this instance means that the offeror has significant experience fabricating aluminum vessels of thirty-three feet. The offeror must be able to demonstrate more than five years of experience in aluminum vessel fabrication and must provide welding qualifications for the persons welding the vessel. The offeror must also have a suitable fabrication facility that is both sheltered and heated. The State shall require the apparent best proposing firm to provide proof of these qualifications in their proposal. Failure to provide adequate proof of these qualifications will result in disqualification of the subject offer and the proposal evaluation process will begin again with the next highest ranked offering firm.
SEC. 3.03 QUALITY OF VESSEL DESIGN
The State requires that the vessel design be of high quality, outer hull from gunnels to keel must be from a proven design from a qualified boat designer with more than five years’ experience.
"Proven design" means that the same hull design proposed by the offeror already exists and is proven in similar service. "High quality" design means that the vessel scantlings are adequately sized and structural members correctly spaced to provide an acceptable level of stress when subjected to design loads. "High quality" also means that the vessel design has features that allow for easy and safe vessel operation and easy vessel maintenance.
The State requires that all offerors submit a complete vessel design with their proposal. The design submitted by each offeror must contain the following minimum information:
1) Plan view drawing of the arrangement of the Main Deck.
2) Profile view drawing of vessel, showing design water line, fully loaded.
3) Arrangement drawing of Cabin.
4) Structural plans for hull describing plate, stiffeners, frames, girders, and bulkheads.
The State will require that prior to fabrication the following drawings are to be submitted for approval:
1) Electrical load analysis with one-line diagram (each system).
2) Hydraulic piping schematics.
3) Heating system piping and ducting.
4) Console layout (bridge).
Minimum drawing size is 11”X17”.
SEC. 3.04 QUALITY OF FABRICATION AND INSTALLATION
The State requires that this vessel be a high-quality vessel. All work and fabrication procedures must be accomplished to good marine practice. The quality of aluminum welding must meet U.S. Coast Guard standards, and the Contractor shall provide results of relevant and recent weld strength tests for State approval, before the start of construction. All materials installed on the vessel must be suitable for use in the marine environment and shall be chosen to provide strength and extended wear. The Contractor shall not use metal materials other than aluminum or stainless steel without specifically informing the State how the Contractor intends to deal with galvanic corrosion due to dissimilar metals.
SEC. 3.05 QUALITY OF EQUIPMENT AND COMPONENTS
The State requires that all equipment and components installed on the vessel, or provided with the vessel, be of a high quality suitable for service in a marine environment. All equipment and components must have a proven record of three years of successful service, working in a similar marine environment. No first models of any equipment or components shall be installed or provided by the Contractor unless approved by the State.
SEC. 3.06 CONTRACT TERM AND WORK SCHEDULE
The length of the contract will be from the date of award, approximately February 10, 2025, until completion at the construction facility and underway or shipped to the delivery location in Kodiak, Alaska no later than 18 months after the date of award, approximately July 31, 2026. Offerors are advised that the State considers the above construction/delivery schedule adaptable within justifiable reason due to the current demand. Any estimation by the offeror of a delivery date beyond July 31, 2026, must be clearly identified in the proposal with justification and be mutually accepted by the State and the offeror.
The Contractor shall complete construction of the vessel with appropriate inspections done by State representatives at various completion phases of construction.
The Contractor shall deliver the vessel in the water for sea trials and initial acceptance at agreed upon location.
Sea trials and final acceptance of the vessel shall be completed by the State.
Unless otherwise provided in this RFP, the State and the successful offeror/contractor agree: (1) that any extension of the contract excluding any exercised renewal options, will be considered as a month-to-month extension, and all other terms and conditions shall remain in full force and effect and (2) the Procurement Officer will provide notice to the Contractor of the intent to cancel such month-to-month extension at least 30 days before the desired date of cancellation. A month-to-month extension may only be executed by the Procurement Officer via a written contract amendment.
SEC. 3.07 DELIVERABLES
The Contractor will be required to provide the following deliverables:
A. One completed vessel underway to Kodiak, Alaska after meeting the specifications in Section 3 Scope of Work Specifications, to include the passing of all sea trials.
SEC. 3.08 CONTRACT TYPE
The contract is a firm, fixed-priced contract.
SEC. 3.09 PROPOSED PAYMENT PROCEDURES
The State will make payments based on a negotiated payment schedule. Each billing must consist of an invoice and progress report. No payment will be made until the progress report, and the invoice has been approved by the Project Manager.
SEC. 3.10 PROMPT PAYMENT FOR STATE PURCHASES
Not applicable for this RFP.
SEC. 3.11 CONTRACT PAYMENT
No payment will be made until the contract is approved by the Commissioner of the Department of Natural Resources or the Commissioner's designee. Under no conditions will the State be liable for the payment of any interest charges associated with the cost of the contract. The State is not responsible for and will not pay federal, state, or local taxes. All costs associated with the contract must be stated in U.S. currency.
Payment for agreements under $500,000.00 for the undisputed purchase of goods or services provided to a State agency, will be made within 30 days of the receipt of a proper billing or the delivery of the goods or services to the location(s) specified in the agreement, whichever is later.
A late payment is subject to 1.5% interest per month on the unpaid balance. Interest will not be paid if there is a dispute or if there is an agreement that establishes a lower interest rate or precludes the charging of interest.
Any single contract payment of $1 million or higher must be accepted by the Contractor via Electronic Funds Transfer (EFT).
SEC. 3.12 CONTRACT PRICE ADJUSTMENTS
Not applicable for this RFP.
SEC. 3.13 LOCATION OF WORK
The location(s) the work is to be performed, completed, and managed is the Contractor’s place of business.
The State will not provide workspace for the Contractor. The Contractor must provide its own workspace. Travel will not be required.
By signature on their proposal, the offeror certifies that all services provided under this contract by the Contractor and all subcontractors shall be performed in the United States.
If the offeror cannot certify that all work will be performed in the United States, the offeror must contact the Procurement Officer in writing to request a waiver at least 10 days prior to the deadline for receipt of proposals.
The request must include a detailed description of the portion of work that will be performed outside the United States, where, by whom, and the reason the waiver is necessary.
Failure to comply with these requirements may cause the State to reject the proposal as non-responsive or cancel the contract.
SEC. 3.14 THIRD-PARTY SERVICE PROVIDERS
Not applicable for this RFP.
SEC. 3.15 SUBCONTRACTORS
Subcontractor experience shall not be considered in determining whether the offeror meets the requirements set forth in SEC. 1.04 PRIOR EXPERIENCE AND MINIMUM REQUIREMENTS.
If a proposal with subcontractors is selected, the offeror must provide the following information concerning each prospective subcontractor within five working days from the date of the State's request:
• complete name of the subcontractor;
• complete address of the subcontractor;
• type of work the subcontractor will be performing;
• percentage of work the subcontractor will be providing;
• evidence that the subcontractor holds, or will hold a valid Alaska business license at time of award;
• a written statement, signed by each proposed subcontractor, that clearly verifies that the subcontractor is committed to rendering the services required by the contract.
The substitution of one subcontractor for another may be made only at the discretion and prior written approval of the Project Manager.
Note that if the subcontractor will not be performing work within Alaska, they will not be required to hold an Alaska business license.
SEC. 3.16 JOINT VENTURES
Joint ventures will not be allowed.
SEC. 3.17 RIGHT TO INSPECT PLACE OF BUSINESS
At reasonable times, the State may inspect those areas of the Contractor's place of business that are related to the performance of a contract. If the State makes such an inspection, the Contractor must provide reasonable assistance.
SEC. 3.18 F.O.B. POINT
All goods purchased through this contract will be F.O.B. final destination. Unless specifically stated otherwise, all prices offered must include the delivery costs to any location within the State of Alaska.
SEC. 3.19 CONTRACT PERSONNEL
Any change of the project team members or subcontractors named in the proposal must be approved, in advance and in writing, by the Project Manager or Procurement Officer. Changes that are not approved by the State may be grounds for the State to terminate the contract.
SEC. 3.20 INSPECTION & MODIFICATION - REIMBURSEMENT FOR UNACCEPTABLE
DELIVERABLES
The Contractor is responsible for the completion of all work set out in the contract. All work is subject to inspection, evaluation, and approval by the Project Manager. The State may employ all reasonable means to ensure that the work is progressing and being performed in compliance with the contract. The Project Manager or Procurement Officer may instruct the Contractor to make corrections or modifications if needed in order to accomplish the contract’s intent. The Contractor will not unreasonably withhold such changes.
The substantial failure of the Contractor to perform the contract may cause the State to terminate the contract. In this event, the State may require the Contractor to reimburse monies paid (based on the identified portion of unacceptable work received) and may seek associated damages.
SEC. 3.21 LIQUIDATED DAMAGES
Not applicable for this RFP.
SEC. 3.22 CONTRACT CHANGES - UNANTICIPATED AMENDMENTS
During the course of this contract, the Contractor may be required to perform additional work.
That work will be within the general scope of the initial contract. When additional work is required, the Project Manager will provide the Contractor a written description of the additional work and request the Contractor to submit a firm time schedule for accomplishing the additional work and a firm price for the additional work. Cost and pricing data must be provided to justify the cost of such amendments per AS 36.30.400.
The Contractor will not commence additional work until the Procurement Officer has secured any required State approvals necessary for the amendment and issued a written contract amendment, approved by the Commissioner of the Department of Natural Resources or the Commissioner's designee.
SEC. 3.23 NONDISCLOSURE AND CONFIDENTIALITY
The Contractor agrees that all confidential information shall be used only for purposes of providing the deliverables and performing the services specified herein and shall not disseminate or allow dissemination of confidential information except as provided for in this section.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .